Subcontratos de Demolición
Subcontratos de Demolición
CANTIDAD MONTO
175.03 35,006.00
1,886.97 198,656.40
1,712.48 373,259.20
1,256.00 100,480.00
0.73 352,589.13
21.71 10,401.55
8.00 29,893.67
-0.23 - 20.70
776.00 7,760.00
726.91 36,345.50
-625.96 - 625.96
0.00 1,874.00
0.00 2,614.90
640.00 16,800.00
0.00 -
0.00 -
5.00 2,500.00
5.00 1,000.00
0.00 2,396.00
0.00 -
1,620,161.69
- -
DESINTALACIÓN DE ESTRUCTURA DE TECHO, INCLUYE: CERCHAS, CLAVADORES, COLUMNAS, CUBIERTA Y ELEMEN
ACCESORIOS INCLUYE: CARGA Y DESALOJO AL SITIO AUTORIZADO
354,454.62
VICIOS OCULTOS
IR
DEDUCCION
Planilla (Neto a Pagar)
Prestación Social
INSS
Combustible
Otros
NETO A RECIBIR
AVALUO 1
DE 3ERA BASE A 1ERA
Area de techo= ((127+100)/2) *12.80 = 1,452.80 m2
AVALUO 2
AVALUO 3
977.71 C$ 48,885.50
100.60 C$ 10,060.00
4.00 C$ 2,400.00
977.71 48,885.50 - -
100.60 10,060.00 - -
4.00 2,400.00 - -
54.00 3,384.72 54.00 3,384.72
31,605.12 354,454.62 -
C$ 1,580.26 C$ 14,453.93
C$ 632.10 C$ 5,781.57
C$ - C$ -
C$ - - C$ -
C$ - - C$ -
C$ - - C$ -
C$ -
C$ -
C$ 29,392.76 C$ 334,219.12
CONTRACTUAL
ADENDUMS
M2 3322.06 C$ 180.00
M2
CTUAL ADENDUM 1 ADENDUM 2
31,605.12 0.00
ADENDUM 5 ADENDUM 6
0.00 0.00
DESINTALACIÓN DE MALLA Y ESTRUCTURAS DE MAMPOSTERIA Y CONCRETO REFORZADO
Fecha:
SUBCONTRATISTA 1 VALENTÍN CERNA
CONTRACTUAL
Desintalación de Banco de
2
transformadores de 3x75 kva gbl 1.00 15,750.00 C$ 15,750.00
BAJA TENSION
Desintalación de Acometida eléctrica a c/d
3
torre (703 m)
gbl 1.00 12,350.00 C$ 12,350.00
127,900.00
VICIOS OCULTOS
IR
DEDUCCION
Planilla (Neto a Pagar)
Prestación Social
INSS
Combustible
Otros
NETO A RECIBIR
A Y CONCRETO REFORZADO
8/22/2021
AVALUO 1 AVALUO 2
AVALUO 3
PERIODO 9 AGOS - 22 AGOS PERIODO 23 AGOS - 5 SEPT
CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO
1.00 C$ 19,250.00
C$ - 0.25 3,937.50
1.00 C$ 12,350.00
1.00 C$ 1,500.00
1.00 C$ 1,500.00
1.00 C$ 42,000.00
C$ - 14.00 7,000.00
C$ - 13.00 1,950.00
C$ - 4.00 1,200.00
C$ - 2.00 400.00
640.00 16,800.00
C$ 82,750.00 33,337.50 C$ -
C$ - C$ 1,666.88 C$ -
C$ - C$ 666.75 C$ -
C$ - C$ - C$ -
C$ - C$ - C$ -
C$ - C$ - C$ -
C$ 82,750.00 C$ 31,003.88 C$ -
C$ 82,750.00 C$ 31,670.63 C$ -
ACUMULADO SALDO
1.00 C$ 19,250.00 - C$ -
- C$ -
1.00 12,350.00 - C$ -
1.00 8,200.00 - C$ -
1.00 1,500.00 - C$ -
1.00 1,500.00 - C$ -
1.00 42,000.00 - C$ -
14.00 7,000.00 - C$ -
13.00 1,950.00 - C$ -
4.00 1,200.00 - C$ -
2.00 400.00 - C$ -
- C$ -
640.00 16,800.00 - C$ -
116,087.50 11,812.50
C$ 1,666.88
C$ 666.75
C$ -
C$ - - C$ -
C$ - - C$ -
C$ - - C$ -
C$ -
C$ -
C$ 113,753.88
CONTRACTUAL ADENDUM 1
C$ -
c/u 640.00
110,700.00
ADENDUM 1 ADENDUM 2 ADENDUM 3
C$ 200.00 C$ 400.00
C$ 26.25 C$ 16,800.00
17,200.00 0.00
ADENDUM 3 ADENDUM 4 ADENDUM 5
0.00
CONSTRUCCION DE CERCA DE Z
SUBCONTRATISTA 1 Fecha:
CONTRACTUAL
63,632.80
VICIOS OCULTOS
IR
DEDUCCION
Planilla (Neto a Pagar)
Prestación Social
INSS
Combustible
Otros
NETO A RECIBIR
STRUCCION DE CERCA DE ZINC PERIMETRAL
MONTO UND
ADENDUMS
0.00 M2
0.00
0.00
0.00
0.00
0.00
0.00
C$ -
C$ -
C$ -
CONTRACTUAL ADENDUM 1 ADENDUM 2
58,732.80 0.00
ADENDUM 2 ADENDUM 3 ADENDUM 4
0.00 0.00
DENDUM 4 ADENDUM 5 ADENDUM 6
MONTO
CONTRACTUAL
Fecha: Fecha:
8/8/2021 8/22/2021 9/6/2021
AVALUO 1 AVALUO 2 PERIODO AVALUO 3
PERIODO 26 JUL - 8 AGOS 9 AGOS - 22 AGOS PERIODO 23 AGOS - 5 SEPT
CANTIDAD MONTO CANTIDAD MONTO CANTIDAD MONTO
175.26 15,773.40
1,200.00 12,000.00
27.00 13,500.00
1.00 10,000.00
5.00 2,500.00
C$ 48,750.00 154,081.00 C$ 41,911.00
C$ - C$ 7,704.05 C$ 2,095.55
C$ - C$ 3,081.62 C$ 838.22
C$ - C$ - C$ -
C$ - C$ - C$ -
C$ - C$ - C$ -
- C$ - 0.00 0.00
M2 175.26
GBL 1.00
m2 131.87
C/U 27.00
C/U 1.00
C/U 5.00
156,773.00
ADENDUM 1 ADENDUM 2 ADENDUM 3
C$ 90.00 C$ 15,773.40
C$ 10.00 C$ (7,760.00)
C$ 50.00 C$ (85,231.00)
C$ 500.00 C$ 13,500.00
C$ 10,000.00 C$ 10,000.00
C$ 500.00 C$ 2,500.00
56,490.00 31,479.00
ADENDUM 3 ADENDUM 4 ADENDUM 5
0.00