01.00 T
01.01 ALMACEN Y CASETA DE GUARDIANIA MES 6.00 - - - 6.00 6.00
01.02 MOVILIZACION Y DESMOVILIZACION EQUIPO GLB. 2.00 - - - 2.00 2.00
01.03 CARTEL DE IDENTIFICACION DE OBRA UND. 1.00 - - - 1.00 1.00
02.00 TRABAJOS PRELIMINARES
02.01 TRAZO Y REPLANTEO M2 7,076.78
* Jr. San agustin 1.00 152.00 6.60 - 1,003.20
prog 0+00-0+009.55
Km 0+100 - 0+118 - San Roque (area cad) 1.00 AREA = 90.00 0.20 18.00
Entre Km 225 - 0+235 Santa Beatriz (area Cad) 1.00 AREA = 50.00 0.20 10.00
Km 0+000 - 0+0+065 - San Jorge (area cad) 1.00 AREA = 65.00 0.10 6.50
Km 0+110 - 0+120 - San Jorge (area Cad) 1.00 AREA = 20.00 0.10 2.00
03.00 EXPLANACIONES
03.01 CORTE DE TERRENO A NIVEL DE SUB RASANTE M3 2,472.35
* Jr. San Agustin (Ver Formato de Explanaciones) 1.00 VOLUMEN= 313.90 - 313.90
* Jr. Santa Beatriz (Ver Formato de Explanaciones) 1.00 VOLUMEN= 305.30 - 305.30
* Jr. San Roque (Ver Formato de Explanciones) 1.00 VOLUMEN= 325.73 - 325.73
Entre Jr. San Marcos - San Jorge 1.00 45.00 0.30 0.20 2.70
Entre Jr. San Jorge - Final del Proyecto 1.00 58.00 0.30 0.20 3.48
Lado Izquierdo
Entre Inicio del Pavimento - Jr. San Marcos 1.00 13.00 0.30 0.20 0.78
Entre Jr. San Marcos - San Jorge 1.00 48.00 0.30 0.20 2.88
Entre Jr. San Jorge - Calle C 1.00 33.00 0.30 0.20 1.98
Entre Calle C - Final del Pavimento 1.00 207.20 0.30 0.20 12.43
1.00 33.28 0.30 0.20 2.00
1.00 26.99 0.30 0.20 1.62
1.00 45.73 0.30 0.20 2.74
1.00 45.08 0.30 0.20 2.70
1.00 16.07 0.30 0.20 0.96
1.00 16.06 0.30 0.20 0.96
* Jr. Cusco
1.00 35.13 0.30 0.20 2.11
1.00 25.29 0.30 0.20 1.52
1.00 44.58 0.30 0.20 2.67
1.00 44.74 0.30 0.20 2.68
1.00 14.15 0.30 0.20 0.85
1.00 13.99 0.30 0.20 0.84
1.00 94.78 0.30 0.20 5.69
1.00 128.46 0.30 0.20 7.71
1.00 6.69 0.30 0.20 0.40
* Jr. 7 de Agosto
1.00 166.44 0.30 0.20 9.99
1.00 166.76 0.30 0.20 10.01
* Jr. El Angar
1.00 165.65 0.30 0.20 9.94
1.00 165.23 0.30 0.20 9.91
* Jr. Union
1.00 22.33 0.15 0.10 0.33
* Jr. Cusco
1.00 10.56 0.15 0.10 0.16
1.00 13.51 0.15 0.10 0.20
1.00 66.45 0.15 0.10 1.00
1.00 17.36 0.15 0.10 0.26
1.00 7.55 0.15 0.10 0.11
1.00 15.43 0.15 0.10 0.23
* Jr. El Angar
1.00 85.31 0.15 0.10 1.28
De Inexpuesto
* Jr. Los Alisos 1.00 16.10 0.15 0.45 1.09
* Jr. Cusco
1.00 13.42 1.20 0.20 3.22
1.00 14.44 1.20 0.20 3.47
1.00 13.41 1.20 0.20 3.22
1.00 12.24 1.20 0.20 2.94
1.00 11.39 1.20 0.20 2.73
HOJA DE METRADOS
PROYECTO: PARQUE DE LA IDENTIDAD WANKA
HOJA :PAVIMENTO FLEXIBLE PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE HUANCAYO
DEPARTAMENTO :JUNIN PROVINCIA : HUANCAYO
DISTRITO :HUANCAYO LUGAR : ENTORNO PARQUE IDENTIDAD WANKA
HECHO POR :ING. KARINA ISABEL HUAMAN CARD REVISADO : AEP
FECHA :ABRIL DEL 2010
- De Corte Manual
* Jr. Los Alisos 1.20 VOLUMEN= 1,011.87 - 1,214.24
04.00 PAVIMENTO
04.01 SUB BASE GRANULAR
04.01.01 EXTRACION DE SUB BASE M3 1,826.49
* Jr. Los Alisos 1.40 345.02 6.60 0.15 478.20
- De Veredas a Demoler y Construir Lado Izquierda 1.40 38.65 1.50 0.10 8.12
1.40 9.75 1.50 0.10 2.05
1.40 8.50 1.50 0.10 1.79
- De Veredas a Demoler Construir Lado Izquierda 1.40 13.73 1.50 0.10 2.88
- De Veredas a Demoler y Construir Lado izquierdo 1.40 16.86 1.50 0.10 3.54
HOJA DE METRADOS
PROYECTO: PARQUE DE LA IDENTIDAD WANKA
HOJA :PAVIMENTO FLEXIBLE PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE HUANCAYO
DEPARTAMENTO :JUNIN PROVINCIA : HUANCAYO
DISTRITO :HUANCAYO LUGAR : ENTORNO PARQUE IDENTIDAD WANKA
HECHO POR :ING. KARINA ISABEL HUAMAN CARD REVISADO : AEP
FECHA :ABRIL DEL 2010
- De Veredas a Demoler y Construir Lado Izquierda 1.20 38.65 1.50 0.10 6.96
1.20 9.75 1.50 0.10 1.76
1.20 8.50 1.50 0.10 1.53
- De Veredas a Demoler Construir Lado Izquierda 1.20 13.73 1.50 0.10 2.47
- De Veredas a Demoler y Construir Lado izquierdo 1.20 16.86 1.50 0.10 3.03
04.04 DRENAJE
04.04.01 DRENAJE CUNETA CONCRETO F'C=210KG/CM2 M3 173.64
* Jr. Los Alisos
1.00 AREA = 53.58 0.07 3.75
1.00 AREA = 53.58 0.07 3.75
1.00 AREA = 166.35 0.07 11.64
1.00 AREA = 167.15 0.07 11.70
1.00 AREA = 122.03 0.07 8.54
1.00 AREA = 123.06 0.07 8.61
* Jr. Union
1.00 AREA = 207.20 0.07 14.50
1.00 AREA = 33.28 0.07 2.33
1.00 AREA = 26.99 0.07 1.89
1.00 AREA = 45.73 0.07 3.20
1.00 AREA = 45.08 0.07 3.16
1.00 AREA = 16.07 0.07 1.12
1.00 AREA = 16.06 0.07 1.12
* Jr. Cusco
1.00 AREA = 35.13 0.07 2.46
1.00 AREA = 25.29 0.07 1.77
1.00 AREA = 44.58 0.07 3.12
1.00 AREA = 44.74 0.07 3.13
1.00 AREA = 14.15 0.07 0.99
1.00 AREA = 13.99 0.07 0.98
1.00 AREA = 94.78 0.07 6.63
1.00 AREA = 128.46 0.07 8.99
1.00 AREA = 6.69 0.07 0.47
* Jr. 7 de Agosto
1.00 AREA = 166.44 0.07 11.65
1.00 AREA = 166.76 0.07 11.67
* Jr. El Angar
1.00 AREA = 165.65 0.07 11.60
1.00 AREA = 165.23 0.07 11.57
* Jr. Union
HOJA DE METRADOS
PROYECTO: PARQUE DE LA IDENTIDAD WANKA
HOJA :PAVIMENTO FLEXIBLE PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE HUANCAYO
DEPARTAMENTO :JUNIN PROVINCIA : HUANCAYO
DISTRITO :HUANCAYO LUGAR : ENTORNO PARQUE IDENTIDAD WANKA
HECHO POR :ING. KARINA ISABEL HUAMAN CARD REVISADO : AEP
FECHA :ABRIL DEL 2010
* Jr. Cusco
1.00 35.13 - 0.05 1.76
1.00 25.29 - 0.05 1.26
1.00 44.58 - 0.05 2.23
1.00 44.74 - 0.05 2.24
1.00 14.15 - 0.05 0.71
1.00 13.99 - 0.05 0.70
1.00 94.78 - 0.05 4.74
1.00 128.46 - 0.05 6.42
1.00 6.69 - 0.05 0.33
* Jr. 7 de Agosto
1.00 166.44 - 0.05 8.32
1.00 166.76 - 0.05 8.34
* Jr. El Angar
1.00 165.65 - 0.05 8.28
1.00 165.23 - 0.05 8.26
Transversal
* Jr. Los Alisos
53.80/3= 17.93 19.00 AREA = 0.09 - 1.71
* Jr. Union
207.20/3=69.03 70.00 AREA = 0.09 - 6.30
* Jr. Cusco
35.13/3=11.71 12.00 AREA = 0.09 - 1.08
* Jr. 7 de Agosto
166.44/3=55.48 56.00 AREA = 0.09 - 5.04
* Jr. El Angar
165.65/3=55.21 56.00 AREA = 0.09 - 5.04
04.05 BADEN
04.05.01 BADENES CONCRETO F'C=210KG/CM2 M3 31.62
* Jr. Union
2.00 AREA = 13.08 0.21 5.49
1.00 AREA = 12.60 0.21 2.65
1.00 AREA = 11.78 0.21 2.47
1.00 AREA = 11.10 0.21 2.33
* Jr. Cusco
1.00 AREA = 13.42 0.21 2.82
1.00 AREA = 14.44 0.21 3.03
1.00 AREA = 13.41 0.21 2.82
1.00 AREA = 12.24 0.21 2.57
1.00 AREA = 11.39 0.21 2.39
1.00 AREA = 11.06 0.21 2.32
1.00 AREA = 13.02 0.21 2.73
* Jr. Cusco
2.00 AREA = 13.42 0.05 1.34
2.00 AREA = 14.44 0.05 1.44
2.00 AREA = 13.41 0.05 1.34
2.00 AREA = 12.24 0.05 1.22
2.00 AREA = 11.39 0.05 1.14
2.00 AREA = 11.06 0.05 1.11
2.00 AREA = 13.02 0.05 1.30
Transversal
HOJA DE METRADOS
PROYECTO: PARQUE DE LA IDENTIDAD WANKA
HOJA :PAVIMENTO FLEXIBLE PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE HUANCAYO
DEPARTAMENTO :JUNIN PROVINCIA : HUANCAYO
DISTRITO :HUANCAYO LUGAR : ENTORNO PARQUE IDENTIDAD WANKA
HECHO POR :ING. KARINA ISABEL HUAMAN CARD REVISADO : AEP
FECHA :ABRIL DEL 2010
* Jr. Union
13.08/3=4.36 4.00 VOLUMEN = 0.21 - 0.84
* Jr. Cusco
13.42/3=4.47 4.00 VOLUMEN = 0.21 - 0.84
* Jr. Union
1.00 22.33 0.15 0.55 1.84
* Jr. Cusco
1.00 10.56 0.15 0.55 0.87
1.00 13.51 0.15 0.55 1.11
1.00 66.45 0.15 0.55 5.48
1.00 17.36 0.15 0.55 1.43
1.00 7.55 0.15 0.55 0.62
1.00 15.43 0.15 0.55 1.27
* Jr. El Angar
1.00 85.31 0.15 0.55 7.04
* Jr. Union
2.00 22.33 - 0.55 24.56
* Jr. Cusco
2.00 10.56 - 0.55 11.62
2.00 13.51 - 0.55 14.86
2.00 66.45 - 0.55 73.10
2.00 17.36 - 0.55 19.10
2.00 7.55 - 0.55 8.31
2.00 15.43 - 0.55 16.97
* Jr. El Angar
2.00 85.31 - 0.55 93.84
05.03 VEREDAS
05.03.01 REFINE Y NIVELACION M2 694.47
* Jr. Los Alisos
- De Veredas a Lado Izquierda 1.00 38.65 1.50 - 57.98
1.00 9.75 1.50 - 14.63
1.00 8.50 1.50 - 12.75
* Jr Union
- De Veredas Lado Izquierda 1.00 13.73 1.50 - 20.60
* Jr. Cusco
- De Veredas Lado izquierdo 1.00 16.86 1.50 - 25.29
* Jr. El Angar -
* Jr Union
- De Veredas Lado Izquierda 1.00 13.73 1.50 - 20.60
* Jr. Cusco
- De Veredas Lado izquierdo 1.00 16.86 1.50 - 25.29
* Jr. El Angar
- De VeredasLado Izquierda 1.00 76.24 1.50 - 114.36
* Jr Union
- De Veredas Lado Izquierda 1.00 13.73 1.50 - 20.60
* Jr. Cusco
- De Veredas Lado izquierdo 1.00 16.86 1.50 - 25.29
* Jr. El Angar
- De VeredasLado Izquierda 1.00 76.24 1.50 - 114.36
06.00 JUNTAS
06.01 JUNTAS DE DILATACION ML. 727.30
De Cunetas
* Jr. Los Alisos 685.76/3=228.58 229.00 0.60 - - 137.40
De Badenes
* Jr. Union 48.56/3=16.18 17.00 1.40 - - 23.80
De Sardineles
* Jr. Los Alisos 299.22/3=99.74 100.00 0.58 - - 58.00
09.00 VARIOS
09.01 LIMPIEZA FINAL DE OBRA M2 1.00 AREA = 9,777.14 - 9,777.14 9,777.14