PROYECTO :
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE
RINCONADA DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
REDES REDES
TOTAL
ITEM DESCRIPCION PRIMARIAS SECUNDARIAS
(S/.)
(S/.) (S/.)
COSTO (S/. )
PARCIAL
255.00
S/. 255.00
4927.50
245.00
S/. 5,172.50
75.30
38.30
1290.00
S/. 1,403.60
933.57
3001.21
S/. 3,934.78
21.00
16.80
248.40
11.90
14.40
349.80
S/. 662.30
1377.50
384.00
87.00
S/. 1,848.50
12.15
27.00
37.75
114.40
78.84
4.35
45.90
18.50
40.00
70.00
248.00
S/. 696.89
222.50
52.60
187.20
152.00
3.78
17.36
12.24
180.00
530.00
114.00
S/. 1,471.68
525.00
71.40
41.00
186.00
63.00
455.00
980.90
S/. 2,322.30
4100.00
4100.00
S/. 8,200.00
1035.00
8.20
19.00
855.00
S/. 1,917.20
4750.00
4980.00
S/. 9,730.00
NISTRO DE EQUIPOS Y MATERIALES
SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO DE CARAZ, PROVINCIA
DE HUAYLAS, DEPARTAMENTO DE ANCASH
81.00
280.50
213.00
S/. 574.50
MONTAJE ELECTROMECANICO
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO DE CARAZ, PROVINCIA
DE HUAYLAS, DEPARTAMENTO DE ANCASH
PROYECTISTAING° CELESTINO PAICO CARLOS
SECCION I: REDES PRIMARIAS 13.2 KV MRT FECHA: marzo-22
1.02 ELABORACIÓN, GESTIÓN DE APROBACIÓN Y EJECUCIÓN DEL PLAN DE MONITOREO ARQUEOLÓGICO glob. 0.50 0.50 1.00 3178.12 3,178.12
(CIRA) EN LA ETAPA DE EJECUCION DE OBRAS DEL PROYECTO (RP Y RS)
1.03 ELABORACION Y EJECUCION DEL PMA (DIA) DEL PROYECTO (RP Y RS) glob. 0.50 0.50 1.00 9442.46 9,442.46
1.04 ELABORACION Y GESTION DEL SISTEMA ELECTRICO RURAL (SER) ANTE EL MINEM glob. 0.50 0.50 1.00 4132.46 4,132.46
1.05 REPLANTEO TOPOGRÁFICO Y UBICACIÓN DE ESTRUCTURAS EN REDES PRIMARIAS glob. 0.50 0.50 1.00 421.40 421.40
1.06 INGENIERIA DE DETALLE DE LAS REDES PRIMARIAS glob. 0.50 0.50 1.00 819.60 819.60
GESTION DE SERVIDUMBRE E INFORME TECNICO SUSTENTATORIO (1 ORIG. + 3 COPIAS) INCLUYE
1.07 LEVANTAMIENTO TOPOGRAFICO Y RESENTACION DIGITALIZADA DEL EXPEDIENTE CONTENIDA EN glob. 0.50 0.50 1.00 3928.80 3,928.80
UN CD
1.08 CAMPAMENTOS Y ALMACENES (INCLUYE RP Y RS) glob. 0.50 0.50 1.00 1882.63 1,882.63
SUB-TOTAL 1 24,703.88
2.00 INSTALACION DE POSTES DE CONCRETO
2.01 TRANSPORTE DE POSTE DE CONCRETO 12/400 Kgf DE ALMACEN A PUNTO DE IZAJE Und 1.00 4.00 5.00 146.53 732.65
2.02 EXCAVACIÓN EN TERRENO NORMAL m3 0.45 1.80 2.25 51.61 116.12
2.03 EXCAVACIÓN EN TERRENO ROCOSO m3 0.30 1.20 1.50 106.41 159.62
2.04 IZADO DE POSTE DE CONCRETO DE 12 m / 400 Kgf Und 1.00 4.00 5.00 111.04 555.20
2.05 RELLENO Y COMPACTACIÓN PARA CIMENTACIÓN DE POSTE DE C.A.C. m3 0.62 2.48 3.10 57.19 177.29
2.06 PINTADO DE BASE DE POSTE CON ALQUITRAN. Und 1.00 4.00 5.00 15.81 79.05
SUB-TOTAL 2 1,819.93
3.00 INSTALACION DE RETENIDAS
3.01 EXCAVACIÓN EN TERRENO NORMAL m3 0.00 3.02 3.02 51.61 156.07
3.02 EXCAVACIÓN EN TERRENO ROCOSO m3 0.00 4.03 4.03 106.41 429.05
3.03 INSTALACIÓN DE RETENIDA SIMPLE O INCLINADA Und 0.00 4.00 4.00 72.41 289.64
3.04 RELLENO Y COMPACTACIÓN PARA EL BLOQUE DE ANCLAJE m3 0.00 5.04 5.04 48.16 242.73
SUB-TOTAL 3 1,117.48
4.00 MONTAJE DE ARMADOS
4.01 ARMADO TIPO DT-0 jgo. 1.00 1.00 2.00 64.11 128.22
4.02 ARMADO TIPO PSEC-1P jgo. 1.00 1.00 130.59 130.59
4.03 ARMADO TIPO PA3-0 jgo. 1.00 1.00 68.60 68.60
4.04 ARMADO TIPO PR3-0 jgo. 1.00 1.00 79.18 79.18
4.05 ARMADO TIPO SAM1-1P jgo. 1.00 1.00 2.00 768.33 1,536.66
SUB-TOTAL 4 1,943.25
5.00 MONTAJE DE CONDUCTORES DE ALEACION DE ALUMINIO
5.01 TENDIDO Y PUESTA EN FLECHA CONDUCTOR DE ALEACIÓN DE Al DE 50 mm2, POR FASE Km 0.04 0.26 0.30 1,111.93 334.86
5.02 TENDIDO Y PUESTA EN FLECHA CONDUCTOR DE ALEACIÓN DE Al DE 70 mm2, POR FASE Km 0.00 0.82 0.82 1,474.24 1,212.19
SUB-TOTAL 5 1,547.05
6.00 INSTALACION DE PUESTA A TIERRA
6.01 EXCAVACIÓN EN TERRENO NORMAL m3 2.45 4.48 6.92 51.61 357.35
6.02 EXCAVACIÓN EN TERRENO ROCOSO m3 1.63 2.98 4.62 106.41 491.19
6.03 INSTALACION DE PUESTA A TIERRA TIPO PAT-1 EN POSTES DE CAC jgo. 3.00 4.00 7.00 62.09 434.63
6.04 INSTALACION DE PUESTA A TIERRA TIPO PAT-2 EN POSTES DE CAC jgo. 0.00 2.00 2.00 23.54 47.08
6.05 RELLENO Y COMPACTACIÓN DE PUESTA A TIERRA m3 4.08 7.46 11.54 54.12 624.54
SUB-TOTAL 6 1,954.79
7.00 PRUEBAS Y PUESTA EN SERVICIO
7.01 PRUEBAS Y PUESTA EN SERVICIO DE LAS LINEAS PRIMARIAS glob. 0.50 0.50 1.00 877.92 877.92
7.02 PAGO POR SUSPENSION TEMPORAL DEL SERVICIO ELECTRICO PARA CONEXIÓN EN PUNTO DE DI glob. 0.50 0.50 1.00 4600.00 4,600.00
7.03 EXPEDIENTES TECNICOS FINAL CONFORME A OBRA (1 ORIGINAL + 3 COPIAS), DE LINEAS PRIMARIAS, glob. 0.50 0.50 1.00 2563.10 2,563.10
INCLUYE LA PRESENTACION DIGITALIZADA DE TEXTOS Y PLANOS EN CD.
7.04 SEÑALIZACION Y CODIFICACION DE POSTES DE CAC DE 12m Und 1.00 4.00 5.00 52.43 262.15
SUB-TOTAL 7 8,303.17
8.00 PRUEBAS Y PUESTA EN SERVICIO
8.01 EQUIPOS DE SEGURIDAD (EPP) Glob. 1.00 6422.40 6,422.40
8.02 ELABORACION, IMPLENETACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD Mes 2.00 3500.00 7,000.00
8.03 EQUIPOS DE PROTECCION COLECTIVA Glob. 1.00 2145.60 2,145.60
8.04 RECURSOS PARA RESPUESTA ANTE EMERGENCIA EN SALUD DURANTE EL TRABAJO Glob. 1.00 3,500.00 3,500.00
SUB-TOTAL 7 19,068.00
TOTAL MONTAJE ELECTROMECANICO
2
0
ESTRUCT. POSTE Nº
SECCIÓN
SUB TOTAL
ARMADO - ESTRUCTURA
DT-0
DETALLE Y
UBICACIÓN
UBICACION
SAM1-1P
PROYECTO :
VANO ATRAS (m)
40.0
2.00
38.00
CONDUCTOR AAAC 50 mm2
METRADO /
43.9
2.10
CONDUCTOR
41.80
POSTE NORMALIZADO DE C.A.C.
0.00
12/300 Kgf
POSTE NORMALIZADO DE C.A.C.
1.0
1.00
12/400 Kgf
Cruceta madera tratada 90x115mm
1.00
1.00
sección, 1.50m long
ACCESORIOS
POSTES DE C.A.C. Y
1.00
1.00
AºGº 38x38x6mm sec, 710mm long
Aislador de porcelana tipo PIN, clase
0.00
ANSI 56-3
RINCONADA - CARAZ - HUAYLAS - ANCASH
2.00
1.00
1.00
de 25KV
Espiga para cabeza de poste, para
0.00
aislador tipo PIN clase ANSI 56-3
Perno maquinado A°G° 13mmøx254mm
1.00
1.00 long, 152mm, con tuerca y contratuerca
tuerca y contratuerca
1.6
1.0
1.00
2.0
1.0
1.0
mm2
5.0
5.0
de oxido metálico
OTROS
SECCIONAD /
20.5
18.0
Retenida contrapunta
RETENIDAS Y PUESTA A TIERRA
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
3
3
S.E.
SECCIÓN
SUB TOTAL
ARMADO - ESTRUCTURA
DT-0
PA3-0
PR3-0
PROYECTO
DETALLE Y
UBICACION
UBICACIÓN
PSEC-1P
SAM1-1P
2.0
VANO ATRAS (m)
35.0
23.0
715.0
CONDUCTOR AAAC 50 mm2
2.10
36.75
24.15
185.0 194.25
METRADO /
CONDUCTOR
CONDUCTOR AAAC 70 mm2
1
1
1
1
4
Kgf
Cruceta madera tratada 90x115mm sección,
1
1
2
1.50m long
ACCESORIOS
1
1
2
REDES PRIMARIAS 13.2 KV MRT
1
56-3
1
2
2
2
1
8
RINCONADA - CARAZ - HUAYLAS - ANCASH
1
aislador tipo PIN clase ANSI 56-3
Perno maquinado A°G° 13mmøx254mm
1
2
1
4
long, 152mm, con tuerca y contratuerca
Perno maquinado AºGº 16mmøx356mm
1
1
2
long, 152mm, con tuerca y contratuerca
Perno doble armado AºGº 16mmØx508mm,
3
3
con 4 tuercas
Perno cabeza coche AºGº 13mmø x
1
1
2
152mm, 76mm maquinado, con arandela,
tuerca y contratuerca
1
2
2
2
1
6
Cinta plana de armar
Arandela cuadrada curva AºGº,
4
4
6
8
2
24
perno de 16mmØ
SE02 CASERIO TUPAC AMARU
10
10.0
de 16 mm2
Seccionador fusible tipo
1
1
de oxido metálico
OTROS
1
1
2
SECCIONAD /
18.0
18.0
18.0
18.0
74.5
12.0
15
3
1
10 KVA
ANALISIS DE PRECIOS UNITARIOS RED PRIMARIA
PROYECTO :
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE
RINCONADA DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE
ANCASH
UBICACIÓN : RINCONADA - CARAZ - HUAYLAS - ANCASH
FECHA : marzo-22
Sub-total 414.56
MANO DE OBRA
Capataz 0.10 h-h 0.80 16.15 12.92 047
Operario 1.00 h-h 8.00 12.58 100.64 047
Oficial 1.00 h-h 8.00 11.42 91.36 047
Peón 2.00 h-h 16.00 10.16 162.56 047
Sub-total 367.48
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4x2, 122 HP, 8 TN. 0.10 h-m 0.80 122.50 98.00 049
Herramientas 5% M.O % 5.00 367.48 18.37 048
Sub-total 116.37
TOTAL S/. 898.41
Sub-total 289.54
MANO DE OBRA
Arqueologo 1.00 h-h 32.00 20.00 640.00 047
Peón 1.00 h-h 32.00 10.16 325.12 047
Sub-total 965.12
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 1.00 h-m 32.00 58.60 1875.20 049
Herramientas 5% M.O % 5.00 965.12 48.26 048
Sub-total 1923.46
TOTAL S/. 3178.12
PARTIDA : Elaboración de la Declaració Jurada Ambiental y Ejecución del Plan de Manejo Ambiental
del Proyecto (Incluye Red Primaria y Red Secundaria)
UNIDAD : Km
RENDIMIENTO : 0.5 km/día
Sub-total 5389.97
MANO DE OBRA
Especialista en Estudios de Impacto Ambiental 1.00 h-h 16.00 20.83 333.28 047
Asistente de Ingeniería 1.00 h-h 16.00 14.58 233.28 047
Presentacion de expedientes 1.00 gbl 2.00 1200.00 2400.00 047
Sub-total 2966.56
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 1.00 h-m 16.00 58.60 937.60 049
Herramientas 5% M.O % 5.00 2966.56 148.33
Sub-total 1085.93
TOTAL S/. 9442.46
ANALISIS DE PRECIOS UNITARIOS RED PRIMARIA
PROYECTO :
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE
RINCONADA DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE
ANCASH
UBICACIÓN : RINCONADA - CARAZ - HUAYLAS - ANCASH
FECHA : marzo-22
Sub-total 709.97
MANO DE OBRA
Ing. 1.00 h-h 16.00 20.83 333.28 047
Asistente de Ingeniería 1.00 h-h 16.00 14.58 233.28 047
Presentacion de expedientes 1.00 gbl 1.00 1800.00 1800.00
Sub-total 2366.56
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 1.00 h-m 16.00 58.60 937.60 049
Herramientas 5% M.O % 5.00 2366.56 118.33
Sub-total 1055.93
TOTAL S/. 4132.46
Sub-total 11.36
MANO DE OBRA
Ingeniero de Redes Primarias 1.00 h-h 2.67 20.83 55.62 047
Técnico especialista en dibujo por computadora 0.50 h-h 1.33 12.42 16.52 047
Topógrafo Operador de Estación Total 1.00 h-h 2.67 15.03 40.13 047
Oficial 2.00 h-h 5.33 11.42 60.87 047
Peón 2.00 h-h 5.33 10.16 54.15 047
Sub-total 227.29
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.50 h-m 1.33 58.60 77.94 049
Equipo de Estación Total y accesorios 1.00 h-m 2.67 35.00 93.45 049
Herramientas 5% mano de obra % 5.00 227.29 11.36 048
Sub-total 182.75
TOTAL S/. 421.40
Sub-total 26.60
MANO DE OBRA
Ingeniero de Redes Primarias 1.00 h-h 16.00 20.83 333.28 047
Técnico especialista en dibujo por computadora 1.00 h-h 16.00 12.42 198.72 047
Sub-total 532.00
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.25 h-m 4.00 58.60 234.40 049
Herramientas 5% mano de obra % 5.00 532.00 26.60 048
Sub-total 261.00
TOTAL S/. 819.60
Sub-total 3514.16
MANO DE OBRA
Ingeniero de Redes Primarias 1.00 h-h 8.00 20.83 166.64 047
Asistente de Ingeniería 1.00 h-h 8.00 14.58 116.64 047
Sub-total 283.28
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.25 h-m 2.00 58.60 117.20 049
Herramientas 5% mano de obra % 5.00 283.28 14.16 048
Sub-total 131.36
TOTAL S/. 3928.80
Sub-total 1681.36
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.25 h-m 2.00 58.60 117.20 049
Herramientas 5% mano de obra % 5.00 1681.36 84.07 048
Sub-total 201.27
TOTAL S/. 1882.63
Sub-total 3.88
MANO DE OBRA
Capataz 0.20 h-h 0.13 16.15 2.10 047
Oficial 1.00 h-h 0.67 11.42 7.65 047
Peón 10.00 h-h 6.67 10.16 67.77 047
Sub-total 77.52
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.75 h-m 0.50 122.50 61.25 049
Herramientas 5% mano de obra % 5.00 77.52 3.88 048
Sub-total 65.13
TOTAL S/. 146.53
Sub-total 1.57
MANO DE OBRA
Capataz 0.1 h-h 0.14 16.15 2.26 047
Peón 2 h-h 2.86 10.16 29.06 047
ANALISIS DE PRECIOS UNITARIOS RED PRIMARIA
PROYECTO :
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE
RINCONADA DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE
ANCASH
UBICACIÓN : RINCONADA - CARAZ - HUAYLAS - ANCASH
FECHA : marzo-22
Sub-total 31.32
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4x2, 122 HP, 8 TN. 0.10 h-m 0.14 122.50 17.15 049
Herramientas 5% mano de obra % 5.00 31.32 1.57 048
Sub-total 18.72
TOTAL S/. 51.61
Sub-total 3.32
MANO DE OBRA
Capataz 0.50 h-h 0.40 16.15 6.46 047
Operario 1.00 h-h 0.80 12.58 10.06 047
Oficial 1.00 h-h 0.80 11.42 9.14 047
Peón 5.00 h-h 4.00 10.16 40.64 047
Sub-total 66.30
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.15 h-m 0.12 122.50 14.70 049
Pluma de Izaje 1 h-m 0.80 19.25 15.40 049
Teodolito 1 h-m 0.80 10.00 8.00 049
Herramientas 5% de mano de obra 1 % 5.00 66.30 3.32 048
Sub-total 41.42
TOTAL S/. 111.04
Sub-total 5.96
MANO DE OBRA
Capataz 0.10 h-h 0.09 16.15 1.45 047
Oficial 1.00 h-h 0.89 11.42 10.16 047
Peón 2.00 h-h 1.78 10.16 18.08 047
Sub-total 29.69
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.10 h-m 0.09 122.50 11.03 049
Herramientas 5% mano de obra % 5.00 29.69 1.48 048
Sub-total 12.51
TOTAL S/. 48.16
Sub-total 1.27
MANO DE OBRA
Capataz 0.20 h-h 0.11 16.15 1.78 047
Operario 1.00 h-h 0.53 12.58 6.67 047
Oficial 1.00 h-h 0.53 11.42 6.05 047
Peón 2.00 h-h 1.07 10.16 10.87 047
Sub-total 25.37
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.27 122.50 33.08 049
Caja de herramientas 2.00 h-m 1.07 2.00 2.14 037
Escalera 1.00 h-m 0.53 1.85 0.98 048
Herramientas 5% mano de obra % 5.00 25.37 1.27 048
Sub-total 37.47
TOTAL S/. 64.11
Camión plataforma 4X2, 122 HP, 8 TN. 0.50 h-m 0.33 122.50 40.43 049
Caja de herramientas 2.00 h-m 1.33 2.00 2.66 037
Escalera 1.00 h-m 0.67 1.85 1.24 048
Herramientas 5% mano de obra % 5.00 31.69 1.58 048
Sub-total 45.91
TOTAL S/. 79.18
PARTIDA : Armado SAM-1P S.E. 1ø, Monoposte en fin de línea, con pararrayos.
UNIDAD : Und.
RENDIMIENTO : 2.5 Und/dia
Sub-total 1.50
MANO DE OBRA
Capataz 0.20 h-h 0.16 16.15 2.58 047
Operario 1.00 h-h 0.80 12.58 10.06 047
Oficial 1.00 h-h 0.80 11.42 9.14 047
Peón 1.00 h-h 0.80 10.16 8.13 047
Sub-total 29.91
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 0.20 122.50 24.50 049
Caja de herramientas 2.00 h-m 1.60 2.00 3.20 037
Escalera 1.00 h-m 0.80 1.85 1.48 048
Herramientas 5% mano de obra % 5.00 29.91 1.50 048
Sub-total 30.68
TOTAL S/. 62.09
Sub-total 0.75
MANO DE OBRA
Capataz 0.20 h-h 0.08 16.15 1.29 047
Operario 1.00 h-h 0.40 12.58 5.03 047
Oficial 1.00 h-h 0.40 11.42 4.57 047
Peón 1.00 h-h 0.40 10.16 4.06 047
Sub-total 14.95
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.20 h-m 0.08 58.60 4.69 049
Escalera 1.00 h-m 0.40 2.00 0.80 048
Caja de herramientas 2.00 h-m 0.80 2.00 1.60 037
Herramientas 5% mano de obra % 5.00 14.95 0.75 048
Sub-total 7.84
TOTAL S/. 23.54
Sub-total 0.67
MANO DE OBRA
Capataz 0.10 h-h 0.11 16.15 1.78 047
Oficial 1.00 h-h 1.14 11.42 13.02 047
Peón 2.00 h-h 2.29 10.16 23.27 047
Sub-total 38.07
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.10 h-m 0.11 122.50 13.48 049
Herramientas 5% mano de obra % 5.00 38.07 1.90 048
Sub-total 15.38
TOTAL S/. 54.12
Sub-total 21.44
MANO DE OBRA
Capataz 1.00 h-h 4.00 16.15 64.60 047
Operario 3.00 h-h 12.00 12.58 150.96 047
Oficial 2.00 h-h 8.00 11.42 91.36 047
Peón 3.00 h-h 12.00 10.16 121.92 047
Sub-total 428.84
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 1.00 h-m 4.00 58.60 234.40 049
Motosierra 1.00 h-m 4.00 6.50 26.00 037
Teodolito 1.00 h-m 4.00 11.20 44.80 037
Medidor de aislamiento eléctrico 1.00 h-m 4.00 6.80 27.20 049
Medidor de resistencia de puesta a tierra 1.00 h-m 4.00 6.80 27.20 049
Termometro de línea 1.00 h-m 4.00 3.65 14.60 049
Caja de herramientas 4.00 h-m 16.00 2.00 32.00 037
Herramientas 5% mano de obra % 5.00 428.84 21.44 048
Sub-total 427.64
TOTAL S/. 877.92
Sub-total 4600.00
Sub-total 517.49
ANALISIS DE PRECIOS UNITARIOS RED PRIMARIA
PROYECTO :
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE
RINCONADA DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE
ANCASH
UBICACIÓN : RINCONADA - CARAZ - HUAYLAS - ANCASH
FECHA : marzo-22
MANO DE OBRA
Especialista en Estudios de Impacto Ambiental 1.00 h-h 8.00 20.83 166.64 047
Asistente de Ingeniería 0.50 h-h 4.00 14.58 58.32 047
Presentacion de expedientes 0.50 gbl 1.00 1500.00 1500.00
Sub-total 1724.96
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.50 h-m 4.00 58.60 234.40 049
Herramientas 5% M.O % 5.00 1724.96 86.25
Sub-total 320.65
TOTAL S/. 2563.10
Sub-total 0.97
MANO DE OBRA
Capataz 1.00 h-h 0.53 16.15 8.56 047
Peón 2.00 h-h 1.07 10.16 10.87 047
Sub-total 19.43
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 1.00 h-m 0.53 58.60 31.06 049
Herramientas 5% mano de obra % 5.00 19.43 0.97 048
Sub-total 32.03
TOTAL S/. 52.43
FORMULA POLINOMICA - RED PRIMARIA
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL BARRIO ICHOHUAYLAS DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS,
PROYECTO:
DEPARTAMENTO DE ANCASH
FECHA : marzo-22
INDICE SIMBOLO
Nº ELEMENTO REPRESENTATIVO SIMBOLO MONTO INCIDENCIA % PARCIAL COEFICIENTE
UNIFICADO MONOMIO
1 POSTES DE CONCRETO 062 PC PC 5,172.50 0.135 43.96% 0.3081
CRUCETAS DE MADERA 043 MN 255.00 0.007 2.17%
FERRETERIA PARA POSTES 002 FP 696.89 0.018 5.92%
RETENIDAS Y ANCLAJES 002 FE 1,471.68 0.039 12.51%
CONDUCTOR DE COBRE Y ACCESORIOS 006 CU 1,848.50 0.048 15.71%
MATERIAL PARA PUESTA A TIERRA 006 PT 2,322.30 0.061 19.74%
2 EQUIPOS DE PROTECCIÓN 011 AE1 AE 1,917.20 0.050 22.58% 0.2224
AISLADORES Y ACCESORIOS 011 AE2 1,403.60 0.037 16.53%
CABLES DE ENERGÍA 019 NY 574.50 0.015 6.76%
CONDUCTORES DE AAAC Y ACCESORIOS 030 DI 4,597.08 0.120 54.13%
3 TRANSFORMADORES DE DISTRIBUCIÓN Y TABLEROS 048 EN EN 17,930.00 0.470 100.00% 0.4695
4 MONTAJE ELECTROMECANICO 047 J J 0.00 0.000 #DIV/0! 0.0000
TRANSPORTE 032 FT 0.00 0.000 #DIV/0!
5 GASTOS GENERALES Y UTILIDADES 039 GG GG 0.00 0.000 #DIV/0! 0.0000
38,189.25 1.000
K= 0.30812 PCr/PCo + 0.22238 AEr/AEo + 0.4695 ENr/ENo + 0 Jr/Jo + 0 GGr/GGo
NOTAS:
1.- En la fórmula los sub-indices "o" de cada símbolo corresponden al indice de precios según (CREPCO) a la fecha de Elaboración del Presupuesto (Presupuesto Base)
y los sub-indices "r" al indice de precios al momento de reajuste o fecha de valorización.
2.- En el caso de los monomios compuestos por varios indices se ha considerado para efecto de denominación el símbolo que tiene mayor porcentaje de incidencia.
3.- En caso de cambios en el suministro se deberá actualizar la formula polinómica.
SUMINISTRO DE EQUIPOS Y MATERIALES
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL BARRIO ICHOHUAYLAS DEL
PROYECTO:
DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
SECCION II: REDES SECUNDARIAS - 440/220 V FECHA: Aug-21
METRADO
9.08 MEDIDOR MONOF. ENERGIA ACTIVA, TIPO ELECTRONICO CON MICRO PROCESADOR DE 220 V; 5-40A; 60 Hz. Und 219.00
9.00 TRANSPORTE DE EQUIPOS Y MATERIALES (DE FABRICA A ALMACEN DE OBRA)
9.01 TRANSPORTE DE EQUIPOS Y MATERIALES (COSTO 10% DE INSUMOS RS) glb 1.00
MONTAJE ELECTROMECANICO
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL BARRIO ICHOHUAYLAS DEL DISTRITO DE CARAZ,
PROYECTO:
PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
SECCION III: REDES SECUNDARIAS - 440/220 V FECHA: abril-21
METRADO
1.01 REPLANTEO TOPOGRAFICO, UBICACION DE ESTRUCTURAS E INGENIERIA DE DETALLE DE LAS REDES SECUNDARIAS Local 1.00 1.00
Estruct. Dist. Postes de CAC Tipo Armado Grapa Grapa TIPO DE CONDUCTORES Retenidas Alumb. Acometidas
PAT
Nº Vano (m) anclaje suspens. Pub.
8/200 8/300 Princ. Secund. 2x16+16+NP25 2x16+NP25 1x16+NP25 RI RV Corta Larga Conect.
CIRCUITO C-1
SE 2.00 12/400 - - E4' 2 - 2x16+16+NP25 2.00 0.00 0.00 1 - - -
1 25.00 8/300 - 1 E4 E4 4 - 2x16+16+NP25 25.00 0.00 0.00 2 - - - 1 2
2 37.00 8/300 - 1 E4 2 - 2x16+16+NP25 37.00 0.00 0.00 1 - - - - -
3 50.00 8/200 1 - E1 - 1 2x16+16+NP25 50.00 0.00 0.00 - - - - - -
4 48.00 8/200 1 - E1 - 1 2x16+16+NP25 48.00 0.00 0.00 - - - - - -
5 50.00 8/200 1 - E1 - 1 2x16+16+NP25 50.00 0.00 0.00 - - - - - -
6 54.00 8/300 - 1 E4 2 - 2x16+16+NP25 54.00 0.00 0.00 2 - 1 1 1 1 4
7 55.00 8/200 1 - E1 - 1 2x16+16+NP25 55.00 0.00 0.00 - - - - - -
8 55.00 8/200 1 - E1 - 1 2x16+16+NP25 55.00 0.00 0.00 - - - - - -
9 55.00 8/200 1 - E1 - 1 2x16+16+NP25 55.00 0.00 0.00 - - - - - -
10 65.00 8/200 1 - E1 - 1 2x16+16+NP25 65.00 0.00 0.00 - - - - - -
11 61.00 8/300 - 1 E6 3 - 2x16+16+NP25 61.00 0.00 0.00 2 - 1 - - - -
12 254.00 8/300 - 1 E3 E3 2 - 2x16+16+NP25 254.00 0.00 0.00 2 - 1 - - - -
13 52.00 8/200 1 - E1 - 1 2x16+16+NP25 52.00 0.00 0.00 - - - - - -
14 52.00 8/200 1 - E1 - 1 2x16+16+NP25 52.00 0.00 0.00 - - - - - -
15 52.00 8/200 1 - E1 - 1 2x16+16+NP25 52.00 0.00 0.00 - - - - - -
16 54.00 8/300 - 1 E4 2 - 2x16+16+NP25 54.00 0.00 0.00 2 - - 1 - 2
17 35.00 8/200 1 - E1 - 1 2x16+16+NP25 35.00 0.00 0.00 - - - - - -
18 38.00 8/300 - 1 E3 1 - 2x16+16+NP25 38.00 0.00 0.00 1 - 1 1 1 2 6
1.1 217.00 8/300 - 1 E4 2 - 2x16+16+NP25 217.00 0.00 0.00 2 - 1 1 2 - 4
1.2 75.00 8/200 1 - E1 - 1 2x16+16+NP25 75.00 0.00 0.00 - - - - - -
1.3 121.00 8/300 - 1 E6 3 - 2x16+16+NP25 121.00 0.00 0.00 2 - 1 1 1 4
1.40 37.00 8/300 - 1 E6 3 - 2x16+16+NP25 37.00 0.00 0.00 2 - 1 2 - 4
1.5 137.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 137.00 - - - - - -
1.60 110.00 8/300 - 1 E4 2 - 1x16+NP25 0.00 0.00 110.00 2 - 1 - - - -
1.70 212.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 212.00 - - - - - -
1.80 55.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 55.00 1 - 1 - 1 - 2
1.90 53.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 53.00 - - - - - -
1.1 95.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 95.00 - - - - - -
1.11 57.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 57.00 1 - 1 - 1 - 2
11.1 55.00 8/200 1 - E1 - 1 2x16+NP25 0.00 55.00 0.00 - - - - - -
11.2 150.00 8/200 1 - E1 - 1 2x16+NP25 0.00 150.00 0.00 - - - - - -
11.3 52.00 8/300 - 1 E4 2 - 2x16+NP25 0.00 52.00 0.00 2 - 1 - 1 - 2
11.4 55.00 8/200 1 - E1 - 1 2x16+NP25 0.00 55.00 0.00 - - - - - -
11.50 55.00 8/300 - 1 E2 2 - 2x16+NP25 0.00 55.00 0.00 - - - 1 - 2
11.60 55.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 55.00 - - - - - -
11.70 58.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 58.00 1 - 1 - 1 - 2
1.3.1 56.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 56.00 1 - 1 - 1 - 2
1.4.1 55.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 55.00 1 - 1 - 1 - 2
PLANILLA DE METRADOS - REDES SECUNDARIAS
SE01 CASERIO RINCONADA
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
Estruct. Dist. Postes de CAC Tipo Armado Grapa Grapa TIPO DE CONDUCTORES Retenidas Alumb. Acometidas
PAT
Nº Vano (m) anclaje suspens. Pub.
8/200 8/300 Princ. Secund. 2x16+16+NP25 2x16+NP25 1x16+NP25 RI RV Corta Larga Conect.
CIRCUITO C-2
1 33.00 8/300 - 1 E3 E3 2 - 2x16+16+NP25 33.00 0.00 0.00 1 - - - - -
2 159.50 8/200 1 - E1 - 1 2x16+16+NP25 159.50 0.00 0.00 - - 1 - - - -
3 136.00 8/300 - 1 E4 2 - 2x16+16+NP25 136.00 0.00 0.00 2 - - - - -
4 175.00 8/200 1 - E1 - 1 2x16+16+NP25 175.00 0.00 0.00 - - 1 - - - -
5 85.00 8/200 1 - E1 - 1 2x16+16+NP25 85.00 0.00 0.00 - - - - - -
6 69.00 8/300 - 1 E5 1 1 2x16+16+NP25 69.00 0.00 0.00 1 - - - - -
7 75.00 8/300 - 1 E5 1 1 2x16+16+NP25 75.00 0.00 0.00 1 - 1 - - - -
8 72.00 8/200 1 - E1 - 1 2x16+16+NP25 72.00 0.00 0.00 - - - - - -
9 76.00 8/300 - 1 E3 E3 2 - 2x16+16+NP25 76.00 0.00 0.00 2 - 1 1 1 - 2
10 129.00 8/200 1 - E1 - 1 2x16+NP25 0.00 129.00 0.00 - - - - - -
11 190.00 8/300 - 1 E4 2 - 2x16+NP25 0.00 190.00 0.00 2 - 1 - - - -
12 120.00 8/200 1 - E1 - 1 2x16+NP25 0.00 120.00 0.00 - - - - - -
13 56.00 8/300 - 1 E4 2 - 2x16+NP25 0.00 56.00 0.00 2 - 1 - 1 - 2
14 180.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 180.00 - - - - - -
15 75.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 75.00 1 - 1 - 1 - 2
6.1 60.00 8/200 1 - E1 - 1 2x16+16+NP25 60.00 0.00 0.00 - - - - - -
6.2 55.00 8/200 1 - E1 - 1 2x16+16+NP25 55.00 0.00 0.00 1 - 1 1 - 2
6.3 115.00 8/300 - 1 E3 E3 2 - 2x16+16+NP25 115.00 0.00 0.00 1 - 1 1 1 4
6.4 33.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 33.00 - - 1 - 1 - 2
6.2.1 55.00 8/200 1 - E1 - 1 2x16+16+NP25 55.00 0.00 0.00 - - - - - -
6.2.2 75.00 8/300 - 1 E3 E3 2 - 2x16+16+NP25 75.00 0.00 0.00 2 - - 1 - 2
7.1 48.00 8/200 1 - E1 - 1 2x16+16+NP25 48.00 0.00 0.00 - - - 1 - 2
7.2 49.00 8/300 - 1 E3 1 - 2x16+16+NP25 49.00 0.00 0.00 1 - 1 1 1 1 4
7.3 45.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 45.00 - - - - - -
7.4 45.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 45.00 1 - 1 - 1 - 2
TOTAL 5064.50 32.00 31.00 57.00 34.00 2881.50 862.00 1321.00 45.00 0.00 22.00 10.00 25.00 7.00 64.00
CONTROL DE ARMADOS
TIPO E1 E2 E3 E4 E5 E6 TOTAL
Cantidad 32 1 20 11 2 3 69
Porta-
línea
-
1
-
-
-
-
1
-
-
-
-
-
-
-
-
-
1
-
2
1
-
1
1
-
-
-
1
-
-
1
-
-
1
-
1
-
1
1
1
ADOS - REDES SECUNDARIAS
Porta-
línea
###
-
-
-
-
-
-
-
-
1
-
-
-
1
-
1
-
1
1
1
-
1
1
1
-
1
25.00
PLANILLA DE METRADOS - REDES SECUNDARIAS
SE01 BARRIO ICHOHUAYLAS
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL BARRIO ICHOHUAYLAS DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
PROYECTO :
UBICACIÓN : RINCONADA - CARAZ - HUAYLAS - ANCASH
FECHA : marzo-22
1.00 28.50 8/300 - 1 E4 - 2 - 2x16+1x16/25 0.00 0.00 0.00 0.00 28.50 0.00 0.00 2 0 - 1
1.01 49.82 8/300 - 1 E6 - 2 - 2x16+1x16/25 0.00 0.00 0.00 0.00 49.82 0.00 0.00 0 - - 2
1.02 50.45 8/200 1 - E1 - - 1 2x16+1x16/25 0.00 0.00 0.00 0.00 50.45 0.00 0.00 0 - 1 2
1.03 34.1.5 8/200 1 - E1 - - 1 2x16+1x16/25 0.00 0.00 0.00 0.00 34.1.5 0.00 0.00 0 - - 3
1.04 35.51 8/200 1 - E1 - - 1 2x16+1x16/25 0.00 0.00 0.00 0.00 35.51 0.00 0.00 0 - 1 2
1.05 63.19 8/200 1 - E1 - 2 - 2x16+1x16/25 0.00 0.00 0.00 0.00 63.19 0.00 0.00 0 - 1 2
1.06 69.04 8/200 1 - E1 - - 1 2x16+1x16/25 0.00 0.00 0.00 0.00 69.04 0.00 0.00 0 - - 3
1.07 27.00 8/300 - 1 E6 - - 1 2x16+1x16/25 0.00 0.00 0.00 0.00 27.00 0.00 0.00 0 - 1 3
1.08 29.69 8/200 1 - E1 - - 1 2x16/25 0.00 0.00 29.69 0.00 0.00 0.00 0.00 0 - - 1
1.09 31.70 8/300 - 1 E6 - - 1 2x16/25 0.00 0.00 31.70 0.00 0.00 0.00 0.00 0 - - 3
1.10 30.16 8/300 - 1 E6 - 3 - 2x16/25 0.00 0.00 30.16 0.00 0.00 0.00 0.00 0 - - 3
1.11 23.11 8/300 - 1 E6 - 2 - 2x16/25 0.00 0.00 23.11 0.00 0.00 0.00 0.00 0 - 1 1
1.12 61.63 8/200 1 - E1 - - 1 2x16/25 0.00 0.00 61.63 0.00 0.00 0.00 0.00 0 - 1 2
1.13 77.27 8/200 1 - E1 - - 1 2x16/25 0.00 0.00 77.27 0.00 0.00 0.00 0.00 0 - - 2
1.14 38.41 8/300 - 1 E4 - - 1 2x16/25 0.00 0.00 38.41 0.00 0.00 0.00 0.00 1 0 - -
1.15 27.17 8/300 - 1 E6 - 2 - 2x16/25 0.00 0.00 27.17 0.00 0.00 0.00 0.00 0 - - 1
1.16 47.02 8/200 1 - E1 - - 1 2x16/25 0.00 0.00 47.02 0.00 0.00 0.00 0.00 0 - -
1.17 79.40 8/200 1 - E1 - 1 - 2x16/25 0.00 0.00 79.40 0.00 0.00 0.00 0.00 0 - -
1.18 29.18 8/200 1 - E1 - 2 - 2x16/25 0.00 0.00 29.18 0.00 0.00 0.00 0.00 0 - 1 1
1.19 34.81 8/300 - 1 E6 - - 1 1x16+1x16/25 0.00 0.00 0.00 0.00 0.00 0.00 34.81 0 - 1 4
1.2 19.30 8/200 1 - E1 - 3 - 1x16+1x16/25 0.00 0.00 0.00 0.00 0.00 0.00 19.30 0 - - 1
1.21 18.65 8/300 - 1 E6 - 3 - 1x16/25 0.00 0.00 0.00 0.00 0.00 18.65 0.00 0 - 1 2
1.22 8/300 - 1 E3 - - 1 0.00 0.00 0.00 0.00 0.00 0 - -
1.24 27.95 8/300 - 1 E3 - 2 - 1x16/25 0.00 0.00 0.00 27.95 0.00 1 0 - 1 2
1.23 28.89 8/200 1 - E1 - - 1 1x16/25 0.00 0.00 0.00 28.89 0.00 0 - - 5
1.29 24.70 8/300 - 1 E3 - 1 - 1x16/25 0.00 0.00 0.00 0.00 0.00 24.70 0.00 1 0 - 1 1
1.28 36.71 8/200 1 - E1 - - 1 1x16/25 0.00 0.00 0.00 0.00 0.00 36.71 0.00 0 - -
1.27 49.29 8/200 1 - E1 - - 1 1x16/25 0.00 0.00 0.00 0.00 0.00 49.29 0.00 0 - - 2
1.26 61.51 8/300 - 1 E6 - 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 0.00 0.00 61.51 0 - -
1.25 57.63 8/200 1 - E1 - - 1 1x16+1x16/25 0.00 0.00 0.00 0.00 0.00 0.00 57.63 0 - - 2
1.31 44.21 8/300 - 1 E3 - - 1 1x16/25 0.00 0.00 0.00 0.00 0.00 44.21 0.00 1 0 1 1 3
1.30 61.14 8/200 1 - E1 - 2 - 1x16/25 0.00 0.00 0.00 0.00 0.00 61.14 0.00 0 - -
1.33 29.97 8/300 - 1 E3 - - 1 1x16/25 0.00 0.00 0.00 0.00 0.00 29.97 0.00 1 0 - 1 1
1.32 56.04 8/200 1 - E1 - 2 - 1x16/25 0.00 0.00 0.00 0.00 0.00 56.04 0.00 0 - -
1.34 32.91 8/300 - 1 E3 - - 1 1x16/25 0.00 0.00 0.00 0.00 0.00 32.91 0.00 1 0 - 1 1
1.35 43.51 8/300 - 1 E3 - 1 - 1x16/25 0.00 0.00 0.00 0.00 0.00 43.51 0.00 1 0 - 1 3
1.44 55.38 8/300 - 1 E3 - 1 - 1x16/25 0.00 0.00 0.00 0.00 0.00 55.38 0.00 1 0 1 - 3
1.43 24.65 8/300 - 1 E4 - 1 - 1x16/25 0.00 0.00 0.00 0.00 0.00 24.65 0.00 2 0 - - 3
1.42 32.91 8/200 1 - E1 - 1 - 1x16/25 0.00 0.00 0.00 32.91 0.00 0 - -
1.41 23.40 8/300 - 1 E4 - 1 - 1x16/25 0.00 0.00 0.00 23.40 0.00 2 0 - -
1.40 52.76 8/200 1 - E1 - 1 - 1x16/25 0.00 0.00 0.00 52.76 0.00 0 - - 1
1.39 43.10 8/200 1 - E1 - 1 - 1x16/25 0.00 0.00 0.00 43.10 0.00 0 - -
1.38 27.86 8/300 - 1 E6 - 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 27.86 0 - - 3
1.37 25.69 8/200 1 - E1 - 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 25.69 0 - - 1
1.36 29.93 8/300 - 1 E4 - 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 29.93 1 0 - - 1
1.46 55.16 8/300 - 1 E4 - 1 - 1x16/25 0.00 0.00 0.00 55.16 0.00 1 0 1 1 2
1.45 36.90 8/300 - 1 E4 - 1 - 1x16/25 0.00 0.00 0.00 36.90 0.00 2 0 - - 2
1.59 53.47 8/300 - 1 E3 - 1 - 1x16/25 0.00 0.00 0.00 53.47 0.00 1 0 1 -
1.58 38.05 8/300 - 1 E4 - 1 - 1x16/25 0.00 0.00 0.00 38.05 0.00 2 0 - -
1.57 56.59 8/200 1 - E1 - 1 - 1x16/25 0.00 0.00 0.00 56.59 0.00 0 - -
1.56 27.91 8/200 1 - E1 - 1 - 1x16/25 0.00 0.00 0.00 27.91 0.00 0 - -
1.55 49.57 8/200 1 - E1 - 1 - 1x16/25 0.00 0.00 0.00 49.57 0.00 0 - -
1.54 37.08 8/200 1 - E1 - 1 - 1x16/25 0.00 0.00 0.00 37.08 0.00 0 - 1
1.53 35.31 8/200 1 - E1 - 1 - 1x16/25 0.00 0.00 0.00 35.31 0.00 0 - 2
1.52 48.86 8/200 1 - E1 - 1 - 1x16/25 0.00 0.00 0.00 48.86 0.00 0 - 3
1.51 58.00 8/300 - 1 E4 - 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 58.00 2 0 - 1
1.5 58.00 8/200 1 - E1 - 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 58.00 0 - 1
1.49 47.26 8/200 1 - E1 - 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 47.26 0 - - 2
1.48 47.62 8/200 1 - E1 - 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 47.62 0 - 1 4
1.47 51.73 8/200 1 - E1 - 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 51.73 0 - 1 4
CIRCUITO C-2 -
ST - 0.00 0.00 0.00 0.00 0.00 - -
2.01 43.76 8/200 1 - E1 2 - 2x16/25 0.00 0.00 43.76 0.00 0.00 0.00 0.00 - - 1
2.02 43.63 8/200 1 - E1 - 1 2x16/25 0.00 0.00 43.63 0.00 0.00 0.00 0.00 - - 2
2.03 72.28 8/300 - 1 E6 2 - 2x16/25 0.00 0.00 72.28 0.00 0.00 0.00 0.00 - 1 3
2.04 24.37 8/200 1 - E1 - 1 1x16/25 0.00 0.00 0.00 0.00 0.00 24.37 0.00 - - 3
2.05 58.03 8/200 1 - E1 - 1 1x16/25 0.00 0.00 0.00 0.00 0.00 58.03 0.00 - - 3
2.06 49.64 8/200 1 - E1 1 1 1x16/25 0.00 0.00 0.00 0.00 0.00 49.64 0.00 - - 2
2.07 51.13 8/200 1 - E1 1 1 1x16/25 0.00 0.00 0.00 0.00 0.00 51.13 0.00 - - 1
2.08 93.71 8/300 - 1 E4 - 1 1x16/25 0.00 0.00 0.00 0.00 0.00 93.71 0.00 2 - 1 1
2.09 33.39 8/200 1 - E1 2 - 1x16/25 0.00 0.00 0.00 33.39 0.00 - -
2.1 42.55 8/200 1 - E1 - 1 1x16/25 0.00 0.00 0.00 42.55 0.00 - - 1
2.11 41.30 8/300 - 1 E3 2 - 1x16/25 0.00 0.00 0.00 41.30 0.00 - - 2
2.12 50.78 8/200 1 - E1 - 1 1x16+1x16/25 0.00 0.00 0.00 0.00 50.78 - - 3
2.13 39.83 8/200 1 - E1 2 - 1x16+1x16/25 0.00 0.00 0.00 0.00 39.83 - - 4
2.14 75.21 8/300 - 1 E6 - 1 1x16+1x16/25 0.00 0.00 0.00 0.00 75.21 - - 1
2.15 37.75 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 37.75 0.00 - - 2
2.16 50.17 8/300 - 1 E3 - 1 1x16/25 0.00 0.00 0.00 50.17 0.00 1 - 1 1
2.17 35.53 8/300 - 1 E6 - 1 1x16+1x16/25 0.00 0.00 0.00 0.00 35.53 - - 2
2.18 47.99 8/300 - 1 E3 2 - 1x16/25 0.00 0.00 0.00 47.99 0.00 1 - 1 1
2.19 43.63 8/300 - 1 E3 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 43.63 1 - 1 1
CIRCUITO C-5 - -
ST 0.00 0.00 0.00 0.00 0.00 - -
5.01 28.59 8/200 1 - E1 - 1 2x16/25 28.59 0.00 0.00 0.00 0.00 - -
5.02 54.10 8/200 1 - E1 1 - 2x16/25 54.10 0.00 0.00 0.00 0.00 - - 2
5.03 27.77 8/200 1 - E1 - 1 2x16/25 27.77 0.00 0.00 0.00 0.00 - -
5.04 42.64 8/300 - 1 E4 1 - 2x16/25 42.64 0.00 0.00 0.00 0.00 - - 3
5.05 33.70 8/300 - 1 E3 1 - 1x16/25 0.00 0.00 0.00 33.70 0.00 1 - - 1
5.06 32.36 8/200 1 - E1 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 32.36 - - 2
5.07 49.84 8/200 1 - E1 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 49.84 - - 3
5.08 20.76 8/200 1 - E1 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 20.76 - - 1
5.09 30.76 8/300 - 1 E4 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 30.76 1 - 1 3
5.10 14.02 8/200 1 - E1 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 14.02 - - 1
5.11 17.87 8/200 1 - E1 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 17.87 - - 1
5.12 39.67 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 39.67 0.00 - -
5.13 36.35 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 36.35 0.00 1 - - 1
5.14 58.45 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 58.45 0.00 - - 1
5.15 65.74 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 65.74 0.00 - -
5.16 64.15 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 64.15 0.00 1 - - 2
5.17 31.22 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 31.22 0.00 - - 2
5.18 44.66 8/300 - 1 E3 1 - 1x16/25 0.00 0.00 0.00 44.66 0.00 1 - 1 2
CIRCUITO C-3 -
ST-2 0.00 0.00 0.00 0.00 0.00 -
3.01 67.17 8/200 1 - E1 2 - 1x16+1x16/25 0.00 0.00 0.00 0.00 67.17 - 1 1
3.02 42.13 8/200 1 - E1 - 1 1x16+1x16/25 0.00 0.00 0.00 0.00 42.13 - 2
3.03 46.78 8/200 1 - E1 2 - 1x16+1x16/25 0.00 0.00 0.00 0.00 46.78 - 1 2
3.04 40.00 8/200 1 - E1 - 1 1x16+1x16/25 0.00 0.00 0.00 0.00 40.00 - 1
3.05 97.49 8/200 1 - E1 2 - 1x16+1x16/25 0.00 0.00 0.00 0.00 97.49 -
3.06 42.03 8/200 1 - E1 - 1 1x16+1x16/25 0.00 0.00 0.00 0.00 42.03 -
3.07 51.74 8/200 1 - E1 2 - 1x16+1x16/25 0.00 0.00 0.00 0.00 51.74 - 1 2
3.08 51.74 8/200 1 - E1 - 1 1x16/25 0.00 0.00 0.00 51.74 0.00 - 1
3.09 47.63 8/200 1 - E1 2 - 1x16/25 0.00 0.00 0.00 47.63 0.00 -
3.10 54.19 8/200 1 - E1 - 1 1x16/25 0.00 0.00 0.00 54.19 0.00 - 1 1
3.11 32.55 8/200 1 - E1 2 - 1x16/25 0.00 0.00 0.00 32.55 0.00 - 1
3.12 41.54 8/300 - 1 E3 - 1 1x16/25 0.00 0.00 0.00 41.54 0.00 1 - 1 2
CIRCUITO C-4
ST-02
4.01 42.39 8/200 1 - E1 1 - 2x16/25 42.39 0.00 0.00 0.00 0.00
4.02 70.92 8/200 1 - E1 1 - 2x16/25 70.92 0.00 0.00 0.00 0.00
4.03 34.52 8/300 - 1 E6 1 - 2x16/25 34.52 0.00 0.00 0.00 0.00 1 6
4.04 26.82 8/200 1 - E1 1 - 2x16/25 26.82 0.00 0.00 0.00 0.00
4.05 73.19 8/300 - 1 E6 1 - 2x16/25 73.19 0.00 0.00 0.00 0.00 3
4.06 37.22 8/300 - 1 E3 1 - 1x16/25 0.00 0.00 0.00 37.22 0.00 1 1 1
4.07 67.15 8/300 - 1 E4 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 67.15 2 1 2
4.08 44.26 8/300 - 1 E6 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 44.26 1 1
4.09 32.56 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 32.56 0.00
4.10 44.57 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 44.57 0.00 1
4.11 32.52 8/300 - 1 E3 1 - 1x16/25 0.00 0.00 0.00 32.52 0.00 1 1 1
4.12 40.74 8/200 1 - E1 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 40.74 1
4.13 45.13 8/300 - 1 E3 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 45.13 2 1 1
4.14 29.00 8/200 1 - E1 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 29.00
4.15 85.43 8/300 - 1 E6 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 85.43
4.16 93.51 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 93.51 0.00
4.17 93.51 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 93.51 0.00 1
4.18 49.07 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 49.07 0.00 1
4.19 57.47 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 57.47 0.00 2
4.20 53.37 8/300 - 1 E4 1 - 1x16/25 0.00 0.00 0.00 53.37 0.00
4.21 41.30 8/300 - 1 E3 1 - 1x16/25 0.00 0.00 0.00 41.30 0.00 1
4.22 48.10 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 48.10 0.00
4.23 28.51 8/300 - 1 E3 1 - 1x16/25 0.00 0.00 0.00 28.51 0.00 4
4.24 47.23 8/300 - 1 E3 1 - 1x16/25 0.00 0.00 0.00 47.23 0.00 1 4
4.25 42.11 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 42.11 0.00
4.26 29.24 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 29.24 0.00
4.27 49.96 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 49.96 0.00
4.28 26.22 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 26.22 0.00 1 1
4.29 36.09 8/200 1 - E1 1 - 1x16/25 0.00 0.00 0.00 36.09 0.00 2
4.30 32.88 8/300 - 1 E3 1 - 1x16/25 0.00 0.00 0.00 32.88 0.00 1 1
4.31 39.43 8/300 - 1 E4 1 - 1x16+1x16/25 0.00 0.00 0.00 0.00 39.43 1 1
TOTAL 6159.40 85.00 55.00 130.00 39.00 0.00 0.00 1035.35 0.00 323.51 3132.13 1668.41 37.00 5.00 4.00 47.00 191.00
TIPO E1 E2 E3 E4 E5 E6 E7 TOTAL
Cantidad 85 0 23 15 0 17 0 140
- -
1 6 2
4 1
6 2
1 6 2
1 6 2
6 2
6 2
2 1
6 2
6 2
2 1
4 1
4 1
- -
2 1
1 2 1
1 2 1
2 1
- 2
2 1
4 1
- -
4 1
- 2
1 4 1
- -
4 1
- -
4 1
6 2
- -
2 1
- -
2 1
6 2
6 2
6 2
- -
- -
2 1
- -
6 2
2 1
2 1
4 1
4 1
1 2 1
1 2 1
2 4 1
2 4 1
3 6 2
3 6 2
4 - 2
4 - 2
2 4 1
- -
4 1
- 2
- 2
-
- -
2 1
4 1
6 2
6 2
6 2
4 1
2 1
2 1
- -
2 1
4 1
6 2
- 2
2 1
4 1
2 1
4 1
2 1
2 1
-
- -
- -
4 1
- -
6 2
2 1
4 1
6 2
2 1
6 2
2 1
2 1
- -
2 1
2 1
- -
4 1
4 1
4 1
- -
- -
2 1
4 1
4 1
2 1
- -
- -
4 1
2 1
- -
2 1
2 1
4 1
- -
- -
- -
- 2
- -
6 2
2 1
4 1
2 1
- -
2 1
2 1
2 1
2 1
- -
- -
- -
2 1
2 1
4 1
- -
2 1
- -
- 2
- 2
- -
- -
- -
2 1
4 1
2 1
2 1
28.00 352.00 142.00
PLANILLA DE METRADOS - REDES SECUNDARIAS
SE02 CASERIO RINCONADA
PROYECTO :
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
UBICACIÓN : RINCONADA - CARAZ - HUAYLAS - ANCASH
FECHA : marzo-22
Estruct. Dist. Postes de CAC Tipo Armado Grapa Grapa TIPO DE CONDUCTORES Retenidas Alumb. Acometidas
PAT
Nº Vano (m) anclaje suspens. Pub.
8/200 8/300 Princ. Secund. 2x16+16+NP25 2x16+NP25 1x16+NP25 RI RV Corta Larga Conect.
CIRCUITO C-1
SE 2.00 12/400 - - E4' 2 - 2x16+16+NP25 2.00 0.00 0.00 1 2 - 4
1 35.00 12/400 - - E4' 2 - 2x16+16+NP25 35.00 0.00 0.00 - - - - - -
2 85.00 8/200 1 - E1 - 1 2x16+16+NP25 85.00 0.00 0.00 - - - - - -
3 64.00 8/300 - 1 E6 3 - 2x16+16+NP25 64.00 0.00 0.00 2 - 1 - 1 - 2
4 192.00 8/200 1 - E1 - 1 2x16+16+NP25 192.00 0.00 0.00 - - - - - -
5 65.00 8/300 - 1 E3 E3 2 - 2x16+16+NP25 65.00 0.00 0.00 2 - 1 1 1 - 2
6 50.00 8/200 1 - E1 - 1 2x16+16+NP25 50.00 0.00 0.00 - - - 1 - 2
7 207.00 8/200 1 - E1 - 1 2x16+16+NP25 207.00 0.00 0.00 - - 1 - - - -
8 52.00 8/300 - 1 E4 2 - 2x16+16+NP25 52.00 0.00 0.00 1 - - - - -
9 38.00 8/300 - 1 E6 3 - 2x16+16+NP25 38.00 0.00 0.00 2 - - - 1 2
10 70.00 8/200 1 - E1 - 1 2x16+16+NP25 70.00 0.00 0.00 - - 1 - - - -
11 168.00 8/300 - 1 E3 E3 2 - 2x16+16+NP25 168.00 0.00 0.00 1 - 1 1 - 2
12 34.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 34.00 - - 1 - 1 - 2
3.1 40.00 8/300 - 1 E4 2 - 1x16+NP25 0.00 0.00 40.00 1 - - - - -
3.2 340.00 8/300 - 1 E4 2 - 1x16+NP25 0.00 0.00 340.00 2 - 1 - - - -
3.3 65.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 65.00 - - - - - -
3.4 50.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 50.00 - - - - - -
3.5 50.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 50.00 - - - - - -
3.6 50.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 50.00 1 - 1 - 1 - 2
9.1 50.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 50.00 - - - - - -
9.2 96.00 8/200 1 - E1 - 1 1x16+NP25 0.00 0.00 96.00 - - - - - -
9.3 93.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 93.00 1 - 1 - 1 - 2
PLANILLA DE METRADOS - REDES SECUNDARIAS
SE02 CASERIO RINCONADA
PROYECTO :
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
UBICACIÓN : RINCONADA - CARAZ - HUAYLAS - ANCASH
FECHA : marzo-22
Estruct. Dist. Postes de CAC Tipo Armado Grapa Grapa TIPO DE CONDUCTORES Retenidas Alumb. Acometidas
PAT
Nº Vano (m) anclaje suspens. Pub.
8/200 8/300 Princ. Secund. 2x16+16+NP25 2x16+NP25 1x16+NP25 RI RV Corta Larga Conect.
CIRCUITO C-2
1 35.00 8/300 - 1 E3 E3 2 - 2x16+16+NP25 35.00 0.00 0.00 1 - - - - -
2 50.00 8/200 1 - E1 - 1 2x16+16+NP25 50.00 0.00 0.00 - - - - - -
3 54.00 8/200 1 - E1 - 1 2x16+16+NP25 54.00 0.00 0.00 - - 1 - - - -
4 180.00 8/200 1 - E1 - 1 2x16+16+NP25 180.00 0.00 0.00 - - - - - -
5 40.00 8/200 1 - E1 - 1 2x16+16+NP25 40.00 0.00 0.00 - - - - - -
6 41.00 8/300 - 1 E3 E3 2 - 2x16+16+NP25 41.00 0.00 0.00 2 - 1 1 1 1 4
7 52.00 8/200 1 - E1 - 1 2x16+16+NP25 52.00 0.00 0.00 - - - - - -
8 52.00 8/200 1 - E1 - 1 2x16+16+NP25 52.00 0.00 0.00 - - - - - -
9 120.00 8/300 - 1 E4 2 - 2x16+16+NP25 120.00 0.00 0.00 2 - 1 - - - -
10 65.00 8/200 1 - E1 - 1 2x16+16+NP25 65.00 0.00 0.00 - - - - - -
11 120.00 8/300 - 1 E3 E3 2 - 2x16+16+NP25 120.00 0.00 0.00 2 - 1 1 - 2
12 50.00 8/200 1 - E1 - 1 2x16+NP25 0.00 50.00 0.00 - - 1 - - - -
13 180.00 8/300 - 1 E4 2 - 2x16+NP25 0.00 180.00 0.00 2 - - - - -
14 52.00 8/300 - 1 E6 3 - 2x16+NP25 0.00 52.00 0.00 - - - 1 - 2
15 60.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 60.00 1 - 1 - 1 - 2
14.1 40.00 8/300 - 1 E3 1 - 1x16+NP25 0.00 0.00 40.00 - - 1 - 1 - 2
TOTAL 3087.00 18.00 18.00 38.00 18.00 1837.00 282.00 968.00 23.00 0.00 14.00 5.00 14.00 2.00 32.00
CONTROL DE ARMADOS
TIPO E1 E2 E3 E4 E5 E6 TOTAL
Cantidad 18 0 15 5 0 3 41
Porta-
línea
1
-
-
1
-
1
1
-
-
1
-
1
1
-
-
-
-
-
1
-
-
1
ADOS - REDES SECUNDARIAS
Porta-
línea
-
-
-
-
-
1
-
-
-
-
1
-
-
1
1
1
14.00
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO
DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA : marzo-22
Sub-total 20.65
MANO DE OBRA
Ingeniero Especialista en Redes Secundarias 0.50 h-h 4.00 12.58 50.32 047
Topógrafo Operador de Teodolito 1.00 h-h 8.00 13.60 108.80 047
Oficial 1.00 h-h 8.00 11.42 91.36 047
Peón 2.00 h-h 16.00 10.16 162.56 047
Sub-total 413.04
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.25 h-m 2.00 58.60 117.20 049
Herramientas 5% mano de obra % 5.00 413.04 20.65 048
Sub-total 137.85
TOTAL S/. 571.54
Sub-total 2.24
MANO DE OBRA
Capataz 0.10 h-h 0.05 16.15 0.81 047
Oficial 1.00 h-h 0.53 11.42 6.05 047
Peón 7.00 h-h 3.73 10.16 37.90 047
Sub-total 44.76
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.75 h-m 0.40 122.50 49.00 049
Herramientas 5% mano de obra % 5.00 44.76 2.24 048
Sub-total 51.24
TOTAL S/. 98.24
Sub-total 1.57
MANO DE OBRA
Capataz 0.1 h-h 0.14 16.15 2.26 047
Peón 2 h-h 2.86 10.16 29.06 047
Sub-total 31.32
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.10 h-m 0.14 122.50 17.15 049
Herramientas 5% mano de obra % 5.00 31.32 1.57 048
Sub-total 18.72
TOTAL S/. 51.61
Sub-total 1.38
MANO DE OBRA
Capataz 0.1 h-h 0.08 16.15 1.29 047
Operario 1.0 h-h 0.80 12.58 10.06 047
Peón 2.0 h-h 1.60 10.16 16.26 047
Sub-total 27.61
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO
DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA : marzo-22
EQUIPOS Y HERRAMIENTAS
Compresor Neumático, perforador y barrenos 1.000 h-m 0.80 82.80 66.24 049
( incluye Explosivos, fulminantes y mechas)
Camión plataforma 4X2, 122 HP, 8 TN. 0.100 h-m 0.08 122.50 9.80 049
Herramientas 5% mano de obra % 5.00 27.61 1.38 048
Sub-total 77.42
TOTAL S/. 106.41
Sub-total 1.94
MANO DE OBRA
Capataz 0.50 h-h 0.27 16.15 4.36 047
Operario 1.00 h-h 0.53 12.58 6.67 047
Oficial 1.00 h-h 0.53 11.42 6.05 047
Peón 4.00 h-h 2.13 10.16 21.64 047
Sub-total 38.72
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.15 h-m 0.08 122.50 9.80 049
Pluma de Izaje 1 h-m 0.53 19.25 10.20 049
Herramientas 5% de mano de obra 1 % 5.00 38.72 1.94 048
Sub-total 21.94
TOTAL S/. 62.60
Sub-total 9.91
MANO DE OBRA
Capataz 0.10 h-h 0.05 16.15 0.81 047
Oficial 1.00 h-h 0.53 11.42 6.05 047
Peón 2.00 h-h 1.07 10.16 10.87 047
Sub-total 17.73
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.10 h-m 0.05 122.50 6.13 049
Herramientas 5% mano de obra % 5.00 17.73 0.89 048
Sub-total 7.02
TOTAL S/. 34.66
Sub-total 2.00
MANO DE OBRA
Capataz 0.10 h-h 0.04 16.15 0.65 047
Peón 1.00 h-h 0.40 10.16 4.06 047
Sub-total 4.71
EQUIPOS Y HERRAMIENTAS
Herramientas 5% mano de obra % 5.00 4.71 0.24 048
Sub-total 0.24
TOTAL S/. 6.95
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO
DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA : marzo-22
MATERIALES
Material varios (soga,estrobo,etc) % M.O. 5.00 26.23 1.31 039
Sub-total 1.31
MANO DE OBRA
Capataz 0.10 h-h 0.06 16.15 0.97 047
Operario 1.00 h-h 0.57 12.58 7.17 047
Oficial 1.00 h-h 0.57 11.42 6.51 047
Peón 2.00 h-h 1.14 10.16 11.58 047
Sub-total 26.23
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.100 h-m 0.06 122.50 7.35 049
Tirfor 3 ton. 1.00 h-m 0.57 3.50 2.00 049
Escalera 1.00 h-m 0.57 1.85 1.05 037
Caja de herramientas 2.00 h-m 1.14 2.00 2.28 037
Herramientas 5% mano de obra % 5.00 26.23 1.31 048
Sub-total 13.99
TOTAL S/. 41.53
Sub-total 5.96
MANO DE OBRA
Capataz 0.10 h-h 0.09 16.15 1.45 047
Oficial 1.00 h-h 0.89 11.42 10.16 047
Peón 2.00 h-h 1.78 10.16 18.08 047
Sub-total 29.69
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.10 h-m 0.09 122.50 11.03 049
Herramientas 5% mano de obra % 5.00 29.69 1.48 048
Sub-total 12.51
TOTAL S/. 48.16
PARTIDA : Armado TIPO E1 Alineamiento y Angulo - Cond. Autoportante, Sin Caja de Derivación.
UNIDAD : Un.
RENDIMIENTO : 35 Un/dia
P. Unitario Parcial Indice
DESCRIPCION Und. Cantidad S/. S/. (INEI)
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 11.00 0.55 039
Sub-total 0.55
MANO DE OBRA
Capataz 0.20 h-h 0.05 16.15 0.81 047
Operario 1.00 h-h 0.23 12.58 2.89 047
Oficial 1.00 h-h 0.23 11.42 2.63 047
Peón 2.00 h-h 0.46 10.16 4.67 047
Sub-total 11.00
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.05 122.50 6.13 049
Caja de herramientas 2.00 h-m 0.46 2.00 0.92 037
Escalera 2.00 h-m 0.46 1.85 0.85 048
Herramientas 5% mano de obra % 5.00 11.00 0.55 048
Sub-total 8.45
TOTAL S/. 20.00
PARTIDA : Armado TIPO E2 Anclaje y Cambio de Sección-Cond. Autopórt. Sin Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 30 Un/dia
P. Unitario Parcial Indice
DESCRIPCION Und. Cantidad S/. S/. (INEI)
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 12.67 0.63 039
Sub-total 0.63
MANO DE OBRA
Capataz 0.20 h-h 0.05 16.15 0.81 047
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO
DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA : marzo-22
Sub-total 12.67
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.05 122.50 6.13 049
Caja de herramientas 2.00 h-m 0.53 2.00 1.06 037
Escalera 1.00 h-m 0.27 1.85 0.50 048
Herramientas 5% mano de obra % 5.00 12.67 0.63 048
Sub-total 8.32
TOTAL S/. 21.62
PARTIDA : Armado TIPO E3 Extremo de Linea con Conductor Autoportante Sin Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 35 Un/dia
P. Unitario Parcial Indice
DESCRIPCION Und. Cantidad S/. S/. (INEI)
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 11.00 0.55 039
Sub-total 0.55
MANO DE OBRA
Capataz 0.20 h-h 0.05 16.15 0.81 047
Operario 1.00 h-h 0.23 12.58 2.89 047
Oficial 1.00 h-h 0.23 11.42 2.63 047
Peón 2.00 h-h 0.46 10.16 4.67 047
Sub-total 11.00
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.05 122.50 6.13 049
Caja de herramientas 2.00 h-m 0.46 2.00 0.92 037
Escalera 1.00 h-m 0.23 1.85 0.43 048
Herramientas 5% mano de obra % 5.00 11.00 0.55 048
Sub-total 8.03
TOTAL S/. 19.58
PARTIDA : Armado TIPO E4 Extremo de Linea Con Derivación - Red Aerea Cond Autoport y sin Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 30 Un/dia
P. Unitario Parcial Indice
DESCRIPCION Und. Cantidad S/. S/. (INEI)
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 12.67 0.63 039
Sub-total 0.63
MANO DE OBRA
Capataz 0.20 h-h 0.05 16.15 0.81 047
Operario 1.00 h-h 0.27 12.58 3.40 047
Oficial 1.00 h-h 0.27 11.42 3.08 047
Peón 2.00 h-h 0.53 10.16 5.38 047
Sub-total 12.67
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.05 122.50 6.13 049
Caja de herramientas 2.00 h-m 0.53 2.00 1.06 037
Escalera 1.00 h-m 0.27 1.85 0.50 048
Herramientas 5% mano de obra % 5.00 12.67 0.63 048
Sub-total 8.32
TOTAL S/. 21.62
PARTIDA : Armado TIPO E5 Alineamiento Con Derivación - Red Aerea Cond Autoport y sin Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 20 Un/dia
P. Unitario Parcial Indice
DESCRIPCION Und. Cantidad S/. S/. (INEI)
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 19.02 0.95 039
Sub-total 0.95
MANO DE OBRA
Capataz 0.20 h-h 0.08 16.15 1.29 047
Operario 1.00 h-h 0.40 12.58 5.03 047
Oficial 1.00 h-h 0.40 11.42 4.57 047
Peón 2.00 h-h 0.80 10.16 8.13 047
Sub-total 19.02
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.15 h-m 0.06 122.50 7.35 049
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO
DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA : marzo-22
Sub-total 10.64
TOTAL S/. 30.61
PARTIDA : Armado TIPO E6 Anclaje y/o Derivación - Red Aerea con Cond Autoport y sin Caja de Derivación
UNIDAD : Un.
RENDIMIENTO : 15 Un/dia
P. Unitario Parcial Indice
DESCRIPCION Und. Cantidad S/. S/. (INEI)
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 25.37 1.27 039
Sub-total 1.27
MANO DE OBRA
Capataz 0.20 h-h 0.11 16.15 1.78 047
Operario 1.00 h-h 0.53 12.58 6.67 047
Oficial 1.00 h-h 0.53 11.42 6.05 047
Peón 2.00 h-h 1.07 10.16 10.87 047
Sub-total 25.37
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.15 h-m 0.08 122.50 9.80 049
Caja de herramientas 2.00 h-m 1.07 2.00 2.14 037
Escalera 1.00 h-m 0.53 1.85 0.98 048
Herramientas 5% mano de obra % 5.00 25.37 1.27 048
Sub-total 14.19
TOTAL S/. 40.83
Sub-total 54.74
MANO DE OBRA
Capataz 1.00 h-h 5.00 16.15 80.75 047
Operario 2.00 h-h 10.00 12.58 125.80 047
Oficial 2.00 h-h 10.00 11.42 114.20 047
Peón 5.00 h-h 25.00 10.16 254.00 047
Sub-total 574.75
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 1.25 122.50 153.13 049
Tirfor 3 ton. 2.00 h-m 10.00 3.50 35.00 049
Escalera 2.00 h-m 10.00 1.85 18.50 037
Agua 2.00 h-m 10.00 3.35 33.50 037
Equipo de comunicación 4.00 h-m 20.00 2.85 57.00 037
Caja de herramientas 4.00 h-m 20.00 2.00 40.00 037
Herramientas 5% mano de obra % 5.00 574.75 28.74 048
Sub-total 365.87
TOTAL S/. 995.36
Sub-total 48.99
MANO DE OBRA
Capataz 1.00 h-h 4.00 16.15 64.60 047
Operario 2.00 h-h 8.00 12.58 100.64 047
Oficial 2.00 h-h 8.00 11.42 91.36 047
Peón 5.00 h-h 20.00 10.16 203.20 047
Sub-total 459.80
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 1.00 122.50 122.50 049
Tirfor 3 ton. 2.00 h-m 8.00 3.50 28.00 049
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO
DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA : marzo-22
Sub-total 292.69
TOTAL S/. 801.48
Sub-total 44.39
MANO DE OBRA
Capataz 1.00 h-h 3.20 16.15 51.68 047
Operario 2.00 h-h 6.40 12.58 80.51 047
Oficial 2.00 h-h 6.40 11.42 73.09 047
Peón 5.00 h-h 16.00 10.16 162.56 047
Sub-total 367.84
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.25 h-m 0.80 122.50 98.00 049
Tirfor 3 ton. 2.00 h-m 6.40 3.50 22.40 049
Escalera 2.00 h-m 6.40 1.85 11.84 037
Agua 2.00 h-m 6.40 3.35 21.44 037
Equipo de comunicación 4.00 h-m 12.80 2.85 36.48 037
Caja de herramientas 4.00 h-m 12.80 2.00 25.60 037
Herramientas 5% mano de obra % 5.00 367.84 18.39 048
Sub-total 234.15
TOTAL S/. 646.38
Sub-total 1.87
MANO DE OBRA
Capataz 0.20 h-h 0.20 16.15 3.23 047
Operario 1.00 h-h 1.00 12.58 12.58 047
Oficial 1.00 h-h 1.00 11.42 11.42 047
Peón 1.00 h-h 1.00 10.16 10.16 047
Sub-total 37.39
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.20 h-m 0.20 58.60 11.72 049
Caja de herramientas 2.00 h-m 2.00 2.00 4.00 037
Herramientas 5% mano de obra % 5.00 37.39 1.87 048
Sub-total 17.59
TOTAL S/. 56.85
Sub-total 0.67
MANO DE OBRA
Capataz 0.10 h-h 0.11 16.15 1.78 047
Oficial 1.00 h-h 1.14 11.42 13.02 047
Peón 2.00 h-h 2.29 10.16 23.27 047
Sub-total 38.07
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.10 h-m 0.11 122.50 13.48 049
Herramientas 5% mano de obra % 5.00 38.07 1.90 048
Sub-total 15.38
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO
DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA : marzo-22
Sub-total 0.63
MANO DE OBRA
Capataz 0.20 h-h 0.07 16.15 1.13 047
Oficial 1.00 h-h 0.36 11.42 4.11 047
Peón 2.00 h-h 0.73 10.16 7.42 047
Sub-total 12.66
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.07 122.50 8.58 049
Caja de herramientas 1.00 h-m 0.36 2.00 0.72 037
Escalera 1.00 h-m 0.36 1.85 0.67 048
Herramientas 5% mano de obra % 5.00 12.66 0.63 048
Sub-total 10.60
TOTAL S/. 23.89
Sub-total 1.19
MANO DE OBRA
Capataz 0.20 h-h 0.10 16.15 1.62 047
Operario 1.00 h-h 0.50 12.58 6.29 047
Oficial 1.00 h-h 0.50 11.42 5.71 047
Peón 2.00 h-h 1.00 10.16 10.16 047
Sub-total 23.78
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.10 122.50 12.25 049
Caja de herramientas 2.00 h-m 1.00 2.00 2.00 037
Escalera 1.00 h-m 0.50 1.85 0.93 048
Herramientas 5% mano de obra % 5.00 23.78 1.19 048
Sub-total 16.37
TOTAL S/. 41.34
PARTIDA : Conexión de Acometida Domiciliaria Configuración CORTA (No Incluye medidor de energía activa)
UNIDAD : Un.
RENDIMIENTO : 18 Un/dia
P. Unitario Parcial Indice
DESCRIPCION Und. Cantidad S/. S/. (INEI)
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 21.05 1.05 039
Sub-total 1.05
MANO DE OBRA
Capataz 0.20 h-h 0.09 16.15 1.45 047
Operario 1.00 h-h 0.44 12.58 5.54 047
Oficial 1.00 h-h 0.44 11.42 5.02 047
Peón 2.00 h-h 0.89 10.16 9.04 047
Sub-total 21.05
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.09 122.50 11.03 049
Caja de herramientas 2.00 h-m 0.89 2.00 1.78 037
Escalera 2.00 h-m 0.89 1.85 1.65 048
Herramientas 5% mano de obra % 5.00 21.05 1.05 048
Sub-total 15.51
TOTAL S/. 37.61
PARTIDA : Conexión de Acometida Domiciliaria Configuración LARGA (No Iincluye medidor de energía activa)
UNIDAD : Un.
RENDIMIENTO : 14 Un/dia
P. Unitario Parcial Indice
DESCRIPCION Und. Cantidad
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO
DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA : marzo-22
DESCRIPCION Und. Cantidad S/. S/. (INEI)
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 27.04 1.35 039
Sub-total 1.35
MANO DE OBRA
Capataz 0.20 h-h 0.11 16.15 1.78 047
Operario 1.00 h-h 0.57 12.58 7.17 047
Oficial 1.00 h-h 0.57 11.42 6.51 047
Peón 2.00 h-h 1.14 10.16 11.58 047
Sub-total 27.04
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.20 h-m 0.11 122.50 13.48 049
Caja de herramientas 2.00 h-m 1.14 2.00 2.28 037
Escalera 2.00 h-m 1.14 1.85 2.11 048
Herramientas 5% mano de obra % 5.00 27.04 1.35 048
Sub-total 19.22
TOTAL S/. 47.61
Sub-total 0.40
MANO DE OBRA
Capataz 0.10 h-h 0.04 16.15 0.65 047
Operario 1.00 h-h 0.40 12.58 5.03 047
Oficial 0.50 h-h 0.20 11.42 2.28 047
047
Sub-total 7.96
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.10 h-m 0.04 122.50 4.90 049
Caja de herramientas 1.00 h-m 0.40 2.00 0.80 037
Escalera 1.00 h-m 0.40 1.85 0.74 048
Herramientas 5% mano de obra % 5.00 7.96 0.40 048
Sub-total 6.84
TOTAL S/. 15.20
Sub-total 20.00
TOTAL S/. 20.00
Sub-total 0.67
MANO DE OBRA
Capataz 0.10 h-h 0.07 16.15 1.13 047
Operario 1.00 h-h 0.67 12.58 8.43 047
Oficial 0.50 h-h 0.33 11.42 3.77 047
047
Sub-total 13.33
EQUIPOS Y HERRAMIENTAS
Camión plataforma 4X2, 122 HP, 8 TN. 0.10 h-m 0.07 122.50 8.58 049
Caja de herramientas 1.00 h-m 0.67 2.00 1.34 037
Escalera 1.00 h-m 0.67 1.85 1.24 048
Herramientas 5% mano de obra % 5.00 8.33 0.42 048
Sub-total 11.58
TOTAL S/. 25.58
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO
DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA : marzo-22
RENDIMIENTO : 2 Localidades/dia
P. Unitario Parcial Indice
DESCRIPCION Und. Cantidad S/. S/. (INEI)
MATERIALES
Material varios (Soga,estrobo,etc) % 5.00 292.20 14.61 039
Sub-total 14.61
MANO DE OBRA
Capataz 1.00 h-h 4.00 16.15 64.60 047
Operario 2.00 h-h 8.00 12.58 100.64 047
Oficial 1.00 h-h 4.00 11.42 45.68 047
Peón 2.00 h-h 8.00 10.16 81.28 047
Sub-total 292.20
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.25 h-m 1.00 58.60 58.60 049
Motosierra 1.00 h-m 4.00 6.50 26.00 037
Teodolito 1.00 h-m 4.00 11.20 44.80 037
Medidor de aislamiento eléctrico 1.00 h-m 4.00 6.80 27.20 049
Medidor de resistencia de puesta a tierra 1.00 h-m 4.00 6.80 27.20 049
Termometro de línea 1.00 h-m 4.00 3.65 14.60 049
Caja de herramientas 2.00 h-m 8.00 2.00 16.00 037
Herramientas 5% mano de obra % 5.00 292.20 14.61 048
Sub-total 229.01
TOTAL S/. 535.82
Sub-total 517.49
MANO DE OBRA
Asistente de Ingeniería 1.00 h-h 24.00 14.58 349.92 047
Presentacion de expedientes 1.00 gbl 1.00 1000.00 1000.00 047
Sub-total 1349.92
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.25 h-m 1.00 0.00 0.00 049
Herramientas 5% mano de obra % 5.00 1349.92 67.50 048
Sub-total 67.50
TOTAL S/. 1934.91
Sub-total 517.49
MANO DE OBRA
Asistente de Ingeniería 1.00 h-h 24.00 14.58 349.92 047
Presentacion de expedientes 0.50 gbl 1.00 1500.00 1500.00 047
Sub-total 1849.92
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.25 h-m 1.00 0.00 0.00 049
Herramientas 5% mano de obra % 5.00 1849.92 92.50 048
Sub-total 92.50
TOTAL S/. 2459.91
Sub-total 0.81
MANO DE OBRA
Capataz 1.00 h-h 0.44 16.15 7.11 047
Peón 2.00 h-h 0.89 10.16 9.04 047
ANALISIS DE PRECIOS UNITARIOS RED SECUNDARIA
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO
DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA : marzo-22
Sub-total 16.15
EQUIPOS Y HERRAMIENTAS
Camioneta Rural 4x4 de 135 HP 0.25 h-m 0.11 58.60 6.45 049
Herramientas 5% mano de obra % 5.00 16.15 0.81 048
Sub-total 24.59
TOTAL S/. 41.55
FORMULA POLINOMICA - RED SECUNDARIA
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL BARRIO ICHOHUAYLAS DEL DISTRITO DE CARAZ, PROVINCIA DE HUAYLAS,
PROYECTO:
DEPARTAMENTO DE ANCASH
FECHA : marzo-22
INDICE SIMBOLO
Nº ELEMENTO REPRESENTATIVO SIMBOLO MONTO INCIDENCIA % PARCIAL COEFICIENTE
UNIFICADO MONOMIO
NOTAS:
1.- En la fórmula los sub-indices "o" de cada símbolo corresponden al indice de precios según (CREPCO) a la fecha de Elaboración del Presupuesto (Presupuesto Base)
y los sub-indices "r" al indice de precios al momento de reajuste o fecha de valorización.
2.- En el caso de los monomios compuestos por varios indices se ha considerado para efecto de denominación el símbolo que tiene mayor porcentaje de incidencia.
3.- En caso de cambios en el suministro se deberá actualizar la formula polinómica.
ANALISIS DE PRECIOS UNITARIOS RED PRIMARIA
PROYECTO :
MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS DE ENERGIA EN EL CASERIO DE RINCONADA DEL DISTRITO
DE CARAZ, PROVINCIA DE HUAYLAS, DEPARTAMENTO DE ANCASH
FECHA : marzo-22
ELAB., IMPL. ,ADM. DEL PLAN DE SEGURIDAD Y SALUD COVID Glb 1 3500 3500 48
19
Partida 9.04 RECURSOS PARA RESPUESTA ANTE EMERGENCIA EN SALUD DURANTE EL TRABAJO
COVID 19
UNIDAD : Glb
RENDIMIENTO : 1 Glb/dia
PARTICIPACIÓN DE LA M. O. EN LOS COSTOS
DESCRIPCION Unidad Cantidad P. Unitario Parcial Indice
S/. S/. (INEI)
MATERIALES