Documentos de Académico
Documentos de Profesional
Documentos de Cultura
VACIADOS DE CONCRETO
HYF
23 DE FEBRERO DEL 2022
SOLADO - CONCRETO
ITEM DESCRIPCCION Und L A AREA H M3 TOTAL
1.01 TRAMO EJE 10-10 AL EJE 12-12 m3 1 17.4 9.80 170.52 0.05 8.53
2.01 TRAMO G-G AL L-L ENTRE LOS EJES10-10 AL 12-12 m3 1 17.45 12.40 216.38 0.05 10.82
2.01 TRAMO L-L AL M-M ENTRE LOS EJES10-10 AL 12-12 m3 1 4.15 12.40 51.46 0.05 2.57
21.92
PABELLONES
Inm.
ITEM DESCRIPCCION Und Met. SAN SINCERADO
CAROS
ESTRUCTURAS
1.00.00 TRABAJOS PRELIMINARES
4.04 COLUMNAS
COLUMNAS CONCRETO F´C=210KG/CM2 m3 75.00
ENCOFRADO Y DESENCOFRADO P/ COLUMNA m2 30.00
IZAJE DE COLUMNAS kg
ACERO FY= 4,200 KG/CM2 kg
4.05 VIGAS
VIGAS CONCRETO F´C=210 KG/CM2 m3 65.00
ENCOFRADO Y DESENCOFRADO P/ VIGAS m2 30.00
ACERO FY= 4,200 KG/CM2 kg
4.07 ESCALERAS
CONCRETO F´C=210 KG/CM2 m3 80.00
ENCOFRADO Y DESENCOFRADO P/ VIGAS m2 30.00
ACERO FY= 4,200 KG/CM2 kg
Inm.
ITEM DESCRIPCCION Und Met. SAN SINCERADO
CAROS
ARQUITECTURA
5.00 ALBAÑILERIA
11.00 OTROS
10.01 CURADO DE SUPERFICIES m2
2.00 ESTRUCTURAS
02.03.10.01 VIGAS
VIGA METALICA ARCO - PEFIL Kg 6,028.02 9.32 56,181.15
02.03.10.02 VIGUETAS
VIGUETA METALICA - ARCO ACERO LISO Kg 4902.57 10.36 50,790.63
02.03.10.03 COBERTURA
CERAMICA DE COLOR 45X45 m2 1,836.00 60.10 110,343.60
SUBTOTAL 232,087.77
IGV 273,863.57
TOTAL 273,863.57
3.00 ARQUITECTURA
3.04.00 PISOS Y PAVIMENTOS
3.04.02 PISOS
ITEM DESCRIPCCION Und Met. Costo TOTAL
CERAMICOS
224000029 PISO CERAMICO DE 30 X 20 cm. m2 35.56 21.24 755.37
3.06.00 COBERTURAS
3.06.01 RECUBRIMIENTO CON PANEES TERMOACUSTICOS
ITEM DESCRIPCCION Und Met. Costo TOTAL
03.06.01.02 PLANCHA TR4 COLOR NATURAL E=0.4 MM INC/CORREAS DE MADERA 2"X2" m2 2158.63 107.58 232,225.42
03.06.01.03 PLANCHA TR4 COLOR NATURAL E=0.4 MM INC/VIGAS METALICAS 2"X2" m2 31.57 106.41 3,359.36
SUBTOTAL 273,025.12
IGV 322,169.64
TOTAL 322,169.64
3.07.00 CARPINTERIA DE MADERA
3.07.01 PUERTAS
ITEM DESCRIPCCION Und Met. Costo TOTAL
SUBTOTAL 91,309.73
IGV 107,745.48
TOTAL 107,745.48
3.07.02 VENTANAS
ITEM DESCRIPCCION Und Met. Costo TOTAL
SUBTOTAL 1,091.27
IGV 1,287.70
TOTAL 1,287.70
VENTANA
203110005 VENTANA DE FIERRO PERFIL DE 1" X 1/8" FIJO MARCO "T" DE 1" C/SEG. 1/2" (T/REJA) Und 626.55 542.26 339,753.00
SUBTOTAL 339,753.00
IGV 400,908.54
TOTAL 400,908.54
PLATEA - VC
ITEM DESCRIPCCION Und ML H M2 TOTAL
185.01 185.01
M2
PLATEA - VC
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
98.55 98.55
M2
COLUMNAS
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
6.00 PABELLON 9 M2 66.41
235.30 235.30
M2
SOBRECIMIENTOS
ITEM DESCRIPCCION Und CANT. L H M2 TOTAL
105.48 105.48
M2
VAL 01
Platea - Vigas Pab.9 43.34 21,852.11
Platea - Vigas Pab.1 110.66
Platea - Vigas Escalera 31.01
Platea - Vigas SS.hh 37.79
Platea - Vigas Pab. 2 60.76
Columnas Pab. 9 66.41
Columnas Pab. 1 168.89
Sobrec. Pab. 9 55.35
Sobrec. Pab. 1 50.13
Metrado total 624.35 S/ 35.00
con Igv
VAL. 02 - ENCOFRADOS 2
ENCOFRADOS GENERALES
EDGAR VILCHEZ NAVARRO
15 DE AGOSTO DEL 2021
PLATEA - VC
ITEM DESCRIPCCION Und ML H M2 TOTAL
197.20 197.20
COLUMNAS
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
268.52 268.52
M2
SOBRECIMIENTOS
ITEM DESCRIPCCION Und CANT. L H M2 TOTAL
278.50 278.50
M2
ALIGERADO - VIGAS
ITEM DESCRIPCCION Und ML H M2 TOTAL
145.55 145.55
M2
VAL 02
Platea - Vigas Pab.4 112.67 30,285.62
Platea - Vigas Pab.5 84.53
Columnas Ss.hh Prim. 78.72
Columnas Pab. 2 117.77
Columnas Pab. 4 72.04
Sobrec. Pab. 1 78.89
Sobrec. Ss.hh. Prim. 78.89
Sobrec. Pab. 2 96.25
Aligerado y Vigas Pab. 9 145.55
PLATEA - VC
ITEM DESCRIPCCION Und ML H M2 TOTAL
221.05 243.37
COLUMNAS
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
314.47 314.47
SOBRECIMIENTOS
ITEM DESCRIPCCION Und CANT. L H M2 TOTAL
346.60 346.60
ALIGERADO - VIGAS
ITEM DESCRIPCCION Und ML H M2 TOTAL
339.37 339.37
M2
226.37 226.37
M2
VAL 03 - ENCOFRADOS
Platea - Ss.hh Secund. 57.32 50,675.14
Platea - Vigas Pab.3 77.22
Platea - Vigas Pab.8 43.26
Platea - Vigas Pab.7 43.26
Columnas - Pab. 4 222.63
Columnas - Pab. 5 91.84
Sobrec. Pab. 4 132.46
Sobrec. Pab. 5 44.37
Sobrec. Escalera 24.56
Sobrec. Sa.hh Secund. 66.55
Sobrec. Pab. 8 27.76
Sobrec. Pab. 3 50.89
Aligerado y Vigas Pab. 1 339.37
Aligerado y Vigas Pab. 2 226.37
VAL. 04 - ENCOFRADOS 4
PLATEA - VC
ITEM DESCRIPCCION Und ML H M2 TOTAL
2.01 ZAPATA ESCALERA PAB- 9-1 / PAB. 4-5 m2 2 15.94 0.70 22.32
0.00 92.46
M2
COLUMNAS
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
0.00 548.70
M2
SOBRECIMIENTOS
ITEM DESCRIPCCION Und CANT. L H M2 TOTAL
0.00 330.94
M2
ALIGERADO - VIGAS
ITEM DESCRIPCCION Und ML H M2 TOTAL
M2 352.83
VAL 04 - ENCOFRADOS
Platea - Pab. 6 92.46 46,372.34
Columnas - Pab. 4 548.70
Sobrec. Pab. 4 330.94
Aligerado y Vigas Pab. 1 352.83
PLATEA - VC
ITEM DESCRIPCCION Und ML H M2 TOTAL
COLUMNAS
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
SOBRECIMIENTOS
ITEM DESCRIPCCION Und CANT. L H M2 TOTAL
ALIGERADO - VIGAS
ITEM DESCRIPCCION Und ML H M2 TOTAL
ESCALERAS
2.00 ESCALERA PABELLON 1 - Ss.hh Primaria m2 60.195
VAL 05 - ENCOFRADOS
Platea - Corred. Prim. 34.94 55,154.58
Colum. - Pab. 4 / Pab.6 186.30
Sobrec. - 255.04
Aligdo.- Pab 1-2-5 -8-7 1,039.37
Escalera - Pab. 1 y Ss.hh 60.20
ZAPATAS
ITEM DESCRIPCCION Und ML H M2 TOTAL
COLUMNAS
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
COLUMNETAS
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
VIGUETAS
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
ALIGERADO - VIGAS
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
VAL 06 - ENCOFRADOS
Zapatas - Arco Techo 30.00 37,615.45
Colum. - Pab. 5 -7 corr. 116.04
Columtas. - Pab. 9-1-2 39.09
Viguetas - Pab. 9 -1 -2 11.96
Aligdo.- Pab 7-6-3 -5 877.64
Escalera - 0.00
ZAPATAS
ITEM DESCRIPCCION Und ML H M2 TOTAL
COLUMNAS
2.00 PABELLON 3 - Segundo Nivel 83.10
COLUMNETAS
5.00 PABELLON 4 10.30
VIGUETAS
7.00 PABELLON 4 3.16
SOBRECIMIENTOS
8.00 CORREDOR 2.86
ALIGERADO - VIGAS
9.00 PABELLON 04-Segundo Nivel m2 384.665
VAL 07 - ENCOFRADOS
Zapatas - Arco Techo 30.00 33,864.23
Colum. - Pab. 3-7-6 corr. 159.30
Colmtas. - Pab. 4 15.90
Vigueta. - Pab. 4 3.16
Sobrec. - Corr. 2.86
Algdo.- Pab 4-7-6 756.33
Metrado total 967.55 S/ 35.00
VAL. 08 - ENCOFRADOS 8
EDGARD VILCHEZ NAVARRO
I.E LAS - 26 Octubre
15 DICIEMBRE DEL 2021
ZAPATAS
1.00 ARCO TECHO - Secundaria 30.00
COLUMNETAS
3.00 PABELLON 1 - Segundo Nivel 19.55
VIGUETAS
5.00 PABELLON 1 -Segundo Nivel 11.93
ALIGERADO - VIGAS
8.00 PABELLON 03 Segundo Nivel m2 297.636
RAMPA - ALIGERADO
2.00 RAMPA 24.91
VAL 08 - ENCOFRADOS
Zapatas. Colum. Techo-Prim. 30.00 19,075.65
Colum. Arco Techo-Prim. 73.73
Colmtas. - Pab.1-2 Seg.Nivel 32.58
Vigueta. - Pab. 1-2 Seg. Nivel 46.17
Algdo.- Pab 3.seg.Nivel 297.64
ZAPATAS
1.00 ARCO TECHO - Secundaria 12.00
COLUMNAS
2.00 ESCALERAS - Primer Descanso 10.03
COLUMNETAS
4.00 PABELLON 7 - Primer Nivel 6.52
ESCALERAS
2.00 ESCALERA PABELLON 4-Pimer Nivel m2 60.195
ARCOTECHO VIGAS
2.00 ARCO TECHO (viga eje 2)-PRIMARIA m2 21.460
TARIMA TARRAJEO
2.00 PABELLÓN 2 - FACHADA LATERAL m2 19.548
VAL 09 - ENCOFRADOS
Zapatas. Arcot. - secund 12.00
Columnas. Escalera 13.96
Escaleras. Pabellón 4 -
Primer Nivel 60.20
Arcotecho Vigas y
Tarima. Eje 2-Primaria 42.92
Tarimas para Tarrajeo 19.55
Metrado total 471.68 S/ 35.00
PRIMER NIVEL
2.02 C-1 49.03
Verticales Und 4.00 1.00 5.70 1.55 35.39
SEGUNDO NIVEL
2.02 C-1 78.92
Verticales Und 4.00 1.00 9.00 1.55 55.87
BAÑOS
2.02 C-1 172.11
Verticales Und 8.00 1.00 9.00 1.55 111.74
V-103 242.38
Horizontales (5/8) Und 7.00 1.00 12.37 1.55 134.39
V-P 109.54
Horizontales (5/8) Und 4.00 1.00 9.43 1.55 58.47
V-B 14.36
Horizontales (3/8) Und 2.00 1.00 9.00 0.56 10.08
PRIMER NIVEL
V-101 207.17
Horizontales (5/8) Und 5.00 1.00 12.37 1.55 95.99
V-102 215.23
Horizontales (5/8) Und 6.00 1.00 12.37 1.55 115.19
V-103 242.38
Horizontales (5/8) Und 7.00 1.00 12.37 1.55 134.39
V-P 48.13
Horizontales (5/8) Und 4.00 1.00 4.15 1.55 25.73
V-B 6.52
Horizontales (3/8) Und 2.00 1.00 4.15 0.56 4.65
PRIMER NIVEL
V-101 6.96
Horizontales (1/2) Und 4.50 1.00 1.00 0.99 4.46
VAL. ACERO - 01
EDGARD VILCHEZ NAVARRO
I.E LAS - 26 Octubre
16 DE SEPTIEMBRE DEL 2021
PLATEA
1.00 PLATEAS KG AREA 6,210.26
VIGAS DE CIMENTACION
2.00 VIGAS KG M 179.98
COLUMNAS
C1 kg 3 78.92 236.76
C2 kg 4 300.38 1,201.54
C3 kg 6 361.79 2,170.71
IZAJE
5.00 PABELLON 5 Y SS.HH SECUNDARIA KG 9,756.50
SOBRECIMIENTO
CISTERNA
PLATEA KG 486.09
VAL 01 15,633.37
PLATEAS 6,210.26 1.00 6,210.26
Ss.hh Sec. / Pab.5-3 0.00
VIGAS DE CIMENT. 179.98 1.00 179.98
Pab. 3 0.00
COLUMNAS 5,036.82 1.00 5,036.82
Pab. 3 - Sh.hh 0.00
IZAJE 9,756.50 0.30 2,926.95
Pab. 5 - Sh.hh 0.00
SOBRECIMIENTO 583.99 1.00 583.99
Ss.hh Secund. 0.00
CISTERNA 695.37 1.00 695.37
VAL. ACERO - 02
EDGARD VILCHEZ NAVARRO
I.E LAS - 26 Octubre
30 DE SEPTIEMBRE DEL 2021
PLATEA
1.00 PLATEAS KG AREA 4,195.26
VIGAS DE CIMENTACION
2.00 VIGAS KG M 539.91
COLUMNAS
3.00 PABELLON 8 KG 1,274.08
C1 kg 2 49.03 98.06
C2 kg 4 182.31 729.24
C3 kg 2 223.39 446.78
C1 kg 2 78.92 157.84
C2 kg 4 300.38 1,201.52
C3 kg 2 361.79 723.58
C1 kg 2 78.92 157.84
C2 kg 4 300.38 1,201.52
C3 kg 2 361.79 723.58
SOBRECIMIENTO
6.00 PABELLON 3 KG 740.49
VIGAS
9.00 PABELLON 9 UND 890.15
CISTERNA
13.00 DOBLE MALLA KG 400.51
VAL 02 - ACERO
PLATEAS 4,195.26 22,596.98
Pab. 8 / Pab. 7 0.00
VIGAS DE CIMENT. 539.91
Pab. 8 / Pab. 7
COLUMNAS 5,439.96
Pab. 8 / Pab. 7
SOBRECIMIENTO 1,559.36
Pab. 3 / Pab. 8 / Pab. 7
VIGAS 4,578.14
Pab. 9 / Pab. 1 / Pab. 2
ALIGERADO 5,883.84
Pab. 9 / Pab. 1 / Pab. 2
CISTERNA 400.51
VAL. ACERO - 03
EDGARD VILCHEZ NAVARRO
I.E LAS - 26 Octubre
15 OCTUBRE DEL 2021
PLATEA
1.00 PLATEAS KG AREA 1,350.48
VIGAS DE CIMENTACION
2.00 VIGAS KG M 179.97
COLUMNETAS
3.00 PABELLON 9 KG 1,005.70
Ca kg 16 172.11 2,753.79
Ca kg 10 20.28 202.80
SOBRECIMIENTO
14.00 PABELLON 6 KG 409.44
VIGAS
15.00 PABELLON 4 UND 3,759.73
ALIGERADO
16.00 VIGUETAS BALANCINES - TEMPERATURA KG 1,860.81
COLUMNETAS 5,479.19
Pab. 1-2-3-4-5-6-7-8-9
SOBRECIMIENTO 409.44
Pab. 6
VIGAS 3,759.73
Pab. 4
ALIGERADO 1,860.81
Pab. 9 / Pab. 1 / Pab. 2
VAL. ACERO - 04
EDGARD VILCHEZ NAVARRO
I.E LAS - 26 Octubre
31 OCTUBRE DEL 2021
PLATEA
1.00 CORREDOR - PRIMARIA KG AREA 923.44
VIGAS DE CIMENTACION
2.00 CORREDOR - PRIMARIA KG M 97.44
SOBRECIMIENTO
3.00 CORREDOR KG 30.86
COLUMNAS
4.00 CORREDOR KG 921.69
C1 kg 6 144.16 864.96
C-c Kg 1 56.73 56.73
C1 kg 6 0.00 0.00
Cc kg 1 0.00 0.00
VIGAS
5.00 PABELLON 1 SEGUNDO PISO KG 2,188.62
V-101 Und 1 414.34
ALIGERADO
11.00 VIGUETAS BALANCINES - TEMPERATURA KG M2 8,761.30
PABELLON 5 kg 2,784.94
PABELLON 8 kg 957.60
ESCALERA
12.00 ESCALERA PABELLON 01 KG 454.35
PAÑO 1 kg 81.42
PAÑO 2 Kg 106.50
PAÑO 3 Kg 159.93
PAÑO 4 Kg 106.5
VAL 04 - ACERO
PLATEA 923.44 18,662.94
Corredor Primaria 0.00
VIGAS DE CIMENT. 97.44
Corredor Primaria
SOBRECIMIENTO 30.86
Corredor Primaria
COLUMNAS 921.69
Corredor Primaria
VIGAS 7,339.77
Pab. 1-2-5-8-7-Escalera
ALIGERADOS 8,761.30
Pab. 4
ESCALERA 454.35
Pab. 9 / Pab. 1 / Pab. 2
VAL. ACERO - 05
EDGARD VILCHEZ NAVARRO
I.E LAS - 26 Octubre
15 NOVIEMBRE DEL 2021
ZAPATAS
1.00 ARCO METALICO - PRIMARIA KG Nº V 662.60
C1 kg 5 539.81 2699.05
VIGUETAS
ITEM DESCRIPCCION Und CANT. ML H M2 TOTAL
VIGAS
5.00 PABELLON 6 UND 1,304.50
V-101 Und 1 414.34
V-102 Und 1 414.34
V-103 Und 1 242.38
V-P Und 1 219.08
V-B Und 1 14.36
ALIGERADO
8.00 VIGUETAS BALANCINES - TEMPERATURA KG M2 7,690.74
PABELLON 7 kg 957.60
PABELLON 8 kg 957.60
PABELLON 3 kg 2,990.60
PABELLON 5 kg 2,784.94
VAL 05 - ACERO
ZAPATAS 662.60 15,934.82
Arcotecho primaria 0.00
COLUMNAS 2,699.05
Arcotch primaria
VIGUETAS 69.26
Confinamiento de tabiques
VIGAS 4,738.67
Pab. 6 -3 -5
ALIGERADOS 7,690.74
Pab.7 - 8 - 3 -5
ZAPATAS
1.00 ARCO METALICO - PRIMARIA KG Nº V 662.60
C1 kg 5 539.81 2699.05
C1 kg 30 45.96 1378.8
VIGAS
15.00 PABELLON 4-Segundo Nivel UND 3,574.48
VIGUETAS
3.00 PABELLON 4 30.86
VAL 06 - ACERO
ZAPATAS 1,231.40 18,257.87
Arcotecho primaria 0.00
COLUMNAS 4,077.85
Arcotch primaria
VIGAS 5,917.59
Pab. 7-4
VIGUETAS 30.86
Pab. 7-4
ALIGERADOS 6,910.77
Pab.7-4
ZAPATAS
1.00 ARCO METALICO - Secundaria KG Nº V 662.60
C1 kg 10 542.57 5425.7
C1 kg 10 45.96 459.6
SOBRECIMIENTO
6.00 SOBRECIMIENTO-Cerco ML 236.45
VIGUETAS
3.00 PABELLON 1-Segundo Nivel 51.57
VIGAS
6.00 PABELLON 3-Segundo Nivel UND 1,672.89
ALIGERADO
7.00 VIGUETAS BALANCINES - TEMPERATURA KG M2 2,990.60
VAL 07 - ACERO
ZAPATAS 852.20 12,682.06
Arcotecho primaria 0.00
COLUMNAS 5,885.30
Arcotch primaria
Sobrec-Cerco 236.45
VIGUETAS 268.43
Pab. 1-2
VIGAS 1,672.89
Pab. 3
ALIGERADOS 3,751.89
Pab.3, SS.HH Secund
ZAPATAS
1.00 ARCO METALICO - Secundaria KG Nº V 265.04
COLUMNETAS / PABELLON 03
1.00 PABELLON 3 kg
0.222 0.395
1.01 Cp kg
1.00 PABELLON 2 kg
0.222 0.395
1.01 Cp kg 2
VIGUETAS / PABELLON 02
1.00 PABELLON 2 kg
0.222 0.395
1.01 Vigueta kg
ESCALERA 982.69
PAÑO 1 kg 81.42
PAÑO 2 Kg 106.50
PAÑO 3 Kg 159.93
PAÑO 4 Kg 106.5
VIGAS DE ESCALERA
10.00 ESCALERA PABELLON 1 UND 501.22
ALIGERADO DE ESCALERA
Acero de temperatura Kg 6.66
Viguetas Kg 20.46
VAL 08 - ACERO
ZAPATAS 265.04 1,393.34
Arcotecho Secundaria 0.00
COLUMNAS 92.82
Pabellon 3 / Pabellon 2
VIGUETAS 52.79
Pabellon 2
ESCALERA
Pab. 4 - 5 454.35
VIGAS DE ESCALERA 501.22
ALIGERADO ESCALERA 27.12
BALANCINES LOSA
Pab. 3
ZAPATAS- CERCO
1.00 Cerco 36.260
CIMIENTO -CORRIDO
1.00 Cimiento Corrido-Cerco 22.652
VAL 01 - ENCOFRADOS
ZAPATAS- CERCO 36.26 2,061.92
CIMIENTO -CORRIDO 22.65
ZAPATAS- CERCO
1.00 Cerco 35.140
COLUMNAS- CERCO
2.00 Cerco 15.925
CIMIENTO -CORRIDO
3.00 Cimiento Corrido-Cerco 21.336
SOBRECIMIENTO
4.00 Sobrecimiento-Cerco 90.818
VAL 02 - ENCOFRADOS
ZAPATAS 35.14 5,712.67
COLUMNAS 15.93
CIMIENTO CORRIDO 21.34
SOBRECIMIENTO 90.82
CIMIENTO -CORRIDO
2.00 Cimiento Corrido-Cerco 4.760
COLUMNAS- CERCO
3.00 Cerco 55.26
SOBRECIMIENTO
4.00 Sobrecimiento-Cerco 42.900
VAL 03 - ENCOFRADOS
CIMIENTO CORRIDO 4.76
COLUMNAS 55.26
SOBRECIMIENTO 42.90
ZAPATAS- CERCO
1.00 Cerco 64.54
CIMIENTO -CORRIDO
2.00 Cimiento Corrido-Cerco 39.27
SOBRECIMIENTO
3.00 Sobrecimiento-Cerco 157.46
COLUMNAS- CERCO
4.00 Cerco 27.82
VIGAS- CERCO
5.00 Cerco 21.20
VAL 03 - ENCOFRADOS
ZAPATAS 64.54
CIMIENTO CORRIDO 39.27
COLUMNAS 27.82
SOBRECIMIENTO 157.46
VIGAS 21.20
ZAPATAS- CONCRETO
1.00 ZAPATAS-Cerco=fc 210 M3
VAL 01 - EJECUCION
ZAPATAS 10.10 65.00
CIMIENTO CORRIDO 6.80 60.00
Con. Igv
VAL. 02 - EJECUCION
VACIADOS DE CONCRETO
Horly Percy Michilot Garcia
29 DE DICIEMBRE DEL 2021
ZAPATAS- CONCRETO
ITEM DESCRIPCCION Und L A H M3
COLUMNA- CONCRETO
2.00 Cerco
SOBRECIMIENTO - CONCRETO
4.00 Sobrecimiento-Cerco=fc 100 M3
VAL 02 - EJECUCION
ZAPATAS 6.93 65.00
COLUMNAS 1.46 75.00
CIMIENTO CORRIDO 6.43 60.00
SOBRECIMIENTO 5.90 65.00
Con. Igv
VAL. 03 - EJECUCION
VACIADOS DE CONCRETO
Horly Percy Michilot Garcia
15 DE ENERO DEL 2022
COLUMNA- CONCRETO
2.00 Cerco
SOBRECIMIENTO - CONCRETO
1.00 Sobrecimiento-Cerco=fc 100 M3
VAL 03 - EJECUCIÓN
COLUMNAS 4.78 75.00 358.13
CIMIENTO CORRIDO 1.43 60.00 85.68
SOBRECIMIENTO 2.79 65.00 181.25
VAL. 04 - EJECUCION
VACIADOS DE CONCRETO
Horly Percy Michilot Garcia
31 DE ENERO DEL 2022
ZAPATAS- CERCO
1.00 ZAPATAS-Cerco=fc 210 M3
SOBRECIMIENTO - CONCRETO
3.00 Sobrecimiento-Cerco=fc 100 M3
4.00 Cerco
VIGAS- CONCRETO
5.00 Cerco
ALBAÑILERIA
6.00 Cerco
VAL 03 - EJECUCIÓN
ZAPATAS 17.72 65.00 1152.06
COLUMNAS 2.06 75.00 154.73
CIMIENTO CORRIDO 13.21 60.00 792.54
SOBRECIMIENTO 10.23 65.00 665.25
VIGAS 1.47 60.00 88.50
ALBAÑILERIA 49.50 30.00 1485.00
Sin. Igv
1
10.10
6.80
1,064.38
656.57
407.81
1,255.96
2
TOTAL
6.93
1.46
6.43
5.90
1,329.40
450.45
109.69
385.56
383.71
1,568.70
3
4.78
1.43
2.79
625.06
4
TOTAL
17.72
13.21
10.23
2.06
1.47
49.50
4,338.08
4,338.08
VAL. 01 - ENCOFRADOS 1
FERNANDO ARCE
I.E LAS - 26 Octubre
07 DICIEMBRE DEL 2021
ALIGERADO - VIGAS
ITEM DESCRIPCCION Und ML H M2 TOTAL
VAL 07 - ENCOFRADOS
Aligerado Sshh. - 81.52 2,445.54
Metrado total 81.52 S/ 30.00
ALIGERADO - VIGAS
ITEM DESCRIPCCION Und ML H M2 TOTAL
VAL 02 - ENCOFRADOS
SS.HH-Secundaria 125.50 5,779.50
CORREDOR Primaria 67.15
COLUMNETAS
1.00 PABELLON 8- Primer Nivel N° H 6.30
VIGUETAS
2.00 PABELLON 8- Primer Nivel N° Lados L H 2.42
ZAPATAS
3.00 Zapatas Cerco 30.80
SOBRECIMIENTO
3.00 Sobrecimiento Cerco 7.15
COLUMNAS
3.00 SS.HH. SECUNDARIA - Segundo Nivel 15.40
VAL 01 - ENCOFRADOS
Pab.7 Seg. Nivel, Pab.6 Seg.
Nivel, Pab.5 Seg. Nivel 47.33
Parapeto, Pab. 7 Seg. Nivel,
Pab.5 Seg. Nivel 24.36
VIGUETAS
1.00 PABELLON 5 - Primer Nivel N° de Lados H L 2.88
COLUMNETAS
4.00 PABELLON 5 - Primer Nivel N° de Columnetas H 14.16
COLUMNAS
23.00 SS.HH. SECUNDARIA - Segundo Nivel N° de Columnas H 66.59
ALIGERADO - VIGAS
ITEM DESCRIPCCION Und ML H M2 TOTAL
CIMIENTO CORRIDO-CERCO
2.00 Cimiento Corrido-Cerco 11.90
COLUMNETAS 34.40
Pab. 5 1° y 2°, Pab. 6, s.h
COLUMNAS 81.11
Ss.hh Secund y Prima.
SOLADO-CERCO 4.14
Metrado total 286.25 S/ 30.00
COLUMNETAS
1.00 PABELLON 5 - Segundo nivel KG Varillas Estribos 46.40
VIGUETAS
6.00 PABELLON 8 - Primer nivel KG Varillas Estribos 16.51
COLUMNAS
11.00 SS.HH. SECUNDARIA - Segundo nivel KG 1,342.76
SOBRECIMIENTO
12.00 SOBRECIMIENTO CERCO PERIMETRICO - SECUNDARIA ML 129.36
ZAPATAS
12.00 ZAPATA CERCO PERIMETRICO - SECUNDARIA N° 89.67
VAL 01 - ACERO
COLUMNETAS 183.07 2,302.65
Pab.8 Prim. Nivel, Parapeto - Pab. 5
Seg. Nivel - Pab.7 Seg. Nivel - Pab. 5
Seg. Nivel
VIGUETAS 110.03
Pab.8 Prim. Nivel, Parapeto - Pab. 5
Seg. Nivel - Pab.7 Seg. Nivel - Pab. 6
Seg. Nivel
COLUMNAS 1,919.88
SSHH Secundaria
ZAPATAS 89.67
Cerco Secundaria
SOBRECIMIENTO 129.36
Cerco Secundaria
Metrado total 2,302.65 S/ 1.00
VAL. 2 - ACERO 2
GREGORIO COVEÑAS RAMOS
I.E LAS - 26 Octubre
31 DE ENERO DEL 2022
COLUMNETAS
1.00 PABELLON 5 - Primer nivel KG Varillas Estribos 197.27
VIGUETAS
8.00 PABELLON 5 - Primer nivel KG Varillas Estribos 19.35
3 Viguetas Eje A kg 9.41 1.89 11.30
COLUMNAS
13.00 SS.HH. SECUNDARIA - Primer nivel KG Varillas Estribos 65.11
SOBRECIMIENTO- CERCO
6.00 SOBRECIMIENTO-Cerco ML 318.46
VAL 02 - ACERO
COLUMNETAS 492.73 2,001.39
Pab.5 -1°. Nivel, Pab. 6- 2° nivel
/Pab. 6 Parapeto /Pab. 7-
2°nivel/Pab. 7 parpto/Ss.hh secund.
1°nivel
VIGUETASy 2°nivel 102.29
Pab.5 - 1° nivel/ Pab. 6 -1° nivel/
Pab.7 - 2° nivel /Pab.7 Parpto.
COLUMNAS 65.11
SSHH Secund-1° nivel
Sin Igv
2,001.39
VAL. 1 - EJECUCION 1
VACIADOS DE CONCRETO
GREGORIO COVEÑAS RAMOS
15 DE ENERO DEL 2022
ALBAÑILERIA
1.00 PABELLON 5- Segundo Nivel M2 SOGA L H 14.07
TARRAJEO
6.00 VIGAS M2 L 42.83
V201= EJE 4 - Parte externa (cara interior y abajo) m2 1 0.65 2.55 1.66
ZOCALO
12.00 PABELLONES M M 15.76
ZAPATAS
13.00 ZAPATAS CERCO PERIMETRICO - Secundaria N° H 4.28
SOBRECIMIENTOS
14.00 Sobrecimienos Cerco N° H 1.51
VIGUETAS
15.00 PABELLON 8 - Primer Nivel Fondo H L 0.18
COLUMNETAS
18.00 PABELLON 8 - Primer Nivel N° H 0.26
COLUMNAS
18.00 SSHH SECUNDARIA - Segundo Nivel N° H 1.93
C1- Eje D m3 4 0.25 0.50 3.08 1.54
C1- Eje B-1 m3 1 0.25 0.50 3.08 0.39
CIMIENTO CORRIDO
18.00 CIMIENTO CORRIDO CERCO PERIMETRICO - Secundaria N° H 1.37
TARRAJEO
VIGAS 42.83 25.00 1,070.71
COLUMNAS 36.79 25.00 919.80
MUROS 214.56 18.00 3,862.05
CIELO RASO 75.44 25.00 1,886.12
DERRAMES 49.48 3.00 148.44
VAL. 2 - EJECUCION 2
VACIADOS DE CONCRETO
GREGORIO COVEÑAS RAMOS
31 DE ENERO DEL 2022
ALBAÑILERIA
1.00 PABELLON 5 - Primer Nivel M2 SOGA L H 54.16
TARRAJEO
7.00 VIGAS M2 L 84.24
ZOCALO
14.00 PABELLONES M M 35.61
PABELLON 5 - Primer Nivel (Eje A) ml 10.31
VIGUETAS
15.00 PABELLON 5 - Primer Nivel Fondo H L 0.22
COLUMNETAS
19.00 PABELLON 5 - Primer Nivel N° H 1.05
COLUMNAS
25.00 SS.HH. SECUNDARIA - Segundo Nivel N° H 8.48
CONTRAPISO
26.00 PABELLONES 236.82
CERAMICO
27.00 PABELLONES 217.46
ZOCALO CERAMICO
28.00 PABELLONES 94.45
SOLADOS-CERCO
2.00 SOLADOS-Cerco=fc 210 M3 1.22