N°
ESPECIFICACION UND VECES
PARTIDA
1.01 TRABAJOS PRELIMINALES
01.01.02 LIMPIEZA DE TERRENO MANUAL M2
1.00
1.04.02 COLUMNA
01.04.02.01 CONCRETO F'C =210 KG/CM2- ESTRUCTURAL M3
columna 1.00
mensula 1.00
1.00
16.80
2.00 4.00 2.10 16.80
16.80
2.00 4.00 2.10 16.80
28.06
2.00 4.00 2.10 1.67 28.06
13.26
2.00 4.00 2.10 0.80 13.26
24.62
28.06 37.88 24.62
1.00
2.00 4.00 2.10 0.07 1.00
13.26
2.00 4.00 2.10 0.80 13.26
4.24
2.00 0.60 0.30 11.30 4.07
2.00 0.60 0.30 0.30 0.11
2.00 0.10 0.30 0.06
41.31
4.00 0.30 11.30 13.56
4.00 0.60 11.30 27.12
4.00 0.60 0.30 0.30 0.22
4.00 0.10 0.30 0.12
1.00 0.30 0.30 0.09
1.00 0.30 0.68 0.20
Ø Largo Peso/M. # Veces 573.92
5/8" 12.75 1.46 2.00 78.87
3/4" 12.75 2.10 3.00 170.37
3/4" 13.69 2.10 3.00 182.93
3/8" 1.72 0.53 62.00 118.92
5/8" 2.20 1.46 3.00 20.41
COSTO
Unitario Parcial
40.00 1122.24
22.00 541.54
25.00 24.90
0.00
0.00
420.00 2953.90
16.00 5923.87
0.00
480.00 2115.21
65.50 2705.96
25.00 14348.12
total 29735.75
b= 1.2 h= 0.34
a= 0.6 b= 0.6
1.38