Está en la página 1de 6

PROYECTO: CENTRO DE EXPOCIONES AMBATO

UBICACION: SHURIURCO
ELABORADO: ING. ALFONSO BUCHELI

TABLA DE DESCRIPCIÓN DE RUBROS, UNIDADES, CANTIDADES Y PRECIOS

No. Rubro / Descripción Unidad Cantidad Precio unitario Precio global


1 TANQUE DE FERROCEMENTO 150 M3
RNES 1 REPLANTEO Y NIVELACION DE ESTRUCTURAS M2 225.00 0.29 65.25
LIDE 2 LIMPIEZA Y DESBROCE M2 225.00 0.44 99.00
E1240 3 EXCAVACION MECÁNICA SIN CLASIFICAR M3 25.07 4.54 113.82
HC18 4 HORMIGON CICLOPEO: 40% PIEDRA + H. S. F'C=180 KG/CM2 M3
9.73 116.57 1,134.23
BD335 5 REPLANTILLO DE HORMIGÓN SIMPLE F"C=180 KG/CM2 E=7 M2
CM, PIEDRA E=15CM 65.87 17.77 1,170.51
SCAR 6 ACERO DE REFUERZO FY=4200 KG/CM2 KG 2,347.60 2.10 4,929.96
HFZKF 7 HORMIGON SIMPLE F'C=240 KG/CM2 M3 1.00 168.73 168.73
E1015 8 ALIVIANAMIENTO BLOQUE U 378.00 0.67 253.26
E1190 9 ENCOFRADO RECTO ELEMENTOS DE HORMIGON M2 130.00 16.61 2,159.30
CEA1 10 S.C. MALLA HEXAGONLA 5/8" M2 285.02 4.48 1,276.89
SCMG 11 S. C. MALLA ELECTROSOLDADA 10X10X6MM M2 75.65 10.02 758.01
WUPZU 12 ENCOFRADO CURVO PARED FERROCEMENTO M2 75.65 20.57 1,556.12
E1203 13 ENLUCIDO PALETEADO PARED DE TANQUE E=2CM M2 226.95 8.46 1,920.00
E1200 14 ENLUCIDO PASTEADO FINO CON IMPERMEABILIZANTE PISO Y M2
PARED INTERNOS 133.74 10.72 1,433.69
CEA3 15 ENLUCIDO HORIZONTAL M2 58.09 11.30 656.42
CEA4 16 MASILLADO DE LOSA M2 69.10 9.50 656.45
CEA2 17 CHAFLAN PARED-PISO M 27.02 1.61 43.50
TAPR 18 TAPA SANITARIA EN ACERO INOXIDABLE E=1MM U
ESTRUCTURADA 2.00 179.33 358.66
LC100 19 ACCESORIOS TANQUE ( INGRESO, DESAGUE Y DESBORDE) GLB
1.00 2,593.43 2,593.43
b15u 20 ESCALERA EN ACERO INOXIDABLE H = 3.80 SEGÚN DETALLE U
1.00 373.32 373.32
CEA5 21 ESCALERA EN ACERO INOXIDABLE H = 3.20 SEGÚN DETALLE U
1.00 325.32 325.32
bu006 22 RESPIRADEROS CISTERNA U 4.00 40.12 160.48
E1428 23 PINTURA RESISTENTE A LA HUMEDAD INTERIOR Y EXTERIOR M2
TIPO SIKATOP 144 151.30 7.84 1,186.19
SUB TOTAL 1 23,392.54
2 CUARTO DE BOMBAS
E1240 3 EXCAVACION MECÁNICA SIN CLASIFICAR M3 2.74 4.54 12.44
HC18 4 HORMIGON CICLOPEO: 40% PIEDRA + H. S. F'C=180 KG/CM2 M3
1.92 116.57 223.81
BD335 5 REPLANTILLO DE HORMIGÓN SIMPLE F"C=180 KG/CM2 E=7 M2
CM, PIEDRA E=15CM 9.00 17.77 159.93
SCAR 6 ACERO DE REFUERZO FY=4200 KG/CM2 KG 279.30 2.10 586.53
HFZKF 7 HORMIGON SIMPLE F'C=240 KG/CM2 M3 3.13 168.73 528.12
E1015 8 ALIVIANAMIENTO BLOQUE U 72.00 0.67 48.24
E1190 9 ENCOFRADO RECTO ELEMENTOS DE HORMIGON M2 12.52 16.61 207.96
E1352 24 MAMPOSTERIA LADRILLO TIPO CHAMBO M2 18.80 14.23 267.52
EFG 13 ENLUCIDO PALETEADO PARED DE TANQUE E=2CM M2 50.12 8.46 424.02
E1485 25 PUERTA DE HIERRO U 1.00 252.31 252.31
ce100 26 PINTURA INTERIOR Y EXTERIOR LATEX M2 50.12 5.60 280.67
SUB TOTAL 2 2,991.55
3 SISTEMAS DE BOMBEO
as 27 SISTEMA DE PRESION CONSTANTE Q = 7.2 L./S. TDH= 52 MCA U
(INCENDIO) 1.00 17,779.06 17,779.06
AS1 28 SISTEMA DE PRESION CONSTANTE Q = 10.8 L./S. TDH= 35 U
MCA (AGUA POTABLE) 1.00 14,671.06 14,671.06
SUB TOTAL3 32,450.12
BLOQUE A - EDIFICIO PRINCIPAL
4 AGUA POTABLE
QSH01 29 REPLANTEO Y NIVELACION (CON EQUIPO DE PRECISION) KM
AGUA POTABLE 0.48 187.97 90.23
QSH02 30 EXCAVACION MECANICA ZANJA, TERRENO SIN CLASIFICAR H M3
= 1.20M 342.72 3.77 1,292.05
QSH04 31 S. C. TUBERIA U-PVC UZ Ø 110MM (1.00MPA), PRUEBA M 39.00 12.14 473.46
QSH05 32 S. C. TUBERIA U-PVC UZ Ø 90MM (1.00MPA), PRUEBA M 437.00 8.53 3,727.61
QSH06 33 S. C. TUBERIA U-PVC UZ Ø 63MM (1.00MPA), PRUEBA M 2.80 5.60 15.68
QSH07 34 RELLENO COMPACTADO DE ZANJA EN CAPAS DE 20CM MAX M3
CON MATERIAL DE LA EXCAVACION 341.56 5.08 1,735.12
QSH09 35 S. C. VALVULA DE COMPUERTA BRONCE Ø 4" U 1.00 747.86 747.86
CE1 36 S. C. VALVULA DE COMPUERTA BRONCE Ø 2 1/2" U 4.00 495.86 1,983.44
CE2 37 PUNTO DE AGUA FRIA HG ISO 1 Ø 1 1/4" PTO 47.00 86.94 4,086.18
CE3 38 PUNTO DE AGUA FRIA HG ISO 1 Ø 1/2" PTO 73.00 43.26 3,157.98
CE4 39 TUBERIA HG ISO 1 Ø 2" M 221.82 24.64 5,465.64
CE5 40 TUBERIA HG ISO 1 Ø 1 1/4" M 262.20 19.38 5,081.44
CE6 41 TUBERIA HG ISO 1 Ø1/2" M 219.00 6.08 1,331.52
bu031 47 SOPORTE DE TUBERIAS EN PISO Y PARED U 235.00 25.93 6,093.55
S1 35,281.76

----------------------------------------------------------------------------------------------------_x000D_ CENTRO DE EXPOCIONES AMBATO


5 COMBATE DE INCENDIO
QSH01 29 REPLANTEO Y NIVELACION (CON EQUIPO DE PRECISION) KM
AGUA POTABLE 0.46 187.97 86.47
QSH02 30 EXCAVACION MECANICA ZANJA, TERRENO SIN CLASIFICAR H M3
= 1.20M 334.80 3.77 1,262.20
QSH04 31 S. C. TUBERIA U-PVC UZ Ø 110MM (1.00MPA), PRUEBA M 19.00 12.14 230.66
QSH05 32 S. C. TUBERIA U-PVC UZ Ø 90MM (1.00MPA), PRUEBA M 438.00 8.53 3,736.14
QSH06 33 S. C. TUBERIA U-PVC UZ Ø 63MM (1.00MPA), PRUEBA M 8.00 5.60 44.80
QSH07 34 RELLENO COMPACTADO DE ZANJA EN CAPAS DE 20CM MAX M3
CON MATERIAL DE LA EXCAVACION 331.80 5.08 1,685.54
QSH09 35 S. C. VALVULA DE COMPUERTA BRONCE Ø 4" U 1.00 747.86 747.86
CE1 36 S. C. VALVULA DE COMPUERTA BRONCE Ø 2 1/2" U 4.00 495.86 1,983.44
CE8 42 TUBERIA HG ASTM Ø 2" M 18.00 40.46 728.28
CE9 43 TUBERIA HG ASTM Ø 1 1/2" M 192.70 35.65 6,869.76
bu013 44 SPRINKLERS O ROCIADORES AUTOMATICOS COBERTURA 9.3 U
M2 36.00 69.72 2,509.92
AP021 45 BOCA DE INCENDIO EQUIPADA (BIE) U 8.00 1,028.35 8,226.80
AP104 46 TOMA SIAMESA Ø 2 1/2" U 1.00 605.38 605.38
bu031 47 SOPORTE DE TUBERIAS EN PISO Y PARED U 73.00 25.93 1,892.89
S2 30,610.14
6 ALCANTARILLADO SANITARIO
QSH16 48 REPLANTEO Y NIVELACION (CON EQUIPO DE PRECISION) KM
ALCANTARILLADO 0.69 502.80 346.93
QSH17 49 EXCAVACION MECANICA ZANJA, EN TIERRA PARA M3
ALCANTARILLADO 447.86 5.68 2,543.84
ex12 50 EXCAVACION MECANICA ZANJA, EN CONGLOMERADO PARA M3
ALCANTARILLADO 191.94 11.34 2,176.60
QSH19 51 RASANTEO DE FONDO DE ZANJA M2 255.92 0.55 140.76
QSH20 52 COLCHON ARENA E = 10 CM M3 25.60 22.55 577.28
QSH21 53 S. C. TUBERIA PVC 160MM ESTRUCTURADO INEN 2059, M
PRUEBA 49.00 13.60 666.40
QSH23 54 S. C. TUBERIA PVC 250MM ESTRUCTURADO INEN 2059, M
PRUEBA 270.90 27.96 7,574.36
QSH25 55 RELLENO INICIAL COMPACTADO DE ZANJA EN CAPAS DE M3
20CM CON MATERIAL SELECIONADO DE LA EXCAVACION 127.91 7.88 1,007.93
QSH26 34 RELLENO COMPACTADO DE ZANJA EN CAPAS DE 20CM MAX M3
CON MATERIAL DE LA EXCAVACION 511.84 5.08 2,600.15
PO2M 56 POZO REVISION H=0.80-2M DINT=0.9M PARED 20CM U 3.00 375.01 1,125.03
PO3M 57 POZO REVISION H=2.01-3M DINT=0.9M PARED 20CM U 2.00 533.96 1,067.92
QSH30 58 CERCO Y TAPA PARA POZO H.N U 5.00 366.05 1,830.25
QSH31 59 CAJAS DE REVISIÓN 0.60 * 0.60 H= 0.75 - 1.20 M U 8.00 160.50 1,284.00
SA179 60 TUBERIA PVC D=110 MM DESAGUE M 255.90 8.68 2,221.21
SA178 61 TUBERIA PVC D=75 MM DESAGUE M 77.60 6.47 502.07
SA177 62 TUBERIA PVC D=50 MM DESAGUE M 34.50 3.35 115.58
CE99 63 TUBERIA PVC D=50 MM VENTILACION M 215.00 2.54 546.10
SA093 64 PUNTO DE DESAGUES PVC 110 MM PTO 47.00 40.24 1,891.28
SA092 65 PUNTO DE DESAGUES PVC 75 MM PTO 61.00 31.36 1,912.96
SA091 66 PUNTO DE DESAGUES PVC 50 MM PTO 57.00 20.16 1,149.12
ce98 67 PUNTO DE VENTILACION PVC 50 MM PTO 45.00 18.96 853.20
S3 32,132.97
7 ALCANTARILLADO PLUVIAL
QSH16 48 REPLANTEO Y NIVELACION (CON EQUIPO DE PRECISION) KM
ALCANTARILLADO 0.46 502.80 231.29
QSH17 49 EXCAVACION MECANICA ZANJA, EN TIERRA PARA M3
ALCANTARILLADO 650.79 5.68 3,696.49
ex12 50 EXCAVACION MECANICA ZANJA, EN CONGLOMERADO PARA M3
ALCANTARILLADO 278.91 11.34 3,162.84
QSH19 51 RASANTEO DE FONDO DE ZANJA M2 371.88 0.55 204.53
QSH20 52 COLCHON ARENA E = 10 CM M3 37.19 22.55 838.63
QSH21 53 S. C. TUBERIA PVC 160MM ESTRUCTURADO INEN 2059, M
PRUEBA 69.87 13.60 950.23
33 77 S. C. TUBERIA PVC 200MM ESTRUCTURADO INEN 2059, M
PRUEBA 116.80 21.00 2,452.80
34 54 S. C. TUBERIA PVC 250MM ESTRUCTURADO INEN 2059, M
PRUEBA 20.41 27.96 570.66
35 78 S. C. TUBERIA PVC 300MM ESTRUCTURADO INEN 2059, M
PRUEBA 20.58 37.15 764.55
37 87 S. C. TUBERIA PVC 400MM ESTRUCTURADO INEN 2059, M
PRUEBA 147.74 66.36 9,804.03
39 79 S. C. TUBERIA PVC 500MM ESTRUCTURADO INEN 2059, M
PRUEBA 89.45 103.15 9,226.77
QSH25 80 RELLENO INICIAL COMPACTADO DE ZANJA EN CAPAS DE M3
20CM CON MATERIAL SELECIONADO DE LA EXCAVACION 185.45 7.88 1,461.35
QSH26 34 RELLENO COMPACTADO DE ZANJA EN CAPAS DE 20CM MAX M3
CON MATERIAL DE LA EXCAVACION 743.76 5.08 3,778.30
PO2M 56 POZO REVISION H=0.80-2M DINT=0.9M PARED 20CM U 14.00 375.01 5,250.14
PO3M 57 POZO REVISION H=2.01-3M DINT=0.9M PARED 20CM U 1.00 533.96 533.96
QSH30 58 CERCO Y TAPA PARA POZO H.N U 15.00 366.05 5,490.75
SA179 60 TUBERIA PVC D=110 MM DESAGUE M 933.30 8.68 8,101.04
SA093 64 PUNTO DE DESAGUES PVC 110 MM PTO 34.00 40.24 1,368.16
cej 69 REJILLA DE CUPULA CONCENTRICA U 34.00 83.08 2,824.72

----------------------------------------------------------------------------------------------------_x000D_ CENTRO DE EXPOCIONES AMBATO


qs1 70 S. C. SILLA ADAPTADORA 110MMX160MM U 6.00 67.24 403.44
QS2 71 S. C. SILLA ADAPTADORA 110MMX200MM U 7.00 73.60 515.20
QS3 72 S. C. SILLA ADAPTADORA 110MMX250MM U 1.00 76.18 76.18
QS4 73 S. C. SILLA ADAPTADORA 110MMX300MM U 2.00 82.36 164.72
QS5 75 S. C. SILLA ADAPTADORA 110MMX400MM U 12.00 92.68 1,112.16
SA178 61 TUBERIA PVC D=75 MM DESAGUE M 30.00 6.47 194.10
ade1 76 REJILLA CROMADA Ø 75MM U 30.00 25.09 752.70
S4 63,929.74
SUB TOTAL4 161,954.61
BLOQUE B - PABELLON EVENTOS
4 AGUA POTABLE
QSH01 29 REPLANTEO Y NIVELACION (CON EQUIPO DE PRECISION) KM
AGUA POTABLE 0.50 187.97 93.99
QSH02 30 EXCAVACION MECANICA ZANJA, TERRENO SIN CLASIFICAR H M3
= 1.20M 356.83 3.77 1,345.25
QSH04 31 S. C. TUBERIA U-PVC UZ Ø 110MM (1.00MPA), PRUEBA M 142.00 12.14 1,723.88
QSH05 32 S. C. TUBERIA U-PVC UZ Ø 90MM (1.00MPA), PRUEBA M 296.00 8.53 2,524.88
QSH06 33 S. C. TUBERIA U-PVC UZ Ø 63MM (1.00MPA), PRUEBA M 57.60 5.60 322.56
QSH07 34 RELLENO COMPACTADO DE ZANJA EN CAPAS DE 20CM MAX M3
CON MATERIAL DE LA EXCAVACION 353.41 5.08 1,795.32
DS2 75 S. C. VALVULA DE COMPUERTA BRONCE Ø 3" U 2.00 519.86 1,039.72
CE1 36 S. C. VALVULA DE COMPUERTA BRONCE Ø 2 1/2" U 9.00 495.86 4,462.74
CE3 38 PUNTO DE AGUA FRIA HG ISO 1 Ø 1/2" U 137.00 43.26 5,926.62
CE4 39 TUBERIA HG ISO 1 Ø 2" M 375.60 24.64 9,254.78
CE6 41 TUBERIA HG ISO 1 Ø1/2" M 411.00 6.08 2,498.88
bu031 47 SOPORTE DE TUBERIAS EN PISO Y PARED U 262.00 25.93 6,793.66
S1 37,782.28
5 COMBATE DE INCENDIO
QSH01 29 REPLANTEO Y NIVELACION (CON EQUIPO DE PRECISION) KM
AGUA POTABLE 0.46 187.97 86.47
QSH02 30 EXCAVACION MECANICA ZANJA, TERRENO SIN CLASIFICAR H M3
= 1.20M 333.94 3.77 1,258.95
QSH04 31 S. C. TUBERIA U-PVC UZ Ø 110MM (1.00MPA), PRUEBA M 175.00 12.14 2,124.50
QSH05 32 S. C. TUBERIA U-PVC UZ Ø 90MM (1.00MPA), PRUEBA M 163.80 8.53 1,397.21
QSH06 33 S. C. TUBERIA U-PVC UZ Ø 63MM (1.00MPA), PRUEBA M 125.00 5.60 700.00
QSH07 34 RELLENO COMPACTADO DE ZANJA EN CAPAS DE 20CM MAX M3
CON MATERIAL DE LA EXCAVACION 330.84 5.08 1,680.67
QSH09 35 S. C. VALVULA DE COMPUERTA BRONCE Ø 4" U 1.00 747.86 747.86
CE9 43 TUBERIA HG ASTM Ø 1 1/2" M 10.50 35.65 374.33
AP021 45 BOCA DE INCENDIO EQUIPADA (BIE) U 4.00 1,028.35 4,113.40
bu031 47 SOPORTE DE TUBERIAS EN PISO Y PARED U 4.00 25.93 103.72
S2 12,587.11
6 ALCANTARILLADO SANITARIO
QSH16 48 REPLANTEO Y NIVELACION (CON EQUIPO DE PRECISION) KM
ALCANTARILLADO 0.88 502.80 442.46
QSH17 49 EXCAVACION MECANICA ZANJA, EN TIERRA PARA M3
ALCANTARILLADO 705.60 5.68 4,007.81
ex12 50 EXCAVACION MECANICA ZANJA, EN CONGLOMERADO PARA M3
ALCANTARILLADO 302.40 11.34 3,429.22
QSH19 51 RASANTEO DE FONDO DE ZANJA M2 403.20 0.55 221.76
QSH20 52 COLCHON ARENA E = 10 CM M3 40.32 22.55 909.22
QSH21 53 S. C. TUBERIA PVC 160MM ESTRUCTURADO INEN 2059, M
PRUEBA 108.00 13.60 1,468.80
QSH23 54 S. C. TUBERIA PVC 250MM ESTRUCTURADO INEN 2059, M
PRUEBA 396.00 27.96 11,072.16
QSH25 55 RELLENO INICIAL COMPACTADO DE ZANJA EN CAPAS DE M3
20CM CON MATERIAL SELECIONADO DE LA EXCAVACION 201.55 7.88 1,588.21
QSH26 34 RELLENO COMPACTADO DE ZANJA EN CAPAS DE 20CM MAX M3
CON MATERIAL DE LA EXCAVACION 806.40 5.08 4,096.51
PO2M 56 POZO REVISION H=0.80-2M DINT=0.9M PARED 20CM U 5.00 375.01 1,875.05
QSH30 58 CERCO Y TAPA PARA POZO H.N U 5.00 366.05 1,830.25
QSH31 59 CAJAS DE REVISIÓN 0.60 * 0.60 H= 0.75 - 1.20 M U 11.00 160.50 1,765.50
SA179 60 TUBERIA PVC D=110 MM DESAGUE M 258.25 8.68 2,241.61
SA178 61 TUBERIA PVC D=75 MM DESAGUE M 85.00 6.47 549.95
SA177 62 TUBERIA PVC D=50 MM DESAGUE M 35.00 3.35 117.25
CE99 63 TUBERIA PVC D=50 MM VENTILACION M 206.00 2.54 523.24
SA093 64 PUNTO DE DESAGUES PVC 110 MM PTO 55.00 40.24 2,213.20
SA092 65 PUNTO DE DESAGUES PVC 75 MM PTO 61.00 31.36 1,912.96
SA091 66 PUNTO DE DESAGUES PVC 50 MM PTO 61.00 20.16 1,229.76
ce98 67 PUNTO DE VENTILACION PVC 50 MM PTO 48.00 18.96 910.08
S3 42,405.00
7 ALCANTARILLADO PLUVIAL
QSH16 48 REPLANTEO Y NIVELACION (CON EQUIPO DE PRECISION) KM
ALCANTARILLADO 0.44 502.80 221.23
QSH17 49 EXCAVACION MECANICA ZANJA, EN TIERRA PARA M3
ALCANTARILLADO 618.17 5.68 3,511.21
ex12 50 EXCAVACION MECANICA ZANJA, EN CONGLOMERADO PARA M3
ALCANTARILLADO 264.93 11.34 3,004.31
QSH19 51 RASANTEO DE FONDO DE ZANJA M2 353.24 0.55 194.28
QSH20 52 COLCHON ARENA E = 10 CM M3 35.32 22.55 796.47

----------------------------------------------------------------------------------------------------_x000D_ CENTRO DE EXPOCIONES AMBATO


QSH21 53 S. C. TUBERIA PVC 160MM ESTRUCTURADO INEN 2059, M
PRUEBA 139.50 13.60 1,897.20
33 77 S. C. TUBERIA PVC 200MM ESTRUCTURADO INEN 2059, M
PRUEBA 204.85 21.00 4,301.85
34 54 S. C. TUBERIA PVC 250MM ESTRUCTURADO INEN 2059, M
PRUEBA 75.20 27.96 2,102.59
35 78 S. C. TUBERIA PVC 300MM ESTRUCTURADO INEN 2059, M
PRUEBA 22.00 37.15 817.30
QSH25 55 RELLENO INICIAL COMPACTADO DE ZANJA EN CAPAS DE M3
20CM CON MATERIAL SELECIONADO DE LA EXCAVACION 176.45 7.88 1,390.43
QSH26 34 RELLENO COMPACTADO DE ZANJA EN CAPAS DE 20CM MAX M3
CON MATERIAL DE LA EXCAVACION 706.48 5.08 3,588.92
PO2M 56 POZO REVISION H=0.80-2M DINT=0.9M PARED 20CM U 10.00 375.01 3,750.10
PO3M 57 POZO REVISION H=2.01-3M DINT=0.9M PARED 20CM U 1.00 533.96 533.96
QSH30 58 CERCO Y TAPA PARA POZO H.N U 11.00 366.05 4,026.55
SA179 60 TUBERIA PVC D=110 MM DESAGUE M 118.50 8.68 1,028.58
SA093 64 PUNTO DE DESAGUES PVC 110 MM PTO 34.00 40.24 1,368.16
JBV49 68 REJILLA CUADRADA TRADICIONAL U 12.00 316.61 3,799.32
cej 69 REJILLA DE CUPULA CONCENTRICA U 22.00 83.08 1,827.76
qs1 70 S. C. SILLA ADAPTADORA 110MMX160MM U 12.00 67.24 806.88
QS2 71 S. C. SILLA ADAPTADORA 110MMX200MM U 11.00 73.60 809.60
QS3 72 S. C. SILLA ADAPTADORA 110MMX250MM U 4.00 76.18 304.72
S4 40,081.42
SUB TOTAL5 132,855.81
C529-471378

TOTAL: 353,644.63

SON : TRESCIENTOS CINCUENTA Y TRES MIL SEISCIENTOS CUARENTA Y CUATRO DOLARES, 63/100 CENTAVOS

ING. ALFONSO BUCHELI AMBATO, MARZO DE 2018


ELABORADO
C.I.: LP:18-083

----------------------------------------------------------------------------------------------------_x000D_ CENTRO DE EXPOCIONES AMBATO


Fase 1
Fase 2

----------------------------------------------------------------------------------------------------_x000D_ CENTRO DE EXPOCIONES AMBATO


353407.53