OBRAS DE CONCRETO SIMPLE Y ARMADO

ÍTEM DESCRIPCIÓN UNIDAD METRADO


2.2 OBRAS DE CONCRETO SIMPLE
2.2.1 SOLADOS E=10CM M2 49.90
2.2.2 CIMIENTO CORRIDO
2.2.2.1 CONCRETO F'C=210 KG/CM2 M3 8.30
2.2.3 SOBRECIMIENTO
2.2.3.1 CONCRETO F'C=210 KG/CM2 M3 7.06
2.2.3.2 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO M2 56.50
2.2.4 FALSO PISO E=10CM M2
2.3 OBRAS DE CONCRETO ARMADO
2.3.1 ZAPATA
2.3.1.1 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS M3 29.94
2.3.1.2 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS M2 -
2.3.1.3 ACERO F'Y=4200 KG/CM2 PARA ZAPATAS KG 732.08
2.3.2 COLUMNA
2.3.2.1 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS M3 11.24
2.3.2.2 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 107.04
2.3.2.3 ACERO F'Y=4200 KG/CM2 PARA COLUMNAS KG 2,111.03
2.3.3 VIGAS
2.3.3.1 CONCRETO F'C=210 KG/CM2 PARA VIGAS M3 1.50
2.3.3.2 ENCOFRADO Y DESENCOFRADO PARA VIGAS M2 18.40
2.3.3.3 ACERO F'Y=4200 KG/CM2 PARA VIGAS KG 97.07
2.3.4 LOSA ALIGERADA
2.3.4.1 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA M3 -
2.3.4.2 ENCOFRADO Y DESENCOFRADO PARA LOSA ALIGERADA M2 -
2.3.4.3 ACERO F'Y=4200 KG/CM2 PARA LOSA ALIGERADA KG -
2.3.4.4 LADRILLO DE TECHO 30x30x15cm UND -
PLANILLA DE METRADO - ESTRUCTURAS
VOLUMEN ÁREA
DESCRIPCION TOTAL Nª DE ALTO/ TOTAL
CANT. LARGO ANCHO ALTO LARGO
(M3) VECES ANCHO (M2)

SOLADO E=10CM 0.00 0.00

Z-1 0.00 5 2.20 1.85 20.35

Z-2 0.00 5 1.15 2.30 13.23

Z-3 0.00 2 6.80 1.20 16.32

0.00 0.00

TOTAL 0.00 TOTAL 49.90

VOLUMEN ÁREA
DESCRIPCION TOTAL Nª DE ALTO/ TOTAL
CANT. LARGO ANCHO ALTO LARGO
(M3) VECES ANCHO (M2)

CIMIENTO CORRIDO 0.00 0.00

CORTE 2-2 - EJE F 1 3.80 0.80 0.80 2.43 0.00

CORTE 3-3 - EJE 3 / D-E 1 1.08 0.60 0.80 0.52 0.00

CORTE 3-3 - EJE 3 / E-F 1 1.11 0.60 0.80 0.53 0.00

CORTE 3-3 - EJE 3 / F-G 1 0.99 0.60 0.80 0.48 0.00

CORTE 3-3 - EJE 3 / G-H 1 1.05 0.60 0.80 0.50 0.00

CORTE 3-3 - EJE 3 / H-I 1 1.05 0.60 0.80 0.50 0.00

CORTE 3-3 - EJE 3 / I-J 1 1.08 0.60 0.80 0.52 0.00

CORTE 4-4 - EJE 1 / D-E 1 1.03 0.60 0.80 0.49 0.00

CORTE 4-4 - EJE 1 / E-F 1 0.95 0.60 0.80 0.46 0.00

CORTE 4-4 - EJE 1 / F-G 1 0.95 0.60 0.80 0.46 0.00

CORTE 4-4 - EJE 1 / G-H 1 0.95 0.60 0.80 0.46 0.00

CORTE 4-4 - EJE 1 / H-I 1 0.95 0.60 0.80 0.46 0.00

CORTE 4-4 - EJE 1 / I-J 1 1.03 0.60 0.80 0.49 0.00

0.00 0.00

TOTAL 8.30 TOTAL 0.00

VOLUMEN ÁREA
DESCRIPCION TOTAL Nª DE ALTO/ TOTAL
CANT. LARGO ANCHO ALTO LARGO
(M3) VECES ANCHO (M2)

SOBRECIMIENTO 0.00 0.00

EJE 1 0.00 0.00

S/C EN Z-1 2 0.68 0.25 0.70 0.24 4 0.68 0.70 1.90


PLANILLA DE METRADO - ESTRUCTURAS
VOLUMEN ÁREA
DESCRIPCION TOTAL Nª DE ALTO/ TOTAL
CANT. LARGO ANCHO ALTO LARGO
(M3) VECES ANCHO (M2)

SOLADO E=10CM 0.00 0.00

Z-1 0.00 5 2.20 1.85 20.35

Z-2 0.00 5 1.15 2.30 13.23

Z-3 0.00 2 6.80 1.20 16.32

0.00 0.00

TOTAL 0.00 TOTAL 49.90

S/C EN Z-2 10 0.75 0.25 0.70 1.31 20 0.75 0.70 10.50

CORTE 4-4 0.00 0.00 0.00 0.00

TRAMO 1 Y 6 2 1.03 0.25 0.55 0.28 4 1.03 0.55 2.27

TRAMO 2, 3, 4 Y 5 4 0.95 0.25 0.55 0.52 8 0.95 0.55 4.18

EJE 3 0.00 0.00

S/C EN Z-1 2 0.68 0.25 0.70 0.24 4 0.68 0.70 1.90

S/C EN Z-3 10 0.70 0.25 0.70 1.23 20 0.70 0.70 9.80

CORTE 3-3 0.00 0.00

TRAMO 1 Y 6 2 1.08 0.25 0.55 0.30 4 1.08 0.55 2.38

TRAMO 2 1 1.11 0.25 0.55 0.15 2 1.11 0.55 1.22

TRAMO 3 1 0.99 0.25 0.55 0.14 2 0.99 0.55 1.09

TRAMO 4 Y 5 2 1.05 0.25 0.55 0.29 4 1.05 0.55 2.31

EJE D 0.00 0.00

S/C EN Z-3 2 2.43 0.25 0.70 0.85 4 2.43 0.70 6.79

EJE F 0.00 0.00

S/C EN Z-1 1 0.60 0.25 0.70 0.11 2 0.60 0.70 0.84

S/C EN Z-2 1 0.70 0.25 0.70 0.12 2 0.70 0.70 0.98

CORTE 2-2 0.00 0.00

TRAMO 1 1 1.73 0.25 0.50 0.22 2 1.73 0.50 1.73

TRAMO 2 1 1.83 0.25 0.50 0.23 2 1.83 0.50 1.83

EJE J 0.00 0.00

S/C EN Z-3 2 2.43 0.25 0.70 0.85 4 2.43 0.70 6.79

0.00 0.00

TOTAL 7.06 TOTAL 56.50


PLANILLA DE METRADO - ESTRUCTURAS

CONCRETO F'C = 210 KG/CM2 ENCOFRADO Y DESENCOFRADO ACERO FY = 4,200 KG/M2 LONGUITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 6mm 1/4" 8mm 3/8" 12mm 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO PERM. ALTO TIPO DIAM. CANT. LONG.
(M3) VECES (M2) VECES 0.222 0.250 0.395 0.560 0.888 0.994 1.552 2.235 3.973

ZAPATAS 0.00 0.00

Z-1 5 2.20 1.85 0.60 12.21 0.00 L1 5 5/8 11 1.70 93.50

0.00 0.00 L2 5 5/8 10 2.05 102.50

0.00 0.00

Z-2 5 2.30 1.15 0.60 7.94 0.00 L1 5 5/8 12 1.00 60.00

0.00 0.00 L2 5 5/8 6 2.15 64.50

0.00 0.00

Z-3 2 6.80 1.20 0.60 9.79 0.00 L1 2 5/8 6 6.65 79.80

0.00 0.00 L2 2 5/8 34 1.05 71.40

0.00 0.00 TOTAL POR DIAM. EN M. 0.00 0.00 0.00 0.00 0.00 0.00 471.70 0.00 0.00

0.00 0.00 TOTAL POR DIAM. EN KG. 0.00 0.00 0.00 0.00 0.00 0.00 732.08 0.00 0.00

TOTAL 29.94 TOTAL 0.00 TOTAL GENERAL EN KG. 732.08

CONCRETO F'C = 210 KG/CM2 ENCOFRADO Y DESENCOFRADO ACERO FY = 4,200 KG/M2 LONGUITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 6mm 1/4" 8mm 3/8" 12mm 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO PERM. ALTO TIPO DIAM. CANT. LONG.
(M3) VECES (M2) VECES 0.222 0.250 0.395 0.560 0.888 0.994 1.552 2.235 3.973

COLUMNAS 0.00 0.00

C1 0.00 0.00

VOLUMEN 1 4 0.53 0.25 3.15 1.67 4 1.70 3.15 21.42 Vertical 4 3/4 10 4.48 179.00

VOLUMEN 2 4 0.20 0.25 3.15 0.63 0.00 Estribo 1 4 3/8 27 1.50 162.43

ENDENTADO 2 0.07 0.24 2.45 0.08 8 0.07 2.45 1.27 Estribo 2 4 3/8 27 1.35 146.23

C-2 0.00 0.00

VOLUMEN 1 8 0.80 0.25 3.15 5.04 8 2.50 3.15 63.00 Vertical 8 3/4 4 4.48 143.36

VOLUMEN 2 8 0.30 0.20 3.15 1.51 0.00 Vertical 8 5/8 8 4.48 286.72

0.00 0.00 Estribo 1 8 3/8 27 2.05 442.80

0.00 0.00 Estribo 2 8 3/8 27 1.45 313.20

C-3 0.00 0.00

VOLUMEN 1 2 0.80 0.25 3.15 1.26 2 2.25 3.15 14.18 Vertical 2 5/8 10 4.48 89.60

VOLUMEN 2 2 0.20 0.25 3.15 0.32 0.00 Vertical 2 1/2 4 4.48 35.84

ENDENTADO 1 0.07 0.24 2.45 0.04 4 0.07 2.45 0.64 Estribo 1 2 3/8 27 2.05 110.92

0.00 0.00 Estribo 2 2 3/8 27 1.35 73.12

C-4 0.00 0.00


PLANILLA DE METRADO - ESTRUCTURAS
EJE D Y J 2 0.25 0.25 3.15 0.39 4 0.25 3.15 3.15 Vertical 2 1/2 4 4.48 35.84

ENDENTADO 2 0.07 0.25 2.45 0.08 8 0.07 2.45 1.27 Estribo 2 1/4 27 0.92 49.68

0.00 0.00

EJE F 1 0.25 0.25 2.95 0.18 2 0.25 2.95 1.48 Vertical 1 1/2 4 4.48 17.92

ENDENTADO 1 0.07 0.25 2.45 0.04 4 0.07 2.45 0.64 Estribo 1 1/4 25 0.92 23.00

0.00 0.00

0.00 0.00 TOTAL POR DIAM. EN M. 0.00 72.68 0.00 1248.70 0.00 89.60 376.32 322.36 0.00

0.00 0.00 TOTAL POR DIAM. EN KG. 0.00 18.17 0.00 699.27 0.00 89.06 584.05 720.47 0.00

TOTAL 11.24 TOTAL 107.04 TOTAL GENERAL EN KG. 2111.03

CONCRETO F'C = 210 KG/CM2 ENCOFRADO Y DESENCOFRADO ACERO FY = 4,200 KG/M2 LONGUITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 6mm 1/4" 8mm 3/8" 12mm 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO PERM. LARGO TIPO DIAM. CANT. LONG.
(M3) VECES (M2) VECES 0.222 0.250 0.395 0.560 0.888 0.994 1.552 2.235 3.973

VIGAS 0.00 0.00

Vs 101 (25x50) 2 6.00 0.25 0.50 1.50 2 0.80 11.50 18.40 Capa 1 2 1/2 2 6.45 25.80

0.00 0.00 Capa 2 2 5/8 1 1.14 2.28

0.00 0.00 Capa 3 2 3/8 2 5.92 23.68

0.00 0.00 Capa 4 2 1/2 2 6.45 25.80

0.00 0.00 Estribo 2 1/4 46 1.26 115.92

0.00 0.00

VP 101 (30x50) 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00 TOTAL POR DIAM. EN M. 0.00 115.92 0.00 23.68 0.00 51.60 2.28 0.00 0.00

0.00 0.00 TOTAL POR DIAM. EN KG. 0.00 28.98 0.00 13.26 0.00 51.29 3.54 0.00 0.00

TOTAL 1.50 TOTAL 18.40 TOTAL GENERAL EN KG. 97.07

CONCRETO F'C = 210 KG/CM2 ENCOFRADO Y DESENCOFRADO ACERO FY = 4,200 KG/M2 LONGUITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 6mm 1/4" 8mm 3/8" 12mm 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO PERM. ALTO TIPO DIAM. CANT. LONG.
(M3) VECES (M2) VECES 0.222 0.250 0.395 0.560 0.888 0.994 1.552 2.235 3.973
PLANILLA DE METRADO - ESTRUCTURAS
LOSA ALIGERADA 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00 TOTAL POR DIAM. EN M. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 TOTAL POR DIAM. EN KG. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 TOTAL 0.00 TOTAL GENERAL EN KG. 0.00

LADRILLOS DE TECHO 0.00


Recubrimiento 7.5cm, en todos los lados (perimetral)

Cantidad de Varillas de L1:


L1 Cant. L1 = 2.05/0.20=10.25=10+1 (inicio) = 11 VARILLAS
Analizar el decimal:
L1=1.85M-0.15M=1.70M

0.25varillas - X=0.05M
1 varilla - 0.20m
X=0.05M

Cantidad de Varillas de L2:


Cant. L2 = 1.70/0.20=8.5=9+1 (inicio) = 10 VARILLAS

L2

L2=2.20M-0.15M=2.05M

COLUMNA C-1

SEGÚN PLANO (EN VIGA)


T4 (3)
T4
V1
EXTREMO SUPERIOR
(1)+(5)+(1)=(7)
1x0.05+5x0.10+1x0.15=0.70m V2 0.20M

RESTO 0.25M
2.60-0.70-0.70=1.20m/0.25m(5)
Se resta 1: (5)-1=(4)
T3
3.15M EXTREMO INFERIOR T3
(1)+(5)+(1)=(7)
1x0.05+5x0.10+1x0.15=0.70m

DEBAJO DEL NPT


(1)+(5)=(6)

T1 T2 0.485m
T2
T1 0.057m 0.21m
0.41m 0.057m
0.057m 0.21m
0.41m 0.057m

0.21m

Estribo 1
Estribo 2

0.17M
Capa 1

Capa 2 Capa 3
0.50
0.30 0.42M
0.42M
Capa 4

0.038M
cada gancho
2.43m 2.43m 0.17M

CAPA 1

EXTREMO IZQ RESTO


0.3m PLANO
0.3m (1) (1)+(10)+(4)=(15) Long: 1.80m/0.25m=7.2=(7)
CAPA 2 IZQ CAPA 4 CAPA 3 CAPA 2 DER Longitud: 1.65m Se resta 1: (7)-1=(6)

CAPA 5
EXTREMO IZQ RESTO EXTREMO DER EXTREMO IZQ RESTO EXTREMO DER
PLANO (1)+(10)+(1)=(12) PLANO
(1) (1)+(5)+(1)=(7) Long: 1.03m/0.20m=5.2=(5) (1)+(5)+(1)=(7) Long: 0.03m = (1) (1)+(10)+(1)=(12) (1)
Longitud: 0.70m Se resta 1: (5)-1=(4) Longitud: 0.70m Longitud: 1.20m Longitud: 1.20m

2.43m 2.43m

RESTO EXTREMO DER


PLANO
m/0.25m=7.2=(7) (1)+(10)+(4)=(15) (1)
a 1: (7)-1=(6) Longitud: 1.65m

0.42M
0.42M

0.057M
cada gancho
0.22M