CÁLCULO GENERAL
AÑO 2036
Q_2=(Dot.×D)/86400=
Consumo Medio:
Qm = 16.57 lt/s
Q_mh=2.0×Q_m
Consumo Máximo Horario:
Q_(unit.)=Q_mh/L_Total =
0.001226 L/s.m
01 02 100 522.09 2,638.11 3,160.20 0.00123 0 0.000 0 0.000 0 0.000 3.873 01 0.000 0.000 -33.138 25.185 4,124.850 4,116.920 7.930 0.01519 0.140969 6.000 144.600
01 04 100 461.09 5,794.06 6,255.15 0.00123 0 0.000 0 0.000 0 0.000 7.667 03 5.667 0.000 5.667 7.953 4,124.850 4,113.850 11.000 0.02386 0.082893 4.000 99.400
04 05 100 523.27 2,669.76 3,193.03 0.00123 0 0.000 0 0.000 0 0.000 3.914 06 11.073 0.000 11.073 0.286 4,113.850 4,113.020 0.830 0.00159 0.040863 3.000 81.400
02 05 100 474.22 296.30 770.52 0.00123 0 0.000 0 0.000 0 0.000 0.944 02 3.873 0.000 3.873 7.459 4,121.920 4,113.020 8.900 0.01877 0.084981 4.000 99.400
02 03 100 672.28 3,951.29 4,623.57 0.00123 0 0.000 0 0.000 0 0.000 5.667 04 7.667 0.000 7.667 13.852 4,121.920 4,116.420 5.500 0.00818 0.127522 6.000 144.600
03 06 100 461.70 4,844.73 5,306.43 0.00123 0 0.000 0 0.000 0 0.000 6.504 05 4.858 0.000 4.858 8.185 4,116.420 4,108.990 7.430 0.01609 0.090862 4.000 99.400
05 06 100 668.77 3,058.94 3,727.71 0.00123 0 0.000 0 0.000 0 0.000 4.569 2.887 4,113.020 4,108.990 4.030 0.00603 0.074800 3.000 81.400
01 02 -1 522.09 6.00 -0.0252 0.01342 -7.01 278.3458 -0.0024 -0.02283 0.0112 -5.84 255.8487 -0.0004
01 04 1 461.09 4.00 0.0080 0.00985 4.54 570.8537 -0.0024 0.01031 0.0159 7.35 712.7957 -0.0004
04 05 1 523.27 3.00 0.0003 0.00006 0.03 104.7643 -0.0024 0.00264 0.0034 1.78 673.0019 -0.0004
02 05 -1 474.22 4.00 -0.0075 0.00875 -4.15 556.3810 -0.0026 -0.00487 0.0040 -1.89 387.8454 -0.0010
-6.59 1510.34 1.40 2029.49
02 05 1 474.22 4.00 0.0075 0.00875 4.15 556.3810 0.0026 0.00487 0.0040 1.89 387.8454 0.0010
02 03 -1 672.28 6.00 -0.0139 0.00444 -2.98 215.1271 -0.0002 -0.01362 0.0043 -2.89 212.1110 -0.0006
03 06 -1 461.70 4.00 -0.0082 0.01039 -4.80 586.4112 -0.0002 -0.00796 0.0099 -4.55 571.7481 -0.0006
05 06 1 668.77 3.00 0.0029 0.00399 2.67 924.7273 -0.0002 0.00311 0.0046 3.07 985.6583 -0.0006
-0.96 2282.65 -2.48 2157.36
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 02
TRAMO HORARIO PRIMERA ITERACIÓN SEGUNDA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 522.09 6.00 -0.0228 0.0112 -5.8400 255.8487 -0.0004 -0.02320 0.0115 -6.02 259.4954 -0.0001
01 04 1 461.09 4.00 0.0103 0.0159 7.3500 712.7957 -0.0004 0.00994 0.0149 6.86 690.2360 -0.0001
04 05 1 523.27 3.00 0.0026 0.0034 1.7800 673.0019 -0.0004 0.00227 0.0026 1.34 589.7923 -0.0001
02 05 -1 474.22 4.00 -0.0049 0.0040 -1.8900 387.8454 -0.0010 -0.00587 0.0056 -2.66 453.3574 -0.0001
1.40 2029.49 -0.48 1992.88
02 05 1 474.22 4.00 0.0049 0.0040 1.8900 387.8454 0.0010 0.00587 0.0056 2.66 453.3574 0.0001
02 03 -1 672.28 6.00 -0.0136 0.0043 -2.8900 212.1110 -0.0006 -0.01300 0.0039 -2.65 203.7903 0.0000
03 06 -1 461.70 4.00 -0.0080 0.0099 -4.5500 571.7481 -0.0006 -0.00734 0.0085 -3.92 534.3022 -0.0001
05 06 1 668.77 3.00 0.0031 0.0046 3.0700 985.6583 -0.0006 0.00374 0.0064 4.30 1150.9485 0.0000
-2.48 2157.36 0.39 2342.40
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 02
TRAMO HORARIO SEGUNDA ITERACIÓN TERCERA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 522.09 6.00 -0.0232 0.0115 -6.0200 259.4954 -0.0001 -0.02307 0.0114 -5.96 258.3590 0.0000
01 04 1 461.09 4.00 0.0099 0.0149 6.8600 690.2360 -0.0001 0.01007 0.0152 7.03 698.1948 0.0000
04 05 1 523.27 3.00 0.0023 0.0026 1.3400 589.7923 -0.0001 0.00240 0.0028 1.49 620.2700 0.0000
02 05 -1 474.22 4.00 -0.0059 0.0056 -2.6600 453.3574 -0.0001 -0.00574 0.0054 -2.55 444.4722 0.0000
-0.48 1992.88 0.01 2021.30
02 05 1 474.22 4.00 0.0059 0.0056 2.6600 453.3574 0.0001 0.00574 0.0054 2.55 444.4722 0.0000
02 03 -1 672.28 6.00 -0.0130 0.0039 -2.6500 203.7903 0.0000 -0.01300 0.0039 -2.65 203.7903 0.0000
03 06 -1 461.70 4.00 -0.0073 0.0085 -3.9200 534.3022 -0.0001 -0.00747 0.0088 -4.05 542.3963 0.0000
05 06 1 668.77 3.00 0.0037 0.0064 4.3000 1,150.9485 0.0000 0.00374 0.0064 4.30 1150.9485 0.0000
0.39 2342.40 0.15 2341.61
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 02
TRAMO HORARIO TERCERA ITERACIÓN CUARTA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 522.09 6.00 -0.0231 0.0114 -5.9600 258.3590 0.0000 -0.02307 0.0114 -5.95 257.9554 0.0000
01 04 1 461.09 4.00 0.0101 0.0152 7.0300 698.1948 0.0000 0.01007 0.0153 7.03 698.0094 0.0000
04 05 1 523.27 3.00 0.0024 0.0028 1.4900 620.2700 0.0000 0.00240 0.0028 1.49 619.5803 0.0000
02 05 -1 474.22 4.00 -0.0057 0.0054 -2.5500 444.4722 0.0000 -0.00573 0.0054 -2.55 444.6794 0.0000
0.01 2021.30 0.02 2020.22
02 05 1 474.22 4.00 0.0057 0.0054 2.5500 444.4722 0.0000 0.00573 0.0054 2.55 444.6794 0.0000
02 03 -1 672.28 6.00 -0.0130 0.0039 -2.6500 203.7903 0.0000 -0.01300 0.0039 -2.65 203.7903 0.0000
03 06 -1 461.70 4.00 -0.0075 0.0088 -4.0500 542.3963 0.0000 -0.00746 0.0088 -4.04 541.2509 0.0000
05 06 1 668.77 3.00 0.0037 0.0064 4.3000 1,150.9485 0.0000 0.00374 0.0064 4.30 1150.9485 0.0000
0.15 2341.61 0.16 2340.67
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 02
TRAMO HORARIO CUARTA ITERACIÓN QUINTA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 522.09 6.00 -0.0231 0.0114 -5.9500 257.9554 0.0000 -0.02307 0.0114 -5.96 258.3290 0.0000
01 04 1 461.09 4.00 0.0101 0.0153 7.0300 698.0094 0.0000 0.01007 0.0152 7.03 698.3805 0.0000
04 05 1 523.27 3.00 0.0024 0.0028 1.4900 619.5803 0.0000 0.00240 0.0028 1.48 616.7945 0.0000
02 05 -1 474.22 4.00 -0.0057 0.0054 -2.5500 444.6794 0.0000 -0.00574 0.0054 -2.55 444.2649 0.0000
0.02 2020.22 0.00 2017.77
02 05 1 474.22 4.00 0.0057 0.0054 2.5500 444.6794 0.0000 0.00574 0.0054 2.55 444.2649 0.0000
02 03 -1 672.28 6.00 -0.0130 0.0039 -2.6500 203.7903 0.0000 -0.01300 0.0039 -2.65 203.7903 0.0000
03 06 -1 461.70 4.00 -0.0075 0.0088 -4.0400 541.2509 0.0000 -0.00747 0.0088 -4.05 542.2020 0.0000
05 06 1 668.77 3.00 0.0037 0.0064 4.3000 1,150.9485 0.0000 0.00374 0.0064 4.30 1150.9485 0.0000
0.16 2340.67 0.15 2341.21
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 02
TRAMO HORARIO QUINTA ITERACIÓN SEXTA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 522.09 6.00 -0.0231 0.0114 -5.9600 258.3290 0.0000 -0.02307 0.0114 -5.96 258.3290 0.00000
01 04 1 461.09 4.00 0.0101 0.0152 7.0300 698.3805 0.0000 0.01007 0.0152 7.03 698.3805 0.00000
04 05 1 523.27 3.00 0.0024 0.0028 1.4800 616.7945 0.0000 0.00240 0.0028 1.48 616.7945 0.00000
02 05 -1 474.22 4.00 -0.0057 0.0054 -2.5500 444.2649 0.0000 -0.00574 0.0054 -2.55 444.2649 0.00000
0.00 2017.77 0.00 2017.77
02 05 1 474.22 4.00 0.0057 0.0054 2.5500 444.2649 0.0000 0.00574 0.0054 2.55 444.2649 0.00000
02 03 -1 672.28 6.00 -0.0130 0.0039 -2.6500 203.7903 0.0000 -0.01300 0.0039 -2.65 203.7903 0.00000
03 06 -1 461.70 4.00 -0.0075 0.0088 -4.0500 542.2020 0.0000 -0.00747 0.0088 -4.05 542.2020 0.00000
05 06 1 668.77 3.00 0.0037 0.0064 4.3000 1,150.9485 0.0000 0.00374 0.0064 4.30 1150.9485 0.00000
0.15 2341.21 0.15 2341.21
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 02
TRAMO HORARIO SEXTA ITERACIÓN SEPTIMA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 522.09 6.00 -0.0231 0.0114 -5.9600 258.3290 0.0000 -0.02307 0.0114 -5.96 258.3290 0.0000
01 04 1 461.09 4.00 0.0101 0.0152 7.0300 698.3805 0.0000 0.01007 0.0152 7.03 698.3805 0.0000
04 05 1 523.27 3.00 0.0024 0.0028 1.4800 616.7945 0.0000 0.00240 0.0028 1.48 616.7945 0.0000
02 05 -1 474.22 4.00 -0.0057 0.0054 -2.5500 444.2649 0.0000 -0.00574 0.0054 -2.55 444.2649 0.0000
0.00 2017.77 0.00 2017.77
02 05 1 474.22 4.00 0.0057 0.0054 2.5500 444.2649 0.0000 0.00574 0.0054 2.55 444.2649 0.0000
02 03 -1 672.28 6.00 -0.0130 0.0039 -2.6500 203.7903 0.0000 -0.01300 0.0039 -2.65 203.7903 0.0000
03 06 -1 461.70 4.00 -0.0075 0.0088 -4.0500 542.2020 0.0000 -0.00747 0.0088 -4.05 542.2020 0.0000
05 06 1 668.77 3.00 0.0037 0.0064 4.3000 1,150.9485 0.0000 0.00374 0.0064 4.30 1150.9485 0.0000
0.15 2341.21 0.15 2341.21
RESULTADOS DEFINITIVOS - SECTOR 02
TRAMO HORARIO
/ VELOCIDA ELEVACIÓ PIEZOMÉT PRESIÓN (NUDO
LONGITUD DIÁMETRO CAUDAL CAÍDA, H
ANTIHORA D N RICA FINAL)
De A RIO
NUDO NUDO
# # (+) (-) m " mm m3/s m/s m m Condición
FINAL FINAL
Cota Piez. 1 4,123.85 4139.35 15.50
01 02 -1 522.09 6.00 144.60 0.0231 1.40 5.96 4,115.92 4133.39 17.47 OK
01 04 1 461.09 4.00 99.40 0.0101 1.30 7.03 4,112.85 4132.32 19.47 OK
04 05 1 523.27 3.00 81.40 0.0024 0.46 1.48 4,112.02 4130.84 18.82 OK
02 05 -1 474.22 4.00 99.40 0.0057 0.74 2.55 4,112.02 4130.84 18.82 OK
COTA PIEZOMÉTRICA A LA ENTRADA A LA RED, NUDO N° 01: COTA DE PROYECTO + PRESIÓN DE DISEÑO = 4,138.85 m
D=(Q/(0.2785×C×J^0.54 ))^(1⁄2.63)=
0.1430 m = 6'' = 0.1446 m
J=(Q/(0.2785×C×D^2.63 ))^(1⁄0.54)=
0.02230723 m/m
COTA PIEZOMÉTRICA EN EL NUDO 01: COTA PIEZOMÉTRICA EN EL RESERV. - ( ∑REDUCT. DE VELOC.) - H = 4,139.35 m
PRESIÓN RESULTANTE EN EL NUDO 01: COTA PIEZOMÉTRICA - COTA DE PROYECTO NODO 01 = 15.50 mca