Está en la página 1de 2

FORMULARIO DE AVANCE Nº 1

FECHA DE INICIACION : 18-mar-19


CONTRATO Nº: FPS/LPZ/CD-156/2017 PLAZO DE EJECUCIÓN DE OBRA ORIGINAL: 150 DC
NOMBRE DEL PROYECTO: AMPL. SISTEMA DE AGUA POTABLE MALLASA-MECAPACA FASE II (MECAPACA) TRAMO 1 FECHA DE CONCLUSIÓN ORIGINAL: 14-ago-19
CODIGO Nº: FPS-02-00005618 AMPLIACION DE PLAZO Nº1 0 DC
FECHA DE CONCLUSIÓN ACTUALIZADA: 14-ago-19
CONSTRUCTORA: OBRAS CIVILES E INDUSTRIALES OCIS S.R.L. PLANILLA Nº: 1
SUPERVISOR: xxxxxxxxxxxxxxxxxxxx PERÍODO: 18-mar-2019 al 18-abr-2019

CONTRATO ORIGINAL AVANCE PORCENTAJES


ITEM DESCRIPCION UNIDAD PRECIO
CANTIDAD PRECIO ACUMULADO ANTERIOR AVANCE ACTUAL ACUMULADO TOTAL % AVANCE % AVANCE % TOTAL
Nº (Bs.) TOTAL (Bs.) CANTIDAD MONTO (Bs.) CANTIDAD MONTO (Bs.) CANTIDAD MONTO (Bs.) ANTERIOR ACTUAL ACUMULADO

46 ACTIVIDADES PRELIMINARES 29,985.94 0.00 29,985.94 29,985.94 0.00% 100.00% 100.00%


2312 INSTALACION DE FAENAS GENERAL GLB 23,720.34 1.00 23,720.34 0.00 0.00 1.00 23,720.34 1.00 23,720.34 0.00% 100.00% 100.00%
70 LETRERO DE OBRA PZA 3,132.80 2.00 6,265.60 0.00 0.00 2.00 6,265.60 2.00 6,265.60 0.00% 100.00% 100.00%
132 TANQUE DE ALMACENAMIENTO 661,810.48 0.00 65,337.44 65,337.44 0.00% 9.87% 9.87%
3 REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES M2 9.42 159.10 1,498.72 0.00 0.00 128.25 1,208.12 128.25 1,208.12 0.00% 80.61% 80.61%
2208 EXCAVACION CON MAQUINARIA SUELO SEMIDURO M3 42.42 157.44 6,678.60 0.00 0.00 128.25 5,440.37 128.25 5,440.37 0.00% 81.46% 81.46%
225 HORMIGON SIMPLE H21 M3 2,604.58 126.43 329,297.05 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
2619 ZAMPEADO DE PIEDRA M2 105.77 159.10 16,828.01 0.00 0.00 107.30 11,349.12 107.30 11,349.12 0.00% 67.44% 67.44%
3333 BASE DE HORMIGON POBRE e=5cm M2 36.86 159.10 5,864.43 0.00 0.00 107.30 3,955.08 107.30 3,955.08 0.00% 67.44% 67.44%
RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR
2661
MECANICO
M3 56.22 30.16 1,695.60 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

251 ACERO DE REFUERZO (Fcy=4200) KG 16.54 10,935.89 180,879.62 0.00 0.00 2,623.02 43,384.75 2,623.02 43,384.75 0.00% 23.99% 23.99%
414 REVOQUE INTERIOR CON IMPERMEABILIZANTE E=2,5 CM M2 147.15 451.90 66,497.09 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
2935 REVOQUE EXTERIOR DE CEMENTO M2 103.58 356.57 36,933.52 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4647 TAPA METALICA (80x80cm) C/PLANCHA e=1/8" PZA 612.22 12.18 7,456.84 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1809 PRUEBA DE ESTANQUEIDAD Y DESINFECCION TANQUES M3 20.20 405.00 8,181.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
128 RED DE DISTRIBUCION 2,656,465.25 0.00 273,006.72 273,006.72 0.00% 10.28% 10.28%
148 CAMA DE TIERRA CERNIDA M3 62.42 224.37 14,005.18 0.00 0.00 28.80 1,797.70 28.80 1,797.70 0.00% 12.84% 12.84%
175 PROV. Y TENDIDO TUBERIA PEAD Ø=250mm - PN16 M 485.87 3,366.06 1,635,467.57 0.00 0.00 480.00 233,217.60 480.00 233,217.60 0.00% 14.26% 14.26%
2208 EXCAVACION CON MAQUINARIA SUELO SEMIDURO M3 42.42 2,996.43 127,108.56 0.00 0.00 360.00 15,271.20 360.00 15,271.20 0.00% 12.01% 12.01%
225 HORMIGON SIMPLE H21 M3 2,604.58 34.26 89,232.91 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR
2661
MECANICO
M3 56.22 1,685.02 94,731.82 0.00 0.00 187.20 10,524.38 187.20 10,524.38 0.00% 11.11% 11.11%

2662 RELLENO Y COMPACTADO CON TIERRA CERNIDA M3 67.96 917.93 62,382.52 0.00 0.00 144.00 9,786.24 144.00 9,786.24 0.00% 15.69% 15.69%
3324 PRUEBA HIDRAULICA DE TUBERIAS HASTA D=10" M 18.09 4,051.84 73,297.79 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
3552 CORTE, RETIRO Y REPOSICION DE CARPETA ASFALTICA E=5cm M2 242.49 1,943.24 471,216.27 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4827 REPLANTEO Y TRAZADO DE TUBERIAS M 5.02 4,051.84 20,340.24 0.00 0.00 480.00 2,409.60 480.00 2,409.60 0.00% 11.85% 11.85%
3122 COLOCACION DE TUBERIA FFD D=200mm M 81.46 135.93 11,072.86 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4687 PROV. Y TENDIDO TUBERIA PEAD Ø=90mm - PN16 M 98.69 508.52 50,185.84 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4898 PROV. Y TENDIDO TUBERIA PEAD Ø=140mm - PN16 M 179.62 41.33 7,423.69 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
176 ACCESORIOS DE DISTRIBUCION 39,765.38 0.00 0.00 0.00 0.00% 0.00% 0.00%
4945 PROV. Y COLOC. ACOPLE PEAD 250mm - PN16 PZA 1,213.55 1.00 1,213.55 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4929 PROV. E INST. ADAPTADOR BRIDA FFD PARA PEAD DN=200x250mm PN16 PZA 4,514.69 4.00 18,058.76 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4949 PROV. Y COLOC. PORTA BRIDA PEAD Ø=250mm - PN16 PZA 540.13 4.00 2,160.52 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
5005 PROV. E INST. ADAPTADOR BRIDA FFD C/TOLERANCIA DN=200mm PN16 PZA 3,250.84 4.00 13,003.36 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4954 PROV. Y COLOC. CODO 90º PEAD Ø=250mm - PN16 PZA 1,275.43 1.00 1,275.43 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4950 PROV. Y COLOC. CODO 90º PEAD Ø=90mm - PN16 PZA 358.13 2.00 716.26 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4959 PROV. Y COLOC. CODO 45º PEAD Ø=250mm - PN16 PZA 1,215.98 2.00 2,431.96 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4957 PROV. Y COLOC. CODO 45º PEAD Ø=140mm - PN16 PZA 452.77 2.00 905.54 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
44 ACTIVIDADES COMPLEMENTARIAS 19,613.77 0.00 0.00 0.00 0.00% 0.00% 0.00%
2040 LIMPIEZA Y RETIRO DE ESCOMBROS EN VOLQUETA M3 80.62 243.29 19,613.77 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
166 CAMARA DE VALVULAS 155,567.63 0.00 0.00 0.00 0.00% 0.00% 0.00%
3 REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES M2 9.42 37.04 348.92 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
2208 EXCAVACION CON MAQUINARIA SUELO SEMIDURO M3 42.42 120.03 5,091.67 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
225 HORMIGON SIMPLE H21 M3 2,604.58 33.65 87,644.12 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
3333 BASE DE HORMIGON POBRE e=5cm M2 36.86 37.04 1,365.29 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
RELLENO Y COMPACTADO DE TIERRA COMUN C/COMPACTADOR
2661
MECANICO
M3 56.22 65.90 3,704.90 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

251 ACERO DE REFUERZO (Fcy=4200) KG 16.54 1,990.15 32,917.08 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
413 REVOQUE FINO INTERIOR M2 147.15 133.50 19,644.53 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
2935 REVOQUE EXTERIOR DE CEMENTO M2 103.58 22.24 2,303.62 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
828 PELDAÑOS DE FIERRO CORRUGADO 12 MM PZA 36.40 54.00 1,965.60 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4674 EXCAVACION CON MAQUINARIA Y AGOTAMIENTO M3 44.42 13.10 581.90 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
175 ACCESORIOS TANQUE 245,342.28 0.00 0.00 0.00 0.00% 0.00% 0.00%
4929 PROV. E INST. ADAPTADOR BRIDA FFD PARA PEAD DN=200x250mm PN16 PZA 4,514.69 8.00 36,117.52 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4960 PROV. E INST. CODO 90º FFD C/BRIDAS DN=80mm PN10 PZA 382.74 8.00 3,061.92 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4961 PROV. E INST. CODO 90º FFD C/BRIDAS DN=100mm PN10 PZA 421.93 8.00 3,375.44 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

5010 PROV. E INST. BRIDA FFD A COMPRESION PARA PEAD DN=150x200mm PN16 PZA 580.94 1.00 580.94 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

5012 PROV. E INST. BRIDA FFD A COMPRESION PARA PEAD DN=100x140mm PN16 PZA 385.59 1.00 385.59 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

5014 PROV. E INST. BRIDA FFD A COMPRESION PARA PEAD DN=80x90mm PN16 PZA 315.22 2.00 630.44 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1856 PROV. Y COLOCADO DE COLADOR DE ACERO INOXIDABLE DN=80mm PZA 515.42 2.00 1,030.84 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
3910 PROV. E INST. FILTRO TAMIZ FFD C/BRIDAS DN 100mm PN16 PZA 1,615.18 1.00 1,615.18 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
3912 PROV. E INST. JUNTA DESMONTABLE FFD C/BRIDAS DN=100mm PN16 PZA 1,327.17 1.00 1,327.17 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

1
4405 PROV. E INST. JUNTA DESMONTABLE FFD C/BRIDAS DN=80mm PN16 PZA 1,198.55 1.00 1,198.55 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4921 PROV. E INST. FILTRO TAMIZ FFD C/BRIDAS DN=80mm PN16 PZA 1,456.68 1.00 1,456.68 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4971 PROV. E INST. JUNTA DESMONTABLE FFD C/BRIDAS DN=100mm PN10 PZA 1,315.66 4.00 5,262.64 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4970 PROV. E INST. JUNTA DESMONTABLE FFD C/BRIDAS DN=80mm PN10 PZA 1,187.11 4.00 4,748.44 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4922 PROV. E INST. PASAMURO FFD BRIDADO DN=100mm L=0,70m PN16 PZA 1,655.99 3.00 4,967.97 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4923 PROV. E INST. PASAMURO FFD BRIDADO DN=200mm L=0,70m PN16 PZA 2,866.93 8.00 22,935.44 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4942 PROV. Y COLOC. TUBERIA FFD DN=100mm C/EXTREMO ESPIGA-CAMPANA M 829.56 3.15 2,613.11 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4943 PROV. Y COLOC. TUBERIA FFD DN=80mm C/EXTREMO ESPIGA-CAMPANA M 775.20 2.90 2,248.08 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4972 PROV. E INST. ADAPTADOR BRIDA FFD C/TOLERANCIA DN=80mm PN16 PZA 637.95 2.00 1,275.90 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4973 PROV. E INST. ADAPTADOR BRIDA FFD C/TOLERANCIA DN=100mm PN16 PZA 705.48 2.00 1,410.96 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4974 PROV. E INST. PASAMURO FFD BRIDADO DN=80mm L=0,70m PN16 PZA 1,494.61 4.00 5,978.44 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4975 PROV. E INST. PASAMURO FFD BRIDADO DN=150mm L=0,70m PN16 PZA 2,583.00 1.00 2,583.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4976 PROV. E INST. PASAMURO FFD BRIDADO DN=80mm L=0,70m PN10 PZA 1,482.48 6.00 8,894.88 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4977 PROV. E INST. PASAMURO FFD BRIDADO DN=100mm L=0,70m PN10 PZA 1,643.86 6.00 9,863.16 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4409 PROV. E INST. RAMAL TEE FFD C/BRIDAS DN=200mm PN16 PZA 1,664.60 1.00 1,664.60 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4902 TAPA METALICA FFD CIRCULAR (D=60 cm) PZA 3,427.51 6.00 20,565.06 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4932 PROV. E INST. RAMAL TEE FFD C/BRIDAS DN=200x100mm PN16 PZA 1,432.04 1.00 1,432.04 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4981 PROV. E INST. RAMAL TEE FFD C/BRIDAS DN=80mm PN16 PZA 1,216.46 2.00 2,432.92 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4987 PROV. E INST. RAMAL TEE FFD C/BRIDAS DN=200x80mm PN16 PZA 1,361.14 2.00 2,722.28 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4999 PROV. E INST. PLACA DE REDUCCION FFD DN=200x150mm PN16 PZA 1,501.16 1.00 1,501.16 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1263 PROVISION E INSTALACION CODO 90 GRADOS FG D=2 PULG PZA 73.76 16.00 1,180.16 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1386 PROV. Y COLOC. MALLA MILIMETRICA M2 47.43 0.40 18.97 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1749 PROV. Y COLOC. TUBO DE VENTILACION DE PVC D=2 PULG M 39.43 6.00 236.58 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

2408 PROV. E INSTALACION DE VALVULA COMPUERTA FFD C/BRIDAS DN=80mm PZA 815.97 8.00 6,527.76 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

2430 PROV. E INSTALACION DE VALVULA COMPUERTA FFD C/BRIDAS DN=150mm PZA 3,140.55 1.00 3,140.55 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

3905 PROV. E INST. VALVULA COMPUERTA FFD C/BRIDAS DN=100mm PN16 PZA 903.28 7.00 6,322.96 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

4028 PROV. E INSTALACION DE VALVULA COMPUERTA FFD C/BRIDAS DN=200mm PZA 3,486.14 4.00 13,944.56 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

4989 PROV. E INST. VALVULA FLOTADOR DE DOS NIVELES FFD DN=80mm PZA 879.43 2.00 1,758.86 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4990 PROV. E INST. VALVULA FLOTADOR DE DOS NIVELES FFD DN=100mm PZA 940.10 2.00 1,880.20 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4994 PROV. E INST. VALVULA DE REGULACION DE CAUDAL FFD DN=80mm PN16 PZA 19,322.06 1.00 19,322.06 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

4995 PROV. E INST. VALVULA DE REGULACION DE CAUDAL FFD DN=100mm PN16 PZA 23,180.43 1.00 23,180.43 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

1085 PROVISION Y TENDIDO TUBERIA FG D=2 PULG M 123.50 16.00 1,976.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1375 PROVISION E INSTALACION LLAVE DE PASO D=2 PULG PZA 1,039.60 4.00 4,158.40 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1394 PROV. E INSTALACION NIPLE HEXAGONAL FG D=2 PULG PZA 71.94 21.60 1,553.90 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1437 PROVISION E INSTALACION TEE FG D=2 PULG PZA 96.20 8.00 769.60 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1505 PROV. E INSTALACION UNION UNIVERSAL FG D=2 PULG PZA 136.85 12.00 1,642.20 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1617 PROV. Y COLOCADO DE COLADOR DE ACERO INOXIDABLE DN=100mm PZA 576.09 2.00 1,152.18 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
4754 PROV. E INSTALACION DE TEE FFD C/BRIDAS DN=100mm PN16 PZA 1,348.28 2.00 2,696.56 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
247 MEDIDAS DE MITIGACION AMBIENTAL 75,455.21 0.00 18,832.78 18,832.78 0.00% 24.96% 24.96%
1763 CINTA PLASTICA DE SEGURIDAD M 2.41 4,051.84 9,764.93 0.00 0.00 480.00 1,156.80 480.00 1,156.80 0.00% 11.85% 11.85%
1773 CONTENEDOR DE RESIDUOS SOLIDOS PZA 546.02 6.00 3,276.12 0.00 0.00 6.00 3,276.12 6.00 3,276.12 0.00% 100.00% 100.00%
1839 SEÑALIZACION VERTICAL PREVENTIVA PZA 546.02 6.00 3,276.12 0.00 0.00 6.00 3,276.12 6.00 3,276.12 0.00% 100.00% 100.00%
2190 HUMEDECIMIENTO DE SUELOS CON CAMION CISTERNA M2 4.74 10,129.60 48,014.30 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
3890 SEÑALIZACION FIJA PZA 802.37 6.00 4,814.22 0.00 0.00 6.00 4,814.22 6.00 4,814.22 0.00% 100.00% 100.00%
3891 SEÑALIZACION MOVIL (TIPO CABALLETE) PZA 788.69 8.00 6,309.52 0.00 0.00 8.00 6,309.52 8.00 6,309.52 0.00% 100.00% 100.00%
315 CERRAMIENTO PERIMETRAL PARA TANQUE DE ALMACENAMIENTO 106,779.06 0.00 0.00 0.00 0.00% 0.00% 0.00%
PROV Y COLOC DE MALLA OLIMPICA Y TUBOS FG 2.1/2" C/2.5m CON
2984
ALAMBRE DE PUAS
M2 384.35 207.00 79,560.45 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

708 QUINCALLERIA ALDABA, CERROJOS, CADENA Y CANDADO PZA 242.67 2.00 485.34 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
220 HORMIGON CICLOPEO CON 50% PIEDRA DESPLAZADORA M3 866.14 26.45 22,909.40 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
843 PUERTA METALICA CON MALLA OLIMPICA M2 685.82 4.00 2,743.28 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
92 EXCAVACION DE 0-2 M SUELO SEMIDURO M3 68.09 15.87 1,080.59 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
MONTO TOTAL PRODUCTO SUMATORIA VERTICAL: 3,990,785.00 0.00 387,162.88 387,162.88 0.00% 9.70% 9.70%
CORRECCION DE DECIMALES POR VERIFICACION DE SUMATORIA VERTICAL:
CANTIDADES CORREGIDAS TRAS VERIFICACION DE DECIMALES: 0.00 387,162.88 387,162.88
APROBACIÓN: CONTRATO
TOTAL CONTRATO ORIGINAL 3,990,785.00
MONTO EJECUTADO EN EL PERIODO 387,162.88

ANTICIPO (0%) 0.00


MONTO RETENIDO ANTICIPO CERTIFICADOS ANTERIORES 0.00
MONTO RETENIDO ANTICIPO PRESENTE PERIODO 0.00
MONTO RETENIDO ANTICIPO ACUMULADO A LA FECHA 0.00
MONTO POR RESTITUIR ANTICIPO 0.00

……………………………………………...........…… ……………………………………………………………… RETENCION POR CUMPLIMIENTO DE CONTRATO CC (0%)


OBRAS CIVILES E INDUSTRIALES OCIS SRL SUPERVISOR DE OBRA MONTO RETENIDO POR CC CERTIFICADOS ANTERIORES 0.00
MONTO RETENIDO POR CC PRESENTE PERIODO 0.00
MONTO RETENIDO POR CC ACUMULADO A LA FECHA 0.00

LIQUIDO PAGABLE 387,162.88


FECHA: jueves, 18 de abril de 2019
SON: TRESCIENTOS OCHENTA Y SIETE MIL CIENTO SESENTA Y DOS CON 88/100, BOLIVIANOS