Está en la página 1de 29

CONSTRUCCION DEL CAMINO: MONTENEGRO (LOMA DE FLOR-CERRO DEL AGUILA)

TRAMO: DEL KM. 0+000.00 AL KM. 2+587.00


LOCALIDAD: MONTENEGRO
MUNICIPIO: SAN JUAN ÑUMI

DATOS DE CONSTRUCCION A NIVEL TERRACERIAS

Semicorona Izquierda Semicorona Derecha


Elevaciones Espesor
Estación Cero Cuneta Hombro sobrelev. sobrelev. Hombro Cuneta Cero
Talud Talud
T.N. Sub. Rasante Corte Terraplen dist desn dist desn dist desn bombeo bombeo dist desn dist desn dist desn

0+000.00 2265.06 2264.86 -0.20 TCO 0.50 -4.08 -0.07 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.50 2.77 TCO 0.50
BN 0-1 UBICADO A 15.89 MTS A LA DER. DE LA ESTACION 0+000.00
PINTURA ROJA SOBRE ARBOL
ELEV. PROM. = 2271.53 MTS
0+020.00 2267.74 2267.29 -0.46 TTE 1.50 -4.87 -1.14 -3.31 -0.10 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.88 3.54 TCO 0.50
0+040.00 2270.76 2268.53 -2.23 TCO 0.50 -4.53 0.84 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 6.04 3.85 TCO 0.50
0+057.39 2270.32 2268.50 -1.83 TCO 0.50 -4.81 1.40 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 6.31 4.58 TCO 0.50
0+060.00 2270.28 2268.41 -1.87 TCO 0.50 -4.86 1.45 -4.00 -0.26 -3.69 -0.15 -4.12 4.12 3.53 0.15 4.00 -0.01 6.48 4.96 TCO 0.50
0+075.15 2270.14 2267.41 -2.73 TCO 0.50 -4.71 1.15 -4.00 -0.26 -3.69 -0.16 -4.30 4.30 3.53 0.15 4.00 0.00 7.13 6.26 TCO 0.50
0+080.00 2270.15 2266.93 -3.22 TCO 0.50 -5.24 2.22 -4.00 -0.26 -3.69 -0.16 -4.30 4.30 3.53 0.15 4.00 0.00 7.35 6.70 TCO 0.50
0+088.86 2269.67 2265.84 -3.83 TCO 0.50 -5.98 3.73 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 7.47 6.90 TCO 0.50
0+100.00 2268.48 2264.26 -4.22 TCO 0.50 -5.28 2.33 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 7.39 6.74 TCO 0.50
0+108.55 2267.33 2263.04 -4.28 TCO 0.50 -5.22 2.23 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 7.84 7.64 TCO 0.50
0+120.00 2265.94 2261.42 -4.53 TCO 0.50 -5.34 2.45 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 8.31 8.57 TCO 0.50
0+138.65 2263.44 2258.77 -4.68 TCO 0.50 -5.70 3.17 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 8.63 9.22 TCO 0.50
0+140.00 2263.26 2258.58 -4.69 TCO 0.50 -5.70 3.19 -4.00 -0.21 -3.65 -0.10 -2.64 2.64 3.56 0.09 4.00 -0.05 8.64 9.23 TCO 0.50
0+160.00 2260.21 2255.74 -4.48 TCO 0.50 -5.53 3.01 -4.00 -0.05 -3.55 0.10 2.75 -2.75 3.65 -0.10 4.00 -0.22 8.33 8.44 TCO 0.50
0+160.93 2260.06 2255.60 -4.46 TCO 0.50 -5.52 2.99 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 8.31 8.39 TCO 0.50
0+180.00 2256.88 2252.90 -3.99 TCO 0.50 -5.37 2.70 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 8.31 8.40 TCO 0.50
0+192.34 2255.21 2251.14 -4.07 TCO 0.50 -5.31 2.58 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 8.30 8.38 TCO 0.50
0+200.00 2254.69 2250.06 -4.63 TCO 0.50 -5.37 2.63 -4.00 -0.11 -3.59 0.03 0.70 -3.00 3.66 -0.11 4.00 -0.22 8.35 8.48 TCO 0.50
0+220.00 2252.12 2247.22 -4.90 TCO 0.50 -5.88 3.54 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 8.83 9.43 TCO 0.50
0+240.00 2248.17 2244.38 -3.79 TCO 0.50 -5.40 2.57 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 7.97 7.72 TCO 0.50
0+260.00 2245.64 2241.57 -4.07 TCO 0.50 -5.17 2.12 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 7.82 7.41 TCO 0.50
0+280.00 2241.61 2238.88 -2.74 TCO 0.50 -4.56 0.90 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 6.75 5.27 TCO 0.50
0+300.00 2235.14 2236.28 1.14 TTE 1.50 -9.43 -4.18 -3.31 -0.10 -3.00 -3.00 3.66 -0.11 4.00 -0.22 4.14 0.06 TCO 0.50
0+320.00 2234.13 2233.68 -0.46 TRE 0.00 -3.32 -0.03 -3.30 -0.03 -0.75 -3.00 3.66 -0.11 4.00 -0.22 4.82 1.42 TCO 0.50
0+332.50 2234.73 2232.06 -2.68 TCO 0.50 -4.76 1.48 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.01 3.79 TCO 0.50
0+340.00 2235.71 2231.15 -4.56 TCO 0.50 -5.22 2.41 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.82 5.42 TCO 0.50
0+360.00 2236.72 2229.18 -7.55 TCO 0.50 -5.76 3.48 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 8.54 8.85 TCO 0.50
0+370.68 2235.77 2228.37 -7.39 TCO 0.50 -5.81 3.58 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 8.85 9.48 TCO 0.50
0+380.00 2234.38 2227.82 -6.56 TCO 0.50 -6.07 4.03 -4.00 -0.11 -3.59 0.03 0.79 -0.79 3.62 -0.03 4.00 -0.16 8.48 8.79 TCO 0.50
0+400.00 2230.33 2227.09 -3.24 TCO 0.50 -4.96 1.64 -4.00 -0.27 -3.70 -0.17 -4.68 4.68 3.53 0.17 4.00 0.01 6.79 5.59 TCO 0.50
0+400.78 2230.10 2227.07 -3.03 TCO 0.50 -4.88 1.47 -4.00 -0.28 -3.71 -0.19 -5.00 5.00 3.52 0.18 4.00 0.02 6.78 5.57 TCO 0.50
0+420.00 2223.90 2226.98 3.07 TTE 1.50 -8.28 -3.62 -3.35 -0.34 -10.00 10.00 3.26 0.33 7.10 -2.23 TTE 1.50
0+426.20 2222.97 2227.07 4.10 TTE 1.50 -9.07 -4.14 -3.35 -0.34 -10.00 10.00 3.26 0.33 9.28 -3.69 TTE 1.50
0+440.00 2227.45 2227.49 0.03 TTE 1.50 -8.80 -3.93 -3.35 -0.29 -8.63 8.63 3.48 0.30 4.00 0.13 5.03 2.19 TCO 0.50
0+448.71 2229.38 2227.90 -1.48 TRE 0.00 -3.49 -0.17 -3.32 -0.17 -5.00 5.00 3.52 0.18 4.00 0.02 6.35 4.72 TCO 0.50
0+460.00 2230.56 2228.62 -1.94 TCO 0.50 -4.29 0.37 -4.00 -0.22 -3.66 -0.11 -3.00 0.30 3.60 0.01 4.00 -0.12 6.83 5.54 TCO 0.50

Hoja No. 1
CONSTRUCCION DEL CAMINO: MONTENEGRO (LOMA DE FLOR-CERRO DEL AGUILA)
TRAMO: DEL KM. 0+000.00 AL KM. 2+587.00
LOCALIDAD: MONTENEGRO
MUNICIPIO: SAN JUAN ÑUMI

DATOS DE CONSTRUCCION A NIVEL TERRACERIAS

Semicorona Izquierda Semicorona Derecha


Elevaciones Espesor
Estación Cero Cuneta Hombro sobrelev. sobrelev. Hombro Cuneta Cero
Talud Talud
T.N. Sub. Rasante Corte Terraplen dist desn dist desn dist desn bombeo bombeo dist desn dist desn dist desn
0+480.00 2232.65 2230.38 -2.28 TCO 0.50 -4.58 0.93 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 6.96 5.70 TCO 0.50
BN 0-2 UBICADO A 10.33 MTS A LA DER. DE LA ESTACION 0+480.00
PINTURA ROJA SOBRE ARBOL
ELEV. PROM. = 2238.66 MTS
0+500.00 2235.77 2232.75 -3.01 TCO 0.50 -4.92 1.69 -4.00 -0.14 -3.61 -0.01 -0.29 -3.00 3.66 -0.11 4.00 -0.22 7.30 6.37 TCO 0.50
0+507.65 2237.52 2233.83 -3.69 TCO 0.50 -5.04 2.03 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 7.68 7.13 TCO 0.50
0+520.00 2241.55 2235.68 -5.88 TCO 0.50 -6.28 4.55 -4.00 0.00 -3.53 0.15 4.30 -4.30 3.69 -0.16 4.00 -0.26 9.10 9.93 TCO 0.50
0+540.00 2248.16 2238.68 -9.48 TCO 0.50 -6.82 5.59 -4.00 -0.04 -3.55 0.11 3.15 -3.15 3.66 -0.12 4.00 -0.23 11.11 13.99 TCO 0.50
0+540.34 2248.28 2238.73 -9.55 TCO 0.50 -6.88 5.72 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 11.14 14.07 TCO 0.50
0+560.00 2254.78 2241.68 -13.10 TCO 0.50 -8.23 8.23 -4.00 -0.23 -3.67 -0.12 -3.32 3.32 3.55 0.12 4.00 -0.03 15.04 22.05 TCO 0.50
0+563.15 2254.62 2242.15 -12.47 TCO 0.50 -8.06 7.85 -4.00 -0.27 -3.70 -0.17 -4.65 4.65 3.53 0.16 4.00 0.01 14.62 21.26 TCO 0.50
0+580.00 2249.74 2244.68 -5.07 TCO 0.50 -5.96 3.50 -4.00 -0.41 -3.83 -0.36 -9.30 9.30 3.47 0.32 4.00 0.15 6.81 5.76 TCO 0.50
0+583.90 2247.99 2245.25 -2.74 TCO 0.50 -5.12 1.84 -4.00 -0.41 -3.83 -0.36 -9.30 9.30 3.47 0.32 4.00 0.15 6.14 4.43 TCO 0.50
0+600.00 2254.68 2247.28 -7.40 TCO 0.50 -6.12 3.96 -4.00 -0.28 -3.70 -0.18 -4.76 4.76 3.53 0.17 4.00 0.01 10.82 13.66 TCO 0.50
0+600.27 2254.74 2247.31 -7.43 TCO 0.50 -6.13 3.98 -4.00 -0.27 -3.70 -0.17 -4.65 4.65 3.53 0.16 4.00 0.01 10.86 13.72 TCO 0.50
0+620.00 2256.69 2249.08 -7.62 TCO 0.50 -6.20 4.34 -4.00 -0.06 -3.56 0.09 2.62 -2.62 3.65 -0.10 4.00 -0.21 10.36 12.50 TCO 0.50
0+621.08 2256.74 2249.15 -7.59 TCO 0.50 -6.19 4.34 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 10.38 12.54 TCO 0.50
0+640.00 2257.81 2250.48 -7.33 TCO 0.50 -6.25 4.51 -4.00 0.02 -3.52 0.18 5.00 -5.00 3.71 -0.19 4.00 -0.28 8.76 9.24 TCO 0.50
0+651.52 2252.49 2251.28 -1.21 TRE 0.00 -3.44 0.10 -3.29 0.10 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.02 3.81 TCO 0.50
0+659.40 2249.94 2251.83 1.89 TTE 1.50 -7.12 -2.54 -3.30 0.01 0.23 -0.23 3.60 -0.01 4.00 -0.14 4.06 -0.03 TCO 0.50
0+660.00 2250.24 2251.88 1.64 TTE 1.50 -6.67 -2.25 -3.30 0.00 0.02 -0.02 3.30 0.00 3.83 -0.36 TTE 1.50
0+668.60 2254.53 2252.48 -2.06 TCO 0.50 -5.14 2.05 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 5.03 2.01 TCO 0.50
0+680.00 2261.34 2253.28 -8.07 TCO 0.50 -6.85 5.43 -4.00 -0.26 -3.69 -0.16 -4.30 4.30 3.53 0.15 4.00 0.00 10.06 12.11 TCO 0.50
0+699.00 2264.19 2254.41 -9.78 TCO 0.50 -7.20 6.18 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 11.32 14.59 TCO 0.50
0+700.00 2264.15 2254.45 -9.70 TCO 0.50 -7.19 6.16 -4.00 -0.22 -3.65 -0.10 -2.71 2.71 3.56 0.10 4.00 -0.05 11.24 14.43 TCO 0.50
0+719.90 2262.03 2254.85 -7.18 TCO 0.50 -6.39 4.73 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 9.38 10.54 TCO 0.50
0+720.00 2262.01 2254.85 -7.16 TCO 0.50 -6.38 4.71 -4.00 -0.04 -3.55 0.11 3.03 -3.03 3.66 -0.11 4.00 -0.22 9.37 10.52 TCO 0.50
0+740.00 2258.42 2254.68 -3.74 TCO 0.50 -4.80 1.57 -4.00 -0.03 -3.55 0.12 3.30 -3.30 3.67 -0.12 4.00 -0.23 7.84 7.46 TCO 0.50
0+750.06 2257.68 2254.57 -3.11 TCO 0.50 -4.58 1.11 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 7.55 6.88 TCO 0.50
0+760.00 2257.36 2254.48 -2.88 TCO 0.50 -4.52 1.00 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 7.50 6.78 TCO 0.50
0+776.15 2256.23 2254.31 -1.92 TCO 0.50 -4.14 0.23 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.52 4.81 TCO 0.50
0+780.00 2255.82 2254.28 -1.55 TRE 0.00 -3.54 0.11 -3.29 0.10 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.14 4.06 TCO 0.50
0+800.00 2255.34 2254.08 -1.26 TTE 1.50 -3.71 -0.18 -3.29 0.10 3.00 -3.00 3.66 -0.11 4.00 -0.22 5.83 3.43 TCO 0.50
0+804.89 2255.75 2254.03 -1.73 TCO 0.50 -4.10 0.16 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.01 3.79 TCO 0.50
0+820.00 2257.11 2253.88 -3.23 TCO 0.50 -4.85 1.52 -4.00 -0.18 -3.63 -0.06 -1.53 -3.00 3.66 -0.11 4.00 -0.22 6.75 5.28 TCO 0.50
0+840.00 2257.01 2253.68 -3.33 TCO 0.50 -4.95 1.67 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 6.74 5.26 TCO 0.50
0+859.43 2256.61 2253.48 -3.13 TCO 0.50 -4.89 1.56 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 6.37 4.70 TCO 0.50
0+860.00 2256.60 2253.48 -3.13 TCO 0.50 -4.89 1.55 -4.00 -0.23 -3.67 -0.12 -3.24 3.24 3.55 0.12 4.00 -0.04 6.36 4.68 TCO 0.50
0+880.00 2257.95 2253.28 -4.68 TCO 0.50 -4.84 1.36 -4.00 -0.31 -3.73 -0.22 -6.00 6.00 3.51 0.21 4.00 0.05 10.65 13.35 TCO 0.50
0+892.26 2258.86 2253.16 -5.70 TCO 0.50 -5.07 1.91 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 11.96 15.87 TCO 0.50
0+900.00 2253.81 2253.15 -0.66 TTE 1.50 -19.05 -10.53 -3.30 -0.03 -0.84 0.84 3.59 0.03 4.00 -0.11 6.79 5.47 TCO 0.50

Hoja No. 2
CONSTRUCCION DEL CAMINO: MONTENEGRO (LOMA DE FLOR-CERRO DEL AGUILA)
TRAMO: DEL KM. 0+000.00 AL KM. 2+587.00
LOCALIDAD: MONTENEGRO
MUNICIPIO: SAN JUAN ÑUMI

DATOS DE CONSTRUCCION A NIVEL TERRACERIAS

Semicorona Izquierda Semicorona Derecha


Elevaciones Espesor
Estación Cero Cuneta Hombro sobrelev. sobrelev. Hombro Cuneta Cero
Talud Talud
T.N. Sub. Rasante Corte Terraplen dist desn dist desn dist desn bombeo bombeo dist desn dist desn dist desn
0+913.79 2260.20 2253.34 -6.87 TCO 0.50 -5.46 2.87 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 11.48 14.73 TCO 0.50
0+920.00 2259.58 2253.51 -6.06 TCO 0.50 -5.15 2.31 -4.00 0.01 -3.53 0.17 4.70 -4.70 3.70 -0.17 4.00 -0.27 10.94 13.61 TCO 0.50
0+940.00 2261.49 2254.45 -7.04 TCO 0.50 -5.65 3.31 -4.00 0.01 -3.53 0.17 4.70 -4.70 3.70 -0.17 4.00 -0.27 11.09 13.91 TCO 0.50
0+947.72 2263.24 2254.96 -8.28 TCO 0.50 -6.24 4.43 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 11.65 15.07 TCO 0.50
0+960.00 2266.76 2255.95 -10.81 TCO 0.50 -7.27 6.34 -4.00 -0.20 -3.64 -0.08 -2.25 -3.00 3.66 -0.11 4.00 -0.22 14.03 19.83 TCO 0.50
0+980.00 2271.71 2258.01 -13.70 TCO 0.50 -8.34 8.46 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 16.57 24.92 TCO 0.50
1+000.00 2274.42 2260.65 -13.78 TCO 0.50 -8.36 8.53 -4.00 -0.19 -3.64 -0.07 -1.86 -3.00 3.66 -0.11 4.00 -0.22 16.33 24.44 TCO 0.50
BN 1-1 UBICADO A 14.26 MTS A LA IZQ. DE LA ESTACION 1+000.00
PINTURA ROJA SOBRE ARBOL
ELEV. PROM. = 2264.15 MTS
1+016.20 2276.22 2263.17 -13.05 TCO 0.50 -7.78 7.51 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 15.62 23.02 TCO 0.50
1+020.00 2276.67 2263.78 -12.89 TCO 0.50 -7.66 7.28 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 15.39 22.56 TCO 0.50
1+040.00 2279.05 2266.98 -12.08 TCO 0.50 -7.36 6.67 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 14.48 20.74 TCO 0.50
1+047.45 2279.77 2268.17 -11.60 TCO 0.50 -7.29 6.54 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 14.15 20.07 TCO 0.50
1+060.00 2281.26 2270.18 -11.09 TCO 0.50 -7.24 6.33 -4.00 -0.16 -3.61 -0.03 -0.77 -3.00 3.66 -0.11 4.00 -0.22 13.84 19.45 TCO 0.50
1+080.00 2283.58 2273.38 -10.21 TCO 0.50 -6.92 5.62 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 13.28 18.33 TCO 0.50
1+100.00 2285.89 2276.58 -9.32 TCO 0.50 -6.46 4.86 -4.00 -0.06 -3.56 0.09 2.55 -3.00 3.66 -0.11 4.00 -0.22 12.97 17.71 TCO 0.50
1+101.51 2286.06 2276.82 -9.25 TCO 0.50 -6.41 4.77 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 12.96 17.70 TCO 0.50
1+120.00 2288.59 2279.78 -8.82 TCO 0.50 -6.08 4.12 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 12.61 16.99 TCO 0.50
1+132.81 2289.11 2281.83 -7.29 TCO 0.50 -5.70 3.36 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 11.56 14.89 TCO 0.50
1+140.00 2289.68 2282.98 -6.70 TCO 0.50 -5.57 3.03 -4.00 -0.11 -3.59 0.03 0.84 -3.00 3.66 -0.11 4.00 -0.22 11.10 13.98 TCO 0.50
1+160.00 2291.36 2286.18 -5.19 TCO 0.50 -5.04 1.87 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 9.94 11.66 TCO 0.50
1+180.00 2293.29 2289.38 -3.92 TCO 0.50 -4.57 0.92 -4.00 -0.22 -3.66 -0.11 -3.00 1.63 3.57 0.06 4.00 -0.08 8.99 9.90 TCO 0.50
1+184.57 2293.91 2290.11 -3.80 TCO 0.50 -4.53 0.84 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 8.91 9.79 TCO 0.50
1+200.00 2294.99 2292.35 -2.64 TCO 0.50 -4.08 -0.07 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 8.52 8.99 TCO 0.50
1+205.00 2294.90 2292.98 -1.93 TTE 1.50 -6.12 -1.97 -3.31 -0.10 -3.00 3.00 3.55 0.11 4.00 -0.04 8.27 8.50 TCO 0.50
1+220.00 2296.71 2294.55 -2.16 TRE 0.00 -3.45 -0.10 -3.31 -0.10 -3.00 3.00 3.55 0.11 4.00 -0.04 7.83 7.61 TCO 0.50
1+220.21 2296.72 2294.57 -2.16 TRE 0.00 -3.44 -0.10 -3.31 -0.10 -3.00 3.00 3.55 0.11 4.00 -0.04 7.82 7.59 TCO 0.50
1+240.00 2297.97 2296.18 -1.79 TTE 1.50 -7.53 -2.91 -3.31 -0.10 -3.00 -2.94 3.66 -0.11 4.00 -0.22 7.33 6.44 TCO 0.50
1+260.00 2299.78 2297.78 -2.01 TRE 0.00 -3.36 -0.09 -3.31 -0.09 -2.76 -3.00 3.66 -0.11 4.00 -0.22 7.49 6.76 TCO 0.50
1+276.65 2300.74 2299.13 -1.61 TTE 1.50 -4.81 -0.88 -3.28 0.14 4.15 -4.15 3.69 -0.15 4.00 -0.26 6.69 5.13 TCO 0.50
1+280.00 2301.23 2299.43 -1.79 TTE 1.50 -3.42 0.09 -3.28 0.18 5.54 -5.54 3.72 -0.21 4.00 -0.30 6.72 5.14 TCO 0.50
1+300.00 2307.56 2301.50 -6.06 TCO 0.50 -6.34 4.79 -4.00 0.12 -3.48 0.29 8.30 -8.30 3.80 -0.32 4.00 -0.38 8.07 7.75 TCO 0.50
1+320.00 2317.51 2304.03 -13.48 TCO 0.50 -11.51 15.13 -4.00 0.12 -3.48 0.29 8.30 -8.30 3.80 -0.32 4.00 -0.38 9.77 11.15 TCO 0.50
1+340.00 2323.52 2306.98 -16.54 TCO 0.50 -15.92 23.89 -4.00 0.06 -3.51 0.22 6.27 -6.27 3.74 -0.23 4.00 -0.32 9.98 11.64 TCO 0.50
1+345.11 2324.01 2307.74 -16.27 TCO 0.50 -16.18 24.34 -4.00 -0.01 -3.53 0.15 4.15 -4.15 3.69 -0.15 4.00 -0.26 9.71 11.15 TCO 0.50
1+360.00 2323.76 2309.98 -13.78 TCO 0.50 -15.88 23.56 -4.00 -0.19 -3.64 -0.07 -2.03 -3.00 3.66 -0.11 4.00 -0.22 8.39 8.57 TCO 0.50
1+380.00 2324.07 2312.98 -11.09 TCO 0.50 -14.51 20.79 -4.00 -0.22 -3.65 -0.10 -2.72 -3.00 3.66 -0.11 4.00 -0.22 6.90 5.57 TCO 0.50
1+397.00 2324.91 2315.53 -9.38 TCO 0.50 -13.03 18.00 -4.00 -0.06 -3.56 0.09 2.38 -3.00 3.66 -0.11 4.00 -0.22 6.22 4.21 TCO 0.50
1+399.08 2325.29 2315.84 -9.46 TCO 0.50 -13.09 18.14 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.28 4.33 TCO 0.50
1+400.00 2325.54 2315.98 -9.56 TCO 0.50 -13.19 18.33 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.31 4.40 TCO 0.50

Hoja No. 3
CONSTRUCCION DEL CAMINO: MONTENEGRO (LOMA DE FLOR-CERRO DEL AGUILA)
TRAMO: DEL KM. 0+000.00 AL KM. 2+587.00
LOCALIDAD: MONTENEGRO
MUNICIPIO: SAN JUAN ÑUMI

DATOS DE CONSTRUCCION A NIVEL TERRACERIAS

Semicorona Izquierda Semicorona Derecha


Elevaciones Espesor
Estación Cero Cuneta Hombro sobrelev. sobrelev. Hombro Cuneta Cero
Talud Talud
T.N. Sub. Rasante Corte Terraplen dist desn dist desn dist desn bombeo bombeo dist desn dist desn dist desn
1+420.00 2328.91 2318.98 -9.94 TCO 0.50 -13.37 18.69 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.43 4.63 TCO 0.50
1+431.02 2329.44 2320.63 -8.81 TCO 0.50 -12.57 17.10 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.03 3.84 TCO 0.50
1+440.00 2329.48 2321.98 -7.50 TCO 0.50 -11.60 15.07 -4.00 -0.12 -3.59 0.01 0.31 -3.00 3.66 -0.11 4.00 -0.22 5.55 2.87 TCO 0.50
1+460.00 2331.31 2324.98 -6.34 TCO 0.50 -10.91 13.61 -4.00 -0.22 -3.66 -0.11 -3.00 -2.20 3.64 -0.08 4.00 -0.20 5.12 2.04 TCO 0.50
1+475.75 2332.56 2327.34 -5.22 TCO 0.50 -10.37 12.51 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 4.66 1.28 TCO 0.50
1+480.00 2332.69 2327.98 -4.72 TCO 0.50 -10.20 12.18 -4.00 -0.23 -3.67 -0.12 -3.30 3.30 3.55 0.12 4.00 -0.03 4.49 0.94 TCO 0.50
1+500.00 2334.81 2330.58 -4.23 TCO 0.50 -10.02 11.82 -4.00 -0.23 -3.67 -0.12 -3.30 3.30 3.55 0.12 4.00 -0.03 4.41 0.79 TCO 0.50
BN 1-2 UBICADO A 14.93 MTS A LA IZQ. DE LA ESTACION 1+500.00
PINTURA ROJA SOBRE ARBOL
ELEV. PROM. = 2346.82 MTS
1+512.96 2335.82 2331.83 -3.99 TCO 0.50 -9.63 11.03 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 4.36 0.67 TCO 0.50
1+520.00 2337.00 2332.38 -4.62 TCO 0.50 -9.91 11.59 -4.00 -0.22 -3.66 -0.11 -3.00 0.68 3.59 0.02 4.00 -0.11 4.61 1.10 TCO 0.50
1+540.00 2339.32 2333.78 -5.55 TCO 0.50 -10.42 12.61 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.06 1.90 TCO 0.50
1+560.00 2338.95 2335.18 -3.78 TCO 0.50 -9.43 10.63 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 4.49 0.76 TCO 0.50
1+580.00 2338.75 2336.58 -2.17 TCO 0.50 -8.37 8.51 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.31 -0.10 3.49 -0.11 TRE 0.00
1+600.00 2341.94 2337.98 -3.97 TCO 0.50 -9.89 11.55 -4.00 -0.22 -3.66 -0.11 -3.00 -1.23 3.62 -0.05 4.00 -0.17 4.52 0.88 TCO 0.50
1+614.11 2344.56 2338.96 -5.60 TCO 0.50 -11.24 14.26 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 5.08 2.12 TCO 0.50
1+620.00 2345.75 2339.38 -6.37 TCO 0.50 -11.81 15.39 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 5.32 2.59 TCO 0.50
1+640.00 2348.17 2340.78 -7.40 TCO 0.50 -12.58 16.93 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 5.58 3.11 TCO 0.50
1+653.75 2347.85 2341.74 -6.11 TCO 0.50 -11.60 14.97 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 5.10 2.16 TCO 0.50
1+660.00 2347.87 2342.18 -5.70 TCO 0.50 -11.26 14.30 -4.00 -0.22 -3.66 -0.11 -3.00 1.13 3.58 0.04 4.00 -0.10 4.97 1.84 TCO 0.50
1+665.70 2347.90 2342.57 -5.33 TCO 0.50 -11.26 14.30 -4.00 -0.22 -3.66 -0.11 -3.00 -0.59 3.61 -0.02 4.00 -0.15 4.84 1.53 TCO 0.50
1+680.00 2358.23 2343.58 -14.65 TCO 0.50 -17.31 26.39 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 8.16 8.09 TCO 0.50
1+700.00 2363.13 2344.98 -18.16 TCO 0.50 -19.06 29.95 -4.00 -0.17 -3.62 -0.04 -1.05 -3.00 3.66 -0.11 4.00 -0.22 9.89 11.55 TCO 0.50
1+710.50 2362.96 2345.71 -17.25 TCO 0.50 -19.07 30.10 -4.00 -0.03 -3.55 0.12 3.35 -3.35 3.67 -0.12 4.00 -0.23 8.89 9.55 TCO 0.50
1+720.00 2361.34 2346.38 -14.96 TCO 0.50 -18.19 28.44 -4.00 0.07 -3.50 0.23 6.70 -6.70 3.75 -0.25 4.00 -0.33 8.06 7.79 TCO 0.50
1+740.00 2362.57 2347.78 -14.80 TCO 0.50 -16.88 25.74 -4.00 -0.01 -3.53 0.15 4.15 -4.15 3.69 -0.15 4.00 -0.26 8.06 7.86 TCO 0.50
1+741.90 2362.53 2347.91 -14.62 TCO 0.50 -16.73 25.42 -4.00 -0.03 -3.55 0.12 3.35 -3.35 3.67 -0.12 4.00 -0.23 8.00 7.77 TCO 0.50
1+760.00 2361.70 2349.18 -12.52 TCO 0.50 -15.54 22.92 -4.00 -0.16 -3.62 -0.03 -0.95 0.95 3.58 0.03 4.00 -0.11 7.12 6.14 TCO 0.50
1+773.74 2358.39 2350.14 -8.25 TCO 0.50 -13.73 19.18 -4.00 -0.28 -3.71 -0.19 -5.00 5.00 3.52 0.18 4.00 0.02 5.91 3.84 TCO 0.50
1+780.00 2357.09 2350.58 -6.51 TCO 0.50 -13.22 18.07 -4.00 -0.36 -3.78 -0.29 -7.61 7.61 3.49 0.27 4.00 0.10 5.00 2.09 TCO 0.50
1+800.00 2356.47 2352.21 -4.26 TCO 0.50 -10.20 11.97 -4.00 -0.43 -3.86 -0.39 -10.00 10.00 3.26 0.33 4.01 0.40 TRE 0.00
1+820.00 2360.03 2354.30 -5.74 TCO 0.50 -8.85 9.37 -4.00 -0.32 -3.74 -0.23 -6.23 6.23 3.51 0.22 4.00 0.05 5.16 2.38 TCO 0.50
1+822.94 2360.65 2354.64 -6.01 TCO 0.50 -8.89 9.49 -4.00 -0.28 -3.71 -0.19 -5.00 5.00 3.52 0.18 4.00 0.02 5.42 2.85 TCO 0.50
1+833.08 2363.22 2355.91 -7.31 TCO 0.50 -10.55 13.05 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.20 4.17 TCO 0.50
1+840.00 2365.51 2356.85 -8.67 TCO 0.50 -12.28 16.52 -4.00 -0.03 -3.55 0.12 3.30 -3.30 3.67 -0.12 4.00 -0.23 6.43 4.63 TCO 0.50
1+860.00 2370.07 2359.63 -10.44 TCO 0.50 -14.61 21.18 -4.00 -0.03 -3.55 0.12 3.30 -3.30 3.67 -0.12 4.00 -0.23 6.71 5.19 TCO 0.50
1+865.15 2370.65 2360.34 -10.31 TCO 0.50 -14.65 21.26 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.66 5.09 TCO 0.50
1+880.00 2371.86 2362.41 -9.45 TCO 0.50 -14.50 20.81 -4.00 -0.19 -3.64 -0.07 -1.90 -3.00 3.66 -0.11 4.00 -0.22 6.40 4.57 TCO 0.50
1+900.00 2373.26 2365.19 -8.08 TCO 0.50 -13.18 18.27 -4.00 -0.09 -3.58 0.05 1.44 -3.00 3.66 -0.11 4.00 -0.22 6.16 4.09 TCO 0.50
1+904.56 2373.53 2365.82 -7.71 TCO 0.50 -12.82 17.61 -4.00 -0.03 -3.55 0.12 3.35 -3.35 3.67 -0.12 4.00 -0.23 6.01 3.80 TCO 0.50

Hoja No. 4
CONSTRUCCION DEL CAMINO: MONTENEGRO (LOMA DE FLOR-CERRO DEL AGUILA)
TRAMO: DEL KM. 0+000.00 AL KM. 2+587.00
LOCALIDAD: MONTENEGRO
MUNICIPIO: SAN JUAN ÑUMI

DATOS DE CONSTRUCCION A NIVEL TERRACERIAS

Semicorona Izquierda Semicorona Derecha


Elevaciones Espesor
Estación Cero Cuneta Hombro sobrelev. sobrelev. Hombro Cuneta Cero
Talud Talud
T.N. Sub. Rasante Corte Terraplen dist desn dist desn dist desn bombeo bombeo dist desn dist desn dist desn
1+920.00 2377.50 2367.97 -9.54 TCO 0.50 -13.41 18.88 -4.00 0.07 -3.50 0.23 6.70 -6.70 3.75 -0.25 4.00 -0.33 8.22 8.11 TCO 0.50
1+931.00 2380.36 2369.49 -10.87 TCO 0.50 -15.55 23.16 -4.00 0.07 -3.50 0.23 6.70 -6.70 3.75 -0.25 4.00 -0.33 10.50 12.66 TCO 0.50
1+940.00 2380.88 2370.75 -10.13 TCO 0.50 -14.79 21.60 -4.00 0.02 -3.52 0.18 5.12 -5.12 3.71 -0.19 4.00 -0.29 8.05 7.81 TCO 0.50
1+944.22 2380.29 2371.33 -8.95 TCO 0.50 -13.83 19.63 -4.00 -0.03 -3.55 0.12 3.35 -3.35 3.67 -0.12 4.00 -0.23 6.95 5.66 TCO 0.50
1+960.00 2381.07 2373.53 -7.54 TCO 0.50 -12.69 17.16 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.64 3.06 TCO 0.50
1+980.00 2383.45 2376.31 -7.15 TCO 0.50 -11.83 15.43 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.49 2.75 TCO 0.50
BN 2-1 UBICADO A 14.46 MTS A LA IZQ. DE LA ESTACION 1+990.00
PINTURA ROJA SOBRE ARBOL
ELEV. PROM. = 2394.81 MTS
2+000.00 2385.66 2379.09 -6.57 TCO 0.50 -11.66 15.09 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.22 2.22 TCO 0.50
2+017.61 2387.51 2381.53 -5.98 TCO 0.50 -11.32 14.39 -4.00 -0.25 -3.68 -0.14 -3.85 3.85 3.54 0.14 4.00 -0.02 4.86 1.70 TCO 0.50
2+020.00 2387.85 2381.87 -5.99 TCO 0.50 -11.02 13.76 -4.00 -0.28 -3.70 -0.18 -4.87 4.87 3.52 0.17 4.00 0.01 4.86 1.74 TCO 0.50
2+040.00 2389.20 2384.65 -4.56 TCO 0.50 -10.01 11.66 -4.00 -0.36 -3.78 -0.29 -7.70 7.70 3.49 0.27 4.00 0.10 4.69 1.49 TCO 0.50
2+052.09 2392.04 2386.22 -5.83 TCO 0.50 -10.49 12.73 -4.00 -0.25 -3.68 -0.14 -3.85 3.85 3.54 0.14 4.00 -0.02 5.21 2.40 TCO 0.50
2+060.00 2394.68 2387.13 -7.55 TCO 0.50 -11.46 14.75 -4.00 -0.18 -3.63 -0.06 -1.59 1.59 3.57 0.06 4.00 -0.09 5.76 3.43 TCO 0.50
2+079.26 2399.71 2388.97 -10.75 TCO 0.50 -14.35 20.66 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 7.27 6.33 TCO 0.50
2+080.00 2399.84 2389.03 -10.81 TCO 0.50 -14.32 20.61 -4.00 -0.03 -3.55 0.12 3.30 -3.30 3.67 -0.12 4.00 -0.23 7.31 6.39 TCO 0.50
2+100.00 2400.08 2390.63 -9.45 TCO 0.50 -11.41 14.81 -4.00 -0.01 -3.54 0.14 4.00 -4.00 3.68 -0.15 4.00 -0.25 7.24 6.24 TCO 0.50
2+117.21 2398.57 2392.00 -6.57 TCO 0.50 -8.52 9.00 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 6.03 3.84 TCO 0.50
2+120.00 2398.23 2392.23 -6.00 TCO 0.50 -8.24 8.41 -4.00 -0.07 -3.56 0.08 2.23 -2.23 3.64 -0.08 4.00 -0.20 5.76 3.32 TCO 0.50
2+139.00 2395.58 2393.75 -1.83 TCO 0.50 -6.14 4.05 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.55 0.11 4.00 -0.04 4.21 0.37 TCO 0.50
2+140.00 2395.42 2393.83 -1.60 TCO 0.50 -6.04 3.84 -4.00 -0.24 -3.67 -0.13 -3.43 3.43 3.54 0.12 4.00 -0.03 4.14 0.24 TCO 0.50
2+160.00 2395.58 2395.43 -0.15 TCO 0.50 -5.06 1.81 -4.00 -0.31 -3.73 -0.22 -6.00 6.00 3.28 0.20 5.87 -1.53 TTE 1.50
2+172.14 2397.41 2396.40 -1.01 TCO 0.50 -5.42 2.62 -4.00 -0.22 -3.66 -0.11 -3.00 3.00 3.29 0.10 3.64 0.11 TRE 0.00
2+180.00 2399.22 2397.03 -2.20 TCO 0.50 -6.11 4.00 -4.00 -0.22 -3.66 -0.11 -3.00 -0.37 3.61 -0.01 4.00 -0.14 4.48 0.81 TCO 0.50
2+200.00 2402.73 2398.63 -4.11 TCO 0.50 -7.22 6.22 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.37 2.51 TCO 0.50
2+220.00 2405.01 2400.43 -4.59 TCO 0.50 -7.42 6.61 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.67 3.12 TCO 0.50
2+240.00 2407.53 2402.63 -4.90 TCO 0.50 -7.24 6.33 -4.00 -0.15 -3.61 -0.02 -0.56 -3.00 3.66 -0.11 4.00 -0.22 5.88 3.54 TCO 0.50
2+248.54 2408.36 2403.65 -4.71 TCO 0.50 -7.05 6.05 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 5.86 3.49 TCO 0.50
2+260.00 2408.97 2405.03 -3.94 TCO 0.50 -6.65 5.31 -4.00 0.02 -3.52 0.18 5.00 -5.00 3.71 -0.19 4.00 -0.28 5.64 3.00 TCO 0.50
2+280.00 2411.27 2407.43 -3.85 TCO 0.50 -6.60 5.19 -4.00 -0.01 -3.53 0.15 4.23 -4.23 3.69 -0.16 4.00 -0.26 5.56 2.86 TCO 0.50
2+282.94 2411.59 2407.78 -3.81 TCO 0.50 -6.62 5.19 -4.00 -0.04 -3.55 0.11 3.00 -3.00 3.66 -0.11 4.00 -0.22 5.51 2.80 TCO 0.50
2+300.00 2413.21 2409.83 -3.39 TCO 0.50 -6.43 4.64 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.37 2.51 TCO 0.50
2+320.00 2414.94 2412.23 -2.71 TCO 0.50 -6.04 3.87 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.24 2.25 TCO 0.50
2+340.00 2416.48 2414.63 -1.85 TCO 0.50 -5.56 2.90 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 4.84 1.47 TCO 0.50
2+360.00 2419.30 2416.97 -2.33 TCO 0.50 -5.64 3.00 -4.00 -0.27 -3.69 -0.17 -4.48 4.48 3.53 0.16 4.00 0.00 4.67 1.33 TCO 0.50
2+360.41 2419.35 2417.01 -2.34 TCO 0.50 -5.66 3.05 -4.00 -0.27 -3.70 -0.17 -4.65 4.65 3.53 0.16 4.00 0.01 4.67 1.34 TCO 0.50
2+380.00 2423.50 2418.90 -4.60 TCO 0.50 -6.33 4.26 -4.00 -0.41 -3.83 -0.36 -9.30 9.30 3.47 0.32 4.00 0.15 6.52 5.18 TCO 0.50
2+399.00 2426.99 2420.35 -6.64 TCO 0.50 -6.39 4.50 -4.00 -0.27 -3.70 -0.17 -4.65 4.65 3.53 0.16 4.00 0.01 8.90 9.81 TCO 0.50
2+400.00 2427.09 2420.43 -6.67 TCO 0.50 -6.36 4.47 -4.00 -0.26 -3.69 -0.16 -4.23 4.23 3.53 0.15 4.00 -0.01 8.94 9.87 TCO 0.50
2+420.00 2427.21 2421.90 -5.32 TCO 0.50 -5.35 2.48 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 9.29 10.36 TCO 0.50

Hoja No. 5
CONSTRUCCION DEL CAMINO: MONTENEGRO (LOMA DE FLOR-CERRO DEL AGUILA)
TRAMO: DEL KM. 0+000.00 AL KM. 2+587.00
LOCALIDAD: MONTENEGRO
MUNICIPIO: SAN JUAN ÑUMI

DATOS DE CONSTRUCCION A NIVEL TERRACERIAS

Semicorona Izquierda Semicorona Derecha


Elevaciones Espesor
Estación Cero Cuneta Hombro sobrelev. sobrelev. Hombro Cuneta Cero
Talud Talud
T.N. Sub. Rasante Corte Terraplen dist desn dist desn dist desn bombeo bombeo dist desn dist desn dist desn
2+440.00 2427.96 2423.36 -4.60 TCO 0.50 -5.06 1.90 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 8.58 8.94 TCO 0.50
2+460.00 2428.78 2424.83 -3.95 TCO 0.50 -4.78 1.34 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 8.11 8.00 TCO 0.50
2+461.55 2428.85 2424.95 -3.90 TCO 0.50 -4.76 1.30 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 8.10 7.97 TCO 0.50
2+480.00 2429.16 2426.30 -2.86 TCO 0.50 -4.31 0.39 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 7.51 6.80 TCO 0.50
2+500.00 2430.64 2427.77 -2.87 TCO 0.50 -4.40 0.58 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 7.60 6.98 TCO 0.50
2+505.37 2430.96 2428.16 -2.80 TCO 0.50 -4.42 0.62 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 7.60 6.98 TCO 0.50
BN 2-2 UBICADO A 13.64 MTS A LA IZQ. DE LA ESTACION 2+518.00
PINTURA ROJA SOBRE ARBOL
ELEV. PROM. = 2424.68 MTS
2+520.00 2431.58 2429.24 -2.35 TCO 0.50 -4.29 0.36 -4.00 -0.22 -3.66 -0.11 -3.00 -3.00 3.66 -0.11 4.00 -0.22 7.46 6.69 TCO 0.50
2+540.00 2432.17 2430.70 -1.46 TTE 1.50 -8.31 -3.43 -3.31 -0.10 -3.00 -3.00 3.66 -0.11 4.00 -0.22 7.41 6.59 TCO 0.50
2+560.00 2432.99 2432.17 -0.82 TTE 1.50 -13.81 -7.10 -3.31 -0.10 -3.00 -3.00 3.66 -0.11 4.00 -0.22 6.97 5.72 TCO 0.50
2+580.00 2434.00 2433.64 -0.36 TTE 1.50 -7.42 -2.83 -3.31 -0.10 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.68 3.13 TCO 0.50
2+587.00 2434.35 2434.15 -0.20 TTE 1.50 -6.88 -2.47 -3.31 -0.10 -3.00 -3.00 3.66 -0.11 4.00 -0.22 5.22 2.23 TCO 0.50

Hoja No. 6
estacion T.N. Rasante Esp. Corte Esp. Terr talud 0 I dist 0I desn cun.i. dist cun.i desn hI dist hI desn
0+000.00 2265.055 2264.855 -0.2 0 TCO 0.5 -4.077 -0.069 -4 -0.223 -3.659 -0.11
0+020.00 2267.742 2267.285 -0.457 0 TTE 1.5 -4.867 -1.135 0 0 -3.314 -0.099
0+040.00 2270.759 2268.525 -2.234 0 TCO 0.5 -4.533 0.843 -4 -0.223 -3.659 -0.11
0+057.39 2270.323 2268.498 -1.825 0 TCO 0.5 -4.812 1.401 -4 -0.223 -3.659 -0.11
0+060.00 2270.277 2268.405 -1.872 0 TCO 0.5 -4.855 1.454 -4 -0.257 -3.685 -0.152
0+075.15 2270.137 2267.409 -2.728 0 TCO 0.5 -4.705 1.147 -4 -0.262 -3.689 -0.159
0+080.00 2270.145 2266.925 -3.22 0 TCO 0.5 -5.243 2.223 -4 -0.262 -3.689 -0.159
0+088.86 2269.669 2265.835 -3.834 0 TCO 0.5 -5.975 3.726 -4 -0.223 -3.659 -0.11
0+100.00 2268.477 2264.255 -4.222 0 TCO 0.5 -5.278 2.333 -4 -0.223 -3.659 -0.11
0+108.55 2267.325 2263.041 -4.284 0 TCO 0.5 -5.224 2.225 -4 -0.223 -3.659 -0.11
0+120.00 2265.94 2261.415 -4.525 0 TCO 0.5 -5.338 2.453 -4 -0.223 -3.659 -0.11
0+138.65 2263.442 2258.767 -4.675 0 TCO 0.5 -5.699 3.174 -4 -0.223 -3.659 -0.11
0+140.00 2263.264 2258.575 -4.689 0 TCO 0.5 -5.703 3.193 -4 -0.213 -3.652 -0.096
0+160.00 2260.21 2255.735 -4.475 0 TCO 0.5 -5.532 3.013 -4 -0.051 -3.554 0.098
0+160.93 2260.061 2255.603 -4.458 0 TCO 0.5 -5.517 2.991 -4 -0.043 -3.55 0.107
0+180.00 2256.882 2252.895 -3.987 0 TCO 0.5 -5.372 2.701 -4 -0.043 -3.55 0.107
0+192.34 2255.212 2251.143 -4.069 0 TCO 0.5 -5.309 2.575 -4 -0.043 -3.55 0.107
0+200.00 2254.685 2250.055 -4.63 0 TCO 0.5 -5.37 2.628 -4 -0.112 -3.588 0.025
0+220.00 2252.119 2247.215 -4.904 0 TCO 0.5 -5.882 3.541 -4 -0.223 -3.659 -0.11
0+240.00 2248.165 2244.375 -3.79 0 TCO 0.5 -5.396 2.568 -4 -0.223 -3.659 -0.11
0+260.00 2245.638 2241.569 -4.069 0 TCO 0.5 -5.169 2.115 -4 -0.223 -3.659 -0.11
0+280.00 2241.614 2238.879 -2.735 0 TCO 0.5 -4.56 0.896 -4 -0.223 -3.659 -0.11
0+300.00 2235.138 2236.275 0 1.137 TTE 1.5 -9.434 -4.179 0 0 -3.314 -0.099
0+320.00 2234.132 2233.675 -0.457 0 TRE 0 -3.32 -0.025 0 0 -3.303 -0.025
0+332.50 2234.734 2232.055 -2.679 0 TCO 0.5 -4.762 1.481 -4 -0.043 -3.55 0.107
0+340.00 2235.714 2231.153 -4.561 0 TCO 0.5 -5.224 2.405 -4 -0.043 -3.55 0.107
0+360.00 2236.724 2229.175 -7.549 0 TCO 0.5 -5.759 3.475 -4 -0.043 -3.55 0.107
0+370.68 2235.768 2228.374 -7.394 0 TCO 0.5 -5.811 3.579 -4 -0.043 -3.55 0.107
0+380.00 2234.38 2227.82 -6.56 0 TCO 0.5 -6.067 4.025 -4 -0.11 -3.586 0.028
0+400.00 2230.327 2227.086 -3.241 0 TCO 0.5 -4.955 1.637 -4 -0.274 -3.698 -0.173
0+400.78 2230.097 2227.07 -3.027 0 TCO 0.5 -4.876 1.468 -4 -0.283 -3.706 -0.185
0+420.00 2223.904 2226.975 0 3.071 TTE 1.5 -8.279 -3.619 0 0 -3.353 -0.335
0+426.20 2222.972 2227.067 0 4.095 TTE 1.5 -9.066 -4.144 0 0 -3.353 -0.335
0+440.00 2227.452 2227.486 0 0.034 TTE 1.5 -8.801 -3.926 0 0 -3.345 -0.289
0+448.71 2229.378 2227.903 -1.475 0 TRE 0 -3.49 -0.174 0 0 -3.324 -0.166
0+460.00 2230.56 2228.619 -1.941 0 TCO 0.5 -4.294 0.366 -4 -0.223 -3.659 -0.11
0+480.00 2232.65 2230.375 -2.275 0 TCO 0.5 -4.578 0.933 -4 -0.223 -3.659 -0.11
0+500.00 2235.766 2232.753 -3.013 0 TCO 0.5 -4.917 1.692 -4 -0.142 -3.605 -0.01
0+507.65 2237.521 2233.827 -3.694 0 TCO 0.5 -5.039 2.034 -4 -0.043 -3.55 0.107
0+520.00 2241.551 2235.675 -5.876 0 TCO 0.5 -6.277 4.549 -4 -0.004 -3.531 0.152
0+540.00 2248.158 2238.675 -9.483 0 TCO 0.5 -6.815 5.592 -4 -0.039 -3.548 0.112
0+540.34 2248.277 2238.726 -9.551 0 TCO 0.5 -6.883 5.722 -4 -0.043 -3.55 0.107
0+560.00 2254.775 2241.675 -13.1 0 TCO 0.5 -8.232 8.23 -4 -0.233 -3.666 -0.122
0+563.15 2254.616 2242.147 -12.469 0 TCO 0.5 -8.062 7.851 -4 -0.273 -3.697 -0.172
0+580.00 2249.743 2244.675 -5.068 0 TCO 0.5 -5.958 3.503 -4 -0.412 -3.832 -0.356
0+583.90 2247.987 2245.245 -2.742 0 TCO 0.5 -5.124 1.836 -4 -0.412 -3.832 -0.356
0+600.00 2254.677 2247.275 -7.402 0 TCO 0.5 -6.12 3.964 -4 -0.276 -3.7 -0.176
0+600.27 2254.737 2247.305 -7.432 0 TCO 0.5 -6.127 3.982 -4 -0.273 -3.697 -0.172
0+620.00 2256.694 2249.075 -7.619 0 TCO 0.5 -6.199 4.344 -4 -0.055 -3.556 0.093
0+621.08 2256.738 2249.151 -7.587 0 TCO 0.5 -6.191 4.338 -4 -0.043 -3.55 0.107
0+640.00 2257.809 2250.475 -7.334 0 TCO 0.5 -6.247 4.51 -4 0.017 -3.522 0.176
0+651.52 2252.488 2251.281 -1.207 0 TRE 0 -3.441 0.103 0 0 -3.287 0.099
0+659.40 2249.939 2251.833 0 1.894 TTE 1.5 -7.116 -2.537 0 0 -3.299 0.008
0+660.00 2250.238 2251.875 0 1.637 TTE 1.5 -6.671 -2.247 0 0 -3.3 0.001
0+668.60 2254.532 2252.477 -2.055 0 TCO 0.5 -5.136 2.048 -4 -0.223 -3.659 -0.11
0+680.00 2261.34 2253.275 -8.065 0 TCO 0.5 -6.848 5.433 -4 -0.262 -3.689 -0.159
0+699.00 2264.187 2254.409 -9.778 0 TCO 0.5 -7.203 6.183 -4 -0.223 -3.659 -0.11
0+700.00 2264.15 2254.45 -9.7 0 TCO 0.5 -7.188 6.162 -4 -0.215 -3.653 -0.099
0+719.90 2262.032 2254.85 -7.182 0 TCO 0.5 -6.386 4.729 -4 -0.043 -3.55 0.107
0+720.00 2262.011 2254.85 -7.161 0 TCO 0.5 -6.376 4.709 -4 -0.042 -3.55 0.108
0+740.00 2258.419 2254.675 -3.744 0 TCO 0.5 -4.804 1.573 -4 -0.034 -3.546 0.117
0+750.06 2257.68 2254.574 -3.106 0 TCO 0.5 -4.578 1.112 -4 -0.043 -3.55 0.107
0+760.00 2257.356 2254.475 -2.881 0 TCO 0.5 -4.519 0.995 -4 -0.043 -3.55 0.107
0+776.15 2256.229 2254.313 -1.916 0 TCO 0.5 -4.138 0.233 -4 -0.043 -3.55 0.107
0+780.00 2255.821 2254.275 -1.546 0 TRE 0 -3.542 0.106 0 0 -3.287 0.099
0+800.00 2255.338 2254.075 -1.263 0 TTE 1.5 -3.712 -0.184 0 0 -3.287 0.099
0+804.89 2255.752 2254.026 -1.726 0 TCO 0.5 -4.101 0.158 -4 -0.043 -3.55 0.107
0+820.00 2257.107 2253.875 -3.232 0 TCO 0.5 -4.85 1.521 -4 -0.179 -3.629 -0.056
0+840.00 2257.008 2253.675 -3.333 0 TCO 0.5 -4.946 1.669 -4 -0.223 -3.659 -0.11
0+859.43 2256.614 2253.481 -3.133 0 TCO 0.5 -4.89 1.557 -4 -0.223 -3.659 -0.11
0+860.00 2256.602 2253.475 -3.127 0 TCO 0.5 -4.892 1.552 -4 -0.231 -3.665 -0.119
0+880.00 2257.954 2253.275 -4.679 0 TCO 0.5 -4.838 1.363 -4 -0.313 -3.732 -0.224
0+892.26 2258.857 2253.156 -5.701 0 TCO 0.5 -5.065 1.906 -4 -0.223 -3.659 -0.11
0+900.00 2253.808 2253.146 -0.662 0 TTE 1.5 -19.05 -10.525 0 0 -3.304 -0.028
0+913.79 2260.204 2253.338 -6.866 0 TCO 0.5 -5.458 2.872 -4 -0.043 -3.55 0.107
0+920.00 2259.576 2253.512 -6.064 0 TCO 0.5 -5.152 2.312 -4 0.008 -3.526 0.166
0+940.00 2261.489 2254.446 -7.043 0 TCO 0.5 -5.649 3.305 -4 0.008 -3.526 0.166
0+947.72 2263.242 2254.958 -8.284 0 TCO 0.5 -6.237 4.431 -4 -0.043 -3.55 0.107
0+960.00 2266.759 2255.946 -10.813 0 TCO 0.5 -7.269 6.338 -4 -0.201 -3.643 -0.082
0+980.00 2271.714 2258.012 -13.702 0 TCO 0.5 -8.343 8.462 -4 -0.223 -3.659 -0.11
1+000.00 2274.424 2260.646 -13.778 0 TCO 0.5 -8.358 8.528 -4 -0.189 -3.635 -0.068
1+016.20 2276.217 2263.167 -13.05 0 TCO 0.5 -7.778 7.512 -4 -0.043 -3.55 0.107
1+020.00 2276.667 2263.775 -12.892 0 TCO 0.5 -7.662 7.281 -4 -0.043 -3.55 0.107
1+040.00 2279.052 2266.975 -12.077 0 TCO 0.5 -7.355 6.667 -4 -0.043 -3.55 0.107
1+047.45 2279.77 2268.167 -11.603 0 TCO 0.5 -7.29 6.537 -4 -0.043 -3.55 0.107
1+060.00 2281.263 2270.175 -11.088 0 TCO 0.5 -7.241 6.326 -4 -0.156 -3.614 -0.028
1+080.00 2283.58 2273.375 -10.205 0 TCO 0.5 -6.921 5.619 -4 -0.223 -3.659 -0.11
1+100.00 2285.891 2276.575 -9.316 0 TCO 0.5 -6.459 4.862 -4 -0.057 -3.557 0.091
1+101.51 2286.064 2276.817 -9.247 0 TCO 0.5 -6.405 4.767 -4 -0.043 -3.55 0.107
1+120.00 2288.593 2279.775 -8.818 0 TCO 0.5 -6.082 4.12 -4 -0.043 -3.55 0.107
1+132.81 2289.112 2281.825 -7.287 0 TCO 0.5 -5.701 3.358 -4 -0.043 -3.55 0.107
1+140.00 2289.675 2282.975 -6.7 0 TCO 0.5 -5.568 3.029 -4 -0.108 -3.585 0.03
1+160.00 2291.363 2286.175 -5.188 0 TCO 0.5 -5.044 1.865 -4 -0.223 -3.659 -0.11
1+180.00 2293.29 2289.375 -3.915 0 TCO 0.5 -4.571 0.918 -4 -0.223 -3.659 -0.11
1+184.57 2293.91 2290.106 -3.804 0 TCO 0.5 -4.529 0.835 -4 -0.223 -3.659 -0.11
1+200.00 2294.987 2292.35 -2.637 0 TCO 0.5 -4.075 -0.073 -4 -0.223 -3.659 -0.11
1+205.00 2294.901 2292.975 -1.926 0 TTE 1.5 -6.121 -1.971 0 0 -3.314 -0.099
1+220.00 2296.714 2294.55 -2.164 0 TRE 0 -3.45 -0.103 0 0 -3.314 -0.099
1+220.21 2296.724 2294.569 -2.155 0 TRE 0 -3.437 -0.103 0 0 -3.314 -0.099
1+240.00 2297.967 2296.175 -1.792 0 TTE 1.5 -7.525 -2.906 0 0 -3.314 -0.099
1+260.00 2299.783 2297.775 -2.008 0 TRE 0 -3.363 -0.093 0 0 -3.313 -0.091
1+276.65 2300.741 2299.133 -1.608 0 TTE 1.5 -4.809 -0.882 0 0 -3.282 0.136
1+280.00 2301.227 2299.433 -1.794 0 TTE 1.5 -3.422 0.085 0 0 -3.277 0.182
1+300.00 2307.558 2301.5 -6.058 0 TCO 0.5 -6.336 4.788 -4 0.116 -3.48 0.289
1+320.00 2317.513 2304.033 -13.48 0 TCO 0.5 -11.507 15.13 -4 0.116 -3.48 0.289
1+340.00 2323.519 2306.975 -16.544 0 TCO 0.5 -15.918 23.89 -4 0.055 -3.505 0.22
1+345.11 2324.01 2307.742 -16.268 0 TCO 0.5 -16.175 24.341 -4 -0.009 -3.534 0.147
1+360.00 2323.756 2309.975 -13.781 0 TCO 0.5 -15.876 23.557 -4 -0.194 -3.639 -0.074
1+380.00 2324.068 2312.975 -11.093 0 TCO 0.5 -14.505 20.794 -4 -0.215 -3.653 -0.099
1+397.00 2324.908 2315.525 -9.383 0 TCO 0.5 -13.032 18.002 -4 -0.062 -3.56 0.085
1+399.08 2325.292 2315.837 -9.455 0 TCO 0.5 -13.093 18.142 -4 -0.043 -3.55 0.107
1+400.00 2325.535 2315.975 -9.56 0 TCO 0.5 -13.188 18.332 -4 -0.043 -3.55 0.107
1+420.00 2328.91 2318.975 -9.935 0 TCO 0.5 -13.368 18.693 -4 -0.043 -3.55 0.107
1+431.02 2329.442 2320.628 -8.814 0 TCO 0.5 -12.572 17.101 -4 -0.043 -3.55 0.107
1+440.00 2329.475 2321.975 -7.5 0 TCO 0.5 -11.597 15.071 -4 -0.124 -3.594 0.011
1+460.00 2331.312 2324.975 -6.337 0 TCO 0.5 -10.914 13.605 -4 -0.223 -3.659 -0.11
1+475.75 2332.555 2327.338 -5.217 0 TCO 0.5 -10.368 12.512 -4 -0.223 -3.659 -0.11
1+480.00 2332.693 2327.975 -4.718 0 TCO 0.5 -10.204 12.175 -4 -0.232 -3.666 -0.121
1+500.00 2334.808 2330.575 -4.233 0 TCO 0.5 -10.024 11.816 -4 -0.232 -3.666 -0.121
1+512.96 2335.819 2331.833 -3.986 0 TCO 0.5 -9.628 11.032 -4 -0.223 -3.659 -0.11
1+520.00 2336.996 2332.375 -4.621 0 TCO 0.5 -9.906 11.589 -4 -0.223 -3.659 -0.11
1+540.00 2339.324 2333.775 -5.549 0 TCO 0.5 -10.416 12.608 -4 -0.223 -3.659 -0.11
1+560.00 2338.952 2335.175 -3.777 0 TCO 0.5 -9.425 10.627 -4 -0.223 -3.659 -0.11
1+580.00 2338.745 2336.575 -2.17 0 TCO 0.5 -8.365 8.507 -4 -0.223 -3.659 -0.11
1+600.00 2341.941 2337.975 -3.966 0 TCO 0.5 -9.886 11.549 -4 -0.223 -3.659 -0.11
1+614.11 2344.561 2338.963 -5.598 0 TCO 0.5 -11.243 14.263 -4 -0.223 -3.659 -0.11
1+620.00 2345.749 2339.375 -6.374 0 TCO 0.5 -11.807 15.392 -4 -0.223 -3.659 -0.11
1+640.00 2348.171 2340.775 -7.396 0 TCO 0.5 -12.577 16.931 -4 -0.223 -3.659 -0.11
1+653.75 2347.845 2341.738 -6.107 0 TCO 0.5 -11.597 14.972 -4 -0.223 -3.659 -0.11
1+660.00 2347.874 2342.175 -5.699 0 TCO 0.5 -11.263 14.303 -4 -0.223 -3.659 -0.11
1+665.70 2347.9 2342.574 -5.326 0 TCO 0.5 -11.263 14.302 -4 -0.223 -3.659 -0.11
1+680.00 2358.228 2343.575 -14.653 0 TCO 0.5 -17.307 26.39 -4 -0.223 -3.659 -0.11
1+700.00 2363.132 2344.975 -18.157 0 TCO 0.5 -19.056 29.947 -4 -0.165 -3.62 -0.038
1+710.50 2362.958 2345.71 -17.248 0 TCO 0.5 -19.066 30.1 -4 -0.033 -3.545 0.119
1+720.00 2361.337 2346.375 -14.962 0 TCO 0.5 -18.186 28.44 -4 0.068 -3.5 0.234
1+740.00 2362.573 2347.775 -14.798 0 TCO 0.5 -16.876 25.742 -4 -0.009 -3.534 0.147
1+741.90 2362.528 2347.908 -14.62 0 TCO 0.5 -16.725 25.418 -4 -0.033 -3.545 0.119
1+760.00 2361.695 2349.175 -12.52 0 TCO 0.5 -15.543 22.924 -4 -0.162 -3.618 -0.034
1+773.74 2358.391 2350.137 -8.254 0 TCO 0.5 -13.73 19.177 -4 -0.283 -3.706 -0.185
1+780.00 2357.089 2350.575 -6.514 0 TCO 0.5 -13.216 18.069 -4 -0.362 -3.778 -0.287
1+800.00 2356.469 2352.205 -4.264 0 TCO 0.5 -10.202 11.971 -4 -0.433 -3.857 -0.386
1+820.00 2360.033 2354.295 -5.738 0 TCO 0.5 -8.847 9.374 -4 -0.32 -3.738 -0.233
1+822.94 2360.652 2354.641 -6.011 0 TCO 0.5 -8.885 9.486 -4 -0.283 -3.706 -0.185
1+833.08 2363.218 2355.911 -7.307 0 TCO 0.5 -10.545 13.047 -4 -0.043 -3.55 0.107
1+840.00 2365.511 2356.845 -8.666 0 TCO 0.5 -12.276 16.517 -4 -0.034 -3.546 0.117
1+860.00 2370.066 2359.625 -10.441 0 TCO 0.5 -14.609 21.184 -4 -0.034 -3.546 0.117
1+865.15 2370.654 2360.341 -10.313 0 TCO 0.5 -14.653 21.263 -4 -0.043 -3.55 0.107
1+880.00 2371.857 2362.405 -9.452 0 TCO 0.5 -14.499 20.808 -4 -0.19 -3.636 -0.069
1+900.00 2373.264 2365.185 -8.079 0 TCO 0.5 -13.182 18.274 -4 -0.09 -3.575 0.051
1+904.56 2373.526 2365.819 -7.707 0 TCO 0.5 -12.822 17.611 -4 -0.033 -3.545 0.119
1+920.00 2377.5 2367.965 -9.535 0 TCO 0.5 -13.407 18.881 -4 0.068 -3.5 0.234
1+931.00 2380.36 2369.494 -10.866 0 TCO 0.5 -15.545 23.157 -4 0.068 -3.5 0.234
1+940.00 2380.879 2370.745 -10.134 0 TCO 0.5 -14.787 21.595 -4 0.02 -3.52 0.18
1+944.22 2380.286 2371.332 -8.954 0 TCO 0.5 -13.831 19.629 -4 -0.033 -3.545 0.119
1+960.00 2381.065 2373.525 -7.54 0 TCO 0.5 -12.693 17.163 -4 -0.223 -3.659 -0.11
1+980.00 2383.453 2376.305 -7.148 0 TCO 0.5 -11.828 15.433 -4 -0.223 -3.659 -0.11
2+000.00 2385.656 2379.085 -6.571 0 TCO 0.5 -11.658 15.093 -4 -0.223 -3.659 -0.11
2+017.61 2387.513 2381.533 -5.98 0 TCO 0.5 -11.32 14.391 -4 -0.249 -3.678 -0.142
2+020.00 2387.854 2381.865 -5.989 0 TCO 0.5 -11.021 13.762 -4 -0.279 -3.703 -0.18
2+040.00 2389.2 2384.645 -4.555 0 TCO 0.5 -10.012 11.66 -4 -0.364 -3.78 -0.291
2+052.09 2392.043 2386.218 -5.825 0 TCO 0.5 -10.487 12.725 -4 -0.249 -3.678 -0.142
2+060.00 2394.681 2387.13 -7.551 0 TCO 0.5 -11.464 14.746 -4 -0.181 -3.63 -0.058
2+079.26 2399.71 2388.965 -10.745 0 TCO 0.5 -14.352 20.66 -4 -0.043 -3.55 0.107
2+080.00 2399.839 2389.025 -10.814 0 TCO 0.5 -14.32 20.606 -4 -0.034 -3.546 0.117
2+100.00 2400.079 2390.625 -9.454 0 TCO 0.5 -11.412 14.81 -4 -0.013 -3.536 0.141
2+117.21 2398.573 2392.002 -6.571 0 TCO 0.5 -8.524 9.004 -4 -0.043 -3.55 0.107
2+120.00 2398.229 2392.225 -6.004 0 TCO 0.5 -8.239 8.411 -4 -0.066 -3.562 0.079
2+139.00 2395.575 2393.745 -1.83 0 TCO 0.5 -6.138 4.053 -4 -0.223 -3.659 -0.11
2+140.00 2395.423 2393.825 -1.598 0 TCO 0.5 -6.038 3.84 -4 -0.236 -3.669 -0.126
2+160.00 2395.577 2395.425 -0.152 0 TCO 0.5 -5.061 1.808 -4 -0.313 -3.732 -0.224
2+172.14 2397.407 2396.396 -1.011 0 TCO 0.5 -5.421 2.619 -4 -0.223 -3.659 -0.11
2+180.00 2399.22 2397.025 -2.195 0 TCO 0.5 -6.112 4 -4 -0.223 -3.659 -0.11
2+200.00 2402.73 2398.625 -4.105 0 TCO 0.5 -7.222 6.222 -4 -0.223 -3.659 -0.11
2+220.00 2405.013 2400.425 -4.588 0 TCO 0.5 -7.419 6.614 -4 -0.223 -3.659 -0.11
2+240.00 2407.526 2402.625 -4.901 0 TCO 0.5 -7.24 6.33 -4 -0.15 -3.61 -0.02
2+248.54 2408.36 2403.65 -4.71 0 TCO 0.5 -7.045 6.046 -4 -0.043 -3.55 0.107
2+260.00 2408.968 2405.025 -3.943 0 TCO 0.5 -6.648 5.313 -4 0.017 -3.522 0.176
2+280.00 2411.273 2407.425 -3.848 0 TCO 0.5 -6.596 5.185 -4 -0.006 -3.532 0.149
2+282.94 2411.59 2407.778 -3.812 0 TCO 0.5 -6.616 5.188 -4 -0.043 -3.55 0.107
2+300.00 2413.213 2409.825 -3.388 0 TCO 0.5 -6.431 4.64 -4 -0.223 -3.659 -0.11
2+320.00 2414.939 2412.225 -2.714 0 TCO 0.5 -6.044 3.865 -4 -0.223 -3.659 -0.11
2+340.00 2416.479 2414.625 -1.854 0 TCO 0.5 -5.562 2.9 -4 -0.223 -3.659 -0.11
2+360.00 2419.3 2416.967 -2.333 0 TCO 0.5 -5.635 3.003 -4 -0.268 -3.693 -0.165
2+360.41 2419.347 2417.011 -2.336 0 TCO 0.5 -5.659 3.046 -4 -0.273 -3.697 -0.172
2+380.00 2423.503 2418.901 -4.602 0 TCO 0.5 -6.334 4.256 -4 -0.412 -3.832 -0.356
2+399.00 2426.994 2420.354 -6.64 0 TCO 0.5 -6.385 4.498 -4 -0.273 -3.697 -0.172
2+400.00 2427.094 2420.427 -6.667 0 TCO 0.5 -6.364 4.468 -4 -0.26 -3.687 -0.156
2+420.00 2427.211 2421.895 -5.316 0 TCO 0.5 -5.35 2.478 -4 -0.223 -3.659 -0.11
2+440.00 2427.958 2423.363 -4.595 0 TCO 0.5 -5.063 1.903 -4 -0.223 -3.659 -0.11
2+460.00 2428.778 2424.831 -3.947 0 TCO 0.5 -4.782 1.341 -4 -0.223 -3.659 -0.11
2+461.55 2428.848 2424.945 -3.903 0 TCO 0.5 -4.76 1.296 -4 -0.223 -3.659 -0.11
2+480.00 2429.163 2426.299 -2.864 0 TCO 0.5 -4.306 0.389 -4 -0.223 -3.659 -0.11
2+500.00 2430.639 2427.767 -2.872 0 TCO 0.5 -4.401 0.579 -4 -0.223 -3.659 -0.11
2+505.37 2430.956 2428.161 -2.795 0 TCO 0.5 -4.421 0.619 -4 -0.223 -3.659 -0.11
2+520.00 2431.584 2429.235 -2.349 0 TCO 0.5 -4.292 0.36 -4 -0.223 -3.659 -0.11
2+540.00 2432.167 2430.703 -1.464 0 TTE 1.5 -8.31 -3.43 0 0 -3.314 -0.099
2+560.00 2432.99 2432.171 -0.819 0 TTE 1.5 -13.813 -7.099 0 0 -3.314 -0.099
2+580.00 2434 2433.639 -0.361 0 TTE 1.5 -7.416 -2.834 0 0 -3.314 -0.099
2+587.00 2434.353 2434.153 -0.2 0 TTE 1.5 -6.876 -2.474 0 0 -3.314 -0.099
bombeo bombeo hd. dist hd. desn cun. dist cun. desn 0d dist 0d desn talud
-3 -3 3.659 -0.11 4 -0.223 5.498 2.772 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 5.88 3.537 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 6.038 3.853 TCO 0.5
-3 3 3.55 0.107 4 -0.043 6.311 4.579 TCO 0.5
-4.12 4.12 3.534 0.146 4 -0.01 6.483 4.957 TCO 0.5
-4.3 4.3 3.531 0.152 4 -0.004 7.132 6.259 TCO 0.5
-4.3 4.3 3.531 0.152 4 -0.004 7.35 6.696 TCO 0.5
-3 3 3.55 0.107 4 -0.043 7.474 6.904 TCO 0.5
-3 3 3.55 0.107 4 -0.043 7.392 6.741 TCO 0.5
-3 3 3.55 0.107 4 -0.043 7.843 7.643 TCO 0.5
-3 3 3.55 0.107 4 -0.043 8.305 8.567 TCO 0.5
-3 3 3.55 0.107 4 -0.043 8.633 9.222 TCO 0.5
-2.64 2.64 3.556 0.094 4 -0.054 8.643 9.231 TCO 0.5
2.75 -2.75 3.654 -0.1 4 -0.216 8.33 8.443 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 8.309 8.394 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 8.313 8.403 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 8.303 8.382 TCO 0.5
0.7 -3 3.659 -0.11 4 -0.223 8.351 8.478 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 8.828 9.432 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 7.972 7.721 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 7.816 7.408 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 6.749 5.274 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 4.144 0.064 TCO 0.5
-0.75 -3 3.659 -0.11 4 -0.223 4.819 1.415 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.006 3.79 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.82 5.417 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 8.536 8.848 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 8.854 9.484 TCO 0.5
0.79 -0.79 3.615 -0.029 4 -0.157 8.476 8.794 TCO 0.5
-4.68 4.68 3.526 0.165 4 0.007 6.794 5.594 TCO 0.5
-5 5 3.522 0.176 4 0.017 6.778 5.573 TCO 0.5
-10 10 3.261 0.326 0 0 7.095 -2.23 TTE 1.5
-10 10 3.261 0.326 0 0 9.282 -3.688 TTE 1.5
-8.63 8.63 3.477 0.3 4 0.126 5.03 2.186 TCO 0.5
-5 5 3.522 0.176 4 0.017 6.35 4.716 TCO 0.5
-3 0.3 3.595 0.011 4 -0.124 6.832 5.539 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 6.959 5.695 TCO 0.5
-0.29 -3 3.659 -0.11 4 -0.223 7.295 6.367 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 7.677 7.13 TCO 0.5
4.3 -4.3 3.689 -0.159 4 -0.262 9.096 9.93 TCO 0.5
3.15 -3.15 3.663 -0.115 4 -0.228 11.109 13.991 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 11.144 14.066 TCO 0.5
-3.32 3.32 3.546 0.118 4 -0.034 15.041 22.048 TCO 0.5
-4.65 4.65 3.527 0.164 4 0.006 14.624 21.255 TCO 0.5
-9.3 9.3 3.469 0.323 4 0.146 6.807 5.759 TCO 0.5
-9.3 9.3 3.469 0.323 4 0.146 6.14 4.425 TCO 0.5
-4.76 4.76 3.525 0.168 4 0.009 10.824 13.657 TCO 0.5
-4.65 4.65 3.527 0.164 4 0.006 10.855 13.716 TCO 0.5
2.62 -2.62 3.651 -0.096 4 -0.212 10.357 12.503 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 10.379 12.535 TCO 0.5
5 -5 3.706 -0.185 4 -0.283 8.761 9.238 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.016 3.809 TCO 0.5
0.23 -0.23 3.604 -0.008 4 -0.14 4.056 -0.028 TCO 0.5
0.02 -0.02 3.3 -0.001 0 0 3.832 -0.355 TTE 1.5
-3 3 3.55 0.107 4 -0.043 5.027 2.011 TCO 0.5
-4.3 4.3 3.531 0.152 4 -0.004 10.055 12.105 TCO 0.5
-3 3 3.55 0.107 4 -0.043 11.318 14.592 TCO 0.5
-2.71 2.71 3.555 0.096 4 -0.052 11.241 14.43 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 9.384 10.544 TCO 0.5
3.03 -3.03 3.66 -0.111 4 -0.224 9.373 10.522 TCO 0.5
3.3 -3.3 3.666 -0.121 4 -0.232 7.844 7.456 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 7.553 6.884 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 7.5 6.776 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.518 4.813 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.139 4.055 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 5.828 3.432 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.008 3.792 TCO 0.5
-1.53 -3 3.659 -0.11 4 -0.223 6.753 5.282 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 6.744 5.264 TCO 0.5
-3 3 3.55 0.107 4 -0.043 6.371 4.699 TCO 0.5
-3.24 3.24 3.547 0.115 4 -0.036 6.356 4.676 TCO 0.5
-6 6 3.508 0.211 4 0.047 10.652 13.35 TCO 0.5
-3 3 3.55 0.107 4 -0.043 11.956 15.868 TCO 0.5
-0.84 0.84 3.585 0.03 4 -0.108 6.79 5.473 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 11.476 14.729 TCO 0.5
4.7 -4.7 3.698 -0.174 4 -0.274 10.943 13.613 TCO 0.5
4.7 -4.7 3.698 -0.174 4 -0.274 11.091 13.908 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 11.646 15.07 TCO 0.5
-2.25 -3 3.659 -0.11 4 -0.223 14.027 19.83 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 16.569 24.915 TCO 0.5
-1.86 -3 3.659 -0.11 4 -0.223 16.33 24.437 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 15.621 23.018 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 15.394 22.564 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 14.481 20.739 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 14.149 20.074 TCO 0.5
-0.77 -3 3.659 -0.11 4 -0.223 13.835 19.447 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 13.277 18.332 TCO 0.5
2.55 -3 3.659 -0.11 4 -0.223 12.966 17.708 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 12.96 17.696 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 12.605 16.987 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 11.555 14.887 TCO 0.5
0.84 -3 3.659 -0.11 4 -0.223 11.101 13.978 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 9.942 11.661 TCO 0.5
-3 1.63 3.572 0.058 4 -0.084 8.991 9.897 TCO 0.5
-3 3 3.55 0.107 4 -0.043 8.914 9.785 TCO 0.5
-3 3 3.55 0.107 4 -0.043 8.517 8.991 TCO 0.5
-3 3 3.55 0.107 4 -0.043 8.27 8.497 TCO 0.5
-3 3 3.55 0.107 4 -0.043 7.827 7.611 TCO 0.5
-3 3 3.55 0.107 4 -0.043 7.816 7.588 TCO 0.5
-3 -2.94 3.658 -0.108 4 -0.222 7.331 6.44 TCO 0.5
-2.76 -3 3.659 -0.11 4 -0.223 7.49 6.756 TCO 0.5
4.15 -4.15 3.685 -0.153 4 -0.258 6.692 5.126 TCO 0.5
5.54 -5.54 3.72 -0.206 4 -0.3 6.718 5.136 TCO 0.5
8.3 -8.3 3.799 -0.315 4 -0.382 8.068 7.753 TCO 0.5
8.3 -8.3 3.799 -0.315 4 -0.382 9.765 11.148 TCO 0.5
6.27 -6.27 3.739 -0.234 4 -0.321 9.982 11.643 TCO 0.5
4.15 -4.15 3.685 -0.153 4 -0.258 9.705 11.151 TCO 0.5
-2.03 -3 3.659 -0.11 4 -0.223 8.394 8.565 TCO 0.5
-2.72 -3 3.659 -0.11 4 -0.223 6.897 5.57 TCO 0.5
2.38 -3 3.659 -0.11 4 -0.223 6.217 4.211 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.275 4.327 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.313 4.402 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.425 4.627 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.032 3.841 TCO 0.5
0.31 -3 3.659 -0.11 4 -0.223 5.548 2.873 TCO 0.5
-3 -2.2 3.642 -0.08 4 -0.199 5.118 2.036 TCO 0.5
-3 3 3.55 0.107 4 -0.043 4.66 1.277 TCO 0.5
-3.3 3.3 3.546 0.117 4 -0.034 4.487 0.94 TCO 0.5
-3.3 3.3 3.546 0.117 4 -0.034 4.414 0.794 TCO 0.5
-3 3 3.55 0.107 4 -0.043 4.359 0.674 TCO 0.5
-3 0.68 3.588 0.024 4 -0.113 4.607 1.1 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 5.062 1.902 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 4.49 0.756 TCO 0.5
-3 -3 3.314 -0.099 0 0 3.488 -0.105 TRE 0
-3 -1.23 3.623 -0.045 4 -0.17 4.524 0.878 TCO 0.5
-3 3 3.55 0.107 4 -0.043 5.081 2.119 TCO 0.5
-3 3 3.55 0.107 4 -0.043 5.318 2.592 TCO 0.5
-3 3 3.55 0.107 4 -0.043 5.577 3.111 TCO 0.5
-3 3 3.55 0.107 4 -0.043 5.103 2.163 TCO 0.5
-3 1.13 3.58 0.04 4 -0.099 4.967 1.835 TCO 0.5
-3 -0.59 3.611 -0.021 4 -0.151 4.842 1.534 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 8.159 8.094 TCO 0.5
-1.05 -3 3.659 -0.11 4 -0.223 9.887 11.551 TCO 0.5
3.35 -3.35 3.667 -0.123 4 -0.234 8.889 9.545 TCO 0.5
6.7 -6.7 3.751 -0.251 4 -0.334 8.06 7.785 TCO 0.5
4.15 -4.15 3.685 -0.153 4 -0.258 8.06 7.862 TCO 0.5
3.35 -3.35 3.667 -0.123 4 -0.234 8.002 7.77 TCO 0.5
-0.95 0.95 3.583 0.034 4 -0.105 7.124 6.143 TCO 0.5
-5 5 3.522 0.176 4 0.017 5.913 3.842 TCO 0.5
-7.61 7.61 3.488 0.265 4 0.095 4.996 2.088 TCO 0.5
-10 10 3.261 0.326 0 0 4.009 0.401 TRE 0
-6.23 6.23 3.506 0.218 4 0.054 5.163 2.381 TCO 0.5
-5 5 3.522 0.176 4 0.017 5.417 2.85 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.196 4.169 TCO 0.5
3.3 -3.3 3.666 -0.121 4 -0.232 6.432 4.631 TCO 0.5
3.3 -3.3 3.666 -0.121 4 -0.232 6.713 5.194 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.655 5.087 TCO 0.5
-1.9 -3 3.659 -0.11 4 -0.223 6.397 4.571 TCO 0.5
1.44 -3 3.659 -0.11 4 -0.223 6.157 4.091 TCO 0.5
3.35 -3.35 3.667 -0.123 4 -0.234 6.014 3.795 TCO 0.5
6.7 -6.7 3.751 -0.251 4 -0.334 8.221 8.107 TCO 0.5
6.7 -6.7 3.751 -0.251 4 -0.334 10.498 12.662 TCO 0.5
5.12 -5.12 3.709 -0.19 4 -0.287 8.051 7.814 TCO 0.5
3.35 -3.35 3.667 -0.123 4 -0.234 6.948 5.663 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 5.639 3.055 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 5.489 2.754 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 5.22 2.217 TCO 0.5
-3.85 3.85 3.538 0.136 4 -0.018 4.858 1.698 TCO 0.5
-4.87 4.87 3.524 0.172 4 0.013 4.862 1.737 TCO 0.5
-7.7 7.7 3.487 0.269 4 0.098 4.694 1.486 TCO 0.5
-3.85 3.85 3.538 0.136 4 -0.018 5.207 2.396 TCO 0.5
-1.59 1.59 3.573 0.057 4 -0.086 5.76 3.434 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 7.274 6.325 TCO 0.5
3.3 -3.3 3.666 -0.121 4 -0.232 7.309 6.386 TCO 0.5
4 -4 3.682 -0.147 4 -0.253 7.244 6.236 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 6.033 3.842 TCO 0.5
2.23 -2.23 3.643 -0.081 4 -0.2 5.759 3.317 TCO 0.5
-3 3 3.55 0.107 4 -0.043 4.208 0.373 TCO 0.5
-3.43 3.43 3.544 0.122 4 -0.03 4.135 0.239 TCO 0.5
-6 6 3.275 0.197 0 0 5.868 -1.532 TTE 1.5
-3 3 3.287 0.099 0 0 3.644 0.109 TRE 0
-3 -0.37 3.607 -0.013 4 -0.144 4.476 0.808 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 5.367 2.51 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 5.67 3.117 TCO 0.5
-0.56 -3 3.659 -0.11 4 -0.223 5.88 3.537 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 5.858 3.493 TCO 0.5
5 -5 3.706 -0.185 4 -0.283 5.641 2.999 TCO 0.5
4.23 -4.23 3.687 -0.156 4 -0.26 5.558 2.856 TCO 0.5
3 -3 3.659 -0.11 4 -0.223 5.511 2.799 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 5.368 2.513 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 5.237 2.251 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 4.844 1.465 TCO 0.5
-4.48 4.48 3.529 0.158 4 0.001 4.666 1.334 TCO 0.5
-4.65 4.65 3.527 0.164 4 0.006 4.665 1.337 TCO 0.5
-9.3 9.3 3.469 0.323 4 0.146 6.516 5.179 TCO 0.5
-4.65 4.65 3.527 0.164 4 0.006 8.901 9.808 TCO 0.5
-4.23 4.23 3.532 0.149 4 -0.006 8.936 9.865 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 9.289 10.355 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 8.581 8.939 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 8.111 8 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 8.095 7.966 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 7.513 6.802 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 7.602 6.982 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 7.603 6.983 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 7.459 6.694 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 7.408 6.593 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 6.973 5.722 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 5.678 3.132 TCO 0.5
-3 -3 3.659 -0.11 4 -0.223 5.224 2.225 TCO 0.5
CONSTRUCCION DEL CAMINO: MONTENEGRO (LOMA DE FLOR-CERRO DEL AGUILA)
TRAMO: DEL KM. 0+000.00 AL KM. 2+587.00
LOCALIDAD: MONTENEGRO
MUNICIPIO: SAN JUAN ÑUMI

VOLUMENES CURVA - MASA


Areas a1+a2 Semi- Volumen Coef. Corte Suma Ordenada
Cadenamiento
Corte Terraplen Corte Terraplen distancia Corte Terraplen Abund. abundado algebraica curva masa

00+000.00 5.10 0.00 1000


00+020.00 8.07 2.99 13.17 2.99 10.00 132 30 1.06 140 110 1110
00+040.00 17.11 0.00 25.18 2.99 10.00 252 30 1.06 267 237 1347
00+057.39 18.71 0.00 35.82 8.70 311 1.05 327 327 1674
00+060.00 21.43 0.00 40.14 1.31 52 1.05 55 55 1729
00+075.15 0.00 0.00 21.43 7.58 162 1.05 170 170 1899
00+080.00 35.81 0.00 35.81 2.43 87 1.05 91 91 1990
00+088.86 41.18 0.00 76.99 4.43 341 1.05 358 358 2348
00+100.00 37.47 0.00 78.65 5.57 438 1.05 460 460 2808
00+108.55 39.37 0.00 76.84 4.28 329 1.05 345 345 3153
00+120.00 45.10 0.00 84.47 5.73 484 1.05 508 508 3661
00+138.65 55.12 0.00 100.22 9.33 935 1.05 981 981 4642
00+140.00 55.78 0.00 110.90 0.67 75 1.05 79 79 4721
00+160.00 53.38 0.00 109.16 10.00 1092 1.05 1146 1146 5867
00+160.93 53.10 0.00 106.48 0.47 50 1.05 52 52 5919
00+180.00 50.26 0.00 103.36 9.54 986 1.05 1035 1035 6954
00+192.34 46.93 0.00 97.19 6.17 600 1.05 630 630 7584
00+200.00 47.04 0.00 93.97 3.83 360 1.05 378 378 7961
00+220.00 64.52 0.00 111.56 10.00 1116 1.05 1171 1171 9133
00+240.00 45.85 0.00 110.37 10.00 1104 1.05 1159 1159 10292
00+260.00 42.73 0.00 88.58 10.00 886 1.05 930 930 11222
00+280.00 24.70 0.00 67.43 10.00 674 1.05 708 708 11930
00+300.00 5.80 19.74 30.50 19.74 10.00 305 197 1.05 320 123 12053
00+320.00 2.49 0.00 8.29 19.74 10.00 83 197 1.05 87 -110 11942
00+332.50 22.02 0.00 24.51 6.25 153 1.05 161 161 12103
00+340.00 38.74 0.00 60.76 3.75 228 1.05 239 239 12342
00+360.00 72.63 0.00 111.37 10.00 1114 1.05 1169 1169 13512
00+370.68 75.42 0.00 148.05 5.34 791 1.05 830 830 14342
00+380.00 71.10 0.00 146.52 4.66 683 1.05 717 717 15059
00+400.00 29.19 0.00 100.29 10.00 1003 1.05 1053 1053 16112
00+400.78 27.14 0.00 56.33 0.39 22 1.05 23 23 16135
00+420.00 0.00 37.64 27.14 37.64 9.61 261 362 1.05 274 -88 16047
00+426.20 0.00 0.00 37.64 3.10 117 1.05 -117 15930
00+440.00 7.67 11.82 7.67 11.82 6.90 53 82 1.05 56 -26 15904
00+448.71 13.53 0.00 21.20 11.82 4.35 92 51 1.05 97 45 15950
00+460.00 19.35 0.00 32.88 5.65 186 1.05 195 195 16145
00+480.00 23.91 0.00 43.26 10.00 433 1.05 454 454 16599
00+500.00 32.67 0.00 56.58 10.00 566 1.05 594 594 17193

SUMAS 16434 1066

Hoja 17 de 29
CONSTRUCCION DEL CAMINO: MONTENEGRO (LOMA DE FLOR-CERRO DEL AGUILA)
TRAMO: DEL KM. 0+000.00 AL KM. 2+587.00
LOCALIDAD: MONTENEGRO
MUNICIPIO: SAN JUAN ÑUMI

CALCULO DE VOLUMENES DE REVESTIMIENTO


AREAS SUMAS Semi VOLUMENES
Estación
0 REVESTIMIENTO 0 0 REVESTIMIENTO 0 distancia 0 REVESTIMIENTO 0

00+000.00 0.00 1.33 0.00 0.00 0.00 0.00


00+020.00 0.00 1.30 0.00 0.00 2.63 0.00 10.00 0.00 26.29 0.00
00+040.00 0.00 1.33 0.00 0.00 2.63 0.00 10.00 0.00 26.29 0.00
00+057.39 0.00 1.32 0.00 0.00 2.65 0.00 8.70 0.00 23.07 0.00
00+060.00 0.00 1.32 0.00 0.00 2.64 0.00 1.31 0.00 3.45 0.00
00+075.15 0.00 0.00 0.00 0.00 1.32 0.00 7.58 0.00 10.01 0.00
00+080.00 0.00 1.32 0.00 0.00 1.32 0.00 2.43 0.00 3.21 0.00
00+088.86 0.00 1.32 0.00 0.00 2.64 0.00 4.43 0.00 11.71 0.00
00+100.00 0.00 1.32 0.00 0.00 2.64 0.00 5.57 0.00 14.72 0.00
00+108.55 0.00 1.32 0.00 0.00 2.64 0.00 4.28 0.00 11.29 0.00
00+120.00 0.00 1.32 0.00 0.00 2.64 0.00 5.73 0.00 15.13 0.00
00+138.65 0.00 1.32 0.00 0.00 2.64 0.00 9.33 0.00 24.64 0.00
00+140.00 0.00 1.32 0.00 0.00 2.64 0.00 0.67 0.00 1.78 0.00
00+160.00 0.00 1.32 0.00 0.00 2.64 0.00 10.00 0.00 26.42 0.00
00+160.93 0.00 1.32 0.00 0.00 2.64 0.00 0.47 0.00 1.23 0.00
00+180.00 0.00 1.32 0.00 0.00 2.64 0.00 9.54 0.00 25.19 0.00
00+192.34 0.00 1.32 0.00 0.00 2.64 0.00 6.17 0.00 16.30 0.00
00+200.00 0.00 1.33 0.00 0.00 2.65 0.00 3.83 0.00 10.13 0.00
00+220.00 0.00 1.33 0.00 0.00 2.66 0.00 10.00 0.00 26.57 0.00
00+240.00 0.00 1.33 0.00 0.00 2.66 0.00 10.00 0.00 26.64 0.00
00+260.00 0.00 1.33 0.00 0.00 2.66 0.00 10.00 0.00 26.64 0.00
00+280.00 0.00 1.33 0.00 0.00 2.66 0.00 10.00 0.00 26.64 0.00
00+300.00 0.00 1.30 0.00 0.00 2.63 0.00 10.00 0.00 26.29 0.00

SUMAS 383.64

Página 18 de 29
CONSTRUCCION DEL CAMINO: MONTENEGRO (LOMA DE FLOR-CERRO DEL AGUILA)
TRAMO: DEL KM. 0+000.00 AL KM. 2+587.00
TRAMO: MONTENEGRO
MUNICIPIO: SAN JUAN ÑUMI

Generador de Volumenes De Terracerias

Estación Despalme Despalme Corte y Rebaje de Ampliación de Comp. del Terr. Compacion de
Escalones Terraplenes
Corte Terraplen adicionales corona corte Natural la caja

00+000.00
00+020.00 36.99 3.66 108 23.90 29.91
00+040.00 38.98 3.66 228 23.90 29.91
00+057.39 37.73 311
00+060.00 5.86 52
00+075.15 17.18 162
00+080.00 6.11 87
00+088.86 23.08 341
00+100.00 29.10 438
00+108.55 22.00 329
00+120.00 30.58 484
00+138.65 52.17 935
00+140.00 3.87 75
00+160.00 56.41 1092
00+160.93 2.57 50
00+180.00 52.46 986
00+192.34 33.68 600
00+200.00 20.93 360
00+220.00 56.86 1116
00+240.00 56.16 1104
00+260.00 52.71 886
00+280.00 48.59 674
00+300.00 23.47 26.30 247 57.50 197.42

sumas 707.51 33.62 10662.37 0.00 0.00 105.30 0.00 0.00 257.24

741.13
0.74112716 10405.13

Página 19 de 29
Generador de Volumenes De Terracerias

Caja de corte

0.00

Página 20 de 29
estacion corte desp cor reb cor amp cort corte ad caja corte escalones terraplen desp terra cuña sob subrasante sub parcial revest, carpeta ctn comp caja com escal
0 5.1 1.915 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
20 5.68 1.784 0 0 0 0 2.39 0.136 0.366 0.099 0 0 1.297 0 0 0 0
40 17.11 2.114 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
57.39 18.71 2.225 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
60 21.43 2.268 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
75.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
80 35.81 2.519 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
88.86 41.18 2.69 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
100 37.47 2.534 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
108.55 39.37 2.613 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
120 45.1 2.729 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
138.65 55.12 2.866 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
140 55.78 2.869 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
160 53.38 2.772 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
160.93 53.1 2.765 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
180 50.26 2.737 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
192.34 46.93 2.722 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
200 47.04 2.744 0 0 0 0 0 0 0 0 0 0 1.325 0 0 0 0
220 64.52 2.942 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
240 45.85 2.674 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
260 42.73 2.597 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
280 24.7 2.262 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
300 0.047 0.085 0 0 0 0 5.75 10.972 2.63 0.39 0 0 1.297 0 0 0 0
320 2.49 1.628 0 0 0 0 0 0 0 0 0 0 1.296 0 0 0 0
332.5 22.02 2.154 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
340 38.74 2.409 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
360 72.63 2.859 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
370.68 75.42 2.933 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
380 71.1 2.909 0 0 0 0 0 0 0 0 0 0 1.32 0 0 0 0
400 29.19 2.35 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
400.78 27.14 2.331 0 0 0 0 0 0 0 0 0 0 1.323 0 0 0 0
420 0 0 0 0 0 0 0 33.992 3.075 0.573 0 0 1.261 0 0 0 0
426.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
440 2.43 0.986 0 0 0 0 5.24 4.504 1.76 0.317 0 0 1.282 0 0 0 0
448.71 13.53 1.968 0 0 0 0 0 0 0 0 0 0 1.285 0 0 0 0
460 19.35 2.225 0 0 0 0 0 0 0 0 0 0 1.325 0 0 0 0
480 23.91 2.307 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
500 32.67 2.442 0 0 0 0 0 0 0 0 0 0 1.326 0 0 0 0
507.65 39.05 2.543 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
520 65.61 3.075 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
540 117.7 3.585 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
540.34 118.5 3.605 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
560 224.2 4.654 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
563.15 202.2 4.537 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
580 48.78 2.553 0 0 0 0 0 0 0 0 0 0 1.33 0 0 0 0
583.9 24.52 2.253 0 0 0 0 0 0 0 0 0 0 1.33 0 0 0 0
600 93.24 3.389 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
600.27 93.86 3.396 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
620 93.52 3.311 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
621.08 97.72 3.314 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
estacion corte desp cor reb cor amp cort corte ad caja corte escalones terraplen desp terra cuña sob subrasante sub parcial revest, carpeta ctn comp caja com escal
640 75.43 3.001 0 0 0 0 0 0 0 0 0 0 1.323 0 0 0 0
651.52 10.79 1.891 0 0 0 0 0 0 0 0 0 0 1.295 0 0 0 0
659.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
660 0 0 0 0 0 0 0 12.631 2.101 0.225 0 0 1.26 0 0 0 0
668.6 15.52 2.033 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
680 97.91 3.38 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
699 131.3 3.704 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
700 131.8 3.686 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
719.9 82.97 3.154 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
720 82.63 3.15 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
740 38.05 2.53 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
750.06 30.87 2.426 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
760 29.09 2.404 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
776.15 16.14 2.131 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
780 12.72 1.936 0 0 0 0 0 0 0 0 0 0 1.295 0 0 0 0
800 9.91 1.908 0 0 0 0 0 0.041 0 0 0 0 1.295 0 0 0 0
804.89 16.71 2.022 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
820 29.78 2.321 0 0 0 0 0 0 0 0 0 0 1.329 0 0 0 0
840 27.5 2.338 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
859.43 27.12 2.252 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
860 26.98 2.249 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
880 61.31 3.098 0 0 0 0 0 0 0 0 0 0 1.324 0 0 0 0
892.26 86.82 3.404 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
900 10.06 1.586 0 0 0 0 15.64 19.577 3.582 1.037 0 0 1.289 0 0 0 0
913.79 90.19 3.387 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
920 77.56 3.219 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
940 90.56 3.348 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
947.72 111 3.577 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
960 169.7 4.259 0 0 0 0 0 0 0 0 0 0 1.33 0 0 0 0
980 257.2 4.982 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
1000 253.7 4.938 0 0 0 0 0 0 0 0 0 0 1.329 0 0 0 0
1016.2 227 4.68 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1020 213.5 4.611 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1040 198.6 4.367 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1047.45 187.9 4.288 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1060 177.1 4.215 0 0 0 0 0 0 0 0 0 0 1.327 0 0 0 0
1080 157.1 4.04 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
1100 139.9 3.885 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
1101.51 138.4 3.873 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1120 127.4 3.737 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1132.81 99.02 3.451 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1140 89.11 3.334 0 0 0 0 0 0 0 0 0 0 1.324 0 0 0 0
1160 64.64 2.997 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
1180 45.62 2.712 0 0 0 0 0 0 0 0 0 0 1.323 0 0 0 0
1184.57 44.09 2.689 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1200 32.11 2.518 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1205 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1220 25.15 2.255 0 0 0 0 0 0 0 0 0 0 1.286 0 0 0 0
1220.21 25.02 2.251 0 0 0 0 0 0 0 0 0 0 1.286 0 0 0 0
1240 19.58 2.069 0 0 0 0 5.22 0.401 0.902 0.268 0 0 1.297 0 0 0 0
estacion corte desp cor reb cor amp cort corte ad caja corte escalones terraplen desp terra cuña sob subrasante sub parcial revest, carpeta ctn comp caja com escal
1260 21.69 2.171 0 0 0 0 0 0 0 0 0 0 1.297 0 0 0 0
1276.65 16.5 1.903 0 0 0 0 2.13 0.269 0.397 0.108 0 0 1.297 0 0 0 0
1280 18.64 1.987 0 0 0 0 0 0.003 0.041 0 0 0 1.3 0 0 0 0
1300 65.11 2.881 0 0 0 0 0 0 0 0 0 0 1.328 0 0 0 0
1320 193.9 4.255 0 0 0 0 0 0 0 0 0 0 1.328 0 0 0 0
1340 299.2 5.18 0 0 0 0 0 0 0 0 0 0 1.324 0 0 0 0
1345.11 294.4 5.176 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
1360 243.5 4.854 0 0 0 0 0 0 0 0 0 0 1.33 0 0 0 0
1380 177.3 4.28 0 0 0 0 0 0 0 0 0 0 1.331 0 0 0 0
1397 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1399.08 136.5 3.874 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1400 138.9 3.9 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1420 138.8 3.959 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1431.02 123 3.721 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1440 97.66 3.429 0 0 0 0 0 0 0 0 0 0 1.325 0 0 0 0
1460 79.5 3.206 0 0 0 0 0 0 0 0 0 0 1.33 0 0 0 0
1475.75 73.17 3.006 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1480 59.89 2.938 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1500 53.23 2.888 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1512.96 48.62 2.797 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1520 56.74 2.903 0 0 0 0 0 0 0 0 0 0 1.325 0 0 0 0
1540 70.13 3.096 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
1560 47.22 2.783 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
1580 26.27 2.371 0 0 0 0 0 0 0 0 0 0 1.297 0 0 0 0
1600 49.89 2.882 0 0 0 0 0 0 0 0 0 0 1.328 0 0 0 0
1614.11 76.22 3.265 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1620 87.85 3.425 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1640 108.7 3.631 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1653.75 84.66 3.34 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1660 77.39 3.246 0 0 0 0 0 0 0 0 0 0 1.324 0 0 0 0
1665.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1680 263.2 5.093 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
1700 388.4 5.789 0 0 0 0 0 0 0 0 0 0 1.328 0 0 0 0
1710.5 370 5.591 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1720 282.3 5.249 0 0 0 0 0 0 0 0 0 0 1.325 0 0 0 0
1740 268.1 4.987 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
1741.9 262.2 4.945 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1760 210.8 4.533 0 0 0 0 0 0 0 0 0 0 1.32 0 0 0 0
1773.74 133.1 3.929 0 0 0 0 0 0 0 0 0 0 1.323 0 0 0 0
1780 105.4 3.642 0 0 0 0 0 0 0 0 0 0 1.327 0 0 0 0
1800 54.85 2.842 0 0 0 0 0 0 0 0 0 0 1.312 0 0 0 0
1820 61.73 2.802 0 0 0 0 0 0 0 0 0 0 1.324 0 0 0 0
1822.94 67.17 2.86 0 0 0 0 0 0 0 0 0 0 1.323 0 0 0 0
1833.08 93.55 3.348 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1840 120.8 3.741 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1860 172.7 4.264 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1865.15 171 4.262 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1880 154.3 4.179 0 0 0 0 0 0 0 0 0 0 1.33 0 0 0 0
1900 120.4 3.868 0 0 0 0 0 0 0 0 0 0 1.323 0 0 0 0
1904.56 112.6 3.767 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
estacion corte desp cor reb cor amp cort corte ad caja corte escalones terraplen desp terra cuña sob subrasante sub parcial revest, carpeta ctn comp caja com escal
1920 152.9 4.325 0 0 0 0 0 0 0 0 0 0 1.325 0 0 0 0
1931 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1940 180.5 4.568 0 0 0 0 0 0 0 0 0 0 1.323 0 0 0 0
1944.22 146.1 4.156 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
1960 111.8 3.667 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
1980 97.99 3.463 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2000 87.05 3.376 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2017.61 78.52 3.236 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
2020 75.12 3.177 0 0 0 0 0 0 0 0 0 0 1.323 0 0 0 0
2040 59.34 2.941 0 0 0 0 0 0 0 0 0 0 1.327 0 0 0 0
2052.09 74.95 3.139 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
2060 99.44 3.445 0 0 0 0 0 0 0 0 0 0 1.32 0 0 0 0
2079.26 171.2 4.325 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
2080 172 4.326 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
2100 129.6 3.731 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
2117.21 75.49 2.911 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
2120 67.14 2.799 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
2139 15.42 2.069 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
2140 13.55 2.035 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
2160 2.87 1.102 0 0 0 0 2.61 2.56 1.084 0.188 0 0 1.301 0 0 0 0
2172.14 7.161 1.813 0 0 0 0 0 0 0 0 0 0 1.295 0 0 0 0
2180 18.37 2.118 0 0 0 0 0 0 0 0 0 0 1.327 0 0 0 0
2200 40.91 2.518 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2220 46.75 2.618 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2240 48.34 2.624 0 0 0 0 0 0 0 0 0 0 1.327 0 0 0 0
2248.54 45.65 2.581 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
2260 37 2.458 0 0 0 0 0 0 0 0 0 0 1.323 0 0 0 0
2280 35.79 2.431 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
2282.94 35.39 2.425 0 0 0 0 0 0 0 0 0 0 1.321 0 0 0 0
2300 31.52 2.36 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2320 24.77 2.256 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2340 15.77 2.081 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2360 17.82 2.06 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
2360.41 18.02 2.065 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
2380 44.77 2.57 0 0 0 0 0 0 0 0 0 0 1.33 0 0 0 0
2399 76.32 3.057 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
2400 76.3 3.06 0 0 0 0 0 0 0 0 0 0 1.322 0 0 0 0
2420 66.14 2.928 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2440 50.38 2.729 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2460 40.65 2.579 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2461.55 44.01 2.571 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2480 28.6 2.364 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2500 29.15 2.401 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2505.37 28.82 2.405 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2520 24.98 2.35 0 0 0 0 0 0 0 0 0 0 1.332 0 0 0 0
2540 17.07 1.95 0 0 0 0 5.07 2.065 1.194 0.318 0 0 1.297 0 0 0 0
2560 13.71 1.656 0 0 0 0 10.15 6.5 2.501 0.668 0 0 1.297 0 0 0 0
2580 7.12 1.251 0 0 0 0 5.11 4.351 1.368 0.261 0 0 1.297 0 0 0 0
2587 3.76 1.148 0 0 0 0 3.42 3.345 1.272 0.227 0 0 1.297 0 0 0 0
CONSTRUCCION DEL CAMINO: MONTENEGRO (LOMA DE FLOR-CERRO DEL AGUILA)
TRAMO: DEL KM. 0+000.00 AL KM. 2+587.00
LOCALIDAD: MONTENEGRO
MUNICIPIO: SAN JUAN ÑUMI

MOVIMIENTOS DE TIERRA
MOVIMIENTO SE EXCAVARA SE TERRAPLENARA DEL KM:
DE EST. A EST. DE EST. A EST. M³ EST. M³ HM. M³ HM+1 M³ 5HM. M³ 5HM+1 M³ KM. prestamo M³ DESP.

Desperdicio 0+000.00 0+291.00 10478.00


a/libre adte. 0+291.00 0+300.00 0+300.00 0+309.00
a/libre ats. 0+320.00 0+325.00 0+309.00 0+320.00
Desperdicio 0+325.00 0+398.00 3800.00
S/A Adte. 0+398.00 0+401.00 0+401.00 0+423.00 11.00
s/a ats. 0+440.00 0+451.00 0+423.00 0+440.00 16.00
Desperdicio 0+451.00 2+573.00 181605.00
a/libre adte. 2+573.00 2+580.00 2+580.00 2+587.00

sumas 27.00 0.00 0.00 0.00 0.00 0.00 0.00 ###

Página 25 de 29
CONSTRUCCION DEL CAMINO: MONTENEGRO (LOMA DE FLOR-CERRO DEL AGUILA)
TRAMO: DEL KM. 0+000.00 AL KM. 2+587.00
LOCALIDAD: MONTENEGRO
MUNICIPIO: SAN JUAN ÑUMI

PIV ELEVACION LCV PEND. PCV PTV

1 0 2264.855 0
2 50 2271.355 80 13.00 % 10 90
3 265 2240.825 40 -14.20 % 245 285
4 420 2220.675 180 -13.00 % 330 510
5 600 2247.675 40 15.00 % 580 620
6 705 2255.025 40 7.00 % 685 725
7 950 2252.575 120 -1.00 % 890 1010
8 1205 2293.375 40 16.00 % 1185 1225
9 1300 2300.975 60 8.00 % 1270 1330
10 1500 2330.975 40 15.00 % 1480 1520
11 1810 2352.675 60 7.00 % 1780 1840
12 2060 2387.425 40 13.90 % 2040 2080
13 2220 2400.225 40 8.00 % 2200 2240
14 2370 2418.225 40 12.00 % 2350 2390
15 2587 2434.153 0 7.34 % 2587 2587
CAMINO: MONTE NEGRO (LOMA DE FLOR - CERRO DEL AGUILA)
TRAMO: DEL KM 0+000.00 AL KM 2+587.00
SUBTRAMO: DEL KM 0+000.00 AL KM 2+587.00
ORIGEN: 0+000

RELACION DE OBRAS DE DRENAJE

No. UBICACION TIPO DE OBRA EXCAVACION


ESTACION TOTAL A B C
1 0+075.15 TUBO DE CONCRETO DE D = 1.23M 138 27.7 111 0
SUMA: 138.41 27.68 110.73 0.00

138.41
ERRO DEL AGUILA)

DE OBRAS DE DRENAJE Y CANTIDADES DE OBRA

MAMPOST. 3ª ZAMP. LONG TUB0(M) CONCR. HIDRAUL. ACERO CANALES


CLASE (M3). CONC.(M3) 1.07 1.22 CICL 150 250 REF.(Kg). ENTR. SAL.
0.0 0.7 0.0 7.3 21.0 0.0 0.0 0.0 62 25
0.00 0.72 0.00 7.31 21.04 0.00 0.00 0.00 61.81 24.60
PLANTILLA RELLENOSCHAPEOMAT. FILTRO TUBO PVC
(M2) (M3) (M2) (M3) Ø 10 cm (M)
16.6 37 4.4 0 0.0
16.62 36.66 4.40 0.00 0.00