RESUMEN DE METRADOS - OBRAS DE ARTE

"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LA CARRETERA ENTRE LA


LOCALIDAD DE CASCAS-LA BANDA DISTRITO DE CASCAS -PROV. GRAN CHIMU LA LIBERTAD"

Descripción Und. METRADOS


CONSTRUCCION DE ALCANTARILLAS
ENCOFRADO Y DESENCOFRADO DE ALCANTARILLAS M2 #REF!
CONCRETO F`C = 210 KG/ CM2 EN ALCANTARILLAS M3 #REF!
ACERO DE REFUERZO FY = 4200 KG/CM2 KG #REF!
BADENES
ENCOFRADO Y DESENCOFRADO M2 #REF!
CONCRETO 175 KG/ CM2+30% PG M3 #REF!
ENBOQUILLADO DE PIEDRA 12 " EN BADEN M3 #REF!
PONTON
ENCOFRADO Y DESENCOFRADO M2 #REF!
CONCRETO 175 KG/ CM2+30% PG M3 #REF!
CONCRETO 210 KG/ CM2 EN PONTON M3 #REF!
ACERO CORRUGADO F'Y=4200 Kg/Cm2 M3 #REF!
CUNETAS
EXCAVACION MANUAL M3 #REF!
REVESTIMIENTO DE CUNETAS DE CONCRETO ML #REF!
JUNTAS DE DILATACION ML #REF!
RESUMEN DE METRADOS
PROYECTO REHABILITACION DE CAMINO VECINAL-20.4 KM EN LI-105 CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-
SAN MIGUEL-SAN IGNACIO, DISTRITO DE SINSICAP, PROVINCIA DE OTUZCO-LA LIBERTAD

TRAMO : CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO


UBICACIÓN : SINSICAP - OTUZCO - LA LIBERTAD
SUB PRESUPUESTO: PUENTE SAN IGNACIO 13.50 ML SETIEMBRE 2019

METRADOS METRADOS MAYORES MENORES


Item Descripción Und.
EXPEDIENTE EJECUTADOS METRADOS METRADOS

01 OBRAS PRELIMINARES
01.01 TRAZO NIVELACION Y REPLANTEO (OBRAS CIVILES) m2 208.18 208.18
01.02 DESVIO PROVISIONAL DE CURSOS DE AGUA m 25.00 25.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA PUENTE glb 1.00 1.00
01.04 FLETE TERRESTRE PUENTE SAN MIGUEL glb 1.00 1.00
02 MOVIMIENTO DE TIERRAS
02.01 DEMOLICION DE ESTRUCTURAS EXISTENTES m2 60.75 60.75
02.02 EXCAVACION MASIVA PARA ESTRUCTURAS m3 1,661.15 1,661.15
02.03 EXCAVACION MASIVA PARA LIMPIEZA DE CAUSE m3 545.00 545.00
02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1,175.27 1,175.27
02.05 TRANSPORTE DE MATERIAL EXCEDENTE D > 1 KM m3k 1,550.66 1,550.66
02.06 ENROCADO PARA PROTECCION DE RIVERA H=3.00 M m3 240.00 240.00
03 CONCRETO SIMPLE
03.01 SOLADO EN ESTRIBOS m2 114.68 114.68
03.02 CONCRETO F'c=100 Kg/cm2 EN FALSO PUENTE m3 20.16 20.16
04. CONCRETO ARMADO
04.01. ESTRIBOS
04.01.01 CONCRETO f'c=210 Kg/cm2 m3 273.20 188.96 -84.24
04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 KG 8,932.97 12,800.84 3,867.87
04.01.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS M2 410.80 359.52 -51.28
04.02 VIGAS PRINCIPALES
04.02.01 CONCRETO f'c=280 Kg/cm2 m3 12.15 14.04 1.89
04.02.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 3,063.34 3,347.68 284.35
04.02.03 ENCOFRADO Y DESENCOFRADO EN VIGAS PRINCIPALES m2 62.10 81.00 18.90
04.01 VIGAS DIAFRAGMA
04.01.01 CONCRETO f'c=280 Kg/cm2 m3 2.02 1.70 -0.32
04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 370.27 281.00 -89.27
04.01.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGA m2 15.96 13.23 -2.73
04.02 LOSA MACIZA
04.02.01 CONCRETO f'c=280 Kg/cm2 m3 13.91 13.91
04.02.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 1,966.77 2,962.16 995.39
04.02.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN LOSA m2 61.45 64.26 2.81
05 VARIOS
05.01 BARANDA METALICA PARA PUENTE m 32.00 27.00
06.01 JUNTA TIPO HONEL C/PLATINZ DE 3/8" X 4" m2 2.00 2.00
06.02 TUBERIA PVC SAP DE 2" m 32.00 32.00
06.03 FALSO PUENTE m 13.50 13.50
SUSTENTO DE METRADOS
PROYECTO REHABILITACION DE CAMINO VECINAL-20.4 KM EN LI-105 CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO,
DISTRITO DE SINSICAP, PROVINCIA DE OTUZCO-LA LIBERTAD
TRAMO : CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO
UBICACIÓN : SINSICAP - OTUZCO - LA LIBERTAD
SUB PRESUPUESTO: PUENTE SAN IGNACIO 13.50 ML SETIEMBRE 2019

Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total

01 OBRAS PRELIMINARES
01.01 TRAZO NIVELACION Y REPLANTEO (OBRAS CIVILES) m2 (area) 208.18
estribos 2.00 57.34 114.68
losa 1.00 13.50 13.50
enrocado 2.00 20.00 2.00 80.00

01.02 DESVIO PROVISIONAL DE CURSOS DE AGUA m 1.00 25.00 25.00 25.00

01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA PUENTE glb 1.00 1.00 1.00

01.04 FLETE TERRESTRE glb 1.00 1.00 1.00

02 MOVIMIENTO DE TIERRAS
02.01 DEMOLICION DE ESTRUCTURAS EXISTENTES m2 1.00 13.50 4.50 60.75 60.75

02.02 EXCAVACION MASIVA PARA ESTRUCTURAS m3 ST LONG 1,661.15


ESTRIBOS 1 1.00 45.10 15.75 710.33
ESTRIBOS 2 1.00 60.37 15.75 950.83

02.03 EXCAVACION MASIVA PARA LIMPIEZA DE CAUSE m3 545.00


limpieza de cause 1.00 30.00 15.50 465.00
base para enrocado 2.00 20.00 2.00 80.00
02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1,175.27
ESTRIBO1 1.00 38.32 15.75 603.54

ESTRIBO 2 1.00 36.30 15.75 571.73

02.05 TRANSPORTE DE MATERIAL EXCEDENTE D > 1 KM m3k (area) 1,550.66


demolicion de puente 1.35 60.75 82.01
excavacion masiva para estructuras 1.25 1,661.15 2,076.44
excavacion masiva para limpieza de cause 1.30 545.00 708.50
relleno compactado -1.12 1,175.27 -1,316.30

02.06 ENROCADO PARA PROTECCION DE RIVERA H=3.00 M m3 2.00 20.00 2.00 3.00 240.00 240.00

03 CONCRETO SIMPLE (area)


03.01 SOLADO EN ESTRIBOS m2 2.00 57.34 114.68 114.68

03.02 CONCRETO F'c=100 Kg/cm2 EN FALSO PUENTE m3 20.16


DADO CENTRAL 2.00 6.30 0.80 1.00 10.08
DADO LATERAL 2.00 6.30 0.80 1.00 10.08
04. CONCRETO ARMADO
04.01 ESTRIBOS
04.01.01 CONCRETO f'c=210 Kg/cm2 m3 188.96
ESTRIBO IZQ. (area)
ZAPATA DE ESTRIBO 1.00 57.34 0.70 40.14
1.00 5.55 3.79 21.03
ALETAS (area promedio x 5 m de longitud) 2.00 5.00 3.33 33.31
ESTRIBO DER. (area)
ZAPATA DE ESTRIBO 1.00 57.34 0.70 40.14
MURO DE ESTRIBO 1.00 5.55 3.79 21.03
ALETAS 2.00 5.00 3.33 33.30
04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg (coef.) 12,800.84
ZAPATA DE ESTRIBO CANT ELEM
ver "hoja de acero en puente " partida 04.01.02 4,220.72
SUSTENTO DE METRADOS
PROYECTO REHABILITACION DE CAMINO VECINAL-20.4 KM EN LI-105 CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO,
DISTRITO DE SINSICAP, PROVINCIA DE OTUZCO-LA LIBERTAD
TRAMO : CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO
UBICACIÓN : SINSICAP - OTUZCO - LA LIBERTAD
SUB PRESUPUESTO: PUENTE SAN IGNACIO 13.50 ML SETIEMBRE 2019

Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total

MUROS DE ESTRIBO 8,580.12


ver "hoja de acero en puente " partida 04.01.02 -

04.01.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS m2 359.52


ESTRIBO IZQ. VECES
MURO DE ESTRIBO 1.00 5.55 6.13 2.00 68.04
ALEROS 2.00 5.00 5.33 2.00 106.60
BORDE DE ALEROS 2.00 0.57 4.53 5.12
ESTRIBO DER.
MURO DE ESTRIBO 1.00 5.55 6.13 2.00 68.04
ALEROS 2.00 5.00 5.33 2.00 106.60
BORDE DE ALEROS 2.00 0.57 4.53 5.12

04.02. VIGAS PRINCIPALES


04.02.01 CONCRETO f'c=280 Kg/cm2 m3 2.00 13.50 0.40 1.30 14.04 14.04

04.02.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg (coef.) 3,347.68


ACERO LONGITUDINAL (A) 18.00 17.60 3.97 1,258.65
ACERO LONGITUDINAL (B) 8.00 9.00 3.97 286.06
ACERO LONGITUDINAL ( C ) 4.00 15.10 1.56 94.22
ACERO LONGITUDINAL ( D ) 12.00 15.10 3.97 719.91
ACERO LONGITUDINAL ( F ) 4.00 15.10 1.56 94.22
ACERO TRANSVERSAL 200.00 4.00 1.02 816.00
SEPARADOR CENTRAL 63.00 0.80 1.56 78.62
Perimetro
04.02.03 ENCOFRADO Y DESENCOFRADO EN VIGAS PRINCIPALES m2 2.00 13.50 3.00 81.00 81.00

4.03 VIGAS DIAFRAGMA


04.03.01 CONCRETO f'c=280 Kg/cm2 m3 3.00 2.10 0.30 0.90 1.70 1.70

04.03.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg (coef.) 281.00


ACERO LONGITUDINAL (L) 15.00 3.50 1.56 81.90
ACERO LONGITUDINAL (M) 12.00 2.80 1.56 52.42
ACERO LONGITUDINAL (K) 15.00 3.50 1.56 81.90
ACERO TRANSVERSAL 45.00 2.44 0.59 64.78
Perimetro
04.03.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGA m2 3.00 2.10 2.10 13.23 13.23

4.04 LOSA MACIZA (area)


04.04.01 CONCRETO f'c=280 Kg/cm2 m3 1.00 13.50 1.03 13.91 13.91
04.04.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg (coef.) 2,962.16
loza
ACERO LONGITUDINAL SUPERIOR (I) 25.00 16.60 1.02 423.30
ACERO LONGITUDINAL INFERIOR(J) 25.00 16.60 1.02 423.30
ACERO TRANSVERSAL SUPERIOR (G) 136.00 4.20 1.02 582.62
ACERO TRANSVERSAL INFERIOR (H) 136.00 4.20 1.02 582.62
vereda
ACERO LONGITUDINAL SUPERIOR (I) 5.00 16.60 1.02 84.66
ACERO LONGITUDINAL INFERIOR(J) 5.00 16.60 1.02 84.66
ACERO TRANSVERSAL SUPERIOR (G) 2.00 136.00 1.79 1.02 496.62
ACERO TRANSVERSAL INFERIOR (H) 2.00 136.00 1.03 1.02 284.38

04.04.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN LOSA m2 64.26


fondo y tapa vereda 2.00 13.50 0.60 16.20
fondo y tapa loza 2.00 13.50 0.80 21.60
fondo entre vigas de loza 2.00 6.30 2.10 26.46
-
SUSTENTO DE METRADOS
PROYECTO REHABILITACION DE CAMINO VECINAL-20.4 KM EN LI-105 CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO,
DISTRITO DE SINSICAP, PROVINCIA DE OTUZCO-LA LIBERTAD
TRAMO : CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO
UBICACIÓN : SINSICAP - OTUZCO - LA LIBERTAD
SUB PRESUPUESTO: PUENTE SAN IGNACIO 13.50 ML SETIEMBRE 2019

Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total

05 VARIOS
05.01. BARANDA METALICA PARA PUENTE m 2.00 13.50 27.00 27.00
05.02. JUNTA TIPO HONEL C/PLATINZ DE 3/8" X 4" m2 2.00 2.00 2.00
05.03. TUBERIA PVC SAP DE 2" m 32.00 32.00 32.00
05.04. FALSO PUENTE m 13.50 13.50 13.50
VIGUETA TRANSVERSAL 7"X5"X21' p² 1.17 21.00 5.00 7.00 857.50 7,185.63
VIGUETA DE APOYO 3"X5"X21' p² 0.50 21.00 5.00 3.00 157.50
MADERA DE 3"X4" VERTICAL p² 2.33 2.00 4.00 3.00 56.00
MADERA DE 3"X4" VERTICAL p² 2.33 2.00 4.00 3.00 56.00
MADERA DE 3"X4" VERTICAL p² 2.33 4.00 4.00 3.00 112.00
MADERA DE 3"X4" HORIZONTAL p² 2.33 3.50 4.00 3.00 98.00
MADERA DE 3"X4" HORIZONTAL p² 2.33 7.00 4.00 3.00 196.00
MADERA DE 3"X4" HORIZONTAL p² 4.67 4.00 4.00 3.00 224.00
MADERA DE 3"X2" p² 0.33 42.00 2.00 3.00 84.00
MADERA DE 3"X2" p² 0.67 42.00 2.00 2.00 112.00
ROLLIZO HORIZONTAL D=10" p² 0.08 11.00 42.00 78.54 3,023.79
ROLLIZO VERTICAL D=10" p² 0.08 11.00 16.00 78.54 1,151.92
ROLLIZO VERTICAL D=10" p² 0.08 22.00 5.00 78.54 719.95
ROLLIZO VERTICAL D=10" p² 0.08 22.00 1.00 78.54 143.99
ROLLIZO D=3" p² 0.08 22.00 5.00 7.07 64.81
ROLLIZO D=3" p² 0.08 22.00 4.00 7.07 51.85
ROLLIZO D=3" p² 0.08 22.00 5.00 7.07 64.81
ROLLIZO D=2" p² 0.08 22.00 2.00 3.14 11.52
RESUMEN DE METRADOS PUENTE SAN MIGUEL, TOTAL EJECUTADO EN OBRA
: REHABILITACION DE CAMINO VECINAL-20.4 KM EN LI-105 CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN
PROYECTO IGNACIO, DISTRITO DE SINSICAP, PROVINCIA DE OTUZCO-LA LIBERTAD
TRAMO : CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO
UBICACIÓN : SINSICAP - OTUZCO - LA LIBERTAD
SUB PRESUPUESTO: PUENTE SAN MIGUEL 15.50 ML Jul-21
04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2
1.55 2.24
ACERO EN ZAPATA n° veces longitud (m) TOTAL
5/8 3/4

acero maya inf yy (5/8) 2 302.52 468.91 937.81


acero maya inf xx (3/4)
2 309.38 693.01 1,386.02

acero maya superior yy (5/8) 2 302.52 468.91 937.81


acero mayas superior xx (5/8) 2 309.38 479.54 959.08

TOTAL ACERO EN ZAPATA 4,220.72

ACERO TRANSVERSAL ACERO LONGITUDINAL


1 3.13 2 6.26 6.3 6.3
2 3.28 2 6.56 6.58 6.58
3 3.43 2 6.86 6.87 6.87
4 3.58 2 7.16 7.15 7.15
5 3.74 2 7.48 7.43 7.43
6 3.89 2 7.78 7.71 7.71
7 4.04 2 8.08 7.99 7.99
8 4.19 2 8.38 8.27 8.27
9 4.35 2 8.7 8.55 8.55
10 4.5 2 9 8.83 8.83
11 4.65 2 9.3 9.12 9.12
12 4.81 2 9.62 9.4 9.4
13 4.96 2 9.92 9.68 9.68
14 5.11 2 10.22 9.96 9.96
15 5.26 2 10.52 10.24 10.24
16 5.42 2 10.84 10.52 10.52
17 5.57 2 11.14 10.8 10.8
18 5.77 28 161.56 11.08 11.08
309.38 11.36 11.36
11.65 11.65
11.93 11.93
12.21 12.21
12.49 12.49
12.77 12.77
13.05 13.05
13.08 13.08
3.74 2 7.48
3.44 2 6.88
3.13 2 6.26
2.83 2 5.66
2.53 2 5.06
2.22 2 4.44
1.92 2 3.84
1.62 2 3.24
1.31 2 2.62
1.01 2 2.02
302.52

ACERO EN ESTRIBO
n veces longitud # elementos PARCIAL
acero vert 1" int @0.20 m 2 3.53 76.00 536.56 2,130.14 2,130.14
acero vert 1" int @0.40 m 2 5.84 45.00 525.60 2,086.63 2,086.63
ACERO VERT EXT 3/4" @0.25 m 2 6.21 67.00 832.14 1,863.99 1,863.99

ACERO HORIZONTAL (DESARROLLO MURO INT 1/2" 2 16.05 24.00 770.40 785.81 785.81
SEGUN PLANO) MURO EX 5/8" 2 16.30 24.00 782.40 1,212.72 1,212.72
parapeto
MURO INT HORIZ. 1/2" 2 5.95 9.00 107.10 109.24 109.24
MURO EX HORIZ. 1/2" 2 5.95 9.00 107.10 109.24 109.24
ACERO vert baston 1/2"@0.25 par 2 3.95 24.00 189.60 193.39 193.39
ACERO vert baston 1/2" @0.30 par 2 2.18 20.00 87.20 88.94 88.94
TOTAL ACERO EN ESTRIBO 8,580.12
3/8 1/2 5/8 3/4 1
ACERO ZAPATA 5/8 914.42
ACERO ZAPATA 3/4 309.38

ESTRIBO 1" 1,062.16


ESTRIBO 3/4" 832.14
ESTRIBO 1/2" 1,261.40
ESTRIBO 5/8" 782.40

VIGAS PRINCIPALES 570.00


VIGAS PRINCIPALES
VIGAS PRINCIPALES 151.00
TRAVERSAL 800.00

VIGAS DIAFRAGMA 109.80 138.60


LOSA 2521
LONGITUL TOTAL 109.80 4,733.40 1,835.42 1,141.52 1,632.16
#VARILLAS 13.00 526.00 204.00 127.00 182.00
#VARILLAS +5% 14 553 215 134 192
SUSTENTO DE METRADOS
PROYECTO REHABILITACION DE CAMINO VECINAL-20.4 KM EN LI-105 CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO, DISTRITO
DE SINSICAP, PROVINCIA DE OTUZCO-LA LIBERTAD
TRAMO : CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO
UBICACIÓN : SINSICAP - OTUZCO - LA LIBERTAD
SUB PRESUPUESTO: PUENTE SAN IGNACIO 13.50 ML SETIEMBRE 2019

Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total

01 OBRAS PRELIMINARES
01.01 TRAZO NIVELACION Y REPLANTEO (OBRAS CIVILES) m2 (area) 210.18
estribos 2.00 57.34 114.68
losa 1.00 15.50 15.50
enrocado 2.00 20.00 2.00 80.00

01.02 DESVIO PROVISIONAL DE CURSOS DE AGUA m 1.00 20.00 20.00 20.00

01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA PUENTE glb 1.00 1.00 1.00

01.04 FLETE TERRESTRE PUENTE SAN MIGUEL glb 1.00 1.00 1.00

02 MOVIMIENTO DE TIERRAS
02.01 DEMOLICION DE ESTRUCTURAS EXISTENTES m2 - - - - 0.00
106.51
02.02 EXCAVACION MASIVA PARA ESTRUCTURAS m3 ST LONG 1,208.03
ESTRIBOS 1 1.00 38.53 15.75 606.85
ESTRIBOS 2 1.00 38.17 15.75 601.18

02.03 EXCAVACION MASIVA PARA LIMPIEZA DE CAUSE m3 545.00


limpieza de cause 1.00 30.00 15.50 465.00
base para enrocado 2.00 20.00 2.00 80.00
02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 995.40
ESTRIBO1 1.00 30.78 15.75 484.79

ESTRIBO 2 1.00 32.42 15.75 510.62

02.05 TRANSPORTE DE MATERIAL EXCEDENTE D > 1 KM m3k (area) 1,103.68


demolicion de puente 1.35 - -
excavacion masiva para estructuras 1.25 1,208.03 1,510.03
excavacion masiva para limpieza de cause 1.30 545.00 708.50
relleno compactado -1.12 995.40 -1,114.85
02.06 ENROCADO PARA PROTECCION DE RIVERA H=3.00 M m3 2.00 20.00 2.00 3.00 240.00 240.00

03 CONCRETO SIMPLE (area)


03.01 SOLADO EN ESTRIBOS m2 2.00 57.34 114.68 114.68

03.02 CONCRETO F'c=100 Kg/cm2 EN FALSO PUENTE m3 20.16


DADO CENTRAL 2.00 6.30 0.80 1.00 10.08
DADO LATERAL 2.00 6.30 0.80 1.00 10.08
04. CONCRETO ARMADO
04.01 ESTRIBOS
04.01.01 CONCRETO f'c=210 Kg/cm2 m3 282.82
ESTRIBO IZQ. (area)
ZAPATA DE ESTRIBO 53.25 0.80 42.60
MURO DE ESTRIBO 1.00 5.55 6.66 36.96
ALETAS 2.00 5.00 0.80 5.63 45.04
ESTRIBO DER. (area)
ZAPATA DE ESTRIBO 53.25 1.50 79.88
MURO DE ESTRIBO 1.00 5.00 6.66 33.30
2.00 5.00 0.80 5.63 45.04
04.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg (coef.) 4,220.72

ZAPATA DE ESTRIBO CANT ELEM


ver "hoja de acero en puente " partida 04.01.02 4,220.72
SUSTENTO DE METRADOS
PROYECTO REHABILITACION DE CAMINO VECINAL-20.4 KM EN LI-105 CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO, DISTRITO
DE SINSICAP, PROVINCIA DE OTUZCO-LA LIBERTAD
TRAMO : CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO
UBICACIÓN : SINSICAP - OTUZCO - LA LIBERTAD
SUB PRESUPUESTO: PUENTE SAN IGNACIO 13.50 ML SETIEMBRE 2019

Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total

PANTALLA DE ESTRIBO

04.01.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS m2 311.80


ESTRIBO IZQ. VECES
MURO DE ESTRIBO 1.00 5.00 5.73 2.00 57.30
2.00 5.00 4.93 2.00 98.60
ESTRIBO DER.
MURO DE ESTRIBO 1.00 5.00 5.73 2.00 57.30
2.00 5.00 4.93 2.00 98.60

04.02. VIGAS PRINCIPALES


04.02.01 CONCRETO f'c=280 Kg/cm2 m3 2.00 15.50 0.50 1.10 17.05 17.05

04.02.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg (coef.) 3,340.98


ACERO LONGITUDINAL (A) 18.00 17.10 3.97 1,222.89
ACERO LONGITUDINAL (B) 14.00 9.70 3.97 539.53
ACERO LONGITUDINAL ( C ) 4.00 16.70 1.56 104.21
ACERO LONGITUDINAL ( D ) 12.00 17.10 3.97 815.26
ACERO LONGITUDINAL ( F ) 4.00 16.70 1.56 104.21
ACERO TRANSVERSAL 170.00 2.84 1.02 492.46
SEPARADOR CENTRAL 72.00 0.85 1.02 62.42
Perimetro
04.02.03 ENCOFRADO Y DESENCOFRADO EN VIGAS PRINCIPALES m2 2.00 15.50 2.30 71.30 71.30

4.03 VIGAS DIAFRAGMA


04.03.01 CONCRETO f'c=280 Kg/cm2 m3 4.00 2.10 0.30 0.80 2.02 2.02

04.03.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg (coef.) 370.27


ACERO LONGITUDINAL (L) 20.00 3.50 1.56 109.20
ACERO LONGITUDINAL (M) 16.00 2.80 1.56 69.89
ACERO LONGITUDINAL (K) 20.00 3.50 1.56 109.20
ACERO TRANSVERSAL 60.00 2.44 0.56 81.98
Perimetro
04.03.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGA m2 4.00 2.10 1.90 15.96 15.96

4.04 LOSA MACIZA (area)


04.04.01 CONCRETO f'c=280 Kg/cm2 m3 1.00 15.50 1.03 15.97 15.97
04.04.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg (coef.) 2,019.81
ACERO LONGITUDINAL SUPERIOR (I) 13.00 16.60 1.02 220.12
ACERO LONGITUDINAL INFERIOR(J) 13.00 16.60 1.02 220.12
ACERO TRANSVERSAL SUPERIOR (G) 77.00 7.85 1.56 942.94
ACERO TRANSVERSAL INFERIOR (H) 77.00 5.30 1.56 636.64

04.04.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN LOSA m2 60.82


2.00 4.10 2.11 17.30
1.00 5.20 2.11 10.97
2.00 15.50 1.05 32.55
SUSTENTO DE METRADOS
PROYECTO REHABILITACION DE CAMINO VECINAL-20.4 KM EN LI-105 CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO, DISTRITO
DE SINSICAP, PROVINCIA DE OTUZCO-LA LIBERTAD
TRAMO : CALUARA-PURRUPAMPA-VISTA ALEGRE-MAIMAL-CHAPICORRAL-SAN MIGUEL-SAN IGNACIO
UBICACIÓN : SINSICAP - OTUZCO - LA LIBERTAD
SUB PRESUPUESTO: PUENTE SAN IGNACIO 13.50 ML SETIEMBRE 2019

Item Descripciòn Unid Nº Veces Largo Ancho Altura Sub Total Total

05 VARIOS
05.01. BARANDA METALICA PARA PUENTE m 2.00 15.50 31.00 31.00
05.02. JUNTA TIPO HONEL C/PLATINZ DE 3/8" X 4" m2 2.00 2.00 2.00
05.03. TUBERIA PVC SAP DE 2" m 32.00 32.00 32.00
05.04. FALSO PUENTE m 15.50 15.50 15.50
VIGUETA TRANSVERSAL 7"X5"X21' p² 1.17 21.00 5.00 7.00 857.50 7,185.63
VIGUETA DE APOYO 3"X5"X21' p² 0.50 21.00 5.00 3.00 157.50
MADERA DE 3"X4" VERTICAL p² 2.33 2.00 4.00 3.00 56.00
MADERA DE 3"X4" VERTICAL p² 2.33 2.00 4.00 3.00 56.00
MADERA DE 3"X4" VERTICAL p² 2.33 4.00 4.00 3.00 112.00
MADERA DE 3"X4" HORIZONTAL p² 2.33 3.50 4.00 3.00 98.00
MADERA DE 3"X4" HORIZONTAL p² 2.33 7.00 4.00 3.00 196.00
MADERA DE 3"X4" HORIZONTAL p² 4.67 4.00 4.00 3.00 224.00
MADERA DE 3"X2" p² 0.33 42.00 2.00 3.00 84.00
MADERA DE 3"X2" p² 0.67 42.00 2.00 2.00 112.00
ROLLIZO HORIZONTAL D=10" p² 0.08 11.00 42.00 78.54 3,023.79
ROLLIZO VERTICAL D=10" p² 0.08 11.00 16.00 78.54 1,151.92
ROLLIZO VERTICAL D=10" p² 0.08 22.00 5.00 78.54 719.95
ROLLIZO VERTICAL D=10" p² 0.08 22.00 1.00 78.54 143.99
ROLLIZO D=3" p² 0.08 22.00 5.00 7.07 64.81
ROLLIZO D=3" p² 0.08 22.00 4.00 7.07 51.85
ROLLIZO D=3" p² 0.08 22.00 5.00 7.07 64.81
ROLLIZO D=2" p² 0.08 22.00 2.00 3.14 11.52
SUSTENTO TRANSPORTE

(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
+0 1+000 - 100.00% 7.00 0.12 7.38 1,000.00 4.70 4,700.00 0.15 705.00 5,202.90 705.00 4,497.90
1+000 2+000 - 100.00% 7.00 0.12 8.38 1,000.00 4.80 4,800.00 0.15 720.00 6,033.60 720.00 5,313.60
2+000 3+000 - 100.00% 7.00 0.12 9.38 1,000.00 5.30 5,300.00 0.15 795.00 7,457.10 795.00 6,662.10
3+000 4+000 - 100.00% 7.00 0.12 10.38 1,000.00 5.50 5,500.00 0.15 825.00 8,563.50 825.00 7,738.50
4+000 5+000 - 100.00% 7.00 0.12 11.38 1,000.00 5.70 5,700.00 0.15 855.00 9,729.90 855.00 8,874.90
5+000 6+000 - 100.00% 7.00 0.12 12.38 1,000.00 5.60 5,600.00 0.15 840.00 10,399.20 840.00 9,559.20
6+000 7+000 - 100.00% 7.00 0.12 13.38 1,000.00 5.60 5,600.00 0.15 840.00 11,239.20 840.00 10,399.20
7+000 8+000 - 100.00% 7.00 0.12 14.38 1,000.00 4.90 4,900.00 0.15 735.00 10,569.30 735.00 9,834.30
8+000 9+000 - 100.00% 7.00 0.12 15.38 1,000.00 5.30 5,300.00 0.15 795.00 12,227.10 795.00 11,432.10
9+000 10+000 - 100.00% 7.00 0.12 16.38 1,000.00 5.50 5,500.00 0.15 825.00 13,513.50 825.00 12,688.50
10+000 11+000 - 100.00% 7.00 0.12 17.38 1,000.00 4.20 4,200.00 0.15 630.00 10,949.40 630.00 10,319.40
11+000 12+000 - 100.00% 7.00 0.12 18.38 1,000.00 5.50 5,500.00 0.15 825.00 15,163.50 825.00 14,338.50
12+000 12+450 - 100.00% 7.00 0.12 19.11 450.00 4.40 1,980.00 0.15 297.00 5,674.19 297.00 5,377.19
12+450 13+000 31.90 100.00% - 0.12 19.06 550.00 4.40 2,420.00 0.15 363.00 6,916.97 363.00 6,553.97
13+000 14+000 31.90 100.00% - 0.12 18.28 1,000.00 4.30 4,300.00 0.15 645.00 11,790.60 645.00 11,145.60
14+000 15+000 31.90 100.00% - 0.12 17.28 1,000.00 4.10 4,100.00 0.15 615.00 10,627.20 615.00 10,012.20
15+000 16+000 31.90 100.00% - 0.12 16.28 1,000.00 4.60 4,600.00 0.15 690.00 11,233.20 690.00 10,543.20
16+000 17+000 31.90 100.00% - 0.12 15.28 1,000.00 4.90 4,900.00 0.15 735.00 11,230.80 735.00 10,495.80
17+000 18+000 31.90 100.00% - 0.12 14.28 1,000.00 4.90 4,900.00 0.15 735.00 10,495.80 735.00 9,760.80
18+000 19+000 31.90 100.00% - 0.12 13.28 1,000.00 5.20 5,200.00 0.15 780.00 10,358.40 780.00 9,578.40
19+000 20+000 31.90 100.00% - 0.12 12.28 1,000.00 6.00 6,000.00 0.15 900.00 11,052.00 900.00 10,152.00
20+000 21+000 31.90 100.00% - 0.12 11.28 1,000.00 5.20 5,200.00 0.15 780.00 8,798.40 780.00 8,018.40
21+000 22+000 31.90 100.00% - 0.12 10.28 1,000.00 5.30 5,300.00 0.15 795.00 8,172.60 795.00 7,377.60
22+000 23+000 31.90 100.00% - 0.12 9.28 1,000.00 5.30 5,300.00 0.20 1,060.00 9,836.80 1,060.00 8,776.80
23+000 24+000 31.90 100.00% - 0.12 8.28 1,000.00 5.50 5,500.00 0.20 1,100.00 9,108.00 1,100.00 8,008.00
24+000 25+000 31.90 100.00% - 0.12 7.28 1,000.00 5.30 5,300.00 0.20 1,060.00 7,716.80 1,060.00 6,656.80
(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
25+000 26+000 31.90 100.00% - 0.12 6.28 1,000.00 5.00 5,000.00 0.20 1,000.00 6,280.00 1,000.00 5,280.00
26+000 27+000 31.90 100.00% - 0.12 5.28 1,000.00 4.30 4,300.00 0.20 860.00 4,540.80 860.00 3,680.80
27+000 28+000 31.90 100.00% - 0.12 4.28 1,000.00 4.60 4,600.00 0.20 920.00 3,937.60 920.00 3,017.60
28+000 29+000 31.90 100.00% - 0.12 3.28 1,000.00 4.50 4,500.00 0.20 900.00 2,952.00 900.00 2,052.00
29+000 30+000 31.90 100.00% - 0.12 2.28 1,000.00 5.50 5,500.00 0.20 1,100.00 2,508.00 1,100.00 1,408.00
30+000 31+000 31.90 100.00% - 0.12 1.28 1,000.00 4.70 4,700.00 0.20 940.00 1,203.20 940.00 263.20
31+000 32+000 31.90 100.00% - 0.12 0.28 1,000.00 5.70 5,700.00 0.20 1,140.00 319.20 319.20 -
32+000 33+000 31.90 100.00% - 0.12 0.48 1,000.00 5.70 5,700.00 0.20 1,140.00 547.20 547.20 -
33+000 34+000 31.90 100.00% - 0.12 1.48 1,000.00 4.90 4,900.00 0.20 980.00 1,450.40 980.00 470.40
34+000 34+950 31.90 100.00% - 0.12 2.46 950.00 4.60 4,370.00 0.20 874.00 2,145.67 874.00 1,271.67
34+950 35+000 37.00 100.00% 1.00 0.12 2.91 50.00 4.60 230.00 0.20 46.00 133.63 46.00 87.63
35+000 36+000 37.00 100.00% 1.00 0.12 2.38 1,000.00 4.50 4,500.00 0.20 900.00 2,142.00 900.00 1,242.00
36+000 37+000 37.00 100.00% 1.00 0.12 1.38 1,000.00 4.90 4,900.00 0.20 980.00 1,352.40 980.00 372.40
--- --- --- --- --- --- --- 37,000.00 --- --- --- 31,725.00 283,572.05 30,311.40 253,260.65
SUSTENTO TRANSPORTE

(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
+0 1+000 11.00 100.00% - 0.12 10.38 1,000.00 4.70 4,700.00 0.15 705.00 7,317.90 705.00 6,612.90
1+000 2+000 11.00 100.00% - 0.12 9.38 1,000.00 4.80 4,800.00 0.15 720.00 6,753.60 720.00 6,033.60
2+000 3+000 11.00 100.00% - 0.12 8.38 1,000.00 5.30 5,300.00 0.15 795.00 6,662.10 795.00 5,867.10
3+000 4+000 11.00 100.00% - 0.12 7.38 1,000.00 5.50 5,500.00 0.15 825.00 6,088.50 825.00 5,263.50
4+000 5+000 11.00 100.00% - 0.12 6.38 1,000.00 5.70 5,700.00 0.15 855.00 5,454.90 855.00 4,599.90
5+000 6+000 11.00 100.00% - 0.12 5.38 1,000.00 5.60 5,600.00 0.15 840.00 4,519.20 840.00 3,679.20
6+000 7+000 11.00 100.00% - 0.12 4.38 1,000.00 5.60 5,600.00 0.15 840.00 3,679.20 840.00 2,839.20
7+000 8+000 11.00 100.00% - 0.12 3.38 1,000.00 4.90 4,900.00 0.15 735.00 2,484.30 735.00 1,749.30
8+000 9+000 11.00 100.00% - 0.12 2.38 1,000.00 5.30 5,300.00 0.15 795.00 1,892.10 795.00 1,097.10
9+000 10+000 11.00 100.00% - 0.12 1.38 1,000.00 5.50 5,500.00 0.15 825.00 1,138.50 825.00 313.50
10+000 11+000 11.00 100.00% - 0.12 0.38 1,000.00 4.20 4,200.00 0.15 630.00 239.40 239.40 -
11+000 12+000 11.00 100.00% - 0.12 0.38 1,000.00 5.50 5,500.00 0.15 825.00 313.50 313.50 -
12+000 13+000 11.00 100.00% - 0.12 1.38 1,000.00 4.40 4,400.00 0.15 660.00 910.80 660.00 250.80
13+000 14+000 11.00 100.00% - 0.12 2.38 1,000.00 4.30 4,300.00 0.15 645.00 1,535.10 645.00 890.10
14+000 15+000 11.00 100.00% - 0.12 3.38 1,000.00 4.10 4,100.00 0.15 615.00 2,078.70 615.00 1,463.70
15+000 16+000 11.00 100.00% - 0.12 4.38 1,000.00 4.60 4,600.00 0.15 690.00 3,022.20 690.00 2,332.20
16+000 17+000 11.00 100.00% - 0.12 5.38 1,000.00 4.90 4,900.00 0.15 735.00 3,954.30 735.00 3,219.30
17+000 18+000 11.00 100.00% - 0.12 6.38 1,000.00 4.90 4,900.00 0.15 735.00 4,689.30 735.00 3,954.30
18+000 19+000 11.00 100.00% - 0.12 7.38 1,000.00 5.20 5,200.00 0.15 780.00 5,756.40 780.00 4,976.40
19+000 20+000 11.00 100.00% - 0.12 8.38 1,000.00 6.00 6,000.00 0.15 900.00 7,542.00 900.00 6,642.00
20+000 21+000 11.00 100.00% - 0.12 9.38 1,000.00 5.20 5,200.00 0.15 780.00 7,316.40 780.00 6,536.40
21+000 22+000 11.00 100.00% - 0.12 10.38 1,000.00 5.30 5,300.00 0.15 795.00 8,252.10 795.00 7,457.10
22+000 23+000 11.00 100.00% - 0.12 11.38 1,000.00 5.30 5,300.00 0.20 1,060.00 12,062.80 1,060.00 11,002.80
23+000 24+000 11.00 100.00% - 0.12 12.38 1,000.00 5.50 5,500.00 0.20 1,100.00 13,618.00 1,100.00 12,518.00
24+000 25+000 11.00 100.00% - 0.12 13.38 1,000.00 5.30 5,300.00 0.20 1,060.00 14,182.80 1,060.00 13,122.80
25+000 26+000 11.00 100.00% - 0.12 14.38 1,000.00 5.00 5,000.00 0.20 1,000.00 14,380.00 1,000.00 13,380.00
(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
26+000 27+000 11.00 100.00% - 0.12 15.38 1,000.00 4.30 4,300.00 0.20 860.00 13,226.80 860.00 12,366.80
27+000 28+000 11.00 100.00% - 0.12 16.38 1,000.00 4.60 4,600.00 0.20 920.00 15,069.60 920.00 14,149.60
28+000 29+000 11.00 100.00% - 0.12 17.38 1,000.00 4.50 4,500.00 0.20 900.00 15,642.00 900.00 14,742.00
29+000 30+000 11.00 100.00% - 0.12 18.38 1,000.00 5.50 5,500.00 0.20 1,100.00 20,218.00 1,100.00 19,118.00
30+000 31+000 11.00 100.00% - 0.12 19.38 1,000.00 4.70 4,700.00 0.20 940.00 18,217.20 940.00 17,277.20
31+000 32+000 11.00 100.00% - 0.12 20.38 1,000.00 5.70 5,700.00 0.20 1,140.00 23,233.20 1,140.00 22,093.20
32+000 33+000 11.00 100.00% - 0.12 21.38 1,000.00 5.70 5,700.00 0.20 1,140.00 24,373.20 1,140.00 23,233.20
33+000 34+000 11.00 100.00% - 0.12 22.38 1,000.00 4.90 4,900.00 0.20 980.00 21,932.40 980.00 20,952.40
34+000 35+000 11.00 100.00% - 0.12 23.38 1,000.00 4.60 4,600.00 0.20 920.00 21,509.60 920.00 20,589.60
35+000 36+000 11.00 100.00% - 0.12 24.38 1,000.00 4.50 4,500.00 0.20 900.00 21,942.00 900.00 21,042.00
36+000 37+000 11.00 100.00% - 0.12 25.38 1,000.00 4.90 4,900.00 0.20 980.00 24,872.40 980.00 23,892.40
--- --- --- --- --- --- --- 37,000.00 --- 186,500.00 --- 31,725.00 366,080.50 30,822.90 335,257.60
SUSTENTO TRANSPORTE

(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
+0 1+000 11.00 100.00% - 0.12 10.38 1,000.00 4.70 4,700.00 0.15 705.00 5,688.82 693.30 4,995.52
1+000 2+000 11.00 100.00% - 0.12 9.38 1,000.00 4.80 4,800.00 0.15 720.00 5,265.96 708.05 4,557.91
2+000 3+000 11.00 100.00% - 0.12 8.38 1,000.00 5.30 5,300.00 0.15 795.00 5,213.94 781.81 4,432.13
3+000 4+000 11.00 100.00% - 0.12 7.38 1,000.00 5.50 5,500.00 0.15 825.00 4,787.47 811.31 3,976.16
4+000 5+000 11.00 100.00% - 0.12 6.38 1,000.00 5.70 5,700.00 0.15 855.00 4,315.67 840.81 3,474.86
5+000 6+000 11.00 100.00% - 0.12 5.38 1,000.00 5.60 5,600.00 0.15 840.00 3,605.41 826.06 2,779.35
6+000 7+000 11.00 100.00% - 0.12 4.38 1,000.00 5.60 5,600.00 0.15 840.00 2,970.85 826.06 2,144.79
7+000 8+000 11.00 100.00% - 0.12 3.38 1,000.00 4.90 4,900.00 0.15 735.00 2,044.26 722.80 1,321.46
8+000 9+000 11.00 100.00% - 0.12 2.38 1,000.00 5.30 5,300.00 0.15 795.00 1,610.58 781.81 828.77
9+000 10+000 11.00 100.00% - 0.12 1.38 1,000.00 5.50 5,500.00 0.15 825.00 1,048.13 811.31 236.82
10+000 11+000 11.00 100.00% - 0.12 0.38 1,000.00 4.20 4,200.00 0.15 630.00 235.43 235.43 -
11+000 12+000 11.00 100.00% - 0.12 0.38 1,000.00 5.50 5,500.00 0.15 825.00 308.30 308.30 -
12+000 13+000 11.00 100.00% - 0.12 1.38 1,000.00 4.40 4,400.00 0.15 660.00 838.51 649.05 189.46
13+000 14+000 11.00 100.00% - 0.12 2.38 1,000.00 4.30 4,300.00 0.15 645.00 1,306.70 634.30 672.40
14+000 15+000 11.00 100.00% - 0.12 3.38 1,000.00 4.10 4,100.00 0.15 615.00 1,710.50 604.79 1,105.71
15+000 16+000 11.00 100.00% - 0.12 4.38 1,000.00 4.60 4,600.00 0.15 690.00 2,440.34 678.55 1,761.79
16+000 17+000 11.00 100.00% - 0.12 5.38 1,000.00 4.90 4,900.00 0.15 735.00 3,154.73 722.80 2,431.93
17+000 18+000 11.00 100.00% - 0.12 6.38 1,000.00 4.90 4,900.00 0.15 735.00 3,709.96 722.80 2,987.16
18+000 19+000 11.00 100.00% - 0.12 7.38 1,000.00 5.20 5,200.00 0.15 780.00 4,526.34 767.06 3,759.28
19+000 20+000 11.00 100.00% - 0.12 8.38 1,000.00 6.00 6,000.00 0.15 900.00 5,902.57 885.06 5,017.51
20+000 21+000 11.00 100.00% - 0.12 9.38 1,000.00 5.20 5,200.00 0.15 780.00 5,704.79 767.06 4,937.73
21+000 22+000 11.00 100.00% - 0.12 10.38 1,000.00 5.30 5,300.00 0.15 795.00 6,415.06 781.81 5,633.25
22+000 23+000 11.00 100.00% - 0.12 11.38 1,000.00 5.30 5,300.00 0.20 1,060.00 9,354.16 1,042.41 8,311.75
23+000 24+000 11.00 100.00% - 0.12 12.38 1,000.00 5.50 5,500.00 0.20 1,100.00 10,538.11 1,081.75 9,456.36
24+000 25+000 11.00 100.00% - 0.12 13.38 1,000.00 5.30 5,300.00 0.20 1,060.00 10,955.65 1,042.41 9,913.24
25+000 26+000 11.00 100.00% - 0.12 14.38 1,000.00 5.00 5,000.00 0.20 1,000.00 11,090.94 983.41 10,107.53
(km) CALZADA
Inicio Fin Ubicación Acceso DLP Distancia Longitud Ancho Area Espesor Volumen Momento D <= 1 km D > 1 km
Participación
(km) (km) Cantera (km) (km) (km) (m) (m) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
26+000 27+000 11.00 100.00% - 0.12 15.38 1,000.00 4.30 4,300.00 0.20 860.00 10,187.87 845.73 9,342.14
27+000 28+000 11.00 100.00% - 0.12 16.38 1,000.00 4.60 4,600.00 0.20 920.00 11,593.64 904.73 10,688.91
28+000 29+000 11.00 100.00% - 0.12 17.38 1,000.00 4.50 4,500.00 0.20 900.00 12,021.48 885.06 11,136.42
29+000 30+000 11.00 100.00% - 0.12 18.38 1,000.00 5.50 5,500.00 0.20 1,100.00 15,523.89 1,081.75 14,442.14
30+000 31+000 11.00 100.00% - 0.12 19.38 1,000.00 4.70 4,700.00 0.20 940.00 13,975.96 924.40 13,051.56
31+000 32+000 11.00 100.00% - 0.12 20.38 1,000.00 5.70 5,700.00 0.20 1,140.00 17,810.75 1,121.08 16,689.67
32+000 33+000 11.00 100.00% - 0.12 21.38 1,000.00 5.70 5,700.00 0.20 1,140.00 18,671.93 1,121.08 17,550.85
33+000 34+000 11.00 100.00% - 0.12 22.38 1,000.00 4.90 4,900.00 0.20 980.00 16,791.62 963.74 15,827.88
34+000 35+000 11.00 100.00% - 0.12 23.38 1,000.00 4.60 4,600.00 0.20 920.00 16,458.55 904.73 15,553.82
35+000 36+000 11.00 100.00% - 0.12 24.38 1,000.00 4.50 4,500.00 0.20 900.00 16,780.63 885.06 15,895.57
36+000 37+000 11.00 100.00% - 0.12 25.38 1,000.00 4.90 4,900.00 0.20 980.00 19,012.55 963.73 18,048.82
--- --- --- --- --- --- --- 37,000.00 --- 186,500.00 --- 31,725.00 283,572.05 30,311.40 253,260.65
INVENTARIO VIAL
INFORME 5 - DRENAJE Y OBRAS DE ARTE

Tipo MAT. Obra Arte o Drenaje Estado Operatividad


Alcantarilla A Puente P Tierra T Madera Mad Bueno B Limpia L
Tajea T Pontón Ptn Manp. Piedra M Piedra P Regular R Semi Obstr S
Cunetas C Badén B Cº Simple C TMC Malo M Obstruido O
Muro M Pase Agua PA Cº Armado CA Metalico Met --- ---

Progresiva
Tipo Material Estado Operativ. Observaciones / comentarios Foto N°
(km)
0+573.33 A CA R S Limpieza y encausamiento 106

1+027.52 P CA R S Limpieza y encausamiento 107

1+075.54 A CA R S Limpieza y encausamiento 108

1+280.00 PA CA R S Limpieza y encausamiento

1+700.00 PA CA R S Limpieza y encausamiento

2+004.86 A TMC R S Limpieza y encausamiento 114

2+222.45 A TMC R S Limpieza y encausamiento 116

2+247.58 A CA R S Limpieza y encausamiento 128

2+350.60 P R O Limpieza y encausamiento 109

2+447.70 P R S Limpieza y encausamiento 110

2+720.00 PA R O Limpieza y encausamiento

3+115.39 P R O Limpieza y encausamiento 111

3+139.68 A CA B L Limpieza y encausamiento 130

3+237.75 A TMC R O Limpieza y encausamiento 117

3+699.65 PA R S Limpieza y encausamiento

4+028.00 A CA R S Limpieza y encausamiento 134

4+079.68 A CA R S Limpieza y encausamiento

4+638.65 A CA R S Limpieza y encausamiento

4+770.48 P R S Limpieza y encausamiento 115

5+126.93 A TMC R O Limpieza y encausamiento 120

5+272.75 A TMC R O Limpieza y encausamiento 121

5+400.00 P R S Limpieza y encausamiento 118

5+587.43 A TMC R S Limpieza y encausamiento

5+806.41 A CA R O Limpieza y encausamiento

6+145.16 P R O Limpieza y encausamiento 119

6+254.08 B R O Limpieza y encausamiento 112

7+743.67 B R O Limpieza y encausamiento 113

7+941.11 A TMC R S Limpieza y encausamiento 123

8+129.12 A TMC R S Limpieza y encausamiento 124

8+347.22 A TMC R O Limpieza y encausamiento 125

8+629.14 A CA R O Limpieza y encausamiento

9+098.29 PA R O Limpieza y encausamiento


INVENTARIO VIAL
INFORME 5 - DRENAJE Y OBRAS DE ARTE

Tipo MAT. Obra Arte o Drenaje Estado Operatividad


Alcantarilla A Puente P Tierra T Madera Mad Bueno B Limpia L
Tajea T Pontón Ptn Manp. Piedra M Piedra P Regular R Semi Obstr S
Cunetas C Badén B Cº Simple C TMC Malo M Obstruido O
Muro M Pase Agua PA Cº Armado CA Metalico Met --- ---

Progresiva
Tipo Material Estado Operativ. Observaciones / comentarios Foto N°
(km)
9+898.29 PA R O Limpieza y encausamiento

10+308.29 A TMC R O Limpieza y encausamiento 127

11+074.98 A CA R O Limpieza y encausamiento

11+579.29 A TMC R O Limpieza y encausamiento 131

11+921.04 A CA R S Limpieza y encausamiento

12+183.13 A CA R S Limpieza y encausamiento

12+402.84 A CA R O Limpieza y encausamiento

13+195.09 B R O Limpieza y encausamiento 126

13+282.26 A CA M S Limpieza y encausamiento

13+590.11 A TMC M S Limpieza y encausamiento 132

14+041.03 A CA M S Limpieza y encausamiento

14+606.99 P M O Limpieza y encausamiento 122

14+728.13 A TMC M S Limpieza y encausamiento 133

14+958.13 A TMC M O Limpieza y encausamiento 136

15+116.11 A TMC R L Limpieza y encausamiento 137

15+498.13 PA R O Limpieza y encausamiento

16+472.83 A CA M S Limpieza y encausamiento

16+559.87 P M S Limpieza y encausamiento 129

16+880.56 A TMC M S Limpieza y encausamiento 138

18+440.19 A TMC R L Limpieza y encausamiento 139

18+758.14 A TMC M S Limpieza y encausamiento 140

19+038.14 A TMC M O Limpieza y encausamiento 141

19+170.24 A TMC R O Limpieza y encausamiento 143

19+424.13 P R L Limpieza y encausamiento 142

19+717.14 A CA M L Limpieza y encausamiento

19+759.51 P M L Limpieza y encausamiento

19+988.13 A CA M S Limpieza y encausamiento

20+367.75 A CA M O Limpieza y encausamiento

20+928.07 A TMC M S Limpieza y encausamiento

21+168.13 A TMC M S Limpieza y encausamiento

21+354.22 B M S Limpieza y encausamiento 135

21+968.05 P M S Limpieza y encausamiento


INVENTARIO VIAL
INFORME 5 - DRENAJE Y OBRAS DE ARTE

Tipo MAT. Obra Arte o Drenaje Estado Operatividad


Alcantarilla A Puente P Tierra T Madera Mad Bueno B Limpia L
Tajea T Pontón Ptn Manp. Piedra M Piedra P Regular R Semi Obstr S
Cunetas C Badén B Cº Simple C TMC Malo M Obstruido O
Muro M Pase Agua PA Cº Armado CA Metalico Met --- ---

Progresiva
Tipo Material Estado Operativ. Observaciones / comentarios Foto N°
(km)
22+248.13 A TMC M O Limpieza y encausamiento

22+958.13 A TMC M S Limpieza y encausamiento

23+086.16 A CA M S Limpieza y encausamiento

23+152.12 A TMC M O Limpieza y encausamiento

23+332.17 A TMC M S Limpieza y encausamiento

23+768.13 A TMC M S Limpieza y encausamiento

24+018.14 PA M S Limpieza y encausamiento

24+265.64 B M S Limpieza y encausamiento

24+531.02 A TMC M S Limpieza y encausamiento

24+583.78 P M S Limpieza y encausamiento

24+625.04 A TMC M S Limpieza y encausamiento

24+788.13 A TMC M S Limpieza y encausamiento

24+938.13 P M S Limpieza y encausamiento

25+844.41 A TMC M S Limpieza y encausamiento

25+937.79 A CA M S Limpieza y encausamiento

26+053.18 A CA M S Limpieza y encausamiento

26+152.79 A TMC M S Limpieza y encausamiento

26+555.34 A TMC M S Limpieza y encausamiento

27+069.87 A TMC M S Limpieza y encausamiento

27+352.39 A TMC M S Limpieza y encausamiento

27+848.13 A TMC M S Limpieza y encausamiento

28+018.12 PA M S Limpieza y encausamiento

28+715.34 PA M S Limpieza y encausamiento

29+418.21 A TMC M S Limpieza y encausamiento

29+498.40 A TMC M S Limpieza y encausamiento

29+569.09 A TMC M S Limpieza y encausamiento

30+451.79 A TMC M S Limpieza y encausamiento

30+887.54 A TMC M S Limpieza y encausamiento

31+135.36 PA M S Limpieza y encausamiento

31+483.28 B M S Limpieza y encausamiento

31+815.35 PA M S Limpieza y encausamiento

32+607.49 A TMC M S Limpieza y encausamiento


INVENTARIO VIAL
INFORME 5 - DRENAJE Y OBRAS DE ARTE

Tipo MAT. Obra Arte o Drenaje Estado Operatividad


Alcantarilla A Puente P Tierra T Madera Mad Bueno B Limpia L
Tajea T Pontón Ptn Manp. Piedra M Piedra P Regular R Semi Obstr S
Cunetas C Badén B Cº Simple C TMC Malo M Obstruido O
Muro M Pase Agua PA Cº Armado CA Metalico Met --- ---

Progresiva
Tipo Material Estado Operativ. Observaciones / comentarios Foto N°
(km)
32+822.82 P M S Limpieza y encausamiento

32+907.78 P M S Limpieza y encausamiento

33+126.98 B M S Limpieza y encausamiento

33+455.35 PA M S Limpieza y encausamiento

34+196.34 A TMC M S Limpieza y encausamiento

34+511.93 A TMC M S Limpieza y encausamiento

35+118.71 A TMC M S Limpieza y encausamiento

35+248.32 A TMC M S Limpieza y encausamiento

35+655.35 P M S Limpieza y encausamiento

36+502.74 B M S Limpieza y encausamiento

36+957.71 A TMC M S Limpieza y encausamiento

37+376.04 PA M S Limpieza y encausamiento

37+690.70 A TMC M S Limpieza y encausamiento

37+995.35 PA M S Limpieza y encausamiento

38+695.36 PA M S Limpieza y encausamiento

39+055.36 PA M S Limpieza y encausamiento

39+373.61 B M S Limpieza y encausamiento

40+030.76 A TMC M S Limpieza y encausamiento

40+497.87 A TMC M S Limpieza y encausamiento

41+475.35 PA M S Limpieza y encausamiento

41+753.97 A TMC M S Limpieza y encausamiento

42+880.89 A TMC M S Limpieza y encausamiento

43+405.35 A TMC M S Limpieza y encausamiento

43+860.00 A TMC M S Limpieza y encausamiento

43+915.52 PA M S Limpieza y encausamiento

43+981.40 A TMC M S Limpieza y encausamiento

44+148.92 A TMC M S Limpieza y encausamiento

44+487.85 A TMC M S Limpieza y encausamiento

45+147.93 A TMC M S Limpieza y encausamiento

45+185.19 P M S Limpieza y encausamiento

45+665.12 A TMC M S Limpieza y encausamiento

45+722.90 A TMC M S Limpieza y encausamiento


INVENTARIO VIAL
INFORME 5 - DRENAJE Y OBRAS DE ARTE

Tipo MAT. Obra Arte o Drenaje Estado Operatividad


Alcantarilla A Puente P Tierra T Madera Mad Bueno B Limpia L
Tajea T Pontón Ptn Manp. Piedra M Piedra P Regular R Semi Obstr S
Cunetas C Badén B Cº Simple C TMC Malo M Obstruido O
Muro M Pase Agua PA Cº Armado CA Metalico Met --- ---

Progresiva
Tipo Material Estado Operativ. Observaciones / comentarios Foto N°
(km)
45+926.71 A TMC M S Limpieza y encausamiento

46+430.25 A TMC M S Limpieza y encausamiento

46+787.99 A TMC M S Limpieza y encausamiento

47+115.12 PA M S Limpieza y encausamiento

47+455.79 PA M S Limpieza y encausamiento

ALCANTARILLA TMC 63

ALCANTARILLAS MCA 22

ALCANTARILLAS TOTAL 85
03.01.01 #REF!

Inicio Final Longitud Tipo


#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
#REF! #REF! #REF! MS
--- --- #REF! ---
CUADRO RESUMEN

Tipo Longitud
Material Suelto MS #REF!
Total #REF!
RESUMEN DE SEÑALIZACION
REGLAMENTARIAS - PREVENTIVAS - INFORMATIVAS

REGLAMENTARIAS PREVENTIVAS INFORMATIVAS


UBICACIÓN
R-16 R-30 P-1A P-1B P-2A P-2B P-4A P-4B P-5-1 P-5-2A P-5-2B P-17 I-8 I-18
Curva Curva Curva y Curva y Curva en Curva en
No Velocidad Camino Reducción de la Poste Placa
Izquierda Derecha Adelantar Máxima
Pronun. Pronun. Curva Derecha Curva Izquierda Contracur. Contracurva
Sinuoso
U U
calzada Kilométrico Informativa
Derecha Izquierda Derecha Izquierda Derecha Izquierda
0+000 1 -
0+020 1
0+120 1
0+190 1
0+240 1
0+310 1
0+430 1
1+000 1
1+200 1
1+280 1
1+480 1
1+550 1
1+620 1
1+780 1
1+820 1
1+985 1
2+000
2+040 1
2+050 1
2+090 1
2+100 1
2+100 1
2+310 1
2+355 1
2+365 1
2+365 1
2+457 1
2+520 1
2+525 1
2+530 1
2+620 1
REGLAMENTARIAS PREVENTIVAS INFORMATIVAS
UBICACIÓN
R-16 R-30 P-1A P-1B P-2A P-2B P-4A P-4B P-5-1 P-5-2A P-5-2B P-17 I-8 I-18
Curva Curva Curva y Curva y Curva en Curva en
No Velocidad Camino Reducción de la Poste Placa
Izquierda Derecha Adelantar Máxima
Pronun. Pronun. Curva Derecha Curva Izquierda Contracur. Contracurva
Sinuoso
U U
calzada Kilométrico Informativa
Derecha Izquierda Derecha Izquierda Derecha Izquierda
2+770 1
2+860 1
2+865 1
3+000 1
3+100 1
3+122 1
3+150 1
3+160 1
3+180 1
3+247 1
3+310 1
3+340 1
3+580 1
3+640 1
3+705 1
3+740 1
3+840 1
4+000 1
4+580 1
4+680 1
5+000 1
5+019 1
5+032 1
5+105 1
5+120 1
5+265 1
5+278 1
5+487 1
5+550 1
5+780 1
5+865 1
6+000 1
6+140 1
REGLAMENTARIAS PREVENTIVAS INFORMATIVAS
UBICACIÓN
R-16 R-30 P-1A P-1B P-2A P-2B P-4A P-4B P-5-1 P-5-2A P-5-2B P-17 I-8 I-18
Curva Curva Curva y Curva y Curva en Curva en
No Velocidad Camino Reducción de la Poste Placa
Izquierda Derecha Adelantar Máxima
Pronun. Pronun. Curva Derecha Curva Izquierda Contracur. Contracurva
Sinuoso
U U
calzada Kilométrico Informativa
Derecha Izquierda Derecha Izquierda Derecha Izquierda
7+000 1
7+070 1
7+080 1
7+150 1
7+162 1
7+230 1
7+375 1
7+380 1
7+450 1
7+720 1
7+760 1
7+770 1
7+940 1
8+000 1
8+220 1
8+325 1
8+360 1
8+370 1
8+630 1
8+990 1
9+000 1
9+350 1
9+360 1
10+000 1
10+130 1
10+135 1
10+200 1
10+210 1
10+215 1
10+370 1
10+410 1
10+670 1
10+820 1
10+850 1
11+000 1
REGLAMENTARIAS PREVENTIVAS INFORMATIVAS
UBICACIÓN
R-16 R-30 P-1A P-1B P-2A P-2B P-4A P-4B P-5-1 P-5-2A P-5-2B P-17 I-8 I-18
Curva Curva Curva y Curva y Curva en Curva en
No Velocidad Camino Reducción de la Poste Placa
Izquierda Derecha Adelantar Máxima
Pronun. Pronun. Curva Derecha Curva Izquierda Contracur. Contracurva
Sinuoso
U U
calzada Kilométrico Informativa
Derecha Izquierda Derecha Izquierda Derecha Izquierda
11+330 1
11+420 1
11+980 1
12+000 1
12+200 1
12+220 1
12+900 1
13+000 1
13+000
13+060
13+200
13+200 1
13+240
13+700 1
13+840 1
14+000 1
14+140 1
14+860 1
15+000 1
15+030 1
15+040 1
15+258 1
15+370 1
15+500 1
15+750
15+785 1
15+805 1
15+920 1
16+000
16+200 1
16+330 1
16+340 1
16+740 1
17+000
17+820 1
REGLAMENTARIAS PREVENTIVAS INFORMATIVAS
UBICACIÓN
R-16 R-30 P-1A P-1B P-2A P-2B P-4A P-4B P-5-1 P-5-2A P-5-2B P-17 I-8 I-18
Curva Curva Curva y Curva y Curva en Curva en
No Velocidad Camino Reducción de la Poste Placa
Izquierda Derecha Adelantar Máxima
Pronun. Pronun. Curva Derecha Curva Izquierda Contracur. Contracurva
Sinuoso
U U
calzada Kilométrico Informativa
Derecha Izquierda Derecha Izquierda Derecha Izquierda
18+000 1
18+355 1
18+370 1
18+540 1
19+000 1
19+980 1
20+000 1
20+060 1
20+140 1
20+240 1
20+680 1
20+740 1
20+880 1
20+960 1
20+990 1
21+000 1
21+080 1
21+240 1
21+450 1
21+540 1
21+610 1
21+810 1
21+850 1
21+915 1
21+980 1
21+990 1
22+000 1
22+120 1
22+155 1
22+160 1
22+170 1
22+692 1
23+000 1
23+300 1
23+930 1
REGLAMENTARIAS PREVENTIVAS INFORMATIVAS
UBICACIÓN
R-16 R-30 P-1A P-1B P-2A P-2B P-4A P-4B P-5-1 P-5-2A P-5-2B P-17 I-8 I-18
Curva Curva Curva y Curva y Curva en Curva en
No Velocidad Camino Reducción de la Poste Placa
Izquierda Derecha Adelantar Máxima
Pronun. Pronun. Curva Derecha Curva Izquierda Contracur. Contracurva
Sinuoso
U U
calzada Kilométrico Informativa
Derecha Izquierda Derecha Izquierda Derecha Izquierda
24+000 1
24+020 1
25+000 1
25+515 1
25+645 1
25+650 1
26+000 1
26+080 1
26+080 1
26+340 1
27+000 1
27+060 1
28+000 1
28+050 1
29+000 1
30+000 1
30+300
30+770 1 1
30+790 1
31+000 1
31+260 1
31+940 1
32+000
32+540 1
32+580 1
32+640 1
32+825 1
33+000
33+120 1
33+125 1
33+495 1
33+530 1
33+790 1
34+000 1
34+200 1
REGLAMENTARIAS PREVENTIVAS INFORMATIVAS
UBICACIÓN
R-16 R-30 P-1A P-1B P-2A P-2B P-4A P-4B P-5-1 P-5-2A P-5-2B P-17 I-8 I-18
Curva Curva Curva y Curva y Curva en Curva en
No Velocidad Camino Reducción de la Poste Placa
Izquierda Derecha Adelantar Máxima
Pronun. Pronun. Curva Derecha Curva Izquierda Contracur. Contracurva
Sinuoso
U U
calzada Kilométrico Informativa
Derecha Izquierda Derecha Izquierda Derecha Izquierda
34+260 1
34+520 1
34+920 1
35+000 1
35+040 1
35+370 1
35+660 1
35+720 1
36+000 1
36+480 1
36+600 1
36+617 1
36+620 1
36+997 1
37+000 1
TOTAL 43 16 26 25 3 4 1 1 16 - - 23 33 18
SUSTENTO DE GUARDAVIAS

Núm.
Inicio de Fin de Núm. De
Item Longitud (m) de
Guardavías Guardavías curvas
Und.

1 1+990.13 2+046.51 56.38 15 1


2 2+043.67 2+095.53 50.44 13 2
3 2+463.92 2+510.75 45.42 12 3
4 2+486.39 2+551.78 53.21 14 4
5 2+558.74 2+612.73 41.81 11 5
6 2+700.23 2+742.74 42.51 11 6
7 2+715.93 2+772.50 43.16 11 7
8 3+765.06 3+820.15 41.68 11 8
9 3+812.28 3+885.66 69.45 18 9
10 5+179.26 5+234.08 50.88 13 10
11 11+062.65 11+120.54 57.89 15 11
12 15+896.82 15+944.42 47.59 12 12
13 19+059.42 19+118.41 58.99 15 13
14 19+287.60 19+346.61 59.01 15 14
15 19+316.61 19+368.10 36.49 10 15
16 20+152.84 20+212.64 44.80 12 16
17 20+182.64 20+230.42 32.78 9 17
18 21+816.21 21+862.34 31.12 8 18
19 22+770.80 22+812.84 42.04 11 19
20 30+647.42 30+707.87 60.46 16 20
21 31+397.57 31+447.60 50.03 13 21
22 31+417.60 31+475.17 42.57 11 22
23 31+521.67 31+587.54 50.87 13 23
24 34+170.31 34+222.77 52.46 14 24
25 34+452.69 34+515.14 62.46 16 25
26 35+219.97 35+279.73 59.75 16 26
27 35+321.48 35+368.35 46.87 12 27
28 35+684.21 35+742.74 58.53 15 28
--- --- --- 1,389.65 365 ---
CALZADA
Inicio Fin Ubicación Acceso DLP Distancia
Participación
(km) (km) Cantera (km) (km) (km)
+0 1+000 6.42 100.00% 0.25 0.12 6.05
1+000 2+000 6.42 100.00% 0.25 0.12 5.05
2+000 3+000 6.42 100.00% 0.25 0.12 4.05
3+000 4+000 6.42 100.00% 0.25 0.12 3.05
4+000 5+000 6.42 100.00% 0.25 0.12 2.05
5+000 6+000 6.42 100.00% 0.25 0.12 1.05
6+000 6+420 6.42 100.00% 0.25 0.12 0.34
6+420 7+000 6.42 100.00% 0.25 0.12 0.42
7+000 8+000 6.42 100.00% 0.25 0.12 1.21
8+000 9+000 6.42 100.00% 0.25 0.12 2.21
9+000 9+360 6.42 100.00% 0.25 0.12 2.89
9+360 10+000 12.30 100.00% 0.20 0.12 2.70
10+000 11+000 12.30 100.00% 0.20 0.12 1.88
11+000 12+000 12.30 100.00% 0.20 0.12 0.88
12+000 12+300 12.30 100.00% 0.20 0.12 0.23
12+300 13+000 12.30 100.00% 0.20 0.12 0.43
13+000 14+000 12.30 100.00% 0.20 0.12 1.28
14+000 15+000 12.30 100.00% 0.20 0.12 2.28
15+000 16+000 12.30 100.00% 0.20 0.12 3.28
16+000 17+000 12.30 100.00% 0.20 0.12 4.28
17+000 18+000 12.30 100.00% 0.20 0.12 5.28
18+000 19+000 12.30 100.00% 0.20 0.12 6.28
19+000 20+000 12.30 100.00% 0.20 0.12 7.28
20+000 21+000 12.30 100.00% 0.20 0.12 8.28
21+000 21+800 12.30 100.00% 0.20 0.12 9.18
CALZADA
Longitud Ancho Area Espesor Volumen Momento D <= 1 km
(m) (m) (m2) (m) (m3) (m3-km) (m3-km)
1,000.00 4.65 4,650.00 0.15 697.50 4,219.88 697.50
1,000.00 4.65 4,650.00 0.15 697.50 3,522.38 697.50
1,000.00 4.65 4,650.00 0.15 697.50 2,824.88 697.50
1,000.00 4.65 4,650.00 0.15 697.50 2,127.38 697.50
1,000.00 4.65 4,650.00 0.15 697.50 1,429.88 697.50
1,000.00 4.65 4,650.00 0.15 697.50 732.38 697.50
420.00 4.65 1,953.00 0.15 292.95 99.60 99.60
580.00 4.65 2,697.00 0.15 404.55 169.91 169.91
1,000.00 4.65 4,650.00 0.15 697.50 843.98 697.50
1,000.00 4.65 4,650.00 0.15 697.50 1,541.48 697.50
360.00 4.65 1,674.00 0.15 251.10 725.68 251.10
640.00 4.65 2,976.00 0.15 446.40 1,205.28 446.40
1,000.00 4.65 4,650.00 0.15 697.50 1,311.30 697.50
1,000.00 4.65 4,650.00 0.15 697.50 613.80 613.80
300.00 4.65 1,395.00 0.15 209.25 48.13 48.13
700.00 4.65 3,255.00 0.15 488.25 209.95 209.95
1,000.00 4.65 4,650.00 0.15 697.50 892.80 697.50
1,000.00 4.65 4,650.00 0.15 697.50 1,590.30 697.50
1,000.00 4.65 4,650.00 0.15 697.50 2,287.80 697.50
1,000.00 4.65 4,650.00 0.15 697.50 2,985.30 697.50
1,000.00 4.65 4,650.00 0.15 697.50 3,682.80 697.50
1,000.00 4.65 4,650.00 0.15 697.50 4,380.30 697.50
1,000.00 4.65 4,650.00 0.15 697.50 5,077.80 697.50
1,000.00 4.65 4,650.00 0.15 697.50 5,775.30 697.50
800.00 4.65 3,720.00 0.15 558.00 5,122.44 558.00
21,800.00 15,205.50 53,420.69 14,254.39
D > 1 km
(m3-km)
3,522.38
2,824.88
2,127.38
1,429.88
732.38
34.87
-
-
146.48
843.98
474.58
758.88
613.80
-
-
-
195.30
892.80
1,590.30
2,287.80
2,985.30
3,682.80
4,380.30
5,077.80
4,564.44
39,166.30

También podría gustarte