Está en la página 1de 3

VALORIZACION MAYOR METRADO N° 01 - SETIEMBRE 2021 (CORRESPONDIENTE AL PERIODO DEL 01-09-21 AL 30-09-21)

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE HUARAL


PROCESO N° : A.S. Nº 007-2021-MPH-CS-01 Primera Convocatoria
CONTRATO : N° 021-2021 MPH
: A PRECIOS UNITARIOS
SIST. CONTRATACION
OBRA : "MEJORAMIENTO DEL SERVICIO DE MOVILIDAD URBANA EN LA VIA COLECTORA COMPRENDIDA EN EL TRAMO AA.HH. SAN ISIDRO - LOS NATURALES HASTA LA EX-CASA HACIENDA RETES - C.P. SAN MARTIN DE RETES DEL DISTRITO DE HUARAL - PROVINCIA DE HUARAL - DEPARTAMENTO DE LIMA - ETAPA I"

: C.P. SAN MARTIN DE RETES DEL DISTRITO DE HUARAL - PROVINCIA DE HUARAL - DEPARTAMENTO DE LIMA
UBICACIÓN

CONTRATISTA : CONSORCIO RETES VALOR REFERENCIAL : S/ 1,386,659.83 C/IGV FECHA DE INICIO CONTRACTUAL DE OBRA 07/07/2021
: ING. JUAREZ TRUJILLO IVAN C.I.P. 89100
RESIDENTE DE OBRA VALOR REFERENCIAL : S/ 1,175,135.45 S/IGV FECHA DE TERMINO CONTRAC. DE OBRA 04/10/2021
: CONSORCIO SAN JOSE
SUPERVISOR DE OBRA MONTO CONTRATADO : S/ 1,386,659.83 C/IGV SUSPENSION DE PLAZO DE EJECUCION OBRA : EN PROCESO 15/07/2021
: ING. BAUTISTA PINO, ROBERTO CARLOS C.I.P. 73526
JEFE DE SUPERVISION MONTO CONTRATADO : S/ 1,175,135.45 S/IGV PLAZO DE EJECUCION DE OBRA : 90 Dias Calendario
FECHA : 30/09/2021 FACTOR RELACION : 1.00000 :

PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VAL. ACUMULADO ACTUAL SALDO
ITEM DESCRIPCION Y/O PARTIDAS CONTRACTUALES
UND METRADO P.U. [S/.] PARCIAL [S/.] METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] %

01 PAVIMENTOS 436,120.88
01.01 OBRAS PROVISIONALES 17,336.32
01.01.01 ALMACEN, ALMACEN Y CASETA DE GUARDIANIA glb 1.00 1,500.00 1,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,500.00 100.00

01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS glb 1.00 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,500.00 100.00
01.01.03 CARTEL DE IDENTIFICACION DE OBRA DE 3.60x2.40 und 1.00 800.00 800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 800.00 100.00
01.01.04 SEÑALIZACION Y SEGURIDAD EN OBRA DURANTE LA EJECUCION glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 100.00
01.01.05 MANTENIENTO DE TRANSITO Y SEGURIDAD VIAL día 1.00 7,536.32 7,536.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 7,536.32 100.00

01.02 OBRAS PRELIMINARES 8,608.99


01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 2,879.26 0.41 1,180.50 0.00 0.00 0.00 145.12 59.50 5.04 145.12 59.50 5.04 2,734.14 1,121.00 94.96
01.02.02 TRAZO, NIVELACION Y REPLANTEO DE PAVIMENTOS m2 2,879.26 1.16 3,339.94 0.00 0.00 0.00 145.12 168.34 5.04 145.12 168.34 5.04 2,734.14 3,171.60 94.96
01.02.03 TRAZO, NIVELACION Y REPLANTEO PERMANENTE m2 2,879.26 1.42 4,088.55 0.00 0.00 0.00 145.12 206.07 5.04 145.12 206.07 5.04 2,734.14 3,882.48 94.96

01.03 PISTA 326,752.47


01.03.01 MOVIMIENTO DE TIERRAS 181,721.93
01.03.01.01 EXCAVACION A NIVEL DE SUB RASANTE P/PISTAS C/EQUIPOS m3 1,118.20 4.16 4,651.71 0.00 0.00 0.00 91.55 380.85 8.19 91.55 380.85 8.19 1,026.65 4,270.86 91.81
01.03.01.02 CONFORMACION Y COMPACTACION DE SUB RASANTE m3 139.78 23.33 3,261.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 139.78 3,261.07 100.00

01.03.01.03 CONFORMACION Y COMPACTACION DE LA SUB BASE GRANULAR E= 0.15 CM m3 419.33 79.36 33,278.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.33 33,278.03 100.00

01.03.01.04 BASE GRANULAR E=0.15 m.COMPACTADA m3 423.81 90.32 38,278.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 423.81 38,278.52 100.00

01.03.01.05 CARGUIO DE MATERIAL EXEDENTE CON EQUIPO m3 1,430.78 10.48 14,994.57 0.00 0.00 0.00 20.92 219.24 1.46 20.92 219.24 1.46 1,409.86 14,775.33 98.54
01.03.01.06 ELIMINACION DE MATERIAL EXCEDENTE A DISTANCIA D=10 km m3 1,699.28 51.35 87,258.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,699.28 87,258.03 100.00

01.03.02 PAVIMENTOS ASFALTICO 145,030.54


01.03.02.01 IMPRIMACION ASFALTICA MC - 30 m2 2,795.50 4.96 13,865.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,795.50 13,865.68 100.00
01.03.02.02 BARRIDO Y LIMPIEZA A NIVEL DE IMPRIMADO m2 2,795.50 8.24 23,034.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,795.50 23,034.92 100.00

01.03.02.03 CARPETA ASFALTICA EN CALIENTE E=2" C/EQUIPO ADQ. m2 2,795.50 38.68 108,129.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,795.50 108,129.94 100.00

01.04 SEÑALIZACION 27,357.85


01.04.01 SEÑALES HORIZONTALES 14,428.85
01.04.01.01 MARCAS EN EL PAVIMENTO m2 283.37 19.10 5,412.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 283.37 5,412.37 100.00
01.04.01.02 LINEAS EN EL PAVIMIENTO m 813.40 3.35 2,724.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 813.40 2,724.89 100.00

01.04.01.03 LINEAS EN EL SARDINEL m2 765.40 8.22 6,291.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 765.40 6,291.59 100.00

01.04.02 SEÑALES VERTICALES 12,929.00


01.04.02.01 SEÑALES PREVENTIVAS und 11.00 540.00 5,940.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 5,940.00 100.00
01.04.02.02 SEÑALES REGLAMENTARIAS und 6.00 550.00 3,300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 3,300.00 100.00
01.04.02.03 SEÑALES INFORMATIVAS und 7.00 527.00 3,689.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 3,689.00 100.00

01.05 VARIOS 56,065.25


01.05.01 NIVELACION DE BUZONES EN GENERAL und 10.00 5,500.00 55,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 55,000.00 100.00

01.05.02 REDUCTORES DE VELOCIDAD (ROMPE MUELLES) ASFALTICOS m 25.00 42.61 1,065.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 1,065.25 100.00

02 VEREDAS Y SARDINELES 337,554.81


02.01 TRABAJOS PRELIMINARES 12,878.93
02.01.01 DEMOLICION DE VEREDAS m2 573.00 13.50 7,735.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 573.00 7,735.50 100.00
02.01.02 LIMPIEZA DE TERRENO MANUAL m 1,919.19 0.78 1,496.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,919.19 1,496.97 100.00

02.01.03 TRAZO NIVELACION Y REPLANTEO PERMANENTE EN VEREDAS m2 1,919.19 1.90 3,646.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,919.19 3,646.46 100.00

02.02 MOVIMIENTO DE TIERRAS 88,074.34


02.02.01 EXCAVACION MANUAL P/VEREDAS, SARDINEL Y RAMPAS m3 376.40 46.03 17,325.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 376.40 17,325.69 100.00

02.02.02 EXCAVACION MANUAL PARA SARDINELES PERALTADOS (0.15 X 0.40 m) m3 129.60 44.69 5,791.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 129.60 5,791.82 100.00
02.02.03 CONFORMACION DE SUB RASANTE PARA VEREDAS Y RAMPAS m2 1,881.99 9.54 17,954.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,881.99 17,954.18 100.00

02.02.04 BASE GRANULAR PARA VEREDAS E=0.15 M m2 1,881.99 19.96 37,564.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,881.99 37,564.52 100.00

02.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 183.80 51.35 9,438.13 0.00 0.00 0.00 285.66 14,668.64 155.42 285.66 14668.64 155.42 -101.86 -5,230.51 -55.42

02.03 VEREDAS DE CONCRETO 157,657.71


02.03.01 SARDINEL DE VEREDA, CONCRETO F'C=175 KG/CM2 (0.15X0.40cm) m3 35.87 346.42 12,426.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.87 12,426.09 100.00
02.03.02 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 164.00 35.85 5,879.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 164.00 5,879.40 100.00

02.03.03 VEREDA DE CONCRETO F'C=175 KG/CM2 E=0.10 m. , FROTACHADO SEMIPULIDO INC. CURADO
m2 1,968.00 67.71 133,253.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,968.00 133,253.28 100.00
02.03.04 JUNTAS DE DILATACION PARA VEREDAS m 949.99 6.42 6,098.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 949.99 6,098.94 100.00

02.04 RAMPAS PEATONALES 8,154.41


02.04.01 BASE GRANULAR E=0.15 m.COMPACTADA CON EQUIPO LIVIANO m2 37.20 19.96 742.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.20 742.51 100.00

02.04.02 ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 47.81 35.85 1,713.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.81 1,713.99 100.00

02.04.03 CONCRETO EN RAMPAS F´C=175 kg/cm2 e=4", FROTACHADO Y BRUÑADO m3 21.67 262.94 5,697.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.67 5,697.91 100.00

02.05 SARDINELES 53,709.42


02.05.01 ENCOFRADO Y DESENCOFRADO EN SARDINELES m2 531.20 35.85 19,043.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 531.20 19,043.52 100.00
02.05.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN SARDINEL kg 3,231.90 5.86 18,938.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,231.90 18,938.93 100.00
02.05.03 CONCRETO EN SARDINELES SUMERGIDOS Y PERALTADOS F´C= 175 KG/CM2 INC. CURADO
m3 39.84 346.42 13,801.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.84 13,801.37 100.00
02.05.04 JUNTAS DE DILATACION PARA SARDINELES m 332.00 5.80 1,925.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 332.00 1,925.60 100.00

02.06 VARIOS 17,080.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17,080.00 100.00

02.06.01 REPOSICION DE MARCOS Y TAPAS DE CONEXION DOMICILIARIA DE AGUA und 34.00 120.00 4,080.00 0.00 0.00 0.00 10.00 1,200.00 29.41 10.00 1200.00 29.41 24.00 2,880.00 70.59

02.06.02 REPOSICION DE MARCOS Y TAPAS DE CONEXION DOMICILIARIA DE DESAGUE und 34.00 100.00 3,400.00 0.00 0.00 0.00 10.00 1,000.00 29.41 10.00 1000.00 29.41 24.00 2,400.00 70.59

02.06.03 SERVICIO DE REUBICACION DE POSTES DE LUZ Y TELEFONIA glb 6.00 1,600.00 9,600.00 0.00 0.00 0.00 4.00 6,400.00 66.67 4.00 6400.00 66.67 2.00 3,200.00 33.33

03 AREAS VERDES 69,964.01


03.01 OBRAS PRELIMINARES 29,163.88
03.01.01 LIMPIEZA DE TERRENO MANUAL m 1,342.72 0.78 1,047.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,342.72 1,047.32 100.00

03.01.02 TRAZO, NIVELES Y REPLANTEO m 1,342.72 20.94 28,116.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,342.72 28,116.56 100.00

03.02 MOVIMIENTO DE TIERRAS 6,001.80


03.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 50.28 39.46 1,984.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.28 1,984.05 100.00

03.02.02 RELLENO CON MATERIAL DE CULTIVO m3 25.14 31.44 790.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.14 790.40 100.00

03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 62.85 51.35 3,227.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62.85 3,227.35 100.00

03.03 JARDINERIA 34,798.33


03.03.01 SEMBRADO DE GRASS m2 1,342.72 20.00 26,854.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,342.72 26,854.40 100.00
03.03.02 IMPLEMENTACION Y SEMBRIO DE PLANTAS ORNAMENTALES und 69.00 76.05 5,247.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.00 5,247.45 100.00
03.03.03 CONSERVACION Y RIEGO DE JARDINES HASTA ENTREGA DE LA OBRA glb 1.00 2,696.48 2,696.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,696.48 100.00

04 INSTALACIONES SANITARIAS 47,280.61


04.01 OBRAS PRELIMINARES 7,211.04
04.01.01 LIMPIEZA DE TERRENO MANUAL m 332.00 0.78 258.96 0.00 0.00 0.00 133.91 104.45 40.33 133.91 104.45 40.33 198.09 154.51 59.67
04.01.02 TRAZO, NIVELES Y REPLANTEO m 332.00 20.94 6,952.08 0.00 0.00 0.00 133.91 2,804.08 40.33 133.91 2804.08 40.33 198.09 4,148.00 59.67

04.02 MOVIMIENTO DE TIERRAS 7,780.02


04.02.01 EXCAVACION DE ZANJA CON EQUIPO (TERRENO SUAVE) m3 762.00 10.21 7,780.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 762.00 7,780.02 100.00

04.03 RED DE AGUA 32,289.55


04.03.01 RED DE AGUA PIRINCIPAL CON TUBERIA PVC DE 2" m 328.00 63.80 20,926.40 0.00 0.00 0.00 137.91 8,798.66 42.05 137.91 8798.66 42.05 190.09 12,127.74 57.95

04.03.02 CONEXIONES DOMICILIARIAS DE AGUA und 41.00 277.15 11,363.15 0.00 0.00 0.00 2.00 554.30 4.88 2.00 554.30 4.88 39.00 10,808.85 95.12

05 ALCANTARILLA 58,268.89
05.01 TRABAJOS PRELIMINARES 4,886.97
05.01.01 TRAZO Y REPLANTEO m2 33.00 148.09 4,886.97 0.00 0.00 0.00 27.00 3,998.43 81.82 27.00 3998.43 81.82 6.00 888.54 18.18

05.02 MOVIMIENTO DE TIERRAS 6,433.60


05.02.01 DEMOLICION DE CANAL EXISTENTE glb 1.00 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,500.00 100.00
05.02.02 EXCAVACION DE ZANJA PARA CIMENTACION m3 16.50 133.76 2,207.04 0.00 0.00 0.00 21.30 2,849.09 129.09 21.30 2849.09 129.09 -4.80 -642.05 -29.09

05.02.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 16.50 43.02 709.83 0.00 0.00 0.00 4.50 193.59 27.27 4.50 193.59 27.27 12.00 516.24 72.73

05.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 19.80 51.35 1,016.73 0.00 0.00 0.00 26.65 1,368.48 134.60 26.65 1368.48 134.60 -6.85 -351.75 -34.60

05.03 CONCRETO SIMPLE 5,699.32


05.03.01 CONCRETO F'C= 100 KG/CM2 (SOLADO) m2 44.00 129.53 5,699.32 0.00 0.00 0.00 16.00 2,072.48 36.36 16.00 2072.48 36.36 28.00 3,626.84 63.64

05.04 CONCRETO ARMADO 41,249.00


05.04.01 CONCRETO f'c=210 kg/cm2 m3 62.70 346.42 21,720.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62.70 21,720.53 100.00
05.04.02 ENCOFRADO Y DESENCOFRADO VERTICAL Y HORIZONTAL m2 77.00 35.68 2,747.36 0.00 0.00 0.00 118.00 4,210.24 153.25 118.00 4210.24 153.25 -41.00 -1,462.88 -53.25

05.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,863.67 5.86 16,781.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,863.67 16,781.11 100.00

06 SEGURIDAD Y SALUD 35,918.90


ELABORACION, IMPLEMENTACION Y ADMINISTRACION DE PLAN DE SEGURIDAD Y
06.01
SALUD EN EL TRABAJO FRENTE AL COVID 15,393.50
06.01.01 IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
glb - COVID
1.00 -19 15,393.50 15,393.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 15,393.50 100.00

06.02 SEGURIDAD Y SALUD 15,525.40


06.02.01 ELABORACION DE PLAN DE SEGURIDAD EN EL TRABAJO glb 1.00 4,267.97 4,267.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4,267.97 100.00

06.02.02 EQUIPOS DE PROTECCION INDVIDUAL glb 1.00 3,305.63 3,305.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,305.63 100.00
06.02.03 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 2,434.35 2,434.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,434.35 100.00
VALORIZACION MAYOR METRADO N° 01 - SETIEMBRE 2021 (CORRESPONDIENTE AL PERIODO DEL 01-09-21 AL 30-09-21)

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE HUARAL


PROCESO N° : A.S. Nº 007-2021-MPH-CS-01 Primera Convocatoria
CONTRATO : N° 021-2021 MPH
: A PRECIOS UNITARIOS
SIST. CONTRATACION
OBRA : "MEJORAMIENTO DEL SERVICIO DE MOVILIDAD URBANA EN LA VIA COLECTORA COMPRENDIDA EN EL TRAMO AA.HH. SAN ISIDRO - LOS NATURALES HASTA LA EX-CASA HACIENDA RETES - C.P. SAN MARTIN DE RETES DEL DISTRITO DE HUARAL - PROVINCIA DE HUARAL - DEPARTAMENTO DE LIMA - ETAPA I"

: C.P. SAN MARTIN DE RETES DEL DISTRITO DE HUARAL - PROVINCIA DE HUARAL - DEPARTAMENTO DE LIMA
UBICACIÓN

CONTRATISTA : CONSORCIO RETES VALOR REFERENCIAL : S/ 1,386,659.83 C/IGV FECHA DE INICIO CONTRACTUAL DE OBRA 07/07/2021
: ING. JUAREZ TRUJILLO IVAN C.I.P. 89100
RESIDENTE DE OBRA VALOR REFERENCIAL : S/ 1,175,135.45 S/IGV FECHA DE TERMINO CONTRAC. DE OBRA 04/10/2021
: CONSORCIO SAN JOSE
SUPERVISOR DE OBRA MONTO CONTRATADO : S/ 1,386,659.83 C/IGV SUSPENSION DE PLAZO DE EJECUCION OBRA : EN PROCESO 15/07/2021
: ING. BAUTISTA PINO, ROBERTO CARLOS C.I.P. 73526
JEFE DE SUPERVISION MONTO CONTRATADO : S/ 1,175,135.45 S/IGV PLAZO DE EJECUCION DE OBRA : 90 Dias Calendario
FECHA : 30/09/2021 FACTOR RELACION : 1.00000 :

PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VAL. ACUMULADO ACTUAL SALDO
ITEM DESCRIPCION Y/O PARTIDAS CONTRACTUALES
UND METRADO P.U. [S/.] PARCIAL [S/.] METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] %

06.02.04 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 4,181.32 4,181.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4,181.32 100.00

06.02.05 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE


glb LA EJECUCION
1.00 DEL TRABAJO
1,336.13 1,336.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,336.13 100.00

06.03 MITIGACION AMBIENTAL 5,000.00


06.03.01 MITIGACION AMBIENTAL glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 100.00
VALORIZACION MAYOR METRADO N° 01 - SETIEMBRE 2021 (CORRESPONDIENTE AL PERIODO DEL 01-09-21 AL 30-09-21)

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE HUARAL


PROCESO N° : A.S. Nº 007-2021-MPH-CS-01 Primera Convocatoria
CONTRATO : N° 021-2021 MPH
: A PRECIOS UNITARIOS
SIST. CONTRATACION
OBRA : "MEJORAMIENTO DEL SERVICIO DE MOVILIDAD URBANA EN LA VIA COLECTORA COMPRENDIDA EN EL TRAMO AA.HH. SAN ISIDRO - LOS NATURALES HASTA LA EX-CASA HACIENDA RETES - C.P. SAN MARTIN DE RETES DEL DISTRITO DE HUARAL - PROVINCIA DE HUARAL - DEPARTAMENTO DE LIMA - ETAPA I"

: C.P. SAN MARTIN DE RETES DEL DISTRITO DE HUARAL - PROVINCIA DE HUARAL - DEPARTAMENTO DE LIMA
UBICACIÓN

CONTRATISTA : CONSORCIO RETES VALOR REFERENCIAL : S/ 1,386,659.83 C/IGV FECHA DE INICIO CONTRACTUAL DE OBRA 07/07/2021
: ING. JUAREZ TRUJILLO IVAN C.I.P. 89100
RESIDENTE DE OBRA VALOR REFERENCIAL : S/ 1,175,135.45 S/IGV FECHA DE TERMINO CONTRAC. DE OBRA 04/10/2021
: CONSORCIO SAN JOSE
SUPERVISOR DE OBRA MONTO CONTRATADO : S/ 1,386,659.83 C/IGV SUSPENSION DE PLAZO DE EJECUCION OBRA : EN PROCESO 15/07/2021
: ING. BAUTISTA PINO, ROBERTO CARLOS C.I.P. 73526
JEFE DE SUPERVISION MONTO CONTRATADO : S/ 1,175,135.45 S/IGV PLAZO DE EJECUCION DE OBRA : 90 Dias Calendario
FECHA : 30/09/2021 FACTOR RELACION : 1.00000 :

PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VAL. ACUMULADO ACTUAL SALDO
ITEM DESCRIPCION Y/O PARTIDAS CONTRACTUALES
UND METRADO P.U. [S/.] PARCIAL [S/.] METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] %

(A) COSTO DIRECTO 985,108.10 0.00 51,256.44 51,256.44 950,931.66

(B) GASTOS GENERALES 9.29% 91,516.54 0.00 4,761.72 4,761.72 88,341.55

(C) UTILIDADES 10.00% 98,510.81 0.00 5,125.64 5,125.64 95,093.17

TOTAL VALORIZADO SIN IGV (A+B+C) 1,175,135.45 0.00 61,143.80 61,143.80 1,134,366.37

TOTAL VALORIZADO CON IGV 18.00% 211,524.38 0.00 11,005.88 11,005.88 204,185.95

PORCENTAJE DE AVANCE DE OBRA VALORIZADO 1,386,659.83 0.00 72,149.68 72,149.68 1,338,552.33

PERSONAJE DE AVANCE DE OBRA VALORIZADO ACUMULADO % 0.00% 5.20% 5.20% 94.80%

También podría gustarte