Documentos de Académico
Documentos de Profesional
Documentos de Cultura
LIQ. POLICLINICO SAN BORJA Al 10.09.2018
LIQ. POLICLINICO SAN BORJA Al 10.09.2018
OBRA AMPLIACION Y MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA EN LA UPPS DEL PPOLICLINICO NAVAL SAN BORJA DE LA MARINA DE GUERRA DEL PERU, DISTRITO DE SAN BORJA - LIMA
EJECUTA CONSORCIO NAVAL
ENTIDAD MARINA DE GUERRA DEL PERU
Inc/IGV Sin IGV
MONTO DE CONTRATO TOTAL (Expediente tecnico, obras civiles y equipamiento) 44,309,503.55 37,550,426.74
MONTO DE CONTRATO (Obras civiles y equipamiento) 43,265,627.55 36,665,786.06
MONTO DE CONTRATO TOTAL (equipamiento) 10,570,616.50 8,958,149.58
1.00 Contrato inicial (CONTRATO DIRCOMAT N° 069 - 2015) 38,995,598.00 33,047,116.95
Expediente tecnico y estudio de impacto ambiental 1,043,876.00 884,640.68 Supervisor de Obra CONSORCIO SUPERVISOR LIMA
Construccion de policlinico 30,502,853.00 25,849,875.42 Residente de Obra Ing. ALBERTO ORIVE BARREIRO
Equipamiento 7,448,869.00 6,312,600.85
2.00 Contrato final (ADENDA N° 002-2016 al CONTRATO DIRCOMAT N° 069 - 2015) 5,313,905.55 4,503,309.79
Variacion de Incremento de areas en obras civiles 2,192,157.96 1,857,760.98
Variacion costo de vigencia tecnologia del equipamiento biomedico e informatico 3,121,747.50 2,645,548.73
FACTOR DE RELACION 1.00000
ADELANTO DIRECTO 7,590,344.40 6,432,495.25
ADELANTO DE MATERIALES 15,180,688.79 12,864,990.50
UBICACIÓN Dist. de SAN BORJA - Prov. de LIMA - Departamento de LIMA
PLAZO DE EJECUCION CONTRACTUAL INICIAL 210.00 dias calendarios (CONTRATO DIRCOMAT N° 069 - 2015)
AMPLIACION DE PLAZO POR ADIC. DE OBRA 120.00 dias calendarios (ADENDA N° 002-2016 al CONTRATO DIRCOMAT N° 069 - 2015)
PLAZO DE EJEC. CONTRACT. REFORMULADO 330.00 dias calendarios corresponde al plazo contractual inicial de 210 dias mas 120 dias de adicional de obra (CONTRATO DIRCOMAT N° 069 - 2015 y ADENDA N° 002-2016)
PLAZO DE ELABORACION DE EXP. TECNICO 60.00 dias calendarios
PERIODO DE EJECUCION CONTRACTUAL Del 25 de diciembre de 2015 al 18 de noviembre de 2016 CONTRATO DIRCOMAT N° 069 - 2015 - ADENDA N° 002-2016
AMPLIACION DE PLAZO N° 01 10 Del 19 de noviembre de 2016 al 28 de noviembre de 2016 V.200.304 de fecha 11 de febrero de 2016 (La Entidad otorgó 10 días calendario).
AMPLIACION DE PLAZO N° 02 29 Del 29 de noviembre de 2016 al 27 de diciembre de 2016 V.200-595 de fecha 14 de marzo de 2016 (La Entidad mediante Resolución Jefatural N° 044-2016-SUE: 13, otorgó 29 días calendario comprendidos del 28 de noviembre de 2016 al 27 de diciembre de 2016)
AMPLIACION DE PLAZO N° 03 DENEGADO
AMPLIACION DE PLAZO N° 04 DENEGADO
AMPLIACION DE PLAZO N° 05 52 Del 28 de diciembre de 2016 al 17 de febrero de 2017 V.200-2210 de fecha 13 de octubre de 2016 (La Entidad mediante Resolución Jefatural N° 287-2016-SUE: 13, otorgó 52 días calendario comprendidos del 28 de diciembre de 2016 al 17 de febrero de 2017).
AMPLIACION DE PLAZO N° 06 3 Del 18 de febrero de 2017 al 20 de febrero de 2017 V.200.2819 de fecha 26 de diciembre de 2016 (La Entidad otorgó 3 días calendario).
AMPLIACION DE PLAZO N° 07 35 Del 21 de febrero de 2017 al 27 de marzo de 2017 V.200-484 de fecha 06 de marzo de 2017 (La Entidad mediante la Resolución Jefatural N° 024-2017-SUE: 13, otorgó 44 días calendario contabilizados hasta la autorización por parte de la empresa Luz del Sur para la conexión a la Sub Estacion Electrica). 35 días transcurridos efectivos.
AMPLIACION DE PLAZO N° 08 DENEGADO
AMPLIACION DE PLAZO N° 09 DENEGADO
AMPLIACION DE PLAZO N° 10 DENEGADO
AMPLIACION DE PLAZO N° 11 44 Del 28 de marzo de 2017 al 10 de mayo de 2017 V.200-720 de fecha 03 de abril de 2017 (La Entidad otorgó 44 días calendario comprendidos del 28 de marzo al 10 de mayo de 2017 en conformidad con la Resolución Jefatural N° 035-2017 SUE:13 de fecha 31 de marzo de 2017.
SUSPENSIÓN DE PLAZO POR ENTIDAD Del 03 de mayo de 2017 al 12 de mayo de 2017 CARTA N° 032-2017-CONSORCIO NAVAL, de fecha 02 de mayo del 2017 (acepta suspension de plazo por un periodo de 10 dias maximo)
COMPENSACIÓN POR SUSPENSIÓN DE PLAZO Del 13 de mayo de 2017 al 23 de mayo de 2017 V.200-1001de fecha 09 de mayo 2017 (otorga periodo de compensación de 10 d.c. del 13 al 23 de mayo de 2017).
AMPLIACION DE PLAZO N° 12 23 Del 26 de mayo de 2017 al 18 de junio de 2017 V.200-1170 de fecha 29 de mayo de 2017 (La Entidad otorgó 23 días calendario comprendidos del 26 de mayo de 2017 al 18 de junio de 2017).
PLAZO TOTAL AMPLIADO 196
MONTO VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN VALORIZACIÓN
DESCRIPCION PRESUPUESTO N° 1 N° 2 N° 3 N° 4 N° 5 N° 6 N° 7 N° 8 N° 9 SALDOS FR N° 10 N° 11 N° 12 N° 13 N° 14 N° 15 N° 16 N° 17 N° 18 N° 19 TOTAL SALDO
(S/IGV) Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17
A. VALORIZACION CONTRACTUAL
FP No 1 OBRAS PROVISIONALES 1,508,239.92 0.00 62,102.95 365,904.20 140,690.10 136,411.20 104,806.43 96,285.77 130,545.99 107,534.29 160,219.36 61,959.33 51,487.70 33,250.87 33,250.87 16,222.97 3,783.97 3,783.97 -0.05 0.00 0.00 1,508,239.92
FP No 2 ESTRUCTURAS 8,796,679.54 0.00 0.00 320,632.22 931,173.37 1,264,926.92 1,697,150.95 1,213,426.75 1,725,906.04 368,514.57 1,053,174.01 171,339.08 3,666.38 15,474.27 20,574.09 0.00 5,808.21 1,161.49 3,751.19 0.00 0.00 8,796,679.54
FP No 3 ARQUITECTURA 6,398,706.35 0.00 0.00 0.00 0.00 0.00 0.00 7,456.51 110,170.20 551,048.12 93,626.19 686,099.81 765,031.06 759,880.72 1,790,978.48 648,172.28 571,310.84 284,597.75 74,246.66 0.00 56,088.00 6,398,706.62
FP No 4 INSTALACIONES SANITARIAS 1,486,709.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 332,919.99 46,614.63 83,982.28 102,126.37 102,302.62 410,042.40 163,582.47 169,847.47 33,463.12 21,245.08 0.00 20,583.18 1,486,709.61
FP No 5 INSTALACIONES ELECTRICAS 2,351,939.43 0.00 0.00 0.00 0.00 0.00 0.00 38,829.09 173,790.18 325,626.79 75,363.87 309,592.28 201,272.49 473,134.26 417,420.28 264,765.81 47,579.20 -50,887.34 38,527.18 0.00 36,925.42 2,351,939.51
FP No 6 INSTALACIONES MECANICAS 3,244,311.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 330,609.79 112,518.11 62,045.67 516,946.48 259,075.21 512,423.00 692,068.24 479,315.21 146,594.60 42,122.55 6,826.46 29,876.36 53,890.27 3,244,311.95
FP No 7 INSTALACION COMUNICACIONES 3,921,049.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72,894.17 10,206.46 94,167.16 520,253.14 366,215.46 1,294,431.90 1,049,107.66 273,163.53 119,592.51 0.00 10,307.96 110,709.62 3,921,049.57
FP No 8 EQUIPAMIENTO Y MOBILIARIO 8,958,149.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,970,340.39 1,131,003.98 0.00 920,605.06 0.00 759,762.41 1,767,630.17 1,196,090.42 212,717.08 8,958,149.51
TOTAL (A) 36,665,786.06 0.00 62,102.95 686,536.43 1,071,863.47 1,401,338.12 1,801,957.38 1,355,998.12 2,471,022.20 1,871,056.04 1,501,250.19 1,924,086.42 4,873,252.74 3,393,685.18 4,658,766.26 3,541,771.46 1,218,087.82 1,193,596.46 1,912,226.69 1,236,274.74 490,913.57 36,665,786.23 -0.17
AVANCE REAL DE OBRA 0.00% 0.17% 1.87% 2.92% 3.82% 4.91% 3.70% 6.74% 5.10% 4.09% 5.25% 13.29% 9.26% 12.71% 9.66% 3.32% 3.26% 5.22% 3.37% 1.34% 100.00% 0.00%
AVANCE AVANCE REAL ACUMULADO 0.00% 0.17% 2.04% 4.97% 8.79% 13.70% 17.40% 24.14% 29.24% 33.34% 38.58% 51.88% 61.13% 73.84% 83.50% 86.82% 90.07% 95.29% 98.66% 100.00%
B. REAJUSTES
FP No 1 OBRAS PROVISIONALES 0.00 5,775.57 37,453.15 18,190.58 9,588.37 5,515.84 13,904.90 8,306.12 13,845.70 29,250.01 -19,895.91 21,207.80 4,164.20 4,177.81 1,997.03 184.01 288.63 45.40 -18.92 0.00
FP No 2 ESTRUCTURAS 0.00 0.00 27,253.74 86,660.57 89,941.02 102,429.97 119,327.65 133,614.19 80,859.79 229,279.51 -200,168.65 89,314.31 1,706.95 1,188.42 30.95 1,540.86 97.56 392.81 -44.21 18.76
FP No 3 ARQUITECTURA 0.00 0.00 0.00 0.00 0.00 0.00 745.65 10,899.39 61,240.52 11,562.43 80,179.34 100,263.02 97,818.72 226,922.13 84,220.57 59,943.31 27,200.53 12,407.48 -1,076.54 6,748.71
FP No 4 INSTALACIONES SANITARIAS 0.00 0.00 0.00 0.00 0.00 0.00 3,882.91 0.00 38,951.64 5,453.91 12,607.03 18,783.62 13,708.55 56,789.10 22,410.80 18,808.26 1,081.63 3,490.12 -328.25 2,553.64
FP No 5 INSTALACIONES ELECTRICAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17,166.40 33,851.79 8,957.18 34,963.19 15,011.82 49,792.27 46,944.18 33,841.77 902.71 -7,957.76 3,836.19 61.79 3,885.18
FP No 6 INSTALACIONES MECANICAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44,301.71 15,520.55 8,706.78 71,014.49 56,327.52 88,038.08 120,124.95 77,157.35 11,154.93 -2,781.34 2,533.71 4,166.15 8,735.72
FP No 7 INSTALACION COMUNICACIONES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,965.98 1,255.40 13,355.23 76,168.88 53,349.45 199,483.60 181,753.94 17,265.97 4,842.50 2,749.30 865.77 16,325.85
FP No 8 EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 493,076.50 200,050.70 16,405.38 159,264.68 -10,126.66 97,875.99 272,478.61 166,911.81 50,540.75
TOTAL (B) 0.00 5,775.57 64,706.89 104,851.15 99,529.39 107,945.81 137,861.11 214,287.81 253,235.97 294,465.22 -7,945.28 870,153.47 508,628.92 672,035.57 560,677.09 99,673.39 120,647.74 297,933.62 170,537.60 88,808.61 4,663,809.65
VALORIZACION BRUTA ( VB = A + B ) 0.00 67,878.52 751,243.32 1,176,714.62 1,500,867.51 1,909,903.19 1,493,859.23 2,685,310.01 2,124,292.01 1,795,715.41 1,916,141.14 5,743,406.21 3,902,314.10 5,330,801.83 4,102,448.55 1,317,761.21 1,314,244.20 2,210,160.31 1,406,812.34 579,722.18
C. DEDUCCIONES
DEDUCCION ADELANTO EN EFECTIVO 0.00 0.00 1,283.33 906.48 -1,132.71 -1,869.31 6,345.36 94.77 11,329.56 11,236.10 -3,852.33 13,766.22 11,847.38 23,371.47 17,854.56 -5,530.34 -6,644.16 1,667.28 -2,923.39 3,564.95 81,315.22
DEDUCCION ADELANTO MATERIALES 0.00 0.00 329.03 4,440.49 -3,378.04 -43,547.02 14,501.35 -15,913.16 -18,590.89 -16,259.94 10,238.70 -1,950.69 2,670.58 -2,157.42 26,160.17 -6,968.97 -7,437.00 312.68 19.66 0.00 -57,530.46
ESTRUCTURAS 0.00 0.00 329.03 4,440.49 -3,378.04 -43,547.02 15,130.93 -4,476.06 -2,397.65 7,045.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ARQUITECTURA 0.00 0.00 0.00 0.00 0.00 0.00 -37.28 -534.78 -2,952.17 2,047.81 5,876.97 5,400.63 5,805.92 11,564.54 -11,741.73 -483.87 -9.35 0.00 0.00
INSTALACIONES SANITARIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -1,761.32 336.57 4,505.75 510.96 1,339.52 1,446.81 -2,108.57 -2,901.22 32.67 -21.61 0.00
INSTALACIONES ELECTRICAS 0.00 0.00 0.00 0.00 0.00 0.00 -592.30 -3,217.91 -6,921.93 3,439.69 -10,309.88 -11,373.24 -10,847.93 276.69 6,038.30 -103.92 0.00 0.00 0.00
INSTALACIONES MECANICAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -7,684.40 -3,350.55 -2,941.65 15,460.53 4,516.72 -2,048.16 5,183.06 -9,191.92 428.91 265.69 0.00 0.00
INSTALACION COMUNICACIONES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -1,207.26 310.64 2,207.26 1,983.06 3,593.23 37,903.75 -23,357.75 -3,663.16 9.91 0.00 0.00
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -19,691.32 1,632.45 0.00 -30,214.68 33,392.70 -713.74 13.76 41.27 0.00
TOTAL (C) 0.00 0.00 1,612.36 5,346.97 -4,510.75 -45,416.33 20,846.71 -15,818.39 -7,261.33 -5,023.84 6,386.37 11,815.53 14,517.96 21,214.05 44,014.73 -12,499.31 -14,081.16 1,979.96 -2,903.73 3,564.95 23,784.76
0.00 1,612.36 6,959.33 2,448.58 -42,967.75 -22,121.03 -37,939.42 -45,200.75 -50,224.59 -43,838.22 -32,022.68 -17,504.73 3,709.32 47,724.05 35,224.74 21,143.58 23,123.54 20,219.81 23,784.76
D. AMORTIZACIONES
AMORTIZ. ADELANTO EFECTIVO 6,432,495.25 0.00 12,420.59 137,307.29 214,372.69 280,267.62 360,391.48 360,391.48 405,012.58 374,211.21 -89,191.83 426,745.68 854,943.49 595,374.21 817,314.86 621,353.87 213,696.34 209,399.67 335,473.22 216,886.97 86,123.82 6,432,495.24 0.01
AMORTIZ. ADELANTO MATERIALES 12,864,990.50 0.00 0.00 26,370.02 407,120.55 358,095.29 935,915.27 673,361.06 1,023,397.98 655,836.79 571,369.92 780,243.87 2,475,931.69 1,478,912.94 2,625,235.73 659,726.22 35,353.89 158,119.26 0.00 0.00 0.00 12,864,990.51 -0.01
ESTRUCTURAS 0.00 0.00 26,370.02 407,120.55 358,095.29 935,915.27 643,468.50 569,663.21 85,896.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ARQUITECTURA 0.00 0.00 0.00 0.00 0.00 0.00 3,701.24 54,685.89 273,527.29 204,294.15 379,743.37 377,186.86 846,722.88 78,286.11 1,393.21 0.00 0.00 0.00 0.00
INSTALACIONES SANITARIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80,720.70 89,387.63 60,166.71 60,270.54 238,414.29 56,710.29 25,458.20 15,059.13 0.00 0.00 0.00
INSTALACIONES ELECTRICAS 0.00 0.00 0.00 0.00 0.00 0.00 26,191.32 117,226.39 70,820.44 149,408.25 125,855.50 295,850.42 209,697.31 27,766.05 0.00 0.00 0.00 0.00 0.00
INSTALACIONES MECANICAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 281,822.49 95,914.08 290,652.43 170,887.08 436,805.96 461,025.92 26,479.39 8,098.50 72,477.44 0.00 0.00 0.00
INSTALACION COMUNICACIONES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48,957.69 46,501.41 329,995.60 245,960.17 869,375.33 368,186.09 403.98 0.00 0.00 0.00 0.00
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,409,283.43 62,838.99 0.00 102,298.30 0.00 70,582.69 0.00 0.00 0.00
TOTAL (D) 19,297,485.75 0.00 12,420.59 163,677.31 621,493.24 638,362.91 1,296,306.75 1,033,752.54 1,428,410.56 1,030,048.00 482,178.09 1,206,989.55 3,330,875.18 2,074,287.15 3,442,550.59 1,281,080.09 249,050.23 367,518.93 335,473.22 216,886.97 86,123.82 19,297,485.75 0.00
VALORIZACION NETA ( VN = VB - D - C ) 0.00 55,457.93 585,953.64 549,874.40 867,015.35 659,012.77 439,259.98 1,272,717.84 1,101,505.33 1,318,561.17 702,765.22 2,400,715.49 1,813,508.99 1,867,037.19 2,777,353.73 1,081,210.29 960,806.43 1,872,707.13 1,192,829.10 490,033.41
LÍQUIDO A PAGAR AL CONTRATISTA 0.00 65,440.36 691,425.30 648,851.79 1,023,078.11 777,635.07 518,326.78 1,501,807.05 1,299,776.29 1,555,902.18 829,262.96 2,832,844.28 2,139,940.61 2,203,103.88 3,277,277.40 1,275,828.14 1,133,751.59 2,209,794.41 1,407,538.34 578,239.42
PROGRAMACIÓN DE OBRA (del 25.dic.2015 al 18.jun.2017)
AMPLIACION Y MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA EN LA UPPS DEL PPOLICLINICO NAVAL SAN BORJA DE LA MARINA DE
OBRA
GUERRA DEL PERU, DISTRITO DE SAN BORJA - LIMA
EJECUTA CONSORCIO NAVAL
ENTIDAD MARINA DE GUERRA DEL PERU
Inc/IGV Sin IGV
MONTO DE CONTRATO TOTAL (Expediente tecnico, obras civiles y equipamiento) 44,309,503.55 37,550,426.74
Expediente tecnico y estudio de impacto ambiental 1,043,876.00 884,640.68
Construccion de policlinico 32,695,010.96 27,707,636.41
Equipamiento 10,570,616.50 8,958,149.58
MONTO DE CONTRATO (Obras civiles y equipamiento) 43,265,627.55 36,665,786.06
FACTOR DE RELACION 1.00
ADELANTO DIRECTO 7,590,344.40 6,432,495.25
ADELANTO DE MATERIALES 15,180,688.79 12,864,990.50
PROGRAMACION DE OBRA POR FORMULA POLINOMICA PROGRAMACION DE OBRA POR VALORIZACIONES DE OBRA
FORMULA POLINOMICA No. 01: OBRAS PROVISIONALES VALORIZACION N° 01
1 Dec-15 0.00 0.00 1 OBRAS PROVISIONALES 0.00
2 Jan-16 70,798.46 70,798.46 2 ESTRUCTURAS 0.00
3 Feb-16 417,137.88 487,936.34 3 ARQUITECTURA 0.00
4 Mar-16 160,388.38 648,324.72 4 INSTALACIONES SANITARIAS 0.00
5 Apr-16 155,511.16 803,835.88 5 INSTALACIONES ELECTRICAS 0.00
6 May-16 119,481.22 923,317.10 6 INSTALACIONES MECANICAS 0.00
7 Jun-16 109,767.46 1,033,084.56 7 INSTALACION COMUNICACIONES 0.00
8 Jul-16 148,824.70 1,181,909.26 8 EQUIPAMIENTO Y MOBILIARIO 0.00
9 Aug-16 122,590.96 1,304,500.22
10 Sep-16 61,959.36 1,366,459.58 VALORIZACION N° 02
11 Oct-16 51,487.70 1,417,947.28 1 OBRAS PROVISIONALES 70,798.46
12 Nov-16 33,250.87 1,451,198.15 2 ESTRUCTURAS 0.00
13 Dec-16 33,250.87 1,484,449.02 3 ARQUITECTURA 0.00
14 Jan-17 16,222.99 1,500,672.01 4 INSTALACIONES SANITARIAS 0.00
15 Feb-17 3,783.97 1,504,455.98 5 INSTALACIONES ELECTRICAS 0.00
16 Mar-17 3,783.94 1,508,239.92 6 INSTALACIONES MECANICAS 0.00
17 Apr-17 0.00 1,508,239.92 7 INSTALACION COMUNICACIONES 0.00
18 mayo 0.00 1,508,239.92 8 EQUIPAMIENTO Y MOBILIARIO 0.00
19 junio 0.00 1,508,239.92
SUB-TOTAL 1,508,239.92 VALORIZACION N° 03
1 OBRAS PROVISIONALES 417,137.88
2 ESTRUCTURAS 365,526.34
3 ARQUITECTURA 0.00
FORMULA POLINOMICA No. 02: ESTRUCTURAS 4 INSTALACIONES SANITARIAS 0.00
1 Dec-15 0.00 0.00 5 INSTALACIONES ELECTRICAS 0.00
2 Jan-16 0.00 0.00 6 INSTALACIONES MECANICAS 0.00
3 Feb-16 365,526.34 365,526.34 7 INSTALACION COMUNICACIONES 0.00
4 Mar-16 1,061,555.01 1,427,081.35 8 EQUIPAMIENTO Y MOBILIARIO 0.00
5 Apr-16 1,442,039.00 2,869,120.35
6 May-16 1,934,780.26 4,803,900.61 VALORIZACION N° 04
7 Jun-16 1,383,329.03 6,187,229.64 1 OBRAS PROVISIONALES 160,388.38
8 Jul-16 1,967,561.87 8,154,791.51 2 ESTRUCTURAS 1,061,555.01
9 Aug-16 420,113.13 8,574,904.64 3 ARQUITECTURA 0.00
10 Sep-16 171,339.09 8,746,243.73 4 INSTALACIONES SANITARIAS 0.00
11 Oct-16 3,666.38 8,749,910.11 5 INSTALACIONES ELECTRICAS 0.00
12 Nov-16 15,474.27 8,765,384.38 6 INSTALACIONES MECANICAS 0.00
13 Dec-16 20,574.09 8,785,958.47 7 INSTALACION COMUNICACIONES 0.00
14 Jan-17 0.00 8,785,958.47 8 EQUIPAMIENTO Y MOBILIARIO 0.00
15 Feb-17 5,808.21 8,791,766.68
16 Mar-17 1,161.50 8,792,928.18 VALORIZACION N° 05
17 Apr-17 3,751.36 8,796,679.54 1 OBRAS PROVISIONALES 155,511.16
18 mayo 0.00 8,796,679.54 2 ESTRUCTURAS 1,442,039.00
19 junio 0.00 8,796,679.54 3 ARQUITECTURA 0.00
SUB-TOTAL 8,796,679.54 4 INSTALACIONES SANITARIAS 0.00
5 INSTALACIONES ELECTRICAS 0.00
6 INSTALACIONES MECANICAS 0.00
7 INSTALACION COMUNICACIONES 0.00
FORMULA POLINOMICA No. 03: ARQUITECTURA 8 EQUIPAMIENTO Y MOBILIARIO 0.00
1 Dec-15 0.00 0.00
2 Jan-16 0.00 0.00 VALORIZACION N° 06
3 Feb-16 0.00 0.00 1 OBRAS PROVISIONALES 119,481.22
4 Mar-16 0.00 0.00 2 ESTRUCTURAS 1,934,780.26
5 Apr-16 0.00 0.00 3 ARQUITECTURA 0.00
6 May-16 0.00 0.00 4 INSTALACIONES SANITARIAS 0.00
7 Jun-16 8,500.55 8,500.55 5 INSTALACIONES ELECTRICAS 0.00
8 Jul-16 125,595.96 134,096.51 6 INSTALACIONES MECANICAS 0.00
9 Aug-16 628,204.51 762,301.02 7 INSTALACION COMUNICACIONES 0.00
10 Sep-16 686,099.81 1,448,400.83 8 EQUIPAMIENTO Y MOBILIARIO 0.00
11 Oct-16 765,031.06 2,213,431.89
12 Nov-16 759,880.73 2,973,312.62 VALORIZACION N° 07
13 Dec-16 1,790,978.47 4,764,291.09 1 OBRAS PROVISIONALES 109,767.46
14 Jan-17 648,172.29 5,412,463.38 2 ESTRUCTURAS 1,383,329.03
15 Feb-17 571,310.83 5,983,774.21 3 ARQUITECTURA 8,500.55
16 Mar-17 284,597.47 6,268,371.68 4 INSTALACIONES SANITARIAS 0.00
17 Apr-17 74,246.67 6,342,618.35 5 INSTALACIONES ELECTRICAS 44,265.84
18 mayo 0.00 6,342,618.35 6 INSTALACIONES MECANICAS 0.00
19 junio 56,088.00 6,398,706.35 7 INSTALACION COMUNICACIONES 0.00
SUB-TOTAL 6,398,706.35 8 EQUIPAMIENTO Y MOBILIARIO 0.00
VALORIZACION N° 08
1 OBRAS PROVISIONALES 148,824.70
2 ESTRUCTURAS 1,967,561.87
FORMULA POLINOMICA No. 04: INSTALACIONES SANITARIAS 3 ARQUITECTURA 125,595.96
1 Dec-15 0.00 0.00 4 INSTALACIONES SANITARIAS 0.00
2 Jan-16 0.00 0.00 5 INSTALACIONES ELECTRICAS 198,123.85
3 Feb-16 0.00 0.00 6 INSTALACIONES MECANICAS 376,900.94
4 Mar-16 0.00 0.00 7 INSTALACION COMUNICACIONES 0.00
5 Apr-16 0.00 0.00 8 EQUIPAMIENTO Y MOBILIARIO 0.00
6 May-16 0.00 0.00
7 Jun-16 0.00 0.00 VALORIZACION N° 09
8 Jul-16 0.00 0.00 1 OBRAS PROVISIONALES 122,590.96
9 Aug-16 379,534.63 379,534.63 2 ESTRUCTURAS 420,113.13
10 Sep-16 83,982.28 463,516.91 3 ARQUITECTURA 628,204.51
11 Oct-16 102,126.37 565,643.28 4 INSTALACIONES SANITARIAS 379,534.63
12 Nov-16 102,302.62 667,945.90 5 INSTALACIONES ELECTRICAS 371,220.24
13 Dec-16 410,042.41 1,077,988.31 6 INSTALACIONES MECANICAS 128,272.62
14 Jan-17 163,582.47 1,241,570.78 7 INSTALACION COMUNICACIONES 83,100.65
15 Feb-17 169,847.48 1,411,418.26 8 EQUIPAMIENTO Y MOBILIARIO 0.00
16 Mar-17 33,463.12 1,444,881.38
17 Apr-17 21,245.05 1,466,126.43 VALORIZACION N° 10
18 mayo 0.00 1,466,126.43 1 OBRAS PROVISIONALES 61,959.36
19 junio 20,583.18 1,486,709.61 2 ESTRUCTURAS 171,339.09
SUB-TOTAL 1,486,709.61 3 ARQUITECTURA 686,099.81
4 INSTALACIONES SANITARIAS 83,982.28
5 INSTALACIONES ELECTRICAS 309,592.28
6 INSTALACIONES MECANICAS 516,946.48
FORMULA POLINOMICA No. 05: INSTALACIONES ELECTRICAS 7 INSTALACION COMUNICACIONES 94,167.16
1 Dec-15 0.00 0.00 8 EQUIPAMIENTO Y MOBILIARIO 0.00
2 Jan-16 0.00 0.00
3 Feb-16 0.00 0.00 VALORIZACION N° 11
4 Mar-16 0.00 0.00 1 OBRAS PROVISIONALES 51,487.70
5 Apr-16 0.00 0.00 2 ESTRUCTURAS 3,666.38
6 May-16 0.00 0.00 3 ARQUITECTURA 765,031.06
7 Jun-16 44,265.84 44,265.84 4 INSTALACIONES SANITARIAS 102,126.37
8 Jul-16 198,123.85 242,389.69 5 INSTALACIONES ELECTRICAS 201,272.49
9 Aug-16 371,220.24 613,609.93 6 INSTALACIONES MECANICAS 259,075.21
10 Sep-16 309,592.28 923,202.21 7 INSTALACION COMUNICACIONES 520,253.15
11 Oct-16 201,272.49 1,124,474.70 8 EQUIPAMIENTO Y MOBILIARIO 2,970,340.38
12 Nov-16 473,134.26 1,597,608.96
13 Dec-16 417,420.28 2,015,029.24 VALORIZACION N° 12
14 Jan-17 264,765.80 2,279,795.04 1 OBRAS PROVISIONALES 33,250.87
15 Feb-17 47,579.19 2,327,374.23 2 ESTRUCTURAS 15,474.27
16 Mar-17 -50,887.34 2,276,486.89 3 ARQUITECTURA 759,880.73
17 Apr-17 38,527.12 2,315,014.01 4 INSTALACIONES SANITARIAS 102,302.62
18 mayo 0.00 2,315,014.01 5 INSTALACIONES ELECTRICAS 473,134.26
19 junio 36,925.42 2,351,939.43 6 INSTALACIONES MECANICAS 512,422.99
SUB-TOTAL 2,351,939.43 7 INSTALACION COMUNICACIONES 366,215.46
8 EQUIPAMIENTO Y MOBILIARIO 1,131,003.99
VALORIZACION N° 13
FORMULA POLINOMICA No. 06: INSTALACIONES MECANICAS 1 OBRAS PROVISIONALES 33,250.87
1 Dec-15 0.00 0.00 2 ESTRUCTURAS 20,574.09
2 Jan-16 0.00 0.00 3 ARQUITECTURA 1,790,978.47
3 Feb-16 0.00 0.00 4 INSTALACIONES SANITARIAS 410,042.41
4 Mar-16 0.00 0.00 5 INSTALACIONES ELECTRICAS 417,420.28
5 Apr-16 0.00 0.00 6 INSTALACIONES MECANICAS 692,068.25
6 May-16 0.00 0.00 7 INSTALACION COMUNICACIONES 1,294,431.90
7 Jun-16 0.00 0.00 8 EQUIPAMIENTO Y MOBILIARIO 0.00
8 Jul-16 376,900.94 376,900.94
9 Aug-16 128,272.62 505,173.56 VALORIZACION N° 14
10 Sep-16 516,946.48 1,022,120.04 1 OBRAS PROVISIONALES 16,222.99
11 Oct-16 259,075.21 1,281,195.25 2 ESTRUCTURAS 0.00
12 Nov-16 512,422.99 1,793,618.24 3 ARQUITECTURA 648,172.29
13 Dec-16 692,068.25 2,485,686.49 4 INSTALACIONES SANITARIAS 163,582.47
14 Jan-17 479,315.21 2,965,001.70 5 INSTALACIONES ELECTRICAS 264,765.80
15 Feb-17 146,594.60 3,111,596.30 6 INSTALACIONES MECANICAS 479,315.21
16 Mar-17 42,122.52 3,153,718.82 7 INSTALACION COMUNICACIONES 1,049,107.66
17 Apr-17 6,826.50 3,160,545.32 8 EQUIPAMIENTO Y MOBILIARIO 920,605.06
18 mayo 29,876.37 3,190,421.69
19 junio 53,890.27 3,244,311.96 VALORIZACION N° 15
SUB-TOTAL 3,244,311.96 1 OBRAS PROVISIONALES 3,783.97
2 ESTRUCTURAS 5,808.21
3 ARQUITECTURA 571,310.83
4 INSTALACIONES SANITARIAS 169,847.48
FORMULA POLINOMICA No. 07: INSTALACIONES COMUNICACIONES 5 INSTALACIONES ELECTRICAS 47,579.19
1 Dec-15 0.00 0.00 6 INSTALACIONES MECANICAS 146,594.60
2 Jan-16 0.00 0.00 7 INSTALACION COMUNICACIONES 273,163.53
3 Feb-16 0.00 0.00 8 EQUIPAMIENTO Y MOBILIARIO 0.00
4 Mar-16 0.00 0.00
5 Apr-16 0.00 0.00 VALORIZACION N° 16
6 May-16 0.00 0.00 1 OBRAS PROVISIONALES 3,783.94
7 Jun-16 0.00 0.00 2 ESTRUCTURAS 1,161.50
8 Jul-16 0.00 0.00 3 ARQUITECTURA 284,597.47
9 Aug-16 83,100.65 83,100.65 4 INSTALACIONES SANITARIAS 33,463.12
10 Sep-16 94,167.16 177,267.81 5 INSTALACIONES ELECTRICAS -50,887.34
11 Oct-16 520,253.15 697,520.96 6 INSTALACIONES MECANICAS 42,122.52
12 Nov-16 366,215.46 1,063,736.42 7 INSTALACION COMUNICACIONES 119,592.52
13 Dec-16 1,294,431.90 2,358,168.32 8 EQUIPAMIENTO Y MOBILIARIO 759,762.41
14 Jan-17 1,049,107.66 3,407,275.98
15 Feb-17 273,163.53 3,680,439.51 VALORIZACION N° 17
16 Mar-17 119,592.52 3,800,032.03 1 OBRAS PROVISIONALES 0.00
17 Apr-17 0.00 3,800,032.03 2 ESTRUCTURAS 3,751.36
18 mayo 10,307.95 3,810,339.98 3 ARQUITECTURA 74,246.67
19 junio 110,709.63 3,921,049.61 4 INSTALACIONES SANITARIAS 21,245.05
SUB-TOTAL 3,921,049.61 5 INSTALACIONES ELECTRICAS 38,527.12
6 INSTALACIONES MECANICAS 6,826.50
7 INSTALACION COMUNICACIONES 0.00
8 EQUIPAMIENTO Y MOBILIARIO 1,767,630.17
FORMULA POLINOMICA No. 08: EQUIPAMIENTO MEDICO
1 Dec-15 0.00 0.00 VALORIZACION N° 18
2 Jan-16 0.00 0.00 1 OBRAS PROVISIONALES 0.00
3 Feb-16 0.00 0.00 2 ESTRUCTURAS 0.00
4 Mar-16 0.00 0.00 3 ARQUITECTURA 0.00
5 Apr-16 0.00 0.00 4 INSTALACIONES SANITARIAS 0.00
6 May-16 0.00 0.00 5 INSTALACIONES ELECTRICAS 0.00
7 Jun-16 0.00 0.00 6 INSTALACIONES MECANICAS 29,876.37
8 Jul-16 0.00 0.00 7 INSTALACION COMUNICACIONES 10,307.95
9 Aug-16 0.00 0.00 8 EQUIPAMIENTO Y MOBILIARIO 1,196,090.43
10 Sep-16 0.00 0.00
11 Oct-16 2,970,340.38 2,970,340.38 VALORIZACION N° 19
12 Nov-16 1,131,003.99 4,101,344.37 1 OBRAS PROVISIONALES 0.00
13 Dec-16 0.00 4,101,344.37 2 ESTRUCTURAS 0.00
14 Jan-17 920,605.06 5,021,949.43 3 ARQUITECTURA 56,088.00
15 Feb-17 0.00 5,021,949.43 4 INSTALACIONES SANITARIAS 20,583.18
16 Mar-17 759,762.41 5,781,711.84 5 INSTALACIONES ELECTRICAS 36,925.42
17 Apr-17 1,767,630.17 7,549,342.01 6 INSTALACIONES MECANICAS 53,890.27
18 mayo 1,196,090.43 8,745,432.44 7 INSTALACION COMUNICACIONES 110,709.63
19 junio 212,717.20 8,958,149.64 8 EQUIPAMIENTO Y MOBILIARIO 212,717.20
SUB TOTAL 8,958,149.64
M 47 MANO DE OBRA INC. LEYES SOCIALES 0.257 100.00% 523.700 544.120 544.590 0.267 544.120 0.267 544.120 0.267 544.120 0.267 544.120 0.267 544.120 0.267 544.120 0.267 562.240 0.276 562.240 0.276 562.240 0.276 562.240 0.276
A 3 ACERO DE CONSTRUCCION CORRUGADO 0.054 100.00% 459.190 473.870 468.660 0.055 473.870 0.056 477.980 0.056 459.710 0.054 442.800 0.052 460.660 0.054 460.320 0.054 457.960 0.054 461.450 0.054 466.040 0.055 464.710 0.055
D 30 DÓLAR (GENERAL PONDERADO) 0.081 100.00% 386.980 473.880 468.040 0.098 473.880 0.099 484.190 0.101 471.040 0.099 458.220 0.096 465.000 0.097 464.380 0.097 463.540 0.097 467.560 0.098 474.820 0.099 476.530 0.100
M 49 MAQUINARIA Y EQUIPO IMPORTADO 0.205 100.00% 248.340 308.010 302.950 0.250 308.010 0.254 313.960 0.259 305.190 0.252 295.610 0.244 298.570 0.246 297.170 0.245 295.650 0.244 298.910 0.247 303.080 0.250 303.440 0.250
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.403 100.00% 402.720 424.250 422.670 0.423 424.250 0.425 424.990 0.425 427.530 0.428 427.580 0.428 428.470 0.429 429.070 0.429 429.420 0.430 430.960 0.431 431.850 0.432 433.630 0.434
1.000 K (Dic. '15) 1.093 K (Dic. '15) 1.101 (Ene. '16) 1.108 K (Feb. '16) 1.100 (Marz. '16) 1.087 (Abr. '16) 1.093 (May. '16) 1.092 (Jun. '16) 1.101 K (Jul. '16) 1.106 (Ago. '16) 1.112 K (Set. '16) 1.115
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K
Oct. '16 Nov. '16 Dic. '16 Ene. '17 Feb. '17 Marz. '17 Abr. '17 May. '17 Jun. '17
562.240 0.276 562.240 0.276 563.250 0.276 563.250 0.276 563.250 0.276 563.250 0.276 563.250 0.276 563.250 0.276 563.250 0.276
468.620 0.055 470.170 0.055 464.670 0.055 456.590 0.054 453.510 0.053 431.870 0.051 440.820 0.052 448.490 0.053 451.950 0.053
479.510 0.100 477.780 0.100 470.060 0.098 461.490 0.097 463.360 0.097 461.460 0.097 466.530 0.098 466.080 0.098 463.800 0.097
304.740 0.252 304.120 0.251 299.320 0.247 293.650 0.242 293.920 0.243 292.480 0.241 295.460 0.244 294.920 0.243 293.210 0.242
434.890 0.435 436.350 0.437 437.380 0.438 438.800 0.439 444.520 0.445 443.370 0.444 441.500 0.442 440.790 0.441 441.670 0.442
K (Oct. '16) 1.118 K (Nov. '16) 1.119 K (Dic. '16) 1.114 (Ene. '17) 1.108 (Feb. '17) 1.114 (Marz. '17) 1.109 (Abr. '17) 1.112 (May. '17) 1.111 (Jun. '17) 1.110
M 47 MANO DE OBRA INC. LEYES SOCIALES 0.316 100.00% 523.700 544.12 544.59 0.329 544.12 0.328 544.12 0.328 544.12 0.328 544.12 0.328 544.12 0.328 544.12 0.328 562.24 0.339 562.24 0.339 562.24 0.339 562.24 0.339
D 30 DÓLAR (GENERAL PONDERADO) 0.068 100.00% 386.980 473.88 468.04 0.082 473.88 0.083 484.19 0.085 471.04 0.083 458.22 0.081 465.00 0.082 464.38 0.082 463.54 0.081 467.56 0.082 474.82 0.083 476.53 0.084
M 43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 0.071 100.00% 582.280 621.56 616.18 0.075 621.56 0.076 626.33 0.076 627.18 0.076 632.02 0.077 633.39 0.077 637.43 0.078 639.26 0.078 641.30 0.078 642.13 0.078 640.92 0.078
M 49 MAQUINARIA Y EQUIPO IMPORTADO 0.098 100.00% 248.340 308.01 302.95 0.120 308.01 0.122 313.96 0.124 305.19 0.120 295.61 0.117 298.57 0.118 297.17 0.117 295.65 0.117 298.91 0.118 303.08 0.120 303.44 0.120
C 21 CEMENTO PORLAND TIPO I 0.110 100.00% 339.420 382.73 367.31 0.119 382.73 0.124 385.11 0.125 385.11 0.125 385.11 0.125 385.11 0.125 385.11 0.125 385.11 0.125 385.11 0.125 385.11 0.125 385.11 0.125
A 3 ACERO DE CONSTRUCCION CORRUGADO 0.149 100.00% 459.190 473.87 468.66 0.152 473.87 0.154 477.98 0.155 459.71 0.149 442.80 0.144 460.66 0.149 460.32 0.149 457.96 0.149 461.45 0.150 466.04 0.151 464.71 0.151
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.188 100.00% 402.720 424.25 422.67 0.197 424.25 0.198 424.99 0.198 427.53 0.200 427.58 0.200 428.47 0.200 429.07 0.200 429.42 0.200 430.96 0.201 431.85 0.202 433.63 0.202
1.000 K (Dic. '15) 1.074 K (Dic. '15) 1.085 (Ene. '16) 1.091 K (Feb. '16) 1.081 (Marz. '16) 1.072 (Abr. '16) 1.079 (May. '16) 1.079 (Jun. '16) 1.089 K (Jul. '16) 1.093 (Ago. '16) 1.098 K (Set. '16) 1.099
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K
Oct. '16 Nov. '16 Dic. '16 Ene. '17 Feb. '17 Marz. '17 Abr. '17 May. '17 Jun. '17
562.24 0.339 562.240 0.339 563.250 0.340 563.250 0.340 563.250 0.340 563.250 0.340 563.250 0.340 563.250 0.340 563.250 0.340
479.51 0.084 477.780 0.084 470.060 0.083 461.490 0.081 463.360 0.081 461.460 0.081 466.530 0.082 466.080 0.082 463.800 0.081
640.45 0.078 642.670 0.078 642.310 0.078 643.830 0.079 645.180 0.079 644.590 0.079 647.310 0.079 648.120 0.079 651.610 0.079
304.74 0.120 304.120 0.120 299.320 0.118 293.650 0.116 293.920 0.116 292.480 0.115 295.460 0.117 294.920 0.116 293.210 0.116
385.11 0.125 385.110 0.125 393.810 0.128 401.920 0.130 401.920 0.130 401.920 0.130 401.920 0.130 401.920 0.130 401.920 0.130
468.62 0.152 470.170 0.153 464.670 0.151 456.590 0.148 453.510 0.147 431.870 0.140 440.820 0.143 448.490 0.146 451.950 0.147
434.89 0.203 436.350 0.204 437.380 0.204 438.800 0.205 444.520 0.208 443.370 0.207 441.500 0.206 440.790 0.206 441.670 0.206
K (Oct. '16) 1.101 K (Nov. '16) 1.103 K (Dic. '16) 1.102 (Ene. '17) 1.099 (Feb. '17) 1.101 (Marz. '17) 1.092 (Abr. '17) 1.097 (May. '17) 1.099 (Jun. '17) 1.099
M 47 MANO DE OBRA INC. LEYES SOCIALES 0.316 100.000% 523.700 544.12 544.59 0.329 544.12 0.328 544.12 0.328 544.12 0.328 544.12 0.328 544.12 0.328 544.12 0.328 562.24 0.339 562.24 0.339 562.24 0.339 562.24 0.339
C 4 AGREGADO FINO 0.111 100.000% 787.040 920.31 912.17 0.129 920.31 0.130 922.98 0.130 921.80 0.130 922.33 0.130 915.54 0.129 915.25 0.129 915.49 0.129 918.39 0.130 914.46 0.129 924.49 0.130
I 3 ACERO DE CONSTRUCCION CORRUGADO 0.051 100.000% 459.190 473.87 468.66 0.052 473.87 0.053 477.98 0.053 459.71 0.051 442.80 0.049 460.66 0.051 460.32 0.051 457.96 0.051 461.45 0.051 466.04 0.052 464.71 0.052
A 30 DÓLAR (GENERAL PONDERADO) 0.191 100.000% 386.980 473.88 468.04 0.231 473.88 0.234 484.19 0.239 471.04 0.232 458.22 0.226 465.00 0.230 464.38 0.229 463.54 0.229 467.56 0.231 474.82 0.234 476.53 0.235
C 43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 0.075 100.000% 582.280 621.56 616.18 0.079 621.56 0.080 626.33 0.081 627.18 0.081 632.02 0.081 633.39 0.082 637.43 0.082 639.26 0.082 641.30 0.083 642.13 0.083 640.92 0.083
C 49 MAQUINARIA Y EQUIPO IMPORTADO 0.054 100.000% 248.340 308.01 302.95 0.066 308.01 0.067 313.96 0.068 305.19 0.066 295.61 0.064 298.57 0.065 297.17 0.065 295.65 0.064 298.91 0.065 303.08 0.066 303.44 0.066
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.202 100.000% 402.720 424.25 422.67 0.212 424.25 0.213 424.99 0.213 427.53 0.214 427.58 0.214 428.47 0.215 429.07 0.215 429.42 0.215 430.96 0.216 431.85 0.217 433.63 0.218
1.000 K (Dic. '15) 1.098 K (Dic. '15) 1.105 (Ene. '16) 1.112 K (Feb. '16) 1.102 (Marz. '16) 1.092 (Abr. '16) 1.100 (May. '16) 1.099 (Jun. '16) 1.109 K (Jul. '16) 1.115 (Ago. '16) 1.120 K (Set. '16) 1.123
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K
Oct. '16 Nov. '16 Dic. '16 Ene. '17 Feb. '17 Marz. '17 Abr. '17 May. '17 Jun. '17
562.24 0.339 562.240 0.339 563.250 0.340 563.250 0.340 563.250 0.340 563.250 0.340 563.250 0.340 563.250 0.340 563.250 0.340
925.40 0.131 927.800 0.131 928.510 0.131 931.960 0.131 939.010 0.132 940.800 0.133 936.610 0.132 931.670 0.131 935.070 0.132
468.62 0.052 470.170 0.052 464.670 0.052 456.590 0.051 453.510 0.050 431.870 0.048 440.820 0.049 448.490 0.050 451.950 0.050
479.51 0.237 477.780 0.236 470.060 0.232 461.490 0.228 463.360 0.229 461.460 0.228 466.530 0.230 466.080 0.230 463.800 0.229
640.45 0.082 642.670 0.083 642.310 0.083 643.830 0.083 645.180 0.083 644.590 0.083 647.310 0.083 648.120 0.083 651.610 0.084
304.74 0.066 304.120 0.066 299.320 0.065 293.650 0.064 293.920 0.064 292.480 0.064 295.460 0.064 294.920 0.064 293.210 0.064
434.89 0.218 436.350 0.219 437.380 0.219 438.800 0.220 444.520 0.223 443.370 0.222 441.500 0.221 440.790 0.221 441.670 0.222
K (Oct. '16) 1.125 K (Nov. '16) 1.126 K (Dic. '16) 1.122 (Ene. '17) 1.117 (Feb. '17) 1.121 (Marz. '17) 1.118 (Abr. '17) 1.119 (May. '17) 1.119 (Jun. '17) 1.121
FORMULA 04: INSTALACIONES SANITARIAS - AREA 2 - LIMA
K = 0.196*(Mr / Mo) + 0.112*(Tr / To) + 0.198*(Dr / Do) + 0.200*(Ar / Ao) + 0.107*(Mr / Mo) + 0.187*(Ir / Io)
Io (Imo) Ima (Ad.Mat) Ima (Ad.Dir) K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K
Simb IU DESCRIPCION Coef %
Jul. '14 Ene. '16 Dic. '15 Dic. '15 Ene. '16 Feb. '16 Marz. '16 Abr. '16 May. '16 Jun. '16 Jul. '16 Ago. '16 Set. '16
M 47 MANO DE OBRA INC. LEYES SOCIALES 0.196 100.00% 523.700 544.120 544.590 0.204 544.120 0.204 544.120 0.204 544.120 0.204 544.120 0.204 544.120 0.204 544.120 0.204 562.240 0.210 562.240 0.210 562.240 0.210 562.240 0.210
T 71 TUBERIA DE FIERRO FUNDIDO 0.112 100.00% 553.130 682.530 671.810 0.136 682.530 0.138 696.230 0.141 676.770 0.137 655.540 0.133 662.020 0.134 658.510 0.133 655.140 0.133 661.890 0.134 671.610 0.136 672.400 0.136
D 30 DOLAR (GENERAL PONDERADO) 0.198 100.00% 386.980 473.880 468.040 0.239 473.880 0.242 484.190 0.248 471.040 0.241 458.220 0.234 465.000 0.238 464.380 0.238 463.540 0.237 467.560 0.239 474.820 0.243 476.530 0.244
A 10 APARATOS SANITARIOS CON GRIFERIA 0.200 100.00% 382.510 398.720 398.100 0.208 398.720 0.208 398.140 0.208 399.780 0.209 399.630 0.209 402.840 0.211 403.520 0.211 403.670 0.211 403.930 0.211 406.450 0.213 406.380 0.212
M 49 MAQUINARIA Y EQUIPO IMPORTADO 0.107 100.00% 248.340 308.010 302.950 0.131 308.010 0.133 313.960 0.135 305.190 0.131 295.610 0.127 298.570 0.129 297.170 0.128 295.650 0.127 298.910 0.129 303.080 0.131 303.440 0.131
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.187 100.00% 402.720 424.250 422.670 0.196 424.250 0.197 424.990 0.197 427.530 0.199 427.580 0.199 428.470 0.199 429.070 0.199 429.420 0.199 430.960 0.200 431.850 0.201 433.630 0.201
1.000 K (Dic. '15) 1.114 K (Dic. '15) 1.122 (Ene. '16) 1.133 K (Feb. '16) 1.121 (Marz. '16) 1.106 (Abr. '16) 1.115 (May. '16) 1.113 (Jun. '16) 1.117 K (Jul. '16) 1.123 (Ago. '16) 1.134 K (Set. '16) 1.134
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K
Oct. '16 Nov. '16 Dic. '16 Ene. '17 Feb. '17 Marz. '17 Abr. '17 May. '17 Jun. '17
562.240 0.210 562.240 0.210 563.250 0.211 563.250 0.211 563.250 0.211 563.250 0.211 563.250 0.211 563.250 0.211 563.250 0.211
675.780 0.137 674.380 0.137 663.270 0.134 647.400 0.131 648.000 0.131 644.810 0.131 649.980 0.132 648.780 0.131 645.020 0.131
479.510 0.245 477.780 0.244 470.060 0.241 461.490 0.236 463.360 0.237 461.460 0.236 466.530 0.239 466.080 0.238 463.800 0.237
404.520 0.212 405.300 0.212 407.280 0.213 407.020 0.213 408.620 0.214 401.430 0.210 398.060 0.208 403.020 0.211 407.830 0.213
304.740 0.131 304.120 0.131 299.320 0.129 293.650 0.127 293.920 0.127 292.480 0.126 295.460 0.127 294.920 0.127 293.210 0.126
434.890 0.202 436.350 0.203 437.380 0.203 438.800 0.204 444.520 0.206 443.370 0.206 441.500 0.205 440.790 0.205 441.670 0.205
K (Oct. '16) 1.137 K (Nov. '16) 1.137 K (Dic. '16) 1.131 (Ene. '17) 1.122 (Feb. '17) 1.126 (Marz. '17) 1.120 (Abr. '17) 1.122 (May. '17) 1.123 (Jun. '17) 1.123
M 47 MANO DE OBRA INC. LEYES SOCIALES 0.193 100.00% 523.700 544.120 544.590 0.201 544.120 0.201 544.120 0.201 544.120 0.201 544.120 0.201 544.120 0.201 544.120 0.201 562.240 0.207 562.240 0.207 562.240 0.207 562.240 0.207
A 6 ALAMBRE Y CABLE DE COBRE DESNUDO 0.088 100.00% 799.380 832.680 823.920 0.091 832.680 0.092 825.830 0.091 778.870 0.086 768.290 0.085 774.620 0.085 761.330 0.084 754.190 0.083 776.090 0.085 785.220 0.086 779.100 0.086
A 12 ARTEFACTO ALUMBRADO INTERIOR 0.327 100.00% 298.610 343.050 340.550 0.373 343.050 0.376 346.260 0.379 341.380 0.374 335.990 0.368 337.660 0.370 336.750 0.369 335.880 0.368 339.280 0.372 325.240 0.356 325.500 0.356
D 30 DÓLAR (GENERAL PONDERADO) 0.129 100.00% 386.980 473.880 468.040 0.156 473.880 0.158 484.190 0.161 471.040 0.157 458.220 0.153 465.000 0.155 464.380 0.155 463.540 0.155 467.560 0.156 474.820 0.158 476.530 0.159
M 49 MAQUINARIA Y EQUIPO IMPORTADO 0.070 100.00% 248.340 308.010 302.950 0.085 308.010 0.087 313.960 0.088 305.190 0.086 295.610 0.083 298.570 0.084 297.170 0.084 295.650 0.083 298.910 0.084 303.080 0.085 303.440 0.086
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.193 100.00% 402.720 424.250 422.670 0.203 424.250 0.203 424.990 0.204 427.530 0.205 427.580 0.205 428.470 0.205 429.070 0.206 429.420 0.206 430.960 0.207 431.850 0.207 433.630 0.208
1.000 K (Dic. '15) 1.109 K (Dic. '15) 1.117 (Ene. '16) 1.124 K (Feb. '16) 1.109 (Marz. '16) 1.095 (Abr. '16) 1.100 (May. '16) 1.099 (Jun. '16) 1.102 K (Jul. '16) 1.111 (Ago. '16) 1.099 K (Set. '16) 1.102
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K
Oct. '16 Nov. '16 Dic. '16 Ene. '17 Feb. '17 Marz. '17 Abr. '17 May. '17 Jun. '17
562.240 0.207 562.240 0.207 563.250 0.208 563.250 0.208 563.250 0.208 563.250 0.208 563.250 0.208 563.250 0.208 563.250 0.208
803.630 0.088 843.730 0.093 835.540 0.092 831.000 0.091 841.060 0.093 830.580 0.091 829.840 0.091 825.180 0.091 830.360 0.091
326.410 0.357 326.030 0.357 323.580 0.354 318.510 0.349 318.680 0.349 317.780 0.348 319.230 0.350 318.900 0.349 318.240 0.348
479.510 0.160 477.780 0.159 470.060 0.157 461.490 0.154 463.360 0.154 461.460 0.154 466.530 0.156 466.080 0.155 463.800 0.155
304.740 0.086 304.120 0.086 299.320 0.084 293.650 0.083 293.920 0.083 292.480 0.082 295.460 0.083 294.920 0.083 293.210 0.083
434.890 0.208 436.350 0.209 437.380 0.210 438.800 0.210 444.520 0.213 443.370 0.212 441.500 0.212 440.790 0.211 441.670 0.212
K (Oct. '16) 1.106 K (Nov. '16) 1.111 K (Dic. '16) 1.105 (Ene. '17) 1.095 (Feb. '17) 1.100 (Marz. '17) 1.095 (Abr. '17) 1.100 (May. '17) 1.097 (Jun. '17) 1.097
M 47 MANO DE OBRA INC. LEYES SOCIALES 0.071 100.00% 523.700 544.12 544.59 0.074 544.12 0.074 544.12 0.074 544.12 0.074 544.12 0.074 544.12 0.074 544.12 0.074 562.24 0.076 562.24 0.076 562.24 0.076 562.24 0.076
P 61 PLANCHA GALVANIZADA 0.061 100.00% 255.200 231.12 227.49 0.054 231.12 0.055 235.75 0.056 233.59 0.056 244.12 0.058 239.34 0.057 200.74 0.048 199.71 0.048 201.77 0.048 204.73 0.049 213.29 0.051
D 30 DÓLAR (GENERAL PONDERADO) 0.651 100.00% 386.980 473.88 468.04 0.787 473.88 0.797 484.19 0.815 471.04 0.792 458.22 0.771 465.00 0.782 464.38 0.781 463.54 0.780 467.56 0.787 474.82 0.799 476.53 0.802
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.217 100.00% 402.720 424.25 422.67 0.228 424.25 0.229 424.99 0.229 427.53 0.230 427.58 0.230 428.47 0.231 429.07 0.231 429.42 0.231 430.96 0.232 431.85 0.233 433.63 0.234
1.000 K (Dic. '15) 1.143 K (Dic. '15) 1.155 (Ene. '16) 1.174 K (Feb. '16) 1.152 (Marz. '16) 1.133 (Abr. '16) 1.144 (May. '16) 1.134 (Jun. '16) 1.135 K (Jul. '16) 1.143 (Ago. '16) 1.157 K (Set. '16) 1.163
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K
Oct. '16 Nov. '16 Dic. '16 Ene. '17 Feb. '17 Marz. '17 Abr. '17 May. '17 Jun. '17
562.24 0.076 562.240 0.076 563.250 0.076 563.250 0.076 563.250 0.076 563.250 0.076 563.250 0.076 563.250 0.076 563.250 0.076
214.36 0.051 213.910 0.051 221.860 0.053 225.130 0.054 231.020 0.055 230.040 0.055 231.880 0.055 227.620 0.054 222.540 0.053
479.51 0.807 477.780 0.804 470.060 0.791 461.490 0.776 463.360 0.779 461.460 0.776 466.530 0.785 466.080 0.784 463.800 0.780
434.89 0.234 436.350 0.235 437.380 0.236 438.800 0.236 444.520 0.240 443.370 0.239 441.500 0.238 440.790 0.238 441.670 0.238
K (Oct. '16) 1.168 K (Nov. '16) 1.166 K (Dic. '16) 1.156 (Ene. '17) 1.142 (Feb. '17) 1.150 (Marz. '17) 1.146 (Abr. '17) 1.154 (May. '17) 1.152 (Jun. '17) 1.147
M 47 MANO DE OBRA INC. LEYES SOCIALES 0.251 100.00% 523.700 544.12 544.59 0.261 544.12 0.261 544.12 0.261 544.12 0.261 544.12 0.261 544.12 0.261 544.12 0.261 562.24 0.269 562.24 0.269 562.24 0.269 562.24 0.269
C 18 CABLE TELEFONICO 0.103 100.00% 272.030 289.34 279.10 0.106 298.34 0.113 288.67 0.109 285.73 0.108 289.51 0.110 289.06 0.109 282.23 0.107 277.99 0.105 289.16 0.109 289.79 0.110 288.37 0.109
D 30 DÓLAR (GENERAL PONDERADO) 0.459 100.00% 386.980 473.88 468.04 0.555 473.88 0.562 484.19 0.574 471.04 0.559 458.22 0.543 465.00 0.552 464.38 0.551 463.54 0.550 467.56 0.555 474.82 0.563 476.53 0.565
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.187 100.00% 402.720 424.25 422.67 0.196 424.25 0.197 424.99 0.197 427.53 0.199 427.58 0.199 428.47 0.199 429.07 0.199 429.42 0.199 430.96 0.200 431.85 0.201 433.63 0.201
1.000 K (Dic. '15) 1.118 K (Dic. '15) 1.133 (Ene. '16) 1.141 K (Feb. '16) 1.127 (Marz. '16) 1.113 (Abr. '16) 1.121 (May. '16) 1.118 (Jun. '16) 1.123 K (Jul. '16) 1.133 (Ago. '16) 1.143 K (Set. '16) 1.144
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K
Oct. '16 Nov. '16 Dic. '16 Ene. '17 Feb. '17 Marz. '17 Abr. '17 May. '17 Jun. '17
562.24 0.269 562.240 0.269 563.250 0.270 563.250 0.270 563.250 0.270 563.250 0.270 563.250 0.270 563.250 0.270 563.250 0.270
290.80 0.110 316.300 0.120 311.070 0.118 313.370 0.119 320.470 0.121 315.010 0.119 313.340 0.119 309.150 0.117 307.360 0.116
479.51 0.569 477.780 0.567 470.060 0.558 461.490 0.547 463.360 0.550 461.460 0.547 466.530 0.553 466.080 0.553 463.800 0.550
434.89 0.202 436.350 0.203 437.380 0.203 438.800 0.204 444.520 0.206 443.370 0.206 441.500 0.205 440.790 0.205 441.670 0.205
K (Oct. '16) 1.150 K (Nov. '16) 1.159 K (Dic. '16) 1.149 (Ene. '17) 1.140 (Feb. '17) 1.147 (Marz. '17) 1.142 (Abr. '17) 1.147 (May. '17) 1.145 (Jun. '17) 1.141
FORMULA 08: EQUIPAMIENTO - AREA 2 - LIMA
K = 0.322*(GGUr / GGUo) + 0.051*(EQNr / EQNo) + 0.627*(EQIr / EQIo)
Io (Imo) Ima (Ad.Mat) Ima (Ad.Dir) K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K
Simb IU DESCRIPCION Coef %
Jul. '14 Ene. '16 Dic. '15 Dic. '15 Ene. '16 Feb. '16 Marz. '16 Abr. '16 May. '16 Jun. '16 Jul. '16 Ago. '16 Set. '16
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.322 100% 402.720 424.250 422.670 0.338 424.250 0.339 424.990 0.340 427.530 0.342 427.580 0.342 428.470 0.343 429.070 0.343 429.420 0.343 430.960 0.345 431.850 0.345 433.630 0.347
EQN 48 EQUIPO NACIONAL 0.051 100% 337.960 368.180 364.860 0.055 368.180 0.056 370.350 0.056 367.260 0.055 364.310 0.055 366.600 0.055 365.930 0.055 365.290 0.055 366.570 0.055 368.680 0.056 368.830 0.056
EQI 49 EQUIPO IMPORTADO 0.627 100% 248.340 308.010 302.950 0.765 308.010 0.778 313.960 0.793 305.190 0.771 295.610 0.746 298.570 0.754 297.170 0.750 295.650 0.746 298.910 0.755 303.080 0.765 303.440 0.766
1.000 K (Dic. '15) 1.158 K (Dic. '15) 1.173 (Ene. '16) 1.189 K (Feb. '16) 1.168 (Marz. '16) 1.143 (Abr. '16) 1.152 (May. '16) 1.148 (Jun. '16) 1.144 K (Jul. '16) 1.155 (Ago. '16) 1.166 K (Set. '16) 1.169
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K
Oct. '16 Nov. '16 Dic. '16 Ene. '17 Feb. '17 Marz. '17 Abr. '17 May. '17 Jun. '17
434.890 0.348 436.350 0.349 437.380 0.350 438.800 0.351 444.520 0.355 443.370 0.355 441.500 0.353 440.790 0.352 441.670 0.353
369.670 0.056 369.410 0.056 367.860 0.056 365.190 0.055 365.310 0.055 365.670 0.055 366.670 0.055 367.130 0.055 366.280 0.055
304.740 0.769 304.120 0.768 299.320 0.756 293.650 0.741 293.920 0.742 292.480 0.738 295.460 0.746 294.920 0.745 293.210 0.740
K (Oct. '16) 1.173 K (Nov. '16) 1.173 K (Dic. '16) 1.162 (Ene. '17) 1.147 (Feb. '17) 1.152 (Marz. '17) 1.148 (Abr. '17) 1.154 (May. '17) 1.152 (Jun. '17) 1.148
CALCULO DE REAJUSTE DE PRECIOS POR FORMULA POLINOMICA
OBRA AMPLIACION Y MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA EN LA UPPS DEL PPOLICLINICO NAVAL SAN BORJA DE LA MARINA DE GUERRA DEL PERU, DISTRITO DE SAN BORJA - LIMA
02 Enero 2016
OBRAS PROVISIONALES 70,798.46 62,102.95 1.108 0.108 7,646.23 7,646.23 6,707.12 6,707.12 6,707.12 6,707.12
ESTRUCTURAS 0.00 0.00 1.091 0.091 0.00 7,646.23 0.00 6,707.12 0.00 6,707.12
ARQUITECTURA 0.00 0.00 1.112 0.112 0.00 7,646.23 0.00 6,707.12 0.00 6,707.12
INSTALACIONES SANITARIAS 0.00 0.00 1.133 0.133 0.00 7,646.23 0.00 6,707.12 0.00 6,707.12
INSTALACIONES ELECTRICAS 0.00 0.00 1.124 0.124 0.00 7,646.23 0.00 6,707.12 0.00 6,707.12
INSTALACIONES MECANICAS 0.00 0.00 1.174 0.174 0.00 7,646.23 0.00 6,707.12 0.00 6,707.12
INSTALACION COMUNICACIONES 0.00 0.00 1.141 0.141 0.00 7,646.23 0.00 6,707.12 0.00 6,707.12
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 1.189 0.189 0.00 7,646.23 0.00 6,707.12 0.00 6,707.12
03 Febrero 2016
OBRAS PROVISIONALES 417,137.88 365,904.20 1.100 0.100 41,713.79 49,360.02 36,590.42 43,297.54 36,590.42 43,297.54
ESTRUCTURAS 365,526.34 320,632.22 1.081 0.081 29,607.63 78,967.66 25,971.21 69,268.75 25,971.21 69,268.75
ARQUITECTURA 0.00 0.00 1.102 0.102 0.00 78,967.66 0.00 69,268.75 0.00 69,268.75
INSTALACIONES SANITARIAS 0.00 0.00 1.121 0.121 0.00 78,967.66 0.00 69,268.75 0.00 69,268.75
INSTALACIONES ELECTRICAS 0.00 0.00 1.109 0.109 0.00 78,967.66 0.00 69,268.75 0.00 69,268.75
INSTALACIONES MECANICAS 0.00 0.00 1.152 0.152 0.00 78,967.66 0.00 69,268.75 0.00 69,268.75
INSTALACION COMUNICACIONES 0.00 0.00 1.127 0.127 0.00 78,967.66 0.00 69,268.75 0.00 69,268.75
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 1.168 0.168 0.00 78,967.66 0.00 69,268.75 0.00 69,268.75
04 Marzo 2016
OBRAS PROVISIONALES 160,388.38 140,690.10 1.087 0.087 13,953.79 92,921.44 12,240.04 81,508.79 12,240.04 81,508.79
ESTRUCTURAS 1,061,555.01 931,173.37 1.072 0.072 76,431.96 169,353.41 67,044.48 148,553.27 67,044.48 148,553.27
ARQUITECTURA 0.00 0.00 1.092 0.092 0.00 169,353.41 0.00 148,553.27 0.00 148,553.27
INSTALACIONES SANITARIAS 0.00 0.00 1.106 0.106 0.00 169,353.41 0.00 148,553.27 0.00 148,553.27
INSTALACIONES ELECTRICAS 0.00 0.00 1.095 0.095 0.00 169,353.41 0.00 148,553.27 0.00 148,553.27
INSTALACIONES MECANICAS 0.00 0.00 1.133 0.133 0.00 169,353.41 0.00 148,553.27 0.00 148,553.27
INSTALACION COMUNICACIONES 0.00 0.00 1.113 0.113 0.00 169,353.41 0.00 148,553.27 0.00 148,553.27
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 1.143 0.143 0.00 169,353.41 0.00 148,553.27 0.00 148,553.27
05 Abril 2016
OBRAS PROVISIONALES 155,511.16 136,411.20 1.093 0.093 14,462.54 183,815.94 12,686.24 161,239.51 12,686.24 161,239.51
ESTRUCTURAS 1,442,039.00 1,264,926.92 1.079 0.079 113,921.08 297,737.02 99,929.23 261,168.74 99,929.23 261,168.74
ARQUITECTURA 0.00 0.00 1.100 0.100 0.00 297,737.02 0.00 261,168.74 0.00 261,168.74
INSTALACIONES SANITARIAS 0.00 0.00 1.115 0.115 0.00 297,737.02 0.00 261,168.74 0.00 261,168.74
INSTALACIONES ELECTRICAS 0.00 0.00 1.100 0.100 0.00 297,737.02 0.00 261,168.74 0.00 261,168.74
INSTALACIONES MECANICAS 0.00 0.00 1.144 0.144 0.00 297,737.02 0.00 261,168.74 0.00 261,168.74
INSTALACION COMUNICACIONES 0.00 0.00 1.121 0.121 0.00 297,737.02 0.00 261,168.74 0.00 261,168.74
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 1.152 0.152 0.00 297,737.02 0.00 261,168.74 0.00 261,168.74
06 Mayo 2016
OBRAS PROVISIONALES 119,481.22 104,806.43 1.092 0.092 10,992.27 308,729.30 9,642.19 270,810.93 9,642.19 270,810.93
ESTRUCTURAS 1,934,780.26 1,697,150.95 1.079 0.079 152,847.64 461,576.94 134,074.93 404,885.86 134,074.93 404,885.86
ARQUITECTURA 0.00 0.00 1.099 0.099 0.00 461,576.94 0.00 404,885.86 0.00 404,885.86
INSTALACIONES SANITARIAS 0.00 0.00 1.113 0.113 0.00 461,576.94 0.00 404,885.86 0.00 404,885.86
INSTALACIONES ELECTRICAS 0.00 0.00 1.099 0.099 0.00 461,576.94 0.00 404,885.86 0.00 404,885.86
INSTALACIONES MECANICAS 0.00 0.00 1.134 0.134 0.00 461,576.94 0.00 404,885.86 0.00 404,885.86
INSTALACION COMUNICACIONES 0.00 0.00 1.118 0.118 0.00 461,576.94 0.00 404,885.86 0.00 404,885.86
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 1.148 0.148 0.00 461,576.94 0.00 404,885.86 0.00 404,885.86
07 Junio 2016
OBRAS PROVISIONALES 109,767.46 96,285.77 1.101 0.101 11,086.51 472,663.45 9,724.86 414,610.72 9,724.86 414,610.72
ESTRUCTURAS 1,383,329.03 1,213,426.75 1.089 0.089 123,116.28 595,779.73 107,994.98 522,605.70 107,994.98 522,605.70
ARQUITECTURA 8,500.55 7,456.51 1.109 0.109 926.56 596,706.29 812.76 523,418.46 812.76 523,418.46
INSTALACIONES SANITARIAS 0.00 0.00 1.117 0.117 0.00 596,706.29 0.00 523,418.46 0.00 523,418.46
INSTALACIONES ELECTRICAS 44,265.84 38,829.09 1.102 0.102 4,515.12 601,221.41 3,960.57 527,379.03 3,960.57 527,379.03
INSTALACIONES MECANICAS 0.00 0.00 1.135 0.135 0.00 601,221.41 0.00 527,379.03 0.00 527,379.03
INSTALACION COMUNICACIONES 0.00 0.00 1.123 0.123 0.00 601,221.41 0.00 527,379.03 0.00 527,379.03
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 1.144 0.144 0.00 601,221.41 0.00 527,379.03 0.00 527,379.03
08 Julio 2016
OBRAS PROVISIONALES 148,824.70 130,545.99 1.106 0.106 15,775.42 616,996.83 13,837.87 541,216.90 13,837.87 541,216.90
ESTRUCTURAS 1,967,561.87 1,725,906.04 1.093 0.093 182,983.25 799,980.08 160,509.26 701,726.16 160,509.26 701,726.16
ARQUITECTURA 125,595.96 110,170.20 1.115 0.115 14,443.54 814,423.62 12,669.57 714,395.73 12,669.57 714,395.73
INSTALACIONES SANITARIAS 0.00 0.00 1.123 0.123 0.00 814,423.62 0.00 714,395.73 0.00 714,395.73
INSTALACIONES ELECTRICAS 198,123.85 173,790.18 1.111 0.111 21,991.75 836,415.36 19,290.71 733,686.44 19,290.71 733,686.44
INSTALACIONES MECANICAS 376,900.94 330,609.79 1.143 0.143 53,896.83 890,312.20 47,277.20 780,963.64 47,277.20 780,963.64
INSTALACION COMUNICACIONES 0.00 0.00 1.133 0.133 0.00 890,312.20 0.00 780,963.64 0.00 780,963.64
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 1.155 0.155 0.00 890,312.20 0.00 780,963.64 0.00 780,963.64
09 Agosto 2016
OBRAS PROVISIONALES 122,590.96 107,534.29 1.112 0.112 13,730.19 904,042.39 12,043.84 793,007.48 12,043.84 793,007.48
ESTRUCTURAS 420,113.13 368,514.57 1.098 0.098 41,171.09 945,213.47 36,114.43 829,121.91 36,114.43 829,121.91
ARQUITECTURA 628,204.51 551,048.12 1.120 0.120 75,384.54 1,020,598.01 66,125.77 895,247.69 66,125.77 895,247.69
INSTALACIONES SANITARIAS 379,534.63 332,919.99 1.134 0.134 50,857.64 1,071,455.65 44,611.28 939,858.97 44,611.28 939,858.97
INSTALACIONES ELECTRICAS 371,220.24 325,626.79 1.099 0.099 36,750.80 1,108,206.46 32,237.05 972,096.02 32,237.05 972,096.02
INSTALACIONES MECANICAS 128,272.62 112,518.11 1.157 0.157 20,138.80 1,128,345.26 17,665.34 989,761.36 17,665.34 989,761.36
INSTALACION COMUNICACIONES 83,100.65 72,894.17 1.143 0.143 11,883.39 1,140,228.65 10,423.87 1,000,185.23 10,423.87 1,000,185.23
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 1.166 0.166 0.00 1,140,228.65 0.00 1,000,185.23 0.00 1,000,185.23
10 Setiembre 2016
OBRAS PROVISIONALES 61,959.36 61,959.33 1.115 0.115 7,125.33 1,147,353.98 7,125.32 1,167,032.67 7,125.32 1,167,032.67
ESTRUCTURAS 171,339.09 171,339.08 1.099 0.099 16,962.57 1,164,316.55 16,962.57 1,183,995.24 16,962.57 1,183,995.24
ARQUITECTURA 686,099.81 686,099.81 1.123 0.123 84,390.28 1,248,706.83 84,390.28 1,268,385.52 84,390.28 1,268,385.52
INSTALACIONES SANITARIAS 83,982.28 83,982.28 1.134 0.134 11,253.63 1,259,960.45 11,253.63 1,279,639.15 11,253.63 1,279,639.15
INSTALACIONES ELECTRICAS 309,592.28 309,592.28 1.102 0.102 31,578.41 1,291,538.86 31,578.41 1,311,217.56 31,578.41 1,311,217.56
INSTALACIONES MECANICAS 516,946.48 516,946.48 1.163 0.163 84,262.28 1,375,801.14 84,262.28 1,395,479.83 84,262.28 1,395,479.83
INSTALACION COMUNICACIONES 94,167.16 94,167.16 1.144 0.144 13,560.07 1,389,361.21 13,560.07 1,409,039.91 13,560.07 1,409,039.91
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 1.169 0.169 0.00 1,389,361.21 0.00 1,409,039.91 0.00 1,409,039.91
11 Octubre 2016
OBRAS PROVISIONALES 51,487.70 51,487.70 1.118 0.118 6,075.55 1,395,436.76 6,075.55 1,415,115.45 6,075.55 1,415,115.45
ESTRUCTURAS 3,666.38 3,666.38 1.101 0.101 370.30 1,395,807.06 370.30 1,415,485.76 370.30 1,415,485.76
ARQUITECTURA 765,031.06 765,031.06 1.125 0.125 95,628.88 1,491,435.95 95,628.88 1,511,114.64 95,628.88 1,511,114.64
INSTALACIONES SANITARIAS 102,126.37 102,126.37 1.137 0.137 13,991.31 1,505,427.26 13,991.31 1,525,105.95 13,991.31 1,525,105.95
INSTALACIONES ELECTRICAS 201,272.49 201,272.49 1.106 0.106 21,334.88 1,526,762.14 21,334.88 1,546,440.84 21,334.88 1,546,440.84
INSTALACIONES MECANICAS 259,075.21 259,075.21 1.168 0.168 43,524.64 1,570,286.78 43,524.64 1,589,965.47 43,524.64 1,589,965.47
INSTALACION COMUNICACIONES 520,253.15 520,253.14 1.150 0.150 78,037.97 1,648,324.75 78,037.97 1,668,003.44 78,037.97 1,668,003.44
EQUIPAMIENTO Y MOBILIARIO 2,970,340.38 2,970,340.39 1.173 0.173 513,868.89 2,162,193.64 513,868.89 2,181,872.33 513,868.89 2,181,872.33
12 Noviembre 2016
OBRAS PROVISIONALES 33,250.87 33,250.87 1.119 0.119 3,956.85 2,166,150.49 3,956.85 2,185,829.19 3,956.85 2,185,829.19
ESTRUCTURAS 15,474.27 15,474.27 1.103 0.103 1,593.85 2,167,744.34 1,593.85 2,187,423.04 1,593.85 2,187,423.04
ARQUITECTURA 759,880.73 759,880.72 1.126 0.126 95,744.97 2,263,489.31 95,744.97 2,283,168.01 95,744.97 2,283,168.01
INSTALACIONES SANITARIAS 102,302.62 102,302.62 1.137 0.137 14,015.46 2,277,504.77 14,015.46 2,297,183.46 14,015.46 2,297,183.46
INSTALACIONES ELECTRICAS 473,134.26 473,134.26 1.111 0.111 52,517.90 2,330,022.67 52,517.90 2,349,701.37 52,517.90 2,349,701.37
INSTALACIONES MECANICAS 512,422.99 512,423.00 1.166 0.166 85,062.22 2,415,084.89 85,062.22 2,434,763.59 85,062.22 2,434,763.59
INSTALACION COMUNICACIONES 366,215.46 366,215.46 1.159 0.159 58,228.26 2,473,313.15 58,228.26 2,492,991.84 58,228.26 2,492,991.84
EQUIPAMIENTO Y MOBILIARIO 1,131,003.99 1,131,003.98 1.173 0.173 195,663.69 2,668,976.84 195,663.69 2,688,655.53 195,663.69 2,688,655.53
13 Diciembre 2016
OBRAS PROVISIONALES 33,250.87 33,250.87 1.114 0.114 3,790.60 2,672,767.44 3,790.60 2,692,446.13 3,790.60 2,692,446.13
ESTRUCTURAS 20,574.09 20,574.09 1.102 0.102 2,098.56 2,674,865.99 2,098.56 2,694,544.69 2,098.56 2,694,544.69
ARQUITECTURA 1,790,978.47 1,790,978.48 1.122 0.122 218,499.37 2,893,365.37 218,499.37 2,913,044.06 218,499.37 2,913,044.06
INSTALACIONES SANITARIAS 410,042.41 410,042.40 1.131 0.131 53,715.56 2,947,080.92 53,715.55 2,966,759.62 53,715.55 2,966,759.62
INSTALACIONES ELECTRICAS 417,420.28 417,420.28 1.105 0.105 43,829.13 2,990,910.05 43,829.13 3,010,588.75 43,829.13 3,010,588.75
INSTALACIONES MECANICAS 692,068.25 692,068.24 1.156 0.156 107,962.65 3,098,872.70 107,962.65 3,118,551.39 107,962.65 3,118,551.39
INSTALACION COMUNICACIONES 1,294,431.90 1,294,431.90 1.149 0.149 192,870.35 3,291,743.05 192,870.35 3,311,421.75 192,870.35 3,311,421.75
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 1.162 0.162 0.00 3,291,743.05 0.00 3,311,421.75 0.00 3,311,421.75
14 Enero 2017
OBRAS PROVISIONALES 16,222.99 16,222.97 1.108 0.108 1,752.08 3,293,495.14 1,752.08 3,313,173.83 1,752.08 3,313,173.83
ESTRUCTURAS 0.00 0.00 1.099 0.099 0.00 3,293,495.14 0.00 3,313,173.83 0.00 3,313,173.83
ARQUITECTURA 648,172.29 648,172.28 1.117 0.117 75,836.16 3,369,331.29 75,836.16 3,389,009.98 75,836.16 3,389,009.98
INSTALACIONES SANITARIAS 163,582.47 163,582.47 1.122 0.122 19,957.06 3,389,288.36 19,957.06 3,408,967.04 19,957.06 3,408,967.04
INSTALACIONES ELECTRICAS 264,765.80 264,765.81 1.095 0.095 25,152.75 3,414,441.11 25,152.75 3,434,119.80 25,152.75 3,434,119.80
INSTALACIONES MECANICAS 479,315.21 479,315.21 1.142 0.142 68,062.76 3,482,503.87 68,062.76 3,502,182.56 68,062.76 3,502,182.56
INSTALACION COMUNICACIONES 1,049,107.66 1,049,107.66 1.140 0.140 146,875.07 3,629,378.94 146,875.07 3,649,057.63 146,875.07 3,649,057.63
EQUIPAMIENTO Y MOBILIARIO 920,605.06 920,605.06 1.147 0.147 135,328.94 3,764,707.88 135,328.94 3,784,386.57 135,328.94 3,784,386.57
15 Febrero 2017
OBRAS PROVISIONALES 3,783.97 3,783.97 1.114 0.114 431.37 3,765,139.25 431.37 3,784,817.94 431.37 3,784,817.94
ESTRUCTURAS 5,808.21 5,808.21 1.101 0.101 586.63 3,765,725.88 586.63 3,785,404.57 586.63 3,785,404.57
ARQUITECTURA 571,310.83 571,310.84 1.121 0.121 69,128.61 3,834,854.49 69,128.61 3,854,533.19 69,128.61 3,854,533.19
INSTALACIONES SANITARIAS 169,847.48 169,847.47 1.126 0.126 21,400.78 3,856,255.28 21,400.78 3,875,933.97 21,400.78 3,875,933.97
INSTALACIONES ELECTRICAS 47,579.19 47,579.20 1.100 0.100 4,757.92 3,861,013.20 4,757.92 3,880,691.89 4,757.92 3,880,691.89
INSTALACIONES MECANICAS 146,594.60 146,594.60 1.150 0.150 21,989.19 3,883,002.39 21,989.19 3,902,681.08 21,989.19 3,902,681.08
INSTALACION COMUNICACIONES 273,163.53 273,163.53 1.147 0.147 40,155.04 3,923,157.42 40,155.04 3,942,836.12 40,155.04 3,942,836.12
EQUIPAMIENTO Y MOBILIARIO 0.00 0.00 1.152 0.152 0.00 3,923,157.42 0.00 3,942,836.12 0.00 3,942,836.12
16 Marzo 2017
OBRAS PROVISIONALES 3,783.94 3,783.97 1.109 0.109 412.45 3,923,569.87 412.45 3,943,248.57 412.45 3,943,248.57
ESTRUCTURAS 1,161.50 1,161.49 1.092 0.092 106.86 3,923,676.73 106.86 3,943,355.43 106.86 3,943,355.43
ARQUITECTURA 284,597.47 284,597.75 1.118 0.118 33,582.50 3,957,259.23 33,582.53 3,976,937.96 33,582.53 3,976,937.96
INSTALACIONES SANITARIAS 33,463.12 33,463.12 1.120 0.120 4,015.57 3,961,274.81 4,015.57 3,980,953.53 4,015.57 3,980,953.53
INSTALACIONES ELECTRICAS -50,887.34 -50,887.34 1.095 0.095 -4,834.30 3,956,440.51 -4,834.30 3,976,119.24 -4,834.30 3,976,119.24
INSTALACIONES MECANICAS 42,122.52 42,122.55 1.146 0.146 6,149.89 3,962,590.40 6,149.89 3,982,269.13 6,149.89 3,982,269.13
INSTALACION COMUNICACIONES 119,592.52 119,592.51 1.142 0.142 16,982.14 3,979,572.54 16,982.14 3,999,251.27 16,982.14 3,999,251.27
EQUIPAMIENTO Y MOBILIARIO 759,762.41 759,762.41 1.148 0.148 112,444.84 4,092,017.37 112,444.84 4,111,696.10 112,444.84 4,111,696.10
17 Abril 2017
OBRAS PROVISIONALES 0.00 -0.05 1.112 0.112 0.00 4,092,017.37 -0.01 4,111,696.10 -0.01 4,111,696.10
ESTRUCTURAS 3,751.36 3,751.19 1.097 0.097 363.88 4,092,381.26 363.87 4,112,059.96 363.87 4,112,059.96
ARQUITECTURA 74,246.67 74,246.66 1.119 0.119 8,835.35 4,101,216.61 8,835.35 4,120,895.32 8,835.35 4,120,895.32
INSTALACIONES SANITARIAS 21,245.05 21,245.08 1.122 0.122 2,591.90 4,103,808.50 2,591.90 4,123,487.21 2,591.90 4,123,487.21
INSTALACIONES ELECTRICAS 38,527.12 38,527.18 1.100 0.100 3,852.71 4,107,661.22 3,852.72 4,127,339.93 3,852.72 4,127,339.93
INSTALACIONES MECANICAS 6,826.50 6,826.46 1.154 0.154 1,051.28 4,108,712.50 1,051.27 4,128,391.21 1,051.27 4,128,391.21
INSTALACION COMUNICACIONES 0.00 0.00 1.147 0.147 0.00 4,108,712.50 0.00 4,128,391.21 0.00 4,128,391.21
EQUIPAMIENTO Y MOBILIARIO 1,767,630.17 1,767,630.17 1.154 0.154 272,215.05 4,380,927.54 272,215.05 4,400,606.25 272,215.05 4,400,606.25
18 Mayo 2017
OBRAS PROVISIONALES 0.00 0.00 1.111 0.111 0.00 4,380,927.54 0.00 4,400,606.25 0.00 4,400,606.25
ESTRUCTURAS 0.00 0.00 1.099 0.099 0.00 4,380,927.54 0.00 4,400,606.25 0.00 4,400,606.25
ARQUITECTURA 0.00 0.00 1.119 0.119 0.00 4,380,927.54 0.00 4,400,606.25 0.00 4,400,606.25
INSTALACIONES SANITARIAS 0.00 0.00 1.123 0.123 0.00 4,380,927.54 0.00 4,400,606.25 0.00 4,400,606.25
INSTALACIONES ELECTRICAS 0.00 0.00 1.097 0.097 0.00 4,380,927.54 0.00 4,400,606.25 0.00 4,400,606.25
INSTALACIONES MECANICAS 29,876.37 29,876.36 1.152 0.152 4,541.21 4,385,468.75 4,541.21 4,405,147.46 4,541.21 4,405,147.46
INSTALACION COMUNICACIONES 10,307.95 10,307.96 1.145 0.145 1,494.65 4,386,963.41 1,494.65 4,406,642.11 1,494.65 4,406,642.11
EQUIPAMIENTO Y MOBILIARIO 1,196,090.43 1,196,090.42 1.152 0.152 181,805.75 4,568,769.15 181,805.74 4,588,447.86 181,805.74 4,588,447.86
19 Junio 2017
OBRAS PROVISIONALES 0.00 0.00 1.110 0.110 0.00 4,568,769.15 0.00 4,588,447.86 0.00 4,588,447.86
ESTRUCTURAS 0.00 0.00 1.099 0.099 0.00 4,568,769.15 0.00 4,588,447.86 0.00 4,588,447.86
ARQUITECTURA 56,088.00 56,088.00 1.121 0.121 6,786.65 4,575,555.80 6,786.65 4,595,234.51 6,786.65 4,595,234.51
INSTALACIONES SANITARIAS 20,583.18 20,583.18 1.123 0.123 2,531.73 4,578,087.53 2,531.73 4,597,766.24 2,531.73 4,597,766.24
INSTALACIONES ELECTRICAS 36,925.42 36,925.42 1.097 0.097 3,581.77 4,581,669.30 3,581.77 4,601,348.00 3,581.77 4,601,348.00
INSTALACIONES MECANICAS 53,890.27 53,890.27 1.147 0.147 7,921.87 4,589,591.17 7,921.87 4,609,269.87 7,921.87 4,609,269.87
INSTALACION COMUNICACIONES 110,709.63 110,709.62 1.141 0.141 15,610.06 4,605,201.22 15,610.06 4,624,879.93 15,610.06 4,624,879.93
EQUIPAMIENTO Y MOBILIARIO 212,717.20 212,717.08 1.148 0.148 31,482.15 4,636,683.37 31,482.13 4,656,362.06 31,482.13 4,656,362.06
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO MONTO AMOR- AMORTIZACIÓN SALDO POR
MONTO (S/.) MONTO (S/.) COEF.INCID. INCID. Io Ia UTILIZADO (S/.) TIZABLE (S/.) (S/.) AMORTIZAR (S/.)
No. MES FECHA
V A C % Jul-14 Jan-16 AU = C % V MA = AU Ia / Io Am =MA S = A - Am
IU = 43 MADERA NACIONAL PARA ENCOFRADO Y CAR. 547,854.96
1 DIC.2015 0.00 Jan-16 547,854.96 0.071 100.00% 582.28 621.56 0.00 0.00 0.00 547,854.96
2 ENE.2016 0.00 Jan-16 547,854.96 0.071 100.00% 582.28 621.56 0.00 0.00 0.00 547,854.96
3 FEB.2016 365,526.35 Jan-16 547,854.96 0.071 100.00% 582.28 621.56 25,952.37 27,703.09 0.00 547,854.96
4 MARZ.2016 1,061,553.94 Jan-16 547,854.96 0.071 100.00% 582.28 621.56 75,370.33 80,454.73 80,454.73 467,400.23
5 ABR.2016 1,442,038.84 Jan-16 547,854.96 0.071 100.00% 582.28 621.56 102,384.76 109,291.53 109,291.53 358,108.70
6 MAY.2016 1,934,781.80 Jan-16 547,854.96 0.071 100.00% 582.28 621.56 137,369.51 146,636.31 146,636.31 211,472.39
7 JUN.2016 1,383,327.74 Jan-16 547,854.96 0.071 100.00% 582.28 621.56 98,216.27 104,841.84 104,841.84 106,630.55
8 JUL.2016 1,967,563.10 Jan-16 547,854.96 0.071 100.00% 582.28 621.56 139,696.98 149,120.79 106,630.55 0.00
9 AGO.2016 420,113.06 Jan-16 547,854.96 0.071 100.00% 582.28 621.56 29,828.03 31,840.19 0.00 0.00
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO MONTO AMOR- AMORTIZACIÓN SALDO POR
MONTO (S/.) MONTO (S/.) COEF.INCID. INCID. Io Ia UTILIZADO (S/.) TIZABLE (S/.) (S/.) AMORTIZAR (S/.)
No. MES FECHA
V A C % Jul-14 Jan-16 AU = C % V MA = AU Ia / Io Am =MA S = A - Am
43 MADERA NACIONAL PARA ENCOFRADO Y CAR. 420,961.06
1 Dec-15 0.00 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 420,961.06
2 Jan-16 0.00 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 0.00 0.00 0.00 420,961.06
3 Feb-16 0.00 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 0.00 0.00 0.00 420,961.06
4 Mar-16 0.00 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 0.00 0.00 0.00 420,961.06
5 Apr-16 0.00 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 0.00 0.00 0.00 420,961.06
6 May-16 0.00 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 0.00 0.00 0.00 420,961.06
7 Jun-16 8,500.55 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 637.54 680.55 680.55 420,280.51
8 Jul-16 125,595.96 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 9,419.70 10,055.14 10,055.14 410,225.37
9 Aug-16 628,204.51 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 47,115.34 50,293.69 50,293.69 359,931.68
10 Sep-16 686,099.81 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 51,457.49 54,928.75 54,928.75 305,002.92
11 Oct-16 765,031.06 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 57,377.33 61,247.94 61,247.94 243,754.98
12 Nov-16 759,880.72 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 56,991.05 60,835.61 60,835.61 182,919.37
13 Dec-16 1,790,978.48 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 134,323.39 143,384.70 143,384.70 39,534.67
14 Jan-17 648,172.28 Jan-16 420,961.06 0.075 100.00% 582.28 621.56 48,612.92 51,892.30 39,534.67 0.00
15 Feb-17
04 AGREGADO FINO 623,022.36
1 Dec-15 0.00 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 623,022.36
2 Jan-16 0.00 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 0.00 0.00 0.00 623,022.36
3 Feb-16 0.00 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 0.00 0.00 0.00 623,022.36
4 Mar-16 0.00 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 0.00 0.00 0.00 623,022.36
5 Apr-16 0.00 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 0.00 0.00 0.00 623,022.36
6 May-16 0.00 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 0.00 0.00 0.00 623,022.36
7 Jun-16 8,500.55 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 943.56 1,103.33 1,103.33 621,919.03
8 Jul-16 125,595.96 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 13,941.15 16,301.82 16,301.82 605,617.21
9 Aug-16 628,204.51 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 69,730.70 81,538.25 81,538.25 524,078.97
10 Sep-16 686,099.81 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 76,157.08 89,052.81 89,052.81 435,026.16
11 Oct-16 765,031.06 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 84,918.45 99,297.74 99,297.74 335,728.42
12 Nov-16 759,880.72 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 84,346.76 98,629.25 98,629.25 237,099.16
13 Dec-16 1,790,978.48 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 198,798.61 232,461.31 232,461.31 4,637.85
14 Jan-17 648,172.28 Jan-16 623,022.36 0.111 100.00% 787.04 920.31 71,947.12 84,129.98 4,637.85 0.00
03 ACERO DE CONSTRUCCION CORRUGADO 286,253.52
1 Dec-15 0.00 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 286,253.52
2 Jan-16 0.00 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 0.00 0.00 0.00 286,253.52
3 Feb-16 0.00 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 0.00 0.00 0.00 286,253.52
4 Mar-16 0.00 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 0.00 0.00 0.00 286,253.52
5 Apr-16 0.00 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 0.00 0.00 0.00 286,253.52
6 May-16 0.00 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 0.00 0.00 0.00 286,253.52
7 Jun-16 8,500.55 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 433.53 447.39 447.39 285,806.13
8 Jul-16 125,595.96 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 6,405.39 6,610.17 6,610.17 279,195.96
9 Aug-16 628,204.51 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 32,038.43 33,062.68 33,062.68 246,133.28
10 Sep-16 686,099.81 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 34,991.09 36,109.73 36,109.73 210,023.55
11 Oct-16 765,031.06 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 39,016.58 40,263.92 40,263.92 169,759.63
12 Nov-16 759,880.72 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 38,753.92 39,992.85 39,992.85 129,766.78
13 Dec-16 1,790,978.48 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 91,339.90 94,259.98 94,259.98 35,506.80
14 Jan-17 648,172.28 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 33,056.79 34,113.59 34,113.59 1,393.21
15 Feb-17 571,310.84 Jan-16 286,253.52 0.051 100.00% 459.19 473.87 29,136.85 30,068.34 1,393.21
30 DÓLAR (GENERAL PONDERADO) 1,072,047.49
1 Dec-15 0.00 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 1,072,047.49
2 Jan-16 0.00 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 0.00 0.00 0.00 1,072,047.49
3 Feb-16 0.00 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 0.00 0.00 0.00 1,072,047.49
4 Mar-16 0.00 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 0.00 0.00 0.00 1,072,047.49
5 Apr-16 0.00 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 0.00 0.00 0.00 1,072,047.49
6 May-16 0.00 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 0.00 0.00 0.00 1,072,047.49
7 Jun-16 8,500.55 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 1,623.61 1,988.20 1,988.20 1,070,059.29
8 Jul-16 125,595.96 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 23,988.83 29,375.75 29,375.75 1,040,683.55
9 Aug-16 628,204.51 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 119,987.06 146,931.28 146,931.28 893,752.26
10 Sep-16 686,099.81 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 131,045.06 160,472.47 160,472.47 733,279.80
11 Oct-16 765,031.06 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 146,120.93 178,933.76 178,933.76 554,346.03
12 Nov-16 759,880.72 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 145,137.22 177,729.15 177,729.15 376,616.89
13 Dec-16 1,790,978.48 Jan-16 1,072,047.49 0.191 100.00% 386.98 473.88 342,076.89 418,893.47 376,616.89 0.00
TOTAL ADELANTO 2,402,284.43 2,402,284.43 -
SALDO A AMORTIZAR 0.00
CUADRO DE MATERIALES OTORGADOS, UTILIZADOS Y AMORTIZADOS - INSTALACIONES SANITARIAS
LPN No. : 021-2014-MGP/DIRCOMAT
OBRA : “AMPLIACION Y MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA EN LAS UPSS DEL POLICLINICO NAVAL SAN BORJA”
CONTRATISTA : CONSORCIO NAVAL
SUPERVISION : CONSORCIO SUPERVISOR LIMA
FECHA : 31 DE MAYO DE 2017 Ia
MONTO CONT. (S/IGV) : S/. 36,665,786.06 Segunformula D=C *%* V ∗( )
ADEL.MAT. (S/IGV): : S/. 12,864,990.50 Io
FORMULA 04 : INSTALACIONES SANITARIAS
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO MONTO AMOR- AMORTIZACIÓN SALDO POR
MONTO (S/.) MONTO (S/.) COEF.INCID. INCID. Io Ia UTILIZADO (S/.) TIZABLE (S/.) (S/.) AMORTIZAR (S/.)
No. MES FECHA
V A C % Jul-14 Jan-16 AU = C % V MA = AU Ia / Io Am =MA S = A - Am
71 TUBERIA DE FIERRO FUNDIDO 146,060.46
1 Dec-15 0.00 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 0.00 0.00 0.00 146,060.46
2 Jan-16 0.00 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 0.00 0.00 0.00 146,060.46
3 Feb-16 0.00 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 0.00 0.00 0.00 146,060.46
4 Mar-16 0.00 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 0.00 0.00 0.00 146,060.46
5 Apr-16 0.00 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 0.00 0.00 0.00 146,060.46
6 May-16 0.00 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 0.00 0.00 0.00 146,060.46
7 Jun-16 0.00 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 0.00 0.00 0.00 146,060.46
8 Jul-16 0.00 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 0.00 0.00 0.00 146,060.46
9 Aug-16 379,534.62 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 42,507.88 0.00 0.00 146,060.46
10 Sep-16 83,982.28 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 9,406.02 0.00 0.00 146,060.46
11 Oct-16 102,126.37 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 11,438.15 14,114.01 14,114.01 131,946.44
12 Nov-16 102,302.62 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 11,457.89 14,138.37 14,138.37 117,808.08
13 Dec-16 410,042.40 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 45,924.75 56,668.45 56,668.45 61,139.63
14 Jan-17 163,582.47 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 18,321.24 22,607.33 22,607.33 38,532.29
15 Feb-17 169,847.47 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 19,022.92 23,473.16 23,473.16 15,059.13
16 Mar-17 33,463.12 Jan-16 146,060.46 0.112 100.00% 553.13 682.53 3,747.87 4,624.65 15,059.13 0.00
10 APARATO SANITARIO CON GRIFERIA 260,822.24
1 Dec-15 0.00 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 0.00 0.00 0.00 260,822.24
2 Jan-16 0.00 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 0.00 0.00 0.00 260,822.24
3 Feb-16 0.00 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 0.00 0.00 0.00 260,822.24
4 Mar-16 0.00 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 0.00 0.00 0.00 260,822.24
5 Apr-16 0.00 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 0.00 0.00 0.00 260,822.24
6 May-16 0.00 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 0.00 0.00 0.00 260,822.24
7 Jun-16 0.00 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 0.00 0.00 0.00 260,822.24
8 Jul-16 0.00 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 0.00 0.00 0.00 260,822.24
9 Aug-16 379,534.62 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 75,906.92 79,123.71 79,123.71 181,698.54
10 Sep-16 83,982.28 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 16,796.46 17,508.26 17,508.26 164,190.28
11 Oct-16 102,126.37 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 20,425.27 21,290.86 21,290.86 142,899.42
12 Nov-16 102,302.62 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 20,460.52 21,327.60 21,327.60 121,571.82
13 Dec-16 410,042.40 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 82,008.48 85,483.83 85,483.83 36,087.99
14 Jan-17 163,582.47 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 32,716.49 34,102.95 34,102.95 1,985.04
15 Feb-17 169,847.47 Jan-16 260,822.24 0.200 100.00% 382.51 398.72 33,969.49 35,409.05 1,985.04 0.00
30 DÓLAR (GENERAL PONDERADO) 258,214.02
1 Dec-15 0.00 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 0.00 0.00 0.00 258,214.02
2 Jan-16 0.00 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 0.00 0.00 0.00 258,214.02
3 Feb-16 0.00 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 0.00 0.00 0.00 258,214.02
4 Mar-16 0.00 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 0.00 0.00 0.00 258,214.02
5 Apr-16 0.00 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 0.00 0.00 0.00 258,214.02
6 May-16 0.00 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 0.00 0.00 0.00 258,214.02
7 Jun-16 0.00 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 0.00 0.00 0.00 258,214.02
8 Jul-16 0.00 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 0.00 0.00 0.00 258,214.02
9 Aug-16 379,534.62 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 75,147.85 92,023.01 92,023.01 166,191.01
10 Sep-16 83,982.28 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 16,628.49 20,362.58 20,362.58 145,828.43
11 Oct-16 102,126.37 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 20,221.02 24,761.84 24,761.84 121,066.59
12 Nov-16 102,302.62 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 20,255.92 24,804.58 24,804.58 96,262.01
13 Dec-16 410,042.40 Jan-16 258,214.02 0.198 100.00% 386.98 473.88 81,188.40 99,420.01 96,262.01 0.00
TOTAL ADELANTO 665,096.72 665,096.72 -
SALDO A AMORTIZAR 0.00
CUADRO DE MATERIALES OTORGADOS, UTILIZADOS Y AMORTIZADOS - INSTALACIONES ELÉCTRICAS
LPN No. : 021-2014-MGP/DIRCOMAT
OBRA : “AMPLIACION Y MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA EN LAS UPSS DEL POLICLINICO NAVAL SAN BORJA”
CONTRATISTA : CONSORCIO NAVAL
SUPERVISION : CONSORCIO SUPERVISOR LIMA
FECHA : 31 DE MAYO DE 2017
Ia
MONTO CONT. (S/IGV) : S/. 36,665,786.06 Según formula
D=C *%* V ∗( )
ADEL.MAT. (S/IGV):
FORMULA 05
:
:
S/. 12,864,990.50
INSTALACIONES ELECTRICAS
Io
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO MONTO AMOR- AMORTIZACIÓN SALDO POR
MONTO (S/.) MONTO (S/.) COEF.INCID. INCID. Io Ia UTILIZADO (S/.) TIZABLE (S/.) (S/.) AMORTIZAR (S/.)
No. MES FECHA
V A C % Jul-14 Jan-16 AU = C % V MA = AU Ia / Io Am =MA S = A - Am
06 ALAMBRE Y CABLE DE COBRE DESNUDO 181,550.43
1 Dec-15 0.00 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 0.00 0.00 0.00 181,550.43
2 Jan-16 0.00 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 0.00 0.00 0.00 181,550.43
3 Feb-16 0.00 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 0.00 0.00 0.00 181,550.43
4 Mar-16 0.00 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 0.00 0.00 0.00 181,550.43
5 Apr-16 0.00 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 0.00 0.00 0.00 181,550.43
6 May-16 0.00 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 0.00 0.00 0.00 181,550.43
7 Jun-16 44,265.84 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 3,895.39 0.00 0.00 181,550.43
8 Jul-16 198,123.85 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 17,434.90 0.00 0.00 181,550.43
9 Aug-16 371,220.24 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 32,667.38 34,028.22 34,028.22 147,522.22
10 Sep-16 309,592.28 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 27,244.12 28,379.04 28,379.04 119,143.18
11 Oct-16 201,272.49 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 17,711.98 18,449.81 18,449.81 100,693.37
12 Nov-16 473,134.26 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 41,635.81 43,370.25 43,370.25 57,323.12
13 Dec-16 417,420.28 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 36,732.98 38,263.18 38,263.18 19,059.94
14 Jan-17 264,765.81 Jan-16 181,550.43 0.088 100.00% 799.38 832.68 23,299.39 24,269.98 19,059.94 0.00
12 ARTEFACTO DE ALUMBRADO INTERIOR 674,624.90
1 Dec-15 0.00 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 0.00 0.00 0.00 674,624.90
2 Jan-16 0.00 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 0.00 0.00 0.00 674,624.90
3 Feb-16 0.00 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 0.00 0.00 0.00 674,624.90
4 Mar-16 0.00 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 0.00 0.00 0.00 674,624.90
5 Apr-16 0.00 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 0.00 0.00 0.00 674,624.90
6 May-16 0.00 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 0.00 0.00 0.00 674,624.90
7 Jun-16 38,829.09 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 12,697.11 0.00 0.00 674,624.90
8 Jul-16 198,123.85 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 64,786.50 0.00 0.00 674,624.90
9 Aug-16 371,220.24 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 121,389.02 139,454.48 139,454.48 535,170.41
10 Sep-16 309,592.28 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 101,236.68 116,303.01 116,303.01 418,867.41
11 Oct-16 201,272.49 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 65,816.10 75,611.05 75,611.05 343,256.36
12 Nov-16 473,134.26 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 154,714.90 177,740.02 177,740.02 165,516.34
13 Dec-16 417,420.28 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 136,496.43 156,810.22 156,810.22 8,706.12
14 Jan-17 264,765.81 Jan-16 674,624.90 0.327 100.00% 298.61 343.05 86,578.42 99,463.27 8,706.12 0.00
30 DÓLAR (GENERAL PONDERADO) 266,136.43
1 Dec-15 0.00 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 0.00 0.00 0.00 266,136.43
2 Jan-16 0.00 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 0.00 0.00 0.00 266,136.43
3 Feb-16 0.00 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 0.00 0.00 0.00 266,136.43
4 Mar-16 0.00 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 0.00 0.00 0.00 266,136.43
5 Apr-16 0.00 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 0.00 0.00 0.00 266,136.43
6 May-16 0.00 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 0.00 0.00 0.00 266,136.43
7 Jun-16 38,829.09 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 5,008.95 6,133.76 6,133.76 260,002.67
8 Jul-16 198,123.85 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 25,557.98 31,297.26 31,297.26 228,705.41
9 Aug-16 371,220.24 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 47,887.41 58,640.98 58,640.98 170,064.43
10 Sep-16 309,592.28 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 39,937.40 48,905.72 48,905.72 121,158.70
11 Oct-16 201,272.49 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 25,964.15 31,794.65 31,794.65 89,364.06
12 Nov-16 473,134.26 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 61,034.32 74,740.15 74,740.15 14,623.91
13 Dec-16 417,420.28 Jan-16 266,136.43 0.129 100.00% 386.98 473.88 53,847.22 65,939.12 14,623.91 0.00
TOTAL ADELANTO 1,122,311.75 1,122,311.75 -
SALDO A AMORTIZAR 0.00
CUADRO DE MATERIALES OTORGADOS, UTILIZADOS Y AMORTIZADOS - INSTALACIONES MECANICAS
LPN No. : 021-2014-MGP/DIRCOMAT
OBRA : “AMPLIACION Y MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA EN LAS UPSS DEL POLICLINICO NAVAL SAN BORJA”
CONTRATISTA : CONSORCIO NAVAL
SUPERVISION : CONSORCIO SUPERVISOR LIMA
FECHA : 31 DE MAYO DE 2017 Ia
MONTO CONT. (S/IGV) : S/. 36,665,786.06 Según formula D=C *%* V ∗( )
ADEL.MAT. (S/IGV): : S/. 12,864,990.50 Io
FORMULA 06 : INSTALACIONES MECANICAS
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO MONTO AMOR- AMORTIZACIÓN SALDO POR
MONTO (S/.) MONTO (S/.) COEF.INCID. INCID. Io Ia UTILIZADO (S/.) TIZABLE (S/.) (S/.) AMORTIZAR (S/.)
No. MES FECHA
V A C % Jul-14 Jan-16 AU = C % V MA = AU Ia / Io Am =MA S = A - Am
61 PLANCHA GALVANIZADA 173,596.48
1 Dec-15 0.00 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 0.00 0.00 0.00 173,596.48
2 Jan-16 0.00 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 0.00 0.00 0.00 173,596.48
3 Feb-16 0.00 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 0.00 0.00 0.00 173,596.48
4 Mar-16 0.00 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 0.00 0.00 0.00 173,596.48
5 Apr-16 0.00 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 0.00 0.00 0.00 173,596.48
6 May-16 0.00 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 0.00 0.00 0.00 173,596.48
7 Jun-16 0.00 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 0.00 0.00 0.00 173,596.48
8 Jul-16 376,900.95 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 22,990.96 20,821.59 20,821.59 152,774.89
9 Aug-16 128,272.62 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 7,824.63 7,086.32 7,086.32 145,688.57
10 Sep-16 516,946.48 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 31,533.74 28,558.30 28,558.30 117,130.28
11 Oct-16 259,075.21 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 15,803.59 14,312.40 14,312.40 102,817.87
12 Nov-16 512,423.00 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 31,257.80 28,308.40 28,308.40 74,509.48
13 Dec-16 692,068.24 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 42,216.16 38,232.76 38,232.76 36,276.72
14 Jan-17 479,315.21 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 29,238.23 26,479.39 26,479.39 9,797.33
15 Feb-17 146,594.60 Jan-16 173,596.48 0.061 100.00% 255.20 231.12 8,942.27 8,098.50 8,098.50 1,698.83
16 Mar-17 42,122.55 Feb-16 173,596.48 0.061 100.00% 255.20 231.12 2,569.48 2,327.03 1,698.83 0.00
30 DÓLAR (GENERAL PONDERADO) 1,852,644.43
1 Dec-15 0.00 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 0.00 0.00 0.00 1,852,644.43
2 Jan-16 0.00 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 0.00 0.00 0.00 1,852,644.43
3 Feb-16 0.00 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 0.00 0.00 0.00 1,852,644.43
4 Mar-16 0.00 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 0.00 0.00 0.00 1,852,644.43
5 Apr-16 0.00 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 0.00 0.00 0.00 1,852,644.43
6 May-16 0.00 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 0.00 0.00 0.00 1,852,644.43
7 Jun-16 0.00 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 0.00 0.00 0.00 1,852,644.43
8 Jul-16 376,900.95 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 245,362.52 300,460.98 300,460.98 1,552,183.45
9 Aug-16 128,272.62 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 83,505.48 102,257.42 102,257.42 1,449,926.03
10 Sep-16 516,946.48 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 336,532.16 412,103.62 412,103.62 1,037,822.41
11 Oct-16 259,075.21 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 168,657.96 206,531.69 206,531.69 831,290.72
12 Nov-16 512,423.00 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 333,587.37 408,497.56 408,497.56 422,793.16
13 Dec-16 692,068.24 Jan-16 1,852,644.43 0.651 100.00% 386.98 473.88 450,536.42 551,708.62 422,793.16 0.00
TOTAL ADELANTO 2,026,240.91 2,026,240.91 -
SALDO A AMORTIZAR 0.00
CUADRO DE MATERIALES OTORGADOS, UTILIZADOS Y AMORTIZADOS - INSTALACION COMUNICACIONES
LPN No. : 021-2014-MGP/DIRCOMAT
OBRA : “AMPLIACION Y MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA EN LAS UPSS DEL POLICLINICO NAVAL SAN BORJA”
CONTRATISTA : CONSORCIO NAVAL
SUPERVISION : CONSORCIO SUPERVISOR LIMA
FECHA : 31 DE MAYO DE 2017 Ia
MONTO CONT. (S/IGV) : S/. 36,665,786.06 Según formula D=C *%* V ∗( )
ADEL.MAT. (S/IGV): : S/. 12,864,990.50 Io
FORMULA 07 : INSTALACION COMUNICACIONES
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO MONTO AMOR- AMORTIZACIÓN SALDO POR
MONTO (S/.) MONTO (S/.) COEF.INCID. INCID. Io Ia UTILIZADO (S/.) TIZABLE (S/.) (S/.) AMORTIZAR (S/.)
No. MES FECHA
V A C % Jul-14 Jan-16 AU = C % V MA = AU Ia / Io Am =MA S = A - Am
18 CABLE TELEFONICO 354,264.83
1 Dec-15 0.00 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 0.00 0.00 0.00 354,264.83
2 Jan-16 0.00 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 0.00 0.00 0.00 354,264.83
3 Feb-16 0.00 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 0.00 0.00 0.00 354,264.83
4 Mar-16 0.00 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 0.00 0.00 0.00 354,264.83
5 Apr-16 0.00 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 0.00 0.00 0.00 354,264.83
6 May-16 0.00 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 0.00 0.00 0.00 354,264.83
7 Jun-16 0.00 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 0.00 0.00 0.00 354,264.83
8 Jul-16 0.00 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 0.00 0.00 0.00 354,264.83
9 Aug-16 83,100.63 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 8,559.36 0.00 0.00 354,264.83
10 Sep-16 94,167.16 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 9,699.22 0.00 0.00 354,264.83
11 Oct-16 520,253.14 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 53,586.07 56,995.90 56,995.90 297,268.93
12 Nov-16 366,215.46 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 37,720.19 40,120.43 40,120.43 257,148.50
13 Dec-16 1,294,431.90 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 133,326.49 141,810.41 141,810.41 115,338.09
14 Jan-17 1,049,107.66 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 108,058.09 114,934.12 114,934.12 403.98
15 Feb-17 273,163.53 Jan-16 354,264.83 0.103 100.00% 272.03 289.34 28,135.84 29,926.20 403.98 0.00
30 DÓLAR (GENERAL PONDERADO) 1,578,714.15
1 Dec-15 0.00 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 0.00 0.00 0.00 1,578,714.15
2 Jan-16 0.00 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 0.00 0.00 0.00 1,578,714.15
3 Feb-16 0.00 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 0.00 0.00 0.00 1,578,714.15
4 Mar-16 0.00 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 0.00 0.00 0.00 1,578,714.15
5 Apr-16 0.00 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 0.00 0.00 0.00 1,578,714.15
6 May-16 0.00 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 0.00 0.00 0.00 1,578,714.15
7 Jun-16 0.00 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 0.00 0.00 0.00 1,578,714.15
8 Jul-16 0.00 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 0.00 0.00 0.00 1,578,714.15
9 Aug-16 83,100.63 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 38,143.19 46,708.60 46,708.60 1,532,005.55
10 Sep-16 94,167.16 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 43,222.73 52,928.80 52,928.80 1,479,076.75
11 Oct-16 520,253.14 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 238,796.19 292,420.12 292,420.12 1,186,656.63
12 Nov-16 366,215.46 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 168,092.90 205,839.74 205,839.74 980,816.89
13 Dec-16 1,294,431.90 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 594,144.24 727,564.92 727,564.92 253,251.97
14 Jan-17 1,049,107.66 Jan-16 1,578,714.15 0.459 100.00% 386.98 473.88 481,540.42 589,674.85 253,251.97 0.00
TOTAL ADELANTO 1,932,978.98 1,932,978.98 -
SALDO A AMORTIZAR 0.00
CUADRO DE MATERIALES OTORGADOS, UTILIZADOS Y AMORTIZADOS - EQUIPAMIENTO MEDICO
LPN No. : 021-2014-MGP/DIRCOMAT
OBRA : “AMPLIACION Y MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA EN LAS UPSS DEL POLICLINICO NAVAL SAN BORJA”
CONTRATISTA : CONSORCIO NAVAL
SUPERVISION : CONSORCIO SUPERVISOR LIMA
FECHA : 31 DE MAYO DE 2017 Ia
MONTO CONT. (S/IGV) : S/. 36,665,786.06 Según formula D=C *%* V ∗( )
ADEL.MAT. (S/IGV): : S/. 12,864,990.50 Io
FORMULA 08 : EQUIPAMIENTO MEDICO
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO MONTO AMOR- AMORTIZACIÓN SALDO POR
MONTO (S/.) MONTO (S/.) COEF.INCID. INCID. Io Ia UTILIZADO (S/.) TIZABLE (S/.) (S/.) AMORTIZAR (S/.)
No. MES FECHA
V A C % Jul-14 Jan-16 AU = C % V MA = AU Ia / Io Am =MA S = A - Am
48 MAQUINARIA Y EQUIPO NACIONAL 400,753.17
1 Sep-16 0.00 Jan-16 400,753.17 0.051 100.00% 337.96 368.18 0.00 0.00 0.00 400,753.17
2 Oct-16 2,970,340.39 Jan-16 400,753.17 0.051 100.00% 337.96 368.18 151,487.36 165,033.19 165,033.19 235,719.98
3 Nov-16 1,131,003.98 Jan-16 400,753.17 0.051 100.00% 337.96 368.18 57,681.20 62,838.99 62,838.99 172,880.99
4 Dec-16 0.00 Jan-16 400,753.17 0.051 100.00% 337.96 368.18 0.00 0.00 0.00 172,880.99
5 Jan-17 920,605.06 Jan-16 400,753.17 0.051 100.00% 337.96 368.18 46,950.86 51,149.15 102,298.30 70,582.69
6 Feb-17 0.00 Jan-16 400,753.17 0.051 100.00% 337.96 368.18 0.00 0.00 0.00 70,582.69
7 Mar-17 759,762.41 Feb-16 400,753.17 0.051 100.00% 337.96 368.18 38,747.88 42,212.67 70,582.69 0.00
49 MAQUINARIA Y EQUIPO IMPORTADO 1,244,250.25
1 Sep-16 0.00 Jan-16 1,244,250.25 0.627 100.00% 248.34 308.01 0.00 0.00 0.00 1,244,250.25
2 Oct-16 2,970,340.39 Jan-16 1,244,250.25 0.627 100.00% 248.34 308.01 1,862,403.42 2,309,893.21 1,244,250.25 0.00
3 Nov-16 1,131,003.98 Jan-16 1,244,250.25 0.627 100.00% 248.34 308.01 709,139.50 879,528.29 0.00 0.00
4 Dec-16 0.00 Jan-16 1,244,250.25 0.627 200.00% 248.34 308.01 0.00 0.00 0.00 0.00
5 Jan-17 920,605.06 Jan-16 1,244,250.25 0.627 300.00% 248.34 308.01 1,731,658.12 2,147,733.01 0.00 0.00
Imr − Ima
D= AU ∗( )
Imo
FORMULA 02: ESTRUCTURA - AREA 2 - LIMA
K = 0.316*(Mr / Mo) + 0.068*(Dr / Do) + 0.071*(Mr / Mo) + 0.098*(Mr / Mo) + 0.110*(Cr / Co) + 0.149*(Ar / Ao) + 0.188*(IAr / IAo)
ADELANTO DE MATERIALES ADELANTO ADELANTO
VALORIZACIONES DE OBRA COEFICIENTE INDICES UNIFICADOS DE PRECIOS DEDUCCION
OTORGADO DEFLACTADO UTILIZADO
Adelanto
Monto Fecha en que se Imo Ima Imr
N° Mes otorgado ( Ci ) (%) AD=A*(Imo/Ima) AU = (Ci)*(%)*(V) D=AU*(Imr-Ima)/Imo
(V) otorgo el adelanto (Base) (Adelanto) (Mes)
(A)
43 MADERA NACIONAL PARA ENCOF. Y CARPINT.
0 JUL. 2014 0.071 100% 582.280
1 DIC.2015 0.00 621.560 513,232.81 - -
2 ENE.2016 0.00 12.ENE.2016 547,854.96 621.560 626.330 - -
3 FEB.2016 365,526.35 627.180 25,952.37 250.48
4 MARZ.2016 1,061,553.94 632.020 75,370.33 1,353.94
5 ABR.2016 1,442,038.84 633.390 102,384.76 2,080.12
6 MAY.2016 1,934,781.80 637.430 137,369.51 3,744.00
7 JUN.2016 1,383,327.74 639.260 98,216.27 2,985.55
8 JUL.2016 1,967,563.10 641.300 73,939.57 2,506.64
9 AGO.2016 420,113.06 642.130 - -
Imr −Ima
D= AU ∗( )
Imo
FORMULA 03:ARQUITECTURA - AREA 2 - LIMA
K= 0.316*(Mr / Mo) + 0.111*(Ar / Ao) + 0.051*(Ar / Ao) + 0.191*(Dr / Do) + 0.075*(Mr / Mo) + 0.054*(Mr / Mo)+ 0.202*(Ir / Io)
ADELANTO DE MATERIALES ADELANTO ADELANTO
VALORIZACIONES DE OBRA COEFICIENTE INDICES UNIFICADOS DE PRECIOS DEDUCCION
OTORGADO DEFLACTADO UTILIZADO
Adelanto
Monto Fecha en que se Imo Ima
N° Mes Otorgado ( Ci ) (%) Imr (Mes) AD=A*(Imo/Ima) AU = (Ci)*(%)*(V) D=AU*(Imr-Ima)/Imo
(V) otorgo el adelanto (Base) (Adelanto)
(A)
Imr −Ima
D= AU ∗( )
Imo
FORMULA 04: INSTALACIONES SANITARIAS - AREA 2 - LIMA
K = 0.196*(Mr / Mo) + 0.112*(Tr / To) + 0.198*(Dr / Do) + 0.200*(Ar / Ao) + 0.107*(Mr / Mo) + 0.187*(Ir / Io)
ADELANTO DE MATERIALES ADELANTO ADELANTO
VALORIZACIONES DE OBRA COEFICIENTE INDICES UNIFICADOS DE PRECIOS DEDUCCION
OTORGADO DEFLACTADO UTILIZADO
Imr − Ima
D= AU ∗( )
Imo
FORMULA 05: INSTALACIONES ELECTRICAS - AREA 2 - LIMA
K= 0.193*(Mr / Mo) + 0.088*(Ar / Ao) + 0.327*(Ar / Ao) + 0.123*(Dr / Do) + 0.070*(Mr / Mo) + 0.193*(Ir / Io)
ADELANTO DE MATERIALES ADELANTO ADELANTO
VALORIZACIONES DE OBRA COEFICIENTE INDICES UNIFICADOS DE PRECIOS DEDUCCION
OTORGADO DEFLACTADO UTILIZADO
Imr − Ima
D= AU ∗( )
Imo
FORMULA 06: INSTALACIONES MECANICAS - AREA 2 - LIMA
K= 0.071*(Mr / Mo) + 0.061*(Pr / Po) + 0.651*(Dr / Do) + 0.217*(Ir / Io)
ADELANTO DE MATERIALES ADELANTO ADELANTO
VALORIZACIONES DE OBRA COEFICIENTE INDICES UNIFICADOS DE PRECIOS DEDUCCION
OTORGADO DEFLACTADO UTILIZADO
61 PLANCHA GALVANIZADA
0 JUL. 2014 0.061 100% 255.200
1 DIC.2015 0.00 231.120 191,683.21 - -
2 ENE.2016 0.00 12.ENE.2016 173,596.48 231.120 235.750 - -
3 FEB.2016 0.00 233.590 - -
4 MARZ.2016 0.00 244.120 - -
5 ABR.2016 0.00 239.340 - -
6 MAY.2016 0.00 200.740 - -
7 JUN.2016 0.00 199.710 - -
8 JUL.2016 376,900.95 201.770 22,990.96 -2,644.14
9 AGO.2016 128,272.62 204.730 7,824.63 -809.14
10 SET.2016 516,946.48 213.290 31,533.74 -2,203.16
11 OCT.2016 259,075.21 214.360 15,803.59 -1,037.88
12 NOV.2016 512,423.00 213.910 31,257.80 -2,107.94
13 DIC.2016 692,068.24 221.860 42,216.16 -1,531.82
14 ENE.2017 479,315.21 225.130 40,056.33 -940.19
15 FEB.2017 146,594.60 231.020 - -
16 MARZ.2017 42,122.55 230.040 - -
Imr − Ima
D= AU ∗( )
Imo
FORMULA 07: INSTALACIONES COMUNICACIONES - AREA 2 - LIMA
K= 0.251*(Mr / Mo) + 0.103*(Cr / Co) + 0.459*(Dr / Do) + 0.187*(Ir / Io)
ADELANTO DE MATERIALES ADELANTO ADELANTO
VALORIZACIONES DE OBRA COEFICIENTE INDICES UNIFICADOS DE PRECIOS DEDUCCION
OTORGADO DEFLACTADO UTILIZADO
18 CABLE TELEFONICO
0 JUL. 2014 0.103 100% 272.030
1 DIC.2015 0.00 298.340 333,070.65 - -
2 ENE.2016 0.00 12.ENE.2016 354,264.83 289.340 288.670 - -
3 FEB.2016 0.00 285.730 - -
4 MARZ.2016 0.00 289.510 - -
5 ABR.2016 0.00 289.060 - -
6 MAY.2016 0.00 282.230 - -
7 JUN.2016 0.00 277.990 - -
8 JUL.2016 0.00 289.160 - -
9 AGO.2016 83,100.63 289.790 8,559.36 14.16
10 SET.2016 94,167.16 288.370 9,699.22 -34.59
11 OCT.2016 520,253.14 290.800 53,586.07 287.60
12 NOV.2016 366,215.46 316.300 37,720.19 3,738.32
13 DIC.2016 1,294,431.90 311.070 133,326.49 10,650.24
14 ENE.2017 1,049,107.66 313.370 90,179.32 7,966.07
15 FEB.2017 273,163.53 320.470 - -
Imr − Ima
D= AU ∗( )
Imo
FORMULA 08: EQUIPAMIENTO - AREA 2 - LIMA
K = 0.322*(GGUr / GGUo) + 0.051*(EQNr / EQNo) + 0.627*(EQIr / EQIo)
ADELANTO DE MATERIALES ADELANTO ADELANTO
VALORIZACIONES DE OBRA COEFICIENTE INDICES UNIFICADOS DE PRECIOS DEDUCCION
OTORGADO DEFLACTADO UTILIZADO
48 EQUIPO NACIONAL
0 JUL. 2014 0.051 100% 337.960
1 DIC.2015 0.00 368.180 367,859.58 - -
2 ENE.2016 0.00 12.ENE.2016 400,753.17 368.180 370.350 - -
3 FEB.2016 0.00 367.260 - -
4 MARZ.2016 0.00 364.310 - -
5 ABR.2016 0.00 366.600 - -
6 MAY.2016 0.00 365.930 - -
7 JUN.2016 0.00 365.290 - -
8 JUL.2016 0.00 366.570 - -
9 AGO.2016 0.00 368.680 - -
10 SET.2016 0.00 368.830 - -
11 OCT.2016 2,970,340.39 369.670 151,487.36 667.88
12 NOV.2016 1,131,003.98 369.410 57,681.20 209.93
13 DIC.2016 0.00 367.860 - -
14 ENE.2017 920,605.06 365.190 46,950.86 -415.38
15 FEB.2017 0.00 365.310 - -
16 MARZ.2017 759,762.41 365.670 111,740.16 -829.88
TOTAL 4,656,362.06 4,663,809.65 -7,447.59 69,135.88 81,315.22 -12,179.34 -60,970.95 -57,530.46 -3,440.49
INTERES LEGAL POR LA DEMORA EN EL PAGO DE VALORIZACIONES
AMPLIACION Y MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA EN LA UPPS DEL PPOLICLINICO NAVAL SAN BORJA DE LA MARINA DE GUERRA
OBRA
DEL PERU, DISTRITO DE SAN BORJA - LIMA
EJECUTA CONSORCIO NAVAL
ENTIDAD MARINA DE GUERRA DEL PERU
Inc/IGV Sin IGV
MONTO DE CONTRATO TOTAL (Expediente tecnico, obras civiles y equipamiento) 44,309,503.55 37,550,426.74
Expediente tecnico y estudio de impacto ambiental 1,043,876.00 884,640.68
Construccion de policlinico 32,695,010.96 27,707,636.41
Equipamiento 10,570,616.50 8,958,149.58
MONTO DE CONTRATO (Obras civiles y equipamiento) 43,265,627.55 36,665,786.06
FACTOR DE RELACION 1.00000
ADELANTO DIRECTO 7,590,344.40 6,432,495.25
ADELANTO DE MATERIALES 15,180,688.79 12,864,990.50
"INTERES = Valoriz. Neta " x (Factor Acumulado Tasa de Interes Legal dia de pago de
valorizacion)/(Factor Acumulado TIL ultimo dia que debiopagarse la valorizacion) - 1
18 1,192,829.10
797654.20 MAY.2017 30.JUN.2017 7.21681 04.SET.2017 7.25185 3872.88
40266.86 MAY.2017 30.JUN.2017 7.21681 03.OCT.2017 7.26679 278.87
71,309.07 MAY.2017 30.JUN.2017 7.21681 29.ENE.2018 7.3258 1076.93
19 490,033.41
126593.26 JUN.2017 31.JUL.2017 7.23335 29.AGO.2017 7.24861 267.07
278200.73 JUN.2017 31.JUL.2017 7.23335 03.OCT.2017 7.26679 1286.13
PLAZO DE EJEC. CONTRACT. REFORMULADO 330 dias calendarios corresponde al plazo contractual inicial de 210 dias mas 120 dias de adicional de obra (CONTRATO DIRCOMAT N° 069 -
2015 y ADENDA N° 002-2016)
PERIODO DE EJECUCION CONTRACTUAL 0 Del 25 de diciembre de 2015 al 18 de noviembre de 2016
AMPLIACION DE PLAZO N° 01 10 Del 19 de noviembre de 2016 al 28 de noviembre de 2016
AMPLIACION DE PLAZO N° 02 29 Del 29 de noviembre de 2016 al 27 de diciembre de 2016
AMPLIACION DE PLAZO N° 03 0 DENEGADO
AMPLIACION DE PLAZO N° 04 0 DENEGADO
AMPLIACION DE PLAZO N° 05 52 Del 28 de diciembre de 2016 al 17 de febrero de 2017
AMPLIACION DE PLAZO N° 06 3 Del 18 de febrero de 2017 al 20 de febrero de 2017
AMPLIACION DE PLAZO N° 07 35 Del 21 de febrero de 2017 al 27 de marzo de 2017
AMPLIACION DE PLAZO N° 08 0 DENEGADO
AMPLIACION DE PLAZO N° 09 0 DENEGADO
AMPLIACION DE PLAZO N° 10 0 DENEGADO
AMPLIACION DE PLAZO N° 11 44 Del 28 de marzo de 2017 al 10 de mayo de 2017
SUSPENSIÓN DE PLAZO POR ENTIDAD 0 Del 03 de mayo de 2017 al 12 de mayo de 2017
COMPENSACIÓN POR SUSPENSIÓN DE PLAZO 0 Del 13 de mayo de 2017 al 23 de mayo de 2017
AMPLIACION DE PLAZO N° 12 23 Del 26 de mayo de 2017 al 18 de junio de 2017
PLAZO TOTAL AMPLIADO 196
Datos para calcular el MGGV "MGGV = N° días A.P " x (G.G.V. Ofertado)/(N° días plazo contrato) x (Ind. 39
Mes del valor referencial Julio del 2014 (Causal))/(Ind. 39 (V.R.))
Monto Contract. del Gasto Gen. Variable 3,705,288.37
N° dias de
N° dias de
AMPLIACIONES DE PLAZO OTORGADO POR LA contrato
Periodo de Ampliación de Plazo Ampliación de GGV(VR)*FR Ind. 39 (causal) Mes de causal Ind. 39 (VR) TOTAL
ENTIDAD (Ejecución de
Plazo
obra)
Ampliación de Plazo N° 01 28-Nov-16 10.00 3,705,288.38 330.00 422.67 Nov-15 402.72 117,843.68
31-Jan-16 20.00 3,705,288.38 330.00 424.25 Jan-16 402.72 236,568.39
Ampliación de Plazo N° 02
9-Feb-16 9.00 3,705,288.38 330.00 424.99 Feb-16 402.72 106,641.46
31-Dec-16 4.00 3,705,288.38 330.00 436.35 Dec-16 402.72 48,663.11
Ampliación de Plazo N° 05 31-Jan-17 31.00 3,705,288.38 330.00 437.38 Jan-17 402.72 378,029.32
17-Feb-17 17.00 3,705,288.38 330.00 438.80 Feb-17 402.72 207,979.45
Ampliación de Plazo N° 06 20-Feb-17 3.00 3,705,288.38 330.00 438.80 Feb-17 402.72 36,702.26
28-Feb-17 8.00 3,705,288.38 330.00 438.80 Feb-17 402.72 97,872.68
Ampliación de Plazo Parcial N° 07
27-Mar-17 27.00 3,705,288.38 330.00 444.52 Mar-17 402.72 334,626.20
31-Mar-17 4.00 3,705,288.38 330.00 444.52 Mar-17 402.72 49,574.25
Ampliación de Plazo Total N° 07 (N° 11) 30-Apr-17 30.00 3,705,288.38 330.00 443.37 Apr-17 402.72 370,845.01
10-May-17 10.00 3,705,288.38 330.00 441.50 May-17 402.72 123,093.63
31-May-17 6.00 3,705,288.38 330.00 441.50 May-17 402.72 73,856.18
Ampliación de Plazo N° 12
18-Jun-17 18.00 3,705,288.38 330.00 440.79 Jun-17 402.72 221,212.22
TOTAL 196.00 2,403,507.85
PENALIDAD POR MORA EN LA EJECUCIÓN DE LA PRESTACIÓN
AMPLIACION Y MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA EN LA UPPS DEL PPOLICLINICO NAVAL SAN BORJA DE LA MARINA DE GUERRA DEL
OBRA
PERU, DISTRITO DE SAN BORJA - LIMA
EJECUTA CONSORCIO NAVAL
ENTIDAD MARINA DE GUERRA DEL PERU
Inc/IGV Sin IGV
MONTO DE CONTRATO TOTAL (Expediente tecnico, obras civiles y equipamiento) 44,309,503.55 37,550,426.74
Expediente tecnico y estudio de impacto ambiental 1,043,876.00 884,640.68
Construccion de policlinico 32,695,010.96 27,707,636.41
Equipamiento 10,570,616.50 8,958,149.58
MONTO DE CONTRATO (Obras civiles y equipamiento) 43,265,627.55 36,665,786.06
FACTOR DE RELACION 1.00000
ADELANTO DIRECTO 7,590,344.40 6,432,495.25
ADELANTO DE MATERIALES 15,180,688.79 12,864,990.50
MONTO DE CONTRATO FACTOR "F" PLAZO TOTAL DE PENALIDAD TOTAL DIAS MONTO TOTAL A
ITEM COEFICIENTE
VIGENTE ("F" mayor a 60 dias) EJEC. DE OBRA DIARIA PENALIZADOS PENALIZAR
VALORIZACIONES
ITEM CONCEPTO SALDO
AUTORIZ. REAL VALORIZADO
DEL CONTRATO PRINCIPAL (Sin I.G.V.)
Elaboracion de exp. Tec. y estudio de impacto ambiental 884,640.68 884,640.68
Construccion de policlinico 27,707,636.41 27,707,636.72
1
Equipamiento y moviliario de policlinico 8,958,149.65 8,958,149.51
(*) El interes legal calculado en esta liquidacion es de S/. 61,722.45 (Inc.IGV), el cual la empresa no lo cobra por acuerdo mediante ACTA DE CONCILIACION,
del 12 de setiembre del 2018
(**) Los mayores gastos generales calculado en esta liquidacion es de S/. 2´836,139.25 (Inc.IGV), el cual la empresa no lo cobra por acuerdo mediante ACTA
DE CONCILIACION, del 12 de setiembre del 2018
LIQUIDACION FINAL DEL CONTRATO DE OBRA
AMPLIACION Y MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA EN LA UPPS DEL PPOLICLINICO NAVAL SAN BORJA DE LA MARINA DE
OBRA
GUERRA DEL PERU, DISTRITO DE SAN BORJA - LIMA
EJECUTACONSORCIO NAVAL
ENTIDAD MARINA DE GUERRA DEL PERU
Inc/IGV Sin IGV
MONTO DE CONTRATO TOTAL (Expediente tecnico, obras civiles y equipamiento) 44,309,503.55 37,550,426.74
Expediente tecnico y estudio de impacto ambiental 1,043,876.00 884,640.68
Construccion de policlinico 32,695,010.96 27,707,636.41
Equipamiento 10,570,616.50 8,958,149.58
MONTO DE CONTRATO (Obras civiles y equipamiento) 43,265,627.55 36,665,786.06
FACTOR DE RELACION 1.00000
ADELANTO DIRECTO 7,590,344.40 6,432,495.25
ADELANTO DE MATERIALES 15,180,688.79 12,864,990.50
VALORIZACIONES
ITEM CONCEPTO SALDO
AUTORIZ. REAL VALORIZADO
Atendiendo al ACTA DE CONCILIACION, se deduce la suma de $ 1,100 Dolares americanos, equivalente a S/.3575.00 Soles, por concepto de tres (03)
identificadores biometricos. (01 dólar = 3.25 Soles)
El contratista en esta liquidacion se esta cobra la suma total de S/. 435,229.29 soles porque la entidad no ha pagado la totalidad de las valorizaciones N° 18 y