INFORME POR AREA DE RESPONSABILIDAD

INFORME MENSUAL

AREA: ENSABLADO RESPONSABLE: Jorge Jimenez Campos


1. DATOS INFORMATIVOS
EMPRESA: LA DINAMICA , C.POR A.
(EMPRESA, FECHA, PERIODO Y
MES: ene-20 RESPONSABLE)
ACTIVIDAD: ENSABLADO

MES ACUMULADO
AGREGA VALOR NO AGREGA VALOR AGREGAN VALOR NO AGREGAN VALOR TOTAL GENERAL
COSTOS CONTROLABLES:
2,000,000.00 4,000.00 ORDENES DE PRODUCCION 2,000,000.00 4,000.00 2,004,000.00
3,500,000.00 1,000.00 MATERIAL GASTABLE -RESMAS 3,500,000.00 1,000.00 3,501,000.00
7,000.00 8,000.00 MANO DE OBRA 7,000.00 8,000.00 15,000.00
8,000.00 - ENERGIA ELECTRICA 8,000.00 - 8,000.00 2. SEGREGAR LOS COSTOS
7,000.00 - OTROS MATERIALES 7,000.00 - 7,000.00 CONTROLABLES DE LOS NO
5,522,000.00 13,000.00 TOTAL 5,522,000.00 13,000.00 5,535,000.00 CONTROLABLES.
3. IDENTIFICAR LOS COSTOS QUE
AGREGARON VALOR Y LOS QUE NO
COSTOS NO CONTROLABLES: AGREGARON VALOR.
45,000.00 - SUELDO GERENCIAL 45,000.00 - 45,000.00 4. TOTALIZAR EL PUNTO 2 y 3 POR TIPO.
31,000.00 - DEPRECIACION 31,000.00 - 31,000.00
76,000.00 - TOTAL 76,000.00 - 76,000.00

5,598,000.00 13,000.00 TOTAL GENERAL 5,598,000.00 13,000.00 5,611,000.00

5. CUADRO INFORMATIVO PARA LA GRAFICA PASTEL

TIPO DE COSTOS: AGREGAN VALOR NO AGREGAN VALOR TOTAL GENERAL


COSTOS CONTROLABLES: 5,522,000.00 13,000.00 5,535,000.00
COSTOS NO CONTROLABLES: 76,000.00 - 76,000.00
TOTAL GENERAL 5,598,000.00 13,000.00 5,611,000.00

COSTOS CLASIFICADOS POR SU COSTOS CLASIFICADOS POR SU VALOR :


CONTROL: NO AGREGAN
VALOR
13,000
COSTOS NO
5. PREPARAR 2 GRAFICAS DE
CONTROLABL
ES:; PASTEL EN BASE EL PUNTO 2 Y AL
76,000.00 ; PUNTO 3.
1% COSTOS CONTROLABLES:
AGREGAN
VALOR
COSTOS NO 5,598,000
COSTOS CONTROLABLES:
CONTROLABL
ES:;
5,535,000.00
; 99%