Nº DE MEDIDAS
ITEM DESCRIPCION UND. Nº ELEMEN. PARCIAL TOTAL
VECES LARGO ANCHO ALTO Area/vol
I ESTRUCTURAS
2 OBRAS PRELIMINARES
02.02 LIMPIEZA DE TERRENO MANUAL m2 122.80
1.00 1.00 12.00 10.23 122.76
02.03 TRAZO Y REPLANTEO PRELIMINAR m2 122.80
1.00 1.00 12.00 10.23 122.76
3 MOVIMIENTO DE TIERRAS
03.02 EXCAV. ZANJAS P/CIMIENTOS m3 56.30
ZAPATAS Y FALZA ZAPATA
eje A 1.00 2.00 1.40 1.40 2.05 8.04
1.00 1.00 1.70 1.70 2.05 5.92
eje B 1.00 2.00 1.70 1.70 2.05 11.85
1.00 1.00 2.10 2.10 2.05 9.04
VIGAS DE CIMENTACION
eje 1,3 1.00 2.00 5.35 0.40 1.45 6.21
eje 2 1.00 1.00 5.00 0.40 1.45 2.90
eje A 1.00 2.00 4.29 0.40 1.45 4.98
eje B 1.00 2.00 3.94 0.40 1.45 4.57
CIMIENTO CORRIDO
eje A 1.00 2.00 1.45 0.95 2.76
03.03 RELLENO COMPACTADO A MANO-MAT. PROPIO m3 34.60
ZAPATAS Y FALZA ZAPATA
eje A 1.00 2.00 1.40 1.40 1.40 5.49
1.00 1.00 1.70 1.70 1.40 4.05
eje B 1.00 2.00 1.70 1.70 1.40 8.09
1.00 1.00 2.10 2.10 1.40 6.17
VIGAS DE CIMENTACION
eje 1,3 1.00 2.00 5.35 0.40 0.60 2.57
eje 2 1.00 1.00 5.00 0.40 0.60 1.20
eje A 1.00 2.00 4.29 0.40 0.90 3.09
eje B 1.00 2.00 3.94 0.40 0.90 2.84
CIMIENTO CORRIDO
eje A 1.00 2.00 0.60 0.95 1.14
03.04 RELLENO COMPACTADO A MANO-MAT. DE PRESTAMO m3 17.50
PRIMER NIVEL
taller polifuncional 1.00 1.00 0.15 83.04 12.46
vereda 1.00 1.00 12.00 1.80 0.15 3.24
1.00 1.00 12.00 1.00 0.15 1.80
03.05 NIVELACION DE TERRENO Y APISONADO C/20cm m2 116.60
PRIMER NIVEL
taller polifuncional 1.00 1.00 83.04 83.04
vereda 1.00 1.00 12.00 1.80 21.60
1.00 1.00 12.00 1.00 12.00
03.06 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES m3 28.20
de excavacion 1.00 1.30 56.30 73.19
quitar relleno 1.00 (1.30) 34.60 (44.98)
4 CONCRETO SIMPLE
04.02 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 29.90
ZAPATAS Y FALZA ZAPATA
eje A 1.00 2.00 1.40 1.40 3.92
1.00 1.00 1.70 1.70 2.89
eje B 1.00 2.00 1.70 1.70 5.78
1.00 1.00 2.10 2.10 4.41
VIGAS DE CIMENTACION
eje 1,3 1.00 2.00 5.35 0.40 4.28
eje 2 1.00 1.00 5.00 0.40 2.00
eje A 1.00 2.00 4.29 0.40 3.43
eje B 1.00 2.00 3.94 0.40 3.15
04.03 CONCRETO CICLOPEO 1:10(C:H)+30% P.G.-CIMIENTOS CORRIDOS m3 2.10
CIMIENTO CORRIDO
EJE A 1.00 2.00 0.80 1.31 2.10
04.04 CONCRETO CICLOPEO 1:8(C:H)+25% P.M.-SOBRECIMIENTOS m3 4.40
eje 1 Y 3 1.00 4.00 2.88 0.15 0.95 1.64
eje A 1.00 2.00 4.86 0.15 1.25 1.82
eje B 1.00 2.00 1.13 0.15 1.25 0.42
1.00 2.00 1.46 0.15 1.25 0.55
04.05 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTOS m2 59.10
PARA SOBRECIMIENTOS
eje 1 Y 3 2.00 4.00 2.88 0.95 21.89
eje A 2.00 2.00 4.86 1.25 24.30
eje B 2.00 2.00 1.13 1.25 5.65
2.00 2.00 1.46 1.25 7.30
04.06 FALSO PISO DE 4" DE CONCRETO 1:8 m2 83.00
PRIMER NIVEL
taller polifuncional 1.00 1.00 83.04 83.04
5 CONCRETO ARMADO
05.01 ZAPATAS
05.01.01 CONCRETO F'C=210 KG/CM2 ZAPATAS m3 10.20
eje A 1.00 2.00 1.40 1.40 0.60 2.35
1.00 1.00 1.70 1.70 0.60 1.73
SUSTENTO DE METRADOS DE ESTRUCTURA Y ARQUITECTURA DEL PABELLON "4"
proyecto
" MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL COLEGIO SECUNDARIO J.B.S.O. DE OCOBAMBA, DISTRITO DE OCOBAMBA-CHINCHEROS-APURIMAC "
:
Ubicación: OCOBAMBA - CHINCHEROS - APURIMAC
Localidad: OCOBAMBA
Fecha :ABRIL- 2013
Nº DE MEDIDAS
ITEM DESCRIPCION UND. Nº ELEMEN. PARCIAL TOTAL
VECES LARGO ANCHO ALTO Area/vol
eje B 1.00 2.00 1.70 1.70 0.60 3.47
1.00 1.00 2.10 2.10 0.60 2.65
05.01.03 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg coficiente 252.00
Z-4, fierro 5/8" 2.00 14.00 1.25 1.56 54.60
Z-5, fierro 5/8" 3.00 18.00 1.55 1.56 130.57
Z-6, fierro 5/8" 1.00 22.00 1.95 1.56 66.92
05.02 VIGAS DE CIMENTACION
05.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 11.10
eje 1, 2 Y 3 1.00 3.00 6.60 0.40 0.80 6.34
eje A Y B 1.00 2.00 11.97 0.40 0.50 4.79
05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL VIGAS DE CIMENTACION m2 27.80
eje 1, 2 Y 3 1.00 3.00 6.60 0.80 15.84
eje A Y B 1.00 2.00 11.97 0.50 11.97
05.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION kg coeficiente 1,283.00
eje 1,2,3
fierro 3/4" 3.00 8.00 8.70 2.24 467.71
fierro 1/2" 3.00 2.00 7.20 1.02 44.06
estribo 3/8" 3.00 37.00 2.13 0.56 132.40
eje A y B
fierro 3/4" 2.00 8.00 12.90 2.24 462.34
fierro 1/2" 2.00 2.00 11.80 1.02 48.14
estribo 3/8" 2.00 66.00 1.73 0.56 127.88
05.03 COLUMNAS
05.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 5.90
PRIMER NIVEL
columna 0.50x0.30 1.00 4.00 0.50 0.30 2.74 1.64
columna T 1.00 2.00 2.74 0.24 1.32
SEGUNDO NIVEL
columna 0.50x0.30 1.00 4.00 0.50 0.30 2.74 1.64
columna T 1.00 2.00 2.74 0.24 1.32
05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL COLUMNAS m2 perimetro 59.20
PRIMER NIVEL
columna 0.50x0.30 1.00 4.00 1.60 2.74 17.54
columna T 1.00 2.00 2.20 2.74 12.06
SEGUNDO NIVEL
columna 0.50x0.30 1.00 4.00 1.60 2.74 17.54
columna T 1.00 2.00 2.20 2.74 12.06
05.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg cant/col var/col longitud coficiente 1,875.00
PORTICO EN EJES 1 Y 3
columna 0.50x0.30
fierro 3/4" 2.00 4.00 6.99 2.24 125.26
fierro 1/2" 2.00 2.00 6.99 1.02 28.52
fierro 3/4" 2.00 4.00 6.44 2.24 115.40
fierro 3/4" 2.00 4.00 3.10 2.24 55.55
fierro 1/2" 2.00 4.00 2.78 1.02 22.68
estribo 3/8" 2.00 53.00 1.47 0.56 87.26
estribo 3/8" 2.00 53.00 0.87 0.56 51.64
columna 0.50x0.30
fierro 3/4" 2.00 6.00 6.99 2.24 187.89
fierro 1/2" 2.00 4.00 6.99 1.02 57.04
fierro 3/4" 2.00 4.00 3.10 2.24 55.55
fierro 1/2" 2.00 4.00 2.78 1.02 22.68
estribo 3/8" 2.00 53.00 1.47 0.56 87.26
estribo 3/8" 2.00 53.00 0.87 0.56 51.64
PORTICO EN EJE 2
columna T
fierro 1" 1.00 10.00 6.99 3.97 277.50
fierro 1" 1.00 4.00 6.44 3.97 102.27
fierro 3/4" 1.00 8.00 3.09 2.24 55.37
fierro 5/8" 1.00 2.00 2.80 1.56 8.74
estribo 3/8" 1.00 53.00 1.41 0.56 41.85
estribo 3/8" 1.00 53.00 1.63 0.56 48.38
columna T
fierro 1" 1.00 6.00 6.99 3.97 166.50
fierro 1" 1.00 2.00 6.44 3.97 51.13
fierro 5/8" 1.00 2.00 6.44 1.56 20.09
fierro 3/4" 1.00 6.00 3.09 2.24 41.53
fierro 3/4" 1.00 2.00 3.09 2.24 13.84
fierro 5/8" 1.00 2.00 2.80 1.56 8.74
estribo 3/8" 1.00 53.00 1.41 0.56 41.85
estribo 3/8" 1.00 53.00 1.63 0.56 48.38
Nº DE MEDIDAS
ITEM DESCRIPCION UND. Nº ELEMEN. PARCIAL TOTAL
VECES LARGO ANCHO ALTO Area/vol
1.00 2.00 0.30 0.15 0.55 0.05
EJE B 1.00 4.00 0.50 0.15 2.69 0.81
1.00 2.00 0.20 0.15 2.69 0.16
PASILLO 1.00 1.00 16.15 0.15 0.90 2.18
05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE CONFINAMIENTO m2 90.00
PRIMER NIVEL
EJE 1 y 3 2.00 6.00 0.20 3.12 7.49
EJE A 2.00 2.00 0.50 3.64 7.28
2.00 2.00 0.30 1.33 1.60
EJE B 2.00 2.00 0.50 3.94 7.88
2.00 2.00 0.36 3.94 5.67
2.00 4.00 0.20 3.94 6.30
SEGUNDO NIVEL
EJE 1 y 3 2.00 6.00 0.20 2.52 6.05
EJE A 2.00 2.00 0.50 2.69 5.38
2.00 2.00 0.30 0.55 0.66
EJE B 2.00 4.00 0.50 2.69 10.76
2.00 2.00 0.20 2.69 2.15
PASILLO 2.00 1.00 16.15 0.90 29.07
05.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS DE CONFINAMIENTO kg 258.00
PORTICO EN EJES 1 Y 3
c-b
fierro 3/8" 6.00 2.00 4.12 0.56 27.69
estribos 1/4" 6.00 11.00 0.45 0.25 7.43
c-b
fierro 3/8" 6.00 2.00 3.22 0.56 21.64
estribos 1/4" 6.00 13.00 0.45 0.25 8.78
PORTICO EN EJES A
c-a
fierro 3/8" 2.00 6.00 4.12 0.56 27.69
estribos 1/4" 2.00 11.00 1.20 0.25 6.60
c-a
fierro 3/8" 2.00 2.00 3.22 0.56 7.21
estribos 1/4" 2.00 13.00 1.20 0.25 7.80
c-d
fierro 3/8" 2.00 4.00 2.35 0.56 10.53
estribos 1/4" 2.00 3.00 0.83 0.25 1.25
c-d
fierro 3/8" 2.00 4.00 1.20 0.56 5.38
estribos 1/4" 2.00 3.00 0.83 0.25 1.25
PORTICO EN EJES b
PRIMER NIVEL
c-a
fierro 3/8" 2.00 6.00 4.52 0.56 30.37
estribos 1/4" 2.00 13.00 1.20 0.25 7.80
c-c
fierro 3/8" 2.00 2.00 3.14 0.56 7.03
estribos 1/4" 2.00 7.00 0.45 0.25 1.58
c-b
fierro 3/8" 4.00 2.00 4.52 0.56 20.25
estribos 1/4" 4.00 13.00 0.45 0.25 5.85
SEGUNDO NIVEL
c-a
fierro 3/8" 2.00 6.00 3.43 0.56 23.05
estribos 1/4" 2.00 14.00 1.20 0.25 8.40
c-c
fierro 3/8" 2.00 2.00 2.02 0.56 4.52
estribos 1/4" 2.00 7.00 0.45 0.25 1.58
c-b
fierro 3/8" 2.00 2.00 3.43 0.56 7.68
estribos 1/4" 4.00 14.00 0.45 0.25 6.30
05.05 GARGOLA DE CONCRETO
05.05.01 GARGOLA DE CONCRETO.-TERMINADO S/DISEÑO und 2.00
1.00 2.00 2.00
05.06 VIGAS
05,06,01 CONCRETO EN VIGAS F´C=210 kg/cm2 m3 15.50
PRIMER NIVEL
eje A Y B
VIGA .30x .40 1.00 2.00 10.80 0.30 0.40 2.59
eje 1 , 2 Y 3
VIGA .30X.60 1.00 3.00 0.30 5.40 4.86
SEGUNDO NIVEL
eje A Y B
VIGA .30x .40 1.00 1.00 10.80 0.30 0.40 1.30
eje 1 , 2 Y 3
VIGA .30x .40 1.00 3.00 0.30 4.25 3.83
VIGA DE AMARRE 1.00 2.00 7.44 0.30 0.40 1.79
VIGA CUMBRERA 1.00 1.00 13.20 0.25 0.35 1.16
05,06,02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 cara alto/ancho 152.40
PRIMER NIVEL
eje A Y B
VIGA .30x .40 1.00 2.00 10.80 1.10 23.76
eje 1 , 2 Y 3
VIGA .30X.60 2.00 3.00 5.40 32.40
SUSTENTO DE METRADOS DE ESTRUCTURA Y ARQUITECTURA DEL PABELLON "4"
proyecto
" MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL COLEGIO SECUNDARIO J.B.S.O. DE OCOBAMBA, DISTRITO DE OCOBAMBA-CHINCHEROS-APURIMAC "
:
Ubicación: OCOBAMBA - CHINCHEROS - APURIMAC
Localidad: OCOBAMBA
Fecha :ABRIL- 2013
Nº DE MEDIDAS
ITEM DESCRIPCION UND. Nº ELEMEN. PARCIAL TOTAL
VECES LARGO ANCHO ALTO Area/vol
1.00 3.00 9.03 0.30 8.13
SEGUNDO NIVEL
eje A Y B
VIGA .30x .40 1.00 2.00 10.80 1.10 23.76
eje 1 , 2 Y 3
VIGA .30x .40 2.00 3.00 4.25 25.50
1.00 3.00 10.25 0.30 9.23
VIGA DE AMARRE 1.00 2.00 7.44 1.10 16.37
VIGA CUMBRERA 1.00 1.00 13.20 1.00 13.20
05,06,03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg cant/vig var/vig longitud coficiente 1,974.00
PORTICO EN EJES 1 Y 3
2DO NIVEL
V.P.201 .30X.60
fierro 3/4" 2.00 2.00 10.67 2.24 95.60
fierro 5/8" 2.00 2.00 10.67 1.56 66.58
fierro 1/2" 2.00 2.00 2.14 1.02 8.73
fierro 3/4" 2.00 2.00 3.80 2.24 34.05
fierro 3/4" 2.00 2.00 2.80 2.24 25.09
fierro 5/8" 2.00 1.00 2.80 1.56 8.74
fierro 3/4" 2.00 2.00 7.80 2.24 69.89
fierro 5/8" 2.00 1.00 7.80 1.56 24.34
estribo 3/8" 2.00 42.00 1.61 0.56 75.73
(estribo variable)estribo 3/8" 2.00 17.00 1.33 0.56 25.32
PORTICO EN EJES 2
V.P.201 .30X.60
fierro 3/4" 1.00 4.00 10.67 2.24 95.60
fierro 5/8" 1.00 2.00 2.14 1.56 6.68
fierro 1" 1.00 2.00 3.80 3.97 30.17
fierro 3/4" 1.00 2.00 2.80 2.24 12.54
fierro 5/8" 1.00 1.00 2.80 1.56 4.37
fierro 3/4" 1.00 2.00 7.80 2.24 34.94
fierro 5/8" 1.00 1.00 7.80 1.56 12.17
fierro 3/4" 1.00 2.00 4.50 2.24 20.16
estribo 3/8" 1.00 42.00 1.61 0.56 37.87
(estribo variable)estribo 3/8" 1.00 17.00 1.33 0.56 12.66
PORTICO EN EJES A Y B
fierro 5/8" 2.00 4.00 13.35 1.56 166.61
fierro 1/2" 2.00 4.00 4.90 1.02 39.98
fierro 1/2" 2.00 4.00 4.80 1.02 39.17
estribo 3/8" 2.00 68.00 1.30 0.56 99.01
ULTIMO TECHO
EJE 1, 2 Y 3
V.P.401 .30X.40
fierro 5/8" 3.00 2.00 6.25 1.56 58.50
fierro 5/8" 3.00 2.00 6.99 1.56 65.43
fierro 5/8" 3.00 2.00 5.00 1.56 46.80
fierro 5/8" 3.00 2.00 5.42 1.56 50.73
fierro 1/2" 3.00 1.00 3.37 1.02 10.31
estribo 3/8" 3.00 70.00 1.21 0.56 142.30
EJES A Y B
fierro 5/8" 2.00 4.00 13.35 1.56 166.61
estribo 3/8" 2.00 68.00 1.30 0.56 99.01
VIGA DE AMARRE
EJE 1,3
VB-401 .30X.40
fierro 5/8" 2.00 2.00 7.97 1.56 49.73
fierro 5/8" 2.00 2.00 7.83 1.56 48.86
fierro 3/8" 2.00 1.00 3.54 0.56 3.96
estribo 3/8" 2.00 39.00 1.21 0.56 52.85
CUMBRERA
V.A.301-.25X.30
fierro 1/2" 1.00 5.00 14.34 1.02 73.13
estribo 3/8" 1.00 76.00 1.40 0.56 59.58
05.07 VIGUETAS DE CONFINAMIENTO
05,07,01 CONCRETO EN VIGAS DE CONFINAMIENTO F'C=175 KG/CM2 m3 1.20
PRIMER NIVEL
EJE 1 Y 3 1.00 2.00 6.36 0.15 0.20 0.38
SEGUNDO NIVEL
EJE 1 Y 3 1.00 2.00 6.36 0.15 0.20 0.38
PARAPETOS EN CORREDOR 1.00 1.00 13.65 0.15 0.20 0.41
05,07,02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CONFINAMIENTO m2 15.60
PRIMER NIVEL
EJE 1 Y 3 2.00 2.00 6.36 0.20 5.09
SEGUNDO NIVEL
EJE 1 Y 3 2.00 2.00 6.36 0.20 5.09
PARAPETOS EN CORREDOR 2.00 1.00 13.65 0.20 5.46
05,07,03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CONFINAMIENTO kg 67.90
PORTICO EN EJE 1 Y 5
SUSTENTO DE METRADOS DE ESTRUCTURA Y ARQUITECTURA DEL PABELLON "4"
proyecto
" MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL COLEGIO SECUNDARIO J.B.S.O. DE OCOBAMBA, DISTRITO DE OCOBAMBA-CHINCHEROS-APURIMAC "
:
Ubicación: OCOBAMBA - CHINCHEROS - APURIMAC
Localidad: OCOBAMBA
Fecha :ABRIL- 2013
Nº DE MEDIDAS
ITEM DESCRIPCION UND. Nº ELEMEN. PARCIAL TOTAL
VECES LARGO ANCHO ALTO Area/vol
vigueta
fierro 3/8" 4.00 2.00 6.75 0.56 30.24
estribos 1/4" 4.00 31.00 0.45 0.25 13.95
PARAPETOS EN CORREDOR
fierro 3/8" 1.00 2.00 12.40 0.56 13.89
estribos 1/4" 1.00 56.00 0.45 0.25 6.30
fierro 3/8" 1.00 2.00 2.20 0.56 2.46
estribos 1/4" 1.00 9.00 0.45 0.25 1.01
05,08,03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg cant/vig var/viguet longitud coeficiente 1,174.00
2DO NIVEL
fierro 1/2" 1.00 22.00 12.40 1.02 278.26
fierro 3/8" 1.00 22.00 8.40 0.56 103.49
fierro 1/4" 1.00 48.00 9.21 0.25 110.52
ULTIMO TECHO
fierro 1/2" 1.00 24.00 16.50 1.02 403.92
fierro 3/8" 1.00 24.00 10.04 0.56 134.94
fierro 1/4" 1.00 53.00 10.75 0.25 142.44
05,08,04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und coeficiente area 1,023.00
de encofrado de aligerado h=20 cm 1.00 8.3300 12.00 10.23 1,022.59
05,08,05 LADRILLO HUECO DE ARCILLA 12X30X30 CM PARA TECHO ALIGERADO und 1,127.00
de encofrado de aligerado h=175 cm 1.00 8.3300 13.20 10.25 1,127.05
Nº DE MEDIDAS
ITEM DESCRIPCION UND. Nº ELEMEN. PARCIAL TOTAL
VECES LARGO ANCHO ALTO Area/vol
pasillo 1.00 1.00 13.80 1.40 19.32
timpano 1.00 2.00 2.00 4.00
08.04 TARRAJEO COLUMNAS MEZ.C:A 1:5, E=1.5 CM. m2 56.00
PRIMER NIVEL
columna 0.50x0.30 1.00 4.00 1.60 2.49 15.94
columna T 1.00 2.00 2.20 2.49 10.96
SEGUNDO NIVEL
columna 0.50x0.30 1.00 4.00 1.60 2.69 17.22
columna T 1.00 2.00 2.20 2.69 11.84
08.05 TARRAJEO VIGAS MEZ.C:A 1:5, E=1.5 CM. m2 152.40
PRIMER NIVEL
viene del encofrado 1.00 1.00 152.40 152.40
08.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m 143.60
PRIMER NIVEL
P1 1.00 2.00 4.20 8.40
V1 1.00 2.00 5.00 10.00
V2 1.00 2.00 6.42 12.84
V3 1.00 2.00 2.77 5.54
V4 1.00 2.00 15.11 30.22
SEGUNDO NIVEL
P1 1.00 2.00 4.20 8.40
V5 1.00 2.00 2.26 4.52
V6 1.00 2.00 9.96 19.92
V7 1.00 2.00 15.05 30.10
Parapetos en corredor 1.00 1.00 13.65 13.65
09.00 CIELORRASOS
09,01 CIELORASOS CON MEZCLA DE CEMENTO-ARENA m2 246.00
2DO NIVEL 1.00 1.00 110.70 110.70
ULTIMO TECHO 1.00 1.00 13.20 10.25 135.30
10 PISOS Y PAVIMENTOS
10.01 CONTRAPISO
10,01,01 CONTRAPISO DE 2" m2 166.10
PRIMER NIVEL
taller polifuncional 1.00 1.00 83.04 83.04
SEGUNDO NIVEL
aula de arte 1.00 1.00 83.04 83.04
10.02 PISOS
10,02,03 PISO MACHIHEMBRADO DE MADERA CEDRO (Interior de aulas) m2 166.10
1ER Y SEGUNDO NIVEL
taller polifuncional 1.00 1.00 83.04 83.04
aula de arte 1.00 1.00 83.04 83.04
10,02,04 PISO DE CEMENTO FROTACHADO E=2" S/COLOREAR m2 19.20
SEGUNDO NIVEL
pasillo 1.00 1.00 1.64 11.68 19.16
10.03 VEREDAS Y RAMPAS
10,03,01 VEREDA DE F'C=175KG/CM2 e=6" BRUÑADO S/COLOREAR m2 33.60
1.00 1.00 12.00 1.80 21.60
1.00 1.00 12.00 1.00 12.00
13 SARDINELES
13,01 EXC. DE ZANJA PARA SARDINELES m 28.60
1.00 1.00 14.92 14.92
1.00 1.00 13.68 13.68
13,02 CONCRETO f´c= 175kg/cm2 PARA SARDINELES INC ACABADO PULIDO S/COLOR m3 1.70
1.00 1.00 14.92 0.15 0.40 0.90
1.00 1.00 13.68 0.15 0.40 0.82
13,03 ENCOFRADO Y DESENCOFRADO NORMAL SARDINELES m2 22.90
1.00 2.00 14.92 0.40 11.94
1.00 2.00 13.68 0.40 10.94
16 CONTRAZOCALOS
16,01 CONTRAZOCALO DE MADERA CEDRO 3/4"X3" RODON 3/4" m 74.30
PRIMER NIVEL
taller polifuncional 1.00 1.00 37.15 37.15
SEGUNDO NIVEL
aula de arte 1.00 1.00 37.15 37.15
16,02 CONTRAZOCALO CEMENTO SIN COLOREAR H = 0.20 M MEZ. e= 1:5 m 31.90
PRIMER NIVEL
en eje A 1.00 1.00 8.80 8.80
SEGUNDO NIVEL
en eje A 1.00 1.00 9.64 9.64
en pasillo 1.00 1.00 11.84 11.84
1.00 1.00 1.64 1.64
17 ZOCALOS Y ENCHAPES
17,02 ENCHAPE DE MUROS CON FACHALETA DE 0.165X0.50M m2 24.50
1ER NIVEL(EJE A) 1.00 2.00 5.13 0.60 6.16
1.00 1.00 2.03 0.20 0.41
2DO NIVEL (EJE A) 1.00 2.00 5.13 0.78 8.00
1.00 1.00 2.03 0.28 0.57
1ER NIVEL(EJE 1 Y 5) 1.00 2.00 7.43 0.35 5.20
2DO NIVEL (EJE 1 Y 5) 1.00 2.00 7.43 0.28 4.16
18 CUBIERTAS
188,01 IMPERMEABILIZACION DE TECHOS C/PINTURA ASFALTICA m2 135.30
ULTIMO TECHO 1.00 1.00 13.20 10.25 135.30
188,02 COBERTURA CON TEJA ANDINA FIBRO CEMENTO m2 135.30
ULTIMO TECHO 1.00 1.00 13.20 10.25 135.30
SUSTENTO DE METRADOS DE ESTRUCTURA Y ARQUITECTURA DEL PABELLON "4"
proyecto
" MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL COLEGIO SECUNDARIO J.B.S.O. DE OCOBAMBA, DISTRITO DE OCOBAMBA-CHINCHEROS-APURIMAC "
:
Ubicación: OCOBAMBA - CHINCHEROS - APURIMAC
Localidad: OCOBAMBA
Fecha :ABRIL- 2013
Nº DE MEDIDAS
ITEM DESCRIPCION UND. Nº ELEMEN. PARCIAL TOTAL
VECES LARGO ANCHO ALTO Area/vol
188,03 CUMBRERA CON TEJA ANDINA FIBRO CEMENTO m 13.20
1.00 1.00 13.20 13.20
19 CARPINTERIA DE MADERA
19,01 PUERTA DE MADERA MACHIHEMBRADA CEDRO m2 11.30
PRIMER NIVEL
Puerta de 2 hojas 1.00 2.00 1.60 2.10 6.72
SEGUNDO NIVEL
P1 1.00 2.00 1.10 2.10 4.62
19,03 VENTANA DE MADERA CERDO m2 3.20
PRIMER NIVEL
1.00 2.00 1.60 0.59 1.89
SEGUNDO NIVEL
1.00 2.00 1.10 0.59 1.30
20 CERRAJERIA
20,03 BISAGRA ALUMINIZADA CAPUCHINA DE 4" 24.00
P1 1.00 2.00 4.00 8.00
Puerta de 2 hojas 1.00 4.00 4.00 16.00
19,04 CHAPA PARA EXTERIOR,CON LLAVE INTERIOR Y EXTERIOR 3 GOLPES INC. MANIJA und 4.00
P1 1.00 2.00 2.00
Puerta de 2 hojas 1.00 2.00 2.00
20,06 PICAPORTE DE FIERRO REDONDO 3/4"X12" und 2.00
1.00 2.00 2.00
21 CARPINTERIA METALICA
21,10 VENTANA CON FERFILES Y TUB. DE ALUMINIO NEGRO INC. ACC. DE FIJACION m2 18.20
PRIMER NIVEL
V1 1.00 2.00 1.10 1.40 3.08
V2 1.00 2.00 1.81 1.40 5.07
SEGUNDO NIVEL
V6 1.00 2.00 3.57 1.41 10.07
22 VIDRIOS, CRISTALES Y SIMILARES
22,01 VIDRIO TEMPLADO DE 8 MM TONO GRIS. p2 218.60
PRIMER NIVEL
V1 1.00 2.00 1.10 1.40 12.00 36.96
V2 1.00 2.00 1.81 1.40 12.00 60.82
SEGUNDO NIVEL
V6 1.00 2.00 3.57 1.41 12.00 120.81
22,02 VENTANAS SISTEMA NOVA CON VIDRIO TEMPALDO DE 8MM INC. PERFILES Y ACCESORIOSm2 49.00
PRIMER NIVEL
V4 1.00 2.00 5.17 2.39 24.66
SEGUNDO NIVEL
V7 1.00 2.00 5.17 2.36 24.35
22,03 VIDRIO SEMIDOBLE DE 3MM INCOLORO CRUDO P2 37.80
V3 1.00 2.00 1.60 0.59 12.00 22.46
V5 1.00 2.00 1.10 0.58 12.00 15.31
23 PINTURA
23,01 PINTURA EN CIELORASOS CON LATEX (2 MANOS) m2 246.00
tarrageo de cielorazo 1.00 1.00 246.00 246.00
23,02 PINTURA MUROS INTERIORES Y EXTERIORES C/LATEX ACRILICO (2 MANOS) m2 522.70
de tarrajeo de muros interiores y exteriores 1.00 1.00 291.30 291.30
de columnas 1.00 1.00 56.00 56.00
de vigas 1.00 1.00 152.40 152.40
de derrames 1.00 1.00 0.16 143.60 22.98
EXT. TOTAL
26.40 26.40
12.00 12.00
26.00 26.00
17.00 17.00
4.00 4.00
SUSTENTO DE METRADO DE EQUIPAMIENTO Y MOBILIARIO
" MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DEL COLEGIO SECUNDARIO J.B.S.O. DE OCOBAMBA, DISTRITO DE OCOBAMBA-CHINCHEROS-
proyecto :
APURIMAC "
Ubicación : OCOBAMBA - CHINCHEROS - APURIMAC
Localidad : OCOBAMBA
Fecha: :ABRIL- 2013