Está en la página 1de 10

Universidad Católica de Santa María

Facultad de Arquitectura e Ingenierías Civil y del Ambientes

Escuela Profesional de Ingeniería Civil

Curso:
Analisis Estructural - Practicas

Grupo: 01

Docente:
Prof. Luis Genaro Gonzales Galindo

Examen Analisis Estructural Practicas

Integrantes:
- Apaza Beltrán, Gabriela Judith
- Bolivar Zambrano, Omar Arnaldo
- Condo Huaranga, Luis Sebastian
- Rivera Mollo, Jack Nicolas
E
VIGA COLUMNA 218819.7889 kgf/cm2
BASE(m) 0.435352209 0.435352209 2188197.889 tonf/m2
ALTURA(m) 0.544190261 0.435352209
I(m4) 0.005846713 0.002993517 Δ 0.05 m
f'c(kgf/cm2) 210 210
E(tonf/m2) 2188197.889 2188197.889
EI(tonf*m2) 12793.7658 6550.408089
CARGA DEFLEXION FINALES
TRAMO L I I/L Mij Mji Mij Mji Mij
m m4 Kn*m Kn*m Kn*m Kn*m kN*m
AC 3 0.002993517 9.98E-04 109.173 109.173 109.173
CD 6 0.005846713 9.74E-04 0.000
CE 3 0.002993517 9.98E-04 218.347 218.347 218.347
EF 6 0.005846713 9.74E-04 0.000
FD 3 0.002993517 9.98E-04 218.347 218.347 218.347
DB 3 0.002993517 9.98E-04 109.173 109.173 109.173

A C C D C

FT 0.00 0.34 0.33 0.33 0.34

MEP 109.173 109.173 0.000 0.000 218.347


a) Balance -110.033 -107.454 -107.454 -110.033

b) Repartición -110.033 -53.727 -53.727 -55.234


a) Balance 36.606 35.748 35.748 36.606

b) Repartición 36.606 17.874 17.874 27.562


a) Balance -15.265 -14.907 -14.907 -15.265

b) Repartición -15.265 -7.453 -7.453 -11.439


a) Balance 6.347 6.198 6.198 6.347
b) Repartición 6.347 3.099 3.099 4.757
a) Balance -2.639 -2.577 -2.577 -2.639

b) Repartición -2.639 -1.289 -1.289 -1.978


a) Balance 1.097 1.072 1.072 1.097

b) Repartición 1.097 0.536 0.536 0.822


a) Balance -0.456 -0.446 -0.446 -0.456

b) Repartición -0.456 -0.223 -0.223 -0.342


a) Balance 0.190 0.185 0.185 0.190

b) Repartición 0.190 0.093 0.093 0.142


a) Balance -0.079 -0.077 -0.077 -0.079

b) Repartición -0.079 -0.039 -0.039 -0.059


a) Balance 0.033 0.032 0.032 0.033

b) Repartición 0.033 0.016 0.016 0.025


a) Balance -0.014 -0.013 -0.013 -0.014

b) Repartición -0.014 -0.007 -0.007 -0.010


a) Balance 0.006 0.006 0.006 0.006

b) Repartición 0.006 0.003 0.003 0.004


a) Balance -0.002 -0.002 -0.002 -0.002

b) Repartición -0.002 -0.001 -0.001 -0.002


a) Balance 0.001 0.001 0.001 0.001

b) Repartición 0.001 0.000 0.000 0.001

MOMENTOS 24.965 24.965 -123.352 -123.352 98.388

CORTANTE 16.64353984 -16.6435398 -41.1172648 41.11726484 67.70946564

SUMATORIA EN X
AX -16.6435398
BX -22.356463
FUERZAS 39
-2.8257E-06
FINALES
Mji
kN*m
109.173
0.000
218.347
0.000
218.347
109.173

E E F F D D B

0.51 0.49 0.49 0.51 0.34 0.34 0.00

218.347 0.000 0.000 218.347 218.347 109.173 109.173


-110.468 -107.879 -107.879 -110.468 -110.033 -110.033

-55.017 -53.939 -53.939 -55.017 -55.234 -55.017


55.124 53.832 53.832 55.124 36.606 36.606

18.303 26.916 26.916 18.303 27.562 18.303


-22.878 -22.341 -22.341 -22.878 -15.265 -15.265

-7.632 -11.171 -11.171 -7.632 -11.439 -7.632


9.513 9.290 9.290 9.513 6.347 6.347
3.174 4.645 4.645 3.174 4.757 3.174
-3.956 -3.863 -3.863 -3.956 -2.639 -2.639

-1.320 -1.931 -1.931 -1.320 -1.978 -1.320


1.645 1.606 1.606 1.645 1.097 1.097

0.549 0.803 0.803 0.549 0.822 0.549


-0.684 -0.668 -0.668 -0.684 -0.456 -0.456

-0.228 -0.334 -0.334 -0.228 -0.342 -0.228


0.284 0.278 0.278 0.284 0.190 0.190

0.095 0.139 0.139 0.095 0.142 0.095


-0.118 -0.115 -0.115 -0.118 -0.079 -0.079

-0.039 -0.058 -0.058 -0.039 -0.059 -0.039


0.049 0.048 0.048 0.049 0.033 0.033

0.016 0.024 0.024 0.016 0.025 0.016


-0.020 -0.020 -0.020 -0.020 -0.014 -0.014

-0.007 -0.010 -0.010 -0.007 -0.010 -0.007


0.009 0.008 0.008 0.009 0.006 0.006

0.003 0.004 0.004 0.003 0.004 0.003


-0.004 -0.003 -0.003 -0.004 -0.002 -0.002

-0.001 -0.002 -0.002 -0.001 -0.002 -0.001


0.001 0.001 0.001 0.001 0.001 0.001

0.000 0.001 0.001 0.000 0.001 0.000

104.741 -104.739 -104.739 104.741 98.388 67.069

-67.7094656 -34.9131634 34.91316344 67.70946564 -67.7094656 22.35646298 -22.356463

NOTA
EJERCICIO RESUELTO ASIGNANDOLE AL PERALTE DE LA VIGA
UNA MEDIDA DE 1.25 VECES LA BASE CONSIDERADA PARA ESTA
ES DECIR:

b 1 X
h 1.25 X
Deduccion que no corresponde por adelanto de materiales
Proyecto: Fecha de presupuesto:
Fecha de adelanto:
Contratista:
Supervisión:
Fecha:

D= A(Imr-Ima)Imo

ADELANT
Io Ia DEDUCCIÓN
MONTO % DE Ir ADELANTO O SALDO POR
MONTO COEF. DE Dec-99 Dec-99 POR
DEL INCIDENCI DEFLATADO UTILIZAD AMORTIZAR
N°VAL FECHA VALORIZACIÓN EQUIPA INCIDENCIA REAJUSTE
ADELANTO A A*Io/Ia O (11) = (2-14)
(1) (3) (13) = (12)*(7-
(2) (4) (5) (6) (7) (8)=(2)*(5/6) (1*C)
6)/5
(10)

Imo: Fecha de presupuesto


Ima: Fecha de adelanto
Imr: Fecha Ind, Val

También podría gustarte