'MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD PEATONAL Y VEHICULAR EN LA CALLE PRINCIPAL DEL SECTOR FUNDO ACO, DISTRITO DE SAN MIGUEL DE ACO - CARHUAZ - ANCASH"
CLIENTE : MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE ACO PRESUPUESTO S/.2,168,224.93
CONTRATISTA: CONSORCIO INTI INICIO DE OBRA 17/10/2020
SUPERVISOR: ING. YOFRÉ DONATO FIGUEROA ALVARADO PLAZO DE EJECUCIÓN 150 días
RESIDENTE: ING. RONALD SANDRO MONTES CALLUPE FIN DE OBRA 15/03/2021
OCTUBRE (15 días) NOVIEMBRE (30 días) DICIEMBRE (31 días) ENERO (31 días) FEBRERO (28 días) MARZO (15 días) TOTAL POR
ITEM DESCRIPCION PARTIDA UND Metrado P.U. (S/.) PARCIAL (S/.)
### ### ###### ### ###### ### ### ###### ### ###### ### ### 1 2 3 4 5 6 7 8 9 ###### ### ### ###### ### ###### ### ###### ### ### ###### ### ###### ### ### 1 2 3 4 5 6 7 8 9 ### ###### ### ###### ### ###### ### ### ###### ### ###### ### ###### ### ### ### 1 2 3 4 5 6 7 8 9 ###### ### ###### ### ### ###### ### ###### ### ###### ### ### ###### ### ###### 1 2 3 4 5 6 7 8 9 ### ### ###### ### ### ###### ### ###### ### ###### ### ### ###### ### 1 2 3 4 5 6 7 8 9 ### ###### ### ### ### TITULOS
S/.938.69 S/.938.69
01.02 TRABAJOS PRELIMINARES 17,712.44
S/.1,047.69 S/.1,047.69
02.04.01.02.03 REFINE Y NIVELACION DE ZANJA, a=0.80m m 122.36 2.286 279.72
S/.279.72 S/.279.72
02.04.01.02.04 ACARREO DE MATERIAL EXEDENTE FUERA DE LA OBRA PARA ELIMIN m3 213.74 22.862 4,886.52
S/.4,886.52 S/.4,886.52
02.04.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE CARGUIO C/ m3 213.74 14.471 3,093.03
S/.3,093.03 S/.3,093.03
02.04.01.03 CONCRETO EN CUNETAS TRANSVERSAL 86,151.58
02.04.01.03.01 SOLADO E=4" MEZCLA 1:12 C:H INC. CURADO m2 122.36 28.331 3,466.58
S/.3,466.58 S/.3,466.58
02.04.01.03.02 CONCRETO F'C=210KG/CM2 PARA ALCANTARRILLADO m3 47.27 552.469 26,115.21
S/.26,662.17 S/.26,662.17
02.04.01.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 202.51 68.338 13,839.13
S/.6,919.56 S/.6,919.56 S/.13,839.13
02.04.01.03.05 ACERO FY= 4200 kg/cm2 GRADO 60 kg 3,244.85 4.952 16,068.50
S/.11,247.95 S/.4,820.55 S/.16,068.50
02.04.02 CUNETAS DE CONCRETO 174,085.45
02.04.02.01 TRABAJOS PRELIMINARES 954.23
OCTUBRE (15 días) NOVIEMBRE (30 días) DICIEMBRE (31 días) ENERO (31 días) FEBRERO (28 días) MARZO (15 días) TOTAL POR
ITEM DESCRIPCION PARTIDA UND Metrado P.U. (S/.) PARCIAL (S/.)
### ### ###### ### ###### ### ### ###### ### ###### ### ### 1 2 3 4 5 6 7 8 9 ###### ### ### ###### ### ###### ### ###### ### ### ###### ### ###### ### ### 1 2 3 4 5 6 7 8 9 ### ###### ### ###### ### ###### ### ### ###### ### ###### ### ###### ### ### ### 1 2 3 4 5 6 7 8 9 ###### ### ###### ### ### ###### ### ###### ### ###### ### ### ###### ### ###### 1 2 3 4 5 6 7 8 9 ### ### ###### ### ### ###### ### ###### ### ###### ### ### ###### ### 1 2 3 4 5 6 7 8 9 ### ###### ### ### ### TITULOS
S/.1,752.60 S/.1,752.60
03.01.02 CONFORMACION DE LA SUB RAZANTE DE VEREDAS CON EQUIPO LIV m2 1,420.08 8.334 11,834.95
S/.11,834.95 S/.11,834.95
03.01.03 AFIRMADO DE E=4" PARA VEREDAS m2 1,420.08 14.381 20,422.17
05.01 PINTURA DE LINEAS CENTRALES, PASO PEATONAL Y FLECHAS m2 816.15 15.245 12,442.21
06.01 ACONDICIONAMIENTO DE BOTADEROS PARA DESECHOS DE MATERI glb 1.00 1,744.823 1,744.82
S/.697.93 S/.697.93 S/.348.96 S/.1,744.82
06.04 RIEGO DE ZONA DE TRABAJO PARA EVITAR POLVOS glb 1.00 4,193.556 4,193.56
S/.1,677.42 S/.2,516.13 S/.4,193.56
06.04 PLAN DE MANEJO AMBIENTAL glb 1.00 7,000.000 7,000.00
S/.2,800.00 S/.700.00 S/.700.00 S/.700.00 S/.700.00 S/.1,400.00 S/.7,000.00
07 PLAN DE MONITOREO ARQUEOLOGICO 7,000.00
07.01 PLAN DE MONITOREO ARQUEOLOGICO glb 1.00 7,000.000 7,000.00
S/.5,600.00 S/.1,400.00 S/.7,000.00
08 OTROS 108,327.03
08.01 NIVELACION DE TAPAS DE BUZONES und 15.00 224.909 3,373.64
S/.4,430.26 S/.4,430.26
08.03 NIVELACION DE TAPAS DE CAJAS DOMICILIARIAS DE AGUA und 71.00 65.140 4,624.94
S/.4,624.94 S/.4,624.94
08.04 BARANDA DE TUBO F°. NEGRO PASAMANOS 1 1/2"+PARANTEX0.80M D m 281.00 54.946 15,439.83
S/.3,087.97 S/.12,351.86 S/.15,439.83
08.05 LIMPIEZA GENERAL DE OBRA m2 6,312.74 2.691 16,987.58
S/.16,987.58 S/.16,987.58
08.06 RETIRO Y COLOCADO DE POSTES DE LUZ und 5.00 2,379.160 11,895.80
S/.5,947.90 S/.5,947.90 S/.11,895.80
PROYECTO: 'MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD PEATONAL Y VEHICULAR EN LA CALLE PRINCIPAL DEL SECTOR FUNDO ACO, DISTRITO DE SAN MIGUEL DE ACO - CARHUAZ - ANCASH"
CLIENTE : MUNICIPALIDAD DISTRITAL DE SAN MIGUEL DE ACO PRESUPUESTO S/.2,168,224.93
CONTRATISTA: CONSORCIO INTI INICIO DE OBRA 17/10/2020
SUPERVISOR: ING. YOFRÉ DONATO FIGUEROA ALVARADO PLAZO DE EJECUCIÓN 150 días
RESIDENTE: ING. RONALD SANDRO MONTES CALLUPE FIN DE OBRA 15/03/2021
OCTUBRE (15 días) NOVIEMBRE (30 días) DICIEMBRE (31 días) ENERO (31 días) FEBRERO (28 días) MARZO (15 días) TOTAL POR
ITEM DESCRIPCION PARTIDA UND Metrado P.U. (S/.) PARCIAL (S/.)
### ### ###### ### ###### ### ### ###### ### ###### ### ### 1 2 3 4 5 6 7 8 9 ###### ### ### ###### ### ###### ### ###### ### ### ###### ### ###### ### ### 1 2 3 4 5 6 7 8 9 ### ###### ### ###### ### ###### ### ### ###### ### ###### ### ###### ### ### ### 1 2 3 4 5 6 7 8 9 ###### ### ###### ### ### ###### ### ###### ### ###### ### ### ###### ### ###### 1 2 3 4 5 6 7 8 9 ### ### ###### ### ### ###### ### ###### ### ###### ### ### ###### ### 1 2 3 4 5 6 7 8 9 ### ###### ### ### ### TITULOS
TOTAL PROGRAMADO PERIODO 1,597,807.61 S/. 89,134.680 S/. 326,504.830 S/. 319,107.240 S/. 439,438.080 S/. 331,920.530 S/. 91,702.250 1,597,807.61
TOTAL PROGRAMADO ACUMULADO S/. 89,134.68 S/. 415,639.51 S/. 734,746.75 S/. 1,174,184.83 S/. 1,506,105.36 S/. 1,597,807.61
AVANCE MENSUAL PROGRAMADO (%) 5.579% 20.435% 19.972% 27.503% 20.773% 5.739% 100.00%
AVANCE ACUMULADO PROGRAMADO (%) 5.579% 26.013% 45.985% 73.487% 94.261% 100.00%
CRONOGRAMA DE OBRA VALORIZADO
PROYECT 'MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES PEDRO COCHACHIN DE CHAVIN EN EL CENTRO POBLADO DE CHAVIN, DISTRITO DE
O: INDEPENDENCIA-HUARAZ-ANCASH
CLIENTE : ASOCIANCION CIVIL NEOANDINA S/.550,705.75
LUGAR : SECTOR: CP CHAVIN - DISTRITO: INDEPENDENCIA - PROVINCIA : HUARAZ - DEPARTAMENTO: ANCASH S/.780,845.95
01 OBRAS PROVISIONALES
S/.1,408.57 S/.1,408.57
S/.1,408.57
S/.1,763.55 S/.1,763.55
S/.1,763.55
02 TRABAJOS PRELIMINARES
2.01 LIMPIEZA Y TRAZO
02.01.01 LIMPIEZA DE TERRENO MANUAL m2
S/.728.60 S/.728.60
S/.728.60
02.01.02 TRAZO Y REPLANTEO m2
S/.1,037.04 S/.1,037.04
S/.1,037.04
S/.144.14 S/.288.29
S/.201.42 S/.402.84
S/.1,500.00 S/.1,500.00
S/.1,500.00
S/.6,191.02 S/.6,191.02
S/.1,733.49 S/.928.65
S/.825.00 S/.825.00
S/.231.00 S/.123.75
S/.1,320.00 S/.2,640.00
S/.3,365.55 S/.3,365.55
CRONOGRAMA DE OBRA VALORIZADO
PROYECT 'MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES PEDRO COCHACHIN DE CHAVIN EN EL CENTRO POBLADO DE CHAVIN, DISTRITO DE
O: INDEPENDENCIA-HUARAZ-ANCASH
CLIENTE : ASOCIANCION CIVIL NEOANDINA S/.550,705.75
LUGAR : SECTOR: CP CHAVIN - DISTRITO: INDEPENDENCIA - PROVINCIA : HUARAZ - DEPARTAMENTO: ANCASH S/.780,845.95
S/.3,365.55
S/.3,946.00 S/.3,946.00
S/.3,946.00
S/.1,051.10 S/.1,051.10
S/.1,051.10
S/.270.09
S/.4,178.30 S/.4,178.30
S/.4,178.30
3 MOVIMIENTO DE TIERRAS
3.01 EXPLANACIONES
S/.927.69 S/.927.69
S/.927.69
S/.1,512.85 S/.1,512.85
S/.1,512.85
S/.6,691.18 S/.6,691.18
S/.6,691.18
3.02 EXCAVACIONES
S/.10,467.28 S/.10,467.28
S/.10,467.28
S/.1,772.20 S/.1,772.20
S/.1,772.20
S/.261.40 S/.261.40
S/.261.40
S/.1,878.63 S/.1,878.63
S/.1,878.63
CRONOGRAMA DE OBRA VALORIZADO
PROYECT 'MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES PEDRO COCHACHIN DE CHAVIN EN EL CENTRO POBLADO DE CHAVIN, DISTRITO DE
O: INDEPENDENCIA-HUARAZ-ANCASH
CLIENTE : ASOCIANCION CIVIL NEOANDINA S/.550,705.75
LUGAR : SECTOR: CP CHAVIN - DISTRITO: INDEPENDENCIA - PROVINCIA : HUARAZ - DEPARTAMENTO: ANCASH S/.780,845.95
3.03 RELLENOS
S/.2,048.52 S/.2,048.52
S/.2,048.52
S/.2,899.80 S/.2,899.80
S/.2,899.80
S/.8,846.69 S/.8,846.69
S/.6,920.34 S/.1,926.36
S/.3,245.89 S/.3,245.89
S/.3,245.89
S/.5,651.23 S/.5,651.23
S/.5,651.23
S/.2,204.77 S/.2,204.77
S/.2,204.77
S/.3,032.48 S/.3,032.48
S/.3,032.48
S/.10,530.52 S/.10,530.52
S/.10,530.52
S/.2,237.45 S/.2,237.45
4.07 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCENARIO, GRADAS Y m2
S/.382.60 S/.382.60
5.01 ZAPATAS
S/.28,437.86 ###
S/.28,437.86
S/.6,566.68 S/.21,871.18
S/.7,886.52 S/.7,886.52
S/.3,943.26 S/.3,943.26
5.02 PLACAS
S/.4,253.27 S/.4,253.27
S/.4,253.27
S/.2,283.34 S/.2,283.34
S/.2,283.34
S/.6,487.21 S/.6,487.21
S/.3,243.61 S/.3,243.60
5.03 COLUMNAS
S/.14,354.76 S/.14,354.76
S/.14,354.76
S/.320.20 S/.320.20
S/.9,722.89 S/.9,722.89
S/.9,722.89
S/.25,308.44 S/.25,308.44
S/.7,602.68 S/.17,705.76
5.04 VIGAS
S/.11,644.89 S/.11,644.89
S/.9,046.48
S/.12,356.56 S/.12,356.56
S/.21,109.60 S/.21,109.60
S/.8,373.24 S/.8,373.24
S/.10,601.50 S/.10,601.50
S/.1,385.04 S/.1,385.04
S/.1,072.35 S/.1,072.35
S/.1,812.65 S/.1,812.65
5.07 ESCALERAS
S/.1,655.53 S/.1,655.53
5.08 COLUMNETAS
S/.2,430.78 S/.2,430.78
S/.2,430.78
S/.1,505.17 S/.1,505.17
S/.1,505.17
S/.4,104.11 S/.4,104.11
S/.2,823.50
5.09 VIGUETAS
S/.276.72 S/.276.72
S/.808.41 S/.808.41
S/.420.48 S/.420.48
S/.5,337.56 S/.5,337.56
S/.5,337.56
S/.9,488.90 S/.9,488.90
S/.7,590.89
S/.1,452.77 S/.1,452.77
S/.1,452.77
CRONOGRAMA DE OBRA VALORIZADO
PROYECT 'MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES PEDRO COCHACHIN DE CHAVIN EN EL CENTRO POBLADO DE CHAVIN, DISTRITO DE
O: INDEPENDENCIA-HUARAZ-ANCASH
CLIENTE : ASOCIANCION CIVIL NEOANDINA S/.550,705.75
LUGAR : SECTOR: CP CHAVIN - DISTRITO: INDEPENDENCIA - PROVINCIA : HUARAZ - DEPARTAMENTO: ANCASH S/.780,845.95
S/.1,147.16 S/.1,147.16
S/.5,233.15 S/.5,233.15
S/.12,624.30 S/.12,624.30
S/.773.45 S/.773.45
8 CIELORRASOS
S/.14,486.02 S/.14,486.02
S/.320.76 S/.320.76
9 PISOS Y PAVIMENTOS
S/.17,119.48 S/.17,119.48
S/.1,927.94 S/.1,927.94
S/.8,980.89 S/.8,980.89
S/.8,281.01 S/.8,281.01
S/.2,372.81 S/.2,372.81
S/.1,430.75 S/.1,430.75
10 CONTRAZOCALOS
S/.4,075.28 S/.4,075.28
S/.1,239.11 S/.1,239.11
11 REVESTIMIENTO DE ESCALERA
S/.917.25 S/.917.25
12 CARPINTERIA DE MADERA
S/.5,933.81 S/.5,933.81
13 CARPINTERIA METALICA
S/.10,794.20 S/.10,794.20
13.02 REJILLAS DE PROTECCION PARA VENTANA DE VIDRIO SEGÚN PLANO (IN und
S/.12,556.80 S/.12,556.80
S/.296.00 S/.296.00
S/.814.03 S/.814.03
14 CERRAJERIA
S/.774.72 S/.774.72
14.02 BISAGRA CAPUCHINA DE 3" X 3" pza
S/.280.40 S/.280.40
S/.561.68 S/.561.68
S/.350.10 S/.350.10
S/.5,638.78 S/.5,638.78
16 PINTURA
S/.4,385.27 S/.4,385.27
S/.6,801.76 S/.6,801.76
S/.3,540.65 S/.3,540.65
S/.226.99 S/.226.99
S/.162.64 S/.162.64
S/.1,269.94 S/.1,269.94
17 DRENAJE PLUVIAL
S/.201.44 S/.201.44
S/.124.64 S/.124.64
18 INSTALACIONES ELECTRICAS
18.01 ACOMETIDAS
18.01.01 POSTE DE CONCRETO ARMADO CENTRIFUGADO 15/400/180/405 und
S/.160.44 S/.160.44
S/.167.35 S/.167.35
S/.2,064.48 S/.2,064.48
S/.1,325.74 S/.1,325.74
CRONOGRAMA DE OBRA VALORIZADO
PROYECT 'MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES PEDRO COCHACHIN DE CHAVIN EN EL CENTRO POBLADO DE CHAVIN, DISTRITO DE
O: INDEPENDENCIA-HUARAZ-ANCASH
CLIENTE : ASOCIANCION CIVIL NEOANDINA S/.550,705.75
LUGAR : SECTOR: CP CHAVIN - DISTRITO: INDEPENDENCIA - PROVINCIA : HUARAZ - DEPARTAMENTO: ANCASH S/.780,845.95
S/.101.98
S/.811.30 S/.811.30
S/.3,435.57 S/.3,435.57
S/.2,413.66 S/.2,413.66
S/.1,225.18 S/.1,225.18
S/.300.43 S/.300.43
18.05 ARTEFACTOS
S/.1,573.40 S/.1,573.40
S/.500.90 S/.500.90
S/.718.26 S/.718.26
19 INSTALACIONES SANITARIAS
S/.2,402.16 S/.2,402.16
S/.819.68 S/.819.68
S/.1,171.75 S/.1,171.75
S/.208.09 S/.208.09
S/.45.00 S/.45.00
S/.104.00 S/.104.00
S/.27.88 S/.27.88
S/.153.00 S/.153.00
S/.41.82 S/.41.82
S/.344.75 S/.344.75
19.02.04 LLAVES Y VALVULAS
S/.195.44 S/.195.44
S/.484.05 S/.484.05
20 VARIOS
S/.1,639.65 S/.1,639.65
CRONOGRAMA DE OBRA VALORIZADO
PROYECT 'MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES PEDRO COCHACHIN DE CHAVIN EN EL CENTRO POBLADO DE CHAVIN, DISTRITO DE
O: INDEPENDENCIA-HUARAZ-ANCASH
CLIENTE : ASOCIANCION CIVIL NEOANDINA S/.550,705.75
LUGAR : SECTOR: CP CHAVIN - DISTRITO: INDEPENDENCIA - PROVINCIA : HUARAZ - DEPARTAMENTO: ANCASH S/.780,845.95
S/.1,311.72
S/.189.14 S/.189.14
S/.349.42 S/.349.42
S/.271.94 S/.271.94
S/.680.52 S/.680.52
20.01.06 ELIMINACION CON MATERIAL EXCEDENTE CON MAQUINARIA M3
S/.358.15 S/.358.15
S/.1,512.36 S/.1,512.36
S/.650.88 S/.650.88
S/.325.44
S/.155.40 S/.155.40
S/.412.52 S/.412.52
S/.441.82 S/.441.82
S/.1,602.19 S/.1,602.19
S/.487.67 S/.487.67
S/.839.67 S/.839.67
S/.196.00 S/.196.00
S/.428.41 S/.428.41
S/.750.00 S/.750.00
S/.210.00 S/.112.50
20.02.02 ACONDICIONAMIENTO DE AREA OCUPADA POR ALMACEN Y CAMPAMENT GLB
S/.425.00 S/.425.00
S/.1,140.00 S/.1,140.00
S/.237.50
S/.700.00 S/.700.00
CRONOGRAMA DE OBRA VALORIZADO
PROYECT 'MEJORAMIENTO DEL LOCAL COMUNAL DE USOS MULTIPLES PEDRO COCHACHIN DE CHAVIN EN EL CENTRO POBLADO DE CHAVIN, DISTRITO DE
O: INDEPENDENCIA-HUARAZ-ANCASH
CLIENTE : ASOCIANCION CIVIL NEOANDINA S/.550,705.75
LUGAR : SECTOR: CP CHAVIN - DISTRITO: INDEPENDENCIA - PROVINCIA : HUARAZ - DEPARTAMENTO: ANCASH S/.780,845.95
S/.231.00 S/.469.00
20.04 FLETE
S/.4,878.85 S/.7,318.28
S/.150.00 S/.150.00
20.05.02 LIMPIEZA FINAL DE OBRA m2
S/.2,010.01 S/.2,010.01
S/.750.00 S/.750.00
S/.864.46 S/.864.46
TOTAL PROGRAMADO PERIODO S/. 56,384.07 S/. 211,109.10 S/. 183,848.84 S/. 99,363.74 S/. 550,705.75
TOTAL PROGRAMADO ACUMULADO S/. 56,384.07 S/. 211,109.10 S/. 394,957.94 S/. 494,321.68
TOTAL EJECUTADO PERIODO S/. 81,198.81 S/. 152,152.43 S/. 0.00 S/. 0.00
TOTAL EJECUTADO ACUMULADO S/. 81,198.81 S/. 233,351.22 S/. 233,351.22 S/. 233,351.22
PROYECTO: 'MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD PEATONAL Y VEHICULAR EN LA CALLE PRICIPAL DEL SECTOR FUNDO ACO, DISTRITO DE SAN MIGUEL DE ACO - CARHUAZ - ANCASH
CURVA "S"
100% 100%
94%
90%
PROG
0 0
80%
1 5.579%
AVANCE (%)
73% 2 20.435%
70% 3 19.972%
4 27.503%
5 20.773%
60%
6 5.739%
100.00%
50%
46%
40%
30%
26%
20%
10% 9%
6%
0% 0%
0 1 2 3 4 5 PROG 6 EJEC 7
TIEMPO (MESES)
PROG ACUM EJEC EJEC ACUM
0 0 0
5.579% 9.38% 9.38%
26.013%
45.985%
73.487%
94.261%
100.000%
% ADELANTO 3.80%