SALDOS POR VALORIZAR DICIEMBRE 2019

PRESUPUESTO
CONTRATO PRINCIPAL 255,735.70
ADICIONAL POR PARTIDAS NUEVAS 235,131.96
ADICIONAL POR MAYORES METRADOS 10,262.54
SUB TOTAL 501,130.20

REINTEGRO POR REAJUSTE

PRESUPUESTO INCL IGV


CONTRATO PRINCIPAL 259,793.72
SUB TOTAL 259,793.72

TOTAL 760,923.92

VALORIZACIONES COBRAD 2017 2017


5636995.75305229 1,326.26 1,200,390.67
1014659.23554941 238.73 216,070.32
6651654.9886017 1,564.99 1,416,460.99
2019
ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBREOCTUBRE
561,759.04 484,447.29 710,911.23 344,316.82 495,427.18 436,997.37 342,158.48
101,116.63 87,200.51 127,964.02 61,977.03 89,176.89 78,659.53 61,588.53
662,875.67 571,647.80 838,875.25 406,293.85 584,604.07 515,656.89 403,747.01
NOVIEMBRE DICIEMBRE
533,697.91
96,065.62 0.00
629,763.54 0.00
5,111,432.25
920,057.81
6,031,490.06
620,164.93
8.1 Control de Avance Fisico

Avance Fisico de Obra (%) = Valorizacion C.D. x 100


Presupuesto C.D.

Avance Fisico de Obra (%) = Err:509

8.1.1 Programacion de Obra


El contratista por intermedio del residente de obra presenta una copia de los documentos
de programacion, cuadro comparativo (programado vs ejecutado) y curva "S" de la Obra,
para un plazo ofertado de 210 dias

8.2 Control de Avance Financiero

AVANCE
Valorizado Mes Acumulado Estado
Avance programado % #REF! #REF!
ADELANTADA
Avance ejecutado % Err:509 Err:509

VALORIZACION MES Err:509


REAJUSTE S/. -
AMORTIZACION POR ADELANTO (-) S/. 38,488.69
DEDUCCION DE REAJUSTE QUE NO CORRESPONDE S/. -
MONTO NETO A PAGAR Err:509
IGV (18%) Err:509
MONTO A FACTURAR Err:509
8.3 Control de Adelanto Directo y Materiales
Adelanto Directo Otorgado (sin IGV) 513,697.15
Amortizacion de adelanto directo anterior 513,697.15
Amortizacion de adelanto directo actual 0.00
Saldo de adelanto directo 0.00
Reintegro que no corresponde por adelanto directo
Adelanto de Materiales Otorgado (sin IGV) 1,027,394.31
Amortizacion de adelanto de materiales anterior #REF!
Amortizacion de adelanto de materiales actual #REF!
Saldo de adelanto de materiales #REF!
Reintegro que no corresponde por adelanto de materiales

El adelanto directo fue amortizado al 100% con anterioridad


RESUMEN DE VALORIZACION N 14
CONTRATO PRINCIPAL

"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE


OBRA: TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE
MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS"

UBICACIÓN: Err:509

RESIDENTE: Err:509
INSPECTOR ING. TOMAS ENRIQUE FLORES OLAVARRIA
PRECIO BASE S/. 6,061,626.38 ( INC IGV )
AREA GEOGRAFICA AREA 06 - MADRE DE DIOS

CONCEPTO S/.

Monto valorizado del presente mes Err:509


Valorización Err:509

Reajuste de la presente valorización 0.00


Reajuste de la valorización 0.00

Amortizaciones 38,488.69
Del adelanto directo en la presente valorización 0.00
Del adelanto de materiales de la presente valorización. 38,488.69

Deducción del reajuste. 0.00


Por adelanto directo
Por adelanto de materiales 0.00

I MONTO BRUTO (Sin IGV.) Err:509

OTROS 0.00

II TOTAL RETENCIONES 38,488.69


III MONTO NETO A PAGAR (I+II) (Sin I.G.V) Err:509
IV I.G.V. (18.00 %) Err:509
V MONTO FACTURABLE (III + IV) Err:509
RESUMEN DE VALORIZACIONES
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE MADRE DE
OBRA:
DIOS – PROVINCIA DE MANU – MADRE DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
INSPECTOR ING. TOMAS ENRIQUE FLORES OLAVARRIA

MONTO NETO
REINTEGRO AMORTIZ. DEDUCCION
MONTO AMORT. DEDUCCION INTERES
REAJUSTES ADELANTO ADELANTO SUB TOTAL IGV
No. DESCRIPCION BRUTO ADEL. ADEL. RETRASO PRESENTE
PPTO PRINCIP. DIRECTO DIRECTO (S/.) (S/.)
(S/.) MAT. MAT. PAGO VAL. VALORIZAC.
(S/.) (S/.) (S/.)

01 VALORIZACION 01 - JULIO -2017 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02 VALORIZACION 02 - AGOSTO -2017 335,958.52 4,703.42 175,464.83 136,502.05 28,695.06 5,165.11 33,860.17
03 VALORIZACION 03 - SEPTIEMBRE -2017 373,940.56 5,492.35 195,302.14 151,934.39 32,196.38 5,795.35 37,991.73
04 VALORIZACION 04 - OCTUBRE -2017 273,665.17 3,557.64 142,930.18 111,191.87 1,326.26 21,774.49 3,919.41 25,693.90
05 VALORIZACION 04 - NOVIEMBRE -2017 7,155.57 100.18 0.00 2,907.35 4,348.40 782.71 5,131.11
06 VALORIZACION 04 - DICIEMBRE -2017 18,971.63 303.55 0.00 7,708.29 11,566.89 2,082.04 13,648.93
07 VALORIZACION 07- ABRIL-2019 Err:509 0.00 Err:509 Err:509 Err:509

MONTO TOTAL Err:509 14,157.14 513,697.15 410,243.96 1,326.26 0.00 0.00 Err:509 Err:509 Err:509
RESUMEN DE VALORIZACIONES CANCELADAS
OBRA: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA COMUNIDAD DE TAUCABAMBA, DISTRITO PILLPINTO, PROVINCIA DE PARURO - CUSCO"
UBICACIÓN: TAUCABAMBA - PILLPINTO - PARURO - CUSCO
SUPERVISOR: ING. RODOLFO AGUIRRE NEGRON
RESIDENTE: ARQ. JUAN CARLOS LOAYZA NAVARRO

MONTO NETO
REINTEGRO AMORTIZ. DEDUCCION
MONTO AMORT. DEDUCCION INTERES
REAJUSTES ADELANTO ADELANTO SUB TOTAL IGV
No. DESCRIPCION BRUTO ADEL. ADEL. RETRASO PRESENTE
PPTO PRINCIP. DIRECTO DIRECTO (S/.) (S/.)
(S/.) MAT. MAT. PAGO VAL. VALORIZAC.
(S/.) (S/.) (S/.)

01 VALORIZACION 01 - DICIEMBRE -2013 144,417.85 3,093.83 51,146.08 0.00 0.00 0.00 97,051.19 17,469.21 114,520.40
02 VALORIZACION 02 - MAYO - 2104 89,805.53 3,036.48 17,961.11 148.30 50,864.69 -46.92 23,914.83 4,304.67 28,219.50
03 VALORIZACION 03 - JUNIO - 2104 238,501.87 8,001.65 47,700.37 185.26 118,856.99 -215.14 79,976.04 14,395.69 94,371.73
04 VALORIZACION 04 - JULIO - 2104 360,365.79 12,048.01 72,073.16 281.52 182,548.80 -703.73 118,214.05 21,278.53 139,492.58
05 VALORIZACION 05 - AGOSTO - 2014 387,490.27 20,284.06 55,235.54 1,671.71 191,175.17 -193.41 159,885.32 28,779.36 188,664.68
06 VALORIZACION 06 - SEPTIEMBRE - 2014 148,260.32 8,216.96 29,652.06 731.55 72,765.51 391.05 52,937.11 9,528.68 62,465.79
07 VALORIZACION 07 - OCTUBRE - 2014 221,869.38 13,139.12 44,373.88 1,306.52 112,476.72 1,530.88 75,320.50 13,557.69 88,878.19

MONTO TOTAL 1,590,711.01 67,820.11 318,142.20 4,324.86 728,687.88 762.73 0.00 607,299.03 109,313.83 716,612.87

NOTA: EN LA VALORIZACION 06 - SEPTIEMBRE-2014, SOLO SE FACTURO EL MONTO DE : S/. 30,948.80

NETO PAGADO AL CONTRATISTA S/. 685,095.88


VALORIZACION DE OBRA NRO - 04 MAYORES METRADOS
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - FECHA DE INICIO 27 de julio de 2017
OBRA:
DISTRITO DE MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS" FECHA DE TERMINO 22 de febrero de 2018
UBICACIÓN BOCA COLORADO - DISTRITO DE MADRE DE DIOS - PROVINCIA DE MANU - DEPARTAMENTO DE MADRE DE DIOS PLAZO DE EJECUCION 210 DIAS
PRESUPUESTO: S/. 6,061,626.38 RESIDENTE ING. HUMBERTO SALAS FLOREZ
MODALIDAD: CONTRATA INSPECTOR ING. VICENTE JAVIER CARDENAS GUTIERREZ
FECHA 30 de septiembre de 2017

Presupuesto Valorización Anterior Valorización Actual Valorización Acumulada


Item Descripción de la Partida
Unid Metrado PU Parcial Metrado Parcial % Metrado Parcial % Metrado Parcial %
04 PLANTA DE TRATAMIENTO DE AGUAS POTABLE 496,311.76 0.00 0.00 0.00% 117,472.33 23.67% 0.00 117,472.33 23.67%
04.01 CONSTRUCCION DE FILTRO LENTO 160,065.30 0.00 0.00 0.00% 117,472.33 73.39% 0.00 117,472.33 73.39%
04.01.01 OBRAS PRELIMINARES 3,850.77 0.00 0.00 0.00% 1,013.98 26.33% 0.00 1,013.98 26.33%
04.01.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS m2 252.51 9.34 2,358.44 0.00 0.00% 66.49 621.02 26.33% 66.49 621.02 26.33%
04.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA m2 252.51 5.91 1,492.33 0.00 0.00% 66.49 392.96 26.33% 66.49 392.96 26.33%
04.01.02 MOVIMIENTO DE TIERRAS 7,705.96 0.00 0.00% 39,760.57 515.97% 0.00 39,760.57 515.97%
04.01.02.01 EXCAVACION CON MAQUINARIA PARA FILTRO LENTO EN TE m3 151.51 29.21 4,425.61 0.00 0.00% 821.44 23,994.26 542.17% 821.44 23,994.26 542.17%
04.01.02.02 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL A PU m2 252.51 1.55 391.39 0.00 0.00% 66.49 103.06 26.33% 66.49 103.06 26.33%
04.01.02.03 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM m3 181.81 15.89 2,888.96 0.00 0.00% 985.73 15,663.25 542.18% 985.73 15,663.25 542.18%
04.01.03 OBRAS DE CONCRETO 93,170.07 0.00 0.00% 76,697.78 82.32% 0.00 76,697.78 82.32%
04.01.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES (C m3 25.25 319.82 8,075.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
04.01.03.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOLADOS Y/ m2 13.00 31.48 409.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
04.01.03.03 CONCRETO F'C 210 KG/CM2 PARA LOSA DE FONDO CEMENTO P-I m3 9.77 460.93 4,503.29 0.00 0.00% 71.08 32,762.90 727.53% 71.08 32,762.90 727.53%
04.01.03.04 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS FO m2 78.00 31.48 2,455.44 0.00 0.00% 6.50 204.62 8.33% 6.50 204.62 8.33%
04.01.03.05 ACERO ESTRUC. TRABAJADO P/LOSA FONDO-PISO (COSTO PROM kg 132.00 5.18 683.76 0.00 0.00% 4,164.53 21,572.27 3154.95% 4,164.53 21,572.27 3154.95%
04.01.03.06 CONCRETO F´C 210KG/CM2 PARA MUROS REFORZADOS (CEMENT m3 12.20 478.87 5,842.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
04.01.03.07 ENCOFRADO (I/HABILITACION DE MADERA) PARA MUROS TIP m2 121.24 48.67 5,900.75 0.00 0.00% 455.27 22,157.99 375.51% 455.27 22,157.99 375.51%
04.01.03.08 ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PRO kg 12,064.83 5.18 62,495.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
04.01.03.09 ADITIVO DESMOLDADOR PARA ENCOFRADO TIPO CARAVISTA m2 579.36 4.84 2,804.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
COSTO DIRECTO 4,375,674.71 0.00 0.00% 117,472.33 2.68% 117,472.33 2.68%
GASTOS GENERALES 9.40% 411,242.83 0.00 0.00 11,040.50 0.00 11,040.50
UTILIDAD 8.00% 350,053.97 0.00 0.00 9,397.79 0.00 9,397.79
PRESUPUESTO PARCIAL 5,136,971.51 0.00 0.00 0.00% 137,910.62 2.68% 137,910.62 2.68%
IGV 18.00% 924,654.87 0.00 24,823.91 24,823.91
PRESUPUESTO DE EJECUCION DE OBRA 6,061,626.38 0.00 0.00% 162,734.53 2.68% 162,734.53 2.68%
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS
OBRA: RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE MANU – MADRE
DE DIOS"
PRESUPUEST S/. 6,061,626.38

Presupuesto
Item Descripción de la Partida
Unid Metrado PU Parcial

01 OBRAS PROVISIONALES
02 CAPTACION 0.00 0.00
02.01 POZO PROFUNDO (20m.) 0.00 0.00
02.01.11 INSTALACIONES ELECTROMECANICAS (POZO) 0.00 0.00
02.01.11.01 PLANCHA METALICA DE 29" x29" x1" P/BASE DE BOMBA kg 1.00 1,604.44 1,604.44
02.01.11.02 SUMINISTRO E INSTALACION DE EQUIPO DE BOMBEO und 1.00 35,370.42 35,370.42
02.01.11.03 TABLERO ELECTRICO GAB.METALICO P/DISTRIBUCION DE 3 CIRC und 1.00 370.13 370.13
02.01.11.04 POZO-CONEXION A TIERRA und 1.00 1,143.55 1,143.55
03 LINEA DE IMPULSION 0.00 0.00
04 PLANTA DE TRATAMIENTO DE AGUAS POTABLE 0.00 0.00
04.03 CASETA DE BOMBEO (PTAP) 0.00 0.00
04.03.12 INSTALACIONES HIDRAULICAS Y ELECTROMECANICAS
04.03.13 EQUIPO DE CLORACION
04.03.13.01 EJE CABECERO und 1.00 490.49 490.49
04.03.13.02 BALANZA DE PLATAFORMA CAP 500 KG (INC. PESAS Y CADENA) und 1.00 1,490.49 1,490.49
04.03.13.03 CILINDO DE CLORO CAP 150 LBS und 3.00 1,770.25 5,310.75
04.03.13.04 BOCINA TENSORA und 1.00 590.49 590.49
04.03.13.05 TANQUE GOTERO Y CAÑERIAS und 1.00 490.49 490.49
04.03.13.06 REGULADOR DE CLORO AL VACIO und 1.00 748.96 748.96
04.03.13.07 TUERCA TENSORA, REGULADORA Y CONTRATUERCA und 1.00 395.12 395.12
04.03.13.08 CANASTILLA CONICA DE D=4" und 1.00 330.12 330.12
04.03.13.09 INYECTOR DIFUSOR DE CLORO und 1.00 1,370.25 1,370.25
04.03.13.10 GOTERO und 1.00 305.06 305.06
04.03.14 SISTEMA DE AGUA POTABLE 0.00 0.00
04.03.14.07 TANQUE ELEVADO DE 250 LTS und 1.00 259.04 259.04
04.04 TANQUE CISTERNA ( 155 M3) 0.00 0.00
05 CONSTRUCCION DE RESERVORIO PROYECTADO 0.00 0.00
05.01 CONSTRUCCION DE TANQUE ELEVADO (170 M3) 0.00 0.00
06.02.05 SUMINISTRO E INSTALACION DE VALVULAS 0.00 0.00
06.02.05.01 VALVULA DE COMPUERTA DE DN 75 MM und 15.00 711.86 10,677.90
06.02.05.02 VALVULA DE COMPUERTA DE DN 110MM und 7.00 1,008.47 7,059.29
06.02.05.03 INSTALACION DE VALVULA COMPUERTA DN 63-110 MM INCL REG und 22.00 71.30 1,568.60
07 CONEXIONES DOMICILIARIAS DE AGUA POTABLE 0.00 0.00
07.01 CONEXION DOMICILIARIA DE AGUA DN 15 MM T NORMAL und 341.00 355.09 121,085.69
01 RED DE ALCANTARILLADO 0.00 0.00
01.01 OBRAS PRELIMINARES 0.00 0.00
01.01.05 PUENTE D/MADERA PASE VEHICULAR SOBRE ZANJA und 3.00 4,082.36 12,247.08
01.01.06 CARTEL DE INFORMACION DE 0.80x1.20m S/CARTILLA (prov.durante ob und 10.00 228.70 2,287.00
01.03 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 0.00 0.00
01.03.01 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 200mm. INC. ANIL m 6,522.32 31.62 206,235.76
01.03.02 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 250mm. INC. ANIL m 1,442.35 46.89 67,631.79
01.03.03 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 315mm. INC. ANIL m 614.28 74.36 45,677.86
01.03.04 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEB m 6,522.32 3.84 25,045.71
01.03.05 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250mm. INC. PR m 1,442.35 4.17 6,014.60
01.03.06 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 315mm. INC. PR m 614.28 4.66 2,862.54
01.04 CONSTRUCCION DE BUZONES 0.00 0.00
01.04.01 TOTAL BUZONES und 179.00
02 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO 0.00 0.00
02.01 CONEXION DOMICILIARIA DE DESAGUE DN 160 mm. T-NORMAL und 341.00 446.93 152,403.13
03 PLANTA TRATAMIENTO DE AGUAS RESIDUALES 0.00 0.00
03.01 CONSTRUCCION DE CAMARA DE REJAS 0.00 0.00
03.01.05 ADITAMENTOS, VARIOS 0.00 0.00
03.01.05.01 COMPUERTAS TIPO PLANCHA METALICA und 4.00 1,205.12 4,820.48
03.01.05.02 REJA MANUAL SEGUN DISEÑO und 2.00 1,820.70 3,641.40
03.02 CAMARA DE HUMEDA 0.00 0.00
03.02.05 ACCESORIOS 0.00 0.00
03.02.05.01 DISTRIBUIDOR DE CAUDAL und 1.00 450.12 450.12
03.02.05.02 COMPUERTAS TIPO PLANCHA METALICA und 2.00 1,205.12 2,410.24
03.02.05.03 COMPUERTA PLANCHA METALICA DE ACERO INOXIDABLE 48"x2 3/4 kg 1.00 980.12 980.12
03.02.05.04 TAPA DE INGRESO 0.70x0.70m und 3.00 27.86 83.58
03.03 CAMARA DE BOMBEO PTAR 0.00 0.00
03.03.07 CARPINTERIA METALICA 0.00 0.00
03.03.07.01 PUERTA METAL LAC 1/8" C/MARCO 2"X2"X1/4" Y REFUERZOS m2 1.89 917.88 1,734.79
03.03.07.02 VENTANA DE FIERRO C/PERFIL "L" DE 2"X1/4"FIJA+FIERRO CORR m2 0.58 254.13 147.40
03.03.07.03 CERRADURA PARA EXTERIOR, C/LLAVES INTER. Y EXTERIOR DE und 1.00 54.87 54.87
03.04 CONSTRUCCION DE UASB 0.00 0.00
03.05 INSTALACIONES HIDRAULICAS, LINEAS DE INTERCONEXION , EMISOR EFL 0.00 0.00
03.05.05 CONSTRUCCION DE BUZONES TIPO I 0.00 0.00
03.05.05.01 BUZON TIPO I T-NORMAL A MAQ. 1.01 A 1.20m. PROF. (ENCOFR. I und 4.00 1,764.14 7,056.56
03.05.06 VARIOS 0.00 0.00
03.05.06.01 QUEMADOR DE GAS und 1.00 9,192.02 9,192.02
03.05.06.02 ALMACEN DE GAS Y SELLO HIDRAULICO und 1.00 11,419.10 11,419.10
03.05.06.03 PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 200MM A ZANJA m 114.98 2.18 250.66
03.05.06.04 CAJA - PARA DESCARGA DE LODOS EN TERRENO NORMAL INCL und 0.10 7,222.04 722.20
03.05.06.05 ELECTROBOMBA und 2.00 42,937.57 85,875.14
03.06 FILTRO BIOLOGICO 0.00 0.00
03.07 LECHO DE SECADO 0.00 0.00
04 PLAN DE MANEJO AMBIENTAL 0.00 0.00
04.01 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL 0.00 0.00
04.01.01 ACTIVIDADES DE CAPACITACION Y ELAB. DE TRIPTICOS glb 1.00 4,050.00 4,050.00
04.02 PROGRAMA DE ABANDONO Y CIERRE 0.00 0.00
04.02.01 IMPLEMENTACION DEL PROGRAMA DE ABANDONO Y CIERRE glb 1.00 2,800.00 2,800.00
04.03 PROGRAMA DE COMPENSACION 0.00 0.00
04.03.01 COMPENSACION POR AREAS OCUPADAS POR OBRAS m2 1,225.00 12.71 15,569.75
04.04 PROGRAMA DE PREVENCION, CONTROL Y MITIGACION 0.00 0.00
04.04.01 REHABILITACION AREA DE CAMPAMENTOS glb 1.00 4,726.02 4,726.02
04.04.02 REHABILITACION DE AREA OCUPADA POR PATIOS DE MAQUINARIA glb 1.00 18,249.10 18,249.10
04.04.03 CONFORMACION DE MATERIAL EN BOTADERO DE MATERIAL EXC glb 1.00 2,364.40 2,364.40
04.06 PROGRAMA DE MONITOREO AMBIENTAL 0.00 0.00
04.06.01 MONITOREO DE CALIDAD DE AIRE glb 1.00 1,694.92 1,694.92
04.06.02 MONITOREO DE CALIDAD DE AGUA glb 1.00 1,700.00 1,700.00
04.06.03 MONITOREO DE NIVELES SONORAS glb 1.00 3,000.00 3,000.00
04.07 PROGRAMA DE CONTINGENCIA 0.00 0.00
04.07.01 UNIDAD DE CONTINGENCIA und 1.00 2,750.00 2,750.00
CALCULO DEL COEFICIENTE DE REAJUSTE (K)
FORMULA 01 - AGUA POTABLE

"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA
OBRA: COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
Err:509 Err:509
PRECIO BASE Nov-16
AREA GEOGRAFIC AREA 06 - MADRE DE DIOS
K = 0.167*(Mr/Mo) + 0.080*(Tr/To) + 0.105*(Cr/Co) + 0.106*(Ar/Ao) + 0.129*(Dr/Do)+.413*(Ir/Io)

I.U. A FECHA DE
(I.U.) I.U. ADEL. DIRECTO
% DE PAGO
COEF. DE
MON. SIMB. ELEMENTO REPRESENTATIVO I.U. FACTOR INCIDENC PPTO BASE Jul-17 Nov-19
INCID.
.
Nov-16 Ir K Ir K
1 M MANO DE OBRA INC. LEYES SOCIALES 47 0.167 0.167 100.00% 562.24 563.25 0.167 619.76 0.184
2 T TUBERIA DE PVC PARA AGUA 72 0.080 0.080 100.00% 415.95 417.03 0.080 437.89 0.084
3 C CEMENTO PORTLAND TIPO I 21 0.105 0.105 100.00% 410.96 410.96 0.105 413.62 0.106
4 A ACERO DE CONSTRUCCION CORRUGADO 3 0.106 0.106 100.00% 464.71 451.95 0.103 538.89 0.123
5 D DÓLAR (GENERAL PONDERADO) 30 0.129 0.129 100.00% 476.53 463.80 0.126 502.90 0.136
6 I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.413 0.413 100.00% 433.63 441.67 0.421 459.10 0.437
1.000 COEFICIENTE DE REAJUSTE: K= 1.002 1.070
CALCULO DEL COEFICIENTE DE REAJUSTE (K)
FORMULA 02 - ALCANTARILLADO

"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA
OBRA:
COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
SUPERVISOR: Err:509
PRECIO BASE Nov-16
AREA GEOGRAFICA AREA 06 - MADRE DE DIOS

K = 0.221*(Mr/Mo) + 0.070*(Ar/Ao) + 0.090*(Dr/Do) + 0.097*(Tr/To) + 0.107*(Cr/Co)+.415*(Ir/Io)


I.U. A FECHA DE
(I.U.) I.U. ADEL. DIRECTO
% DE PAGO
COEF. DE
MON. SIMB. ELEMENTO REPRESENTATIVO I.U. FACTOR INCIDENC PPTO BASE Jul-17 Oct-19
INCID.
.
Oct-16 Ir K Ir K
1 M MANO DE OBRA INC. LEYES SOCIALES 47 0.221 0.221 100.00% 562.24 563.25 0.221 619.76 0.244
2 A ACERO DE CONSTRUCCION CORRUGADO 3 0.070 0.070 100.00% 464.71 451.95 0.068 538.89 0.081
3 D DÓLAR (GENERAL PONDERADO) 30 0.090 0.090 100.00% 476.53 463.80 0.088 502.90 0.095
4 T TUBERIA DE PVC PARA DESAGUE 73 0.097 0.097 100.00% 541.86 535.76 0.096 555.68 0.099
5 C CEMENTO PORTLAND TIPO I 21 0.107 0.107 100.00% 410.96 410.96 0.107 413.62 0.108
6 I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.415 0.415 100.00% 433.63 441.67 0.423 459.10 0.439
1.000 COEFICIENTE DE REAJUSTE: K= 1.003 1.066
CALCULO DEL COEFICI
FORMULA 01 - ADECUADA TR
OBRA: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA COMUNIDAD DE TAUCABAMBA, DISTRITO PILLPINTO, PROVINCIA DE PARURO - CUSCO"
UBICACIÓN: TAUCABAMBA - PILLPINTO - PARURO - CUSCO
SUPERVISOR: ING. RODOLFO AGUIRRE NEGRON
RESIDENTE: ARQ. JUAN CARLOS LOAYZA NAVARRO
PRECIO BASE Jun-13
AREA GEOGRAFICA AREA 06 - CUSCO

K = 0.269*(Jr / Jo) + 0.220*(AGr / AGo) + 0.160*(M

(I.U.) I.U. ADEL. DIRECTO I.U. A FECHA DE PAGO


COEF. DE % DE
MON. SIMB. ELEMENTO REPRESENTATIVO I.U. FACTOR PPTO BASE Nov-13 Dec-13
INCID. INCIDENC.
Jun-13 Ir K Ir K
1 J MANO DE OBRA 47 0.269 0.269 100.00% 471.44 497.55 0.284 497.55 0.284
AGREGADO GRUESO 5 0.206 93.64% 607.71 636.08 0.216 636.08 0.216
2 AG 0.220
TUBERIA PVC 72 0.014 6.36% 364.70 359.56 0.014 359.56 0.014
3 MAQ MAQUINARIA Y EQUIPO 49 0.160 0.160 100.00% 243.07 248.12 0.163 248.12 0.163
CEMENTO PORTLAND TIPO I 21 0.214 85.26% 410.96 410.96 0.214 410.96 0.214
4 C PETROLEO DIESSEL 53 0.251 0.002 0.80% 849.06 902.71 0.002 902.71 0.002
MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA 43 0.035 13.94% 856.32 869.70 0.036 869.70 0.036
FLETE TERRESTRE 32 0.040 40.30% 455.72 455.86 0.040 455.86 0.040
5 AC INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.100 0.024 23.88% 387.61 391.57 0.024 391.57 0.024
ACERO DE CONSTRUCCION CORRUGADO 3 0.036 35.82% 463.77 474.90 0.037 474.90 0.037

1.000 COEFICIENTE DE REAJUSTE: K= 1.030 1.030


CALCULO DEL COEFICI
FORMULA 02 - ADECUADA T
OBRA: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA COMUNIDAD DE TAUCABAMBA, DISTRITO PILLPINTO, PROVINCIA DE PARURO - CUSCO"
UBICACIÓN: TAUCABAMBA - PILLPINTO - PARURO - CUSCO
SUPERVISOR: ING. RODOLFO AGUIRRE NEGRON
RESIDENTE: ARQ. JUAN CARLOS LOAYZA NAVARRO
PRECIO BASE Jun-13
AREA GEOGRAFICA AREA 06 - CUSCO

K = 0.445*(Jr / Jo) + 0.218*(AGr / AGo) + 0.208*(C

(I.U.) I.U. ADEL. DIRECTO I.U. A FECHA DE PAGO


COEF. DE % DE
MON. SIMB. ELEMENTO REPRESENTATIVO I.U. FACTOR PPTO BASE Nov-13 Dec-13
INCID. INCIDENC.
Jun-13 Ir K
1 J MANO DE OBRA 47 0.445 0.445 100.00% 471.44 497.55 0.470 497.55 0.470
2 AG AGREGADO GRUESO 5 0.218 0.218 100.00% 607.71 636.08 0.228 636.08 0.228
ACERO DE CONSTRUCCION LISO 2 0.003 1.44% 471.93 480.08 0.003 480.08 0.003
3 C 0.208
CEMENTO PORTLAND TIPO I 21 0.205 98.56% 410.96 410.96 0.205 410.96 0.205
MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA 43 0.049 90.60% 856.32 869.70 0.050 869.70 0.050
4 M 0.054
PETROLEO DIESSEL 53 0.005 9.40% 849.06 902.71 0.005 902.71 0.005
INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.004 5.33% 387.61 391.57 0.004 391.57 0.004
5 MAQ 0.075
MAQUINARIA Y EQUIPO NACIONAL 48 0.071 94.67% 335.41 338.15 0.072 338.15 0.072

1.000 COEFICIENTE DE REAJUSTE: K= 1.037 1.037


CALCULO DEL COEFICI
FORMULA 03 - ADECUADO SISTEMA D
OBRA: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA COMUNIDAD DE TAUCABAMBA, DISTRITO PILLPINTO, PROVINCIA DE PARURO - CUSCO"
UBICACIÓN: TAUCABAMBA - PILLPINTO - PARURO - CUSCO
SUPERVISOR: ING. RODOLFO AGUIRRE NEGRON
RESIDENTE: ARQ. JUAN CARLOS LOAYZA NAVARRO
PRECIO BASE Jun-13
AREA GEOGRAFICA AREA 06 - CUSCO

K = 0.200*(Mr / Mo) + 0.349*(Ar / Ao) + 0.

(I.U.) I.U. ADEL. DIRECTO I.U. A FECHA DE PAGO


COEF. DE % DE
MON. SIMB. ELEMENTO REPRESENTATIVO I.U. FACTOR PPTO BASE Nov-13 Dec-13
INCID. INCIDENC.
Jun-13 Ir K
1 M MANO DE OBRA 47 0.200 0.200 100.00% 471.44 497.55 0.211 497.55 0.211
2 A ACERO DE CONSTRUCCION CORRUGADO 3 0.349 0.349 100.00% 463.77 474.90 0.357 474.90 0.357
AGREGADO GRUESO 5 0.019 27.54% 607.71 636.08 0.020 636.08 0.020
3 CAM CEMENTO PORTLAND TIPO I 21 0.069 0.034 49.28% 410.96 410.96 0.034 410.96 0.034
MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA 43 0.016 23.19% 856.32 869.70 0.016 869.70 0.016
MAQUINARIA Y EQUIPO NACIONAL 48 0.080 20.94% 335.41 338.15 0.081 338.15 0.081
4 DMI DÓLAR (30) 29 0.382 0.301 78.80% 372.66 380.83 0.308 380.83 0.308
INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.001 0.26% 387.61 391.57 0.001 391.57 0.001

1.000 COEFICIENTE DE REAJUSTE: K= 1.028 1.028


CALCULO DEL COEFICI
FORMULA 04 - ACONDICINAMIENTO ORNAMENTAL, SEGURIDAD SA
OBRA: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA COMUNIDAD DE TAUCABAMBA, DISTRITO PILLPINTO, PROVINCIA DE PARURO - CUSCO"
UBICACIÓN: TAUCABAMBA - PILLPINTO - PARURO - CUSCO
SUPERVISOR: ING. RODOLFO AGUIRRE NEGRON
RESIDENTE: ARQ. JUAN CARLOS LOAYZA NAVARRO
PRECIO BASE Jun-13
AREA GEOGRAFICA AREA 06 - CUSCO

K = 0.538*(Fr / Fo

(I.U.) I.U. ADEL. DIRECTO I.U. A FECHA DE PAGO


COEF. DE % DE
MON. SIMB. ELEMENTO REPRESENTATIVO I.U. FACTOR PPTO BASE Nov-13 Dec-13
INCID. INCIDENC.
Jun-13 Ir K
FLETE TERRESTRE 32 0.511 94.98% 455.72 455.86 0.511 455.86 0.511
1 F ACERO DE CONSTRUCCION LISO 2 0.538 0.001 0.19% 471.93 480.08 0.001 480.08 0.001
MANO DE OBRA 47 0.026 4.83% 471.44 497.55 0.027 497.55 0.027
MAQUINARIA Y EQUIPO IMPORTADO 49 0.027 5.84% 243.07 248.12 0.028 248.12 0.028
2 D INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.462 0.028 6.06% 387.61 391.57 0.028 391.57 0.028
DOLAR 29 0.407 88.10% 372.66 380.83 0.416 380.83 0.416

1.000 COEFICIENTE DE REAJUSTE: K= 1.011 1.011


ALCULO DEL COEFICIENTE DE REAJUSTE (K)
FORMULA 01 - ADECUADA TRANSITABILIDAD VEHICULAR

/ Jo) + 0.220*(AGr / AGo) + 0.160*(MAQr / MAQo) + 0.251*(Cr / Co) + 0.100*(ACr / ACo)

I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO
May-14 Jun-14 Jul-14 Aug-14 Sep-14 Sep-14 Oct-14 Nov-14 Dec-14
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir
498.10 0.284 498.10 0.284 498.10 0.284 523.70 0.299 523.70 0.299 523.70 0.299 523.70 0.299 523.70 0.299 523.70
648.88 0.220 647.90 0.220 642.26 0.218 647.89 0.220 652.16 0.221 654.09 0.222 654.09 0.222 654.23 0.222 657.61
366.08 0.014 368.40 0.014 370.39 0.014 370.75 0.014 373.23 0.014 379.44 0.015 382.85 0.015 384.26 0.015 386.98
248.50 0.164 248.06 0.163 248.68 0.164 248.34 0.163 250.83 0.165 255.29 0.168 259.41 0.171 261.11 0.172 264.41
410.96 0.214 410.96 0.214 410.96 0.214 410.96 0.214 410.96 0.214 410.96 0.214 410.96 0.214 410.96 0.214 410.96
917.28 0.002 911.32 0.002 909.33 0.002 899.40 0.002 896.75 0.002 881.51 0.002 875.55 0.002 837.14 0.002 792.10
876.04 0.036 811.36 0.033 869.72 0.036 869.80 0.036 871.41 0.036 869.81 0.036 869.84 0.036 860.50 0.035 863.84
465.69 0.041 465.69 0.041 468.30 0.041 468.30 0.041 468.30 0.041 468.49 0.041 468.49 0.041 468.49 0.041 468.56
399.44 0.025 400.34 0.025 400.98 0.025 402.72 0.025 402.37 0.025 403.02 0.025 404.55 0.025 403.94 0.025 404.87
470.04 0.036 473.03 0.037 451.86 0.035 459.19 0.035 468.10 0.036 481.01 0.037 491.87 0.038 495.36 0.038 501.62

1.036 1.033 1.033 1.049 1.053 1.059 1.063 1.063


ALCULO DEL COEFICIENTE DE REAJUSTE (K)
FORMULA 02 - ADECUADA TRANSITABILIDAD PEATONAL

Jr / Jo) + 0.218*(AGr / AGo) + 0.208*(Cr / Co) + 0.125*(Mr / Mo) + 0.075*(MAQr / MAQo)

I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO
May-14 Jun-14 Jul-14 Jul-14 Jul-14 Sep-14 Oct-14 Nov-14 Dec-14
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir
498.10 0.470 498.10 0.470 498.10 0.470 523.70 0.494 523.70 0.494 523.70 0.494 523.70 0.494 523.70 0.494 523.70
648.88 0.233 647.90 0.232 642.26 0.230 647.89 0.232 652.16 0.234 654.09 0.235 654.09 0.235 654.23 0.235 657.61
471.74 0.003 478.45 0.003 492.06 0.003 475.67 0.003 483.35 0.003 491.13 0.003 498.06 0.003 501.04 0.003 507.65
410.96 0.205 410.96 0.205 410.96 0.205 410.96 0.205 410.96 0.205 410.96 0.205 410.96 0.205 410.96 0.205 410.96
876.04 0.050 811.36 0.046 869.72 0.050 869.80 0.050 871.41 0.050 869.81 0.050 869.84 0.050 860.50 0.049 863.84
917.28 0.005 911.32 0.005 909.33 0.005 899.40 0.005 896.75 0.005 881.51 0.005 875.55 0.005 837.14 0.005 792.10
399.44 0.004 400.34 0.004 400.98 0.004 402.72 0.004 402.37 0.004 403.02 0.004 404.55 0.004 403.94 0.004 404.87
338.89 0.072 338.34 0.072 338.46 0.072 337.96 0.072 339.02 0.072 341.35 0.072 343.21 0.073 344.84 0.073 346.68

1.042 1.037 1.039 1.065 1.067 1.068 1.069 1.068


ALCULO DEL COEFICIENTE DE REAJUSTE (K)
A 03 - ADECUADO SISTEMA DE EVACUACION DE AGUAS PLUVIALES

0.200*(Mr / Mo) + 0.349*(Ar / Ao) + 0.069*(CAMr / CAMo) + 0.382*(DMIr / DMIo)

I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO
May-14 Jun-14 Jul-14 Jul-14 Jul-14 Sep-14 Oct-14 Nov-14 Dec-14
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir
498.10 0.211 498.10 0.211 498.10 0.211 523.70 0.222 523.70 0.222 523.70 0.222 523.70 0.222 523.70 0.222 523.70
470.04 0.354 473.03 0.356 451.86 0.340 459.19 0.346 468.10 0.352 481.01 0.362 491.87 0.370 495.36 0.373 501.62
648.88 0.020 647.90 0.020 642.26 0.020 647.89 0.020 652.16 0.020 654.09 0.020 654.09 0.020 654.23 0.020 657.61
410.96 0.034 410.96 0.034 410.96 0.034 410.96 0.034 410.96 0.034 410.96 0.034 410.96 0.034 410.96 0.034 410.96
876.04 0.016 811.36 0.015 869.72 0.016 869.80 0.016 871.41 0.016 869.81 0.016 869.84 0.016 860.50 0.016 863.84
338.89 0.081 338.34 0.081 338.46 0.081 337.96 0.081 339.02 0.081 341.35 0.081 343.21 0.082 344.84 0.082 346.68
384.75 0.311 385.05 0.311 387.37 0.313 386.98 0.313 390.72 0.316 396.99 0.321 403.12 0.326 404.73 0.327 407.64
399.44 0.001 400.34 0.001 400.98 0.001 402.72 0.001 402.37 0.001 403.02 0.001 404.55 0.001 403.94 0.001 404.87

1.028 1.029 1.016 1.033 1.042 1.057 1.071 1.075


ALCULO DEL COEFICIENTE DE REAJUSTE (K)
RNAMENTAL, SEGURIDAD SALUD EN OBRA, SEÑALIZACION, CONTROLES DE CALIDAD, VARIOS

K = 0.538*(Fr / Fo) + 0.462*(Dr / Do)

I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO
May-14 Jun-14 Jul-14 Jul-14 Jul-14 Sep-14 Oct-14 Nov-14 Dec-14
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir
465.69 0.522 465.69 0.522 468.30 0.525 468.30 0.525 468.30 0.525 468.49 0.525 468.49 0.525 468.49 0.525 468.56
471.74 0.001 478.45 0.001 492.06 0.001 475.67 0.001 483.35 0.001 491.13 0.001 498.06 0.001 501.04 0.001 507.65
498.10 0.027 498.10 0.027 498.10 0.027 523.70 0.029 523.70 0.029 523.70 0.029 523.70 0.029 523.70 0.029 523.70
248.50 0.028 248.06 0.028 248.68 0.028 248.34 0.028 250.83 0.028 255.29 0.028 259.41 0.029 261.11 0.029 264.41
399.44 0.029 400.34 0.029 400.98 0.029 402.72 0.029 402.37 0.029 403.02 0.029 404.55 0.029 403.94 0.029 404.87
384.75 0.420 385.05 0.421 387.37 0.423 386.98 0.423 390.72 0.427 396.99 0.434 403.12 0.440 404.73 0.442 407.64

1.027 1.028 1.033 1.035 1.039 1.046 1.053 1.055


I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO
Dec-14 Dec-14
K Ir K
0.299 523.15 0.299
0.223 655.76 0.222
0.015 390.84 0.015
0.174 268.53 0.177
0.214 410.96 0.214
0.002 709.98 0.002
0.035 865.70 0.035
0.041 468.56 0.041
0.025 405.56 0.025
0.039 509.07 0.039

1.067 1.069
I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO
Dec-14 Dec-14
K Ir K
0.494 523.15 0.494
0.236 655.76 0.235
0.003 515.47 0.003
0.205 410.96 0.205
0.049 865.70 0.049
0.005 709.98 0.004
0.004 405.56 0.004
0.073 348.43 0.074

1.069 1.068
I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO
Dec-14 Dec-14
K Ir K
0.222 523.15 0.222
0.377 509.07 0.383
0.021 655.76 0.021
0.034 410.96 0.034
0.016 865.70 0.016
0.083 348.43 0.083
0.329 411.34 0.332
0.001 405.56 0.001

1.083 1.092
I.U. A FECHA DE PAGO I.U. A FECHA DE PAGO
Dec-14 Dec-14
K Ir K
0.525 468.56 0.525
0.001 515.47 0.001
0.029 523.15 0.029
0.029 268.53 0.030
0.029 405.56 0.029
0.445 411.34 0.449

1.058 1.063
REINTEGRO POR REAJUSTE
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE
OBRA:
MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
Err:509 Err:509
AREA GEOGRAFICA AREA 06 - MADRE DE DIOS

VALORIZACIONES REINTEGRO

PROGRAMADO(SIN IGV) EJECUTADO(SIN IGV) PROGRAMADO(SIN IGV) AUTORIZADO(SIN IGV)


(K) (K-1)
No. DESCRIPCION
MES ACUM. MES ACUM. MES ACUM. MES ACUM.

FORMULA 01 - AGUA POTABL #REF! 0.00 1.011 0.011 #REF! 0.00


1 jul-17 FORMULA 01 - ALCANTARILL #REF! 0.00 1.013 0.013 #REF! 0.00
TOTAL #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00
FORMULA 01 - AGUA POTABL #REF! 170,618.27 1.014 0.014 #REF! 2,388.66
2 ago-17 FORMULA 02 - ALCANTARILL #REF! 165,340.25 1.014 0.014 #REF! 2,314.76
TOTAL #REF! #REF! 335,958.52 335,958.52 #REF! #REF! 4,703.42 4,703.42
FORMULA 01 - AGUA POTABL #REF! 257,183.44 1.015 0.015 #REF! 3,857.75
3 sep-17 FORMULA 02 - ALCANTARILL #REF! 116,757.12 1.014 0.014 #REF! 1,634.60
TOTAL #REF! #REF! 373,940.56 709,899.08 #REF! #REF! 5,492.35 10,195.77
FORMULA 01 - AGUA POTABL #REF! 94,868.74 1.013 0.013 #REF! 1,233.29
4 oct-17 FORMULA 02 - ALCANTARILL #REF! 178,796.43 1.013 0.013 #REF! 2,324.35
TOTAL #REF! #REF! 273,665.17 983,564.25 #REF! #REF! 3,557.64 13,753.41
FORMULA 01 - AGUA POTABL #REF! 0.00 1.015 0.015 #REF! 0.00
5 nov-17 FORMULA 02 - ALCANTARILL #REF! 7,155.57 1.014 0.014 #REF! 100.18
TOTAL #REF! #REF! 7,155.57 990,719.82 #REF! #REF! 100.18 13,853.59
FORMULA 01 - AGUA POTABL #REF! 2,829.08 1.016 0.016 #REF! 45.27
6 dic-17 FORMULA 02 - ALCANTARILL #REF! 16,142.55 1.016 0.016 #REF! 258.28
TOTAL #REF! #REF! 18,971.63 1,009,691.45 #REF! #REF! 303.55 14,157.14
FORMULA 01 - AGUA POTABL #REF! 251,684.01 1.055 0.055 #REF! 13,842.62
7 abr-19 FORMULA 02 - ALCANTARILL #REF! 310,075.03 1.052 0.052 #REF! 16,123.90
TOTAL #REF! #REF! 561,759.04 1,571,450.49 #REF! #REF! 29,966.52 44,123.66
FORMULA 01 - AGUA POTABL #REF! 108,046.63 1.055 0.055 #REF! 5,942.56
8 may-19 FORMULA 02 - ALCANTARILL #REF! 376,400.63 1.052 0.052 #REF! 19,572.83
TOTAL #REF! #REF! 484,447.26 2,055,897.75 #REF! #REF! 25,515.39 69,639.05
FORMULA 01 - AGUA POTABL #REF! 224,389.65 1.064 0.064 #REF! 14,360.94
9 jun-19 FORMULA 02 - ALCANTARILL #REF! 486,521.57 1.059 0.059 #REF! 28,704.77
TOTAL #REF! #REF! 710,911.22 2,766,808.97 #REF! #REF! 43,065.71 112,704.76
FORMULA 01 - AGUA POTABL #REF! 234,960.85 1.061 0.061 #REF! 14,332.61
10 jul-19 FORMULA 02 - ALCANTARILL #REF! 109,355.96 1.056 0.056 #REF! 6,123.93
TOTAL #REF! #REF! 344,316.81 3,111,125.78 #REF! #REF! 20,456.54 133,161.30
FORMULA 01 - AGUA POTABL #REF! 203,340.92 1.057 0.057 #REF! 11,590.43
11 ago-19 FORMULA 02 - ALCANTARILL #REF! 292,086.25 1.054 0.054 #REF! 15,772.66
TOTAL #REF! #REF! 495,427.17 3,606,552.95 #REF! #REF! 27,363.09 160,524.39
FORMULA 01 - AGUA POTABL #REF! 172,220.20 1.072 0.072 #REF! 12,399.85

12 sep-19 FORMULA 02 - ALCANTARILL #REF! 167,931.70 1.068 0.068 #REF! 11,419.36

TOTAL #REF! #REF! 340,151.90 3,946,704.85 #REF! #REF! 23,819.21 184,343.60

FORMULA 01 - AGUA POTABL #REF! 101,344.66 1.070 0.070 #REF! 7,094.13

13 oct-19 FORMULA 02 - ALCANTARILL #REF! 106,797.48 1.066 0.066 #REF! 7,048.63

TOTAL #REF! #REF! 208,142.14 4,154,846.99 #REF! #REF! 14,142.76 198,486.36

FORMULA 01 - AGUA POTABL #REF! Err:509 1.070 0.070 #REF! Err:509

14 nov-19 FORMULA 02 - ALCANTARILL #REF! Err:509 1.066 0.066 #REF! Err:509

TOTAL #REF! #REF! Err:509 Err:509 #REF! #REF! Err:509 Err:509

FORMULA 01 - AGUA POTABL #REF! Err:509 0.000 #REF! Err:509

15 dic-19 FORMULA 02 - ALCANTARILL #REF! Err:509 0.000 #REF! Err:509

TOTAL #REF! #REF! Err:509 Err:509 #REF! #REF! Err:509 Err:509

TOTALES #REF! 4,154,846.99 #REF! 198,486.36


CALCULO DE AMORTIZACION POR ADELANTO DIRECTO

OBRA: "CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE


AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE
MANU – MADRE DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
Err:509 Err:509
AREA GEOGRAFICA AREA 06 - MADRE DE DIOS

MONTO DE CONTRATO INC. IGV (S/.): 6,061,626.38


MONTO DE CONTRATO SIN IGV (S/.): 5,136,971.51
ADELANTO DIRECTO. INC. IGV (S/.): 606,162.64
ADELANTO DIRECTO SIN IGV (S/.): 513,697.15
ADELANTO OTORGADO:
N° DESCRIPCION FECHA MONTO SIN IGV %
1.00 ADELANTO DIRECTO Jul-17 513,697.15 10.00

Amortizacion del Adelanto Directo = % Adelanto Directo * Valorizacion

VALORIZACIONES AMORTIZACION DE ADELANTO DIRECTO

AMORTIZAC. ACUMULADO SALDO


N° PERIODO (S/.)
(ADEL*V/C) (S/.) (S/.)
01 VAL-01 JULIO-17 0.00 0.00 0.00 513,697.15
02 VAL-02 AGOSTO-17 447,333.81 44,733.38 44,733.38 468,963.77
03 VAL-03 SEPTIEMBRE-17 642,836.12 64,283.61 109,016.99 404,680.16
04 VAL-04 OCTUBRE-17 Err:509 404,680.16 513,697.15 0.00

TOTALES Err:509 513,697.15


IGV (18%) 92,465.49
AMORTIZACION TOTAL (100.00%) DE LA CARTA FIANZA S/. 606,162.64
REINTEGRO QUE NO CORRESPONDE POR ADELANTO DIRECTO
OBRA: "CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS
RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE MANU – MADRE
DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
Err:509 Err:509
AREA GEOGRAFICA AREA 06 - MADRE DE DIOS

MONTO DE CONTRATO INC. IGV (S/.): 6,061,626.38


MONTO DE CONTRATO SIN IGV (S/.): 5,136,971.51
ADELANTO DIRECTO. INC. IGV (S/.): 606,162.64
ADELANTO DIRECTO SIN IGV (S/.): 513,697.15

ADELANTO OTORGADO:
N° DESCRIPCION FECHA MONTO SIN IGV %
1.00 ADELANTO DIRECTO Jul-17 513,697.15 10.00%

D = (V * ADEL/C ) * (K / Ka - 1)

VALORIZACION EJECUTADA COEFIC. REAJUSTE


MES ADELANTO
MONTO V*ADEL/C DEDUCCION (D)
No. DESCRIPCION VALORIZADO DIRECTO
V (S/.) K Ka

FORMULA 01 - AGUA POTABLE 0.00 0.00 1.002 1.002 0.00


01 FORMULA 02 - ALCANTARILLADO 0.00 0.00 1.003 1.003 0.00
VAL-02 JULIO-17 0.00 0.00
FORMULA 01 - AGUA POTABLE 242,978.31 24,297.83 1.002 1.002 0.00
02 FORMULA 02 - ALCANTARILLADO 204,355.50 20,435.55 1.003 1.003 0.00
VAL-02 AGOSTO-17 447,333.81 0.00
FORMULA 01 - AGUA POTABLE 348,297.11 34,829.71 1.011 1.002 312.84
03 FORMULA 02 - ALCANTARILLADO 294,539.00 29,453.90 1.013 1.003 293.66
VAL-03 SEPTIEMBRE-17 642,836.11 606.50
FORMULA 01 - AGUA POTABLE 168,946.70 16,894.67 1.014 1.002 202.33
04 FORMULA 02 - ALCANTARILLADO 364,457.96 36,445.80 1.014 1.003 399.70
VAL-03 OCTUBRE-17 533,404.66 602.04
TOTALES 1,623,574.58 1,208.54
CALCULO DE AMORTIZACION POR ADELANTO DIRECTO

OBRA: "CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE


AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE
MANU – MADRE DE DIOS"
UBICACIÓN: BOCA COLORADO - DISTRITO DE MADRE DE DIOS - PROVINCIA DE MANU - DEPARTAMENTO DE MADRE DE DIOS
RESIDENTE: Err:509
INSPECTOR Err:509
AREA GEOGRAFICA AREA 06 - MADRE DE DIOS

MONTO DE CONTRATO INC. IGV (S/.): 6,061,626.38


MONTO DE CONTRATO SIN IGV (S/.): 5,136,971.51
ADELANTO DIRECTO. INC. IGV (S/.): 606,162.64
ADELANTO DIRECTO SIN IGV (S/.): 513,697.15
ADELANTO OTORGADO:

N° DESCRIPCION FECHA MONTO SIN IGV %

1.00 ADELANTO DIRECTO Jul-17 513,697.15 10.00

Amortizacion del Adelanto Directo = % Adelanto Directo * Valorizacion

VALORIZACIONES AMORTIZACION DE ADELANTO DIRECTO

AMORTIZAC. ACUMULADO SALDO


N° PERIODO (S/.)
(ADEL*V/C) (S/.) (S/.)
01 VAL-01 JULIO-17 0.00 0.00 0.00 513,697.15
02 VAL-02 AGOSTO-17 335,958.52 175,464.83 175,464.83 338,232.32
03 VAL-03 SEPTIEMBRE-17 373,940.56 195,302.14 370,766.97 142,930.18
04 VAL-04 OCTUBRE-17 273,665.17 142,930.18 513,697.15 0.00
05 VAL-05 NOVIEMBRE-17 7,155.57 0.00 513,697.15 0.00
06 VAL-06 DICIEMBRE-17 18,971.63 0.00 513,697.15 0.00

TOTALES 1,009,691.45 513,697.15


IGV (18%) 92,465.49
AMORTIZACION TOTAL (100.00%) DE LA CARTA FIANZA S/. 606,162.64
CALCULO DE AMORTIZACION DE ADELANTO DE MATERIALES
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE
OBRA:
MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
Err:509 Err:509
AREA GEOGRAFICA AREA 06 - MADRE DE DIOS
MONTO DE CONTRATO INC. IGV (S/.): 6,061,626.38
MONTO DE CONTRATO SIN IGV (S/.): 5,136,971.51
ADELANTO POR MAT. INC. IGV (S/.): 1,212,325.28
ADELANTO POR MAT. SIN IGV (S/.): 1,027,394.31 Amortizacion del Adelanto para materiales = Ci * V * lma / lmo

FORMULA 01 - AGUA POTABLE


INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia lmo lma UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC
TUBERIA DE PVC PARA AGUA 72 251,684.01 86,976.46 0.080 100.00% 415.950 417.030 10,067.36 10,093.50 10,093.50 76,882.96
CEMENTO PORTLAND TIPO I 21 251,684.01 114,156.61 0.105 100.00% 410.960 410.960 13,213.41 13,213.41 13,213.41 100,943.20
VAL-07 ABRIL-19

ACERO DE CONSTRUCCION CORRUGADO 3 251,684.01 115,243.81 0.106 100.00% 464.710 451.950 13,339.26 12,972.99 12,972.99 102,270.82

316,376.88 0.291 AMORTIZACION POR ADELANTO DE MATERIALES 36,279.90 280,096.98

FORMULA 02 - ALCANTARILLADO
INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia Imo Ima UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC

ACERO DE CONSTRUCCION CORRUGADO 3 310,075.03 76,839.93 0.070 100.00% 464.710 451.950 10,852.63 10,554.63 10,554.63 66,285.30
TUBERIA DE PVC PARA DESAGUE 73 310,075.03 106,478.20 0.097 100.00% 541.860 535.760 15,038.64 14,869.34 14,869.34 91,608.86
CEMENTO PORTLAND TIPO I 21 310,075.03 117,455.33 0.107 100.00% 410.960 410.960 16,589.02 16,589.02 16,589.02 100,866.31

300,773.46 0.274 AMORTIZACION POR ADELANTO DE MATERIALES 42,012.99 258,760.47


Total amortizacion por adelanto de materiales 617,150.34 78,292.89 538,857.45
FORMULA 01 - AGUA POTABLE
INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia lmo lma UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC
TUBERIA DE PVC PARA AGUA 72 108,046.63 75,942.46 0.080 100.00% 415.950 432.330 4,321.87 4,492.06 4,492.06 71,450.40
CEMENTO PORTLAND TIPO I 21 108,046.63 99,674.48 0.105 100.00% 410.960 420.470 5,672.45 5,803.72 5,803.72 93,870.76
VAL-08 MAYO-19

ACERO DE CONSTRUCCION CORRUGADO 3 108,046.63 100,623.76 0.106 100.00% 464.710 529.910 5,726.47 6,529.91 6,529.91 94,093.85

276,240.70 0.291 AMORTIZACION POR ADELANTO DE MATERIALES 16,825.69 259,415.01

FORMULA 02 - ALCANTARILLADO
INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia Imo Ima UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC
ACERO DE CONSTRUCCION CORRUGADO 3 376,400.66 67,091.87 0.070 100.00% 464.710 529.910 13,174.03 15,022.37 15,022.37 52,069.50
TUBERIA DE PVC PARA DESAGUE 73 376,400.66 92,970.16 0.097 100.00% 541.860 547.960 18,255.43 18,460.94 18,460.94 74,509.22
CEMENTO PORTLAND TIPO I 21 376,400.66 102,554.72 0.107 100.00% 410.960 420.470 20,137.44 20,603.43 20,603.43 81,951.29

262,616.75 0.274 AMORTIZACION POR ADELANTO DE MATERIALES 54,086.74 208,530.01


Total amortizacion por adelanto de materiales 538,857.45 70,912.43 467,945.02
CALCULO DE AMORTIZACION DE ADELANTO DE MATERIALES
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE
OBRA:
MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
Err:509 Err:509
AREA GEOGRAFICA AREA 06 - MADRE DE DIOS
MONTO DE CONTRATO INC. IGV (S/.): 6,061,626.38
MONTO DE CONTRATO SIN IGV (S/.): 5,136,971.51
ADELANTO POR MAT. INC. IGV (S/.): 1,212,325.28
ADELANTO POR MAT. SIN IGV (S/.): 1,027,394.31 Amortizacion del Adelanto para materiales = Ci * V * lma / lmo

FORMULA 01 - AGUA POTABLE


INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia lmo lma UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC

TUBERIA DE PVC PARA AGUA 72 224,389.65 65,948.60 0.080 100.00% 415.950 433.940 11,967.45 12,485.04 12,485.04 53,463.56
VAL-09 JUNIO-19

CEMENTO PORTLAND TIPO I 21 224,389.65 86,557.54 0.105 100.00% 410.960 418.760 15,707.27 16,005.40 16,005.40 70,552.14
ACERO DE CONSTRUCCION CORRUGADO 3 224,389.65 87,381.90 0.106 100.00% 464.710 553.400 15,856.87 18,883.15 18,883.15 68,498.75

239,888.04 0.291 AMORTIZACION POR ADELANTO DE MATERIALES 47,373.59 192,514.45

FORMULA 02 - ALCANTARILLADO
INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia Imo Ima UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC
ACERO DE CONSTRUCCION CORRUGADO 3 486,521.57 58,262.73 0.070 100.00% 464.710 553.400 22,704.34 27,037.47 27,037.47 31,225.26
TUBERIA DE PVC PARA DESAGUE 73 486,521.57 80,735.50 0.097 100.00% 541.860 551.820 31,461.73 32,040.03 32,040.03 48,695.47
CEMENTO PORTLAND TIPO I 21 486,521.57 89,058.75 0.107 100.00% 410.960 418.760 35,055.76 35,721.12 35,731.16 53,327.59

228,056.98 0.274 AMORTIZACION POR ADELANTO DE MATERIALES 94,808.66 133,248.32


Total amortizacion por adelanto de materiales 467,945.02 142,182.25 325,762.78
FORMULA 01 - AGUA POTABLE
INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia lmo lma UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC
TUBERIA DE PVC PARA AGUA 72 234,960.85 45,910.52 0.080 100.00% 415.950 435.990 18,796.87 19,702.48 19,702.48 26,208.04
CEMENTO PORTLAND TIPO I 21 234,960.85 60,257.56 0.105 100.00% 410.960 418.570 24,670.89 25,127.74 25,127.74 35,129.82
VAL-10 JULIO-19

ACERO DE CONSTRUCCION CORRUGADO 3 234,960.85 60,831.44 0.106 100.00% 464.710 533.280 24,905.85 28,580.82 28,580.82 32,250.62

166,999.52 0.291 AMORTIZACION POR ADELANTO DE MATERIALES 73,411.04 93,588.48

FORMULA 02 - ALCANTARILLADO
INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia Imo Ima UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC
ACERO DE CONSTRUCCION CORRUGADO 3 109,355.96 40,559.96 0.070 100.00% 464.710 533.280 7,654.92 8,784.44 8,784.44 31,775.52
TUBERIA DE PVC PARA DESAGUE 73 109,355.96 56,204.51 0.097 100.00% 541.860 550.850 10,607.53 10,783.52 10,783.52 45,420.99
CEMENTO PORTLAND TIPO I 21 109,355.96 61,998.79 0.107 100.00% 410.960 418.570 11,701.09 11,917.77 11,927.81 50,070.98

158,763.26 0.274 AMORTIZACION POR ADELANTO DE MATERIALES 31,495.77 127,267.49


Total amortizacion por adelanto de materiales 325,762.78 104,906.81 220,855.97
CALCULO DE AMORTIZACION DE ADELANTO DE MATERIALES
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE
OBRA:
MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
Err:509 Err:509
AREA GEOGRAFICA AREA 06 - MADRE DE DIOS
MONTO DE CONTRATO INC. IGV (S/.): 6,061,626.38
MONTO DE CONTRATO SIN IGV (S/.): 5,136,971.51
ADELANTO POR MAT. INC. IGV (S/.): 1,212,325.28
ADELANTO POR MAT. SIN IGV (S/.): 1,027,394.31 Amortizacion del Adelanto para materiales = Ci * V * lma / lmo

FORMULA 01 - AGUA POTABLE


INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia lmo lma UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC

TUBERIA DE PVC PARA AGUA 72 203,340.92 31,125.76 0.080 100.00% 415.950 434.080 16,267.27 10,185.79 10,185.79 20,939.97
VAL-11 AGOSTO-19

CEMENTO PORTLAND TIPO I 21 203,340.92 40,852.56 0.105 100.00% 410.960 418.570 21,350.80 13,047.70 13,047.70 27,804.85
ACERO DE CONSTRUCCION CORRUGADO 3 203,340.92 41,241.63 0.106 100.00% 464.710 527.670 21,554.14 14,684.61 14,684.61 26,557.02

113,219.94 0.291 AMORTIZACION POR ADELANTO DE MATERIALES 37,918.10 75,301.84

FORMULA 02 - ALCANTARILLADO
INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia Imo Ima UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC

ACERO DE CONSTRUCCION CORRUGADO 3 292,086.25 27,498.26 0.070 100.00% 464.710 527.670 20,446.04 13,929.67 13,929.67 13,568.58
TUBERIA DE PVC PARA DESAGUE 73 292,086.25 38,104.73 0.097 100.00% 541.860 546.020 28,332.37 17,129.93 17,129.93 20,974.80
CEMENTO PORTLAND TIPO I 21 292,086.25 42,033.05 0.107 100.00% 410.960 418.570 31,253.23 19,099.18 19,099.18 22,933.87

107,636.03 0.274 AMORTIZACION POR ADELANTO DE MATERIALES 50,158.78 57,477.25


Total amortizacion por adelanto de materiales 220,855.97 88,076.88 132,779.09

FORMULA 01 - AGUA POTABLE


INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia lmo lma UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC

TUBERIA DE PVC PARA AGUA 72 172,220.20 18,712.87 0.080 100.00% 415.950 438.750 13,777.62 8,719.70 8,719.70 9,993.17
VAL-12 SETIEMBRE-19

CEMENTO PORTLAND TIPO I 21 172,220.20 24,560.65 0.105 100.00% 410.960 415.710 18,083.12 10,975.28 10,975.28 13,585.37
ACERO DE CONSTRUCCION CORRUGADO 3 172,220.20 24,794.56 0.106 100.00% 464.710 415.710 18,255.34 9,798.28 9,798.28 14,996.28

68,068.07 0.291 AMORTIZACION POR ADELANTO DE MATERIALES 29,493.25 38,574.82

FORMULA 02 - ALCANTARILLADO
INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia Imo Ima UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC

ACERO DE CONSTRUCCION CORRUGADO 3 167,931.70 16,532.01 0.070 100.00% 464.710 415.710 11,755.22 6,309.43 6,309.43 10,222.58
TUBERIA DE PVC PARA DESAGUE 73 167,931.70 22,908.64 0.097 100.00% 541.860 558.010 16,289.37 10,064.92 10,064.92 12,843.72
CEMENTO PORTLAND TIPO I 21 167,931.70 25,270.36 0.107 100.00% 410.960 415.710 17,968.69 10,905.83 10,905.83 14,364.53

64,711.02 0.274 AMORTIZACION POR ADELANTO DE MATERIALES 27,280.18 37,430.84


Total amortizacion por adelanto de materiales 132,779.09 56,773.43 76,005.66
CALCULO DE AMORTIZACION DE ADELANTO DE MATERIALES
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE
OBRA:
MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
Err:509 Err:509
AREA GEOGRAFICA AREA 06 - MADRE DE DIOS
MONTO DE CONTRATO INC. IGV (S/.): 6,061,626.38
MONTO DE CONTRATO SIN IGV (S/.): 5,136,971.51
ADELANTO POR MAT. INC. IGV (S/.): 1,212,325.28
ADELANTO POR MAT. SIN IGV (S/.): 1,027,394.31 Amortizacion del Adelanto para materiales = Ci * V * lma / lmo

FORMULA 01 - AGUA POTABLE


INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia lmo lma UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC

TUBERIA DE PVC PARA AGUA 72 101,344.66 10,711.66 0.080 100.00% 415.950 437.750 8,107.57 5,119.49 5,119.49 5,592.16
VAL-13 OCTUBRE-19

CEMENTO PORTLAND TIPO I 21 101,344.66 14,059.05 0.105 100.00% 410.960 414.760 10,641.19 6,443.75 6,443.75 7,615.30
ACERO DE CONSTRUCCION CORRUGADO 3 101,344.66 14,192.95 0.106 100.00% 464.710 538.410 10,742.53 7,467.74 7,467.74 6,725.21

38,963.65 0.291 AMORTIZACION POR ADELANTO DE MATERIALES 19,030.99 19,932.67

FORMULA 02 - ALCANTARILLADO
INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia Imo Ima UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC

ACERO DE CONSTRUCCION CORRUGADO 3 106,797.48 9,463.29 0.070 100.00% 464.710 538.410 7,475.82 5,196.86 5,196.86 4,266.42
TUBERIA DE PVC PARA DESAGUE 73 106,797.48 13,113.41 0.097 100.00% 541.860 555.260 10,359.36 6,369.32 6,369.32 6,744.09
CEMENTO PORTLAND TIPO I 21 106,797.48 14,465.31 0.107 100.00% 410.960 414.760 11,427.33 6,919.79 6,919.79 7,545.51

37,042.00 0.274 AMORTIZACION POR ADELANTO DE MATERIALES 18,485.98 18,556.02


Total amortizacion por adelanto de materiales 76,005.66 37,516.97 38,488.69

FORMULA 01 - AGUA POTABLE


INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia lmo lma UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC
VAL-14 NOVIEMBRE-19

TUBERIA DE PVC PARA AGUA 72 Err:509 5,424.30 0.080 100.00% 415.950 437.890 Err:509 Err:509 5,424.30 0.00
CEMENTO PORTLAND TIPO I 21 Err:509 7,119.40 0.105 100.00% 410.960 413.620 Err:509 Err:509 7,119.40 0.00
ACERO DE CONSTRUCCION CORRUGADO 3 Err:509 7,187.20 0.106 100.00% 464.710 538.890 Err:509 Err:509 7,187.20 0.00

19,730.90 0.291 AMORTIZACION POR ADELANTO DE MATERIALES 19,730.90 0.00

FORMULA 02 - ALCANTARILLADO
INDICE MONTO ADELANTO Coef. Incidencia % de INDICES ADELANTO AMORTIZACION AMORTIZACION SALDO
MATERIAL
UNIFICADO VALORIZADO Monto S/IGV (Ci) Incidencia Imo Ima UTILIZADO A MES BASE ESTA VALORIZ AMORTIZAC

ACERO DE CONSTRUCCION CORRUGADO 3 Err:509 4,792.14 0.070 100.00% 464.710 538.890 Err:509 Err:509 4,792.14 0.00
TUBERIA DE PVC PARA DESAGUE 73 Err:509 6,640.53 0.097 100.00% 541.860 555.680 Err:509 Err:509 6,640.53 0.00
CEMENTO PORTLAND TIPO I 21 Err:509 7,325.12 0.107 100.00% 410.960 413.620 Err:509 Err:509 7,325.12 0.00

18,757.79 0.274 AMORTIZACION POR ADELANTO DE MATERIALES 18,757.79 0.00


Total amortizacion por adelanto de materiales 38,488.69 38,488.69 0.00
REINTEGRO QUE NO CORRESPONDE POR ADELANTO DE MATERIAL
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO -
OBRA:
DISTRITO DE MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
Err:509 Err:509
AREA GEOGRAFICA AREA 06 - MADRE DE DIOS
MONTO DE CONTRATO INC. IGV (S/.): 6,061,626.38
MONTO DE CONTRATO SIN IGV (S/.): 5,136,971.51
ADELANTO POR MAT. INC. IGV (S/.): 1,212,325.28
ADELANTO POR MAT. SIN IGV (S/.): 1,027,394.31 D = ci x Val x [ (Imr - Ima) / Imo ]
FORMULA 01 - AGUA POTABLE
Monto Indices Monto Monto Adelanto Monto
MATERIAL IU Coef. Incid. Saldo Deducion
adelant s/IGV Imo Ima Imr deflatado Valorizado utilizado Afecto
TUBERIA DE PVC PARA AGUA 72 10,711.66 415.95 437.89 432.33 10,174.96 Err:509 0.080 100.00% Err:509 Err:509 Err:509 Err:509
CEMENTO PORTLAND TIPO I 21 14,059.05 410.96 413.62 418.57 13,968.64 Err:509 0.105 100.00% Err:509 Err:509 Err:509 Err:509
ACERO DE CONSTRUCCION CORRUGADO 3 14,192.95 464.71 538.89 530.00 12,239.24 Err:509 0.106 100.00% Err:509 Err:509 Err:509 Err:509

38,963.65 Err:509
Sep-19

FORMULA 02 - ALCANTARILLADO
Monto Indices Monto Monto Adelanto Monto
MATERIAL IU Coef. Incid. Saldo Deducion
adelant s/IGV Imo Ima Imr deflatado Valorizado utilizado Afecto

ACERO DE CONSTRUCCION CORRUGADO 3 9,463.29 464.71 538.89 530.00 8,160.63 Err:509 0.070 100.00% Err:509 Err:509 Err:509 Err:509
TUBERIA DE PVC PARA DESAGUE 73 13,113.41 541.86 555.68 547.96 12,787.27 Err:509 0.097 100.00% Err:509 Err:509 Err:509 Err:509
CEMENTO PORTLAND TIPO I 21 14,465.31 410.96 413.62 418.57 14,372.28 Err:509 0.107 100.00% Err:509 Err:509 Err:509 Err:509

37,042.00 Err:509
Total deduccion Err:509
CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO
OBRA: CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS
LUGAR: MADRE DE DIOS - MANU - MADRE DE DIOS
PRESUPUS/. 6,061,755.35
MODALID CONTRATA INICIO 7/27/2017 FIN 12/11/2019
2017 2019
PARTIDA DESCRIPCION MES- MES- MES- MES- MES- MES- MES-
MES-AGOSTO MES-OCTUBRE MES- ABRIL MES-MAYO MES-AGOSTO
PRESUPUESTO MES-JULIO 2017 SETIEMBRE NOVIEMBRE DICIEMBRE MES-JUNIO 2019 MES-JULIO 2019 SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
2017 2017 2019 2019 2019
2017 2017 2017 2019 2019 2019 2019
DURACION TOTAL DE OBRA
SISTEMA DE AGUA POTABLE
1 OBRAS PROVISIONALES 86,608.05
2 CAPTACION 80,774.25
3 LINEA DE IMPULSION 3,101.17
4 PLANTA DE TRATAMIENTO DE AGUAS POTABLE 298,107.19
5 CONSTRUCCION DE RESERVORIO PROYECTADO 501,625.47
6 REDES DE AGUA POTABLE 785,131.84
7 CONEXIONES DOMICILIARIAS DE AGUA POTABLE 121,085.69
SISTEMA DE ALCANTARILLADO Y PLATA DE TRATAMIENTO
1 RED DE ALCANTARILLADO 1,444,518.13
2 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO 152,403.13
3 PLANTA TRATAMIENTO DE AGUAS RESIDUALES 456,440.65
4 PLAN DE MANEJO AMBIENTAL 64,263.11

COSTO DIRECTO 3,993,458.80 S/.108,399.81 S/.177,704.34 S/.318,522.73 S/.233,108.11 S/.6,095.12 S/.16,160.05 S/.478,506.73 S/.412,301.43 S/.605,554.46 S/.293,282.22 S/.415,901.08 S/.11,120.33 S/.201,943.15 S/.430,987.54 S/.283,871.72
GASTOS GENERALES 375,320.70 S/.10,187.83 S/.16,701.34 S/.29,936.00 S/.21,908.40 S/.572.84 S/.1,518.78 S/.44,971.91 S/.38,749.68 S/.56,912.35 S/.27,563.80 S/.39,087.99 S/.1,045.13 S/.18,979.40 S/.40,505.87 S/.26,679.36
UTILIDAD 319,476.70 S/.8,671.98 S/.14,216.35 S/.25,481.82 S/.18,648.65 S/.487.61 S/.1,292.80 S/.38,280.54 S/.32,984.11 S/.48,444.36 S/.23,462.58 S/.33,272.09 S/.889.63 S/.16,155.45 S/.34,479.00 S/.22,709.74
SUBTOTAL 4,688,256.20 S/.127,259.63 S/.208,622.02 S/.373,940.55 S/.273,665.16 S/.7,155.57 S/.18,971.64 S/.561,759.18 S/.484,035.22 S/.710,911.17 S/.344,308.60 S/.488,261.16 S/.13,055.09 S/.237,078.00 S/.505,972.41 S/.333,260.82
IGV (18.00%) 843,886.12 S/.22,906.73 S/.37,551.96 S/.67,309.30 S/.49,259.73 S/.1,288.00 S/.3,414.89 S/.101,116.65 S/.87,126.34 S/.127,964.01 S/.61,975.55 S/.87,887.01 S/.2,349.92 S/.42,674.04 S/.91,075.03 S/.59,986.95
TOTAL INVERSION 5,532,142.32 S/.150,166.36 S/.246,173.99 S/.441,249.85 S/.322,924.89 S/.8,443.58 S/.22,386.53 S/.662,875.83 S/.571,161.56 S/.838,875.18 S/.406,284.14 S/.576,148.16 S/.15,405.01 S/.279,752.04 S/.597,047.44 S/.393,247.76

% DE AVANCE 2.71% 4.45% 7.98% 5.84% 0.15% 0.40% 11.98% 10.32% 15.16% 7.34% 10.41% 0.28% 5.06% 10.79% 7.11%
% DE AVANCE ACUMULADO 2.71% 7.16% 15.14% 20.98% 21.13% 21.53% 33.52% 43.84% 59.01% 66.35% 76.76% 77.04% 82.10% 92.89% 100.00%
CALENDARIO DE AVANCE DE OBRA VALORIZADO
OBRA: CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS

LUGAR: MADRE DE DIOS - MANU - MADRE DE DIOS


PRESUPUESTOS/. 6,061,626.38
MODALIDAD CONTRATA INICIO 7/27/2017 FIN 2/22/2018

2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
DURACION TOTAL DE OBRA S/. 247,398.65 S/. 666,704.78 S/. 716,802.11 S/. 794,246.53 S/. 878,491.61 S/. 692,526.44 S/. 357,895.75 S/. 21,608.90 S/. 4,375,674.71
SISTEMA DE AGUA POTABLE S/. 165,142.17 S/. 368,289.66 S/. 170,947.55 S/. 340,683.07 S/. 669,672.12 S/. 458,171.53 S/. 70,246.41 S/. 2,243,152.51
1 OBRAS PROVISIONALES S/. 58,711.81 S/. 47,383.08 S/. 22,886.04 S/. 128,980.93
1.01 CAMPAMENTO PROVISIONAL PARA LA OBRA TIPO LP-03 S/. 1,328.50 S/. 1,328.50
1.02 SERVICIO DE BAÑO PORTATIL (INODORO Y LAVADERO), TIPO DISAL O SIMILAR S/. 1,680.00 S/. 1,680.00
1.03 CARTEL IDENTIFICACION OBRA 7.20x3.60m. S/. 2,825.30 S/. 2,825.30
1.04 ADQUISICION DE TERRENOS PARA PLANTAS DE TRATAMIENTO S/. 36,723.16 S/. 5,649.72 S/. 42,372.88
1.05 FLETE - TRANSPORTE DE TUBERIA, ACCESORIOS Y MATERIALES PARA LA OBRA S/. 16,154.85 S/. 41,733.36 S/. 22,886.04 S/. 80,774.25
2 CAPTACION S/. 18,047.54 S/. 56,830.28 S/. 8,910.55 S/. 83,788.37
2.01 POZO PROFUNDO (20m.) S/. 18,047.54 S/. 56,830.28 S/. 8,910.55 S/. 83,788.37
02.01.01 OBRAS PRELIMINARES S/. 172.94 S/. 172.94
02.01.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 105.92 S/. 105.92
02.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA S/. 67.02 S/. 67.02
02.01.02 MOVIMIENTO DE TIERRAS S/. 1,561.00 S/. 3,458.29 S/. 5,019.29
02.01.02.01 EXCAV. POZO (MAQ) P/TUB. T-NORMAL DN 21" H=1.5 A 25.00m. PROF. S/. 1,561.00 S/. 1,561.00
02.01.02.02 EXCAV. ZANJA (PULSO) P/CIMIENTOS T. NORMAL S/. 62.94 S/. 62.94
02.01.02.03 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL A PULSO S/. 17.58 S/. 17.58
02.01.02.04 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM CON MAQUINA S/. 3,377.77 S/. 3,377.77
02.01.03 CONCRETO SIMPLE S/. 850.66 S/. 850.66
02.01.03.01 CIMIENTOS CORRIDOS 1:10 + 30% P.M. S/. 368.46 S/. 368.46
02.01.03.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS(CEMENTO P-I) S/. 211.20 S/. 211.20
02.01.03.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS S/. 271.00 S/. 271.00
02.01.04 CONCRETO ARMADO S/. 16,313.60 S/. 9,549.33 S/. 25,862.93
02.01.04.01 CONCRETO F'C 210 KG/CM2 PARA ANILLO EN POZO 20 M. PROF. (CEMENTO P-I) S/. 9,409.99 S/. 4,704.99 S/. 14,114.98
02.01.04.02 ENCOFRADO (INCL. HABILITACION) PARA ANILLO EN POZO 20 M. PROF. S/. 5,256.25 S/. 1,501.79 S/. 6,758.04
02.01.04.03 ACERO ESTRUC. TRABAJADO P/ANILLO EN POZO 20 M. PROF. (COSTO PROM. INCL. DESPERDICIOS) S/. 1,250.06 S/. 1,250.06
02.01.04.04 CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I) S/. 173.21 S/. 173.21
02.01.04.05 ENCOFRADO (I/HABILITACION DE MADERA) PARA COLUMNAS S/. 150.55 S/. 150.55
02.01.04.06 ACERO ESTRUC. TRABAJADO P/COLUMNAS (COSTO PROM. INCL. DESPERDICIOS) S/. 196.74 S/. 196.74
02.01.04.07 CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I) S/. 156.43 S/. 156.43
02.01.04.08 ENCOFRADO (I/HABILITACION DE MADERA) PARA VIGAS RECTAS Y DINTELES TIPO CARAVISTA S/. 171.38 S/. 171.38
02.01.04.09 ACERO ESTRUC. TRABAJADO P/VIGAS (COSTO PROM. INCL. DESPERDICIOS) S/. 696.04 S/. 696.04
02.01.04.10 CONCRETO F'C 210 KG/CM2 PARA LOSA MACIZAS (CEMENTO P-I) S/. 843.79 S/. 843.79
02.01.04.11 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS MACIZAS S/. 458.47 S/. 458.47
02.01.04.12 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS) S/. 231.08 S/. 231.08
02.01.04.13 ADITIVO DESMOLDADOR PARA ENCOFRADO TIPO CARAVISTA S/. 397.30 S/. 264.86 S/. 662.16
02.01.05 MUROS Y TABIQUES DE ALBAÑILERIA S/. 1,221.89 S/. 1,221.89
02.01.05.01 MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:4 X 1.5CM. S/. 1,221.89 S/. 1,221.89
02.01.06 REVOQUES ENLUCIDOS Y MOLDURAS S/. 1,193.51 S/. 1,193.51
02.01.06.01 TARRAJEO INTE. C/MORTERO 1:5 X1.5 CM.(INC.COLUMNAS EMPOT) S/. 348.67 S/. 348.67
02.01.06.02 TARRAJEO EXTE. C/MORTERO 1:5 X 1.5CM.(INC.COLUMNAS EMPOT) S/. 552.88 S/. 552.88
02.01.06.03 CIELO RASO INCL. VIGAS EMPOTRADAS C/MORTERO 1:4 ,1.5CM. S/. 222.63 S/. 222.63
02.01.06.04 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. S/. 69.33 S/. 69.33
02.01.07 CARPINTERIA METALICA S/. 1,526.64 S/. 1,526.64
02.01.07.01 PUERTA METAL LAC 1/8" C/MARCO 2"X2"X1/4" Y REFUERZOS S/. 1,471.77 S/. 1,471.77
02.01.07.02 CERRADURA PARA EXTERIOR, C/LLAVES INTER. Y EXTERIOR DE 2 GOLPES S/. 54.87 S/. 54.87
02.01.08 PINTURA S/. 393.64 S/. 393.64
02.01.08.01 PINTADO DE MURO EXTERIOR CON TEKNO MATE O SUPERMATE(SIMILAR) S/. 220.92 S/. 220.92
02.01.08.02 PINTADO DE MURO INTERIOR CON TEKNO MATE O SUPERMATE(SIMILAR) S/. 139.03 S/. 139.03
02.01.08.03 PINTADO DE CIELO RASO C/TEKNOMATE O SUPERMATE (SIMILAR) S/. 33.69 S/. 33.69
02.01.09 SUMINISTRO E INSTALACION DE TUBERIA S/. 1,809.93 S/. 1,809.93
02.01.09.01 TUBERIA DE HIERRO DUCTIL K-9 DN 100mm. INCL. ANILLO + 1% DE DESPERDICIO S/. 1,809.93 S/. 1,809.93
02.01.10 ADITAMENTOS, VARIOS S/. 245.17 S/. 1,285.10 S/. 1,530.27
02.01.10.01 SUMINISTRO Y COLOCACION DE GRAVA S/. 216.17 S/. 216.17
02.01.10.02 DADO DE CONCRETO DE 0.10x0.10x0.30m. S/. 29.00 S/. 29.00
02.01.10.03 PRUEBA HIDRAULICA C/EMPLEO DE LA LINEA DE INGRESO EN FILTRO BILOGICO S/. 1,285.10 S/. 1,285.10
02.01.11 INSTALACIONES ELECTROMECANICAS (POZO) S/. 36,974.86 S/. 1,513.68 S/. 38,488.54
02.01.11.01 PLANCHA METALICA DE 29" x29" x1" P/BASE DE BOMBA S/. 1,604.44 S/. 1,604.44
02.01.11.02 SUMINISTRO E INSTALACION DE EQUIPO DE BOMBEO S/. 35,370.42 S/. 35,370.42
02.01.11.03 TABLERO ELECTRICO GAB.METALICO P/DISTRIBUCION DE 3 CIRCUITOS S/. 370.13 S/. 370.13
02.01.11.04 POZO-CONEXION A TIERRA S/. 1,143.55 S/. 1,143.55
02.01.12 ACCESORIOS S/. 5,718.13 S/. 5,718.13
02.01.12.01 CODO DE HD BRIDADO 3"x90° PN 16 (75mm.) S/. 94.94 S/. 94.94
02.01.12.02 CODO DE HD BRIDADO 3"x45° PN 16 (75mm.) S/. 180.06 S/. 180.06
2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
02.01.12.03 UNION FLEXIBLE TIPO DRESSER DE 75mm. S/. 1,529.16 S/. 1,529.16
02.01.12.04 CANASTILLA CONICA DE DN 100mm. S/. 328.98 S/. 328.98
02.01.12.05 ACCESORIOS POZO S/. 3,584.99 S/. 3,584.99
3 LINEA DE IMPULSION S/. 10,082.11 S/. 10,082.11
3.01 LINEA DE IMPULSION (POZO - PTAP) S/. 6,317.45 S/. 6,317.45
03.01.01 OBRAS PRELIMINARES S/. 340.00 S/. 340.00
03.01.01.01 TRAZO, NIVEL Y REPLANTEO PARA REDES DE AGUA S/. 23.69 S/. 23.69
03.01.01.02 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION -POLVO (Incl.Costo de agua y transp Surtidor a obra) S/. 45.87 S/. 45.87
03.01.01.03 CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA S/. 41.74 S/. 41.74
03.01.01.04 CARTEL DE INFORMACION DE 0.80x1.20m S/CARTILLA (prov.durante obra) S/. 228.70 S/. 228.70
03.01.02 MOVIMIENTO DE TIERRAS S/. 2,092.07 S/. 2,092.07
03.01.02.01 EXCAV. ZANJA (PULSO) P/TUB.T NORMAL DN 110-160 MM H=0.60 A 1.00M PROF. S/. 602.73 S/. 602.73
03.01.02.02 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 110-160 PARA TODA PROF. S/. 38.73 S/. 38.73
03.01.02.03 RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 110 A 160MM H=0.60 A 1.00M S/. 1,361.12 S/. 1,361.12
03.01.02.04 ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 110-160MM PARA TODA PROF. S/. 89.49 S/. 89.49
03.01.03 SUMINISTRO E INSTALACION DE TUBERIA S/. 3,344.14 S/. 3,344.14
03.01.03.01 TUBERIA DE HIERRO DUCTIL K-9 DN 100mm. INCL. ANILLO + 1% DE DESPERDICIO S/. 3,344.14 S/. 3,344.14
03.01.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 541.24 S/. 541.24
03.01.04.01 CODO DE HD BRIDADO 3"x90° PN 16 (75mm.) S/. 94.94 S/. 94.94
03.01.04.02 CODO DE HD BRIDADO 3"x45° PN 16 (75mm.) S/. 180.06 S/. 180.06
03.01.04.03 CONCRETO FC=140 KG/CM2 PARA ANCLAJES DE ACCESORIOS DN 110-160 MM S/. 266.24 S/. 266.24
3.02 LINEA DE IMPULSION (CISTERNA-TANQUE ELEVADO) S/. 3,764.66 S/. 3,764.66
03.02.01 OBRAS PRELIMINARES S/. 293.74 S/. 293.74
03.02.01.01 TRAZO, NIVEL Y REPLANTEO PARA REDES DE AGUA S/. 12.73 S/. 12.73
03.02.01.02 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION -POLVO (Incl.Costo de agua y transp Surtidor a obra) S/. 29.69 S/. 29.69
03.02.01.03 CERCO DE MALLA HDP DE 1M. ALTURA PARA LIMITE SEGURIDAD OBRA S/. 22.62 S/. 22.62
03.02.01.04 CARTEL DE INFORMACION DE 0.80x1.20m S/CARTILLA (prov.durante obra) S/. 228.70 S/. 228.70
03.02.02 MOVIMIENTO DE TIERRAS S/. 1,128.18 S/. 1,128.18
03.02.02.01 EXCAV. ZANJA (PULSO) P/TUB.T NORMAL DN 110-160 MM H=0.60 A 1.00M PROF. S/. 327.04 S/. 327.04
03.02.02.02 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 110-160 PARA TODA PROF. S/. 21.01 S/. 21.01
03.02.02.03 RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 110 A 160MM H=0.60 A 1.00M S/. 732.05 S/. 732.05
03.02.02.04 ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 110-160MM PARA TODA PROF. S/. 48.08 S/. 48.08
03.02.03 SUMINISTRO E INSTALACION DE TUBERIA S/. 1,796.59 S/. 1,796.59
03.02.03.01 TUBERIA DE HIERRO DUCTIL K-9 DN 100mm. INCL. ANILLO + 1% DE DESPERDICIO S/. 1,796.59 S/. 1,796.59
03.02.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 546.15 S/. 546.15
03.02.04.01 CODO DE HD BRIDADO 3"x90° PN 16 (75mm.) S/. 189.88 S/. 189.88
03.02.04.02 CODO DE HD BRIDADO 3"x45° PN 16 (75mm.) S/. 90.03 S/. 90.03
03.02.04.03 CONCRETO FC=140 KG/CM2 PARA ANCLAJES DE ACCESORIOS DN 110-160 MM S/. 266.24 S/. 266.24
4 PLANTA DE TRATAMIENTO DE AGUAS POTABLE S/. 20,291.67 S/. 132,093.09 S/. 99,643.16 S/. 188,056.15 S/. 56,227.70 S/. 496,311.77
4.01 CONSTRUCCION DE FILTRO LENTO S/. 20,291.67 S/. 132,093.09 S/. 7,680.54 S/. 160,065.30
04.01.01 OBRAS PRELIMINARES S/. 3,850.77 S/. 3,850.77
04.01.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 2,358.44 S/. 2,358.44
04.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA S/. 1,492.33 S/. 1,492.33
04.01.02 MOVIMIENTO DE TIERRAS S/. 4,817.00 S/. 2,888.96 S/. 7,705.96
04.01.02.01 EXCAVACION CON MAQUINARIA PARA FILTRO LENTO EN TERRENO COMPACTO S/. 4,425.61 S/. 4,425.61
04.01.02.02 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL A PULSO S/. 391.39 S/. 391.39
04.01.02.03 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM CON MAQUINA S/. 2,888.96 S/. 2,888.96
04.01.03 OBRAS DE CONCRETO S/. 11,623.90 S/. 81,546.17 S/. 93,170.07
04.01.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES (CEMENTO P-I) S/. 8,075.46 S/. 8,075.46
04.01.03.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOLADOS Y/O SUB BASES S/. 409.24 S/. 409.24
04.01.03.03 CONCRETO F'C 210 KG/CM2 PARA LOSA DE FONDO CEMENTO P-I) S/. 4,503.29 S/. 4,503.29
04.01.03.04 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS FONDO BUZON,CAMARA S/. 2,455.44 S/. 2,455.44
04.01.03.05 ACERO ESTRUC. TRABAJADO P/LOSA FONDO-PISO (COSTO PROM. INCL. DESPERDICIOS) S/. 683.76 S/. 683.76
04.01.03.06 CONCRETO F´C 210KG/CM2 PARA MUROS REFORZADOS (CEMENTO P-I) S/. 5,842.21 S/. 5,842.21
04.01.03.07 ENCOFRADO (I/HABILITACION DE MADERA) PARA MUROS TIPO CARAVISTA S/. 5,900.75 S/. 5,900.75
04.01.03.08 ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS) S/. 62,495.82 S/. 62,495.82
04.01.03.09 ADITIVO DESMOLDADOR PARA ENCOFRADO TIPO CARAVISTA S/. 2,804.10 S/. 2,804.10
04.01.04 REVOQUES ENLUCIDOS Y MOLDURAS S/. 20,907.08 S/. 20,907.08
04.01.04.01 TARRAJEO CON IMPERMEABILIZANTE PARA LOSA DE FONDO S/. 945.00 S/. 945.00
04.01.04.02 TARRAJEO IMPERMEABILIZANTE P/MUROS RESERVORIO APOYADO S/. 11,951.18 S/. 11,951.18
04.01.04.03 WATER STOP DE NEOPRENE DE 6". PROVISION Y COLOCADO DE JUNTA S/. 8,010.90 S/. 8,010.90
04.01.05 SISTEMA FILTRANTE S/. 16,036.63 S/. 16,036.63
04.01.05.01 FILTROS DE ARENA S/. 16,036.63 S/. 16,036.63
04.01.06 CARPINTERIA DE MADERA S/. 251.79 S/. 251.79
04.01.06.01 MADERA TRATADA P/ COMPUERTAS DE FILTRO LENTO S/. 251.79 S/. 251.79
04.01.07 CARPINTERIA METALICA S/. 1,195.56 S/. 1,195.56
04.01.07.01 COMPUERTA PLANCHA METALICA DE ACERO INOXIDABLE 48"x2 3/4" x 1/8" S/. 980.12 S/. 980.12
04.01.07.02 ESCALERA MARINERA C/TUBO DE FºGº DE 1/2" S/. 215.44 S/. 215.44
04.01.08 PINTURA S/. 1,653.74 S/. 1,653.74
04.01.08.01 PINTADO DE MURO EXTERIOR CON TEKNO MATE O SUPERMATE(SIMILAR) S/. 1,653.74 S/. 1,653.74
04.01.09 SUMINISTRO E INSTALACION DE TUBERIA S/. 7,516.50 S/. 507.94 S/. 8,024.44
04.01.09.01 TUBERIA DE PVC-U UF NTP ISO 4422 PN 10 DN 160mm. INC. ANILLO + 2% DESPERDICIOS S/. 653.85 S/. 653.85
04.01.09.02 TUBERIA DE PVC-U UF NTP ISO 4422 PN 10 DN 110mm. INC. ANILLO + 2% DESPERDICIOS S/. 185.76 S/. 185.76
2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
04.01.09.03 TUBERIA DE PVC-U UF NTP ISO 4422 PN 10 DN 63mm. INC. ANILLO + 2% DESPERDICIOS S/. 3,714.05 S/. 3,714.05
04.01.09.04 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 160MM INC PRUEBA HIDRAULICA S/. 46.05 S/. 46.05
04.01.09.05 INSTALACION DE TUBERIA DE PVC P/AGUA POTAB. DN 110mm. INC. PRUEBA HIDRAULICA S/. 1,900.92 S/. 1,900.92
04.01.09.06 INSTALACION TUBERIA PVC P/AGUA POTAB. DN 63 MM INC PRUEBA HIDRAULICA S/. 1,015.87 S/. 507.94 S/. 1,523.81
04.01.10 INSTALACION DE ACCESORIOS S/. 1,750.40 S/. 1,750.40
04.01.10.01 REDUCCION PVC-U UF NTP ISO 4422 DN 110-63 S/. 1,686.00 S/. 1,686.00
04.01.10.02 CODO 90º PVC-U UF NTP ISO 4422 DN 110 S/. 64.40 S/. 64.40
04.01.11 ADITAMENTOS, VARIOS S/. 5,518.86 S/. 5,518.86
04.01.11.01 LIMPIEZA Y DESINFECCION DE FILTRO BILOGICO APOYADOS S/. 4,141.44 S/. 4,141.44
04.01.11.02 PRUEBA HIDRAULICA C/EMPLEO DE LA LINEA DE INGRESO EN FILTRO BILOGICO S/. 1,377.42 S/. 1,377.42
4.02 TRATAMIENTO DE METALES PESADOS EN AGUAS SUBTERRANEAS S/. 50,620.22 S/. 130,768.89 S/. 8,436.70 S/. 189,825.81
04.02.01 INSTALACIONES ESPECIALES S/. 50,620.22 S/. 130,768.89 S/. 8,436.70 S/. 189,825.81
04.02.01.01 CONSTRUCCION E INSTALACION DEL SISTEMA DE FOTOCATALISIS S/. 50,620.22 S/. 130,768.89 S/. 8,436.70 S/. 189,825.81
4.03 CASETA DE BOMBEO (PTAP) S/. 33,287.93 S/. 57,287.26 S/. 47,791.00 S/. 138,366.19
04.03.01 OBRAS PRELIMINARES S/. 1,033.03 S/. 1,033.03
04.03.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 632.69 S/. 632.69
04.03.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA S/. 400.34 S/. 400.34
04.03.02 MOVIMIENTO DE TIERRAS S/. 1,054.57 S/. 1,054.57
04.03.02.01 EXCAV. ZANJA (PULSO) P/CIMIENTOS T. NORMAL S/. 731.93 S/. 731.93
04.03.02.02 RELLENO CON MATERIAL DE PRESTAMO COMPACTADO E=0.20 m. S/. 274.43 S/. 274.43
04.03.02.03 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM CON MAQUINA S/. 48.21 S/. 48.21
04.03.03 CONCRETO SIMPLE S/. 2,434.35 S/. 2,434.35
04.03.03.01 CIMIENTOS CORRIDOS 1:10 + 30% P.M. S/. 2,054.19 S/. 2,054.19
04.03.03.02 SOLADO e=4" C:A 1:12 S/. 380.16 S/. 380.16
04.03.04 CONCRETO ARMADO S/. 16,451.57 S/. 8,242.24 S/. 24,693.81
04.03.04.01 CONCRETO F'C 175 KG/CM2 PARA SOBRECIMIENTO REFORZADO (CEMENTO P-I) S/. 1,404.69 S/. 1,404.69
04.03.04.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOBRECIMIENTO REFORZADO S/. 1,122.66 S/. 1,122.66
04.03.04.03 ACERO ESTRUC. TRABAJADO P/SOBRECIMIENTO REFORZADO (COSTO PROM. INCL. DESPERDICIOS) S/. 1,480.39 S/. 1,480.39
04.03.04.04 CONCRETO F'C 210 KG/CM2 PARA ZAPATAS (CEMENTO P-I) S/. 2,432.54 S/. 2,432.54
04.03.04.05 ACERO ESTRUC. TRABAJADO P/ZAPATA ARMADA (COSTO PROM. INCL. DESPERDICIOS) S/. 592.80 S/. 592.80
04.03.04.06 CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I) S/. 1,360.95 S/. 1,360.95
04.03.04.07 ENCOFRADO (I/HABILITACION DE MADERA) PARA COLUMNAS S/. 940.94 S/. 940.94
04.03.04.08 ACERO ESTRUC. TRABAJADO P/COLUMNAS (COSTO PROM. INCL. DESPERDICIOS) S/. 1,519.09 S/. 1,519.09
04.03.04.09 CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I) S/. 1,877.20 S/. 1,877.20
04.03.04.10 ENCOFRADO (I/HABILITACION DE MADERA) PARA VIGAS RECTAS Y DINTELES TIPO CARAVISTA S/. 523.05 S/. 1,046.11 S/. 1,569.16
04.03.04.11 ACERO ESTRUC. TRABAJADO P/VIGAS (COSTO PROM. INCL. DESPERDICIOS) S/. 2,490.54 S/. 2,490.54
04.03.04.12 CONCRETO F'C 210 KG/CM2 PARA LOSA ALIGERADA (CEMENTO P-I) S/. 2,188.76 S/. 2,188.76
04.03.04.13 ENCOFRADO(I/HABILITACION DE MADERA) PARA LOSA ALIGERADA S/. 723.83 S/. 1,447.67 S/. 2,171.50
04.03.04.14 ACERO ESTRUC. TRABAJADO P/LOSA ALIGERADA (COSTO PROM. INCL. DESPERDICIOS) S/. 1,860.09 S/. 1,860.09
04.03.04.15 LADRILLO HUECO DE ARCILLA 15x30x30 cm. P/LOSA ALIGERADA S/. 1,682.50 S/. 1,682.50
04.03.05 MUROS Y TABIQUES DE ALBAÑILERIA S/. 12,314.41 S/. 12,314.41
04.03.05.01 MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:4 X 1.5CM. S/. 11,525.38 S/. 11,525.38
04.03.05.02 MURO DE LADRILLO K-K ARCILLA DE SOGA CON MORTERO 1:4x1.5 cm S/. 789.03 S/. 789.03
04.03.06 REVOQUES ENLUCIDOS Y MOLDURAS S/. 6,478.64 S/. 6,478.64
04.03.06.01 TARRAJEO INTERIORES Y EXTERIORES C/MORTERO 1:5 X1.5 CM.(INC.COLUMNAS EMPOT) S/. 4,188.26 S/. 4,188.26
04.03.06.02 CIELO RASO INCL. VIGAS EMPOTRADAS C/MORTERO 1:4 ,1.5CM. S/. 1,720.50 S/. 1,720.50
04.03.06.03 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. S/. 569.88 S/. 569.88
04.03.07 PISOS Y PAVIMENTOS S/. 5,654.28 S/. 5,654.28
04.03.07.01 FALSO PISO DE CONCRETO 1:8, e=0.10 m. S/. 2,613.54 S/. 2,613.54
04.03.07.02 CONTRAPISO DE 2", C:A 1:4 S/. 1,123.43 S/. 1,123.43
04.03.07.03 VEREDA DE CONCRET0, ACABADO PULIDO Y BRUÑADO e=4" INC. ENCOFRADO S/. 1,917.31 S/. 1,917.31
04.03.08 CARPINTERIA METALICA S/. 6,445.30 S/. 6,445.30
04.03.08.01 PUERTA METALICA DE 1.50x2.10 m. S/DETALLE S/. 1,894.90 S/. 1,894.90
04.03.08.02 PUERTA METALICA DE 2.10x0.80 m. S/DETALLE S/. 1,704.40 S/. 1,704.40
04.03.08.03 VENTANA METALICA TIPO V-1, DE 2.30x1.20 m. S/DETALLE S/. 850.00 S/. 850.00
04.03.08.04 VENTANA METALICA TIPO V-2, DE 1.50x0.60 m. S/DETALLE S/. 906.00 S/. 906.00
04.03.08.05 VENTANA METALICA TIPO V-3, DE 2.65x0.60 m. S/DETALLE S/. 575.00 S/. 575.00
04.03.08.06 VENTANA METALICA TIPO V-4, DE 2.00x0.60 m. S/DETALLE S/. 515.00 S/. 515.00
04.03.09 CERRAJERIA S/. 524.32 S/. 524.32
04.03.09.01 CERRADURA DE 03 GOLPES P/PUERTA METALICA Y DE MADERA S/. 319.36 S/. 319.36
04.03.09.02 CANDADO INCLUYE ALDABAS S/. 204.96 S/. 204.96
04.03.10 PINTURA S/. 2,037.12 S/. 2,037.12
04.03.10.01 PINTADO DE MUROS EXTERIORES E INTERIORES CON TEKNO MATE O SUPERMATE(SIMILAR) S/. 1,670.12 S/. 1,670.12
04.03.10.02 PINTADO DE CIELO RASO C/TEKNOMATE O SUPERMATE (SIMILAR) S/. 367.00 S/. 367.00
04.03.11 INSTALACIONES ELECTRICAS S/. 1,844.52 S/. 1,844.52
04.03.11.01 CABLE ELECTRICO TW - 2x2.5 mm2 S/. 152.67 S/. 152.67
04.03.11.02 CABLE ELECTRICO TW - 2x4.00mm2 + 1x2.5mm2. S/. 165.88 S/. 165.88
04.03.11.03 SALIDAS PARA CENTROS DE LUZ S/. 250.38 S/. 250.38
04.03.11.04 SALIDAS PARA TOMACORRIENTE S/. 184.44 S/. 184.44
04.03.11.05 TABLERO DE DISTRIBUCION - CAJA METALICA S/. 362.27 S/. 362.27
04.03.11.06 INTERRUPTOR SIMPLE S/. 70.86 S/. 70.86
04.03.11.07 INTERRUPTOR DOBLE S/. 23.62 S/. 23.62
04.03.11.08 CENTRO DE LUZ (SOQUETS Y LUMINARIA) S/. 438.84 S/. 438.84
2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
04.03.11.09 TUBERIA PVC SEL 3/4" PARA INST. ELECTRICAS S/. 195.56 S/. 195.56
04.03.12 INSTALACIONES HIDRAULICAS Y ELECTROMECANICAS S/. 20,516.87 S/. 35,020.87 S/. 55,537.74
04.03.12.01 VALVULA DE AIRE TRIPLE EFECTO DE DN 3" PN16 S/. 1,901.69 S/. 1,901.69
04.03.12.02 VALVULA CHECK DE BRONCE DE 4" S/. 1,047.61 S/. 1,047.61
04.03.12.03 VALVULA COMPUERTA DE HD BRIDADA DN 3" (75mm.) S/. 553.52 S/. 553.52
04.03.12.04 VALVULA COMPUERTA DE HD BRIDADA DN 4" (100mm.) S/. 560.93 S/. 560.93
04.03.12.05 VALVULA DE ALIVIO DE HD BRIDADA DN 3" (75mm.) S/. 519.65 S/. 519.65
04.03.12.06 TEE DE HD BRIDADA 4"x3" (100x75mm.) PN 16 S/. 611.96 S/. 611.96
04.03.12.07 TEE DE HD DUCTIL BB 4"x4" (100x100mm.) PN 16 S/. 450.22 S/. 450.22
04.03.12.08 UNION FLEXIBLE TIPO DRESSER DE HD DN 3" (75mm.) S/. 196.48 S/. 196.48
04.03.12.09 UNION FLEXIBLE TIPO DRESSER DE HD DN 4" (100mm.) S/. 649.44 S/. 649.44
04.03.12.10 CODO DE HD BRIDADO 4"x45° PN 16 (100mm.) S/. 229.32 S/. 229.32
04.03.12.11 CODO DE HD BRIDADO 3"x90° PN 16 (75mm.) S/. 189.88 S/. 189.88
04.03.12.12 CODO DE HD BRIDADO 4"x90° PN 16 (100mm.) S/. 129.83 S/. 129.83
04.03.12.13 BRIDA DE HD P/FIJACION DN 4" (100mm.) S/. 1,129.68 S/. 1,129.68
04.03.12.14 BRIDA DE HD P/FIJACION DN 3" (75mm.) S/. 85.36 S/. 85.36
04.03.12.15 TRANSICION DE HD DE 4"-3" (100-75mm.) S/. 182.23 S/. 182.23
04.03.12.16 ACOPLE FLEXIBLE GRAN RANGO DN 100mm.) S/. 204.49 S/. 204.49
04.03.12.17 TRANSICION LUFLEX-BRIDA 100-110mm. S/. 194.89 S/. 194.89
04.03.12.18 SENSOR DE PRESION DINAMICA TIPO PIEZORESISTIVO S/. 383.98 S/. 383.98
04.03.12.19 MEDIDOR DE CAUDAL ELECTROMAGNETICO DE HD BRIDADO DN 4" (100mm.) S/. 4,990.49 S/. 4,990.49
04.03.12.20 TUBERIA DE ACERO PARA SOLDAR DN 3" (75mm.) PN 16 S/. 140.06 S/. 140.06
04.03.12.21 TUBERIA DE ACERO PARA SOLDAR DN 4" (100mm.) PN 16 S/. 2,059.19 S/. 2,059.19
04.03.12.22 TUBERIA DE ACERO INOXIDABLE P/SUCCION DN 3" (75mm.) S/. 1,298.14 S/. 1,298.14
04.03.12.23 ELECTROBOMBA S05SM-9R1-3.00-5006SR2T44D-17.5T O SIMILAR, INC. ACCESORIOS S/. 27,018.10 S/. 27,018.10
04.03.12.24 CANASTILLA CONICA DE DN 100mm. S/. 328.98 S/. 328.98
04.03.12.25 ELECTROBOMBA BOOSTER 2HP D=1" - 220V - 60 HZ S/. 5,584.22 S/. 5,584.22
04.03.12.26 TABLERO DE CONTROL AUTOMATICO POZO S/. 2,089.57 S/. 2,089.57
04.03.12.27 DADOS DE ANCLAJE DE CONCRETO P/SOPORTE DE TUBERIA RESERV. S/. 1,664.28 S/. 1,664.28
04.03.12.28 POZO-CONEXION A TIERRA S/. 1,143.55 S/. 1,143.55
04.03.13 EQUIPO DE CLORACION S/. 11,522.22 S/. 11,522.22
04.03.13.01 EJE CABECERO S/. 490.49 S/. 490.49
04.03.13.02 BALANZA DE PLATAFORMA CAP 500 KG (INC. PESAS Y CADENA) S/. 1,490.49 S/. 1,490.49
04.03.13.03 CILINDO DE CLORO CAP 150 LBS S/. 5,310.75 S/. 5,310.75
04.03.13.04 BOCINA TENSORA S/. 590.49 S/. 590.49
04.03.13.05 TANQUE GOTERO Y CAÑERIAS S/. 490.49 S/. 490.49
04.03.13.06 REGULADOR DE CLORO AL VACIO S/. 748.96 S/. 748.96
04.03.13.07 TUERCA TENSORA, REGULADORA Y CONTRATUERCA S/. 395.12 S/. 395.12
04.03.13.08 CANASTILLA CONICA DE D=4" S/. 330.12 S/. 330.12
04.03.13.09 INYECTOR DIFUSOR DE CLORO S/. 1,370.25 S/. 1,370.25
04.03.13.10 GOTERO S/. 305.06 S/. 305.06
04.03.14 SISTEMA DE AGUA POTABLE S/. 757.14 S/. 757.14
04.03.14.01 TUBERIA DE PVC-SAP DN 1/2" PROMEDIO + 1% DESPERDICIOS S/. 113.52 S/. 113.52
04.03.14.02 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" S/. 48.66 S/. 48.66
04.03.14.03 VALVULA DE COMPUERTA DE 1/2" S/. 180.06 S/. 180.06
04.03.14.04 VALVULA CHECK DE BRONCE DE 1/2" S/. 64.56 S/. 64.56
04.03.14.05 ACCESORIOS RED DE DISTRIBUCION AGUA POTABLE S/. 49.16 S/. 49.16
04.03.14.06 GRIFO DE RIEGO DE 1/2" S/. 42.14 S/. 42.14
04.03.14.07 TANQUE ELEVADO DE 250 LTS S/. 259.04 S/. 259.04
04.03.15 SISTEMA DE ALCANTARILLADO S/. 5,448.71 S/. 490.77 S/. 5,939.48
04.03.15.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 106.48 S/. 106.48
04.03.15.02 LIMPIEZA DE TERRENO NORMAL S/. 30.89 S/. 30.89
04.03.15.03 EXCAV. ZANJA (PULSO) EN T. NORMAL S/. 925.65 S/. 925.65
04.03.15.04 REFINE Y NIVELACION ZANJA T. NORMAL PARA TODA PROF. S/. 832.66 S/. 832.66
04.03.15.05 CAMA DE APOYO PARA TUBERIAS (MATERIAL ZARANDEADO) S/. 90.97 S/. 90.97
04.03.15.06 REDES DE DISTRIBUCION: TUBERIA PVC SAL 4" S/. 775.20 S/. 775.20
04.03.15.07 REDES DE DISTRIBUCION: TUBERIA PVC SAL 2" S/. 365.38 S/. 365.38
04.03.15.08 RELLENO COMP. ZANJA (PULSO) T-NORMAL S/. 535.65 S/. 535.65
04.03.15.09 RELLENO TIPO FILTRO DE 1.0 A 5.0 cm. S/. 252.79 S/. 252.79
04.03.15.10 SUMINISTRO DE ACCESORIOS DE DESAGUE S/. 101.82 S/. 101.82
04.03.15.11 CAJAS DE REGISTRO DE 40x60cm. S/. 114.08 S/. 114.08
04.03.15.12 CONTROL DE CAUDALES S/. 42.38 S/. 42.38
04.03.15.13 ACCESORIOS PARA INODORO S/. 21.23 S/. 21.23
04.03.15.14 ACCESORIOS PARA LAVATORIO S/. 22.03 S/. 22.03
04.03.15.15 INODORO TANQUE BAJO BLANCO S/. 291.08 S/. 291.08
04.03.15.16 LAVATORIO DE PARED BLANCO 1 LLAVE S/. 231.08 S/. 231.08
04.03.15.17 COLOCACION DE ACCESORIOS S/. 129.53 S/. 129.53
04.03.15.18 SUMIDERO DE BRONCE 2" S/. 31.83 S/. 31.83
04.03.15.19 REGISTRO DE BRONCE 4" S/. 31.65 S/. 31.65
04.03.15.20 SOMBRERO DE VENTILACION PVC DE 2" S/. 25.56 S/. 25.56
04.03.15.21 BIODIGESTOR DE 600 LTS S/. 490.77 S/. 490.77 S/. 981.54
04.03.16 SISTEMA DE AGUA DE LLUVIA S/. 95.26 S/. 95.26
04.03.16.01 TUBERIA PVC SAL DE 3" S/. 95.26 S/. 95.26
2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
4.04 TANQUE CISTERNA ( 155 M3) S/. 8,054.47 S/. 8,054.47
04.04.01 TRABAJOS PRELIMINARES S/. 106.90 S/. 106.90
04.04.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 65.47 S/. 65.47
04.04.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA S/. 41.43 S/. 41.43
04.04.02 MOVIMIENTO DE TIERRAS S/. 93.20 S/. 93.20
04.04.02.01 EXCAV. ZANJA (MAQ) P/TUB. TERRENO NORMAL S/. 37.32 S/. 37.32
04.04.02.02 ELIMIN. DE DESMONTE EN TERRENO NORMAL R=5KM CON MAQUINA S/. 55.88 S/. 55.88
04.04.03 CONCRETO SIMPLE S/. 3,294.02 S/. 3,294.02
04.04.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES (CEMENTO P-I) S/. 2,884.78 S/. 2,884.78
04.04.03.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOLADOS Y/O SUB BASES S/. 409.24 S/. 409.24
04.04.04 CONCRETO ARMADO S/. 2,860.11 S/. 2,860.11
04.04.04.01 CONCRETO F'C 210 KG/CM2 PARA LOSA MACIZAS (CEMENTO P-I) S/. 241.76 S/. 241.76
04.04.04.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS MACIZAS S/. 194.27 S/. 194.27
04.04.04.03 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS) S/. 194.66 S/. 194.66
04.04.04.04 CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I) S/. 262.29 S/. 262.29
04.04.04.05 ENCOFRADO (I/HABILITACION DE MADERA) PARA COLUMNAS S/. 89.82 S/. 89.82
04.04.04.06 ACERO ESTRUC. TRABAJADO P/COLUMNAS (COSTO PROM. INCL. DESPERDICIOS) S/. 957.11 S/. 957.11
04.04.04.07 CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I) S/. 440.86 S/. 440.86
04.04.04.08 ENCOFRADO (I/HABILITACION DE MADERA) PARA VIGAS RECTAS Y DINTELES TIPO CARAVISTA S/. 193.92 S/. 193.92
04.04.04.09 ACERO ESTRUC. TRABAJADO P/VIGAS (COSTO PROM. INCL. DESPERDICIOS) S/. 285.42 S/. 285.42
04.04.05 REVOQUES ENLUCIDOS Y MOLDURAS S/. 1,458.65 S/. 1,458.65
04.04.05.01 TARRAJEO INTE. C/MORTERO 1:5 X1.5 CM.(INC.COLUMNAS EMPOT) S/. 181.36 S/. 181.36
04.04.05.02 TARRAJEO EXTE. C/MORTERO 1:5 X 1.5CM.(INC.COLUMNAS EMPOT) S/. 1,277.29 S/. 1,277.29
04.04.06 CARPINTERIA METALICA S/. 241.59 S/. 241.59
04.04.06.01 TAPA DE INGRESO 0.70x0.70m S/. 27.86 S/. 27.86
04.04.06.02 ESCALERA MARINERA C/TUBO DE FºGº DE 1/2" S/. 213.73 S/. 213.73
5 CONSTRUCCION DE RESERVORIO PROYECTADO S/. 27,126.25 S/. 122,257.16 S/. 73,930.15 S/. 51,952.65 S/. 123,840.05 S/. 93,635.50 S/. 14,018.71 S/. 506,760.47
5.01 CONSTRUCCION DE TANQUE ELEVADO (170 M3) S/. 27,126.25 S/. 122,257.16 S/. 73,930.15 S/. 51,952.65 S/. 123,840.05 S/. 93,635.50 S/. 14,018.71 S/. 506,760.47
05.01.01 OBRAS PRELIMINARES S/. 1,320.04 S/. 1,320.04
05.01.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 808.47 S/. 808.47
05.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA S/. 511.57 S/. 511.57
05.01.02 MOVIMIENTO DE TIERRAS S/. 9,896.45 S/. 9,896.45
05.01.02.01 EXCAV. ZANJA (MAQ) P/TUB. T-NORMAL DN 200-250 MM H=5.51 A 6.00M PROF. S/. 7,868.51 S/. 7,868.51
05.01.02.02 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL A PULSO S/. 134.17 S/. 134.17
05.01.02.03 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM CON MAQUINA S/. 1,893.77 S/. 1,893.77
05.01.03 OBRAS DE CONCRETO S/. 15,909.76 S/. 122,257.16 S/. 73,930.15 S/. 51,952.65 S/. 119,967.37 S/. 39,552.64 S/. 423,569.73
05.01.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES (CEMENTO P-I) S/. 2,766.44 S/. 2,766.44
05.01.03.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOLADOS Y/O SUB BASES S/. 124.98 S/. 124.98
05.01.03.03 CONCRETO F'C 210 KG/CM2 PARA ZAPATAS (CEMENTO P-I) S/. 37,067.49 S/. 37,067.49
05.01.03.04 ENCOFRADO (I/HABILITACION DE MADERA) PARA ZAPATAS CIRCULARES S/. 1,418.49 S/. 1,418.49
05.01.03.05 ACERO ESTRUC. TRABAJADO P/ZAPATA ARMADA (COSTO PROM. INCL. DESPERDICIOS) S/. 13,018.34 S/. 26,036.68 S/. 39,055.02
05.01.03.06 CONCRETO F'C 210 KG/CM2 PARA LOSA DE FONDO CEMENTO P-I) S/. 20,907.78 S/. 20,907.78
05.01.03.07 ACERO ESTRUC. TRABAJADO P/LOSA FONDO-PISO (COSTO PROM. INCL. DESPERDICIOS) S/. 1,967.88 S/. 1,967.88
05.01.03.08 CONCRETO F'C 210 KG/CM2 PARA FUSTE DE 15.01 A 20 M. S.N.T. (CEMENTO P-I) S/. 9,624.74 S/. 38,498.96 S/. 48,123.70
05.01.03.09 ENCOFRADO (INCL. HABILITACION) PARA MURO CILINDRICO DESDE 15.01 A 20 M. S.N.T. S/. 34,418.99 S/. 10,198.22 S/. 44,617.21
05.01.03.10 ACERO ESTRUC. TRABAJADO P/FUSTE DE 15.01 A 20 M. S.N.T. (COSTO PROM. INCL. DESPERDICIOS) S/. 28,226.06 S/. 29,886.42 S/. 58,112.48
05.01.03.11 CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I) S/. 1,460.04 S/. 1,460.04
05.01.03.12 ENCOFRADO (I/HABILITACION DE MADERA) PARA VIGAS CIRCULARES S/. 978.08 S/. 489.04 S/. 1,467.12
05.01.03.13 ACERO ESTRUC. TRABAJADO P/VIGAS (COSTO PROM. INCL. DESPERDICIOS) S/. 2,277.39 S/. 2,277.39
05.01.03.14 CONCRETO F'C 245 KG/CM2 PARA VIGA DE FUSTE DE 25.01 A 30 M. S.N.T. (CEMENTO P-I) S/. 150.96 S/. 150.96
05.01.03.15 ENCOFRADO (INCL. HABILITACION) DE VIGA CILINDRICA DE FUSTE DESDE 25.01 A 30 M. S.N.T. S/. 145.37 S/. 145.37
05.01.03.16 ACERO ESTRUC. TRABAJADO P/VIGA DE FUSTE DE 25.01 A 30 M. S.N.T. (COSTO PROM. INCL. DESPERDICIOS) S/. 235.99 S/. 235.99
05.01.03.17 CONCRETO F'C 245 KG/CM2 PARA TRONCO CONICO DE 30.01 A 35 M. S.N.T. (CEMENTO P-I) S/. 2,107.17 S/. 2,107.17
05.01.03.18 ENCOFRADO (INCL. HABILITACION) DE TRONCO CONICO DESDE 30.01 A 35 M. S.N.T. S/. 3,350.99 S/. 3,350.99
05.01.03.19 ACERO ESTRUC. TRABAJADO P/TRONCO CONICO DE 30.01 A 35 M. S.N.T. (COSTO PROM. INCL.) S/. 2,237.67 S/. 2,237.67
05.01.03.20 CONCRETO F'C 245 KG/CM2 P/FONDO ESFERICO DE CUBA DE 30.01 A 35 M. S.N.T. (CEMENTO P-I) S/. 6,416.39 S/. 6,416.39
05.01.03.21 ENCOFRADO (INCL. HABILITACION) FONDO ESFERICO DE CUBA DESDE 30.01 A 35 M. S.N.T. S/. 4,950.22 S/. 4,950.22
05.01.03.22 ACERO ESTRUC. TRABAJADO P/FONDO ESFERICO CUBA DE 30.01 A 35 M. S.N.T. (COSTO PROM. INCL. DESPERDICIOS) S/. 14,945.28 S/. 14,945.28
05.01.03.23 CONCRETO F'C 245 KG/CM2 P/FONDO CONICO 30.01 A 35 M. S.N.T. (CEMENTO P-I) S/. 4,283.27 S/. 4,283.27
05.01.03.24 ENCOFRADO (INCL. HABILITACION) FONDO CONICO 30.01 A 35 M. S.N.T. S/. 6,742.11 S/. 6,742.11
05.01.03.25 ACERO ESTRUC. TRABAJADO P/FONDO CONICO 30.01 A 35 M. S.N.T. (COSTO PROM. INCL. DESPERDICIOS) S/. 15,612.16 S/. 15,612.16
05.01.03.26 CONCRETO F'C 245 KG/CM2 PARA VIGA DE MURO CUBA DE 30.01 A 35 M. S.N.T. (CEMENTO P-I) S/. 1,759.89 S/. 1,759.89
05.01.03.27 ENCOFRADO (INCL. HABILITACION) DE VIGA DE MURO CUBA DESDE 30.01 A 35 M. S.N.T. S/. 1,953.12 S/. 1,953.12
05.01.03.28 ACERO ESTRUC. TRABAJADO P/VIGA DE MURO CUBA DE 30.01 A 35 M. S.N.T. (COSTO PROM. INCL.) S/. 3,629.75 S/. 3,629.75
05.01.03.29 CONCRETO F'C 245 KG/CM2 PARA MURO DE CUBA DE 35.01 A 40 M. S.N.T. (CEMENTO P-I) S/. 15,340.49 S/. 15,340.49
05.01.03.30 ENCOFRADO (INCL. HABILITACION) DE CUBIERTA ESFERICA DESDE 40.01 A 45 M. S.N.T. S/. 16,257.53 S/. 5,419.18 S/. 21,676.71
05.01.03.31 ACERO ESTRUC. TRABAJADO P/MURO DE CUBA 35.01 A 40 M. S.N.T. (COSTO PROM. INCL.) S/. 28,014.43 S/. 28,014.43
05.01.03.32 CONCRETO F'C 245 KG/CM2 PARA VIGA DE CUBIERTA DE 35.01 A 40 M. S.N.T. (CEMENTO P-I) S/. 1,721.91 S/. 1,721.91
05.01.03.33 ENCOFRADO (INCL. HABILITACION) DE VIGA DE CUBIERTA DESDE 35.01 A 40 M. S.N.T. S/. 1,576.29 S/. 525.43 S/. 2,101.72
05.01.03.34 ACERO ESTRUC. TRABAJADO P/VIGA CUBIERTA DE 35.01 A 40 M. S.N.T. (COSTO PROM. INCL.) S/. 3,649.70 S/. 3,649.70
05.01.03.35 CONCRETO F'C 210 KG/CM2 PARA CUBIERTA ESFERICA DE 40.01 A 45 M. S.N.T. (CEMENTO P-I) S/. 4,944.08 S/. 4,944.08
05.01.03.36 ENCOFRADO (INCL. HABILITACION) DE CUBIERTA ESFERICA DESDE 40.01 A 45 M. S.N.T. S/. 7,757.20 S/. 7,757.20
05.01.03.37 ACERO ESTRUC. TRABAJADO P/CUBIERTA ESFERICA 40.01 A 45 M. S.N.T. (COSTO PROM. INCL.) S/. 3,844.35 S/. 3,844.35
2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
05.01.03.38 ADITIVO DESMOLDADOR PARA ENCOFRADO TIPO CARAVISTA S/. 6,632.78 S/. 6,632.78
05.01.04 REVOQUES ENLUCIDOS Y MOLDURAS S/. 23,532.24 S/. 23,532.24
05.01.04.01 TARRAJEO CON IMPERMEABILIZANTE PARA LOSA DE FONDO S/. 3,591.63 S/. 3,591.63
05.01.04.02 TARRAJEO CON IMPERMEABILIZANTE DE MUROS DE RESERVORIO ELEVADO S/. 14,873.83 S/. 14,873.83
05.01.04.03 CIELORASO CON MORTERO IMPERMEABILIZANTE S/ESPECIFICACIONES EN RESERVORIO ELEVADO S/. 5,066.78 S/. 5,066.78
05.01.05 ACCESORIOS S/. 14,650.05 S/. 8,999.05 S/. 23,649.10
05.01.05.01 VALVULA DE COMPUERTA DE DN 100 MM S/. 4,535.04 S/. 4,535.04
05.01.05.02 UNION FLEXIBLE TIPO DRESSER DE 100MM S/. 2,676.03 S/. 2,676.03
05.01.05.03 TUBERIA DE HIERRO DUCTIL K-9 DN 100MM INCL. ANILLO + 1% DE DESPERDICIO S/. 2,049.65 S/. 2,049.65
05.01.05.04 TUBERIA DE VENTILACION ACERO SCHEDULE - 40 P/EQ. DN 100MM INC. 1% DESP S/. 240.00 S/. 240.00
05.01.05.05 CODO BB Ho HIERRO DUCTIL DE DN 100MM S/. 1,391.64 S/. 1,391.64
05.01.05.06 TEE BB Ho HIERRO DUCTIL DE DN 100MM S/. 422.40 S/. 422.40
05.01.05.07 CANASTILLA DE 4" S/. 51.32 S/. 51.32
05.01.05.08 UNION FLEXIBLE TIPO DRESSER DE 100MM S/. 382.29 S/. 382.29
05.01.05.09 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 4"(100MM) S/. 2,901.68 S/. 2,901.68
05.01.05.10 PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 4" (100MM.) S/. 395.20 S/. 395.20
05.01.05.11 EMPAQUETADURA DE JEBE ENLONADO DE 4" (100MM) S/. 203.30 S/. 203.30
05.01.05.12 MONTAJE E INSTALACIONES HIDRAULICAS DE CAMARA DE BOMBEO S/. 8,400.55 S/. 8,400.55
05.01.06 CARPINTERIA METALICA S/. 10,030.19 S/. 331.04 S/. 10,361.23
05.01.06.01 ESCALERA CON COBERTURA DE SEGURIDAD S/. 3,951.50 S/. 3,951.50
05.01.06.02 ESCALERA MARINERA C/TUBO DE FºGº DE 1/2" S/. 538.60 S/. 538.60
05.01.06.03 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS DE 3/4" S/. 1,161.81 S/. 1,161.81
05.01.06.04 BARANDA SEGÚN DETALLE DE LOS PLANOS S/. 3,684.18 S/. 3,684.18
05.01.06.05 MARCO Y TAPA PLANCHA LAC 1/4" C/MECANISM. DE SEG. S/DISEÑO S/. 694.10 S/. 694.10
05.01.06.06 VENTILACION CON TUBERIA DE ACERO SEGUN DISEÑO DN 100 S/. 279.80 S/. 279.80
05.01.06.07 CANDADO INCLUYENDO ALDABAS S/. 51.24 S/. 51.24
05.01.07 PINTURA S/. 2,670.98 S/. 3,934.52 S/. 6,605.50
05.01.07.01 PINTADO EXTERIOR C/TEKNOMATE O SIMILAR DE RESERVORIO APOYADO INCL. MENSAJE S/. 1,057.45 S/. 1,057.45
05.01.07.02 PINTADO DE MURO EXTERIOR CON TEKNO MATE O SUPERMATE(SIMILAR) S/. 926.38 S/. 926.38
05.01.07.03 PINTADO EXTERIOR RESERVORIO ELEVADO CON TEKNOMATE O SIMILAR 10.01 M - 15 M S.N.T. S/. 687.15 S/. 687.15 S/. 1,374.30
05.01.07.04 PINTADO EXTERIOR RESERVORIO ELEVADO CON TEKNOMATE O SIMILAR 15.01 M - 20 M S.N.T. S/. 3,247.37 S/. 3,247.37
05.01.08 ADITAMENTOS, VARIOS S/. 3,872.68 S/. 3,199.40 S/. 754.10 S/. 7,826.18
05.01.08.01 PROVISION Y COLOCACION DE JUNTA WATER STOP DE 6" S/. 3,872.68 S/. 3,872.68
05.01.08.02 PRUEBA HIDRAULICA C/EMPLEO DE LA LINEA DE INGRESO(CAPTACION) S/. 384.20 S/. 384.20
05.01.08.03 EVACUACION AGUA DE PRUEBA C/EMPLEO DE LINEA DE SALIDA S/. 127.50 S/. 127.50
05.01.08.04 LIMPIEZA Y DESINFECCION DE RESERVORIOS ELEVADO S/. 242.40 S/. 242.40
05.01.08.05 VEREDA DE CONCRETO f'c=175 kg/cm2 e=0.10 m PASTA 1:2 (C-I) C/EMPLEO DE MEZCLADORA S/. 3,199.40 S/. 3,199.40
6 REDES DE AGUA POTABLE S/. 61,256.57 S/. 141,819.14 S/. 34,847.03 S/. 156,637.33 S/. 389,682.25 S/. 111,900.85 S/. 896,143.17
6.01 LINEA DE ADUCCION S/. 57,622.14 S/. 60,409.51 S/. 118,031.65
06.01.01 OBRAS PRELIMINARES S/. 4,907.89 S/. 4,907.89
06.01.01.01 TRAZO, NIVEL Y REPLANTEO PARA REDES DE AGUA S/. 648.90 S/. 648.90
06.01.01.02 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION - POLVO (Incl. Costo de agua y transp Surtidor a obra) S/. 1,514.10 S/. 1,514.10
06.01.01.03 CERCO DE MALLA HDP DE 1m. ALTURA PARA LIMITE SEGURIDAD OBRA S/. 1,153.60 S/. 1,153.60
06.01.01.04 TRANQUERA TIPO TIJERA 2.40x1.20m. P/SEÑAL DE PELIGRO S/. 905.19 S/. 905.19
06.01.01.05 CARTEL DE INFORMACION DE 0.80x1.20m. S/CARTILLA (prov. durante obra) S/. 686.10 S/. 686.10
06.01.02 MOVIMIENTO DE TIERRAS S/. 19,423.74 S/. 40,159.70 S/. 59,583.44
06.01.02.01 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 110-160 mm. H=0.60 A 1.00m. PROF. S/. 4,838.94 S/. 4,838.94
06.01.02.02 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 110-160 mm. H=0.60 A 1.00m. PROF. S/. 1,668.60 S/. 1,668.60
06.01.02.03 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 110-160 mm. PARA TODA PROF. S/. 12,916.20 S/. 12,916.20
06.01.02.04 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 110 A 160 mm. H=0.60 A 1.00m. S/. 37,708.30 S/. 37,708.30
06.01.02.05 ELIMIN. DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 110-160mm. PARA TODA PROF. S/. 2,451.40 S/. 2,451.40
06.01.03 SUMINISTRO E INSTALACION DE TUBERIA PVC U UF ISO 4422 PN 10 S/. 32,506.80 S/. 16,253.40 S/. 48,760.20
06.01.03.01 TUBERIA DE PVC-U UF NTP ISO 4422 PN 10 DN 160mm. INC. ANILLO + 2% DESPERDICIOS S/. 29,931.80 S/. 14,965.90 S/. 44,897.70
06.01.03.02 INSTALACION DE TUBERIA DE PVC P/AGUA POTAB. DN 160mm. INC. PRUEBA HIDRAULICA S/. 2,575.00 S/. 1,287.50 S/. 3,862.50
06.01.04 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC S/. 783.71 S/. 783.71
06.01.04.01 CODO 90º PVC-U UF NTP ISO 4422 DN 160mm. S/. 47.46 S/. 47.46
06.01.04.02 CODO 22.5º PVC-U UF NTP ISO 4422 DN 160mm. S/. 245.75 S/. 245.75
06.01.04.03 INSTALAC. ACCESORIOS PVC DN 75-160mm. S/. 110.58 S/. 110.58
06.01.04.04 CONCRETO F'C 140 KG/CM2 PARA ANCLAJES DE ACCESORIOS DN 75-160mm. S/. 379.92 S/. 379.92
06.01.05 SUMINISTRO E INSTALACION DE VALVULAS S/. 3,996.41 S/. 3,996.41
06.01.05.01 VALVULA COMPUERTA C-C Ho DUCTIL DN 110 S/. 3,176.58 S/. 3,176.58
06.01.05.02 VALVULA DE BOLA 1/4" DE VUELTA D=25 MM S/. 605.93 S/. 605.93
06.01.05.03 INSTALACION DE VALVULA COMPUERTA DN 63-110 MM INCL REGISTRO S/. 213.90 S/. 213.90
6.02 RED DE DISTRIBUCION S/. 3,634.43 S/. 81,409.63 S/. 34,847.03 S/. 156,637.33 S/. 389,682.25 S/. 111,900.85 S/. 778,111.52
06.02.01 OBRAS PRELIMINARES S/. 3,634.43 S/. 54,143.30 S/. 57,777.73
06.02.01.01 TRAZO, NIVEL Y REPLANTEO PARA REDES DE AGUA S/. 3,634.43 S/. 1,817.21 S/. 5,451.64
06.02.01.02 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION - POLVO (Incl. Costo de agua y transp Surtidor a obra) S/. 12,720.50 S/. 12,720.50
06.02.01.03 CERCO DE MALLA HDP DE 1m. ALTURA PARA LIMITE SEGURIDAD OBRA S/. 9,691.81 S/. 9,691.81
06.02.01.04 TRANQUERA TIPO TIJERA 2.40x1.20m. P/SEÑAL DE PELIGRO S/. 3,017.30 S/. 3,017.30
06.02.01.05 PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/. 3,740.28 S/. 3,740.28
06.02.01.06 PUENTE D/MADERA PASE VEHICULAR SOBRE ZANJA S/. 20,411.80 S/. 20,411.80
06.02.01.07 CARTEL DE INFORMACION DE 0.80x1.20m. S/CARTILLA (prov. durante obra) S/. 2,744.40 S/. 2,744.40
06.02.02 MOVIMIENTO DE TIERRAS S/. 27,266.33 S/. 29,037.41 S/. 79,853.48 S/. 221,413.06 S/. 110,332.25 S/. 467,902.53
2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
06.02.02.01 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 60-90 mm. H=0.60 A 1.00m. PROF. S/. 27,266.33 S/. 27,266.33
06.02.02.02 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 60-90 mm. H=0.60 A 1.00m. PROF. S/. 4,623.69 S/. 4,623.69
06.02.02.03 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 110-160 mm. H=0.60 A 1.00m. PROF. S/. 22,476.12 S/. 22,476.12
06.02.02.04 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 110-160 mm. H=0.60 A 1.00m. PROF. S/. 1,937.60 S/. 5,812.80 S/. 7,750.40
06.02.02.05 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 60-90 mm. PARA TODA PROF. S/. 46,043.60 S/. 46,043.60
06.02.02.06 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 110-160 mm. PARA TODA PROF. S/. 27,997.08 S/. 31,996.66 S/. 59,993.74
06.02.02.07 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 60 A 90 mm. H=0.60 A 1.00m. S/. 107,680.11 S/. 107,680.11
06.02.02.08 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 110 A 160 mm. H=0.60 A 1.00m. S/. 81,736.29 S/. 93,412.91 S/. 175,149.20
06.02.02.09 ELIMIN. DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 60-90mm. PARA TODA PROF. S/. 5,532.97 S/. 5,532.97
06.02.02.10 ELIMIN. DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 110-160mm. PARA TODA PROF. S/. 11,386.37 S/. 11,386.37
06.02.03 SUMINISTRO E INSTALACION DE TUBERIA PVC U UF ISO 4422 PN 10 S/. 5,809.62 S/. 76,783.85 S/. 134,976.80 S/. 217,570.27
06.02.03.01 TUBERIA DE PVC-U UF NTP ISO 4422 PN 10 DN 75mm. INC. ANILLO + 2% DESPERDICIOS S/. 5,809.62 S/. 32,921.17 S/. 38,730.79
06.02.03.02 TUBERIA DE PVC-U UF NTP ISO 4422 PN 10 DN 110mm. INC. ANILLO + 2% DESPERDICIOS S/. 43,862.68 S/. 12,532.20 S/. 56,394.88
06.02.03.03 TUBERIA DE PVC-U UF NTP ISO 4422 PN 10 DN 160mm. INC. ANILLO + 2% DESPERDICIOS S/. 89,441.45 S/. 89,441.45
06.02.03.04 INSTALACION DE TUBERIA DE PVC P/AGUA POTAB. DN 75mm. INC. PRUEBA HIDRAULICA S/. 10,214.71 S/. 10,214.71
06.02.03.05 INSTALACION DE TUBERIA DE PVC P/AGUA POTAB. DN 110mm. INC. PRUEBA HIDRAULICA S/. 8,278.90 S/. 8,278.90
06.02.03.06 INSTALACION DE TUBERIA DE PVC P/AGUA POTAB. DN 160mm. INC. PRUEBA HIDRAULICA S/. 14,509.54 S/. 14,509.54
06.02.04 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC S/. 15,555.20 S/. 15,555.20
06.02.04.01 CRUZ PVC-U UF NTP ISO 4422 DN 75mm. S/. 35.59 S/. 35.59
06.02.04.02 CRUZ PVC-U UF NTP ISO 4422 DN 110mm. S/. 147.45 S/. 147.45
06.02.04.03 CRUZ PVC-U UF NTP ISO 4422 DN 160mm. S/. 115.26 S/. 115.26
06.02.04.04 TEE PVC-U UF NTP ISO 4422 DN 75mm. S/. 228.78 S/. 228.78
06.02.04.05 TEE PVC-U UF NTP ISO 4422 DN 110mm. S/. 711.84 S/. 711.84
06.02.04.06 TEE PVC-U UF NTP ISO 4422 DN 160mm. S/. 648.38 S/. 648.38
06.02.04.07 REDUCCION PVC-U UF NTP ISO 4422 DN 110-75mm. S/. 1,267.86 S/. 1,267.86
06.02.04.08 REDUCCION PVC-U UF NTP ISO 4422 DN 160-75mm. S/. 907.62 S/. 907.62
06.02.04.09 REDUCCION PVC-U UF NTP ISO 4422 DN 160-110mm. S/. 474.60 S/. 474.60
06.02.04.10 CODO 90º PVC-U UF NTP ISO 4422 DN 75mm. S/. 81.36 S/. 81.36
06.02.04.11 CODO 90º PVC-U UF NTP ISO 4422 DN 110mm. S/. 32.20 S/. 32.20
06.02.04.12 CODO 90º PVC-U UF NTP ISO 4422 DN 160mm. S/. 47.46 S/. 47.46
06.02.04.13 CODO 22.5º PVC-U UF NTP ISO 4422 DN 75mm. S/. 58.24 S/. 58.24
06.02.04.14 CODO 22.5º PVC-U UF NTP ISO 4422 DN 110mm. S/. 68.40 S/. 68.40
06.02.04.15 CODO 22.5º PVC-U UF NTP ISO 4422 DN 160mm. S/. 98.30 S/. 98.30
06.02.04.16 TAPON PVC-U UF NTP ISO 4422 DN 75mm. S/. 105.12 S/. 105.12
06.02.04.17 TAPON PVC-U UF NTP ISO 4422 DN 110mm. S/. 103.81 S/. 103.81
06.02.04.18 TAPON PVC-U UF NTP ISO 4422 DN 160mm. S/. 40.68 S/. 40.68
06.02.04.19 INSTALAC. ACCESORIOS PVC DN 75-160mm. S/. 2,340.61 S/. 2,340.61
06.02.04.20 CONCRETO F'C 140 KG/CM2 PARA ANCLAJES DE ACCESORIOS DN 75-160mm. S/. 8,041.64 S/. 8,041.64
06.02.05 SUMINISTRO E INSTALACION DE VALVULAS S/. 17,737.19 S/. 1,568.60 S/. 19,305.79
06.02.05.01 VALVULA DE COMPUERTA DE DN 75 MM S/. 10,677.90 S/. 10,677.90
06.02.05.02 VALVULA DE COMPUERTA DE DN 110MM S/. 7,059.29 S/. 7,059.29
06.02.05.03 INSTALACION DE VALVULA COMPUERTA DN 63-110 MM INCL REGISTRO S/. 1,568.60 S/. 1,568.60
7 CONEXIONES DOMICILIARIAS DE AGUA POTABLE S/. 56,506.66 S/. 64,579.03 S/. 121,085.69
7.01 CONEXION DOMICILIARIA DE AGUA DN 15 MM T NORMAL S/. 56,506.66 S/. 64,579.03 S/. 121,085.69
SISTEMA DE ALCANTARILLADO Y PLATA DE TRATAMIENTO S/. 82,256.48 S/. 298,415.12 S/. 545,854.56 S/. 453,563.46 S/. 208,819.49 S/. 234,354.91 S/. 287,649.34 S/. 21,608.90 S/. 2,132,522.26
1 RED DE ALCANTARILLADO S/. 82,256.48 S/. 294,676.14 S/. 535,091.95 S/. 406,812.65 S/. 102,785.18 S/. 37,792.93 S/. 1,459,415.33
1.01 OBRAS PRELIMINARES S/. 28,399.76 S/. 28,399.76
01.01.01 TRAZO, NIVEL Y REPLANTEO PARA REDES DE ALCANTARILLADO S/. 6,147.57 S/. 6,147.57
01.01.02 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA S/. 5,887.81 S/. 5,887.81
01.01.03 TRANQUERA TIPO TIJERA 2.40X1.20M P/SEÑAL DE PELIGRO S/. 1,206.92 S/. 1,206.92
01.01.04 PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/. 623.38 S/. 623.38
01.01.05 PUENTE D/MADERA PASE VEHICULAR SOBRE ZANJA S/. 12,247.08 S/. 12,247.08
01.01.06 CARTEL DE INFORMACION DE 0.80x1.20m S/CARTILLA (prov.durante obra) S/. 2,287.00 S/. 2,287.00
1.02 MOVIMIENTO DE TIERRAS S/. 53,062.38 S/. 205,917.69 S/. 213,473.62 S/. 82,586.98 S/. 37,046.74 S/. 592,087.41
01.02.01 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=1.00 A 1.25m. PROF. S/. 3,197.12 S/. 3,197.12
01.02.02 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=1.00 A 1.25m PROF. S/. 2,173.06 S/. 2,173.06
01.02.03 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=1.26 A 1.50m. PROF. S/. 10,994.48 S/. 10,994.48
01.02.04 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=1.26 A 1.50m. PROF. S/. 7,455.02 S/. 7,455.02
01.02.05 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=1.51 A 2.00m. PROF. S/. 20,927.90 S/. 2,989.70 S/. 23,917.60
01.02.06 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=1.51 A 2.00m. PROF. S/. 17,680.94 S/. 17,680.94
01.02.07 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=2.01 A 2.50m. PROF. S/. 19,482.23 S/. 19,482.23
01.02.08 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=2.01 A 2.50m. PROF. S/. 18,438.76 S/. 18,438.76
01.02.09 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=2.51 A 3.00m. PROF. S/. 34,629.37 S/. 34,629.37
01.02.10 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=2.51 A 3.00m. PROF. S/. 5,473.91 S/. 27,369.57 S/. 32,843.48
01.02.11 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=3.01 A 3.50m. PROF. S/. 3,431.77 S/. 13,727.07 S/. 17,158.84
01.02.12 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=3.01 A 3.50m. PROF. S/. 19,308.57 S/. 19,308.57
01.02.13 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=3.51 A 4.00m. PROF. S/. 12,647.37 S/. 12,647.37
01.02.14 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=3.51 A 4.00m. PROF. S/. 14,849.35 S/. 14,849.35
01.02.15 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=4.01 A 4.50m. PROF. S/. 1,841.94 S/. 613.98 S/. 2,455.92
01.02.16 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=4.01 A 4.50m. PROF. S/. 3,077.35 S/. 3,077.35
01.02.17 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 200-315mm. PARA TODA PROF. S/. 2,825.22 S/. 3,852.57 S/. 3,980.99 S/. 770.51 S/. 11,429.29
01.02.18 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=1.00 A 1.25m. S/. 5,489.58 S/. 2,744.79 S/. 8,234.37
01.02.19 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=1.26 A 1.50m. S/. 27,864.74 S/. 27,864.74
2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
01.02.20 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=1.51 A 2.00m. S/. 59,683.16 S/. 59,683.16
01.02.21 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=2.01 A 2.50m. S/. 9,645.75 S/. 38,583.02 S/. 48,228.77
01.02.22 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=2.51 A 3.00m. S/. 81,165.74 S/. 4,271.88 S/. 85,437.62
01.02.23 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=3.01 A 3.50m. S/. 39,963.85 S/. 39,963.85
01.02.24 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=3.51 A 4.00m. S/. 30,697.60 S/. 30,697.60
01.02.25 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=4.01 A 4.50m. S/. 3,191.81 S/. 3,191.81 S/. 6,383.62
01.02.26 ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 200 A 315mm. P/TODA PROF. S/. 33,854.93 S/. 33,854.93
1.03 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 S/. 68,582.07 S/. 148,540.09 S/. 121,691.72 S/. 20,198.20 S/. 746.19 S/. 359,758.27
01.03.01 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 200mm. INC. ANILLO + 2% DESPERDICIOS S/. 64,162.24 S/. 137,490.51 S/. 4,583.02 S/. 206,235.77
01.03.02 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 250mm. INC. ANILLO + 2% DESPERDICIOS S/. 67,631.79 S/. 67,631.79
01.03.03 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 315mm. INC. ANILLO + 2% DESPERDICIOS S/. 38,697.69 S/. 12,899.23 S/. 51,596.92
01.03.04 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HIDRAULICA S/. 4,419.83 S/. 11,049.58 S/. 9,576.30 S/. 25,045.71
01.03.05 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250mm. INC. PRUEBA HIDRAULICA S/. 1,202.92 S/. 4,811.68 S/. 6,014.60
01.03.06 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 315mm. INC. PRUEBA HIDRAULICA S/. 2,487.29 S/. 746.19 S/. 3,233.48
1.04 CONSTRUCCION DE BUZONES S/. 53,856.72 S/. 173,031.69 S/. 180,634.17 S/. 71,647.31 S/. 479,169.89
01.04.01 BUZON TIPO I T-NORMAL A MAQ. 1.01 A 1.20m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) S/. 15,877.26 S/. 15,877.26
01.04.02 BUZON TIPO I T-NORMAL A MAQ. 1.21 A 1.50m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) S/. 37,979.46 S/. 37,979.46 S/. 75,958.92
01.04.03 BUZON TIPO I T-NORMAL A MAQ. 1.51 A 2.00m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) S/. 103,416.28 S/. 103,416.28
01.04.04 BUZON TIPO I T-NORMAL A MAQ. 2.01 A 2.50m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) S/. 31,635.95 S/. 21,090.64 S/. 52,726.59
01.04.05 BUZON TIPO I T-NORMAL A MAQ. 2.51 A 3.00m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) S/. 115,359.60 S/. 115,359.60
01.04.06 BUZON TIPO I T-NORMAL A MAQ. 3.01 A 3.50m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) S/. 44,183.93 S/. 14,727.98 S/. 58,911.91
01.04.07 BUZON TIPO I T-NORMAL A MAQ. 3.51 A 4.00m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) S/. 41,837.85 S/. 41,837.85
01.04.08 BUZON TIPO I T-NORMAL A MAQ. 4.01 A 4.50m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) S/. 15,081.48 S/. 15,081.48
2 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO S/. 25,400.52 S/. 78,741.62 S/. 48,260.99 S/. 152,403.13
2.01 CONEXION DOMICILIARIA DE DESAGUE DN 160 mm. T-NORMAL S/. 25,400.52 S/. 78,741.62 S/. 48,260.99 S/. 152,403.13
3 PLANTA TRATAMIENTO DE AGUAS RESIDUALES S/. 30,725.71 S/. 54,492.73 S/. 110,225.00 S/. 239,388.35 S/. 21,608.90 S/. 456,440.69
3.01 CONSTRUCCION DE CAMARA DE REJAS S/. 28,029.30 S/. 8,487.08 S/. 36,516.38
03.01.01 OBRAS PRELIMINARES S/. 56.27 S/. 56.27
03.01.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 34.46 S/. 34.46
03.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA S/. 21.81 S/. 21.81
03.01.02 MOVIMIENTO DE TIERRAS S/. 448.97 S/. 448.97
03.01.02.01 EXCAV. ZANJA (MAQ) P/TUB. T-NORMAL DN 200-250 mm. H=4.01 A 5.00m. PROF. S/. 247.91 S/. 247.91
03.01.02.02 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL A PULSO S/. 5.72 S/. 5.72
03.01.02.03 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM CON MAQUINA S/. 195.34 S/. 195.34
03.01.03 OBRAS DE CONCRETO S/. 25,401.85 S/. 25,401.85
03.01.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES (CEMENTO P-I) S/. 537.30 S/. 537.30
03.01.03.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOLADOS Y/O SUB BASES S/. 67.37 S/. 67.37
03.01.03.03 CONCRETO F'C 210 KG/CM2 P/LOSA DE FONDO-BASE DE BUZONES, CAMARAS, CAJAS (CEMENTO P-I) S/. 1,184.68 S/. 1,184.68
03.01.03.04 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS FONDO BUZON, CAMARA, CAJA S/. 101.37 S/. 101.37
03.01.03.05 ACERO ESTRUC. TRABAJADO P/LOSA FONDO-BASE DE BUZON,CAMARA,CAJA (COSTO PROM. INCL. DESPERDICIOS) S/. 1,964.98 S/. 1,964.98
03.01.03.06 CONCRETO F'C 210 KG/CM2 PARA MUROS DE BUZONES, CAMARAS, CAJAS (CEMENTO P-I) S/. 6,924.46 S/. 6,924.46
03.01.03.07 ENCOFRADO (I/HABILITACION DE MADERA) PARA MURO CARAVISTA DE BUZONES, CAMARAS, CAJAS S/. 8,176.15 S/. 8,176.15
03.01.03.08 ACERO ESTRUC. TRABAJADO P/MURO DE BUZONES CAMARAS, CAJAS (COSTO PROM. INCL. DESPERDICIOS) S/. 5,493.70 S/. 5,493.70
03.01.03.09 CONCRETO F'C 210 KG/CM2 PARA LOSA MACIZAS DE BUZONES, CAMARAS, CAJAS (CEMENTO P-I) S/. 37.87 S/. 37.87
03.01.03.10 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS MACIZAS DE BUZONES, CAMARAS, CAJAS S/. 47.42 S/. 47.42
03.01.03.11 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS DE BUZONES, CAMARAS (COSTO PROM. INCL. DESPERDICIOS) S/. 29.42 S/. 29.42
03.01.03.12 ADITIVO DESMOLDADOR PARA ENCOFRADO TIPO CARAVISTA S/. 837.13 S/. 837.13
03.01.04 REVOQUES ENLUCIDOS Y MOLDURAS S/. 2,122.21 S/. 25.20 S/. 2,147.41
03.01.04.01 TARRAJEO CON IMPERMEABILIZANTE PARA LOSA DE FONDO S/. 25.20 S/. 25.20
03.01.04.02 TARRAJEO IMPERMEABILIZANTE P/MUROS RESERVORIO APOYADO S/. 2,122.21 S/. 2,122.21
03.01.05 ADITAMENTOS, VARIOS S/. 8,461.88 S/. 8,461.88
03.01.05.01 COMPUERTAS TIPO PLANCHA METALICA S/. 4,820.48 S/. 4,820.48
03.01.05.02 REJA MANUAL SEGUN DISEÑO S/. 3,641.40 S/. 3,641.40
3.02 CAMARA DE HUMEDA S/. 2,696.41 S/. 46,005.65 S/. 4,487.80 S/. 53,189.86
03.02.01 OBRAS PRELIMINARES S/. 146.40 S/. 146.40
03.02.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 89.66 S/. 89.66
03.02.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA S/. 56.74 S/. 56.74
03.02.02 MOVIMIENTO DE TIERRAS S/. 2,550.01 S/. 2,024.96 S/. 4,574.97
03.02.02.01 EXCAV. ZANJA (MAQ) P/TUB. T-NORMAL DN 200-250 mm. H=5.51 A 6.00m. PROF. S/. 2,550.01 S/. 2,550.01
03.02.02.02 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL A PULSO S/. 14.88 S/. 14.88
03.02.02.03 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM CON MAQUINA S/. 2,010.08 S/. 2,010.08
03.02.03 OBRAS DE CONCRETO S/. 39,105.51 S/. 39,105.51
03.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES (CEMENTO P-I) S/. 307.03 S/. 307.03
03.02.03.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOLADOS Y/O SUB BASES S/. 39.98 S/. 39.98
03.02.03.03 CONCRETO F'C 210 KG/CM2 P/LOSA DE FONDO-BASE DE BUZONES, CAMARAS, CAJAS (CEMENTO P-I) S/. 1,339.81 S/. 1,339.81
03.02.03.04 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS FONDO BUZON, CAMARA, CAJA S/. 60.13 S/. 60.13
03.02.03.05 ACERO ESTRUC. TRABAJADO P/LOSA FONDO-BASE DE BUZON,CAMARA,CAJA (COSTO PROM. INCL. DESPERDICIOS) S/. 1,225.80 S/. 1,225.80
03.02.03.06 CONCRETO F'C 210 KG/CM2 PARA MUROS DE BUZONES, CAMARAS, CAJAS (CEMENTO P-I) S/. 8,586.14 S/. 8,586.14
03.02.03.07 ENCOFRADO (I/HABILITACION DE MADERA) PARA MURO CARAVISTA DE BUZONES, CAMARAS, CAJAS S/. 4,731.36 S/. 4,731.36
03.02.03.08 ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS) S/. 20,408.63 S/. 20,408.63
03.02.03.09 CONCRETO F'C 210 KG/CM2 PARA LOSA MACIZAS DE BUZONES, CAMARAS, CAJAS (CEMENTO P-I) S/. 899.48 S/. 899.48
03.02.03.10 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS MACIZAS DE BUZONES, CAMARAS, CAJAS S/. 293.84 S/. 293.84
03.02.03.11 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS DE BUZONES, CAMARAS (COSTO PROM. INCL. DESPERDICIOS) S/. 725.87 S/. 725.87
2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
03.02.03.12 ADITIVO DESMOLDADOR PARA ENCOFRADO TIPO CARAVISTA S/. 487.44 S/. 487.44
03.02.04 REVOQUES ENLUCIDOS Y MOLDURAS S/. 3,404.66 S/. 218.61 S/. 3,623.27
03.02.04.01 TARRAJEO CON IMPERMEABILIZANTE PARA LOSA DE FONDO S/. 218.61 S/. 218.61
03.02.04.02 TARRAJEO IMPERMEABILIZANTE P/MUROS RESERVORIO APOYADO S/. 3,404.66 S/. 3,404.66
03.02.05 ACCESORIOS S/. 3,924.06 S/. 3,924.06
03.02.05.01 DISTRIBUIDOR DE CAUDAL S/. 450.12 S/. 450.12
03.02.05.02 COMPUERTAS TIPO PLANCHA METALICA S/. 2,410.24 S/. 2,410.24
03.02.05.03 COMPUERTA PLANCHA METALICA DE ACERO INOXIDABLE 48"x2 3/4" x 1/8" S/. 980.12 S/. 980.12
03.02.05.04 TAPA DE INGRESO 0.70x0.70m S/. 83.58 S/. 83.58
03.02.06 ADITAMENTOS, VARIOS S/. 1,470.52 S/. 345.13 S/. 1,815.65
03.02.06.01 WATER STOP DE NEOPRENE DE 6". PROVISION Y COLOCADO DE JUNTA S/. 1,470.52 S/. 1,470.52
03.02.06.02 LIMPIEZA Y DESINFECCION DE FILTRO BILOGICO APOYADOS S/. 345.13 S/. 345.13
3.03 CAMARA DE BOMBEO PTAR S/. 14,100.14 S/. 1,937.06 S/. 16,037.20
03.03.01 OBRAS PRELIMINARES S/. 155.70 S/. 155.70
03.03.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 95.36 S/. 95.36
03.03.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA S/. 60.34 S/. 60.34
03.03.02 MOVIMIENTO DE TIERRAS S/. 436.50 S/. 436.50
03.03.02.01 EXCAVACIONES EN TERRENO NORMAL A PULSO HASTA 1.50M PROFUNTIDAD S/. 226.15 S/. 226.15
03.03.02.02 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL A PULSO S/. 15.83 S/. 15.83
03.03.02.03 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM CON MAQUINA S/. 194.52 S/. 194.52
03.03.03 OBRAS DE CONCRETO S/. 9,267.29 S/. 9,267.29
03.03.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES (CEMENTO P-I) S/. 326.22 S/. 326.22
03.03.03.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOLADOS Y/O SUB BASES S/. 41.24 S/. 41.24
03.03.03.03 CONCRETO F'C 210 KG/CM2 P/LOSA DE FONDO-BASE DE BUZONES, CAMARAS, CAJAS (CEMENTO P-I) S/. 959.02 S/. 959.02
03.03.03.04 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS FONDO BUZON, CAMARA, CAJA S/. 82.48 S/. 82.48
03.03.03.05 CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I) S/. 598.30 S/. 598.30
03.03.03.06 ENCOFRADO (I/HABILITACION DE MADERA) PARA VIGAS RECTAS Y DINTELES TIPO CARAVISTA S/. 438.55 S/. 438.55
03.03.03.07 ACERO ESTRUC. TRABAJADO P/VIGAS (COSTO PROM. INCL. DESPERDICIOS) S/. 2,154.36 S/. 2,154.36
03.03.03.08 CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I) S/. 317.42 S/. 317.42
03.03.03.09 ENCOFRADO (I/HABILITACION DE MADERA) PARA COLUMNAS S/. 223.64 S/. 223.64
03.03.03.10 ACERO ESTRUC. TRABAJADO P/COLUMNAS (COSTO PROM. INCL. DESPERDICIOS) S/. 813.80 S/. 813.80
03.03.03.11 CONCRETO F'C 210 KG/CM2 PARA LOSA MACIZAS (CEMENTO P-I) S/. 872.34 S/. 872.34
03.03.03.12 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS MACIZAS S/. 487.39 S/. 487.39
03.03.03.13 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS DE BUZONES, CAMARAS (COSTO PROM. INCL. DESPERDICIOS) S/. 1,225.28 S/. 1,225.28
03.03.03.14 CONCRETO F'C 210 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I) S/. 313.89 S/. 313.89
03.03.03.15 ENCOFRADO (I/HABILITACION DE MADERA) PARA ANCLAJE Y/O DADOS S/. 159.09 S/. 159.09
03.03.03.16 ACERO ESTRUC. TRABAJADO P/ANCLAJE REF. (COSTO PROM. INCL. DESPERDICIOS) S/. 126.27 S/. 126.27
03.03.03.17 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS) S/. 128.00 S/. 128.00
03.03.04 MUROS Y TABIQUES DE ALBAÑILERIA S/. 2,869.21 S/. 2,869.21
03.03.04.01 MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:4 X 1.5CM. S/. 2,869.21 S/. 2,869.21
03.03.05 REVOQUES ENLUCIDOS Y MOLDURAS S/. 394.99 S/. 394.99
03.03.05.01 TARRAJEO INTE. C/MORTERO 1:5 X1.5 CM.(INC.COLUMNAS EMPOT) S/. 16.46 S/. 16.46
03.03.05.02 TARRAJEO EXTE. C/MORTERO 1:5 X 1.5CM.(INC.COLUMNAS EMPOT) S/. 192.10 S/. 192.10
03.03.05.03 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. S/. 17.50 S/. 17.50
03.03.05.04 CIELO RASO INCL. VIGAS EMPOTRADAS C/MORTERO 1:4 ,1.5CM. S/. 168.93 S/. 168.93
03.03.06 PISOS Y PAVIMENTOS S/. 41.21 S/. 41.21
03.03.06.01 FALSO PISO DE CONCRETO 1:10 DE ESPESOR 4" (CEMENTO P I) S/. 19.55 S/. 19.55
03.03.06.02 CONTRAPISO DE 48 mm C/MORTERO 1:5 x 38 mm EN BASE 1:2 x 10 mm ACABADO S/. 21.66 S/. 21.66
03.03.07 CARPINTERIA METALICA S/. 1,937.06 S/. 1,937.06
03.03.07.01 PUERTA METAL LAC 1/8" C/MARCO 2"X2"X1/4" Y REFUERZOS S/. 1,734.79 S/. 1,734.79
03.03.07.02 VENTANA DE FIERRO C/PERFIL "L" DE 2"X1/4"FIJA+FIERRO CORRUGADO DE 3/4" S/. 147.40 S/. 147.40
03.03.07.03 CERRADURA PARA EXTERIOR, C/LLAVES INTER. Y EXTERIOR DE 2 GOLPES S/. 54.87 S/. 54.87
03.03.08 PINTURA S/. 450.11 S/. 450.11
03.03.08.01 PINTADO DE CIELO RASO C/TEKNOMATE O SUPERMATE (SIMILAR) S/. 206.99 S/. 206.99
03.03.08.02 PINTADO DE MURO INTERIOR CON TEKNO MATE O SUPERMATE(SIMILAR) S/. 188.14 S/. 188.14
03.03.08.03 PINTADO DE MURO EXTERIOR CON TEKNO MATE O SUPERMATE(SIMILAR) S/. 23.71 S/. 23.71
03.03.08.04 PINTADO DE PUERTAS METALICAS LAC (2 MANOS ANTIC.+2 ESMALTE) S/. 27.58 S/. 27.58
03.03.08.05 PINTADO DE VENTANAS METALICAS (2 MANOS ANTIC.+2 ESMALTE) S/. 3.69 S/. 3.69
03.03.09 ADITAMENTOS, VARIOS S/. 485.13 S/. 485.13
03.03.09.01 TEJA ANDINA S/. 485.13 S/. 485.13
3.04 CONSTRUCCION DE UASB S/. 76,195.97 S/. 26,650.48 S/. 102,846.45
03.04.01 OBRAS PRELIMINARES S/. 651.94 S/. 651.94
03.04.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 399.29 S/. 399.29
03.04.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA S/. 252.65 S/. 252.65
03.04.02 MOVIMIENTO DE TIERRAS S/. 7,423.20 S/. 7,423.20
03.04.02.01 EXCAVACIONES EN T NORMAL CON CARGADOR RETROEXCAV 0.75-1.60 YD3 S/. 1,534.19 S/. 1,534.19
03.04.02.02 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL A PULSO S/. 66.26 S/. 66.26
03.04.02.03 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM CON MAQUINA S/. 5,822.75 S/. 5,822.75
03.04.03 OBRAS DE CONCRETO S/. 67,215.51 S/. 11,766.23 S/. 78,981.74
03.04.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES (CEMENTO P-I) S/. 5,017.98 S/. 5,017.98
03.04.03.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOLADOS Y/O SUB BASES S/. 137.88 S/. 137.88
03.04.03.03 CONCRETO F'C 245 KG/CM2 PARA LOSA DE FONDO CEMENTO P-V) S/. 9,854.98 S/. 9,854.98
03.04.03.04 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS FONDO BUZON,CAMARA S/. 520.34 S/. 520.34
2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
03.04.03.05 ACERO ESTRUC. TRABAJADO P/LOSA FONDO-PISO (COSTO PROM. INCL. DESPERDICIOS) S/. 5,988.96 S/. 5,988.96
03.04.03.06 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS(CEMENTO P-I) S/. 8,424.96 S/. 8,424.96
03.04.03.07 ENCOFRADO (I/HABILITACION DE MADERA) PARA MUROS RECTOS S/. 13,878.57 S/. 13,878.57
03.04.03.08 ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS) S/. 16,411.48 S/. 16,411.48
03.04.03.09 CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I) S/. 146.15 S/. 146.15
03.04.03.10 ENCOFRADO (I/HABILITACION DE MADERA) PARA VIGAS RECTAS Y DINTELES TIPO CARAVISTA S/. 158.13 S/. 158.13
03.04.03.11 ACERO ESTRUC. TRABAJADO P/VIGAS (COSTO PROM. INCL. DESPERDICIOS) S/. 176.02 S/. 176.02
03.04.03.12 CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I) S/. 387.30 S/. 387.30
03.04.03.13 ENCOFRADO (I/HABILITACION DE MADERA) PARA COLUMNAS S/. 445.52 S/. 445.52
03.04.03.14 ACERO ESTRUC. TRABAJADO P/COLUMNAS (COSTO PROM. INCL. DESPERDICIOS) S/. 683.24 S/. 683.24
03.04.03.15 CONCRETO F'C 245 KG/CM2 PARA LOSA MACIZAS (CEMENTO P-V) S/. 11,620.08 S/. 11,620.08
03.04.03.16 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS MACIZAS S/. 2,687.33 S/. 2,687.33
03.04.03.17 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS) S/. 823.21 S/. 823.21
03.04.03.18 ADITIVO DESMOLDADOR PARA ENCOFRADO TIPO CARAVISTA S/. 1,619.61 S/. 1,619.61
03.04.04 REVOQUES ENLUCIDOS Y MOLDURAS S/. 11,556.36 S/. 11,556.36
03.04.04.01 TARRAJEO CON IMPERMEABILIZANTE PARA LOSA DE FONDO S/. 956.34 S/. 956.34
03.04.04.02 TARRAJEO IMPERMEABILIZANTE P/MUROS RESERVORIO APOYADO S/. 10,600.02 S/. 10,600.02
03.04.05 ACCESORIOS S/. 2,982.76 S/. 2,982.76
03.04.05.01 DISTRIBUIDOR DE CAUDAL S/. 450.12 S/. 450.12
03.04.05.02 COMPUERTA PLANCHA METALICA DE ACERO INOXIDABLE 48"x2 3/4" x 1/8" S/. 1,960.24 S/. 1,960.24
03.04.05.03 TAPA DE INGRESO 0.17x0.40 m S/. 386.40 S/. 386.40
03.04.05.04 TAPA DE INGRESO 0.35x1.00m S/. 186.00 S/. 186.00
03.04.06 ADITAMENTOS, VARIOS S/. 905.32 S/. 345.13 S/. 1,250.45
03.04.06.01 PROVISION Y COLOCACION DE JUNTA WATER STOP DE 6" S/. 905.32 S/. 905.32
03.04.06.02 LIMPIEZA Y DESINFECCION DE FILTRO BILOGICO APOYADOS S/. 345.13 S/. 345.13
3.05 INSTALACIONES HIDRAULICAS, LINEAS DE INTERCONEXION , EMISOR EFLUENTE S/. 15,441.09 S/. 130,614.21 S/. 146,055.30
03.05.01 OBRAS PRELIMINARES S/. 461.33 S/. 461.33
03.05.01.01 TRAZO, NIVEL Y REPLANTEO PARA REDES DE ALCANTARILLADO S/. 81.64 S/. 81.64
03.05.01.02 CINTAS PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA S/. 68.00 S/. 68.00
03.05.01.03 PUENTE D/MADERA PASE PEATONAL SOBRE ZANJA S/. 311.69 S/. 311.69
03.05.02 MOVIMIENTO DE TIERRAS S/. 919.02 S/. 1,739.73 S/. 2,658.75
03.05.02.01 EXCAV. ZANJA (MAQ) P/TUB.T NORMAL DN 160-250 MM H=1.01 A 1.25M S/. 626.71 S/. 626.71
03.05.02.02 EXCAV ZANJA (PULSO) P/TUB. T-NORMAL DN 160 - 250 DE 1.01m A 1.25m PROF. S/. 189.38 S/. 189.38
03.05.02.03 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 160-250 PARA TODA PROF. S/. 102.93 S/. 102.93
03.05.02.04 RELLENO COMP. ZANJA (PULSO) T-NORMAL- DN 160 A 250MM H=1.01 A 1.25M. PROF. S/. 1,434.83 S/. 1,434.83
03.05.02.05 ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 160-250 P/TODA PROF. S/. 304.90 S/. 304.90
03.05.03 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 S/. 2,836.77 S/. 3,629.54 S/. 6,466.31
03.05.03.01 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 200mm. INC. ANILLO + 2% DESPERDICIOS S/. 2,465.73 S/. 2,465.73
03.05.03.02 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HIDRAULICA S/. 299.44 S/. 299.44
03.05.03.03 TUBERIA DE ACERO SCHEDULE - 40 P/EQ. DN 200MM INC. 1% DESP S/. 264.50 S/. 264.50
03.05.03.04 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 160mm. INC. ANILLO + 2% DESPERDICIOS S/. 106.54 S/. 106.54 S/. 213.08
03.05.03.05 TUBERIA DE HIERRO DUCTIL K-9 DN 100MM INCL. ANILLO + 1% DE DESPERDICIO S/. 2,037.57 S/. 2,037.57
03.05.03.06 TUBERIA DE POLITILENO DE MEDIANA DENSIDAD DE 63 MM S/. 1,185.99 S/. 1,185.99
03.05.04 ACCESORIOS S/. 4,167.41 S/. 17,785.82 S/. 21,953.23
03.05.04.01 BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 200 MM S/. 165.40 S/. 165.40
03.05.04.02 BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 100 MM S/. 305.44 S/. 305.44
03.05.04.03 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 8"(200MM) S/. 152.40 S/. 152.40
03.05.04.04 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 4"(100MM) S/. 1,603.56 S/. 1,603.56
03.05.04.05 CODO 90º GAS TOPE DN 63 S/. 293.76 S/. 293.76
03.05.04.06 TEE GAS TOPE DN 63 S/. 101.25 S/. 101.25
03.05.04.07 VALVULA DE COMPUERTA DE 2" GAS S/. 1,545.60 S/. 1,545.60
03.05.04.08 VALVULA DE COMPUERTA DE DN 150 MM S/. 9,226.16 S/. 9,226.16
03.05.04.09 VALVULA DE COMPUERTA DE DN 100 MM S/. 1,133.76 S/. 1,133.76
03.05.04.10 UNION FLEXIBLE TIPO DRESSER DE 100MM S/. 377.98 S/. 377.98
03.05.04.11 CODO BB Ho HIERRO DUCTIL DE DN 100MM S/. 231.94 S/. 231.94
03.05.04.12 REDUCCION BB Ho HIERRO DUCTIL DE DN 150X100MM S/. 255.80 S/. 255.80
03.05.04.13 YEE BB Ho HIERRO DUCTIL DE DN 150MM S/. 1,173.60 S/. 1,173.60
03.05.04.14 UNION FLEXIBLE TIPO DRESSER DE 150MM S/. 651.04 S/. 651.04
03.05.04.15 CODO BB Ho HIERRO DUCTIL DE DN 200MM S/. 304.15 S/. 304.15
03.05.04.16 CODO BB Ho HIERRO DUCTIL DE DN 150MM S/. 1,809.60 S/. 1,809.60
03.05.04.17 CODO BB Ho HIERRO DUCTIL DE DN 100MM S/. 1,391.64 S/. 1,391.64
03.05.04.18 TEE BB Ho HIERRO DUCTIL DE DN 100MM S/. 704.00 S/. 704.00
03.05.04.19 PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 8" (200MM.) S/. 68.16 S/. 68.16
03.05.04.20 PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DE 4" (100MM.) S/. 260.00 S/. 260.00
03.05.04.21 EMPAQUETADURA DE JEBE ENLONADO DE 8" (200MM) S/. 64.24 S/. 64.24
03.05.04.22 EMPAQUETADURA DE JEBE ENLONADO DE 4" (100MM) S/. 133.75 S/. 133.75
03.05.05 CONSTRUCCION DE BUZONES TIPO I S/. 7,056.56 S/. 7,056.56
03.05.05.01 BUZON TIPO I T-NORMAL A MAQ. 1.01 A 1.20m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) S/. 7,056.56 S/. 7,056.56
03.05.06 VARIOS S/. 107,459.12 S/. 107,459.12
03.05.06.01 QUEMADOR DE GAS S/. 9,192.02 S/. 9,192.02
03.05.06.02 ALMACEN DE GAS Y SELLO HIDRAULICO S/. 11,419.10 S/. 11,419.10
03.05.06.03 PRUEBA HIDRAULICA TUBERIA P/DESAGUE DN 200MM A ZANJA TAPADA S/. 250.66 S/. 250.66
03.05.06.04 CAJA - PARA DESCARGA DE LODOS EN TERRENO NORMAL INCLUYE ELIMINACION DESMONTE S/. 722.20 S/. 722.20
2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
03.05.06.05 ELECTROBOMBA S/. 85,875.14 S/. 85,875.14
3.06 FILTRO BIOLOGICO S/. 55,781.60 S/. 55,781.60
03.06.01 OBRAS PRELIMINARES S/. 966.24 S/. 966.24
03.06.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 591.78 S/. 591.78
03.06.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA S/. 374.46 S/. 374.46
03.06.02 MOVIMIENTO DE TIERRAS S/. 1,972.79 S/. 1,972.79
03.06.02.01 EXCAVACIONES EN T NORMAL CON CARGADOR RETROEXCAV 0.75-1.60 YD3 S/. 369.02 S/. 369.02
03.06.02.02 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL A PULSO S/. 98.21 S/. 98.21
03.06.02.03 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM CON MAQUINA S/. 1,505.56 S/. 1,505.56
03.06.03 OBRAS DE CONCRETO S/. 36,606.30 S/. 36,606.30
03.06.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES (CEMENTO P-I) S/. 2,027.66 S/. 2,027.66
03.06.03.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOLADOS Y/O SUB BASES S/. 102.00 S/. 102.00
03.06.03.03 CONCRETO F'C 245 KG/CM2 PARA LOSA DE FONDO CEMENTO P-V) S/. 7,549.08 S/. 7,549.08
03.06.03.04 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS FONDO BUZON,CAMARA S/. 272.29 S/. 272.29
03.06.03.05 ACERO ESTRUC. TRABAJADO P/LOSA FONDO-PISO (COSTO PROM. INCL. DESPERDICIOS) S/. 2,461.85 S/. 2,461.85
03.06.03.06 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS(CEMENTO P-I) S/. 5,045.76 S/. 5,045.76
03.06.03.07 ENCOFRADO (I/HABILITACION DE MADERA) PARA MUROS RECTOS S/. 12,103.17 S/. 12,103.17
03.06.03.08 ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS) S/. 5,701.73 S/. 5,701.73
03.06.03.09 ADITIVO DESMOLDADOR PARA ENCOFRADO TIPO CARAVISTA S/. 1,342.76 S/. 1,342.76
03.06.04 REVOQUES ENLUCIDOS Y MOLDURAS S/. 9,776.03 S/. 9,776.03
03.06.04.01 TARRAJEO CON IMPERMEABILIZANTE PARA LOSA DE FONDO S/. 9,776.03 S/. 9,776.03
03.06.05 ACCESORIOS S/. 2,001.67 S/. 2,001.67
03.06.05.01 TUBERIA DE PVC-U UF NTP ISO 4422 DN 200MM. PROMEDIO INC. ANILLO + 1% DESPERDICIOS S/. 2,001.67 S/. 2,001.67
03.06.06 PINTURA S/. 106.14 S/. 106.14
03.06.06.01 PINTADO DE MURO EXTERIOR CON TEKNO MATE O SUPERMATE(SIMILAR) S/. 106.14 S/. 106.14
03.06.07 ADITAMENTOS, VARIOS S/. 4,352.43 S/. 4,352.43
03.06.07.01 PROVISION Y COLOCACION DE JUNTA WATER STOP DE 6" S/. 564.08 S/. 564.08
03.06.07.02 LIMPIEZA Y DESINFECCION DE FILTRO BILOGICO APOYADOS S/. 345.13 S/. 345.13
03.06.07.03 PRUEBA HIDRAULICA C/EMPLEO DE LA LINEA DE INGRESO EN FILTRO BILOGICO S/. 63.15 S/. 63.15
03.06.07.04 SUMINISTRO Y COLOCACION DE GRAVA S/. 3,380.07 S/. 3,380.07
3.07 LECHO DE SECADO S/. 24,405.00 S/. 21,608.90 S/. 46,013.90
03.07.01 OBRAS PRELIMINARES S/. 1,399.95 S/. 1,399.95
03.07.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS S/. 857.41 S/. 857.41
03.07.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA S/. 542.54 S/. 542.54
03.07.02 MOVIMIENTO DE TIERRAS S/. 2,865.02 S/. 2,865.02
03.07.02.01 EXCAVACIONES EN T NORMAL CON CARGADOR RETROEXCAV 0.75-1.60 YD3 S/. 541.34 S/. 541.34
03.07.02.02 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL A PULSO S/. 142.29 S/. 142.29
03.07.02.03 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM CON MAQUINA S/. 2,181.39 S/. 2,181.39
03.07.03 OBRAS DE CONCRETO S/. 20,140.03 S/. 9,355.37 S/. 29,495.40
03.07.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES (CEMENTO P-I) S/. 2,935.95 S/. 2,935.95
03.07.03.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOLADOS Y/O SUB BASES S/. 127.81 S/. 127.81
03.07.03.03 CONCRETO F'C 245 KG/CM2 PARA LOSA DE FONDO CEMENTO P-V) S/. 8,605.95 S/. 8,605.95
03.07.03.04 ENCOFRADO (I/HABILITACION DE MADERA) PARA LOSAS FONDO BUZON,CAMARA S/. 289.40 S/. 289.40
03.07.03.05 ACERO ESTRUC. TRABAJADO P/LOSA FONDO-PISO (COSTO PROM. INCL. DESPERDICIOS) S/. 3,674.48 S/. 3,674.48
03.07.03.06 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS(CEMENTO P-I) S/. 2,497.92 S/. 2,497.92
03.07.03.07 ENCOFRADO (I/HABILITACION DE MADERA) PARA MUROS RECTOS S/. 6,857.45 S/. 6,857.45
03.07.03.08 ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS) S/. 2,788.34 S/. 2,788.34
03.07.03.09 ADITIVO DESMOLDADOR PARA ENCOFRADO TIPO CARAVISTA S/. 1,718.10 S/. 1,718.10
03.07.04 REVOQUES ENLUCIDOS Y MOLDURAS S/. 2,579.85 S/. 2,579.85
03.07.04.01 TARRAJEO CON IMPERMEABILIZANTE PARA LOSA DE FONDO S/. 2,579.85 S/. 2,579.85
03.07.05 ACCESORIOS S/. 280.70 S/. 280.70
03.07.05.01 TUBERIA DE PVC-U UF NTP ISO 4422 PN 10 DN 110mm. INC. ANILLO + 2% DESPERDICIOS S/. 280.70 S/. 280.70
03.07.06 PINTURA S/. 306.63 S/. 306.63
03.07.06.01 PINTADO DE MURO EXTERIOR CON TEKNO MATE O SUPERMATE(SIMILAR) S/. 306.63 S/. 306.63
03.07.07 ADITAMENTOS, VARIOS S/. 9,086.35 S/. 9,086.35
03.07.07.01 PROVISION Y COLOCACION DE JUNTA WATER STOP DE 6" S/. 564.08 S/. 564.08
03.07.07.02 LIMPIEZA Y DESINFECCION DE FILTRO BILOGICO APOYADOS S/. 345.13 S/. 345.13
03.07.07.03 PRUEBA HIDRAULICA C/EMPLEO DE LA LINEA DE INGRESO EN FILTRO BILOGICO S/. 63.15 S/. 63.15
03.07.07.04 SUMINISTRO Y COLOCACION DE GRAVA S/. 1,947.66 S/. 1,947.66
03.07.07.05 LADRILLO DE CONCRETO SEGUN DISEÑO S/. 6,166.33 S/. 6,166.33
4 PLAN DE MANEJO AMBIENTAL S/. 3,738.98 S/. 10,762.61 S/. 16,025.10 S/. 26,141.06 S/. 7,595.36 S/. 64,263.11
4.01 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL S/. 810.00 S/. 3,240.00 S/. 4,050.00
04.01.01 ACTIVIDADES DE CAPACITACION Y ELAB. DE TRIPTICOS S/. 810.00 S/. 3,240.00 S/. 4,050.00
4.02 PROGRAMA DE ABANDONO Y CIERRE S/. 1,306.67 S/. 1,493.33 S/. 2,800.00
04.02.01 IMPLEMENTACION DEL PROGRAMA DE ABANDONO Y CIERRE S/. 1,306.67 S/. 1,493.33 S/. 2,800.00
4.03 PROGRAMA DE COMPENSACION S/. 14,531.77 S/. 1,037.98 S/. 15,569.75
04.03.01 COMPENSACION POR AREAS OCUPADAS POR OBRAS S/. 14,531.77 S/. 1,037.98 S/. 15,569.75
4.04 PROGRAMA DE PREVENCION, CONTROL Y MITIGACION S/. 25,103.08 S/. 236.44 S/. 25,339.52
04.04.01 REHABILITACION AREA DE CAMPAMENTOS S/. 4,726.02 S/. 4,726.02
04.04.02 REHABILITACION DE AREA OCUPADA POR PATIOS DE MAQUINARIAS Y EQUIPOS S/. 18,249.10 S/. 18,249.10
04.04.03 CONFORMACION DE MATERIAL EN BOTADERO DE MATERIAL EXCEDENTE S/. 2,127.96 S/. 236.44 S/. 2,364.40
4.05 PROGRAMA DE SEÑALIZACION AMBIENTAL S/. 7,358.92 S/. 7,358.92
04.05.01 SEÑALES INFORMATIVAS DEFINITIVAS S/. 2,850.00 S/. 2,850.00
2016
PARTIDA DESCRIPCION PARCIAL
MES-1 MES-2 MES-3 MES-4 MES-5 MES-6 MES-7 MES-8
04.05.02 SEÑALES DE TRABAJOS PROFESIONALES S/. 4,508.92 S/. 4,508.92
4.06 PROGRAMA DE MONITOREO AMBIENTAL S/. 1,278.98 S/. 5,115.94 S/. 6,394.92
04.06.01 MONITOREO DE CALIDAD DE AIRE S/. 338.98 S/. 1,355.94 S/. 1,694.92
04.06.02 MONITOREO DE CALIDAD DE AGUA S/. 340.00 S/. 1,360.00 S/. 1,700.00
04.06.03 MONITOREO DE NIVELES SONORAS S/. 600.00 S/. 2,400.00 S/. 3,000.00
4.07 PROGRAMA DE CONTINGENCIA S/. 1,650.00 S/. 1,100.00 S/. 2,750.00
04.07.01 UNIDAD DE CONTINGENCIA S/. 1,650.00 S/. 1,100.00 S/. 2,750.00

COSTO DIRECTO S/.247,398.65 S/.666,704.78 S/.716,802.11 S/.794,246.53 S/.878,491.61 S/.692,526.44 S/.357,895.75 S/.21,608.90 S/.4,375,674.71
GASTOS GENERALES S/.23,251.48 S/.62,659.49 S/.67,367.83 S/.74,646.36 S/.82,564.04 S/.65,086.31 S/.33,636.43 S/.2,030.89 S/.411,242.83
UTILIDAD S/.19,791.89 S/.53,336.38 S/.57,344.17 S/.63,539.72 S/.70,279.33 S/.55,402.12 S/.28,631.66 S/.1,728.71 S/.350,053.98
SUBTOTAL S/.290,442.02 S/.782,700.66 S/.841,514.11 S/.932,432.61 S/.1,031,334.98 S/.813,014.87 S/.420,163.84 S/.25,368.50 S/.5,136,971.51
IGV (18.00%) S/.52,279.56 S/.140,886.12 S/.151,472.54 S/.167,837.87 S/.185,640.30 S/.146,342.68 S/.75,629.49 S/.4,566.33 S/.924,654.87
TOTAL INVERSION S/.342,721.59 S/.923,586.77 S/.992,986.65 S/.1,100,270.48 S/.1,216,975.27 S/.959,357.54 S/.495,793.33 S/.29,934.83 S/.6,061,626.38

% DE AVANCE 5.65% 15.24% 16.38% 18.15% 20.08% 15.83% 8.18% 0.49% 100.00%
% DE AVANCE ACUMULADO 5.65% 20.89% 37.27% 55.42% 75.50% 91.33% 99.51% 100.00%
CONTROL DE VALORIZACION

CURVA "S'' PROGRAMADO VS EJECUTADO


CONTRATO PRINCIPAL
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE
OBRA:
MANU – MADRE DE DIOS"
UBICACIÓN: Err:509
RESIDENTE: Err:509
Err:509 Err:509
MONTO DE OBRA 6,061,626.38

V A L O R IZ A C . A C U M U L A D A (S IN IN C . IG V )
Err:509

PLAZO DE EJECUCION DE 305 DIAS CALENDARIO

5,000,000.00

4,500,000.00

4,000,000.00

3,500,000.00

3,000,000.00 Column S Column P

2,500,000.00

2,000,000.00

1,500,000.00

1,000,000.00

500,000.00

0.00

M a y -1 8
A u g -1 7

N o v -1 7

S e p -1 8

N o v -1 8
S e p -1 7

D e c -1 7

A u g -1 8
J u n -1 7

J u n -1 8
O c t-1 7

A p r-1 8

O c t-1 8
J u l-1 8
J u l-1 7

MES

MESES
Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Apr-19 May-19 Jun-19 Jul-19
CRONOGRAMA PROGRAMADO #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
CRONOGRAMA ACUMULADO PROGRAMADO #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
CRONOGRAMA EJECUTADO S/. 0.00 S/. 335,958.52 S/. 373,940.56 S/. 273,665.17 S/. 7,155.57 S/. 18,971.63 S/. 561,759.04 S/. 484,447.26 S/. 710,911.22 S/. 344,316.81
CRONOGRAMA ACUMULADO EJECUTADO S/. 0.00 S/. 335,958.52 S/. 709,899.08 S/. 983,564.25 S/. 990,719.82 S/. 1,009,691.45 S/. 1,571,450.49 S/. 2,055,897.75 S/. 2,766,808.97 S/. 3,111,125.78

MESES
Aug-19 Sep-19 Oct-19 Nov-19
CRONOGRAMA PROGRAMADO #REF! #REF! #REF! #REF!
CRONOGRAMA ACUMULADO PROGRAMADO #REF! #REF! #REF! #REF!
CRONOGRAMA EJECUTADO S/. 495,427.17 S/. 340,151.90 S/. 208,142.14 Err:509
CRONOGRAMA ACUMULADO EJECUTADOS/. 3,606,552.95 S/. 3,946,704.85 S/. 4,154,846.99 Err:509
METRADO CORRESPONDIENTE AL MES DE
OCTUBRE 2019

OBRA: "CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE


TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE
MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS"
BOCA COLORADO - DISTRITO DE MADRE DE DIOS - PROVINCIA DE MANU - DEPARTAMENTO DE
UBICACIÓN
MADRE DE DIOS

PRESUPUES S/. 6,061,626.38


MODALIDAD CONTRATA

Presupuest Valorización
o Actual Octubre
Item Descripción de la Partida
Unid Metrado

01 OBRAS PROVISIONALES
01.02 SERVICIO DE BAÑO PORTATIL (INODORO Y LAVADERO), TIPO DISAL O SIMIL glb 0.10
04 PLANTA DE TRATAMIENTO DE AGUAS POTABLE 0.00
04.01.04 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
04.01.04.03 WATER STOP DE NEOPRENE DE 6". PROVISION Y COLOCADO DE JUNTA m 231.42
04.03 CASETA DE BOMBEO (PTAP) 0.00
04.03.06 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
04.03.06.01 TARRAJEO INTERIORES Y EXTERIORES C/MORTERO 1:5 X1.5 CM.(INC.CO m2 180.00
04.03.11 INSTALACIONES ELECTRICAS 0.00
04.03.11.03 SALIDAS PARA CENTROS DE LUZ pto 6.00
04.03.11.04 SALIDAS PARA TOMACORRIENTE pto 4.00
05 CONSTRUCCION DE RESERVORIO PROYECTADO 0.00
05.01 CONSTRUCCION DE TANQUE ELEVADO (170 M3) 0.00
05.01.03 OBRAS DE CONCRETO 0.00
05.01.03.17 CONCRETO F'C 245 KG/CM2 PARA TRONCO CONICO DE 30.01 A 35 M. S.N.T. m3 3.67
05.01.03.18 ENCOFRADO (INCL. HABILITACION) DE TRONCO CONICO DESDE 30.01 A 35 M m2 36.82
05.01.03.19 ACERO ESTRUC. TRABAJADO P/TRONCO CONICO DE 30.01 A 35 M. S.N.T. (C kg 409.83
05.01.03.30 ENCOFRADO (INCL. HABILITACION) DE CUBIERTA ESFERICA DESDE 40.01 A m2 132.17
05.01.03.31 ACERO ESTRUC. TRABAJADO P/MURO DE CUBA 35.01 A 40 M. S.N.T. (COSTO kg 5,102.81
05.01.03.38 ADITIVO DESMOLDADOR PARA ENCOFRADO TIPO CARAVISTA m2 1,000.00
06 REDES DE AGUA POTABLE 0.00
06.02 RED DE DISTRIBUCION 0.00
06.02.02 MOVIMIENTO DE TIERRAS 0.00
06.02.02.04 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 110-160 mm. H=0.60 A 1.00m. m 31.01
06.02.02.06 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 110-160 mm. PAR m 25.83
06.02.02.08 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 110 A 160 mm. H=0.60 A 1.00 m 25.83
06.02.02.10 ELIMIN. DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 110-160mm. PA m 310.11
06.02.03 SUMINISTRO E INSTALACION DE TUBERIA PVC U UF ISO 4422 PN 10 0.00
06.02.03.05 INSTALACION DE TUBERIA DE PVC P/AGUA POTAB. DN 110mm. INC. PRU m 106.77
06.02.03.06 INSTALACION DE TUBERIA DE PVC P/AGUA POTAB. DN 160mm. INC. PRU m 1,500.00
06.02.04 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC 0.00
06.02.04.05 TEE PVC-U UF NTP ISO 4422 DN 110mm. und 2.00
06.02.04.07 REDUCCION PVC-U UF NTP ISO 4422 DN 110-75mm. und 1.00
06.02.04.08 REDUCCION PVC-U UF NTP ISO 4422 DN 160-75mm. und 1.00
06.02.04.09 REDUCCION PVC-U UF NTP ISO 4422 DN 160-110mm. und 2.00
06.02.04.12 CODO 90º PVC-U UF NTP ISO 4422 DN 160mm. und 1.00
06.02.04.13 CODO 22.5º PVC-U UF NTP ISO 4422 DN 75mm. und 1.00
06.02.04.15 CODO 22.5º PVC-U UF NTP ISO 4422 DN 160mm. und 2.00
06.02.04.16 TAPON PVC-U UF NTP ISO 4422 DN 75mm. und 3.00
06.02.04.17 TAPON PVC-U UF NTP ISO 4422 DN 110mm. und 3.00
06.02.04.18 TAPON PVC-U UF NTP ISO 4422 DN 160mm. und 2.00
06.02.04.19 INSTALAC. ACCESORIOS PVC DN 75-160mm. und 18.00
06.02.04.20 CONCRETO F'C 140 KG/CM2 PARA ANCLAJES DE ACCESORIOS DN 75-160mm. und 18.00
07 CONEXIONES DOMICILIARIAS DE AGUA POTABLE 0.00
07.01 CONEXION DOMICILIARIA DE AGUA DN 15 MM T NORMAL und 41.00
METRADO CORRESPONDIENTE AL MES DE
OCTUBRE 2019

OBRA: "CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE


TRATAMIENTO DE AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE
MADRE DE DIOS – PROVINCIA DE MANU – MADRE DE DIOS"
BOCA COLORADO - DISTRITO DE MADRE DE DIOS - PROVINCIA DE MANU - DEPARTAMENTO DE
UBICACIÓN
MADRE DE DIOS

PRESUPUES S/. 6,061,626.38


MODALIDAD CONTRATA

Presupuest Valorización
o Actual Octubre
Item Descripción de la Partida
Unid Metrado

01 RED DE ALCANTARILLADO 0.00


01.01 OBRAS PRELIMINARES 0.00
01.01.02 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 640.51
01.02 MOVIMIENTO DE TIERRAS 0.00
01.02.01 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=1.00 A 1.25m. PRO m 88.01
01.02.02 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=1.00 A 1.25m PR m 21.99
01.02.03 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=1.26 A 1.50m. PRO m 100.00
01.02.04 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=1.26 A 1.50m. P m 69.64
01.02.05 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=1.51 A 2.00m. PRO m 100.00
01.02.06 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=1.51 A 2.00m. P m 81.65
01.02.08 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=2.01 A 2.50m. P m 16.40
01.02.09 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=2.51 A 3.00m. PRO m 38.10
01.02.10 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=2.51 A 3.00m. P m 55.10
01.02.17 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 200-315mm. PARA m 300.00
01.02.20 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=1.51 A 2.00m. m 170.63
01.02.22 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=2.51 A 3.00m. m 300.00
01.03 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 0.00
01.03.01 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 200mm. INC. ANILLO + 2% m 46.79
01.03.02 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 250mm. INC. ANILLO + 2% m 50.63
01.03.03 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 315mm. INC. ANILLO + 2% m 0.00
01.03.04 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HIDRA m 277.16
01.03.05 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250mm. INC. PRUEBA HI m 48.88
01.03.06 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 315mm. INC. PRUEBA HI m 0.00
01.04 CONSTRUCCION DE BUZONES 0.00
01.04.04 BUZON TIPO I T-NORMAL A MAQ. 2.01 A 2.50m. PROF. (ENCOFR. INTERIOR Y und 1.00
01.04.07 BUZON TIPO I T-NORMAL A MAQ. 3.51 A 4.00m. PROF. (ENCOFR. INTERIOR Y und 0.89
01.04.08 BUZON TIPO I T-NORMAL A MAQ. 4.01 A 4.50m. PROF. (ENCOFR. INTERIOR Y und 0.00
02 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO 0.00
02.01 CONEXION DOMICILIARIA DE DESAGUE DN 160 mm. T-NORMAL und 5.00
03.05.05 CONSTRUCCION DE BUZONES TIPO I 0.00
03.05.05.01 BUZON TIPO I T-NORMAL A MAQ. 1.01 A 1.20m. PROF. (ENCOFR. INTERIOR und 0.00
03.05.06 VARIOS 0.00
03.05.06.05 ELECTROBOMBA und 1.00
9 #REF! 7.00 #REF!
9 #REF! 9.00 #REF!
14 #REF! 14.00 #REF!
4 #REF! 3.00 #REF!
#REF! 0.00 #REF!
1 #REF! 1.00 #REF!
1 #REF! 1.00 #REF!
4 #REF! 3.00 #REF!
#REF! 0.00 #REF!
#REF! 0.00 #REF!
42 #REF! 38.00 #REF!
#REF! 0.00 #REF!
#REF! #REF!
###
RESUMEN DE METRADOS MAYO 2019
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE
OBRA: AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE
MANU – MADRE DE DIOS"
UBICACIÓN BOCA COLORADO - DISTRITO DE MADRE DE DIOS - PROVINCIA DE MANU - DEPARTAMENTO DE MADRE DE DIOS
PRESUPUESTO: S/. 6,061,626.38
MODALIDAD: CONTRATA

Item Descripción de la Partida UND METRADO

01 OBRAS PROVISIONALES
01.02 SERVICIO DE BAÑO PORTATIL (INODORO Y LAVADERO), TIPO DISAL O SIMILAR glb 0.10
01.05 FLETE - TRANSPORTE DE TUBERIA, ACCESORIOS Y MATERIALES PARA LA OBRA gbl 0.15
04 PLANTA DE TRATAMIENTO DE AGUAS POTABLE 0.00
04.01 CONSTRUCCION DE FILTRO LENTO 0.00
04.01.01 OBRAS PRELIMINARES 0.00
04.01.04 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
04.01.04.01 TARRAJEO CON IMPERMEABILIZANTE PARA LOSA DE FONDO m2 30.00
04.01.04.02 TARRAJEO IMPERMEABILIZANTE P/MUROS RESERVORIO APOYADO m2 346.11
05 CONSTRUCCION DE RESERVORIO PROYECTADO 0.00
05.01 CONSTRUCCION DE TANQUE ELEVADO (170 M3) 0.00
05.01.01 OBRAS PRELIMINARES 0.00
05.01.01.01 TRAZO Y REPLANTEO INICIAL PARA ESTRUCTURAS m2 86.56
05.01.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE LA OBRA m2 86.56
05.01.02 MOVIMIENTO DE TIERRAS 0.00
05.01.02.01 EXCAV. ZANJA (MAQ) P/TUB. T-NORMAL DN 200-250 MM H=5.51 A 6.00M PROF. m3 195.20
05.01.02.02 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL A PULSO m2 86.56
05.01.02.03 ELIMINACION DE DESMONTE EN TERRENO NORMAL R=10KM CON MAQUINA m3 119.03
05.01.03 OBRAS DE CONCRETO 0.00
05.01.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES (CEMENTO P-I) m3 8.65
05.01.03.02 ENCOFRADO (I/HABILITACION DE MADERA) PARA SOLADOS Y/O SUB BASES m2 3.97
05.01.03.03 CONCRETO F'C 210 KG/CM2 PARA ZAPATAS (CEMENTO P-I) m3 83.81
05.01.03.04 ENCOFRADO (I/HABILITACION DE MADERA) PARA ZAPATAS CIRCULARES m2 33.22
05.01.03.05 ACERO ESTRUC. TRABAJADO P/ZAPATA ARMADA (COSTO PROM. INCL. DESPERDICIOS) kg 7,539.58
05.01.03.06 CONCRETO F'C 210 KG/CM2 PARA LOSA DE FONDO CEMENTO P-I) m3 45.36
05.01.03.07 ACERO ESTRUC. TRABAJADO P/LOSA FONDO-PISO (COSTO PROM. INCL. DESPERDICIOS) kg 379.90
06 REDES DE AGUA POTABLE 0.00
06.01 LINEA DE ADUCCION 0.00
06.01.01 OBRAS PRELIMINARES 0.00
06.01.01.02 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION - POLVO (Incl. Costo de agua m 102.00
06.01.01.03 CERCO DE MALLA HDP DE 1m. ALTURA PARA LIMITE SEGURIDAD OBRA m 102.00
06.01.02 MOVIMIENTO DE TIERRAS 0.00
06.01.02.01 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 110-160 mm. H=0.60 A 1.00m. PROF. m 102.00
06.01.02.03 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 110-160 mm. PARA TODA PROF. m 102.00
06.01.02.04 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 110 A 160 mm. H=0.60 A 1.00m. m 490.00
06.01.02.05 ELIMIN. DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 110-160mm. PARA TODA PROF. m 490.00
06.01.03 SUMINISTRO E INSTALACION DE TUBERIA PVC U UF ISO 4422 PN 10 0.00
06.01.03.01 TUBERIA DE PVC-U UF NTP ISO 4422 PN 10 DN 160mm. INC. ANILLO + 2% DESPERDICIOS m 490.00
06.01.03.02 INSTALACION DE TUBERIA DE PVC P/AGUA POTAB. DN 160mm. INC. PRUEBA HIDRAULICA m 490.00
06.01.04 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC 0.00
06.01.04.02 CODO 22.5º PVC-U UF NTP ISO 4422 DN 160mm. und 5.00
06.01.04.03 INSTALAC. ACCESORIOS PVC DN 75-160mm. und 5.00
06.01.04.04 CONCRETO F'C 140 KG/CM2 PARA ANCLAJES DE ACCESORIOS DN 75-160mm. und 5.00
06.02 RED DE DISTRIBUCION 0.00
06.02.01 OBRAS PRELIMINARES 0.00
06.02.01.01 TRAZO, NIVEL Y REPLANTEO PARA REDES DE AGUA m 437.28
06.02.01.02 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION - POLVO (Incl. Costo de agua m 437.28
06.02.01.03 CERCO DE MALLA HDP DE 1m. ALTURA PARA LIMITE SEGURIDAD OBRA m 437.28
06.02.02 MOVIMIENTO DE TIERRAS 0.00
06.02.02.01 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 60-90 mm. H=0.60 A 1.00m. PROF. m 393.55
06.02.02.02 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 60-90 mm. H=0.60 A 1.00m. PROF. m 43.73
06.02.02.05 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 60-90 mm. PARA TODA PROF. m 437.28
RESUMEN DE METRADOS MAYO 2019
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE
OBRA: AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE
MANU – MADRE DE DIOS"
UBICACIÓN BOCA COLORADO - DISTRITO DE MADRE DE DIOS - PROVINCIA DE MANU - DEPARTAMENTO DE MADRE DE DIOS
PRESUPUESTO: S/. 6,061,626.38
MODALIDAD: CONTRATA

Item Descripción de la Partida UND METRADO

06.02.02.07 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 60 A 90 mm. H=0.60 A 1.00m. m 437.28
06.02.02.09 ELIMIN. DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 60-90mm. PARA TODA PROF. m 437.28
06.02.03 SUMINISTRO E INSTALACION DE TUBERIA PVC U UF ISO 4422 PN 10 0.00
06.02.03.01 TUBERIA DE PVC-U UF NTP ISO 4422 PN 10 DN 75mm. INC. ANILLO + 2% DESPERDICIOS m 437.28
06.02.03.04 INSTALACION DE TUBERIA DE PVC P/AGUA POTAB. DN 75mm. INC. PRUEBA HIDRAULICA m 437.28
06.02.04 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC 0.00
06.02.04.04 TEE PVC-U UF NTP ISO 4422 DN 75mm. und 4.00
06.02.04.06 TEE PVC-U UF NTP ISO 4422 DN 160mm. und 1.00
06.02.04.09 REDUCCION PVC-U UF NTP ISO 4422 DN 160-110mm. und 1.00
06.02.04.10 CODO 90º PVC-U UF NTP ISO 4422 DN 75mm. und 2.00
06.02.04.16 TAPON PVC-U UF NTP ISO 4422 DN 75mm. und 2.00
06.02.04.19 INSTALAC. ACCESORIOS PVC DN 75-160mm. und 10.00
06.02.04.20 CONCRETO F'C 140 KG/CM2 PARA ANCLAJES DE ACCESORIOS DN 75-160mm. und 10.00
01 RED DE ALCANTARILLADO 0.00
01.01 OBRAS PRELIMINARES 0.00
01.01.02 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 539.36
01.02 MOVIMIENTO DE TIERRAS 0.00
01.02.01 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=1.00 A 1.25m. PROF. m 146.08
01.02.02 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=1.00 A 1.25m PROF. m 36.51
01.02.03 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=1.26 A 1.50m. PROF. m 455.10
01.02.04 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=1.26 A 1.50m. PROF. m 113.78
01.02.05 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=1.51 A 2.00m. PROF. m 398.40
01.02.06 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=1.51 A 2.00m. PROF. m 99.60
01.02.07 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=2.01 A 2.50m. PROF. m 97.60
01.02.08 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=2.01 A 2.50m. PROF. m 24.40
01.02.09 EXCAV. ZANJA (MAQ) P/TUB. T. NORMAL DN 200-315 mm. H=2.51 A 3.00m. PROF. m 210.92
01.02.10 EXCAV. ZANJA (PULSO) P/TUB. T. NORMAL DN 200-315 mm. H=2.51 A 3.00m. PROF. m 52.73
01.02.17 REFINE Y NIVELACION ZANJA T. NORMAL PARA TUB. DN 200-315mm. PARA TODA PROF. m 1,635.12
01.02.18 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=1.00 A 1.25m. m 182.59
01.02.19 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=1.26 A 1.50m. m 568.88
01.02.20 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=1.51 A 2.00m. m 498.00
01.02.21 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=2.01 A 2.50m. m 122.00
01.02.22 RELLENO COMP. ZANJA (PULSO) T-NORMAL DN 200 A 315mm. H=2.51 A 3.00m. m 263.65
01.02.26 ELIMIN.DESMONTE (CARG+VOLQ) T-NORMAL D=10KM DN 200 A 315mm. P/TODA PROF. m 1,635.12
01.03 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 0.00
01.03.01 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 200mm. INC. ANILLO + 2% DESPERDICIOS m 1,330.22
01.03.02 TUBERIA DE PVC-U UF NTP ISO 4435 SERIE 25 DN 250mm. INC. ANILLO + 2% DESPERDICIOS m 148.71
01.03.04 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 200 INC. PRUEBA HIDRAULICA m 1,330.22
01.03.05 INSTALACION DE TUBERIA DE PVC P/DESAGUE DN 250mm. INC. PRUEBA HIDRAULICA m 148.71
01.04 CONSTRUCCION DE BUZONES 0.00
01.04.01 BUZON TIPO I T-NORMAL A MAQ. 1.01 A 1.20m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) und 2.40
01.04.02 BUZON TIPO I T-NORMAL A MAQ. 1.21 A 1.50m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) und 11.20
01.04.03 BUZON TIPO I T-NORMAL A MAQ. 1.51 A 2.00m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) und 21.60
01.04.05 BUZON TIPO I T-NORMAL A MAQ. 2.51 A 3.00m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) und 8.80
01.04.06 BUZON TIPO I T-NORMAL A MAQ. 3.01 A 3.50m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) und 0.80
01.04.07 BUZON TIPO I T-NORMAL A MAQ. 3.51 A 4.00m. PROF. (ENCOFR. INTERIOR Y EXTERIOR) und 0.80
03.06 FILTRO BIOLOGICO 0.00
03.06.04 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
03.06.04.01 TARRAJEO CON IMPERMEABILIZANTE PARA LOSA DE FONDO m2 310.35
04 PLAN DE MANEJO AMBIENTAL 0.00
04.01 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL 0.00
04.01.01 ACTIVIDADES DE CAPACITACION Y ELAB. DE TRIPTICOS glb 0.10
04.04 PROGRAMA DE PREVENCION, CONTROL Y MITIGACION 0.00
RESUMEN DE METRADOS MAYO 2019
"CONSTRUCCION DE LOS SISTEMAS DE AGUA POTABLE, ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE
OBRA: AGUAS RESIDUALES DE LA LOCALIDAD DE BOCA COLORADO - DISTRITO DE MADRE DE DIOS – PROVINCIA DE
MANU – MADRE DE DIOS"
UBICACIÓN BOCA COLORADO - DISTRITO DE MADRE DE DIOS - PROVINCIA DE MANU - DEPARTAMENTO DE MADRE DE DIOS
PRESUPUESTO: S/. 6,061,626.38
MODALIDAD: CONTRATA

Item Descripción de la Partida UND METRADO

04.04.01 REHABILITACION AREA DE CAMPAMENTOS glb 0.20


04.04.02 REHABILITACION DE AREA OCUPADA POR PATIOS DE MAQUINARIAS Y EQUIPOS glb 0.20
04.04.03 CONFORMACION DE MATERIAL EN BOTADERO DE MATERIAL EXCEDENTE glb 0.10
0.00
Item Descripción de la Partida UND METRADO

04 PLAN DE MANEJO AMBIENTAL 0.00


04.01 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL 0.00
04.01.01 ACTIVIDADES DE CAPACITACION Y ELAB. DE TRIPTICOS glb 0.10
04.03 PROGRAMA DE COMPENSACION 0.00
04.03.01 COMPENSACION POR AREAS OCUPADAS POR OBRAS m2 706.25
04.04 PROGRAMA DE PREVENCION, CONTROL Y MITIGACION 0.00
04.04.01 REHABILITACION AREA DE CAMPAMENTOS glb 0.35
04.04.02 REHABILITACION DE AREA OCUPADA POR PATIOS DE MAQUINARIAS Y EQUI glb 0.20
04.04.03 CONFORMACION DE MATERIAL EN BOTADERO DE MATERIAL EXCEDENTE glb 0.10
04.05 PROGRAMA DE SEÑALIZACION AMBIENTAL 0.00
04.05.01 SEÑALES INFORMATIVAS DEFINITIVAS und 0.35
04.05.02 SEÑALES DE TRABAJOS PROFESIONALES und 0.10
04.06 PROGRAMA DE MONITOREO AMBIENTAL 0.00
04.06.01 MONITOREO DE CALIDAD DE AIRE glb 0.10
04.06.02 MONITOREO DE CALIDAD DE AGUA glb 0.10
04.06.03 MONITOREO DE NIVELES SONORAS glb 0.10
04.07 PROGRAMA DE CONTINGENCIA 0.00
04.07.01 UNIDAD DE CONTINGENCIA und 0.10