Documentos de Académico
Documentos de Profesional
Documentos de Cultura
01 OBRAS PRELIMINARES
01.01 TRAZO NIVELACION Y REPLANTEO (OBRAS CIVILES) m2 208.18 208.18
01.02 DESVIO PROVISIONAL DE CURSOS DE AGUA m 25.00 25.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA PUENTE glb 1.00 1.00
01.04 FLETE TERRESTRE PUENTE SAN MIGUEL glb 1.00 1.00
02 MOVIMIENTO DE TIERRAS
02.01 DEMOLICION DE ESTRUCTURAS EXISTENTES m2 60.75 60.75
02.02 EXCAVACION MASIVA PARA ESTRUCTURAS m3 1,661.15 1,661.15
02.03 EXCAVACION MASIVA PARA LIMPIEZA DE CAUSE m3 545.00 545.00
02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1,175.27 1,175.27
02.05 TRANSPORTE DE MATERIAL EXCEDENTE D > 1 KM m3k 1,550.66 1,550.66
02.06 ENROCADO PARA PROTECCION DE RIVERA H=3.00 M m3 240.00 240.00
03 CONCRETO SIMPLE
03.01 SOLADO EN ESTRIBOS m2 114.68 114.68
03.02 CONCRETO F'c=100 Kg/cm2 EN FALSO PUENTE m3 20.16 20.16
04. CONCRETO ARMADO
04.01. ESTRIBOS
04.01.01 CONCRETO f'c=210 Kg/cm2 m3 273.20 188.96 -84.24
04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 KG 8,932.97 12,800.84 3,867.87
04.01.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS M2 410.80 359.52 -51.28
04.02 VIGAS PRINCIPALES
04.02.01 CONCRETO f'c=280 Kg/cm2 m3 12.15 14.04 1.89
04.02.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 3,063.34 3,347.68 284.35
04.02.03 ENCOFRADO Y DESENCOFRADO EN VIGAS PRINCIPALES m2 62.10 81.00 18.90
04.01 VIGAS DIAFRAGMA
04.01.01 CONCRETO f'c=280 Kg/cm2 m3 2.02 1.70 -0.32
04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 370.27 281.00 -89.27
04.01.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGA m2 15.96 13.23 -2.73
04.02 LOSA MACIZA
04.02.01 CONCRETO f'c=280 Kg/cm2 m3 13.91 13.91
04.02.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 1,966.77 2,962.16 995.39
04.02.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN LOSA m2 61.45 64.26 2.81
05 VARIOS
05.01 BARANDA METALICA PARA PUENTE m 32.00 27.00
06.01 JUNTA TIPO HONEL C/PLATINZ DE 3/8" X 4" m2 2.00 2.00
06.02 TUBERIA PVC SAP DE 2" m 32.00 32.00
06.03 FALSO PUENTE m 13.50 13.50
SUSTENTO DE METRADOS
PROYECTO REHABILITACION DE CAMINO VECINAL-20.4 KM EN LI-105 CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO,
DISTRITO DE SINSICAP, PROVINCIA DE OTUZCO-LA LIBERTAD
TRAMO : CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO
UBICACIÓN : SINSICAP - OTUZCO - LA LIBERTAD
SUB PRESUPUESTO: PUENTE SAN IGNACIO 13.50 ML SETIEMBRE 2019
Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total
01 OBRAS PRELIMINARES
01.01 TRAZO NIVELACION Y REPLANTEO (OBRAS CIVILES) m2 (area) 208.18
estribos 2.00 57.34 114.68
losa 1.00 13.50 13.50
enrocado 2.00 20.00 2.00 80.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA PUENTE glb 1.00 1.00 1.00
02 MOVIMIENTO DE TIERRAS
02.01 DEMOLICION DE ESTRUCTURAS EXISTENTES m2 1.00 13.50 4.50 60.75 60.75
02.06 ENROCADO PARA PROTECCION DE RIVERA H=3.00 M m3 2.00 20.00 2.00 3.00 240.00 240.00
Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total
Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total
05 VARIOS
05.01. BARANDA METALICA PARA PUENTE m 2.00 13.50 27.00 27.00
05.02. JUNTA TIPO HONEL C/PLATINZ DE 3/8" X 4" m2 2.00 2.00 2.00
05.03. TUBERIA PVC SAP DE 2" m 32.00 32.00 32.00
05.04. FALSO PUENTE m 13.50 13.50 13.50
VIGUETA TRANSVERSAL 7"X5"X21' p² 1.17 21.00 5.00 7.00 857.50 7,185.63
VIGUETA DE APOYO 3"X5"X21' p² 0.50 21.00 5.00 3.00 157.50
MADERA DE 3"X4" VERTICAL p² 2.33 2.00 4.00 3.00 56.00
MADERA DE 3"X4" VERTICAL p² 2.33 2.00 4.00 3.00 56.00
MADERA DE 3"X4" VERTICAL p² 2.33 4.00 4.00 3.00 112.00
MADERA DE 3"X4" HORIZONTAL p² 2.33 3.50 4.00 3.00 98.00
MADERA DE 3"X4" HORIZONTAL p² 2.33 7.00 4.00 3.00 196.00
MADERA DE 3"X4" HORIZONTAL p² 4.67 4.00 4.00 3.00 224.00
MADERA DE 3"X2" p² 0.33 42.00 2.00 3.00 84.00
MADERA DE 3"X2" p² 0.67 42.00 2.00 2.00 112.00
ROLLIZO HORIZONTAL D=10" p² 0.08 11.00 42.00 78.54 3,023.79
ROLLIZO VERTICAL D=10" p² 0.08 11.00 16.00 78.54 1,151.92
ROLLIZO VERTICAL D=10" p² 0.08 22.00 5.00 78.54 719.95
ROLLIZO VERTICAL D=10" p² 0.08 22.00 1.00 78.54 143.99
ROLLIZO D=3" p² 0.08 22.00 5.00 7.07 64.81
ROLLIZO D=3" p² 0.08 22.00 4.00 7.07 51.85
ROLLIZO D=3" p² 0.08 22.00 5.00 7.07 64.81
ROLLIZO D=2" p² 0.08 22.00 2.00 3.14 11.52
RESUMEN DE METRADOS PUENTE SAN MIGUEL, TOTAL EJECUTADO EN OBRA
: REHABILITACION DE CAMINO VECINAL-20.4 KM EN LI-105 CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN
PROYECTO IGNACIO, DISTRITO DE SINSICAP, PROVINCIA DE OTUZCO-LA LIBERTAD
TRAMO : CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO
UBICACIÓN : SINSICAP - OTUZCO - LA LIBERTAD
SUB PRESUPUESTO: PUENTE SAN MIGUEL 15.50 ML Jul-21
04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2
1.55 2.24
ACERO EN ZAPATA n° veces longitud (m) TOTAL
5/8 3/4
ACERO EN ESTRIBO
n veces longitud # elementos PARCIAL
acero vert 1" int @0.20 m 2 3.53 76.00 536.56 2,130.14 2,130.14
acero vert 1" int @0.40 m 2 5.84 45.00 525.60 2,086.63 2,086.63
ACERO VERT EXT 3/4" @0.25 m 2 6.21 67.00 832.14 1,863.99 1,863.99
ACERO HORIZONTAL (DESARROLLO MURO INT 1/2" 2 16.05 24.00 770.40 785.81 785.81
SEGUN PLANO) MURO EX 5/8" 2 16.30 24.00 782.40 1,212.72 1,212.72
parapeto
MURO INT HORIZ. 1/2" 2 5.95 9.00 107.10 109.24 109.24
MURO EX HORIZ. 1/2" 2 5.95 9.00 107.10 109.24 109.24
ACERO vert baston 1/2"@0.25 par 2 3.95 24.00 189.60 193.39 193.39
ACERO vert baston 1/2" @0.30 par 2 2.18 20.00 87.20 88.94 88.94
TOTAL ACERO EN ESTRIBO 8,580.12
3/8 1/2 5/8 3/4 1
ACERO ZAPATA 5/8 914.42
ACERO ZAPATA 3/4 309.38
Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total
01 OBRAS PRELIMINARES
01.01 TRAZO NIVELACION Y REPLANTEO (OBRAS CIVILES) m2 (area) 210.18
estribos 2.00 57.34 114.68
losa 1.00 15.50 15.50
enrocado 2.00 20.00 2.00 80.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA PUENTE glb 1.00 1.00 1.00
01.04 FLETE TERRESTRE PUENTE SAN MIGUEL glb 1.00 1.00 1.00
02 MOVIMIENTO DE TIERRAS
02.01 DEMOLICION DE ESTRUCTURAS EXISTENTES m2 - - - - 0.00
106.51
02.02 EXCAVACION MASIVA PARA ESTRUCTURAS m3 ST LONG 1,208.03
ESTRIBOS 1 1.00 38.53 15.75 606.85
ESTRIBOS 2 1.00 38.17 15.75 601.18
Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total
PANTALLA DE ESTRIBO
Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total
05 VARIOS
05.01. BARANDA METALICA PARA PUENTE m 2.00 15.50 31.00 31.00
05.02. JUNTA TIPO HONEL C/PLATINZ DE 3/8" X 4" m2 2.00 2.00 2.00
05.03. TUBERIA PVC SAP DE 2" m 32.00 32.00 32.00
05.04. FALSO PUENTE m 15.50 15.50 15.50
VIGUETA TRANSVERSAL 7"X5"X21' p² 1.17 21.00 5.00 7.00 857.50 7,185.63
VIGUETA DE APOYO 3"X5"X21' p² 0.50 21.00 5.00 3.00 157.50
MADERA DE 3"X4" VERTICAL p² 2.33 2.00 4.00 3.00 56.00
MADERA DE 3"X4" VERTICAL p² 2.33 2.00 4.00 3.00 56.00
MADERA DE 3"X4" VERTICAL p² 2.33 4.00 4.00 3.00 112.00
MADERA DE 3"X4" HORIZONTAL p² 2.33 3.50 4.00 3.00 98.00
MADERA DE 3"X4" HORIZONTAL p² 2.33 7.00 4.00 3.00 196.00
MADERA DE 3"X4" HORIZONTAL p² 4.67 4.00 4.00 3.00 224.00
MADERA DE 3"X2" p² 0.33 42.00 2.00 3.00 84.00
MADERA DE 3"X2" p² 0.67 42.00 2.00 2.00 112.00
ROLLIZO HORIZONTAL D=10" p² 0.08 11.00 42.00 78.54 3,023.79
ROLLIZO VERTICAL D=10" p² 0.08 11.00 16.00 78.54 1,151.92
ROLLIZO VERTICAL D=10" p² 0.08 22.00 5.00 78.54 719.95
ROLLIZO VERTICAL D=10" p² 0.08 22.00 1.00 78.54 143.99
ROLLIZO D=3" p² 0.08 22.00 5.00 7.07 64.81
ROLLIZO D=3" p² 0.08 22.00 4.00 7.07 51.85
ROLLIZO D=3" p² 0.08 22.00 5.00 7.07 64.81
ROLLIZO D=2" p² 0.08 22.00 2.00 3.14 11.52
SUSTENTO TRANSPORTE
(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
+0 1+000 - 100.00% 7.00 0.12 7.38 1,000.00 4.70 4,700.00 0.15 705.00 5,202.90 705.00 4,497.90
1+000 2+000 - 100.00% 7.00 0.12 8.38 1,000.00 4.80 4,800.00 0.15 720.00 6,033.60 720.00 5,313.60
2+000 3+000 - 100.00% 7.00 0.12 9.38 1,000.00 5.30 5,300.00 0.15 795.00 7,457.10 795.00 6,662.10
3+000 4+000 - 100.00% 7.00 0.12 10.38 1,000.00 5.50 5,500.00 0.15 825.00 8,563.50 825.00 7,738.50
4+000 5+000 - 100.00% 7.00 0.12 11.38 1,000.00 5.70 5,700.00 0.15 855.00 9,729.90 855.00 8,874.90
5+000 6+000 - 100.00% 7.00 0.12 12.38 1,000.00 5.60 5,600.00 0.15 840.00 10,399.20 840.00 9,559.20
6+000 7+000 - 100.00% 7.00 0.12 13.38 1,000.00 5.60 5,600.00 0.15 840.00 11,239.20 840.00 10,399.20
7+000 8+000 - 100.00% 7.00 0.12 14.38 1,000.00 4.90 4,900.00 0.15 735.00 10,569.30 735.00 9,834.30
8+000 9+000 - 100.00% 7.00 0.12 15.38 1,000.00 5.30 5,300.00 0.15 795.00 12,227.10 795.00 11,432.10
9+000 10+000 - 100.00% 7.00 0.12 16.38 1,000.00 5.50 5,500.00 0.15 825.00 13,513.50 825.00 12,688.50
10+000 11+000 - 100.00% 7.00 0.12 17.38 1,000.00 4.20 4,200.00 0.15 630.00 10,949.40 630.00 10,319.40
11+000 12+000 - 100.00% 7.00 0.12 18.38 1,000.00 5.50 5,500.00 0.15 825.00 15,163.50 825.00 14,338.50
12+000 12+450 - 100.00% 7.00 0.12 19.11 450.00 4.40 1,980.00 0.15 297.00 5,674.19 297.00 5,377.19
12+450 13+000 31.90 100.00% - 0.12 19.06 550.00 4.40 2,420.00 0.15 363.00 6,916.97 363.00 6,553.97
13+000 14+000 31.90 100.00% - 0.12 18.28 1,000.00 4.30 4,300.00 0.15 645.00 11,790.60 645.00 11,145.60
14+000 15+000 31.90 100.00% - 0.12 17.28 1,000.00 4.10 4,100.00 0.15 615.00 10,627.20 615.00 10,012.20
15+000 16+000 31.90 100.00% - 0.12 16.28 1,000.00 4.60 4,600.00 0.15 690.00 11,233.20 690.00 10,543.20
16+000 17+000 31.90 100.00% - 0.12 15.28 1,000.00 4.90 4,900.00 0.15 735.00 11,230.80 735.00 10,495.80
17+000 18+000 31.90 100.00% - 0.12 14.28 1,000.00 4.90 4,900.00 0.15 735.00 10,495.80 735.00 9,760.80
18+000 19+000 31.90 100.00% - 0.12 13.28 1,000.00 5.20 5,200.00 0.15 780.00 10,358.40 780.00 9,578.40
19+000 20+000 31.90 100.00% - 0.12 12.28 1,000.00 6.00 6,000.00 0.15 900.00 11,052.00 900.00 10,152.00
20+000 21+000 31.90 100.00% - 0.12 11.28 1,000.00 5.20 5,200.00 0.15 780.00 8,798.40 780.00 8,018.40
21+000 22+000 31.90 100.00% - 0.12 10.28 1,000.00 5.30 5,300.00 0.15 795.00 8,172.60 795.00 7,377.60
22+000 23+000 31.90 100.00% - 0.12 9.28 1,000.00 5.30 5,300.00 0.20 1,060.00 9,836.80 1,060.00 8,776.80
23+000 24+000 31.90 100.00% - 0.12 8.28 1,000.00 5.50 5,500.00 0.20 1,100.00 9,108.00 1,100.00 8,008.00
24+000 25+000 31.90 100.00% - 0.12 7.28 1,000.00 5.30 5,300.00 0.20 1,060.00 7,716.80 1,060.00 6,656.80
(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
25+000 26+000 31.90 100.00% - 0.12 6.28 1,000.00 5.00 5,000.00 0.20 1,000.00 6,280.00 1,000.00 5,280.00
26+000 27+000 31.90 100.00% - 0.12 5.28 1,000.00 4.30 4,300.00 0.20 860.00 4,540.80 860.00 3,680.80
27+000 28+000 31.90 100.00% - 0.12 4.28 1,000.00 4.60 4,600.00 0.20 920.00 3,937.60 920.00 3,017.60
28+000 29+000 31.90 100.00% - 0.12 3.28 1,000.00 4.50 4,500.00 0.20 900.00 2,952.00 900.00 2,052.00
29+000 30+000 31.90 100.00% - 0.12 2.28 1,000.00 5.50 5,500.00 0.20 1,100.00 2,508.00 1,100.00 1,408.00
30+000 31+000 31.90 100.00% - 0.12 1.28 1,000.00 4.70 4,700.00 0.20 940.00 1,203.20 940.00 263.20
31+000 32+000 31.90 100.00% - 0.12 0.28 1,000.00 5.70 5,700.00 0.20 1,140.00 319.20 319.20 -
32+000 33+000 31.90 100.00% - 0.12 0.48 1,000.00 5.70 5,700.00 0.20 1,140.00 547.20 547.20 -
33+000 34+000 31.90 100.00% - 0.12 1.48 1,000.00 4.90 4,900.00 0.20 980.00 1,450.40 980.00 470.40
34+000 34+950 31.90 100.00% - 0.12 2.46 950.00 4.60 4,370.00 0.20 874.00 2,145.67 874.00 1,271.67
34+950 35+000 37.00 100.00% 1.00 0.12 2.91 50.00 4.60 230.00 0.20 46.00 133.63 46.00 87.63
35+000 36+000 37.00 100.00% 1.00 0.12 2.38 1,000.00 4.50 4,500.00 0.20 900.00 2,142.00 900.00 1,242.00
36+000 37+000 37.00 100.00% 1.00 0.12 1.38 1,000.00 4.90 4,900.00 0.20 980.00 1,352.40 980.00 372.40
--- --- --- --- --- --- --- 37,000.00 --- --- --- 31,725.00 283,572.05 30,311.40 253,260.65
SUSTENTO TRANSPORTE
(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
+0 1+000 11.00 100.00% - 0.12 10.38 1,000.00 4.70 4,700.00 0.15 705.00 7,317.90 705.00 6,612.90
1+000 2+000 11.00 100.00% - 0.12 9.38 1,000.00 4.80 4,800.00 0.15 720.00 6,753.60 720.00 6,033.60
2+000 3+000 11.00 100.00% - 0.12 8.38 1,000.00 5.30 5,300.00 0.15 795.00 6,662.10 795.00 5,867.10
3+000 4+000 11.00 100.00% - 0.12 7.38 1,000.00 5.50 5,500.00 0.15 825.00 6,088.50 825.00 5,263.50
4+000 5+000 11.00 100.00% - 0.12 6.38 1,000.00 5.70 5,700.00 0.15 855.00 5,454.90 855.00 4,599.90
5+000 6+000 11.00 100.00% - 0.12 5.38 1,000.00 5.60 5,600.00 0.15 840.00 4,519.20 840.00 3,679.20
6+000 7+000 11.00 100.00% - 0.12 4.38 1,000.00 5.60 5,600.00 0.15 840.00 3,679.20 840.00 2,839.20
7+000 8+000 11.00 100.00% - 0.12 3.38 1,000.00 4.90 4,900.00 0.15 735.00 2,484.30 735.00 1,749.30
8+000 9+000 11.00 100.00% - 0.12 2.38 1,000.00 5.30 5,300.00 0.15 795.00 1,892.10 795.00 1,097.10
9+000 10+000 11.00 100.00% - 0.12 1.38 1,000.00 5.50 5,500.00 0.15 825.00 1,138.50 825.00 313.50
10+000 11+000 11.00 100.00% - 0.12 0.38 1,000.00 4.20 4,200.00 0.15 630.00 239.40 239.40 -
11+000 12+000 11.00 100.00% - 0.12 0.38 1,000.00 5.50 5,500.00 0.15 825.00 313.50 313.50 -
12+000 13+000 11.00 100.00% - 0.12 1.38 1,000.00 4.40 4,400.00 0.15 660.00 910.80 660.00 250.80
13+000 14+000 11.00 100.00% - 0.12 2.38 1,000.00 4.30 4,300.00 0.15 645.00 1,535.10 645.00 890.10
14+000 15+000 11.00 100.00% - 0.12 3.38 1,000.00 4.10 4,100.00 0.15 615.00 2,078.70 615.00 1,463.70
15+000 16+000 11.00 100.00% - 0.12 4.38 1,000.00 4.60 4,600.00 0.15 690.00 3,022.20 690.00 2,332.20
16+000 17+000 11.00 100.00% - 0.12 5.38 1,000.00 4.90 4,900.00 0.15 735.00 3,954.30 735.00 3,219.30
17+000 18+000 11.00 100.00% - 0.12 6.38 1,000.00 4.90 4,900.00 0.15 735.00 4,689.30 735.00 3,954.30
18+000 19+000 11.00 100.00% - 0.12 7.38 1,000.00 5.20 5,200.00 0.15 780.00 5,756.40 780.00 4,976.40
19+000 20+000 11.00 100.00% - 0.12 8.38 1,000.00 6.00 6,000.00 0.15 900.00 7,542.00 900.00 6,642.00
20+000 21+000 11.00 100.00% - 0.12 9.38 1,000.00 5.20 5,200.00 0.15 780.00 7,316.40 780.00 6,536.40
21+000 22+000 11.00 100.00% - 0.12 10.38 1,000.00 5.30 5,300.00 0.15 795.00 8,252.10 795.00 7,457.10
22+000 23+000 11.00 100.00% - 0.12 11.38 1,000.00 5.30 5,300.00 0.20 1,060.00 12,062.80 1,060.00 11,002.80
23+000 24+000 11.00 100.00% - 0.12 12.38 1,000.00 5.50 5,500.00 0.20 1,100.00 13,618.00 1,100.00 12,518.00
24+000 25+000 11.00 100.00% - 0.12 13.38 1,000.00 5.30 5,300.00 0.20 1,060.00 14,182.80 1,060.00 13,122.80
25+000 26+000 11.00 100.00% - 0.12 14.38 1,000.00 5.00 5,000.00 0.20 1,000.00 14,380.00 1,000.00 13,380.00
(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
26+000 27+000 11.00 100.00% - 0.12 15.38 1,000.00 4.30 4,300.00 0.20 860.00 13,226.80 860.00 12,366.80
27+000 28+000 11.00 100.00% - 0.12 16.38 1,000.00 4.60 4,600.00 0.20 920.00 15,069.60 920.00 14,149.60
28+000 29+000 11.00 100.00% - 0.12 17.38 1,000.00 4.50 4,500.00 0.20 900.00 15,642.00 900.00 14,742.00
29+000 30+000 11.00 100.00% - 0.12 18.38 1,000.00 5.50 5,500.00 0.20 1,100.00 20,218.00 1,100.00 19,118.00
30+000 31+000 11.00 100.00% - 0.12 19.38 1,000.00 4.70 4,700.00 0.20 940.00 18,217.20 940.00 17,277.20
31+000 32+000 11.00 100.00% - 0.12 20.38 1,000.00 5.70 5,700.00 0.20 1,140.00 23,233.20 1,140.00 22,093.20
32+000 33+000 11.00 100.00% - 0.12 21.38 1,000.00 5.70 5,700.00 0.20 1,140.00 24,373.20 1,140.00 23,233.20
33+000 34+000 11.00 100.00% - 0.12 22.38 1,000.00 4.90 4,900.00 0.20 980.00 21,932.40 980.00 20,952.40
34+000 35+000 11.00 100.00% - 0.12 23.38 1,000.00 4.60 4,600.00 0.20 920.00 21,509.60 920.00 20,589.60
35+000 36+000 11.00 100.00% - 0.12 24.38 1,000.00 4.50 4,500.00 0.20 900.00 21,942.00 900.00 21,042.00
36+000 37+000 11.00 100.00% - 0.12 25.38 1,000.00 4.90 4,900.00 0.20 980.00 24,872.40 980.00 23,892.40
--- --- --- --- --- --- --- 37,000.00 --- 186,500.00 --- 31,725.00 366,080.50 30,822.90 335,257.60
SUSTENTO TRANSPORTE
(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
+0 1+000 11.00 100.00% - 0.12 10.38 1,000.00 4.70 4,700.00 0.15 705.00 5,688.82 693.30 4,995.52
1+000 2+000 11.00 100.00% - 0.12 9.38 1,000.00 4.80 4,800.00 0.15 720.00 5,265.96 708.05 4,557.91
2+000 3+000 11.00 100.00% - 0.12 8.38 1,000.00 5.30 5,300.00 0.15 795.00 5,213.94 781.81 4,432.13
3+000 4+000 11.00 100.00% - 0.12 7.38 1,000.00 5.50 5,500.00 0.15 825.00 4,787.47 811.31 3,976.16
4+000 5+000 11.00 100.00% - 0.12 6.38 1,000.00 5.70 5,700.00 0.15 855.00 4,315.67 840.81 3,474.86
5+000 6+000 11.00 100.00% - 0.12 5.38 1,000.00 5.60 5,600.00 0.15 840.00 3,605.41 826.06 2,779.35
6+000 7+000 11.00 100.00% - 0.12 4.38 1,000.00 5.60 5,600.00 0.15 840.00 2,970.85 826.06 2,144.79
7+000 8+000 11.00 100.00% - 0.12 3.38 1,000.00 4.90 4,900.00 0.15 735.00 2,044.26 722.80 1,321.46
8+000 9+000 11.00 100.00% - 0.12 2.38 1,000.00 5.30 5,300.00 0.15 795.00 1,610.58 781.81 828.77
9+000 10+000 11.00 100.00% - 0.12 1.38 1,000.00 5.50 5,500.00 0.15 825.00 1,048.13 811.31 236.82
10+000 11+000 11.00 100.00% - 0.12 0.38 1,000.00 4.20 4,200.00 0.15 630.00 235.43 235.43 -
11+000 12+000 11.00 100.00% - 0.12 0.38 1,000.00 5.50 5,500.00 0.15 825.00 308.30 308.30 -
12+000 13+000 11.00 100.00% - 0.12 1.38 1,000.00 4.40 4,400.00 0.15 660.00 838.51 649.05 189.46
13+000 14+000 11.00 100.00% - 0.12 2.38 1,000.00 4.30 4,300.00 0.15 645.00 1,306.70 634.30 672.40
14+000 15+000 11.00 100.00% - 0.12 3.38 1,000.00 4.10 4,100.00 0.15 615.00 1,710.50 604.79 1,105.71
15+000 16+000 11.00 100.00% - 0.12 4.38 1,000.00 4.60 4,600.00 0.15 690.00 2,440.34 678.55 1,761.79
16+000 17+000 11.00 100.00% - 0.12 5.38 1,000.00 4.90 4,900.00 0.15 735.00 3,154.73 722.80 2,431.93
17+000 18+000 11.00 100.00% - 0.12 6.38 1,000.00 4.90 4,900.00 0.15 735.00 3,709.96 722.80 2,987.16
18+000 19+000 11.00 100.00% - 0.12 7.38 1,000.00 5.20 5,200.00 0.15 780.00 4,526.34 767.06 3,759.28
19+000 20+000 11.00 100.00% - 0.12 8.38 1,000.00 6.00 6,000.00 0.15 900.00 5,902.57 885.06 5,017.51
20+000 21+000 11.00 100.00% - 0.12 9.38 1,000.00 5.20 5,200.00 0.15 780.00 5,704.79 767.06 4,937.73
21+000 22+000 11.00 100.00% - 0.12 10.38 1,000.00 5.30 5,300.00 0.15 795.00 6,415.06 781.81 5,633.25
22+000 23+000 11.00 100.00% - 0.12 11.38 1,000.00 5.30 5,300.00 0.20 1,060.00 9,354.16 1,042.41 8,311.75
23+000 24+000 11.00 100.00% - 0.12 12.38 1,000.00 5.50 5,500.00 0.20 1,100.00 10,538.11 1,081.75 9,456.36
24+000 25+000 11.00 100.00% - 0.12 13.38 1,000.00 5.30 5,300.00 0.20 1,060.00 10,955.65 1,042.41 9,913.24
25+000 26+000 11.00 100.00% - 0.12 14.38 1,000.00 5.00 5,000.00 0.20 1,000.00 11,090.94 983.41 10,107.53
(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
26+000 27+000 11.00 100.00% - 0.12 15.38 1,000.00 4.30 4,300.00 0.20 860.00 10,187.87 845.73 9,342.14
27+000 28+000 11.00 100.00% - 0.12 16.38 1,000.00 4.60 4,600.00 0.20 920.00 11,593.64 904.73 10,688.91
28+000 29+000 11.00 100.00% - 0.12 17.38 1,000.00 4.50 4,500.00 0.20 900.00 12,021.48 885.06 11,136.42
29+000 30+000 11.00 100.00% - 0.12 18.38 1,000.00 5.50 5,500.00 0.20 1,100.00 15,523.89 1,081.75 14,442.14
30+000 31+000 11.00 100.00% - 0.12 19.38 1,000.00 4.70 4,700.00 0.20 940.00 13,975.96 924.40 13,051.56
31+000 32+000 11.00 100.00% - 0.12 20.38 1,000.00 5.70 5,700.00 0.20 1,140.00 17,810.75 1,121.08 16,689.67
32+000 33+000 11.00 100.00% - 0.12 21.38 1,000.00 5.70 5,700.00 0.20 1,140.00 18,671.93 1,121.08 17,550.85
33+000 34+000 11.00 100.00% - 0.12 22.38 1,000.00 4.90 4,900.00 0.20 980.00 16,791.62 963.74 15,827.88
34+000 35+000 11.00 100.00% - 0.12 23.38 1,000.00 4.60 4,600.00 0.20 920.00 16,458.55 904.73 15,553.82
35+000 36+000 11.00 100.00% - 0.12 24.38 1,000.00 4.50 4,500.00 0.20 900.00 16,780.63 885.06 15,895.57
36+000 37+000 11.00 100.00% - 0.12 25.38 1,000.00 4.90 4,900.00 0.20 980.00 19,012.55 963.73 18,048.82
--- --- --- --- --- --- --- 37,000.00 --- 186,500.00 --- 31,725.00 283,572.05 30,311.40 253,260.65
INVENTARIO VIAL
INFORME 5 - DRENAJE Y OBRAS DE ARTE
Progresiva
Tipo Material Estado Operativ. Observaciones / comentarios Foto N°
(km)
0+573.33 A CA R S Limpieza y encausamiento 106
Progresiva
Tipo Material Estado Operativ. Observaciones / comentarios Foto N°
(km)
9+898.29 PA R O Limpieza y encausamiento
Progresiva
Tipo Material Estado Operativ. Observaciones / comentarios Foto N°
(km)
22+248.13 A TMC M O Limpieza y encausamiento
Progresiva
Tipo Material Estado Operativ. Observaciones / comentarios Foto N°
(km)
32+822.82 P M S Limpieza y encausamiento
Progresiva
Tipo Material Estado Operativ. Observaciones / comentarios Foto N°
(km)
45+926.71 A TMC M S Limpieza y encausamiento
ALCANTARILLA TMC 63
ALCANTARILLAS MCA 22
ALCANTARILLAS TOTAL 85
03.01.01 #REF!
Tipo Longitud
Material Suelto MS #REF!
Total #REF!
RESUMEN DE SEÑALIZACION
REGLAMENTARIAS - PREVENTIVAS - INFORMATIVAS
Núm.
Inicio de Fin de Núm. De
Item Longitud (m) de
Guardavías Guardavías curvas
Und.