Está en la página 1de 19

EMPOPASTO S.A. E.S.P.

NIT 891.200.686-3

CONSTRUCCION DEL COLECTOR SEPARADO Y MEJORAMIENTO HIDRAULICO DE LAS REDES DE ACUEDUCTO COLECTOR MIJITAYO, EN LA CARRERA 27
ENTRE CALLE 10 Y CALLE 16

PROGRAMACION POR FASES - CRONOGRAMA DE ACTIVIDADES

ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE


ETAPA 2 4,5 MESES
FASES ACTIVIDADES
ETAPA 3 (5 MESES)
S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32

ETAPA PRECONSTUCTIVA
INTERSECCION 16
ENTRE CALLE 16 Y 15 AUX LOTES
FASE 1 INTERSECCION 15
ENTRE CALLE 15 Y 14 AUX LOTES
INTERSECCION 14
FASE 3
ENTRE CALLE 14 Y 13 AUX LOTES
FASE 3 INTERSECCION 13
FASE 2 ENTRE CALLE 13 Y 11 GRP
FASE 4 INTERSECCION 11
FASE 4 ENTRE CALLE 11 Y 10 SANT ACU

ELABORADO POR: REVISADO POR: APROBADO POR:

NOMBRES Y APELLIDOS: ANA PAOLA RODRIGUEZ SOLARTE NOMBRES Y APELLIDOS: GERARDO CUENCA MELO NOMBRES Y APELLIDOS: CARLOS OVIEDO GARCIA

CARGO: PROGRAMADOR DE OBRA CARGO: DIRECTOR DE OBRA CARGO: SUB DIRECTOR MONITOREO, SEGUIMIENTO Y CONTROL
FIRMA: FIRMA: FIRMA:

FECHA: DD/MM/AA FECHA: DD/MM/AA FECHA: DD/MM/AA


EMPOPASTO S.A. E.S.P.
NIT 891.200.686-3
NOMBRE DE FORMATO:
RELACIÓN DE AVANCE FÍSICO Y FINANCIERO EN OBRA
CÓDIGO VERSIÓN VIGENCIA
PROCESO: ACUEDUCTO Y ALCANTARILLADO
AA-FT-84 1 30-Aug-19

PROYECTO/OBRA: CONSTRUCCION DEL COLECTOR SEPARADO Y MEJORAMIENTO HIDRAULICO DE LAS REDES DE ACUEDUCTO COLECTOR MIJITAYO, EN LA CARRERA 27 ENTRE CALLE 10 Y CALLE 16

VALOR DE LA OBRA
$ 7,955,533,925

CUADRO DE PROGRAMADO VS EJECUTADO DE OBRA


FINANCIERO FISICO

MES INICIO FIN SEMANA VALOR % VALOR


% % ACUMULADO % % PROGRMADO % PROGRAMADO
PROGRAMADO % EJECUTADO EJECUTADO EJECUTADO DIFERENCIA % %EJECUTADO DIFERENCIA
PROGRAMADO PROGRAMADO PROGRAMADO ACUMULADO EJECUTADO
ACUMULADO ACUMULADO ACUMULADO

5/13/2019 5/19/2019 S-1 0.58% 0.58% $ 46,443,428 0.55% 0.55% $ 43,874,770 -%.0.03 0% 0% 0% 0% 0%
MAYO 5/20/2019 5/26/2019 S-2 1.48% 2.06% $ 164,268,249 1.45% 2.00% $ 159,230,012 -%.0.06 1% 1% 1% 1% 0%
5/27/2019 5/31/2019 S-3 2.06% $ 164,268,249 4.34% $ 345,270,172 %.2.28 1% 1% 0%
6/1/2019 6/2/2019 S-3 3.30% 5.36% $ 426,585,825 3.17% 5.17% $ 411,420,437 -%.0.19 2% 2% 2% 3% 1%
6/3/2019 6/9/2019 S-4 3.27% 8.63% $ 686,594,908 2.00% 7.17% $ 570,531,115 -%.1.46 3% 6% 4% 7% 1%
JUNIO 6/10/2019 6/16/2019 S-5 4.41% 13.04% $ 1,037,309,529 1.03% 8.20% $ 652,473,115 -%.4.84 4% 10% 2% 9% -2%
6/17/2019 6/23/2019 S-6 4.44% 17.48% $ 1,390,534,313 3.30% 11.50% $ 915,005,734 -%.5.98 5% 16% 2% 10% -5%
6/24/2019 6/30/2019 S-7 4.11% 21.59% $ 1,717,438,430 0.84% 12.34% $ 981,832,219 -%.9 5% 21% 4% 14% 6%
REPROGRAMACION No. 1
12.34%
7/1/2019 7/7/2019 S-8 2.72% 15.06% $ 1,198,239,941 1.16% 13.50% $ 1,073,997,080 -%.2 2% 16% 2% 16% 0%
7/8/2019 7/14/2019 S-9 2.72% 17.78% $ 1,414,647,664 1.70% 15.20% $ 1,209,241,157 -%.3 2% 18% 2% 18% 0%
JULIO 7/15/2019 7/21/2019 S-10 2.72% 20.50% $ 1,631,055,386 4.20% 19.40% $ 1,543,373,581 -%.1 2% 21% 4% 22% -2%
7/22/2019 7/28/2019 S-11 2.73% 23.23% $ 1,848,060,049 2.55% 21.95% $ 1,746,239,697 -%.1.28 2% 23% 3% 25% -2%
7/29/2019 7/31/2019 S-12 1.37 25% 1957275054 3% 24.85% $ 1,976,950,180 %.0.25 2% 25% 3% 28% -2%
8/1/2019 8/4/2019 S-12 2.75% 25.98% $ 2,066,490,059 1.15% 26.00% $ 2,068,438,821 %.0.02 2% 25% 5% 30% -5%
8/5/2019 8/11/2019 S-13 2.75% 28.72% $ 2,284,920,068 2.55% 28.55% $ 2,271,304,936 -%.0.17 2% 28% 5% 35.45% -8%
AGOSTO 8/12/2019 8/18/2019 S-14 2.75% 31.47% $ 2,503,350,078 1.66% 30.21% $ 2,403,366,799 -1.26% 2% 30% 3% 38.24% -8%
8/19/2019 8/25/2019 S-15 2.75% 34.21% $ 2,721,780,087 2.91% 33.12% $ 2,634,872,836 -1.09% 2% 32% 3% 42% -9%
8/26/2019 8/31/2019 S-16 6.57% 40.78% $ 3,244,061,349 2.43% 35.55% $ 2,828,192,310 -5.23% 6% 39% 4% 46% -7%
REPROGRAMACION No. 2
35.55%
9/2/2019 9/8/2019 S-17 2.20% 37.75% $ 3,003,214,057 2.37% 37.92% $ 3,016,738,464 0.17% 9% 55% 9% 55% 0%
9/9/2019 9/15/2019 S-18 2.26% 40.01% $ 3,183,009,123 2.77% 40.69% $ 3,237,106,754 0.68% 3% 57% 3% 57% 0%
SEPTIEMBRE 9/16/2019 9/22/2019 S-19 2.32% 42.33% $ 3,367,577,510 3.02% 43.71% $ 3,477,363,879 1.38% 3% 60% 3% 60% 0%
9/23/2019 9/29/2019 S-20 2.38% 44.71% $ 3,556,919,218 2.46% 46.17% $ 3,673,070,013 1.46% 2% 62% 3% 63% -1%
9/29/2019 9/30/2019 S-21 44.71% $ 3,556,919,218 $ - -45% 62% 63% -1%
10/1/2019 10/6/2019 S-21 2.44% 47.15% $ 3,751,034,246 0.98% 47.15% $ 3,751,034,246 0.00% 2% 65% 1% 64% 1%
10/7/2019 10/13/2019 S-22 5.80% 52.95% $ 4,212,455,213 2.38% 49.53% $ 3,940,375,953 -3.42% 4% 68% 3% 67% 2%
OCTUBRE 10/14/2019 10/20/2019 S-23 6.90% 59.85% $ 4,761,387,054 2.46% 51.99% $ 4,136,082,088 -7.86% 4% 73% 2% 68% 4%
10/21/2019 10/27/2019 S-24 7.80% 67.65% $ 5,381,918,700 2.11% 54.10% $ 4,303,943,853 -13.55% 4% 77% 2.21% 70.56% 6.47%
10/28/2019 10/31/2019 S-25 $ 5,986,539,279 1.81% 55.91% $ 4,447,939,017 55.91% 77% 71% 6%
11/1/2019 11/3/2019 S-25 7.60% 75.25% $ 6,567,293,255 1.81% 55.91% $ 4,447,939,017 -19.34% 5% 82% 1.80% 72.37% 9.24%
NOVIEMBRE
11/4/2019 11/10/2019 S-26 7.30% 82.55% $ 6,567,293,255 1.33% 57.24% $ 4,553,747,619 -25.31% 6% 87% 1.70% 74.07% 13.10%
REPROGRAMACION No. 3
57.24%
11/11/2019 11/17/2019 S-27 7.70% 64.94% $ 5,166,323,731 1.33% 58.57% $ 4,659,556,220 -6.37% 6% 79.72% 6.12% 80.18% -0.46%
NOVIEMBRE 11/18/2019 11/24/2019 S-28 7.60% 72.54% $ 5,770,944,309 1.70% 60.27% $ 4,794,800,297 -12.27% 3% 82.92% 2.38% 82.56% 0.36%
11/25/2019 11/30/2019 S-29 7.50% 80.04% $ 6,367,609,354 2.09% 62.36% $ 4,961,070,956 -17.68% 4% 87.11% 2.83% 85.39% 1.72%
12/2/2019 12/7/2019 S-30 7.40% 87.44% $ 6,956,318,864 2.35% 64.71% $ 5,148,026,003 -22.73% 5% 92% 2.41% 87.80% 4.39%
DICIEMBRE 12/9/2019 12/14/2019 S-31 7.20% 94.64% $ 7,529,117,307 5% 97% 3.77% 91.57% 5.32%
12/16/2019 12/21/2019 S-32 5.36% 100.00% $ 7,955,533,925 3% 100%

ELABORADO POR: REVISADO POR: APROBADO POR:


NOMBRES Y APELLIDOS: ANA PAOLA RODRIGUEZ
NOMBRES Y APELLIDOS: GERARDO CUENCA MELO NOMBRES Y APELLIDOS: CARLOS OVIEDO GARCIA
SOLARTE
CARGO: PROGRAMADOR DE OBRA CARGO: DIRECTOR DE OBRA CARGO: SUB DIRECTOR MONITOREO, SEGUIMIENTO Y CONTROL
FIRMA: FIRMA: FIRMA:

FECHA: DD/MM/AA FECHA: DD/MM/AA FECHA: DD/MM/AA


EMPOPASTO S.A. E.S.P.
NIT 891.200.686-3
CONSTRUCCION DEL COLECTOR SEPARADO Y MEJORAMIENTO HIDRAULICO DE LAS REDES DE ACUEDUCTO COLECTOR MIJITAYO, EN LA CARRERA 27 ENTRE CALLE 10 Y CALLE 16

CRONOGRAMA DE AVANCE FISICO

DURACION TIEMPO RESTANTE REPROGR


ACTIVIDAD ESPECIFICACION UND REPROGR No. 3 PARA EJECUCION. AMACION S27 S28 S29 S30 S31 S32
EN DIAS DIAS No.3

PROGRAMADO 134.88 284.88 284.88 234.88

ACUMULADO PROGRAMADO 8508.89 8643.77 8928.64 9213.52 9448.39

AVANCE FISICO PROGRAMADO 153.69 158.76 163.82 168.00

% AVANCE FISICO PROGRAMADO 6.34% 6.55% 6.76% 6.93%


EXCAVACIONES M3 168 114
EJECUTADO 76.20 189.50 313.51 280.14

ACUMULADO EJECUTADO 8508.89 8585.09 8774.59 9088.10 9368.24

AVANCE FISICO EJECUTADO 152.65 156.02 161.59 166.57

% AVANCE FISICO EJECUTADO 6.30% 6.44% 6.67% 6.87%

PROGRAMADO 4.29 8.29 12.29 12.29

ACUMULADO PROGRAMADO 489.27 493.56 501.85 514.13 526.42 526.42

AVANCE FISICO PROGRAMADO 150.66 153.19 156.94 160.69 160.69

% AVANCE FISICO PROGRAMADO 6.22% 6.32% 6.47% 6.63% 6.63%


TUBERIA ML 162 120
EJECUTADO 8.18 6.00 14.35 16.62 17.46

ACUMULADO EJECUTADO 489.27 497.45 503.45 517.80 534.42 551.88

AVANCE FISICO EJECUTADO 151.85 153.68 158.06 163.13 168.46

% AVANCE FISICO EJECUTADO 6.26% 6.34% 6.52% 6.73% 6.95%

PROGRAMADO 49.08 149.08 149.08 99.08 149.08 299.08

ACUMULADO PROGRAMADO 5481.42 5530.50 5679.59 5828.67 5927.75 6076.84 6375.92

AVANCE FISICO PROGRAMADO 140.52 144.31 148.10 150.61 154.40 162.00

% AVANCE FISICO PROGRAMADO 5.80% 5.95% 6.11% 6.21% 6.37% 6.68%


GRP RELLENOS M3 162 126
EJECUTADO 66.36 225.00 237.48 232.48 215.05 0.00

ACUMULADO EJECUTADO 5481.42 5547.78 5772.78 6010.26 6242.74 6457.79 6457.79

AVANCE FISICO EJECUTADO 140.96 146.68 152.71 158.62 164.08 164.08

% AVANCE FISICO EJECUTADO 5.82% 6.05% 6.30% 6.54% 6.77% 6.77%

PROGRAMADO 69.90 187.90 193.90 193.90 293.90

ACUMULADO PROGRAMADO 9043.13 9113.03 9300.93 9494.83 9688.73 9982.63

AVANCE FISICO PROGRAMADO 158.84 162.12 165.50 168.88 174.00

% AVANCE FISICO PROGRAMADO 6.55% 6.69% 6.83% 6.97% 7.18%


DESALOJOS M3 174 120
EJECUTADO 76.20 189.50 313.51 280.14 221.63

ACUMULADO EJECUTADO 9043.13 9119.33 9308.83 9622.34 9902.48 10124.11

AVANCE FISICO EJECUTADO 158.95 162.26 167.72 172.60 176.47

% AVANCE FISICO EJECUTADO 6.56% 6.69% 6.92% 7.12% 7.28%

PROGRAMADO 7.74 7.74 7.74 7.74 7.74

ACUMULADO PROGRAMADO 219.78 227.51 235.25 242.99 250.72 258.46


UND
AVANCE FISICO PROGRAMADO 137.32 141.99 146.66 151.33 156.00

A PARTIR DE LA % AVANCE FISICO PROGRAMADO 5.67% 5.86% 6.05% 6.24% 6.44%


CAMARAS 156 78
REPROGRAMACION EJECUTADO 20.83 10.74 4.30 9.14 30.93
No.2 LAS UNIDADES
DE CUANTIFICAN EN ACUMULADO EJECUTADO 219.78 240.61 251.35 255.65 264.79 295.72
M3
AVANCE FISICO EJECUTADO 145.22 151.71 154.30 159.82 178.49

% AVANCE FISICO EJECUTADO 5.99% 6.26% 6.37% 6.59% 7.36%

PROGRAMADO 62.18 162.18 212.18 212.18 162.18

ACUMULADO PROGRAMADO 4432.18 4494.36 4656.54 4868.72 5080.90 5243.08

AVANCE FISICO PROGRAMADO 138.87 143.88 150.43 156.99 162.00

% AVANCE FISICO PROGRAMADO 5.73% 5.94% 6.21% 6.48% 6.68%


EXCAVACIONES M3 162 96
EJECUTADO 212.30 209.90 142.38 107.29 135.68

ACUMULADO EJECUTADO 4432.18 4644.48 4854.38 4996.76 5104.04 5239.72

AVANCE FISICO EJECUTADO 143.50 149.99 154.39 157.70 161.90

% AVANCE FISICO EJECUTADO 5.92% 6.19% 6.37% 6.51% 6.68%

PROGRAMADO 31.32 91.32 91.32 121.32 121.32

ACUMULADO PROGRAMADO 1343.42 1374.74 1466.05 1557.37 1678.68 1800.00

AVANCE FISICO PROGRAMADO 119.14 127.06 134.97 145.49 156.00

% AVANCE FISICO PROGRAMADO 4.92% 5.24% 5.57% 6.00% 6.44%


TUBERIA ML 156 102
EJECUTADO 34.15 100.90 51.01 68.25 32.39

ACUMULADO EJECUTADO 1343.42 1377.57 1478.47 1529.48 1597.73 1630.12

AVANCE FISICO EJECUTADO 119.39 128.13 132.55 138.47 141.28

% AVANCE FISICO EJECUTADO 4.93% 5.29% 5.47% 5.71% 5.83%

SANITARIO
PROGRAMADO 51.01 151.01 51.01 151.01 151.01 351.01

ACUMULADO PROGRAMADO 4370.62 4421.63 4572.64 4623.65 4774.66 4925.67 5276.68

AVANCE FISICO PROGRAMADO 135.75 140.39 141.95 146.59 151.22 162.00

% AVANCE FISICO PROGRAMADO 5.60% 5.79% 5.86% 6.05% 6.24% 6.68%


RELLENOS M3 162 120
EJECUTADO 136.80 130.10 307.70 163.15 166.76 0.00

ACUMULADO EJECUTADO 4370.62 4507.42 4637.52 4945.22 5108.38 5275.14 5275.14

AVANCE FISICO EJECUTADO 138.38 142.38 151.82 156.83 161.95 161.95

% AVANCE FISICO EJECUTADO 5.71% 5.87% 6.26% 6.47% 6.68% 6.68%


SANITARIO
PROGRAMADO 62.18 162.18 162.18 212.18 212.18

ACUMULADO PROGRAMADO 4299.58 4361.76 4523.94 4686.12 4898.30 5110.48

AVANCE FISICO PROGRAMADO 138.27 143.41 148.55 155.27 162.00

% AVANCE FISICO PROGRAMADO 5.70% 5.92% 6.13% 6.41% 6.68%


DESALOJOS M3 162 108
EJECUTADO 212.30 209.90 142.38 107.29 135.68

ACUMULADO EJECUTADO 4299.58 4511.88 4721.78 4864.16 4971.44 5107.12

AVANCE FISICO EJECUTADO 143.02 149.68 154.19 157.59 161.89

% AVANCE FISICO EJECUTADO 5.90% 6.17% 6.36% 6.50% 6.68%

PROGRAMADO 2.68 2.68 2.68 2.68 2.68

ACUMULADO PROGRAMADO 37.62 40.30 42.97 45.65 48.32 51.00


CAMARAS
AVANCE FISICO PROGRAMADO 113.78 121.33 128.89 136.44 144.00
A PARTIR DE LA
REPROGRAMACION % AVANCE FISICO PROGRAMADO 4.69% 5.01% 5.32% 5.63% 5.94%
No.3, SE UND 144 69
REPROGRAMA EJECUTADO 2.70 0.50 0.85 1.15 1.45
TAMBIEN EL TOTAL
DE CAMARAS ACUMULADO EJECUTADO 37.62 40.32 40.82 41.67 42.82 44.27
SANITARIAS
AVANCE FISICO EJECUTADO 113.84 115.26 117.66 120.90 125.00

% AVANCE FISICO EJECUTADO 4.70% 4.75% 4.85% 4.99% 5.16%

PROGRAMADO 0.00 0.00 6.00 6.00 6.00 6.00

ACUMULADO PROGRAMADO 32.00 32.00 32.00 38.00 44.00 50.00 56.00

AVANCE FISICO PROGRAMADO 68.57 68.57 81.43 94.29 107.14 120.00

% AVANCE FISICO PROGRAMADO 2.83% 2.83% 3.36% 3.89% 4.42% 4.95%


CAJILLAS 120
EJECUTADO 0.00 0.00 0.00 0.00 6.00 0.00

ACUMULADO EJECUTADO 32.00 32.00 32.00 32.00 32.00 38.00 38.00

AVANCE FISICO EJECUTADO 68.57 68.57 68.57 68.57 81.43 81.43

% AVANCE FISICO EJECUTADO 2.83% 2.83% 2.83% 2.83% 3.36% 3.36%

PROGRAMADO 223.44 223.44 373.44 423.44 373.44

ACUMULADO PROGRAMADO 2670.82 2894.26 3117.70 3491.14 3914.58 4288.02

AVANCE FISICO PROGRAMADO 109.34 117.79 131.89 147.89 162.00

% AVANCE FISICO PROGRAMADO 4.51% 4.86% 5.44% 6.10% 6.68%


EXCAVACIONES M3 162 96
EJECUTADO 49.53 28.43 0.00 78.74 214.03

ACUMULADO EJECUTADO 2670.82 2720.35 2748.78 2748.78 2827.53 3041.56

AVANCE FISICO EJECUTADO 102.77 103.85 103.85 106.82 114.91

% AVANCE FISICO EJECUTADO 4.24% 4.28% 4.28% 4.41% 4.74%

PROGRAMADO 15.16 45.16 65.16 115.16 85.16

ACUMULADO PROGRAMADO 1274.20 1289.36 1334.52 1399.68 1514.84 1600.00

AVANCE FISICO PROGRAMADO 125.71 130.12 136.47 147.70 156.00

% AVANCE FISICO PROGRAMADO 5.19% 5.37% 5.63% 6.09% 6.44%


TUBERIA ML 156 102
EJECUTADO 17.35 44.12 132.36 23.00 46.10

ACUMULADO EJECUTADO 1274.20 1291.55 1335.67 1468.03 1491.03 1537.13

AVANCE FISICO EJECUTADO 125.93 130.23 143.13 145.38 149.87

% AVANCE FISICO EJECUTADO 5.19% 5.37% 5.90% 6.00% 6.18%


ACUEDUCTO
PROGRAMADO 64.80 164.80 164.80 314.80 264.80 614.80

ACUMULADO PROGRAMADO 2970.15 3034.95 3199.75 3364.55 3679.35 3944.15 4558.95

AVANCE FISICO PROGRAMADO 111.84 117.91 123.99 135.59 145.34 168.00

% AVANCE FISICO PROGRAMADO 4.61% 4.86% 5.11% 5.59% 6.00% 6.93%


RELLENOS M3 168 132
EJECUTADO 51.85 84.80 175.17 78.19 97.17 0.00

ACUMULADO EJECUTADO 2970.15 3022.00 3106.80 3281.97 3360.16 3457.32 3457.32

AVANCE FISICO EJECUTADO 111.36 114.49 120.94 123.82 127.40 127.40

% AVANCE FISICO EJECUTADO 4.59% 4.72% 4.99% 5.11% 5.26% 5.26%

PROGRAMADO 123.44 223.44 323.44 423.44 523.44

ACUMULADO PROGRAMADO 2590.88 2714.32 2937.76 3261.20 3684.64 4208.08

AVANCE FISICO PROGRAMADO 108.36 117.28 130.20 147.10 168.00

% AVANCE FISICO PROGRAMADO 4.47% 4.84% 5.37% 6.07% 6.93%


DESALOJOS M3 168 132
EJECUTADO 49.53 28.43 0.00 78.74 214.03

ACUMULADO EJECUTADO 2590.88 2640.41 2668.84 2668.84 2747.59 2961.62

AVANCE FISICO EJECUTADO 105.41 106.55 106.55 109.69 118.24

% AVANCE FISICO EJECUTADO 4.35% 4.40% 4.40% 4.53% 4.88%

PROGRAMADO 0.00 0.00 0.00 0.00 0.00 111.55

ACUMULADO PROGRAMADO 120.46 120.46 120.46 120.46 120.46 120.46 232.01

AVANCE FISICO PROGRAMADO 21.81 21.81 21.81 21.81 21.81 42.00

ASFALTO 42
% AVANCE FISICO PROGRAMADO 0.90% 0.90% 0.90% 0.90% 0.90% 1.73%
ASFALTO 42
EJECUTADO 0.00 0.00 0.00 0.00 0.00 0.00

ACUMULADO EJECUTADO 120.46 120.46 120.46 120.46 120.46 120.46 120.46

AVANCE FISICO EJECUTADO 21.81 21.81 21.81 21.81 21.81 21.81

% AVANCE FISICO EJECUTADO 0.90% 0.90% 0.90% 0.90% 0.90% 0.90%

2424
1515

TOTAL
% PROGRAMADO 5.66% 3.19% 4.20% 5.08% 4.70% 3.06%
% AVANCE FISICO ACUMULADO 74.07% 79.72% 82.92% 87% 92% 97% 100%
% EJECUTADO 6.12% 2.38% 2.83% 2.41% 3.77% -3.42%
%EJECUTADO ACUMULADO 74.07% 80.18% 82.56% 85.39% 87.80% 91.57% 88.15%
DIFERENCIA -0.46% 0.36% 1.72% 4.39% 5.32% 11.79%
ELABORADO POR: REVISADO POR:
NOMBRES Y
NOMBRES Y APELLIDOS: ANA PAOLA APELLIDOS:
RODRIGUEZ SOLARTE GERARDO CUENCA
MELO
CARGO: DIRECTOR
CARGO: PROGRAMADOR DE OBRA
DE OBRA
FIRMA: FIRMA:

FECHA: DD/MM/AA FECHA: DD/MM/AA


REPROGRAMACION No.1 REPROGRAMACION No.2 REPROGRAMACION No.3 SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
EJECUTADO S/ CANTIDAD
EJECUTADO
CANT. DURACION DURACION DURACION Acta de TOTAL PARA
ACTIVIDAD ESPECIFICACION UND INICIO FIN INICIO FIN INICIO FIN S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S/ AVANCE PREACTAS TOTAL S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32
INICIAL (Dias) (Dias) (Dias) Modificación a CANTIDADES REPROGRAM
FISICO
31/08/19 ACION 3
8,948.27 S2 S26 150 S2 S26 150 S2 S29 168 0 371 746 101 376.7 135 742 710 569 511 312 0 452 433.5 83.64 114 4981.1 5656.52 3919.92 8900.99 9448.39 939.50 305.45 618.7 379.00 215.84 814.84 365.06 183.34 156.81 374.82 76.2 189.5 313.51 280.14 221.63
EXCAVACIONES M3
305.45 618.66 161.69 153.35 293.35 468.35 461.69 451.69 891.69 134.88 284.88 284.88 234.88 939.50
595.83 S3 S27 150 S3 S27 150 S3 S29 162 0 20 52 12 6 43 8 24 7 58.44 28.06 0 3.05 29.68 7.01 4.2 286.28 302.44 254.54 540.82 530.71 41.44 25.70 24.1 20.00 37.20 29.22 1.69 7.16 7.99 45.78 8.18 6 14.35 16.62 17.46
TUBERIA ML
25.70 24.05 12.00 22.00 22.00 22.00 22.00 30.00 27.79 4.29 8.29 12.29 12.29 0.00 37.15
7,432.06 S4 S28 150 S4 S29 156 S4 S30 162 0 0 514 0 0 0 102 57.9 57.47 69 217 223.1 137 423 238 92.37 60.66 3562.75 2192.48 3615.74 7178.49 6375.92 894.50 198.01 117.7 450.00 129.59 342.59 229.43 229.28 161.39 66.36 225 237.48 232.478 215.05
GRP RELLENOS M3
198.01 117.72 143.93 193.93 227.68 231.97 306.97 326.97 271.97 49.08 149.08 149.08 99.08 149.08 299.08 894.50
8,948.27 S2 S27 156 S2 S28 162 S2 S30 174 0 0 746 101 376.7 135 865 962 569 707 312 0 452 433.5 83.64 114 5515.31 5856.52 3718.56 9233.87 9982.63 939.50 305.45 618.7 379.00 215.84 814.84 365.06 183.34 156.81 374.82 76.2 189.5 313.51 280.14 221.63
DESALOJOS M3
305.45 618.66 217.83 157.83 264.26 270.09 319.09 362.84 317.84 69.90 187.90 193.90 193.90 293.90 939.50
15 S5 S20 96 S5 S28 144 S5 S30 156 0 0 0 0 0 0.4 0.5 0.8 0.7 1.6 1 1 0.9 1.9 12.09 155 118.48 84.63 239.63 258.46 38.69 2.42 9.7 2.42 2.42 0.20 20.81 13.55 1.2 20.83 10.74 4.3 9.14 30.93
CAMARAS UND
2.42 9.67 3.72 4.09 4.22 4.37 4.81 4.81 5.48 7.74 7.74 7.74 7.74 7.74 38.68
4,430.07 S3 S23 126 S3 S27 150 S3 S29 162 0 4.03 0 351 229.8 151 388 30 0 100 43.11 454 404 191 35.63 519 224 3476.58 3125.57 2762.09 6238.67 5243.08 810.90 61.09 71.3 162.00 14.75 46.24 147.10 132.6 96.95 212.3 209.9 142.38 107.288 135.676
EXCAVACIONES M3
61.09 71.29 180.77 137.91 197.91 267.91 265.41 252.08 552.08 62.18 162.18 212.18 212.18 162.18 810.90
1,435.75 S4 S24 126 S4 S28 150 S4 S29 156 0 0 0 54 25.7 36 52.54 18 14.63 140 38.11 203.4 140 17.42 31.62 93.65 105 863.05 970.12 902.35 1765.40 1800.00 456.58 24.47 72.8 162.00 5.70 3.10 47.86 34.28 25.03 34.15 100.9 51.01 68.25 32.39
TUBERIA ML
24.47 72.84 41.00 56.00 77.00 83.91 87.00 94.00 101.00 31.32 91.32 91.32 121.32 121.32 456.58
4,266.80 S4 S27 144 S4 S29 156 S4 S30 162 0 0 0 75 0 0 82.59 20 30 35 241 173 516 227 156 40.45 179 2900.05 1776.35 2918.63 5818.68 5276.68 906.06 223.50 169.7 146.00 106.30 161.32 164.38 142.18 55.24 122.781 136.8 130.1 307.698 163.154 166.764
RELLENOS M3
223.50 169.71 154.63 103.51 181.01 248.44 251.44 256.44 137.69 51.01 151.01 51.01 151.01 151.01 351.01 906.06
SANITARIO
4,430.07 S3 S25 138 S3 S28 156 S3 S29 162 0 0 0 351 229.8 151 465 39 0 120 43.11 454 404 191 35.63 519 224 3476.58 3227.54 2713.23 6189.81 5110.48 810.90 61.09 71.3 162.00 14.75 46.24 147.10 96.95 212.3 209.9 142.38 107.288 135.676
DESALOJOS M3
61.09 71.29 161.92 129.42 205.13 270.13 273.13 269.38 349.38 62.18 162.18 162.18 212.18 212.18 810.90
27 S6 S27 81 S6 S27 132 S6 S29 144 0 0 0 0 0 1 2 1 0.5 2 2 1.5 2 4.8 0.2 3 22.0 20.00 18.00 40.00 51.00 13.38 3.20 1.8 2.40 0.80 1.20 0.20 0.75 1.05 1.22 2.7 0.5 0.85 1.15 1.45
CAMARAS UND
3.20 1.80 0.75 0.72 1.42 1.42 1.42 1.42 1.42 2.68 2.68 2.68 2.68 2.68 13.38
S22 S28 66 S12 S31 120 32.0 17.00 24.00 56.00 56.00 24.00 6
CAJILLAS UND
0.00 0.00 0.00 0.00 2.00 2.00 2.00 3.00 4.00 0.00 0.00 6.00 6.00 6.00 6.00 24.00
3,458.52 S3 S23 126 S3 S27 150 S3 S29 162 0 2 7.5 348 0 0 0 0 0 23.93 0 303 262 45.22 49.38 288 230 2155.62 1558.78 3145.63 5301.25 4288.02 1617.20 40.73 39.00 7.06 31.08 109.94 56.98 49.53 28.43 78.742 214.034
EXCAVACIONES M3
40.73 0.00 259.31 223.60 308.60 316.60 321.60 341.60 551.60 223.44 223.44 373.44 423.44 373.44 1617.20
2,447.87 S5 S24 120 S5 S28 144 S5 S30 156 0 0 0 54 30 0 0 0 168 108 18.33 105 116 9.36 35.68 5.83 128 896.02 778.02 1171.84 2067.86 1600.00 325.80 68.48 17.00 77.73 12.50 16.48 52.08 5.76 17.35 44.12 132.36 23 46.1
TUBERIA ML
68.48 0.00 15.00 45.00 72.00 87.34 90.34 95.17 154.00 15.16 45.16 65.16 115.16 85.16 325.80
ACUEDUCTO
3,358.52 S4 S29 156 S4 S29 156 S4 S31 168 0 0 0 75 0 0 37.47 0 25 39.2 0 119 310 135 65.42 27 241 2138.59 1073.32 2831.08 4969.67 4558.95 1588.80 203.70 38.00 41.08 153.33 78.71 27.91 45.03 3.26 51.85 84.8 175.172 78.188 97.166
RELLENOS M3
203.70 0.00 88.68 115.35 222.85 249.99 224.99 221.99 115.74 64.80 164.80 164.80 314.80 264.80 614.80 1588.80
3,458.52 S3 S29 168 S3 S28 156 S3 S30 168 0 2 7.5 348 0 0 0 0 0 31.11 0 303 262 45.22 49.38 288 230 2155.62 1565.96 2990.71 5146.33 4208.08 1617.20 40.73 69.00 7.06 31.08 56.98 49.53 28.43 78.742 214.034
DESALOJOS M3
40.73 0.00 259.31 157.53 303.96 293.13 296.13 302.38 369.04 123.44 223.44 323.44 423.44 523.44 1617.20
S28 S29 24 S14 S32 42 44.15 44.15 187.86 232.01 232.01 111.55 42.0 34.31 0
ASFALTO ASFALTO M2
0.00 42.00 0.00 0.00 0.00 27.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.55 111.55
1887 2202 2424
ABRIL

J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
CARRERA 27 ENTRE CALLES 16 Y 14 E INTERSECCION 15 CON 27 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6
ACTIVIDAD CANTIDAD INICIO FIN
ETAPA PRECONSTRUCTIVA 1
ARQUEOLOGIA
PRELIMINARES

TOPOGRAFIA
PLAN DE MANEJO DE TRANSITO
1 13-May 18-May
IMPLEMENTACION DE PMA
CONSTRUCCION DE CAMPAMENTO

PROGRAMADO
EXCAVACIONES

TUB GRP 1800 MM 3,003.03 20-May 27-Jul


EJECUTADO
PROGRAMADO
VIA 1,383.91 27-May 27-Jul
EJECUTADO
PROGRAMADO
AUX. LOTES 1,214.82 27-May 27-Jul
EJECUTADO
PROGRAMADO
TUB GRP 1800 MM 202.83 27-May 10-Aug
EJECUTADO
PROGRAMADO
VIA
EJECUTADO
PROGRAMADO
TUBERIA PVC SANIT. ESTRUCT.500MM D=20 201.70
EJECUTADO
4-Jun 3-Aug
PROGRAMADO
TUBERIA PVC SANIT. ESTRUCT.250MM D=10 320.00
EJECUTADO
TUBERIAS

TUBERÌA PR200 BIORIENTADA PVC PRESIÒN PROGRAMADO


195.00
Ø=12"U.M. EJECUTADO
10-Jun 10-Aug
PROGRAMADO
TUBERÍA PR200 BIORIENTADA PVC PRESIÓN Ø=6" U.M. 191.00
EJECUTADO
PROGRAMADO
AUX. LOTES
EJECUTADO
PROGRAMADO
TUBERIA PVC SANIT. ESTRUCT.250MM D=10 102.00
EJECUTADO
10-Jun 10-Aug
PROGRAMADO
TUBERÍA PR200 BIORIENTADA PVC PRESIÓN Ø=6" U.M. 196.00
EJECUTADO
PROGRAMADO
RELLENOS 5,018.39 4-Jun 17-Aug
EJECUTADO
PROGRAMADO
CAMARAS TIPO 3.00 10-Jun 13-Jul
EJECUTADO
CAMARAS

PROGRAMADO
CAMARAS ESPECIAL 1.00 22-Jul 27-Jul
EJECUTADO
PROGRAMADO
POZOS O CAMARAS DE INSPECCION 9.00 17-Jun 10-Aug
EJECUTADO
PROGRAMADO
EXTENDIDO MEZCLA ASFALTICA 29-Jul 23-Aug
EJECUTADO

ABRIL

J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
CARRERA 27 ENTRE CALLES 14 Y 13 E INTERSECCIONES 14 Y 13 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6
ACTIVIDAD CANTIDAD INICIO FIN
PROGRAMADO
TUB GRP 1800 MM 1,743.00 29-Jul 14-Sep
EXCAVACIONES

EJECUTADO
PROGRAMADO
VIA 1,209.80 29-Jul 14-Sep
EJECUTADO
PROGRAMADO
AUX. LOTES 507.30 29-Jul 14-Sep
EJECUTADO
PROGRAMADO
TUB GRP 1800 MM 110.00 12-Aug 21-Sep
EJECUTADO
PROGRAMADO
VIA
EJECUTADO
PROGRAMADO
TUBERIA PVC SANIT. ESTRUCT.500MM D=20 101.00 5-Aug 14-Sep
PROGRAMADO
EJECUTADO
TUBERIA PVC SANIT. ESTRUCT.250MM D=10 93.29 5-Aug 14-Sep
EJECUTADO
TUBERIAS

TUBERÌA PR200 BIORIENTADA PVC PRESIÒN PROGRAMADO


117.00 12-Aug 14-Sep
Ø=12"U.M. EJECUTADO
PROGRAMADO
TUBERÍA PR200 BIORIENTADA PVC PRESIÓN Ø=6" U.M. 117.00 12-Aug 14-Sep
EJECUTADO
PROGRAMADO
AUX. LOTES
EJECUTADO
PROGRAMADO
TUBERIA PVC SANIT. ESTRUCT.250MM D=10 107.78 12-Aug 14-Sep
EJECUTADO
PROGRAMADO
TUBERÍA PR200 BIORIENTADA PVC PRESIÓN Ø=6" U.M. 107.00 12/087/2019 14-Sep
EJECUTADO
PROGRAMADO
RELLENOS 3,136.98 8-Aug 28-Sep
EJECUTADO
PROGRAMADO
CAMARAS TIPO 4.00 20-Aug 7-Sep
EJECUTADO
CAMARAS

PROGRAMADO
CAMARAS ESPECIAL 2.00 26-Aug 28-Sep
EJECUTADO
PROGRAMADO
POZOS O CAMARAS DE INSPECCION 6.00 12-Aug 21-Sep
EJECUTADO
PROGRAMADO
EXTENDIDO MEZCLA ASFALTICA 30-Sep 5-Oct
EJECUTADO
ABRIL

J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
CARRERA 27 ENTRE CALLES 13 Y 11 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6
ACTIVIDAD CANTIDAD INICIO FIN
PROGRAMADO
TUB GRP 1800 MM, TUB SANIT. Y ACUED. 5,937.00 4-Jun 7-Sep
EXCAVACIONES EJECUTADO
PROGRAMADO
TUB GRP 1800 MM 230.00 10-Jun 14-Sep
EJECUTADO
PROGRAMADO
TUB. SANIT. Y ACUED.
EJECUTADO
TUBERIA PVC SANIT. ESTRUCT.500MM D=20 y 450MM PROGRAMADO
TUBERIAS

216.07 17-Jun 14-Sep


D=18 PROGRAMADO
EJECUTADO
TUBERIA PVC SANIT. ESTRUCT.250MM D=10 143.68 17-Jun 14-Sep
EJECUTADO
TUBERÌA PR200 BIORIENTADA PVC PRESIÒN PROGRAMADO
427.00 25-Jun 21-Sep
Ø=12"U.M. EJECUTADO
PROGRAMADO
TUBERÍA PR200 BIORIENTADA PVC PRESIÓN Ø=6" U.M. 494.00 25-Jun 21-Sep
EJECUTADO
PROGRAMADO
RELLENOS 5,296.61 17-Jun 28-Sep
EJECUTADO
PROGRAMADO
CAMARAS TIPO 6.00 17-Jun 31-Aug
EJECUTADO
CAMARAS
PROGRAMADO
POZOS O CAMARAS DE INSPECCION 6.00 2-Jul 3-Aug
EJECUTADO
PROGRAMADO
EXTENDIDO MEZCLA ASFALTICA 30-Sep 8-Oct
EJECUTADO

ABRIL

J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
CARRERA 27 ENTRE CALLES 11 Y 10 CON INTERSECCION 11 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6
ACTIVIDAD CANTIDAD INICIO FIN
PROGRAMADO
TUB GRP 1800 MM, TUB SANIT. Y ACUED. 1,838.00 9-Oct 30-Nov
EXCAVACIONES EJECUTADO
PROGRAMADO
TUB GRP 1800 MM 53.00 15-Oct 9-Nov
EJECUTADO
PROGRAMADO
TUB. SANIT. Y ACUED.
EJECUTADO
PROGRAMADO
TUBERIAS

TUBERIA PVC SANIT. ESTRUCT.450MM D=18 76.67 15-Oct 23-Nov


PROGRAMADO
EJECUTADO
TUBERIA PVC SANIT. ESTRUCT.250MM D=10 73.56 15-Oct 23-Nov
EJECUTADO
TUBERÌA PR200 BIORIENTADA PVC PRESIÒN PROGRAMADO
272.36 21-Oct 30-Nov
Ø=12"U.M. EJECUTADO
PROGRAMADO
TUBERÍA PR200 BIORIENTADA PVC PRESIÓN Ø=6" U.M. 331.51 21-Oct 30-Nov
EJECUTADO
PROGRAMADO
RELLENOS 1,605.41 21-Oct 30-Nov
EJECUTADO
PROGRAMADO
CAMARAS TIPO 1.00 15-Oct 19-Oct
EJECUTADO
CAMARAS
PROGRAMADO
POZOS O CAMARAS DE INSPECCION 3.00 28-Oct 16-Nov
EJECUTADO
PROGRAMADO
EXTENDIDO MEZCLA ASFALTICA 2-Dec 9-Dec
EJECUTADO

r 15,057.39
e 16,836.86

ING. GERARDO CUENCA MELO ING. CARLOS OVIEDO GARCIA


Director de Obra Sub Director Monitoreo, Seguimiento y Control
EMPOPASTO S.A. E.S.P
NIT. 891.200.680-3
PROGRAMACION POR FASES
CRONOGRAMA DE ACTIVIDADES

MAYO
S1
M M J V S D L M M J V S D
7 8 9 10 11 12 13 14 15 16 17 18 19

MAYO
S1
M M J V S D L M M J V S D
7 8 9 10 11 12 13 14 15 16 17 18 19
MAYO
S1
M M J V S D L M M J V S D
7 8 9 10 11 12 13 14 15 16 17 18 19

MAYO
S1
M M J V S D L M M J V S D
7 8 9 10 11 12 13 14 15 16 17 18 19

ING. CARLOS OVIEDO GARCIA


Sub Director Monitoreo, Seguimiento y Control
EMPOPASTO S.A. E.S.P
NIT. 891.200.680-3
PROGRAMACION POR FASES
CRONOGRAMA DE ACTIVIDADES

MAYO JUNIO
S2 S3 S4 S5 S6 S7 S8
L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1

53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626
58.05 58.05 58.05 58.05 58.05 58.05 58.05 58.05 58.05 58.05
27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678
12.42
24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296
22 22
3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251
8.00 12.00 18.00 8.00 8

4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034

6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4

3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9

3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82

2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04

3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92

82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269
67.8 67.8 67.8 67.8 67.8

MAYO JUNIO
S2 S3 S4 S5 S6 S7 S8
L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1
MAYO JUNIO
S2 S3 S4 S5 S6 S7 S8
L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1

76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115

2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114

2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599

1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682

5.8493 5.8493 5.8493 5.8493 5.8493

6.7671 6.7671 6.7671 6.7671 6.7671

62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313

MAYO JUNIO
S2 S3 S4 S5 S6 S7 S8
L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1

ING . ANA PAOLA RODRIGUEZ SOLARTE ING . DAVID AGUIRRE ERAZO


Programadora de Obra Residente de Obra
JULIO AGOSTO
S8 S9 S10 S11 S12 S13 S14
M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12

53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626 53.626

27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678 27.678

24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296 24.296

3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251 3.3251

4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034 4.034

6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4

3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9

3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82

2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04

3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92

82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269 82.269

2 2 2 1

JULIO AGOSTO
S8 S9 S10 S11 S12 S13 S14
M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12

43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575

30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245

12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683

3.1429

2.9706 2.9706 2.9706 2.9706 2.9706 2.9706

2.7438 2.7438 2.7438 2.7438 2.7438 2.7438

4.0345

4.0345

3.7166

3.6897

71.295 71.295 71.295 71.295

2
JULIO AGOSTO
S8 S9 S10 S11 S12 S13 S14
M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12

76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115

2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114

2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599

1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682

5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493

6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671

62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313

2 2 2

JULIO AGOSTO
S9 S10 S11 S12 S13 S14
M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12
AGOSTO
S14 S15 S16
M M J V S D L M M J V S D L M M J V S D
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

82.269 82.269 82.269 82.269 82.269

AGOSTO SEPTIEMBRE
S14 S15 S16 S17
M M J V S D L M M J V S D L M M J V S D L M M J V S D
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8

43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575 43.575

30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245 30.245

12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683 12.683

3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429

2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706 2.9706

2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438 2.7438

4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345

4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345 4.0345

3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166 3.7166

3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897 3.6897

71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295

2 2

2
AGOSTO SEPTIEMBRE
S14 S15 S16 S17
M M J V S D L M M J V S D L M M J V S D L M M J V S D
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8

76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115 76.115

2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114 2.9114

2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599 2.9599

1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682 1.9682

5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493

6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671

62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313

AGOSTO SEPTIEMBRE
S15 S16 S17
M M J V S D L M M J V S D L M M J V S D L M M J V S D
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8
SEPTIEMBRE OCTUBRE
S18 S19 S20 S21 S22
L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8

43.575 43.575 43.575 43.575 43.575 43.575

30.245 30.245 30.245 30.245 30.245 30.245

12.683 12.683 12.683 12.683 12.683 12.683

3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429

2.9706 2.9706 2.9706 2.9706 2.9706 2.9706

2.7438 2.7438 2.7438 2.7438 2.7438 2.7438

4.0345 4.0345 4.0345 4.0345 4.0345 4.0345

4.0345 4.0345 4.0345 4.0345 4.0345 4.0345

3.7166 3.7166 3.7166 3.7166 3.7166 3.7166

3.6897 3.6897 3.6897 3.6897 3.6897 3.6897

71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295 71.295

2 2
SEPTIEMBRE OCTUBRE
S18 S19 S20 S21 S22
L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8

2.9114 2.9114 2.9114 2.9114 2.9114 2.9114

2.9599 2.9599 2.9599 2.9599 2.9599 2.9599

1.9682 1.9682 1.9682 1.9682 1.9682 1.9682

5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493 5.8493

6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671 6.7671

62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313 62.313

SEPTIEMBRE OCTUBRE
S18 S19 S20 S21 S22
L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8

También podría gustarte