Documentos de Académico
Documentos de Profesional
Documentos de Cultura
PROYECTO: CREACION DEL CAMINO VECINAL SAN PEDRO DE PILLAO – CHAUCHAG, DISTRITO DE SAN PEDRO DE PILLAO, PROVINCIA DANIEL ALCIDES CARRION, PASCO
EJECUTA: CONSORCIO INGENIERIA Y CONSTRUCCION
PRESUPUESTO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
DESCRIPCION UND. CANT
PRECIO PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL
MANO DE MANO
CAPATAZ hh 936.44 15.58 14,589.71 164.33 2,560.26 220.67 3,438.04 0.00 0.00 105.45 1,642.91 0.00 8.83 137.57 0.00 78.91 1,229.42 235.36 3,666.91 122.89 1,914.60
OPERARIO hh 2,535.71 15.58 39,506.36 64.24 1,000.86 254.22 3,960.75 0.00 0.00 206.58 3,218.52 0.00 25.05 390.28 0.00 411.07 6,404.47 1,428.20 22,251.36 146.35 2,280.12
OFICIAL hh 2,122.81 13.12 27,851.23 156.49 2,053.15 198.91 2,609.70 0.00 0.00 51.64 677.52 0.00 1.13 14.83 0.00 318.06 4,172.95 1,251.18 16,415.48 145.40 1,907.60
PEON hh 8,542.45 11.66 99,604.92 521.23 6,077.54 946.79 11,039.57 0.00 0.00 614.32 7,162.97 0.00 116.56 1,359.09 0.00 1,201.34 14,007.62 4,297.32 50,106.75 844.89 9,851.38
NEOPRENE PLANCHA und 4.00 1,504.50 6,018.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 6,018.00 0.00
SC FLETE TERRESTRE glb 1.00 4,390.37 4,390.37 1.00 4,390.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ALAMBRE NEGRO RECOCIDO N° 8 kg 98.15 4.96 486.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.34 150.49 66.33 329.00 1.48 7.34
ALAMBRE NEGRO RECOCIDO N° 16 kg 311.38 4.96 1,544.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.50 47.12 282.85 1,402.94 19.03 94.37
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 5,581.82 3.68 20,541.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.96 44.01 5,164.04 19,003.67 405.82 1,493.40
ACERO LISO EN VARILLAS DE 1" kg 185.00 3.68 680.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 185.00 680.80 0.00
CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 69.86 5.31 370.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.98 47.68 59.40 315.40 1.48 7.86
CLAVOS PARA MADERA CON CABEZA DE 3" kg 14.45 5.31 76.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.99 58.36 3.46 18.36 0.00
CLAVOS PARA MADERA CON CABEZA DE 4" kg 14.05 5.31 74.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.59 56.23 3.46 18.36 0.00
CLAVOS PARA MADERA CON CABEZA 1/2" kg 1.00 5.31 5.31 1.00 5.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EDUCACION AMBIENTAL glb 1.00 1,500.00 1,500.00 0.24 360.00 0.22 330.00 0.00 0.00 0.18 270.00 0.00 0.00 0.07 105.00 0.00 0.16 240.00 0.13 195.00 0.00
ALCANTARILLA METALICA CIRCULAR TMC Ø=36" m 14.60 371.50 5,423.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.60 5,423.90 0.00 0.00
ALCANTARILLA METALICA CIRCULAR TMC Ø=48" m 16.00 471.80 7,548.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 7,548.80 0.00 0.00
ALCANTARILLA METALICA CIRCULAR TMC Ø=24" m 47.00 270.80 12,727.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.00 12,727.60 0.00
TUBERIA PVC SAP C-10 S/P Ø3" X 5m NTP 399.002 und 4.00 30.09 120.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 120.24 0.00
PIEDRA CHANCADA 3/4" m3 32.87 84.75 2,785.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.09 7.63 31.31 2,653.52 1.47 124.34
PIEDRA GRANDE DE 8" m3 0.14 59.00 8.50 0.14 8.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GRAVA 1" - 1 1/2" m3 87.14 84.75 7,384.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 87.14 7,384.69 0.00
PIEDRA MEDIANA 4"-6" m3 115.32 59.00 6,803.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.63 686.17 103.69 6,117.71 0.00
ARENA GRUESA m3 21.39 76.27 1,631.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.06 4.58 20.38 1,554.35 0.95 72.46
HORMIGON m3 425.78 76.27 32,473.86 0.25 19.07 0.00 0.00 0.00 0.00 0.00 0.00 103.07 7,861.15 322.46 24,593.64 0.00
MATERIAL GRANULAR m3 401.12 41.30 16,566.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.03 496.84 389.09 16,069.21 0.00
AGUA PUESTA EN OBRA m3 629.94 6.45 4,063.13 0.00 0.00 0.00 143.88 928.03 0.00 0.00 0.00 13.71 88.43 64.65 417.00 407.70 2,629.67
GEOTEXTIL TEJIDO 80gr/m2 m2 260.04 6.61 1,718.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 260.04 1,718.85 0.00
TECNOPOR DE e = 3/4" 0.60 X 1.20 m pln 16.48 26.55 437.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.48 437.47 0.00
CEMENTO PORTLAND TIPO I (42.5 kg) bol 4,211.30 22.03 92,774.83 0.87 19.17 0.00 0.00 0.00 0.00 0.00 0.00 734.81 16,187.86 3,448.94 75,980.15 26.68 587.65
YESO kg 335.27 3.54 1,186.85 294.84 1,043.73 32.76 115.97 0.00 0.00 0.00 3.96 14.02 0.00 3.71 13.13 0.00 0.00
MADERA NACIONAL PARA ENCOFRADO p2 2,876.50 4.24 12,196.38 5.80 24.59 0.00 0.00 0.00 0.00 0.00 0.00 1,234.37 5,233.73 1,599.35 6,781.24 36.98 156.82
TRIPLAY LUPUNA 4 x 8 x 6 mm pln 1.00 28.80 28.80 1.00 28.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 40,177.62 40,177.62 1.00 40,177.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LIJA DE FIERRO #40 plg 47.60 1.20 57.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.60 57.12
PINTURA EPOXICA EN TRAFICO gal 7.99 58.80 469.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.68 216.38 4.31 253.40 0.00
PINTURA ANTICORROSIVA gal 3.51 52.50 184.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.51 184.17
THINNER gal 7.99 14.80 118.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.68 54.46 4.31 63.78 0.00
BARRENO DE PERFORACION und 62.02 570.53 35,385.18 2.59 1,477.67 31.42 17,926.05 0.00 0.00 25.83 14,736.79 0.00 0.56 319.50 0.00 1.62 925.17 0.00 0.00
SOLDADURA ELECTRICA SUPERCITO kg 17.60 15.50 272.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.60 272.80
DINAMITA AL 65% kg 1,372.15 24.19 33,192.36 64.84 1,568.48 751.18 18,171.04 0.00 0.00 508.49 12,300.37 0.00 10.56 255.45 0.00 37.08 897.02 0.00 0.00
FULMINANTE und 7,752.71 1.18 9,148.19 324.18 382.53 3,927.21 4,634.11 0.00 0.00 3,227.83 3,808.84 0.00 70.42 83.10 0.00 203.06 239.61 0.00 0.00
MECHA m 7,752.71 2.07 16,048.10 324.18 671.05 3,927.21 8,129.32 0.00 0.00 3,227.83 6,681.61 0.00 70.42 145.77 0.00 203.06 420.35 0.00 0.00
PLACA RECORDATORIA und 1.00 550.00 550.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 550.00 0.00 0.00
TUBO DE FIERRO NEGRO DE 2" X 6m (E=2mm) pza 54.64 42.24 2,307.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.64 2,307.99
TUBO DE FIERRO NEGRO DE 1" X 6m (E=2mm) pza 13.92 30.44 423.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.92 423.72
TUBO DE FIERRO NEGRO DE 3" X 6m (E=2.5mm) pza 1.00 92.98 92.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 92.98
REFORESTACION glb 1.00 7,150.00 7,150.00 0.24 1,716.00 0.22 1,573.00 0.00 0.00 0.18 1,287.00 0.00 0.00 0.07 500.50 0.00 0.16 1,144.00 0.13 929.50 0.00
SEÑALES AMBIENTALES glb 1.00 900.00 900.00 0.24 216.00 0.22 198.00 0.00 0.00 0.18 162.00 0.00 0.00 0.07 63.00 0.00 0.16 144.00 0.13 117.00 0.00
PERFIL DE FIERRO PARANTES (E=2.5mm) pza 5.10 104.43 533.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.10 533.01
SELLO DE NEOPRENO m 28.66 104.43 2,992.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.66 2,992.55 0.00
GIGANTOGRAFIA DE 3.60 X 2.40 m und 1.00 185.00 185.00 1.00 185.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EQUIPO TOGRAFICO día 8.47 140.00 1,185.18 6.48 907.20 0.72 100.80 0.00 0.00 0.00 0.66 92.40 0.00 0.61 84.78 0.00 0.00
HERRAMIENTAS MANUEALES % 6,315.93 0.00 0.00 0.00 0.00 0.00 63.16 0.00 442.12 2,652.69 3,157.97
MOTOBOMBA 3" (7 HP) día 1.32 8.50 11.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.04 8.84 0.28 2.35 0.00
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 234.76 11.50 2,699.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.27 95.11 226.49 2,604.61 0.00
RODILLO TANDEM EST 8-10 ton hm 155.56 177.97 27,685.60 0.00 0.00 0.00 61.63 10,968.29 0.00 0.00 0.00 0.00 2.22 395.09 91.71 16,322.22
MARTILLO NEUMATICO DE 29 kg hm 515.37 7.80 4,019.91 150.00 1,170.00 55.00 429.00 0.00 0.00 25.00 195.00 0.00 0.00 0.00 285.37 2,225.91 0.00 0.00
COMPRESORA NEUMATICA 125-175 PCM, 76 HP hm 2.61 118.00 307.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.61 307.86 0.00 0.00
COMPRESORA NEUMATICA 250 - 330 PCM - 87 HP hm 210.20 118.64 24,938.38 10.37 1,230.30 114.70 13,608.01 0.00 0.00 59.42 7,049.59 0.00 20.33 2,411.95 0.00 5.38 638.53 0.00 0.00
CARGADOR FRONTAL hm 362.87 186.44 67,652.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.13 2,075.08 351.74 65,577.64 0.00
VOLQUETE 15m3 hm 926.97 131.36 121,767.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.22 1,999.30 861.15 113,120.66 50.60 6,647.32
EXCAVADORA SOBRE ORUGAS 115-165 HP hm 571.07 295.00 168,464.74 303.16 89,432.20 267.11 78,797.45 0.00 0.00 0.00 0.80 235.09 0.00 0.00 0.00 0.00
TRACTOR DE ORUGAS DE 190-240 HP hm 354.73 275.00 97,552.04 19.16 5,269.00 108.25 29,768.75 0.00 0.00 62.27 17,124.25 0.00 1.07 294.25 0.00 5.06 1,391.50 14.34 3,943.50 144.58 39,760.79
MOTONIVELADORA 130 - 135 HP hm 155.56 182.20 28,343.63 0.00 0.00 0.00 61.63 11,228.99 0.00 0.00 0.00 0.00 2.22 404.48 91.71 16,710.16
COMPRESORA DE AIRE hm 2.61 9.05 23.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.61 23.61 0.00 0.00
MAQUINA DE SOLDAR 295 A día 10.04 11.50 115.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.04 115.46
VIBRADOR PARA CONCRETO hm 102.17 7.50 766.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.44 220.80 70.85 531.38 1.88 14.11
MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 356.40 11.50 4,098.63 0.10 1.15 0.00 0.00 0.00 0.00 0.00 0.00 55.27 635.61 299.15 3,440.23 1.88 21.64
MARZO ABRIL MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
COSTO TOTAL: 1,129,258.98 161,995.55 194,829.56 0.00 99,442.68 0.00 6,484.96 0.00 84,750.61 474,006.56 107,749.07
GASTOS GENERALES: 7.87% 88,865.80 12,748.06 15,331.90 0.00 7,825.53 0.00 510.33 0.00 6,669.36 37,301.43 8,479.19
UTILIDAD: 6.08% 68,714.78 9,857.34 11,855.27 0.00 6,051.03 0.00 394.61 0.00 5,157.03 28,843.04 6,556.46
SUB TOTAL: 1,286,839.56 184,600.95 222,016.73 0.00 113,319.24 0.00 7,389.90 0.00 96,577.00 540,151.03 122,784.72
IGV: 18.00% 231,631.12 33,228.17 39,963.01 0.00 20,397.46 0.00 1,330.18 0.00 17,383.86 97,227.19 22,101.25
TOTAL: 1,518,470.68 217,829.12 261,979.74 0.00 133,716.70 0.00 8,720.08 0.00 113,960.85 637,378.22 144,885.96
CRONOGRAMA CONTRACTUAL DE ADQUISICION DE MATERIALES, INSUMOS DE CONSTRUCCION
PROYECTO: CREACION DEL CAMINO VECINAL SAN PEDRO DE PILLAO – CHAUCHAG, DISTRITO DE SAN PEDRO DE PILLAO, PROVINCIA DANIEL ALCIDES CARRION, PASCO
EJECUTA: CONSORCIO INGENIERIA Y CONSTRUCCION
134 D.C. (AÑO 2021)
PRECIO PRESUPUESTO MARZO ABRIL MAYO JUNIO JULIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL
MATERIALES
NEOPRENE PLANCHA und 4.00 1,504.50 6,018.00 0.00 4.00 6,018.00 0.00 0.00 0.00
SC FLETE TERRESTRE glb 1.00 4,390.37 4,390.37 0.10 439.04 0.25 1,097.59 0.25 1,097.59 0.25 1,097.59 0.15 658.56
ALAMBRE NEGRO RECOCIDO N° 8 kg 98.15 4.96 486.83 0.00 60.56 300.38 37.59 186.45 0.00 0.00
ALAMBRE NEGRO RECOCIDO N° 16 kg 311.38 4.96 1,544.43 0.00 32.79 162.64 170.50 845.68 108.0900 536.11 0.00
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 5,581.82 3.68 20,541.08 0.00 550.00 2,024.00 1,250.00 4,600.00 3,781.8200 13,917.08 0.00
ACERO LISO EN VARILLAS DE 1" kg 185.00 3.68 680.80 0.00 185.00 680.80 0.00 0.00 0.00
CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 69.86 5.31 370.94 0.00 32.27 171.35 37.59 199.59 0.00 0.00
CLAVOS PARA MADERA CON CABEZA DE 3" kg 14.45 5.31 76.72 0.00 14.45 76.72 0.00 0.00 0.00
CLAVOS PARA MADERA CON CABEZA DE 4" kg 14.05 5.31 74.59 0.00 14.05 74.59 0.00 0.00 0.00
CLAVOS PARA MADERA CON CABEZA 1/2" kg 1.00 5.31 5.31 1.00 5.31 0.00 0.00 0.00 0.00
EDUCACION AMBIENTAL glb 1.00 1,500.00 1,500.00 0.10 150.00 0.31 465.00 0.34 510.00 0.25 375.00 0.00
ALCANTARILLA METALICA CIRCULAR TMC Ø=36" ml 14.60 371.50 5,423.90 0.00 14.60 5,423.90 0.00 0.00 0.00
ALCANTARILLA METALICA CIRCULAR TMC Ø=48" ml 16.00 471.80 7,548.80 0.00 16.00 7,548.80 0.00 0.00 0.00
ALCANTARILLA METALICA CIRCULAR TMC Ø=24" ml 47.00 270.80 12,727.60 0.00 47.00 12,727.60 0.00 0.00 0.00
TUBERIA PVC SAP C-10 S/P Ø3" X 5m NTP 399.002 und 4.00 30.09 120.24 0.00 4.00 120.24 0.00 0.00 0.00
PIEDRA CHANCADA 3/4" m3 32.87 84.75 2,785.49 0.00 2.00 169.50 30.8671 2,615.99 0.00 0.00
PIEDRA GRANDE DE 8" m3 0.14 59.00 8.50 0.14 8.50 0.00 0.00 0.00 0.00
GRAVA 1" - 1 1/2" m3 87.14 84.75 7,384.69 0.00 87.14 7,384.69 0.00 0.00 0.00
PIEDRA MEDIANA 4"-6" m3 115.32 59.00 6,803.88 0.00 40.46 2,387.14 74.86 4,416.74 0.00 0.00
ARENA GRUESA m3 21.39 76.27 1,631.39 0.00 0.00 21.39 1,631.39 0.00 0.00
HORMIGON m3 425.78 76.27 32,473.86 0.00 250.84 19,131.57 95.200 7,260.90 79.74 6,081.39 0.00
MATERIAL GRANULAR m3 401.12 41.30 16,566.05 0.00 68.44 2,826.57 132.00 5,451.60 200.68 8,287.88 0.00
AGUA PUESTA EN OBRA m3 629.94 6.45 4,063.13 0.00 182.45 1,176.80 39.8733 257.18 407.62 2,629.15 0.00
GEOTEXTIL TEJIDO 80gr/m2 m2 260.04 6.61 1,718.85 0.00 260.04 1,718.85 0.00 0.00 0.00
TECNOPOR DE e = 3/4" 0.60 X 1.20 m pln 16.48 26.55 437.47 0.00 16.48 437.47 0.00 0.00 0.00
CEMENTO PORTLAND TIPO I (42.5 kg) bol 4,211.30 22.03 92,774.83 50.00 1,101.50 1,250.00 27,537.50 1,250.000 27,537.50 1,661.30 36,598.33 0.00
YESO kg 335.27 3.54 1,186.85 27.60 97.70 307.67 1,089.15 0.00 0.00 0.00
MADERA NACIONAL PARA ENCOFRADO p2 2,876.50 4.24 12,196.38 5.80 24.59 1,930.94 8,187.19 939.76 3,984.60 0.00 0.00
TRIPLAY LUPUNA 4 x 8 x 6 mm pln 1.00 28.80 28.80 1.00 28.80 0.00 0.00 0.00 0.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 40,177.62 40,177.62 1.00 40,177.62 0.00 0.00 0.00 0.00
LIJA DE FIERRO #40 plg 47.60 1.20 57.12 0.00 47.60 57.12 0.00 0.00 0.00
PINTURA EPOXICA EN TRAFICO gal 7.99 58.80 469.78 0.00 3.68 216.38 4.31 253.40 0.00 0.00
PINTURA ANTICORROSIVA gal 3.51 52.50 184.17 0.00 3.51 184.17 0.00 0.00 0.00
THINNER gal 7.99 14.80 118.24 0.00 3.68 54.46 4.31 63.78 0.00 0.00
BARRENO DE PERFORACION und 62.02 570.53 35,385.18 6.48 3,697.03 53.36 30,443.48 2.18 1,244.67 0.00 0.00
SOLDADURA ELECTRICA SUPERCITO kg 17.60 15.50 272.80 0.00 17.60 272.80 0.00 0.00 0.00
DINAMITA AL 65% kg 1,372.15 24.19 33,192.36 62.09 1,501.96 1,162.41 28,118.70 147.65 3,571.70 0.00 0.00
FULMINANTE und 7,752.71 1.18 9,148.19 110.46 130.34 6,668.77 7,869.15 973.47 1,148.70 0.00 0.00
MECHA ml 7,752.71 2.07 16,048.10 110.46 228.65 6,668.77 13,804.35 973.47 2,015.10 0.00 0.00
PLACA RECORDATORIA und 1.00 550.00 550.00 0.00 1.00 550.00 0.00 0.00 0.00
TUBO DE FIERRO NEGRO DE 2" X 6m (E=2mm) pza 54.64 42.24 2,307.99 0.00 54.64 2,307.99 0.00 0.00 0.00
TUBO DE FIERRO NEGRO DE 1" X 6m (E=2mm) pza 13.92 30.44 423.72 0.00 13.92 423.72 0.00 0.00 0.00
TUBO DE FIERRO NEGRO DE 3" X 6m (E=2.5mm) pza 1.00 92.98 92.98 0.00 1.00 92.98 0.00 0.00 0.00
REFORESTACION glb 1.00 7,150.00 7,150.00 0.28 2,002.00 0.31 2,216.50 0.34 2,431.00 0.07 500.50 0.00
SEÑALES AMBIENTALES glb 1.00 900.00 900.00 0.28 252.00 0.31 279.00 0.34 306.00 0.07 63.00 0.00
PERFIL DE FIERRO PARANTES (E=2.5mm) pza 5.10 104.43 533.01 0.00 5.10 533.01 0.00 0.00 0.00
SELLO DE NEOPRENO ml 28.66 104.43 2,992.55 0.00 28.66 2,992.55 0.00 0.00 0.00
GIGANTOGRAFIA DE 3.60 X 2.40 m und 1.00 185.00 185.00 1.00 185.00 0.00 0.00 0.00 0.00
EQUIPOS Y MAQUINARIA
EQUIPO TOGRAFICO dia 8.47 140.00 1,185.18 7.20 1,008.00 1.27 177.18 0.00 0.00 0.00
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 234.76 11.50 2,699.72 0.00 10.59 121.79 224.17 2,577.93 0.00 0.00
MARTILLO NEUMATICO DE 29 kg hm 515.37 7.80 4,019.91 15.37 119.89 357.00 2,784.60 100.00 780.00 43.00 335.42 0.00
COMPRESORA NEUMATICA 125-175 PCM, 76 HP hm 2.61 118.00 307.86 0.00 2.61 307.86 0.00 0.00 0.00
COMPRESORA NEUMATICA 250 - 330 PCM - 87 HP hm 210.20 118.64 24,938.38 25.93 3,076.34 158.57 18,812.74 25.70 3,049.30 0.00 0.00
CARGADOR FRONTAL hm 362.87 186.44 67,652.72 0.00 11.13 2,075.08 351.74 65,577.64 0.00 0.00
VOLQUETE 15m3 hm
926.97 131.36 121,767.28 0.00 15.22 1,999.30 886.45 116,444.07 25.30 3,323.91 0.00
EXCAVADORA SOBRE ORUGAS 115-165 HP hm 571.07 295.00 168,464.74 40.00 11,800.00 227.37 67,074.15 303.6969 89,590.59 0.00 0.00
TRACTOR DE ORUGAS DE 190-240 HP hm 354.73 275.00 97,552.04 33.85 9,308.75 149.65 41,153.75 12.68 3,487.00 66.85 18,383.75 91.70 25,218.79
MOTONIVELADORA 130 - 135 HP hm 155.56 182.20 28,343.63 0.00 21.17 3,857.17 41.20 7,506.64 1.48 269.66 91.71 16,710.16
COMPRESORA DE AIRE hm 2.61 9.05 23.61 0.00 2.61 23.61 0.00 0.00 0.00
MAQUINA DE SOLDAR 295 A dia 10.04 11.50 115.46 0.00 10.04 115.46 0.00 0.00 0.00
VIBRADOR PARA CONCRETO hm 102.17 7.50 766.29 0.00 60.54 454.05 41.63 312.24 0.00 0.00