HOJA RESUMEN DE METRADOS - ESTRUCTURAS

OBRA : CONSTRUCCN DE VIVIENDA UNIFAMILIAR EN LA URB. 15 DE SETIEMBRE MZ "C" LT - 21 FECHA: 4/21/2017


EMPRESA:
SECTOR:
DEPARTAMENTO: LIMA PROVINCIA: SAN JUAN DE LURIGANCHO DISTRITO: SUCRE
ELABORADO POR: WILMER NO MARIN ROJAS REVISADO POR: WILMER NO MARIN ROJAS

ITEM. DESCRIPCIN

OE.1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.


OE.1.1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
OE.1.1.1 CONSTRUCCIONES PROVISIONALES
OE.1.1.1.3 CASETAS DE GUARDIANA
OE.1.1.1.7 CERCO PERIMETRICO - PALOS DE EUCALIPTO - MALLA ASPILLERA
OE.1.1.2 INSTALACIONES PROVISIONALES
OE.1.1.2.1 AGUA PARA LA CONSTRUCCIN
OE.1.1.2.2 DESAGE PARA LA CONSTRUCCIN
OE.1.1.2.3 ENERGA ELCTRICA PROVISIONAL
OE.1.1.7 MOVILIZACIN DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
OE.1.1.7.1 TRANSPORTES DE MATERIALES Y EQUIPOS
OE.1.1.9 TRAZOS, NIVELES Y REPLANTEO
OE.1.1.9.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR
OE.2 ESTRUCTURAS.
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2 EXCAVACIONES
OE.2.1.2.1 EXCAVACIONES SIMPLES
OE.2.1. EXCAVACIONES SIMPLES DE ZANJAS PARA CIMIENTOS
OE.2.1.4 RELLENOS
OE.2.1.4.1 RELLENO CON MATERIAL PROPIO
OE.2.1.5 NIVELACIN INTERIOR Y APISONADO
HOJA RESUMEN DE METRADOS - ESTRUCTURAS
OBRA : CONSTRUCCN DE VIVIENDA UNIFAMILIAR EN LA URB. 15 DE SETIEMBRE MZ "C" LT - 21 FECHA: 4/21/2017
EMPRESA:
SECTOR:
DEPARTAMENTO: LIMA PROVINCIA: SAN JUAN DE LURIGANCHO DISTRITO: SUCRE
ELABORADO POR: WILMER NO MARIN ROJAS REVISADO POR: WILMER NO MARIN ROJAS

ITEM. DESCRIPCIN
OE.2.1.5.1 NIVELACIN INTERIOR Y APISONADO MANUAL
OE.2.1.6 ELIMINACIN DE MATERIAL EXCEDENTE
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.1 CIMIENTOS CORRIDOS,MEZCLA CEMENTO:HORMIGON 1:10+30%PG
OE.2.2.6 SOBRECIMIENTOS
OE.2.2.6.1 PARA EL CONCRETO, MEZCLA CEMENTO: HORMIGON 1:8 + 25% PM
OE.2.2.6.2 PARA EL ENCOFRADO Y DESENCOFRADO, DE SOBRECIMIENTOS
OE.2.2.9 FALSOPISO, MEZCLA CEMENTO: HORMIGON 1:8, E=0.10M
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.7 COLUMNAS
OE.2.3.7.1 PARA EL CONCRETO EN COLUMNAS FC=175 KG/CM2
OE.2.3.7.2 PARA EL ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
OE.2.3.7.3 PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN COLUMNAS
OE.2.3.8 VIGAS
OE.2.3.8.1 PARA EL CONCRETO, FC=175 KG/CM2 EN VIGAS
OE.2.3.8.2 PARA EL ENCOFRADO Y DESENCOFRADO, NORMAL EN VIGAS
OE.2.3.8.3 PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN VIGAS
OE.2.3.9 LOSAS
OE.2.3.9.2 LOSAS ALIGERADAS CONVENCIONALES
OE.2.3. PARA EL CONCRETO, FC=175 KG/CM2 EN LOSA ALIGERADA
OE.2.3. PARA EL ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
OE.2.3. PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN LOSA ALIGERADA
HOJA RESUMEN DE METRADOS - ESTRUCTURAS
OBRA : CONSTRUCCN DE VIVIENDA UNIFAMILIAR EN LA URB. 15 DE SETIEMBRE MZ "C" LT - 21 FECHA: 4/21/2017
EMPRESA:
SECTOR:
DEPARTAMENTO: LIMA PROVINCIA: SAN JUAN DE LURIGANCHO DISTRITO: SUCRE
ELABORADO POR: WILMER NO MARIN ROJAS REVISADO POR: WILMER NO MARIN ROJAS

ITEM. DESCRIPCIN
OE.2.3. PARA LADRILLOS HUECOS DE ARCILLA 15X30X30 EN LOSA ALIGERADA
OE.2.3.10 ESCALERAS
OE.2.3.10.1 PARA EL CONCRETO, FC = 175 KG/CM2 EN ESCALERAS
OE.2.3.10.2 PARA EL ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS
OE.2.3.10.3 PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN ESCALERAS
OE.2.6 VARIOS
OE.2.6.1 JUNTAS DE DILATACION DE 1"
UND METRADO

m2 5.76
m2 119.09

Glb. 1.00
Glb. 1.00
Glb. 1.00

Glb. 1.00

m2 79.88

m3 35.2

m3 5.72
UND METRADO
m2 68.66
m3 41.74

m3 23.39

m3 4.36
m2 58.41
m2 68.66

m3 4.12
m2 65.21
Kg. 524.25

m3 4.37
m2 29.51
Kg. 630.14

m3 4.67
m2 51.91
Kg. 282.78
UND METRADO
Und. 453.6

m3 1.79
m2 5.42
Kg. 115.23

m. 5.96
N DE
ITEM. DESCRIPCIN UND Largo (m) Ancho (m) Altura (m)
VECES
OE.1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.
OE.1.1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
OE.1.1.1 CONSTRUCCIONES PROVISIONALES
OE.1.1.1.3 CASETAS DE GUARDIANA m2
m2 1.00 2.40 2.40
OE.1.1.1.7 CERCO PERIMETRICO - PALOS DE EUCALIPTO - MALLA ASPILLERA m2
Frontal m2 1.00 5.32 2.40
Lateral Izquierdo m2 1.00 19.53 2.40
Lateral Derechodo m2 1.00 19.45 2.40
Posterior m2 1.00 5.32 2.40
OE.1.1.2 INSTALACIONES PROVISIONALES
OE.1.1.2.1 AGUA PARA LA CONSTRUCCIN Glb.
GLB 1.00
OE.1.1.2.2 DESAGE PARA LA CONSTRUCCIN Glb.
GLB 1.00
OE.1.1.2.3 ENERGA ELCTRICA PROVISIONAL Glb.
Glb. 1.00
OE.1.1.7 MOVILIZACIN DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
OE.1.1.7.1 TRANSPORTES DE MATERIALES Y EQUIPOS Glb.
Glb. 1.00
OE.1.1.9 TRAZOS, NIVELES Y REPLANTEO
OE.1.1.9.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2
Area del Terreno 1.00 4.32 18.49
OE.2 ESTRUCTURAS.
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2 EXCAVACIONES
OE.2.1.2.1 EXCAVACIONES SIMPLES
OE.2.1.2.1.10 EXCAVACIONES SIMPLES DE ZANJAS PARA CIMIENTOS m3
CIMIENTOS CORRIDOS
EJE "1" / EJE "8" y "9" (Corte: 1-1) m3 1.00 18.53 0.50 1.00
EJE "2" / EJE "5" y "9" (Corte: 2-2) m3 1.00 6.03 0.45 1.00
EJE "3" / EJE "7" y "9" (Corte: 1-1) m3 1.00 14.72 0.50 1.00
EJE "3" / EJE "7" y "8" (Corte: 3-3) m3 1.00 3.23 0.40 1.00
EJE "4" / EJE "7" y "8" (Corte: 2-2) m3 1.00 2.73 0.45 1.00
EJE "5" / EJE "1" y "2" (Corte: 5-5) m3 1.00 0.95 0.50 1.00
EJE "5" / EJE "2" y "3" (Corte: 5-5) m3 1.00 0.75 0.45 1.00
N DE
ITEM. DESCRIPCIN UND Largo (m) Ancho (m) Altura (m)
VECES
EJE "5" / EJE "2" y "3" (Corte: 2-2) m3 1.00 1.62 0.45 1.00
EJE "6" / EJE "1" y "3" (Corte: 5-5) m3 1.00 0.70 0.45 1.00
EJE "6" / EJE "1" y "3" (Corte: 2-2) m3 1.00 2.62 0.45 1.00
EJE "7" / EJE "1" y "3" (Corte: 5-5) m3 1.00 3.82 0.50 1.00
EJE "8" / EJE "1" y "4" (Corte: 1-1) m3 1.00 1.82 0.50 1.00
EJE "8" / EJE "3" y "4" (Corte: 3-3) m3 1.00 1.60 0.40 1.00
EJE "9" / EJE "1" y "3" (Corte: 5-5) m3 1.00 3.32 0.50 1.00
Entre EJE "5" y "6"(Corte: 4-4) ..."ZONA BAO" m3 1.00 2.31 0.40 1.00
Entre EJE "5" y "6"(Corte: 5-5)... "ZONA BAO" m3 1.00 0.54 0.40 1.00
EXCAVACION DE CIMIENTOS CORRIDOS
BAO
Excavacion de Bao m3 1.00 1.60 1.60 0.15
EXCAVACION DE BAO =
PATIO
Excavacion de Patio m3 1.00 3.25 2.00 0.15
EXCAVACION DE PATIO =
POZO TIERRA
Excavacion de Pozo Tierra m3 1.00 0.50 3.00
EXCAVACION DE POZO TIERRA =
INSTALACIONES SANITARIAS
Tub 2": 0.85+0.60+1.07 = 2.52m m3 1.00 2.52 0.10 0.10
Tub 4": 7.63+1.54+0.80+0.40+2.72 = 13.09m m3 1.00 13.09 0.15 0.15
Tub 6": 7.75 = 7.75m m3 1.00 7.75 0.20 0.20
Caja de Registro (0.30 x 0.60) 1.00 0.30 0.60 0.45
m3
1.00 0.30 0.60 0.65
EXCAVACION INSTALACIONES SANITARIAS =
ESCALERA
Cimiento de Escalera m3 1.00 1.00 0.50 0.65
EXCAVACIN DE ESCALERA =
OE.2.1.4 RELLENOS
OE.2.1.4.1 RELLENO CON MATERIAL PROPIO m3
EJE "1" / EJE "8" y "9" (Corte: 1-1) m3 1.00 18.53 0.35 0.25
EJE "2" / EJE "5" y "9" (Corte: 2-2) m3 1.00 6.03 0.30 0.25
EJE "3" / EJE "7" y "9" (Corte: 1-1) m3 1.00 14.72 0.35 0.25
EJE "3" / EJE "7" y "8" (Corte: 3-3) m3 1.00 3.23 0.25 0.25
EJE "4" / EJE "7" y "8" (Corte: 2-2) m3 1.00 2.73 0.30 0.25
N DE
ITEM. DESCRIPCIN UND Largo (m) Ancho (m) Altura (m)
VECES
EJE "5" / EJE "1" y "2" (Corte: 5-5) m3 1.00 0.95 0.50 0.25
EJE "5" / EJE "2" y "3" (Corte: 5-5) m3 1.00 0.75 0.45 0.25
EJE "5" / EJE "2" y "3" (Corte: 2-2) m3 1.00 1.62 0.30 0.25
EJE "6" / EJE "1" y "3" (Corte: 5-5) m3 1.00 0.70 0.45 0.25
EJE "6" / EJE "1" y "3" (Corte: 2-2) m3 1.00 2.62 0.30 0.25
EJE "7" / EJE "1" y "3" (Corte: 5-5) m3 1.00 3.82 0.50 0.25
EJE "8" / EJE "1" y "4" (Corte: 1-1) m3 1.00 1.82 0.35 0.25
EJE "8" / EJE "3" y "4" (Corte: 3-3) m3 1.00 1.60 0.25 0.25
EJE "9" / EJE "1" y "3" (Corte: 5-5) m3 1.00 3.32 0.50 0.25
Entre EJE "5" y "6"(Corte: 4-4) ..."ZONA BAO" m3 1.00 2.30 0.25 0.25
Entre EJE "5" y "6"(Corte: 5-5)... "ZONA BAO" m3 1.00 0.60 0.40 0.25
OE.2.1.5 NIVELACIN INTERIOR Y APISONADO
OE.2.1.5.1 NIVELACIN INTERIOR Y APISONADO MANUAL m2
Cocina m2 1.00 3.36 1.87
Patio m2 1.00 2.56 2.00
Sala - Comedor m2 1.00 5.19 4.02
Escalera Atrs m2 1.00 2.00 1.00
Escalera Delante m3 1.00 1.52 1.00
Frente bao m2 1.00 2.27 1.75
Bao m2 1.00 1.60 1.60
Pasadizo m2 1.00 6.92 1.00
Tienda m2 1.00 6.73 2.87
Puertas m2 1.00 0.70 0.15
OE.2.1.6 ELIMINACIN DE MATERIAL EXCEDENTE m3
VARIOS m3
Material Excavado y Exponjado m3 35.20 1.30
Material de Relleno y Compactado m3 5.72 1.30
Material Excedente a Eliminar (Desmonte 1) m3 TOTAL MATERIAL EXEDENTE 1 =
m3
Area Techada (68.21 m2) Volumen Desmonte 2 m3 68.31 0.05
Material de Limpieza a Eliminar (Desmonte 2) TOTAL MATERIAL EXEDENTE 2 =
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.1 CIMIENTOS CORRIDOS,MEZCLA CEMENTO:HORMIGON 1:10+30%PG m3
EJE "1" / EJE "8" y "9" (Corte: 1-1) m3 1.00 18.53 0.50 0.75
EJE "2" / EJE "5" y "9" (Corte: 2-2) m3 1.00 6.03 0.45 0.75
EJE "3" / EJE "7" y "9" (Corte: 1-1) m3 1.00 14.72 0.50 0.75
N DE
ITEM. DESCRIPCIN UND Largo (m) Ancho (m) Altura (m)
VECES
EJE "3" / EJE "7" y "8" (Corte: 3-3) m3 1.00 3.23 0.40 0.75
EJE "4" / EJE "7" y "8" (Corte: 2-2) m3 1.00 2.73 0.45 0.75
EJE "5" / EJE "1" y "2" (Corte: 5-5) m3 1.00 0.95 0.50 0.75
EJE "5" / EJE "2" y "3" (Corte: 5-5) m3 1.00 0.75 0.45 0.75
EJE "5" / EJE "2" y "3" (Corte: 2-2) m3 1.00 1.62 0.45 0.75
EJE "6" / EJE "1" y "3" (Corte: 5-5) m3 1.00 0.70 0.45 0.75
EJE "6" / EJE "1" y "3" (Corte: 2-2) m3 1.00 2.62 0.45 0.75
EJE "7" / EJE "1" y "3" (Corte: 5-5) m3 1.00 3.82 0.50 0.75
EJE "8" / EJE "1" y "4" (Corte: 1-1) m3 1.00 1.82 0.50 0.75
EJE "8" / EJE "3" y "4" (Corte: 3-3) m3 1.00 1.60 0.40 0.75
EJE "9" / EJE "1" y "3" (Corte: 5-5) m3 1.00 3.32 0.50 0.75
Entre EJE "5" y "6"(Corte: 4-4) ..."ZONA BAO" m3 1.00 2.30 0.40 0.75
Entre EJE "5" y "6"(Corte: 5-5)... "ZONA BAO" m3 1.00 0.60 0.40 0.75
OE.2.2.6 SOBRECIMIENTOS
OE.2.2.6.1 PARA EL CONCRETO, MEZCLA CEMENTO: HORMIGON 1:8 + 25% PM m3
EJE "1" / EJE "8" y "9" (Corte: 1-1) m3 1.00 16.63 0.15 0.55
EJE "2" / EJE "5" y "9" (Corte: 2-2) m3 1.00 6.15 0.15 0.55
EJE "3" / EJE "7" y "9" (Corte: 1-1) m3 1.00 13.75 0.15 0.55
EJE "3" / EJE "7" y "8" (Corte: 3-3) m3 1.00 2.82 0.15 0.55
EJE "4" / EJE "7" y "8" (Corte: 2-2) m3 1.00 2.81 0.15 0.55
EJE "5" / EJE "2" y "3" (Corte: 2-2) m3 1.00 1.87 0.15 0.55
EJE "6" / EJE "1" y "3" (Corte: 2-2) m3 1.00 2.82 0.15 0.55
EJE "8" / EJE "1" y "4" (Corte: 1-1) m3 1.00 1.87 0.15 0.55
EJE "8" / EJE "3" y "4" (Corte: 3-3) m3 1.00 1.72 0.15 0.55
Entre EJE "5" y "6"(Corte: 4-4) ..."ZONA BAO" m3 1.00 2.65 0.15 0.55
OE.2.2.6.2 PARA EL ENCOFRADO Y DESENCOFRADO, DE SOBRECIMIENTOS m2
EJE "1" / EJE "8" y "9" (Corte: 1-1) m2 2.00 16.63 0.55
EJE "2" / EJE "5" y "9" (Corte: 2-2) m2 2.00 6.15 0.55
EJE "3" / EJE "7" y "9" (Corte: 1-1) m2 2.00 13.75 0.55
EJE "3" / EJE "7" y "8" (Corte: 3-3) m2 2.00 2.82 0.55
EJE "4" / EJE "7" y "8" (Corte: 2-2) m2 2.00 2.81 0.55
EJE "5" / EJE "2" y "3" (Corte: 2-2) m2 2.00 1.87 0.55
EJE "6" / EJE "1" y "3" (Corte: 2-2) m2 2.00 2.82 0.55
EJE "8" / EJE "1" y "4" (Corte: 1-1) m2 2.00 1.87 0.55
EJE "8" / EJE "3" y "4" (Corte: 3-3) m2 2.00 1.72 0.55
Entre EJE "5" y "6"(Corte: 4-4) ..."ZONA BAO" m2 2.00 2.65 0.55
N DE
ITEM. DESCRIPCIN UND Largo (m) Ancho (m) Altura (m)
VECES
OE.2.2.9 FALSOPISO, MEZCLA CEMENTO: HORMIGON 1:8, E=0.10M m2
Cocina m2 1.00 3.36 1.87
Patio m2 1.00 2.56 2.00
Sala - Comedor m2 1.00 5.19 4.02
Escalera Atrs m2 1.00 2.00 1.00
Escalera Delante m3 1.00 1.52 1.00
Frente bao m2 1.00 2.27 1.75
Bao m2 1.00 1.60 1.60
Pasadizo m2 1.00 6.92 1.00
Tienda m2 1.00 6.73 2.87
Puertas m2 1.00 0.70 0.15
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.7 COLUMNAS
OE.2.3.7.1 PARA EL CONCRETO EN COLUMNAS FC=175 KG/CM2 m3
Columnas C-1 m3 3.00 0.15 0.40 3.08
Columnas C-1 m3 1.00 0.15 0.40 2.98
Columnas C-2 m3 6.00 0.25 0.25 2.98
Columnas C-3 m3 4.00 0.30 0.30 2.98
Columnas C-4 m3 2.00 0.15 0.25 2.98
Columnas C-4 m3 3.00 0.15 0.25 2.98
VOLUMEN DE CONCRETO EN COLUMNAS =
Muros dentados m3
Volumen Dentado en 1 Muro m3 8.00 0.02
Volumen Dentado en 2 Muro m3 9.00 0.04
Volumen Dentado en 3 Muro m3 2.00 0.06
VOLUMEN DE CONCRETO EN MUROS DENTADOS =
OE.2.3.7.2 PARA EL ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2
Permetro
Columnas C-1 m2 1.00 1.18 2.98
Columnas C-1 m2 2.00 1.26 3.08
Columnas C-1 m2 1.00 1.18 3.08
Columnas C-2 m2 3.00 1.16 2.98
Columnas C-2 m2 1.00 1.24 2.98
Columnas C-2 m2 2.00 1.08 2.98
Columnas C-3 m2 2.00 1.36 2.98
Columnas C-3 m2 1.00 1.44 2.98
N DE
ITEM. DESCRIPCIN UND Largo (m) Ancho (m) Altura (m)
VECES
Columnas C-3 m2 1.00 1.28 2.98
Columnas C-4 m2 1.00 0.88 2.98
Columnas C-4 m2 1.00 0.96 2.98
Columnas C-4 m2 2.00 0.88 2.98
Columnas C-4 m2 1.00 0.96 2.98
OE.2.3.7.3 PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN COLUMNAS Kg.
Total de Acero para Columnas (Ver formato de fierro) kg
OE.2.3.8 VIGAS
OE.2.3.8.1 PARA EL CONCRETO, FC=175 KG/CM2 EN VIGAS m3
VIGAS
V_S - EJE "1" / EJES "6" y "9" m3 1.00 8.86 0.25 0.20
V_P3 - Eje "1" = EJES "3" / EJE "6" y "7" m3 2.00 5.55 0.30 0.30
V_S - Eje 3 / EJES "5" Y "9" m3 1.00 6.09 0.25 0.20
V_P - EJE "9" / EJES "1" y "3" m3 1.00 4.32 0.25 0.30
VIGA CORTE 1 -1 m3 1.00 3.30 0.10 0.20
V_P5 - Eje "2" / EJES "5" y "9" m3 1.00 6.16 0.15 0.30
V_P1 - ENTRE EJES "5" Y "9" m3 2.00 4.32 0.25 0.30
V_CH- EJE "5" / EJE "6" m3 1.00 2.70 0.40 0.20
V_P2 - EJE "6" / EJES "1" y "3" m3 1.00 3.72 0.25 0.30
V_v1 - EJE "7" / EJES "1" y "3" m3 1.00 3.72 0.25 0.20
V_P4 - EJE "3" / Eje "5" y Eje "6" m3 1.00 2.70 0.15 0.30
V_v1 - EJE "1" = EJE "4" / EJES "7" y "8" m3 2.00 3.35 0.25 0.20
V_S - EJE "8" / EJES "1" y "4" m3 1.00 1.67 0.25 0.20
DINTELES TOTAL DE CONCRETO EN VIGAS
EJE "6" y EJE "5" (PUERTA SALA Y PUERTA TIENDA) m3 2.00 1.10 0.15 0.10
PUERTA DE BAO m3 1.00 1.05 0.15 0.10
PUERTA PRINCIPAL m3 1.00 1.00 0.15 0.18
TOTAL DE CONCRETO EN DINTELES
OE.2.3.8.2 PARA EL ENCOFRADO Y DESENCOFRADO, NORMAL EN VIGAS m2
VIGAS PERIMETRO
VS - Eje 1 / Eje 6 m2 1.00 8.86 0.30
VP3 - Eje 1 / Eje 3 m2 2.00 5.55 0.55
VS - Eje 3 m2 1.00 6.05 0.30
VP - Eje 9 m2 1.00 1.15 0.65
VP - Eje 9 m2 1.00 3.17 0.45
V Corte - Eje 1 -1 m2 1.00 3.30 0.30
N DE
ITEM. DESCRIPCIN UND Largo (m) Ancho (m) Altura (m)
VECES
VP5 - Eje 2 m2 1.00 6.16 0.20
VP1 - Eje 5 m2 1.00 2.11 0.30
VP1 - Eje 5 m2 1.00 2.21 0.45
VP1 - Eje 1 / Eje 3 m2 1.00 4.32 0.45
V_CH- (0.40x0.20) m2 1.00 1.00 0.40
V_CH- (0.40x0.20) m2 1.00 1.70 0.60
VP2 - Eje 6 m2 1.00 5.89 0.30
VP2 - Eje 6 m2 1.00 1.75 0.45
Vv1 - Eje 7 m2 1.00 1.85 0.45
Vv1 - Eje 7 m2 1.00 1.92 0.25
VP4 - Eje 3 / Eje 5 y Eje 6 m2 1.00 2.70 0.60
Vv1 - Eje 1 y 4 m2 2.00 3.35 0.30
VS - Eje 8 m2 1.00 1.67 0.30
TOTAL DE ENCOFRADO EN VIGAS
DINTELES PERIMETRO
2.00 1.10 0.20
EJE "6" y EJE "5" (PUERTA SALA Y PUERTA TIENDA) m2
2.00 0.14
1.00 1.05 0.20
PUERTA DE BAO m2
1.00 0.11
1.00 1.00 0.36
PUERTA PRINCIPAL m2
1.00 0.15
TOTAL DE ENCOFRADO EN DINTELES
OE.2.3.8.3 PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN VIGAS Kg.
Total de Acero para Vigas (Ver formato de fierro)
OE.2.3.9 LOSAS
OE.2.3.9.2 LOSAS ALIGERADAS CONVENCIONALES
OE.2.3.9.2.1 PARA EL CONCRETO, FC=175 KG/CM2 EN LOSA ALIGERADA m3
Cocina m3 1.00 1.67 3.10 0.09
Sala Comedor m3 1.00 3.72 5.00 0.09
Escalera Frente m3 1.00 1.77 2.70 0.09
Pasadizo m3 1.00 0.90 6.17 0.09
Tienda m3 1.00 2.78 6.13 0.09
Area Curva m3 1.00 2.81 0.27 0.09
OE.2.3.9.2.2 PARA EL ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m2
Cocina m2 1.00 1.67 3.10
Sala Comedor m2 1.00 3.72 5.00
N DE
ITEM. DESCRIPCIN UND Largo (m) Ancho (m) Altura (m)
VECES
Escalera Frente m2 1.00 1.77 2.70
Pasadizo m2 1.00 0.90 6.17
Tienda m2 1.00 2.78 6.13
Area Curva m2 1.00 2.81 0.27
OE.2.3.9.2.3 PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN LOSA ALIGERADA Kg.
Total de Acero para Losa Aligerada (Ver formato de fierro)
OE.2.3.9.2.4 PARA LADRILLOS HUECOS DE ARCILLA 15X30X30 EN LOSA ALIGERADA Und.
Cocina Und 1.00 1.67 3.10 8.33
Sala Comedor Und 1.00 3.72 5.00 8.33
Escalera Frente Und 1.00 1.77 2.70 8.33
Pasadizo Und 1.00 0.90 6.17 8.33
Tienda Und 1.00 2.78 6.13 8.33
Area Curva Und 1.00 2.81 0.27 8.33
OE.2.3.10 ESCALERAS
OE.2.3.10.1 PARA EL CONCRETO, FC = 175 KG/CM2 EN ESCALERAS m3
1ER TRAMO
Elemento 1 m3 1.00 1.00 0.50 0.98
Elemento 2 (Pasos y Contrapasos) m3 5.00 1.00 0.25 0.09
Elemento 3 (Garganta) m3 1.00 1.59 1.00 0.15
Elemento 4 (Losa) m3 1.00 1.00 1.15 0.15
Elemento 5 (Escalon) m3 1.00 1.00 1.00 0.09
2DO TRAMO TOTAL DE CONCRETO 1ER TRAMO =
Elemento 6 (Pasos y Contrapasos) m3 3.00 1.00 0.25 0.09
Elemento 7 (Garganta) m3 1.00 1.28 1.00 0.15
Elemento 8 (Losa) m3 1.00 1.00 1.15 0.15
3ER TRAMO TOTAL DE CONCRETO 2DO TRAMO =
Elemento 9 (Pasos y Contrapasos) m3 4.00 1.00 0.25 0.09
Elemento 10 (Garganta) m3 1.00 1.15 1.00 0.15
TOTAL DE CONCRETO 3ER TRAMO =
OE.2.3.10.2 PARA EL ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2
1ER TRAMO
Tramo Inclinado m2 1.00 1.59 1.00
Descanso m2 1.00 0.70 1.00
2DO TRAMO TOTAL DE ENCOFRADO 1ER TRAMO =
Tramo Inclinado m2 1.00 1.28 1.00
Descanso m2 1.00 0.70 1.00
N DE
ITEM. DESCRIPCIN UND Largo (m) Ancho (m) Altura (m)
VECES
3ER TRAMO TOTAL DE ENCOFRADO 2DO TRAMO =
Descanso m2 1.00 1.15 1.00
TOTAL DE ENCOFRADO 3ER TRAMO =
OE.2.3.10.3 PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN ESCALERAS Kg.
Total de Acero para Escaleras (Ver formato de fierro)
OE.2.6 VARIOS
OE.2.6.1 JUNTAS DE DILATACION DE 1" m.
Juntas de Dilatacion de 1" m 2.00 2.98
PARCIAL TOTAL

5.76
5.76
119.09
12.77
46.87
46.68
12.77

1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00

79.88
79.88

35.20

9.27
2.71
7.36
1.29
1.23
0.48
0.34
PARCIAL TOTAL
0.73
0.32
1.18
1.91
0.91
0.64
1.66
0.92
0.22
31.17

0.38
0.38

0.98
0.98

1.51
1.51

0.03
0.29
0.31
0.08
0.12
0.83

0.33
0.33

5.72
1.62
0.45
1.29
0.20
0.20
PARCIAL TOTAL
0.12
0.08
0.12
0.08
0.20
0.48
0.16
0.10
0.42
0.14
0.06

68.66
6.28
5.12
20.86
2.00
1.52
3.97
2.56
6.92
19.32
0.11
41.74
41.74
45.76
7.44
38.32

3.42
3.42

23.39
6.95
2.04
5.52
PARCIAL TOTAL
0.97
0.92
0.36
0.25
0.55
0.24
0.88
1.43
0.68
0.48
1.25
0.69
0.18

4.36
1.37
0.51
1.13
0.23
0.23
0.15
0.23
0.15
0.14
0.22
58.41
18.29
6.77
15.13
3.10
3.09
2.06
3.10
2.06
1.89
2.92
PARCIAL TOTAL
68.66
6.28
5.12
20.86
2.00
1.52
3.97
2.56
6.92
19.32
0.11

4.12
0.55
0.18
1.12
1.07
0.22
0.34
3.48

0.16
0.36
0.12
0.64
65.21

3.52
7.76
3.63
10.37
3.70
6.44
8.11
4.29
PARCIAL TOTAL
3.81
2.62
2.86
5.24
2.86
524.25
524.25

4.37

0.44
1.00
0.30
0.32
0.07
0.28
0.65
0.22
0.28
0.19
0.12
0.34
0.08
4.29
0.03
0.02
0.03
0.08
29.51

2.66
6.11
1.82
0.75
1.43
0.99
PARCIAL TOTAL
1.23
0.63
0.99
1.94
0.40
1.02
1.77
0.79
0.83
0.48
1.62
2.01
0.50
27.97

0.44
0.27
0.21
0.11
0.36
0.15
1.54
630.14

4.67
0.47
1.67
0.43
0.50
1.53
0.07
51.91
5.18
18.60
PARCIAL TOTAL
4.78
5.55
17.04
0.76
282.78

453.60
43.00
155.00
40.00
46.00
142.00
6.00

1.79

0.49
0.11
0.24
0.17
0.09
1.10
0.07
0.19
0.17
0.43
0.09
0.17
0.26
5.42

1.59
0.70
2.29
1.28
0.70
PARCIAL TOTAL
1.98
1.15
1.15
115.23

5.96
5.96
HOJA DE SUSTENTO DE METRADOS DE ACEROS - ESTRUCTURAS
OBRA : CONSTRUCCN DE VIVIENDA UNIFAMILIAR EN LA URB. 15 DE SETIEMBRE MZ "C" LT - 21 FECHA: 4/21/2017
EMPRESA:
SECTOR:
DEPARTAMENTO: LIMA PROVINCIA: SAN JUAN DE LURIGANCHO DISTRITO: SUCRE
ELABORADO POR: WILMER NO MARIN ROJAS REVISADO POR: WILMER NO MARIN ROJAS

DIAMETRO N ELEM. N PIEZAS X LONG X PZA 1/4" 3/8" 1/2" 5/8" 3/4"
ITEM DESCRIPCIN
(plg) IGUALES ELEM. (ml) 0.252 0.560 0.994 1.552 2.235
OE.2.3.7.3 PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN COLUMNAS
Columna C-1 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 1/2" 4.00 4.00 4.50 0.00 0.00 72.00 0.00 0.00
ESTRIBOS SECCIN (0.15x0.40) 1/4" 3.00 28.00 1.06 89.04 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Columna C-1 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 3/8" 4.00 2.00 4.50 0.00 36.00 0.00 0.00 0.00
ESTRIBOS SECCIN (0.15x0.40) 1/4" 1.00 28.00 1.06 29.68 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Columna C-2 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 1/2" 6.00 6.00 4.50 0.00 0.00 162.00 0.00 0.00
ESTRIBOS SECCIN (0.25x0.25) 1/4" 6.00 23.00 0.96 132.48 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Columna C-3 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 5/8" 4.00 4.00 4.50 0.00 0.00 0.00 72.00 0.00
ESTRIBOS SECCIN (0.30x0.30) 1/4" 4.00 23.00 1.16 106.72 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Columna C-4 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 3/8" 2.00 4.00 4.50 0.00 36.00 0.00 0.00 0.00
ESTRIBOS SECCIN (0.25x0.15) 1/4" 2.00 23.00 0.76 34.96 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Columna C-4 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 3/8" 3.00 4.00 4.50 0.00 54.00 0.00 0.00 0.00
ESTRIBOS SECCIN (0.25x0.15) 1/4" 3.00 18.00 0.76 41.04 0.00 0.00 0.00 0.00
TOTAL DE ACERO EN (ml) = 433.92 126.00 234.00 72.00 0.00
HOJA DE SUSTENTO DE METRADOS DE ACEROS - ESTRUCTURAS
OBRA : CONSTRUCCN DE VIVIENDA UNIFAMILIAR EN LA URB. 15 DE SETIEMBRE MZ "C" LT - 21 FECHA: 4/21/2017
EMPRESA:
SECTOR:
DEPARTAMENTO: LIMA PROVINCIA: SAN JUAN DE LURIGANCHO DISTRITO: SUCRE
ELABORADO POR: WILMER NO MARIN ROJAS REVISADO POR: WILMER NO MARIN ROJAS

TOTAL DE ACERO EN (Kg) = 109.35 70.56 232.60 111.74 0.00


DIAMETRO N ELEM. N PIEZAS X LONG X PZA 1/4" 3/8" 1/2" 5/8" 3/4"
ITEM DESCRIPCIN
(plg) IGUALES ELEM. (ml) 0.252 0.560 0.994 1.552 2.235

OE.2.3.8.3 PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN VIGAS


Viga Solera (0.25x0.20), Eje 1 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 1/2" 1.00 5.00 11.14 0.00 0.00 55.70 0.00 0.00
ESTRIBOS SECCIN (0.25 x 0.20) 1/4" 1.00 64.00 0.90 57.60 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Viga Peraltada (0.25x0.30), Eje 9 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 5/8" 1.00 4.00 4.64 0.00 0.00 0.00 18.56 0.00
FIERRO LONGITUDINAL 5/8" 1.00 1.00 1.67 0.00 0.00 0.00 1.67 0.00
ESTRIBOS SECCIN (0.25x0.30) 1/4" 1.00 34.00 1.10 37.40 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Viga de Corte 1-1 (0.10x0.20) 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 3/8" 1.00 2.00 3.68 0.00 7.36 0.00 0.00 0.00
ESTRIBOS SECCIN (0.10x0.20) 1/4" 1.00 21.00 0.30 6.30 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Viga P5 (0.15x0.30) 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 3/8" 1.00 4.00 7.22 0.00 28.88 0.00 0.00 0.00
ESTRIBOS SECCIN (0.150x0.20) 1/4" 1.00 43.00 0.90 38.70 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Viga Solera (0.25x0.20), Eje 3 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 1/2" 1.00 5.00 7.16 0.00 0.00 35.80 0.00 0.00
ESTRIBOS SECCIN (0.25x0.15) 1/4" 1.00 43.00 0.90 38.70 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Viga P1 (0.15x0.30) 0.00 0.00 0.00 0.00 0.00
HOJA DE SUSTENTO DE METRADOS DE ACEROS - ESTRUCTURAS
OBRA : CONSTRUCCN DE VIVIENDA UNIFAMILIAR EN LA URB. 15 DE SETIEMBRE MZ "C" LT - 21 FECHA: 4/21/2017
EMPRESA:
SECTOR:
DEPARTAMENTO: LIMA PROVINCIA: SAN JUAN DE LURIGANCHO DISTRITO: SUCRE
ELABORADO POR: WILMER NO MARIN ROJAS REVISADO POR: WILMER NO MARIN ROJAS

FIERRO LONGITUDINAL 5/8" 2.00 4.00 4.64 0.00 0.00 0.00 37.12 0.00
FIERRO LONGITUDINAL 5/8" 2.00 1.00 1.67 0.00 0.00 0.00 3.34 0.00
ESTRIBOS SECCIN (0.25x0.15) 1/4" 2.00 31.00 1.10 68.20 0.00 0.00 0.00 0.00
Viga Chata (0.40x0.20) 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 1/2" 1.00 8.00 3.45 0.00 0.00 27.60 0.00 0.00
ESTRIBOS SECCIN (0.25x0.15) 1/4" 1.00 20.00 1.20 24.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Viga P2 (0.25x0.30), Eje 6 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 5/8" 1.00 4.00 4.64 0.00 0.00 0.00 18.56 0.00
FIERRO LONGITUDINAL negativo 5/8" 1.00 2.00 1.41 0.00 0.00 0.00 2.82 0.00
FIERRO LONGITUDINAL Positivo 5/8" 1.00 2.00 2.72 0.00 0.00 0.00 5.44 0.00
ESTRIBOS SECCIN (0.25x0.15) 1/4" 1.00 31.00 1.10 34.10 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Viga P3 (0.30x0.30) 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 5/8" 2.00 4.00 5.87 0.00 0.00 0.00 46.96 0.00
FIERRO LONGITUDINAL 5/8" 2.00 2.00 1.66 0.00 0.00 0.00 6.64 0.00
FIERRO LONGITUDINAL 5/8" 2.00 2.00 3.75 0.00 0.00 0.00 15.00 0.00
ESTRIBOS SECCIN (0.25x0.15) 3/8" 2.00 36.00 1.20 0.00 86.40 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Viga V1 (0.40x0.20),Eje 7 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 1/2" 1.00 6.00 4.57 0.00 0.00 27.42 0.00 0.00
ESTRIBOS SECCIN (0.25x0.15) 1/4" 1.00 31.00 0.90 27.90 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Viga V1 (0.40x0.20),Eje 1 y 4 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 1/2" 2.00 6.00 3.79 0.00 0.00 45.48 0.00 0.00
ESTRIBOS SECCIN (0.25x0.15) 1/4" 2.00 21.00 0.90 37.80 0.00 0.00 0.00 0.00
HOJA DE SUSTENTO DE METRADOS DE ACEROS - ESTRUCTURAS
OBRA : CONSTRUCCN DE VIVIENDA UNIFAMILIAR EN LA URB. 15 DE SETIEMBRE MZ "C" LT - 21 FECHA: 4/21/2017
EMPRESA:
SECTOR:
DEPARTAMENTO: LIMA PROVINCIA: SAN JUAN DE LURIGANCHO DISTRITO: SUCRE
ELABORADO POR: WILMER NO MARIN ROJAS REVISADO POR: WILMER NO MARIN ROJAS

0.00 0.00 0.00 0.00 0.00


Viga Solera (0.40x0.20),Eje 8 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 1/2" 1.00 5.00 2.42 0.00 0.00 12.10 0.00 0.00
ESTRIBOS SECCIN (0.25x0.15) 1/4" 1.00 16.00 0.90 14.40 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Viga P4 (0.40x0.20),Eje 1 y 4 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 3/8" 1.00 4.00 3.38 0.00 13.52 0.00 0.00 0.00
ESTRIBOS SECCIN (0.25x0.15) 1/4" 1.00 20.00 0.90 18.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Dintel (0.40x0.20),Eje 6 y 5 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 3/8" 2.00 2.00 1.36 0.00 5.44 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Dintel (0.40x0.20), Bao 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 3/8" 1.00 2.00 1.16 0.00 2.32 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
Dintel (0.40x0.20), Puerta Principal 0.00 0.00 0.00 0.00 0.00
FIERRO LONGITUDINAL 1/2" 1.00 2.00 1.41 0.00 0.00 2.82 0.00 0.00
TOTAL DE ACERO EN (ml) = 403.10 143.92 206.92 156.11 0.00
TOTAL DE ACERO EN (Kg) = 101.58 80.60 205.68 242.28 0.00
HOJA DE SUSTENTO DE METRADOS DE ACEROS - ESTRUCTURAS
OBRA : CONSTRUCCN DE VIVIENDA UNIFAMILIAR EN LA URB. 15 DE SETIEMBRE MZ "C" LT - 21 FECHA: 4/21/2017
EMPRESA:
SECTOR:
DEPARTAMENTO: LIMA PROVINCIA: SAN JUAN DE LURIGANCHO DISTRITO: SUCRE
ELABORADO POR: WILMER NO MARIN ROJAS REVISADO POR: WILMER NO MARIN ROJAS

DIAMETRO N ELEM. N PIEZAS X LONG X PZA 1/4" 3/8" 1/2" 5/8" 3/4"
ITEM DESCRIPCIN DISEO DEL FIERRO
(plg) IGUALES ELEM. (ml) 0.252 0.560 0.994 1.552 2.235
OE.2.3.9.2.3 PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN LOSA ALIGERADA

A5 0.00 0.00 0.00 0.00 0.00


NEGATIVO 2.42 3/8" 1.00 7.00 2.42
0.00 16.94 0.00 0.00 0.00
POSITIVO 1.92 3/8" 1.00 7.00 1.92
0.00 13.44 0.00 0.00 0.00

A4 0.00 0.00 0.00 0.00 0.00


NEGATIVO 1.41 1/2" 1.00 24.00 1.41
0.00 0.00 33.84 0.00 0.00
POSITIVO 4.02 1/2" 1.00 12.00 4.02
0.00 0.00 48.24 0.00 0.00

A1 0.00 0.00 0.00 0.00 0.00


NEGATIVO 0.96 1/2" 1.00 2.00 0.96
0.00 0.00 1.92 0.00 0.00
NEGATIVO 2.15 1/2" 1.00 2.00 2.15
0.00 0.00 4.30 0.00 0.00
NEGATIVO 4.11 1/2" 1.00 2.00 4.11
0.00 0.00 8.22 0.00 0.00
POSITIVO 6.79 1/2" 1.00 2.00 6.79
0.00 0.00 13.58 0.00 0.00
POSITIVO 3.38 1/2" 1.00 2.00 3.38
0.00 0.00 6.76 0.00 0.00

A2 0.00 0.00 0.00 0.00 0.00


HOJA DE SUSTENTO DE METRADOS DE ACEROS - ESTRUCTURAS
OBRA : CONSTRUCCN DE VIVIENDA UNIFAMILIAR EN LA URB. 15 DE SETIEMBRE MZ "C" LT - 21 FECHA: 4/21/2017
EMPRESA:
SECTOR:
DEPARTAMENTO: LIMA PROVINCIA: SAN JUAN DE LURIGANCHO DISTRITO: SUCRE
ELABORADO POR: WILMER NO MARIN ROJAS REVISADO POR: WILMER NO MARIN ROJAS

NEGATIVO 1.48 1/2" 1.00 1.00 1.48


0.00 0.00 1.48 0.00 0.00
NEGATIVO 2.15 1/2" 1.00 1.00 2.15
0.00 0.00 2.15 0.00 0.00
NEGATIVO 4.07 1/2" 1.00 1.00 4.07
0.00 0.00 4.07 0.00 0.00
POSITIVO 7.16 1/2" 1.00 1.00 7.16
0.00 0.00 7.16 0.00 0.00
POSITIVO 3.38 1/2" 1.00 1.00 3.38
0.00 0.00 3.38 0.00 0.00

A3 0.00 0.00 0.00 0.00 0.00


NEGATIVO 1.68 1/2" 1.00 6.00 1.68
0.00 0.00 10.08 0.00 0.00
NEGATIVO 2.15 1/2" 1.00 6.00 2.15
0.00 0.00 12.90 0.00 0.00
NEGATIVO 0.96 1/2" 1.00 6.00 0.96
0.00 0.00 5.76 0.00 0.00
POSITIVO 7.24 1/2" 1.00 6.00 7.24
0.00 0.00 43.44 0.00 0.00

Temperatura 0.00 0.00 0.00 0.00 0.00


(T1) 8.66 1/4" 1.00 7.00 8.65
60.55 0.00 0.00 0.00 0.00
(T2) 5.25 1/4" 1.00 9.00 5.25
47.25 0.00 0.00 0.00 0.00
(T3) 2.25 1/4" 1.00 12.00 2.25
27.00 0.00 0.00 0.00 0.00
(T4) 3.57 1/4" 1.00 27.00 3.57
96.39 0.00 0.00 0.00 0.00
(T5) 1.94 1/4" 1.00 3.00 1.94
5.82 0.00 0.00 0.00 0.00
TOTAL DE ACERO EN (ml) = 237.01 30.38 207.28 0.00 0.00
HOJA DE SUSTENTO DE METRADOS DE ACEROS - ESTRUCTURAS
OBRA : CONSTRUCCN DE VIVIENDA UNIFAMILIAR EN LA URB. 15 DE SETIEMBRE MZ "C" LT - 21 FECHA: 4/21/2017
EMPRESA:
SECTOR:
DEPARTAMENTO: LIMA PROVINCIA: SAN JUAN DE LURIGANCHO DISTRITO: SUCRE
ELABORADO POR: WILMER NO MARIN ROJAS REVISADO POR: WILMER NO MARIN ROJAS

TOTAL DE ACERO EN (Kg) = 59.73 17.01 206.04 0.00 0.00

DIAMETRO N ELEM. N PIEZAS X LONG X PZA 1/4" 3/8" 1/2" 5/8" 3/4"
ITEM DESCRIPCIN DISEO DEL FIERRO
(plg) IGUALES ELEM. (ml) 0.252 0.560 0.994 1.552 2.235
OE.2.3.10.3 PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN ESCALERAS

1.60 3/8" 1.00 6.00 1.60 9.60


0.00 0.00 0.00 0.00

3.13 1/2" 1.00 6.00 3.13 0.00


0.00 18.78 0.00 0.00

1.27 3/8" 1.00 6.00 1.27 7.62


0.00 0.00 0.00 0.00
Tramo 1
1.43 3/8" 1.00 6.00 1.43 8.58
0.00 0.00 0.00 0.00

1.21 1/2" 1.00 6.00 1.21 0.00


0.00 7.26 0.00 0.00
0.95 3/8" 1.00 9.00 0.95 0.00 8.55 0.00 0.00 0.00

1.23 3/8" 1.00 6.00 1.23 7.38


0.00 0.00 0.00 0.00

2.79 1/2" 1.00 6.00 2.79 0.00


0.00 16.74 0.00 0.00

Tramo 2 2.81 3/8" 1.00 6.00 2.81


0.00
16.86
0.00 0.00 0.00

1.21 3/8" 1.00 6.00 1.21 7.26


0.00 0.00 0.00 0.00
0.95 3/8" 1.00 7.00 0.95 0.00 6.65 0.00 0.00 0.00
HOJA DE SUSTENTO DE METRADOS DE ACEROS - ESTRUCTURAS
OBRA : CONSTRUCCN DE VIVIENDA UNIFAMILIAR EN LA URB. 15 DE SETIEMBRE MZ "C" LT - 21 FECHA: 4/21/2017
EMPRESA:
SECTOR:
DEPARTAMENTO: LIMA PROVINCIA: SAN JUAN DE LURIGANCHO DISTRITO: SUCRE
ELABORADO POR: WILMER NO MARIN ROJAS REVISADO POR: WILMER NO MARIN ROJAS

2.86 3/8" 1.00 6.00 2.86 17.16


0.00 0.00 0.00 0.00

Tramo 3 2.88 1/2" 1.00 6.00 2.88


0.00
0.00
17.28 0.00 0.00

0.95 3/8" 1.00 10.00 0.95 9.50


0.00 0.00 0.00 0.00
TOTAL DE ACERO EN (ml) = 0.00 99.16 60.06 0.00 0.00
TOTAL DE ACERO EN (Kg) = 0.00 55.53 59.70 0.00 0.00
4/21/2017

1" TOTAL
3.973 (kg)
524.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4/21/2017

0.00
1" TOTAL
3.973 (kg)
630.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4/21/2017

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4/21/2017

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4/21/2017

1" TOTAL
3.973 (kg)
282.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
4/21/2017

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
4/21/2017

0.00

1" TOTAL
3.973 (kg)
115.23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
4/21/2017

0.00

0.00

0.00
0.00
0.00
Partida

OE.2.3.9.1.2

"OE." - ESTRUCTURAS
Partida
OE.1
OE.1.1
OE.1.1.1
OE.1.1.1.1
OE.1.1.1.2
OE.1.1.1.3
OE.1.1.1.4
OE.1.1.1.5
OE.1.1.1.6
OE.1.1.1.7
OE.1.1.1.8
OE.1.1.1.9
OE.1.1.2
OE.1.1.2.1
OE.1.1.2.1.1
OE.1.1.2.1.2
OE.1.1.2.2
OE.1.1.2.3
OE.1.1.2.1.1
OE.1.1.2.1.2
OE.1.1.2.4
OE.1.1.2.4.1
OE.1.1.2.4.2
OE.1.1.3
OE.1.1.3.1
OE.1.1.3.1.1
OE.1.1.3.1.2
OE.1.1.4
OE.1.1.4.1
OE.1.1.4.2
OE.1.1.4.3
OE.1.1.4.4
OE.1.1.5
OE.1.1.5.1
OE.1.1.5.2
OE.1.1.5.3
OE.1.1.5.4
OE.1.1.5.5
OE.1.1.6
OE.1.1.6.1
OE.1.1.7
OE.1.1.7.1
OE.1.1.7.2
OE.1.1.8
OE.1.1.9
OE.1.1.9.1
OE.1.1.9.2
OE.1.2
OE.1.2.1
OE.1.2.1.1
OE.1.2.1.2
OE.1.2.1.3
OE.1.2.1.4
OE.2.1.2.1.1
OE.2.1.2.1.2
OE.2.1.2.1.3
OE.1.2.2
OE.2
OE.2.1
OE.2.1.1
OE.2.1.1.1
OE.2.1.1.2
OE.2.1.2
OE.2.1.2.1
OE.2.1.2.1
OE.2.1.2.1.1
OE.2.1.2.1.2
OE.2.1.3
OE.2.1.4
OE.2.1.4.1
OE.2.1.4.2
OE.2.1.5
OE.2.1.5.1
OE.2.1.5.2
OE.2.1.6
OE.2.1.6.1
OE.2.1.7
OE.2.1.7.1
OE.2.1.7.2
OE.2.2
OE.2.2.1
OE.2.2.2
OE.2.2.2.1
OE.2.2.2.2
OE.2.2.3
OE.2.2.3.1
OE.2.2.4
OE.2.2.4.1
OE.2.2.4.2
OE.2.2.5
OE.2.2.5.1
OE.2.2.5.2
OE.2.2.6
OE.2.2.6.1
OE.2.2.6.2
OE.2.2.7
OE.2.2.7.1
OE.2.2.7.2
OE.2.2.8
OE.2.2.8.1
OE.2.2.8.2
OE.2.2.9
OE.2.2.9.1
OE.2.2.9.2
OE.2.2.9.3
OE.2.3
OE.2.3.1
OE.2.3.1.1
OE.2.3.1.2
OE.2.3.1.3
OE.2.3.2
OE.2.3.2.1
OE.2.3.2.2
OE.2.3.2.3
OE.2.3.2.4
OE.2.3.3
OE.2.3.3.1
OE.2.3.3.2
OE.2.3.3.3
OE.2.3.3.4
OE.2.3.4
OE.2.3.4.1
OE.2.3.4.2
OE.2.3.4.3
OE.2.3.4.4
OE.2.3.5
OE.2.3.5.1
OE.2.3.5.2
OE.2.3.5.3
OE.2.3.5.4
OE.2.3.6
OE.2.3.6.1
OE.2.3.6.1.1
OE.2.3.6.1.2
OE.2.3.6.1.3
OE.2.3.6.1.4
OE.2.3.6.1.5
OE.2.3.6.1.6
OE.2.3.6.1.7
OE.2.3.6.1.8
OE.2.3.6.1.9
OE.2.3.6.1.10
OE.2.3.6.2
OE.2.3.6.2.1
OE.2.3.6.2.2
OE.2.3.6.2.3
OE.2.3.6.2.4
OE.2.3.6.3
OE.2.3.6.3.1
OE.2.3.6.3.2
OE.2.3.6.3.3
OE.2.3.7
OE.2.3.7.1
OE.2.3.7.2
OE.2.3.7.3
OE.2.3.7.4
OE.2.3.7.5
OE.2.3.8
OE.2.3.8.1
OE.2.3.8.2
OE.2.3.8.3
OE.2.3.8.4
OE.2.3.9
OE.2.3.9.1
OE.2.3.9.1.1
OE.2.3.9.1.2
OE.2.3.9.1.3
OE.2.3.9.1.4
OE.2.3.9.2
OE.2.3.9.2.1
OE.2.3.9.2.2
OE.2.3.9.2.3
OE.2.3.9.2.4
OE.2.3.9.2.5
OE.2.3.9.3
OE.2.3.9.3.1
OE.2.3.9.3.2
OE.2.3.9.3.3
OE.2.3.9.3.4
OE.2.3.9.3.5
OE.2.3.9.3.6
OE.2.3.9.4
OE.2.3.9.4.1
OE.2.3.9.4.2
OE.2.3.9.4.3
OE.2.3.9.5
OE.2.3.9.5.1
OE.2.3.9.5.2
OE.2.3.9.5.3
OE.2.3.9.6
OE.2.3.9.6.1
OE.2.3.9.6.2
OE.2.3.9.6.3
OE.2.3.9.7
OE.2.3.9.7.1
OE.2.3.9.7.2
OE.2.3.9.7.3
OE.2.3.10
OE.2.3.10.1
OE.2.3.10.2
OE.2.3.10.3
OE.2.3.10.4
OE.2.3.11
OE.2.3.11.1
OE.2.3.11.2
OE.2.3.11.3
OE.2.3.11.4
OE.2.3.12
OE.2.3.12.1
OE.2.3.12.2
OE.2.3.12.3
OE.2.3.12.4
OE.2.3.12.5
OE.2.3.13
OE.2.3.13.1
OE.2.3.13.2
OE.2.3.13.3
OE.2.3.13.4
OE.2.3.13.5
OE.2.3.14
OE.2.3.14.1
OE.2.3.15
OE.2.3.15.1
OE.2.3.15.2
OE.2.3.15.3
OE.2.3.16
OE.2.3.16.1
OE.2.3.16.1.1
OE.2.3.16.1.2
OE.2.3.16.1.3
OE.2.3.16.1.4
OE.2.3.16.2
OE.2.3.16.2.1
OE.2.3.16.2.2
OE.2.3.16.2.3
OE.2.3.16.2.4
OE.2.3.17
OE.2.4
OE.2.4.1
OE.2.4.1.1
OE.2.4.1.2
OE.2.4.2
OE.2.4.2.1
OE.2.4.2.2
OE.2.4.3
OE.2.4.3.1
OE.2.4.3.2
OE.2.4.4
OE.2.4.4.1
OE.2.4.4.2
OE.2.4.5
OE.2.4.5.1
OE.2.4.5.2
OE.2.4.6
OE.2.4.6.1
OE.2.4.6.2
OE.2.4.6.3
OE.2.4.6.4
OE.2.4.6.5
OE.2.4.6.6
OE.2.4.6.7
OE.2.4.7
OE.2.4.7.1
OE.2.4.7.2
OE.2.4.7.3
OE.2.5
OE.2.5.1
OE.2.5.2
OE.2.5.3
OE.2.5.4
OE.2.5.5
OE.2.5.5.1
OE.2.5.5.2
OE.2.5.5.3
OE.2.5.5.4
OE.2.5.5.5
OE.2.5.5.6
OE.2.5.5.7
OE.2.5.6
OE.2.6
OE.2.6.1
Descripcin

PARA EL ENCOFRADO Y DESENCOFRADO

"OE." - ESTRUCTURAS
Descripcin
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
CONSTRUCCIONES PROVISIONALES
OFICINAS
ALMACENES
CASETAS DE GUARDIANA
COMEDORES
VESTUARIOS
SERVICIOS HIGINICOS
CERCO PERIMETRICO - PALOS DE EUCALIPTO - MALLA ASPILLERA
CARTELES, DE OBRA DE 3.60 X2.40 ml
AREA DE CARPINTERIA Y ACERO
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCIN
OBTENCION DEL SERVICIO
ALMACENAMIENTO Y DISTRIBUCION
DESAGE PARA LA CONSTRUCCIN
ENERGA ELCTRICA PROVISIONAL
CONEXIN E INSTALACION
CONSUMO Y MANTENIMIENTO
INSTALACIN TELEFNICA Y COMUNICACIN PROVISIONAL
CONEXIN E INSTALACION
CONSUMA Y MANTENIMIENTO
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO
ELIMINACION DE BASURA Y ELEMENTOS SUELTOS Y LIVIANOS
ELIMINACION DE MALEZA Y ARBUSTOS DE FACIL EXTRACCION
ELIMINACIN DE OBSTRUCCIONES
TALA DE RBOLES
ELIMINACIN DE RACES
ELIMINACIN DE ROCAS
ELIMINACIN DE ELEMENTOS ENTERRADOS
REMOCIONES
DESMONTAJE DE COBERTURA
DESMONTAJE DE ESTRUCTURA METALICA
DESMONTAJE DE TUBOS DE ACERO, D=4"
DESMONTAJE DE POSTES EN VEREDAS
DESMONTAJE DE KIOSCOS DE MADERA
DEMOLICIONES
ELIMINACION DE DEMOLICIONES
MOVILIZACIN DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
MOVILIZACION Y DESMOBILIZACION DE MATERIALES Y EQUIPOS
MOVILIZACION Y DESMOBILIZACION DE EQUIPOS Y MAQUINARIAS
APUNTALAMIENTOS DE CONSTRUCCIONES EXISTENTES
TRAZOS, NIVELES Y REPLANTEO
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
REPLANTEO DURANTE EL PROCESO
SEGURIDAD Y SALUD
ELABORACIN, IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
EQUIPOS DE PROTECCIN INDIVIDUAL
EQUIPOS DE PROTECCIN COLECTIVA
SEALIZACIN TEMPORAL DE SEGURIDAD
CAPACITACIN EN SEGURIDAD Y SALUD
CAPACITACION EN SEGURIDAD Y SALUD
CAPACITACIN A COMERCIANTES EN MARKETING Y GESTION EMPRESARIAL
CAPACITACIN A COMERCIANTES EN MANIPULACION ADECUADA DE ALIMENTOS.
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO
ESTRUCTURAS.
MOVIMIENTO DE TIERRAS
NIVELACIN DE TERRENO
NIVELACIN.
NIVELADO APISONADO
EXCAVACIONES
EXCAVACIONES MASIVAS
EXCAVACIONES SIMPLES
EXCAVACIONES SIMPLES DE ZANJAS PARA CIMIENTOS
EXCAVACIONES SIMPLES DE ZANJAS TERRENO NORMAL PARA ZAPATAS
CORTES
RELLENOS
RELLENO CON MATERIAL PROPIO
RELLENOS CON MATERIAL DE PRSTAMO
NIVELACIN INTERIOR Y APISONADO
NIVELACIN INTERIOR Y APISONADO MANUAL
NIVELACIN INTERIOR CON MAQUINARIA
ELIMINACIN DE MATERIAL EXCEDENTE
ELIMINACION DE MATERIAL EXCAVAD0
TABLAESTACADO O ENTIBADO
TABLAESTACADO PARA EXCAVACIONES, ESTRUCTURAS, POZOS,CAMARAS SUBTERRANEAS, ETC.
TABLAESTACADO PARA EXCAVACIONES DE ZANJAS
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS, MEZCLA CEMENTO: HORMIGON 1:10 + 30%PG
SUB ZAPATAS O FALSA ZAPATA
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
SOLADOS
SOLADO DE E=4" MEZCLA 1:12 C:H
BASES DE CONCRETO
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
ESTRUCTURAS DE SOSTENIMIENTO DE EXCAVACIONES
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTOS
PARA EL CONCRETO, MEZCLA CEMENTO: HORMIGON 1:8 + 25% PM 3"
PARA EL ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS
GRADAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO EN GRADAS
RAMPAS
PARA EL CONCRETO E=XXX
PARA EL ENCOFRADO Y DESENCOFRADO EN RAMPAS
FALSO PISO
FALSO PISO DE 4", CONCRETO 1:8 C:H
FALSO PISO, MEZCLA CEMENTO: HORMIGON 1:8, E=0.10M
BASE DE AFIRMADO PARA PISOS DE CONCRETO
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO
ZAPATAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
CURADO DEL CONCRETO
VIGAS DE CIMENTACIN
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO
CURADO DEL CONCRETO
LOSAS DE CIMENTACIN
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
CURADO DEL CONCRETO
SOBRECIMIENTOS REFORZADOS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
CURADO DEL CONCRETO
MUROS REFORZADOS
MUROS DE CONTENCIN
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
JUNTA DE DILATACION
CURADO DEL CONCRETO
RELLENO CON MATERIAL FILTRANTE
RELLENO COMPACTADO CON MATERIAL SELECCIONADO
INSTALACION DE TUBERIA PERFORADA UF PVC NPT ISO 4435 2005 S-20 DN 4"
SUMINISTRO E INSTALACION DE GEOTEXTIL TEXURIZADO, EN ZONA DE DRENAJE
SUMINISTRO E INSTALACION DE GEOMEMBRANA, PANTALLA INCLINADA DE MURO
MUROS DE CONCRETO, TABIQUES DE CONCRETO Y PLACAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
CURADO DEL CONCRETO
PANTALLAS, BARANDAS Y SIMILARES
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
COLUMNAS
PARA EL CONCRETO, FC=175 KG/CM2 EN COLUMNAS
PARA EL ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN COLUMNAS
JUNTA SISMICA
CURADO PARA EL CONCRETO
VIGAS
PARA EL CONCRETO, FC=175 KG/CM2 EN VIGAS
PARA EL ENCOFRADO Y DESENCOFRADO, NORMAL EN VIGAS
PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN VIGAS
CURADO PARA EL CONCRETO
LOSAS
LOSAS MACIZAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
CURADO DEL CONCRETO
LOSAS ALIGERADAS CONVENCIONALES
PARA EL CONCRETO, FC=175 KG/CM2 EN LOSA ALIGERADA
PARA EL ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA
PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN LOSA ALIGERADA
PARA LADRILLOS HUECOS DE ARCILLA 15X30X30 CM EN LOSA ALIGERADA
CURADO DEL CONCRETO
LOSAS ALIGERADAS CON VIGUETAS PREFABRICADAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
PARA BLOQUES PROPORCIONADAS POR EL FABRICANTE (BOVEDILLAS)
PARA VIGUETAS PROPORCIONADAS POR EL FABRICANTE
CURADO DEL CONCRETO
LOSAS NERVADAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
LOSAS CSCARA
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
LOSA HONGO
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
LOSAS ESPECIALES
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
ESCALERAS
PARA EL CONCRETO, FC = 175 KG/CM2 EN ESCALERAS
PARA EL ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS
PARA LA ARMADURA DE ACERO, GRADO 60, FY=4200 KG/CM2 EN ESCALERAS
CURADO PARA EL CONCRETO
CAJA DE ASCENSORES Y SIMILARES
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
CURADO PARA EL CONCRETO
CISTERNAS SUBTERRNEAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
JUNTA DE CONSTRUCCION WATER STOP
CURADO PARA EL CONCRETO
TANQUES ELEVADOS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
JUNTA DE CONSTRUCCION WATER STOP
CURADO PARA EL CONCRETO
PILOTES
PARA LOS PILOTES
CAISSONES
PARA CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA ARMADURA
ESTRUCTURAS DE CONCRETO PRETENSADO O POSTENSADO
VIGAS
PARA CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO CONVENCIONAL
PROCESO DE ANCLAJE Y REFUERZO
LOSAS
PARA CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO CONVENCIONAL
PROCESO DE ANCLAJE Y REFUERZO
ESTRUCTURAS PREFABRICADAS
ESTRUCTURAS METLICAS
COLUMNAS O PILARES
PARA ARMADO
PARA MONTAJE
VIGAS
PARA ARMADO
PARA MONTAJE
VIGUETAS
PARA ARMADO
PARA MONTAJE
TIJERALES Y RETICULADOS
PARA ARMADO
PARA MONTAJE
CORREAS
PARA ARMADO
PARA MONTAJE
COBERTURAS
CON PLANCHAS CORRUGADAS GALVANIZADAS
CON PLANCHAS CORRUGADAS DE FIBRO-CEMENTO.
CON PLANCHAS CORRUGADAS DE ALUMINIO.
CON PLANCHAS CORRUGADAS PLSTICAS.
CON TEJAS.
CON LADRILLOS DE VIDRIO.
CON VIDRIO.
ELEMENTOS PARA AGUAS PLUVIALES
PARA CUMBRERAS
A CANALETAS
PARA BAJANTES
ESTRUCTURA DE MADERA
COLUMNAS O PILARES
VIGAS
TIJERALES Y RETICULADOS
CORREAS
COBERTURAS
CON PLANCHAS CORRUGAS GALVANIZADAS.
CON PLANCHAS CORRUGADAS DE FIBRO-CEMENTO.
CON PLANCHAS CORRUGADAS DE ALUMINIO.
CON PLANCHAS CORRUGADAS PLSTICAS.
CON TEJAS.
CON MADERA.
CON DIVERSAS PLANCHAS LISAS.
PILOTES DE MADERA
VARIOS
JUNTAS DE DILATACION DE UNA PULGADA
Unid.

m2

Unid.

m2
m2
m2
m2
m2
m2
m2
Und.
m2

Glb / Mes
Glb.
Glb.
Glb.
Glb.
Glb.
Glb.

Glb.
Glb.

m3
m2

Und.
Und.
m3
Und.
m2/Und
m2
Und.
Und.
Und.
Und.
m3/m2
m3
Glb.
Glb.
Glb.
Glb.

m2
m2/Glb.
Glb.
Und.
Glb.
Glb.
Glb./Mes
Mes
Mes
Mes
Glb.

m2
m2

m3
m3
m3
m3
m3

m3
m3
m2
m2
m2
m3
m3

m2
m2

m3

m3
m2
m2
m2

m3
m2

m3
m2

m3
m2

m3
m2

m2
m2
m2
m2
m2
m2

m3
m2
Kg.

m3
m2
Kg.
m2

m3
m2
Kg.
m2

m3
m2
Kg.
m2

m3
m2
Kg.
m2

m3
m2
Kg.
m
m2
m3
m3
m
m2
m2

m3
m2
Kg.
m2

m3
m2
Kg.

m3
m2
Kg.
m
m2

m3
m2
Kg.
m2

m3
m2
Kg.
m2

m3
m2
Kg.
Und.
m2

m3
m2
Kg.
Und.
ml
m2

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.
m2

m3
m2
Kg.
m2

m3
m2
Kg.
m
m2

m3
m2
Kg.
m
m2

Und./ml

Und.
Und.
Und.

m3
m2
Kg.
Glb.

m3
m2
Kg.
Glb.
m2

Und.
Und.

Und.
Und.

Und.
Und.

Und.
Und.

Und.
Und.

m2
m2
m2
m2
m2
m2
m2
m2
m
m
m

Und.
Und.
Und.
m2/und

m2
m2
m2
m2
m2
m2
m2
Und.

ml
NUEVO REGLAMENTO DE METRADO MAYO 2010

ESTRUCTURAS
Partida
OE.1
OE.1.1
OE.1.1.1
OE.1.1.1.1
OE.1.1.1.2
OE.1.1.1.3
OE.1.1.1.4
OE.1.1.1.5
OE.1.1.1.6
OE.1.1.1.7
OE.1.1.1.8
OE.1.1.2
OE.1.1.2.1
OE.1.1.2.1.1
OE.1.1.2.1.2
OE.1.1.2.2
OE.1.1.2.3
OE.1.1.2.1.1
OE.1.1.2.1.2
OE.1.1.2.4
OE.1.1.2.4.1
OE.1.1.2.4.2
OE.1.1.3
OE.1.1.3.1
OE.1.1.3.1.1
OE.1.1.3.1.2
OE.1.1.4
OE.1.1.4.1
OE.1.1.4.2
OE.1.1.4.3
OE.1.1.4.4
OE.1.1.5
OE.1.1.6
OE.1.1.6.1
OE.1.1.7
OE.1.1.8
OE.1.1.9
OE.1.1.9.1
OE.1.1.9.2
OE.1.2
OE.1.2.1
OE.1.2.1.1
OE.1.2.1.2
OE.1.2.1.3
OE.1.2.1.4
OE.1.2.2
OE.2
OE.2.1
OE.2.1.1
OE.2.1.1.1
OE.2.1.1.2
OE.2.1.2
OE.2.1.2.1
OE.2.1.2.1
OE.2.1.3
OE.2.1.4
OE.2.1.4.1
OE.2.1.4.2
OE.2.1.5
OE.2.1.6
OE.2.1.7
OE.2.1.7.1
OE.2.1.7.2
OE.2.2
OE.2.2.1
OE.2.2.2
OE.2.2.2.1
OE.2.2.2.2
OE.2.2.3
OE.2.2.4
OE.2.2.4.1
OE.2.2.4.2
OE.2.2.5
OE.2.2.5.1
OE.2.2.5.2
OE.2.2.6
OE.2.2.6.1
OE.2.2.6.2
OE.2.2.7
OE.2.2.7.1
OE.2.2.7.2
OE.2.2.8
OE.2.2.8.1
OE.2.2.8.2
OE.2.2.9
OE.2.3
OE.2.3.1
OE.2.3.1.1
OE.2.3.1.2
OE.2.3.1.3
OE.2.3.2
OE.2.3.2.1
OE.2.3.2.2
OE.2.3.2.3
OE.2.3.3
OE.2.3.3.1
OE.2.3.3.2
OE.2.3.3.3
OE.2.3.4
OE.2.3.4.1
OE.2.3.4.2
OE.2.3.4.3
OE.2.3.5
OE.2.3.5.1
OE.2.3.5.2
OE.2.3.5.3
OE.2.3.6
OE.2.3.6.1
OE.2.3.6.1.1
OE.2.3.6.1.2
OE.2.3.6.1.3
OE.2.3.6.2
OE.2.3.6.2.1
OE.2.3.6.2.2
OE.2.3.6.2.3
OE.2.3.6.3
OE.2.3.6.3.1
OE.2.3.6.3.2
OE.2.3.6.3.3
OE.2.3.7
OE.2.3.7.1
OE.2.3.7.2
OE.2.3.7.3
OE.2.3.8
OE.2.3.8.1
OE.2.3.8.2
OE.2.3.8.3
OE.2.3.9
OE.2.3.9.1
OE.2.3.9.1.1
OE.2.3.9.1.2
OE.2.3.9.1.3
OE.2.3.9.2
OE.2.3.9.2.1
OE.2.3.9.2.2
OE.2.3.9.2.3
OE.2.3.9.2.4
OE.2.3.9.3
OE.2.3.9.3.1
OE.2.3.9.3.2
OE.2.3.9.3.3
OE.2.3.9.3.4
OE.2.3.9.3.5
OE.2.3.9.4
OE.2.3.9.4.1
OE.2.3.9.4.2
OE.2.3.9.4.3
OE.2.3.9.5
OE.2.3.9.5.1
OE.2.3.9.5.2
OE.2.3.9.5.3
OE.2.3.9.6
OE.2.3.9.6.1
OE.2.3.9.6.2
OE.2.3.9.6.3
OE.2.3.9.7
OE.2.3.9.7.1
OE.2.3.9.7.2
OE.2.3.9.7.3
OE.2.3.10
OE.2.3.10.1
OE.2.3.10.2
OE.2.3.10.3
OE.2.3.11
OE.2.3.11.1
OE.2.3.11.2
OE.2.3.11.3
OE.2.3.12
OE.2.3.12.1
OE.2.3.12.2
OE.2.3.12.3
OE.2.3.13
OE.2.3.13.1
OE.2.3.13.2
OE.2.3.13.3
OE.2.3.14
OE.2.3.14.1
OE.2.3.15
OE.2.3.15.1
OE.2.3.15.2
OE.2.3.15.3
OE.2.3.16
OE.2.3.16.1
OE.2.3.16.1.1
OE.2.3.16.1.2
OE.2.3.16.1.3
OE.2.3.16.1.4
OE.2.3.16.2
OE.2.3.16.2.1
OE.2.3.16.2.2
OE.2.3.16.2.3
OE.2.3.16.2.4
OE.2.3.17
OE.2.4
OE.2.4.1
OE.2.4.1.1
OE.2.4.1.2
OE.2.4.2
OE.2.4.2.1
OE.2.4.2.2
OE.2.4.3
OE.2.4.3.1
OE.2.4.3.2
OE.2.4.4
OE.2.4.4.1
OE.2.4.4.2
OE.2.4.5
OE.2.4.5.1
OE.2.4.5.2
OE.2.4.6
OE.2.4.6.1
OE.2.4.6.2
OE.2.4.6.3
OE.2.4.6.4
OE.2.4.6.5
OE.2.4.6.6
OE.2.4.6.7
OE.2.4.7
OE.2.4.7.1
OE.2.4.7.2
OE.2.4.7.3
OE.2.5
OE.2.5.1
OE.2.5.2
OE.2.5.3
OE.2.5.4
OE.2.5.5
OE.2.5.5.1
OE.2.5.5.2
OE.2.5.5.3
OE.2.5.5.4
OE.2.5.5.5
OE.2.5.5.6
OE.2.5.5.7
OE.2.5.6
OE.2.6
OE.2.6.1
NUEVO REGLAMENTO DE METRADO MAYO 2010

ESTRUCTURAS
Descripcin
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
CONSTRUCCIONES PROVISIONALES
OFICINAS
ALMACENES
CASETAS DE GUARDIANA
COMEDORES
VESTUARIOS
SERVICIOS HIGINICOS
CERCOS
CARTELES
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCIN
OBTENCION DEL SERVICIO
ALMACENAMIENTO Y DISTRIBUCION
DESAGE PARA LA CONSTRUCCIN
ENERGA ELCTRICA PROVISIONAL
CONEXIN E INSTALACION
CONSUMA Y MANTENIMIENTO
INSTALACIN TELEFNICA Y COMUNICACIN PROVISIONAL
CONEXIN E INSTALACION
CONSUMA Y MANTENIMIENTO
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO
ELIMINACION DE BASURA Y ELEMENTOS SUELTOS Y LIVIANOS
ELIMINACION DE MALEZA Y ARBUSTOS DE FACIL EXTRACCION
ELIMINACIN DE OBSTRUCCIONES
TALA DE RBOLES
ELIMINACIN DE RACES
ELIMINACIN DE ROCAS
ELIMINACIN DE ELEMENTOS ENTERRADOS
REMOCIONES
DEMOLICIONES
ELIMINACION DE DEMOLICIONES
MOVILIZACIN DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
APUNTALAMIENTOS DE CONSTRUCCIONES EXISTENTES
TRAZOS, NIVELES Y REPLANTEO
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
REPLANTEO DURANTE EL PROCESO
SEGURIDAD Y SALUD
ELABORACIN, IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
EQUIPOS DE PROTECCIN INDIVIDUAL
EQUIPOS DE PROTECCIN COLECTIVA
SEALIZACIN TEMPORAL DE SEGURIDAD
CAPACITACIN EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO
ESTRUCTURAS.
MOVIMIENTO DE TIERRAS
NIVELACIN DE TERRENO
NIVELACIN.
NIVELADO APISONADO
EXCAVACIONES
EXCAVACIONES MASIVAS
EXCAVACIONES SIMPLES
CORTES
RELLENOS
RELLENO CON MATERIAL PROPIO
RELLENOS CON MATERIAL DE PRSTAMO
NIVELACIN INTERIOR Y APISONADO
ELIMINACIN DE MATERIAL EXCEDENTE
TABLAESTACADO O ENTIBADO
TABLAESTACADO PARA EXCAVACIONES, ESTRUCTURAS, POZOS,CAMARAS SUBTERRANEAS, ETC.
TABLAESTACADO PARA EXCAVACIONES DE ZANJAS
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS
SUB ZAPATAS O FALSA ZAPATA
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
SOLADOS
BASES DE CONCRETO
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
ESTRUCTURAS DE SOSTENIMIENTO DE EXCAVACIONES
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTOS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
GRADAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO EN GRADAS
RAMPAS
PARA EL CONCRETO E=XXX
PARA EL ENCOFRADO Y DESENCOFRADO EN RAMPAS
FALSOPISO
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO
ZAPATAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
VIGAS DE CIMENTACIN
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO
LOSAS DE CIMENTACIN
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
SOBRECIMIENTOS REFORZADOS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
MUROS REFORZADOS
MUROS DE CONTENCIN
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
MUROS DE CONCRETO, TABIQUES DE CONCRETO Y PLACAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
PANTALLAS, BARANDAS Y SIMILARES
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
COLUMNAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
VIGAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
LOSAS
LOSAS MACIZAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
LOSAS ALIGERADAS CONVENCIONALES
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
PARA LADRILLOS, BLOQUES HUECOS O ELEMENTOS LIVIANOS
LOSAS ALIGERADAS CON VIGUETAS PREFABRICADAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
PARA BLOQUES PROPORCIONADAS POR EL FABRICANTE (BOVEDILLAS)
PARA VIGUETAS PROPORCIONADAS POR EL FABRICANTE
LOSAS NERVADAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
LOSAS CSCARA
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
LOSA HONGO
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
LOSAS ESPECIALES
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
ESCALERAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
CAJA DE ASCENSORES Y SIMILARES
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
CISTERNAS SUBTERRNEAS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
TANQUES ELEVADOS
PARA EL CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA LA ARMADURA DE ACERO.
PILOTES
PARA LOS PILOTES
CAISSONES
PARA CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
PARA ARMADURA
ESTRUCTURAS DE CONCRETO PRETENSADO O POSTENSADO
VIGAS
PARA CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO CONVENCIONAL
PROCESO DE ANCLAJE Y REFUERZO
LOSAS
PARA CONCRETO
PARA EL ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO CONVENCIONAL
PROCESO DE ANCLAJE Y REFUERZO
ESTRUCTURAS PREFABRICADAS
ESTRUCTURAS METLICAS
COLUMNAS O PILARES
PARA ARMADO
PARA MONTAJE
VIGAS
PARA ARMADO
PARA MONTAJE
VIGUETAS
PARA ARMADO
PARA MONTAJE
TIJERALES Y RETICULADOS
PARA ARMADO
PARA MONTAJE
CORREAS
PARA ARMADO
PARA MONTAJE
COBERTURAS
CON PLANCHAS CORRUGADAS GALVANIZADAS
CON PLANCHAS CORRUGADAS DE FIBRO-CEMENTO.
CON PLANCHAS CORRUGADAS DE ALUMINIO.
CON PLANCHAS CORRUGADAS PLSTICAS.
CON TEJAS.
CON LADRILLOS DE VIDRIO.
CON VIDRIO.
ELEMENTOS PARA AGUAS PLUVIALES
PARA CUMBRERAS
A CANALETAS
PARA BAJANTES
ESTRUCTURA DE MADERA
COLUMNAS O PILARES
VIGAS
TIJERALES Y RETICULADOS
CORREAS
COBERTURAS
CON PLANCHAS CORRUGAS GALVANIZADAS.
CON PLANCHAS CORRUGADAS DE FIBRO-CEMENTO.
CON PLANCHAS CORRUGADAS DE ALUMINIO.
CON PLANCHAS CORRUGADAS PLSTICAS.
CON TEJAS.
CON MADERA.
CON DIVERSAS PLANCHAS LISAS.
PILOTES DE MADERA
VARIOS
JUNTAS
Unid.

m2
m2
m2
m2
m2
m2
m2
Und.

mes
Glb.
Glb.

Glb.
Glb.

Glb.
Glb.
m2

m3
m2

Und.
Und.
m3
Und.
m2/Und
m3/m2
m3
Glb.
Glb.

m2
m2/Glb.

Glb.
Und.
Glb.
Glb.
Glb.
Glb.
m2
m2

m3
m3
m3

m3
m3
m2
m3

m2
m2

m3

m3
m2
m2

m3
m2

m3
m2

m3
m2

m3
m2

m2
m2
m2

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.
m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.
Und.

m3
m2
Kg.
Und.
m.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

m3
m2
Kg.

Und./m.

Und.
Und.
Und.

m3
m2
Kg.
Glb.

m3
m2
Kg.
Glb.
m2

Und.
Und.

Und.
Und.

Und.
Und.

Und.
Und.

Und.
Und.

m2
m2
m2
m2
m2
m2
m2
m2
m
m
m

Und.
Und.
Und.
m2/und

m2
m2
m2
m2
m2
m2
m2
Und.

m.
HOJA DE SUSTENTO DE METRADOS - ESTRUCTURAS
OBRA : FECHA:
EMPRESA:
SECTOR:
DEPARTAMENTO: PROVINCIA: DISTRITO:
ELABORADO POR: REVISADO POR:

N DE MEDIDAS
ITEM. DESCRIPCIN UND
VECES Largo (m) Ancho (m) Altura (m)
OE.1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.
OE.1.1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
OE.1.1.1 CONSTRUCCIONES PROVISIONALES
OE.1.1.1.3 CASETAS DE GUARDIANA m2
HOJA DE SUSTENTO DE METRADOS - ESTRUCTURAS
OBRA : FECHA:
EMPRESA:
SECTOR:
DEPARTAMENTO: PROVINCIA: DISTRITO:
ELABORADO POR: REVISADO POR:

N DE MEDIDAS
ITEM. DESCRIPCIN UND
VECES Largo (m) Ancho (m) Altura (m)
HOJA DE SUSTENTO DE METRADOS - ESTRUCTURAS
OBRA : FECHA:
EMPRESA:
SECTOR:
DEPARTAMENTO: PROVINCIA: DISTRITO:
ELABORADO POR: REVISADO POR:

N DE MEDIDAS
ITEM. DESCRIPCIN UND
VECES Largo (m) Ancho (m) Altura (m)
HOJA DE SUSTENTO DE METRADOS - ESTRUCTURAS
OBRA : FECHA:
EMPRESA:
SECTOR:
DEPARTAMENTO: PROVINCIA: DISTRITO:
ELABORADO POR: REVISADO POR:

N DE MEDIDAS
ITEM. DESCRIPCIN UND
VECES Largo (m) Ancho (m) Altura (m)
PARCIAL TOTAL
PARCIAL TOTAL
PARCIAL TOTAL
PARCIAL TOTAL
HOJA DE SUSTENTO DE METRADOS DE ACEROS - ESTRUCTURAS
OBRA : FECHA:
EMPRESA:
SECTOR:
DEPARTAMENTO: PROVINCIA: DISTRITO:
ELABORADO POR: REVISADO POR:

DIAMETRO N ELEM. N PIEZAS X LONG X PZA 1/4" 3/8" 1/2" 5/8" 3/4"
ITEM DESCRIPCIN
(plg) IGUALES ELEM. (ml) 0.252 0.560 0.994 1.552 2.235

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
TOTAL DE ACERO EN (ml) = 0.00 0.00 0.00 0.00 0.00
TOTAL DE ACERO EN (Kg) = 0.00 0.00 0.00 0.00 0.00
1" TOTAL
3.973 (kg)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00