Tipo Descripcion Unidad Precio Cantidad Parcial S/. Cantidad Parcial S/. Cantidad Parcial S/. Cantidad Parcial S/. Cantidad Parcial S/. Cantidad Parcial S/. Cantidad Parcial S/.
OFICIAL HH 17.24 773.4432 13,334.16 498.7791 8,598.95 1,099.8640 18,961.66 2,382.8299 41,079.99 1,851.8553 31,925.99 582.2095 10,037.29 7,188.9811 123,938.03
OPERADOR DE EQUIPO LIVIANO HH 25.52 107.9788 2,755.62 60.3889 1,541.12 76.5918 1,954.62 27.7221 707.47 75.0992 1,916.53 3.7189 94.91 351.4998 8,970.27
MANO DE
OPERADOR DE MAQUINARIA PESADA HH 31.90 48.4514 1,545.60 57.5843 1,836.94 106.0357 3,382.54
OBRA
OPERARIO HH 21.27 479.3713 10,196.23 912.9492 19,418.43 1,009.4729 21,471.49 3,600.4678 76,581.95 2,556.2465 54,371.36 1,453.7484 30,921.23 10,012.2560 212,960.68
PEON HH 15.52 2,017.0820 31,305.11 8,493.0473 131,812.09 4,264.4217 66,183.82 24,507.9516 380,363.41 16,889.0654 262,118.30 6,320.3734 98,092.20 62,491.9414 969,874.93
TOTAL MANO DE OBRA 3,426.3266 59,136.72 10,022.7488 163,207.54 6,450.3504 108,571.59 30,518.9714 498,732.81 21,372.2665 350,332.18 8,360.0501 139,145.62 80,150.7139 1,319,126.46
CRONOGRAMA DE ADQUISICIONES DEL PROYECTO
Periodo
ABRAZADERA PVC Ø 110 MM x 1" UND 27.83 3.0000 83.49 3.0000 83.49
ABRAZADERA PVC Ø 110 MM x 3/4" UND 27.83 4.0000 111.32 4.0000 111.32
ABRAZADERA PVC Ø 160 MM x 1" UND 52.17 3.0000 156.51 3.0000 156.51
ABRAZADERA PVC Ø 75 MM x 1" UND 13.04 2.0000 26.08 2.0000 26.08
ABRAZADERA PVC Ø 75 MM x 3/4" UND 26.09 3.0000 78.27 3.0000 78.27
ABRAZADERA PVC Ø 90 MM x 1" UND 26.09 4.0000 104.36 4.0000 104.36
ABRAZADERA PVC Ø 90 MM x 3/4" UND 26.09 5.0000 130.45 5.0000 130.45
ACERO C° Fy=4200 Kg/Cm2 GRADO 60 KG 3.80 1,421.9134 5,403.27 4,980.6422 18,926.44 917.7036 3,487.27 7,320.2592 27,816.98
ADITIVO IMPERMEABILIZANTE GLN 20.00 29.1036 582.07 21.1154 422.31 28.3643 567.29 78.5833 1,571.67
ADITIVO INCORPORADOR DE AIRE GLN 90.00 0.6071 54.64 0.4405 39.64 0.5917 53.25 1.6393 147.54
AGUA M³ 2.00 29.9700 59.94 13.9022 27.80 14.2927 28.59 7.8568 15.71 21.9521 43.90 3.4323 6.86 91.4061 182.81
ALAMBRE N° 08 KG 4.00 48.6000 194.40 20.5052 82.02 62.6180 250.47 88.9207 355.68 54.1551 216.62 3.6530 14.61 278.4519 1,113.81
ALAMBRE N° 16 KG 4.00 64.9600 259.84 112.4633 449.85 379.2027 1,516.81 193.6825 774.73 86.6481 346.59 5.8448 23.38 842.8015 3,371.21
ARENA FINA M³ 120.00 0.0330 3.96 0.3944 47.32 1.6456 197.47 0.7387 88.64 1.6434 197.20 4.4550 534.60
ARENA GRUESA M³ 70.00 66.5820 4,660.74 44.6916 3,128.42 68.2437 4,777.06 25.4534 1,781.74 67.6026 4,732.18 3.3546 234.83 275.9279 19,314.96
ARPILLERA DOBLE ANCHO DE 4 Mx 400 M RLL 695.65 3.0000 2,086.95 3.0000 2,086.95
BISAGRA ALUMINIZADA 3"x3" UND 5.20 6.0000 31.20 6.0000 31.20
BUSHING F°G° 1 ½ x Ø 1" UND 6.00 200.0000 1,200.00 178.0000 1,068.00 378.0000 2,268.00
CALAMINA DE ALUMINIO 3.0 MTS PLN 31.00 150.0000 4,650.00 150.0000 4,650.00
CALAMINA DE ALUMINIO 3.60 MTS PLN 42.00 36.0000 1,512.00 36.0000 1,512.00
CANASTILLA PVC NTP ISO 1452 Ø 110 MM UND 34.78 4.0000 139.12 4.0000 139.12
CANASTILLA PVC NTP ISO 1452 Ø 75 MM UND 30.00 3.0000 90.00 3.0000 90.00
CANASTILLA PVC NTP ISO 1452 Ø 90 MM UND 30.43 5.0000 152.15 5.0000 152.15
CANASTILLA PVC-UF P/TUB Ø:400MM UND 350.00 1.0000 350.00 1.0000 350.00
CANDADO INCLUYE ALDABA UND 60.00 2.0000 120.00 2.0000 120.00
CARTEL DE OBRA UND 625.00 1.0000 625.00 1.0000 625.00
MATERIALES
CEMENTO PORTLAND TIPO I BOL 21.22 329.5818 6,993.73 819.7158 17,394.37 327.6290 6,952.29 958.6684 20,342.94 66.2827 1,406.52 2,501.8776 53,089.84
CEMENTO PORTLAND TIPO IP (PUZOLANICO) BOL 24.46 1,103.4015 26,989.20 302.4893 7,398.89 1,405.8908 34,388.09
CINTA MASKINGTAPE pza 11.00 3.5636 39.20 3.5636 39.20
CLAVO DE CALAMINA KG 7.00 12.0000 84.00 12.0000 84.00
CLAVO PARA MADERA C/C 3" KG 3.48 91.7672 319.35 4,059.5219 14,127.14 2,135.0937 7,430.13 178.8634 622.44 108.9326 379.09 7.3480 25.57 6,581.5268 22,903.71
CLAVO PARA MADERA C/C 4" KG 3.48 85.9167 298.99 41.2460 143.54 125.9558 438.33 178.8634 622.44 108.9326 379.09 7.3480 25.57 548.2625 1,907.95
CODO 45° PVC-SP NTP ISO 399.002 Ø 114 MM UND 33.04 0.0000 0.00 0.0000 0.00
CODO 45° PVC-SP NTP ISO 399.002 Ø 48 MM UND 8.70 38.0000 330.60 38.0000 330.60
CODO 90° PVC-SP NTP ISO 399.002 Ø 114 MM UND 33.04 8.0000 264.32 28.0000 925.12 36.0000 1,189.44
CODO 90° PVC-SP NTP ISO 399.002 Ø 33 MM UND 10.43 10.0000 104.30 26.0000 271.18 36.0000 375.48
CODO 90° PVC-SP NTP ISO 399.002 Ø 48 MM UND 8.70 35.0000 304.50 79.0000 687.30 114.0000 991.80
CODO 90° PVC-SP NTP ISO 399.002 Ø 60.3 MM UND 10.43 8.0000 83.44 38.0000 396.34 46.0000 479.78
CODO PVC-45° UF NTP ISO 4435 Ø 160 MM UND 125.00 24.0000 3,000.00 24.0000 3,000.00
CODO PVC-90° UF NTP ISO 4435 Ø 160 MM UND 125.00 4.0000 500.00 8.0000 1,000.00 12.0000 1,500.00
COMPUERTA METALICA TIPO ISAJE, MARCO 0.83 x U
0 ND 123.00 1.0000 123.00 20.7000 2,546.10 13.3000 1,635.90 52.0000 6,396.00 87.0000 10,701.00
CRONOGRAMA DE ADQUISICIONES DEL PROYECTO
Periodo
TUBERIA PVC-UF P/ALC NTP ISO 4435 S-25 Ø 160 ML 16.25 24.0000 390.00 48.0000 780.00 405.6711 6,592.15 477.6711 7,762.15
TUBERIA PVC-UF P/ALC NTP ISO 4435 S-25 Ø 200 ML 24.01 1,285.6470 30,868.38 1,285.6470 30,868.38
CRONOGRAMA DE ADQUISICIONES DEL PROYECTO
Periodo
TUBERIA PVC-UF P/ALC NTP ISO 4435 S-25 Ø 250 ML 39.55 1,051.9638 41,605.17 1,051.9638 41,605.17
TUBERIA PVC-UF P/ALC NTP ISO 4435 S-25 Ø 315 ML 62.85 1,066.4026 67,023.40 1,066.4026 67,023.40
UNION CON ROSCA NTP 399.166 Ø 1" UND 3.48 9.0000 31.32 9.0000 31.32
UNION DE REPARACION PVC - UF NTP ISO 1452 Ø UND 30.43 4.0000 121.72 4.0000 121.72
UNION DE REPARACION PVC-UF NTP ISO 1452 Ø 7 UND 21.00 3.0000 63.00 3.0000 63.00
UNION DE REPARACION PVC-UF NTP ISO 1452 Ø 9 UND 24.35 5.0000 121.75 5.0000 121.75
UNION UNIVERSAL F°G° 1 ½" UND 12.35 26.0000 321.10 26.0000 321.10
UNION UNIVERSAL F°G° 2" UND 18.43 8.0000 147.44 8.0000 147.44
UNION UNIVERSAL F°G° 2½" UND 30.70 8.0000 245.60 8.0000 245.60
UNION UNIVERSAL F°G° 3" UND 54.78 28.0000 1,533.84 28.0000 1,533.84
UNION UNIVERSAL F°G° 4" UND 98.17 8.0000 785.36 4.0000 392.68 12.0000 1,178.04
UPR PVC-U NTP ISO 399.002 Ø 48 MM UND 2.17 100.0000 217.00 115.0000 249.55 215.0000 466.55
UPR PVC-UF NTP ISO 1452 Ø 110 MM UND 27.83 8.0000 222.64 4.0000 111.32 12.0000 333.96
UPR PVC-UF NTP ISO 1452 Ø 63 MM UND 8.70 8.0000 69.60 8.0000 69.60
UPR PVC-UF NTP ISO 1452 Ø 75 MM UND 9.13 8.0000 73.04 8.0000 73.04
UPR PVC-UF NTP ISO 1452 Ø 90 MM UND 18.70 28.0000 523.60 28.0000 523.60
VALVULA ESFERICA Ø 1½" UND 96.52 13.0000 1,254.76 13.0000 1,254.76
VALVULA ESFERICA Ø 2" UND 147.83 4.0000 591.32 4.0000 591.32
VALVULA ESFERICA Ø 2½" UND 347.83 4.0000 1,391.32 4.0000 1,391.32
VALVULA ESFERICA Ø 3" UND 433.04 14.0000 6,062.56 14.0000 6,062.56
VALVULA ESFERICA Ø 4" UND 722.78 4.0000 2,891.12 2.0000 1,445.56 6.0000 4,336.68
VALVULA DE AIRE Ø 1" DOBLE EFECTO UND 100.00 9.0000 900.00 9.0000 900.00
VALVULA DE AIRE Ø: 3/4" DOBLE EFECTO UND 80.00 4.0000 320.00 8.0000 640.00 12.0000 960.00
VALVULA ESFERICA DE BRONCE Ø 1" UND 38.43 200.0000 7,686.00 178.0000 6,840.54 378.0000 14,526.54
VALVULA TIPO MASA DE 16" INC/ADAPTADOR UND 2,600.00 2.0000 5,200.00 2.0000 5,200.00
YESO KG 3.04 23.3882 71.10 787.5993 2,394.30 387.1237 1,176.86 8.4229 25.61 0.3419 1.04 0.2710 0.82 1,207.1471 3,669.73
ZARANDA Ø 1/2" UND 6.96 97.6631 679.74 97.6631 679.74 195.3261 1,359.47
TOTAL MATERIALES 5,459.9843 135,037.02 8,071.2557 66,063.80 10,798.4967 83,539.72 17,863.4573 722,766.65 11,353.0416 164,600.74 6,053.8053 80,797.03 59,600.0410 1,252,804.95
CRONOGRAMA DE ADQUISICIONES DEL PROYECTO
Periodo
ACONDICIONAMIENTO PARA LIMITACION DE AREA UND 130.43 1.0000 130.43 1.0000 130.43
BOTAS DE JEBE PAR 34.78 60.0000 2,086.80 60.0000 2,086.80
CAMION VOLQUETE 4x2 210 - 280 HP 8 M³ HM 200.00 2.2669 453.38 0.2050 41.00 2.4719 494.38
CARGADOR RETROEXCAVADOR 0.5-0.7Yd3 62 HP HM 200.00 53.2350 10,647.00 53.2350 10,647.00
CARGADOR SOB. LLANTA 80-95 HP 1.5-1.75 Yd3 HM 200.00 2.2669 453.38 0.2050 41.00 2.4719 494.38
CARTEL DE PROMOCION DE SEGURIDAD Y CONSERUND 347.83 1.0000 347.83 1.0000 347.83
CASCO DE SEGURIDAD AMARILLO UND 8.70 60.0000 522.00 60.0000 522.00
CASCO DE SEGURIDAD VERDE UND 10.43 5.9827 62.40 5.9827 62.40
CHALECO SIMPLE UND 21.74 60.0000 1,304.40 60.0000 1,304.40
CINTA PLASTICA DE SEGURIDAD RLL 52.17 6.0000 313.02 6.0000 313.02
COMPRESORA NEUMATICA 87 HP 250-330 PCM HM 90.00 4.4660 401.94 4.8671 438.04 9.3331 839.98
EQUIPO DE PRUEBA HIDRAULICA UND 217.39 1.9320 420.00 1.9320 420.00
EQUIPO ESTACION TOTAL HM 10.43 9.5436 99.54 112.8280 1,176.80 53.6898 559.99 3.4370 35.85 0.1395 1.46 0.1106 1.15 179.7486 1,874.78
GUANTE DE CUERO PAR 15.65 60.0000 939.00 60.0000 939.00
GUANTE DE JEBE PAR 13.04 60.0000 782.40 60.0000 782.40
HERRAMIENTAS MANUALES %MO 1,319,126.46 0.1346 1,775.36 0.3689 4,866.21 0.2473 3,262.15 1.1318 14,929.32 0.7938 10,470.95 0.3229 4,259.44 2.9992 39,563.10
LENTE VISOR UND 6.96 60.0000 417.60 60.0000 417.60
MARTILLO NEUMATICO 25 KG HM 6.00 8.9320 53.59 9.7342 58.41 18.6662 112.00
MEZCLADORA DE 9-11 P³ HM 6.96 43.2931 301.32 24.2123 168.52 30.7088 213.73 11.1149 77.36 30.1103 209.57 1.4910 10.38 140.9305 980.88
NIVEL DE INGENIERO HM 4.78 9.9163 47.40 106.3992 508.59 50.3690 240.76 3.5712 17.07 0.1450 0.69 0.1149 0.55 170.5156 815.06
SEÑALES DE ADVERTENCIA UND 86.96 3.0000 260.88 3.0000 260.88
SEÑALES DE INTERFERENCIAS DE VIAS PUBLICAS UND 130.43 3.0000 391.29 3.0000 391.29
SOGA DRIZA 3/4" KG 8.70 2.0000 17.40 2.0000 17.40
VIBRADOR DE 4 HP HM 4.35 43.2000 187.92 20.6209 89.70 20.5587 89.43 7.7670 33.79 30.0456 130.70 1.4878 6.47 123.6801 538.01
ZAPATO PUNTA ACERO UND 43.48 60.0000 2,608.80 60.0000 2,608.80
TOTAL EQUIPO 566.0021 13,957.75 332.6756 18,035.27 155.5737 4,366.06 27.0220 15,093.39 61.2342 10,813.36 5.4593 4,697.99 1,147.9668 66,963.81
CRONOGRAMA DE ADQUISICIONES DEL PROYECTO
Periodo