Está en la página 1de 6

ALIMNO CARPIO TORRRES ALFREDO

CURSO COSTOS Y PRESUPUESTOS


ESPECIFICACION UND VECES
PARTIDA
1.01 TRABAJOS PRELIMINALES
01.01.02 LIMPIEZA DE TERRENO MANUAL M2
1.00

01.01.03 TRAZO Y REPLANTEO PRELIMINAR M2


1.00

1.02 MOVIMIENTO DE TIERRAS


01.02.01 EXCAVACION TERRENO NORMAL M3
1.00

01.02.02 RELLENO CON MATERIAL PROPIO M3


1.00

01.02.03 ELIMINACION MATERIAL EXCEDENTE M3


esponjamiento de 35%

1.03 OBRAS DE CONCRETO SIMPLE


01.03.01 CONCRETO F'C=100 KG/CM2 PARA SOLADO M3
solado de sapata 3" 1.00

1.04 OBRAS DE CONCRETO ARMADO


01.04.01 ZAPATAS
01.04.01.01 CONCRETO F'C =210 KG/CM2- ESTRUCTURAL M3
zapatas f'c=210 kg/cm2 1.00

01.04.01.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 KG Cantidad


acero longitudinal mayor 4.00
acero transversal mayor 4.00

1.04.02 COLUMNA
01.04.02.01 CONCRETO F'C =210 KG/CM2- ESTRUCTURAL M3
columna 1.00
mensula 1.00
1.00

01.04.02.02 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) M2


1.00
1.00
1.00
1.00
1.00
1.00
01.04.02.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 KG Cantidad
columa 2.00
2.00
2.00
estribos 2.00
mensula 2.00
estibo de mensula
t1 2.00
t2 2.00
t3 2.00

CUADRO RESUMEN DE METRADOS Y COSTO


Descripción Unid Metrado
1.00 Movimiento de tierras
Excavación de zanjas - zapatas m3 28.06
Eliminación de material +35% esp. m3 24.62
Solado de zapatas 3” m2 1.00
2.00 Obras de Concreto Armado
2.01 Zapatas:
Concreto f´c: 210 kg/cm2 m3 7.03
Acero estructural fý: 4,200 kg/cm2 kg 370.24
2.02 Columna y ménsula
Concreto fc: 210 kg/cm2 m3 4.41
Encofrados y desencofrados m2 41.31
Acero estructural fý: 4,200 kg/cm2 kg 573.92
z
SUB-
CANT. LARGO ANCHO ALTURA TOTAL
TOTAL

16.80
2.00 4.00 2.10 16.80

16.80
2.00 4.00 2.10 16.80

28.06
2.00 4.00 2.10 1.67 28.06

13.26
2.00 4.00 2.10 0.80 13.26

24.62
28.06 37.88 24.62

1.00
2.00 4.00 2.10 0.07 1.00

13.26
2.00 4.00 2.10 0.80 13.26

Ø Largo Peso/M. # Veces 370.24


5/8" 4.75 1.46 6.00 176.31
5/8" 2.85 1.46 11.00 193.94

4.24
2.00 0.60 0.30 11.30 4.07
2.00 0.60 0.30 0.30 0.11
2.00 0.10 0.30 0.06

41.31
4.00 0.30 11.30 13.56
4.00 0.60 11.30 27.12
4.00 0.60 0.30 0.30 0.22
4.00 0.10 0.30 0.12
1.00 0.30 0.30 0.09
1.00 0.30 0.68 0.20
Ø Largo Peso/M. # Veces 573.92
5/8" 12.75 1.46 2.00 78.87
3/4" 12.75 2.10 3.00 170.37
3/4" 13.69 2.10 3.00 182.93
3/8" 1.72 0.53 62.00 118.92
5/8" 2.20 1.46 3.00 20.41

3/8" 0.22 0.53 1.00 0.25


3/8" 0.39 0.53 1.00 0.43
3/8" 1.56 0.53 1.00 1.74

COSTO
Unitario Parcial

40.00 1122.24
22.00 541.54
25.00 24.90
0.00
0.00
420.00 2953.90
16.00 5923.87
0.00
480.00 2115.21
65.50 2705.96
25.00 14348.12
total 29735.75
b= 1.2 h= 0.34
a= 0.6 b= 0.6
1.38

También podría gustarte