FORMATO DE METRADO
CIMIENTO EJE 5
EJE 5-5 (A Y B) 1.00 0.50 2.33 1.10 1.28 M3
EJE 5-5 (B Y C) 1.00 0.50 2.25 1.10 1.24 M3
EJE 5-5 (C Y D) 1.00 0.50 2.33 1.10 1.28 M3
CIMIENTO EJE 4
EJE 4-4 (A Y B) 1.00 0.50 2.83 1.10 1.56 M3
EJE 4-4 (B Y C) 1.00 0.50 0.95 1.10 0.52 M3
EJE 4-4 (B Y C) 1 1.00 0.50 0.75 1.10 0.41 M3
EJE 4-4 (C Y D) 1.00 0.50 2.62 1.10 1.44 M3
CIMIENTO EJE 3
EJE 3-3 (A Y B) 1.00 0.50 2.83 1.10 1.56 M3
EJE 3-3 (B Y C) 1.00 0.50 0.95 1.10 0.52 M3
EJE 3-3 (B Y C) 1 1.00 0.70 0.73 1.10 0.56 M3
EJE 3-3 (C Y D) 1.00 0.50 2.62 1.10 1.44 M3
CIRTERNA
CISTERNA 1.00 1.90 1.30 2.75 6.79 M3
DIFERENCIA EN BANDEJA 1.00 0.64 1.30 0.83 M3
2.1.4 RELLENOS
2.1.4.1 RELLENO CON MATERIAL PROPIO 22.57 M3
ZAPATAZ (Z - 1) CUADRADO 2.00 1.10 1.10 0.50 1.15 M3
RESTO 2.00 0.25 0.25 0.50 M3
ZAPATAZ (Z - 1) CIRCULAR 3.00 1.10 1.10 0.50 1.71 M3
RESTO 3.00 0.07 0.50 M3
ZAPATAZ (Z - 2) 2.00 1.10 0.90 0.50 0.89 M3
RESTO COLUMNA 2.00 0.25 0.25 0.50 M3
RESTO COLUMNETA 2.00 0.25 0.15 0.50 M3
RELLENO EJE A
EJE A-A (7 Y 6) CC-6 1.00 3.85 0.25 0.30 0.29 M3
EJE A-A (6 Y 5) CC-1 1.00 3.43 0.25 0.30 0.26 M3
EJE A-A (5 Y 4) CC-1 1.00 0.57 0.25 0.30 0.04 M3
EJE A-A (5 Y 4) PRIMA 1.00 1.95 0.25 0.30 0.15 M3
EJE A-A (4 Y 3) CC-1 1.00 3.42 0.25 0.30 0.26 M3
EJE A-A (3 Y 2) 1.00 2.40 0.25 0.30 0.18 M3
EJE A-A (2 Y 1) 1.00 3.61 0.25 0.30 0.27 M3
RELLENO EJE B
FORMATO DE METRADO
RELLENO EJE 5
EJE 5-5 (A Y B) 1.00 0.25 1.78 0.30 0.13 M3
1.00 0.50 0.55 0.30 0.08 M3
EJE 5-5 (B Y C) 1.00 0.50 2.25 1.10 1.15 M3
EJE 5-5 (C Y D) 1.00 0.50 2.33 0.30 0.35 M3
RELLENO EJE 4
EJE 4-4 (A Y B) 1.00 0.50 2.83 1.10 1.50 M3
EJE 4-4 (B Y C) 1.00 0.50 0.95 1.10 0.48 M3
EJE 4-4 (B Y C) 1 1.00 0.50 0.75 1.10 0.38 M3
EJE 4-4 (C Y D) 1.00 0.50 2.62 0.30 0.39 M3
RELLENO EJE 3
EJE 3-3 (A Y B) 1.00 0.50 2.83 1.10 1.39 M3
EJE 3-3 (B Y C) 1.00 0.50 0.95 1.10 0.45 M3
EJE 3-3 (B Y C) 1 1.00 0.70 0.73 0.30 0.15 M3
EJE 3-3 (C Y D) 1.00 0.50 2.62 0.30 0.39 M3
2.1.5 NIVELACION INTERIOR Y APISONADO 1.00 92.50 92.50 M2
2.1.6 ELIMINACION DE MATERIAL EXCEDENTE 1.00 33.18 M3
FORMATO DE METRADO
SOBRECIMIENTOS EJE 5
EJE 5-5 (A Y B) 1.00 2.10 0.25 0.60 0.32
EJE 5-5 (B Y C) 1.00 1.56 0.15 0.60 0.14
EJE 5-5 (B Y C) 1.00 0.85 0.25 0.60 0.13
SOBRECIMIENTOS EJE 4
EJE 4-4 (A Y B) 1.00 0.15 1.30 0.60 0.12
EJE 4-4 (B Y C) 1.00 0.15 2.50 0.60 0.23
EJE 4-4 (B Y C) 1.00 0.15 0.40 0.60 0.04
EJE 4-4 (B Y C) 1.00 0.15 0.40 0.60 0.04
EJE 4-4 (B Y C) 1.00 0.10 0.30 0.60 0.02
SOBRECIMIENTOS EJE 3
EJE 3-3 (A Y B) 1.00 0.25 2.30 0.60 0.35
EJE 3-3 (B Y C) 1.00 0.25 1.80 0.60 0.27
2.2.6.2 PARA EL ENCOFRADO Y DESENCOFRADO 72.11 M2
ENCOFRADO Y DESENCOFRADO EJE A
EJE A-A (7 Y 6) CC-6 VERTICAL 2.00 3.45 0.60 4.14
EJE A-A (7 Y 6) CC-6 HORIZONTAL 2.00 0.15 0.60 0.18
EJE A-A (6 Y 5) CC-1 VERTICAL 2.00 3.75 0.60 4.50
2.00 0.25 0.60 0.00
EJE A-A (5 Y 4) CC-1 2.00 0.45 0.60 0.54
2.00 0.15 0.60 0.18
EJE A-A (5 Y 4) PRIMA 2.00 1.40 0.60 1.68
2.00 0.15 0.60 0.18
EJE A-A (4 Y 3) CC-1 2.00 3.17 0.60 3.80
2.00 0.25 0.60 0.30
EJE A-A (3 Y 2) 2.00 1.77 0.60 2.12
2.00 0.15 0.60 0.18
EJE A-A (2 Y 1) 2.00 3.30 0.60 3.96
2.00 0.15 0.60 0.18
ENCOFRADO Y DESENCOFRADO EJE B
EJE B-B (5 Y 4) CC-1 2.00 2.20 0.60 2.64
2.00 0.25 0.60 0.30
EJE B-B (4 Y 3) CC-3 2.00 1.87 0.60 2.24
FORMATO DE METRADO
10.80
9.00
FORMATO DE METRADO DE CONCRETO ARMADO
FORMATO DE METRADO
FORMATO DE METRADO
ALAMBRE DE ACERO
FORMATO DE METRADO
FORMATO DE METRADO
FORMATO DE METRADO
FORMATO DE METRADO
FORMATO DE METRADO
OBRA : CONSTRUCCION DE VIVIENDA UNIFAMILIAR HOJA N° : 29 DE ..............
PROPIETARIO : RAUL SEVERO AVALOS CABREJO PLANO N° : A2
FECHA : 4/10/2015 HECHO POR : DAVID ENRIQUE BARTRA CHUJUTALLY
REVISADO POR : ING. MSC. VISAZA
FORMATO DE METRADO
LONGITUD TOTAL x Ø
TOTAL ( Kgs )
N°
16
FORMATO DE METRADO