Está en la página 1de 3

Tiempo Metros

1.23 0 Regresión polinomial


2.46 4.85 60
3.69 9.89
4.92 14.91 50
f(x) = 1.392E-06 x⁶ − 6.10686E-05 x⁵ + 0.00128245 x⁴ −
+ 3.6397 x − 4.64291
6.15 20.15 R² = 0.999582712244253
40
7.38 25.2
8.61 29.89 30
9.84 36.2
11.07 39.98 20
12.3 46.04
13.53 51.04 10

0
0 2 4 6 8 10

Segundos Metros
2 3.75 Metros
2.46 8.9 140
3.85 12.5
120
4.99 14.91
6.51 24.15 100
8.37 35.2
80
10.54 49.89
12.35 61.2 60
14.07 89.98
16.3 106.04 40

18.53 131.04 20

0
0 2 4 6 8 10 12 1
omial Barras de error
60

50
⁶ − 6.10686E-05 x⁵ + 0.00128245 x⁴ − 0.0162272 x³ + 0.124788 x² f(x) = 4.82026E-06 x⁶ − 0.000171927 x⁵ + 0.00293536 x⁴ − 0.0301966 x³ + 0.188792 x²
4291 + 4.47683 x − 4.64291
244253 40 R² = 0.999582712244253

30

20

10

0
6 8 10 12 14 16 1.23 2.46 3.69 4.92 6.15 7.38 8.61 9.84 11.07 12.3 13.53

Metros

6 8 10 12 14 16 18 20
6 x⁴ − 0.0301966 x³ + 0.188792 x²

9.84 11.07 12.3 13.53

También podría gustarte