1 PRELIMINARES
ITEM DESCRIPCION L (m) A (m)
1.1 LOCALIZACION Y REPLANTEO 10.30 6.40
1.2 DESCAPOTE MANUAL Y RETIRO 10.30 6.40
1.3 CERRAMIENTO EN LONA 10.30 6.40
2 CIMENTACION
ITEM DESCRIPCION L (m) A (m)
2.1 EXCAVACION MANUAL Y RETIRO 48.29 0.40
2.1 CONCRETO VIGA DE CIMENTACION 3000 PSI 5.57
3 ESTRUCTURAS
ITEM DESCRIPCION L (m) A (m)
COLUMNETAS EN CONCRETO 3000 PSI ALTURA
3.1 MENOR 3 MTS 0.35
COLUMNETAS EN CONCRETO 3000 PSI ALTURA
3.2 MAYOR 3 MTS 0.79
3.3 VIGA DE AMARRE SOBRE MURO 3000 PSI 0.98
3.4 PLACA BASE TANQUE DE ALMACENAMIENTO 1.20 1.20
3.5 VIGA CINTA 6.00 0.10
4 MAMPOSTERIA
ITEM DESCRIPCION L (m) A (m)
4.1 MURO EN BLOQUE NO. 4 E=0,10 MTS 35.16
ALFAJIA EN CONCRETO E=0,15 MTS 2500 PSI
4.2 INCLUYE REFUERZO 3.12 0.20
4.3 MESON EN CONCRETO 3.13 0.60
5 PAÑETES
ITEM DESCRIPCION L (m) A (m)
5.1 PAÑETE LISO MURO 1:4 96.95
5.2 FILOS Y DILATACIONES 58.00
8 PINTURA
ITEM DESCRIPCION L (m) A (m)
8.1 ESTUCO Y VINILO TIPO 1 TRES MANOS 254.47
9 ENCHAPES
ITEM DESCRIPCION L (m) A (m)
9.1 ENCHAPE BAÑO PORCELANA OLIMPIA 17.30
9.2 MURETE DUCHA 2.00
9.3 REJILLA PISO SOSCO 4*4*3 ALUMINIO 3.00
9.4 TUBO CORTINA DUCHA 1.00
9.5 ENCHAPE EN GRANITO PARA MESON DE COCINA 3.13
10 PISOS
ITEM DESCRIPCION L (m) A (m)
10.2 AFIRMADO EN RECEBO COMUN 57.82
10.3 NEOPRENO 57.82
10.4 MALLA ELECTROSOLDADA 39.91
10.5 PISO EN CONCRETO POBRE 2500 PSI E= 0,05 M 57.82
11 CUBIERTAS
ITEM DESCRIPCION L (m) A (m)
11.1 ASBESTO CEMENTO NO. 6 46.32
11.2 CANALETA 6.00 0.20
11.3 CABALLETE 6.00
11.4 VIGA CINTA 21.63
11.5 PERIFIL METALICO 24.00
12 CARPINTERIA MADERA
ITEM DESCRIPCION L (m) A (m)
12.1 PUERTA EN MADERA 0,80 * 2,10M 0.80
12.2 PUERTA EN MADERA 0,70 * 2,10M 0.70
12.3 CLOSET TIPO B CEDRO CAQUETA SINN FORRAR 1.77
13 CARPINTERIA METALICA
ITEM DESCRIPCION L (m) A (m)
13.1 PUERTA METALICA 1*2,10M 1.00
SUMINISTRO E INSTALACION VENTANA EN LAMINA
13.2 1,25*1,25M 1.25
SUMINISTRO E INSTALACION VENTANA EN LAMINA
13.3 0,40*0,40 0.40
SUMINISTRO E INSTALACION VENTANA EN LAMINA
13.4 0,50*0,85 0.50
SUMINISTRO E INSTALACION VENTANA EN LAMINA
13.5 0,92*0,92 0.92
14 VIDRIOS Y CERRADURAS
ITEM DESCRIPCION L (m) A (m)
14.1 CERRADURA BAÑO SCHLAGE A 40S 1.00
14.2 CERRADURA ALCOBA SCHLAGE A50 1.00
14.3 CERRADURA ENTRADA DOBLE CILINDRO 2.00
14.4 VIDRIO 4MM V 1,25*1,25M 1.25
14.5 VIDRIO 4MM V 1,25*1,25M 1.25
14.6 VIDRIO 4MM V 0,40*0,40M 0.40
14.7 VIDRIO 4MM V 0,50*0,85M 0.50
14.8 VIDRIO 4MM V 0,92*0,92M 0.92
15 CIELO RASOS
ITEM DESCRIPCION L (m) A (m)
15.1 LISTON MACHIMBRADO CIPRES 57.82
ADES DE OBRA - F02
0.05 0.97 M3
616.60 KG
781.94 KG
0.35 M3
0.79 M3
0.98 M3
0.10 0.14 M3
0.10 0.06 M3
h (m) SUBTOTAL UND
2.89 122.48 M2
0.15 0.09 M3
1.88 M2
1.00 UND
2.10 2.10 ML
1.00 UND
1.00 UND
3.10 ML
1.00 UND
2.00 UND
3.00 UND
2.00 UND
1.00 UND
12.00 UND
5.00 UND
1.00 UND
1.00 UND
1.00 UND
1.00 UND
1.00 UND
h (m) SUBTOTAL UND
1.00 UND
1.00 UND
1.00 UND
1.00 UND
1.00 UND
1.00 UND
34.40 ML
2.00 UND
7.00 UND
12.00 UND
1.25 1.56 M2
0.40 0.16 M2
0.85 0.43 M2
0.92 0.85 M2
2 CIMENTACION
2.1 EXCAVACION MANUAL Y RETIRO M3 6.7606
2.1 CONCRETO VIGA DE CIMENTACION 3000 PSI M3 5.57
2.3 BASE EN CONCRETO POBRE E= 0,05 MTS 2000PSI M3 0.9658
2.4 SUMINISTRO FIGURADO Y AMARRE ACERO A 37 KG 616.6
2.5 SUMINISTRO FIGURADO Y AMARRE ACERO PDR 60 KG 781.94
3 ESTRUCTURAS
COLUMNETAS EN CONCRETO 3000 PSI ALTURA MENOR 3
3.1 MTS M3 0.35
COLUMNETAS EN CONCRETO 3000 PSI ALTURA MAYOR 3
3.2 MTS M3 0.79
3.3 VIGA DE AMARRE SOBRE MURO 3000 PSI M3 0.98
3.4 PLACA BASE TANQUE DE ALMACENAMIENTO M3 0.14
3.5 VIGA CINTA M3 0.06
4 MAMPOSTERIA
4.1 MURO EN BLOQUE NO. 4 E=0,10 MTS M2 122.48
ALFAJIA EN CONCRETO E=0,15 MTS 2500 PSI INCLUYE
4.2 REFUERZO M3 0.0936
4.3 MESON EN CONCRETO 2500 PSI M2 1.878
5 PAÑETES
5.1 PAÑETE LISO MURO 1:4 M2 254.47
5.2 FILOS Y DILATACIONES ML 58
7 INSTALACIONES ELECTRICAS
7.1 ACOMETIDA AEREA PVC UND 1
7.2 CAJA DE CONTADOR O SUB-ESTACION UND 1
7.4 TOMA TRIFASICA COMPLETA UND 1
7.5 SALIDA TIMBRE PVC COMPLETA UND 1
7.6 CAJA DE AUTOMATICOS DE 12 CIRCUITOS UND 1
7.7 TUBERIA DE LA RED DE DISTRIBUICION DE 1/2'' ML 34.4
7.8 INSTALACION TELEVISION COMPLETA UND 2
7.9 SALIDA PARA LAMPARA DE PARED UND 7
8 PINTURA
8.1 ESTUCO Y VINILO TIPO 1 TRES MANOS M2 254.47
9 ENCHAPES
9.1 ENCHAPE BAÑO PORCELANA OLIMPIA 20*20 M2 17.29
9.2 MURETE DUCHA 0,10*0,20 ML 2
9.3 REJILLA PISO SOSCO 4*4*3 ALUMINIO UND 3
9.4 TUBO CORTINA DUCHA UND 1
9.5 ENCHAPE EN GRANITO PARA MESON DE COCINA NO.5 M2 1.878
10 PISOS
10.2 AFIRMADO EN RECEBO COMUN M3 11.564
10.3 NEOPRENO M2 57.82
10.4 MALLA ELECTROSOLDADA M2 41.12
10.5 PISO EN CONCRETO POBRE 2500 PSI E= 0,05 M M3 2.891
11 CUBIERTAS
11.1 ASBESTO CEMENTO NO. 6 M2 46.32
11.2 CANALETA M2 1.2
11.3 CABALLETE ML 6
11.4 VIGA CINTA ML 21.63
11.5 PERIFIL METALICO ML 24
12 CARPINTERIA MADERA
12.1 PUERTA EN MADERA 0,80 * 2,10M UND 3
12.2 PUERTA EN MADERA 0,70 * 2,10M UND 1
12.3 CLOSET TIPO B CEDRO CAQUETA SINN FORRAR M2 5.66
13 CARPINTERIA METALICA
13.1 PUERTA METALICA 1*2,10M M2 2.1
SUMINISTRO E INSTALACION VENTANA EN LAMINA CALIBRE
13.2 18 M2 4.545
14 VIDRIOS Y CERRADURAS
14.1 CERRADURA BAÑO SCHLAGE A 40S UND 1
14.2 CERRADURA ALCOBA SCHLAGE A50 UND 1
14.3 CERRADURA ENTRADA DOBLE CILINDRO UND 2
14.4 VIDRIO 4MM M2 2.99
15 CIELO RASOS
15.1 LISTON MACHEMBRADO CIPRES M2 57.82
COSTO DIRECTO
A.I.U. 25%
TOTAL
IAR
$ 4,966.24 $ 327,374.54
$ 4,126.24 $ 272,001.74
$ 4,594.98 302901.0816
$ 0.00
$ 0.00
$ 18,126.24 $ 17,506.32
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 0.00
$ 919,783.69
$ 229,945.92
$ 1,149,729.61
SENA
REGIONAL BOYACA
AREA CONSTRUCCION
ESTRUCTURA CURRICULAR: Tecnicas de Desarrollo Grafico de Proyectos de Construccion
MODULO:_______________________________________________________________________
UNIDAD DE APRENDIZAJE: _______________________________________________________ HOJA:
ACTIVIDAD E-A-E No:____________________________________________________________
OBRA_ _____________________________
CUADRO DE HIERROS
ACERO REFUERZO CANTIDAD
No ELEMENTO ESTRUCTURAL # ELEM DIAMETRO
# Varillas L. Corte Factor TOTAL
1 CIMENTACION
VIGA DE AMARRE
COLUMNETAS
C13 C14 C15 C16 4.00 4.00 3.00 4.00 1.05 50.40
ESTRIBOS 4.00 3.00 28.00 0.48 53.76
TOTAL ML KG TOTAL KG
ACERO NO. 2 8.40 ML 0.248 2.08 1.40
ACERO NO. 3 1,101.07 ML 0.56 616.60 183.51
ACERO NO. 4 786.66 ML 0.99 781.94 131.11
1,887.73 ML 1,398.54 314.62
REVISO
Subtotal Kgs
ELABORO
UND
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
VARILLAS
VARILLAS
VARILLAS
TOTAL VAR
SENA
REGIONAL BOYACA
AREA CONSTRUCCION
ESTRUCTURA CURRICULAR: Tecnicas de Desarrollo Grafico de Proyectos de Construccion
MODULO:_______________________________________________________________________
UNIDAD DE APRENDIZAJE: _______________________________________________________ HOJA.
ACTIVIDAD E-A-E No:____________________________________________________________
OBRA:
CUADRO DE CONCRETOS
DIMENSIONES CANTIDAD
No ELEMENTO ESTRUCTURAL # ELEM UND
Ancho Largo Altura TOTAL
1 CIMENTACION
VIGAS DE CIMENTACION
VC 1 2.00 0.40 6.40 0.30 1.54 M3
VIGAS DE AMARRE
VA 1 2.00 0.10 6.40 0.20 0.26 M3
VIGAS DE CONFINAMIENTO
Vc 1 2.00 0.10 6.40 0.20 0.26 M3
COLUMNETAS
C1 C2 C3 C4 4.00 0.10 0.20 2.75 0.22 M3
SUBTOTAL M3
ELABORO REVISO
INTERPRETACION DE PLANOS ESTRUCTURALES
ANALISIS DE PRECIOS UNITARIOS F-04
CAPITULO: ACUEDUCTO
DESCRIPCION: DESMONTE Y LIMPIEZA DE BOSQUE EN LINEA DE ACUEDUCTO
UNIDAD : ML
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
ML 0.00 0.00 0.00
LB 0.00 0.00 0.00
ML 0.00 0.00 0.00
0.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 0.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.08 926.24
SUBTOTAL 926.24
PROPONENTE
ANALISIS DE PRECIOS UNITARIOS F-04
CAPITULO: PRELIMINARES
DESCRIPCION: DESCAPOTE MANUAL Y RETIRO
UNIDAD : M2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 0.80 800.00
VOLQUETA 5M3 30,000.00 0.08 2,400.00
SUBTOTAL 3,200.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
0.00
0.00
0.00
0.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 0.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.08 926.24
SUBTOTAL 926.24
CAPITULO: PRELIMINARES
DESCRIPCION: CERRAMIENTO EN LONA 3 MTS ALTURA
UNIDAD : M2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
LONA ML 1.00 1,700.00 1,700.00
PUNTILLAS LB 0.02 2,000.00 40.00
POSTES EN MADERA ML 1.00 2.50 2.50
` 0.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 1,742.50
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.16 1,852.48
SUBTOTAL 1,852.48
SUBTOTAL 39,009.38
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
CEMENTO BLT 4.50 22,000.00 99,000.00
ARENA LAVADA M3 0.55 50,000.00 27,500.00
GRAVILLA M3 0.92 60,000.00 55,200.00
AGUA LT 150.00 30.00 4,500.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 186,200.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 4.00 2,894.50
SUBTOTAL 2,894.50
TOTAL COSTOS DIRECTOS 228,104
PROPONENTE
SUBTOTAL 17,200.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
CEMENTO BLT 0.00
ARENA LAVADA M3 0.00
GRAVILLA M3 0.00
AGUA LT 0.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 0.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.08 926.24
SUBTOTAL 926.24
PROPONENTE
CAPITULO: CIMIENTOS
DESCRIPCION: CONCRETO VIGA DE AMARRE 3000 PSI
UNIDAD : M2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
VIBRADOR 30,000.00 0.04 1,200.00
SUBTOTAL 2,200.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
CEMENTO ML 1,000.00 0.50 500.00
ARENA LAVADA LB 2,000.00 0.02 40.00
GRAVILLA ML 2,500.00 1.00 2,500.00
AGUA 0.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 3,040.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.08 926.24
SUBTOTAL 926.24
PROPONENTE
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
ACERO FIG.60000 PSI 1/2" KG 0.90 2,900.00 2,610.00
ALAMBRE NEGRO DE 18" KG 0.03 3,500.00 105.00
ARENA DE PEÑA M3 0.11 50,000.00 5,500.00
CEMENTO KG 57.19 22,000.00 1,258,180.00
GRAVILLA M3 0.09 60,000.00 5,400.00
LADRILLO TOLETE COMUN UND 92.80 380.00 35,264.00
RECEBO M3 0.11 30,000.00 3,300.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 1,310,359.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 2.00 23,156.00
SUBTOTAL 23,156.00
PROPONENTE
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
ACERO FIG 60000 PSI 1/2 KG 3.20 2,900.00 9,280.00
ALAMBRE NEGRO N°18 KG 0.09 3,500.00 315.00
ARENA DE PEÑA M3 0.19 50,000.00 9,500.00
CEMENTO KG 94.38 22,000.00 2,076,360.00
GRAVILLA M3 0.09 60,000.00 5,400.00
LADRILLO TOLETE COMUN UND 188.64 380.00 71,683.20
RECEBO M3 0.16 30,000.00 4,800.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 2,177,338.20
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 2.00 23,156.00
SUBTOTAL 23,156.00
PROPONENTE
OBJETO:
PROPONENTE :
ANALISIS DE PRECIOS UNITARIOS F-04
PROPONENTE :
SUBTOTAL 1,750.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
cerco ordinario m 8.00 1,500.00 12,000.00
concreto corriente 3000psi m3 1.10 248,080.37 272,888.41
cuarton otobo 2"*4" 2,9 m 4.00 2,000.00 8,000.00
larguero de2" * 4" m 4.00 1,000.00 4,000.00
liston de 2"*4"*3m m 4.00 2,000.00 8,000.00
puntilla con cabeza 2" lb 1.60 3,000.00 4,800.00
repisa ordinaria m 4.00 2400.00 9,600.00
tabla burra cipres m 1.05 4,700.00 4,935.00
0.00
0.00
0.00
0.00
0.00
DESPERDICIO MATERIAL % 1% 309,688.4
SUBTOTAL 309,688.41
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
CUADRILLA A-A1 0.00 0.000
15,713.00 12.00 188,556.00000
SUBTOTAL 188,556.000
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
0.00
0.00
0.00
0.00
0.00
DESPERDICIO MATERIAL % 1% 2,200.0000
SUBTOTAL 2,200.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
CUADRILLA A-A2 0.00 0.000
11,578.00 0.04 463.12000
SUBTOTAL 463.120
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
0
0
0
0
0
0
DESPERDICIO MATERIAL % 1% 1,990
SUBTOTAL 1,990
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
CUADRILLA A-A 0.00 0.000
11,578.00 0.08 961
SUBTOTAL 960.974
SUBTOTAL 200.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
0
0
0
0
0
0
DESPERDICIO MATERIAL % 1% 2,540
SUBTOTAL 2,540
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
CUADRILLA A-A 0.00 0.000
11,578.00 0.08 961
SUBTOTAL 960.974
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
0
0
0
0
DESPERDICIO MATERIAL % 1% 11,300
SUBTOTAL 11,300
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
CUADRILLA A-A 0.00 0.000
11,578.00 1.00 11,578
SUBTOTAL 11,578.000
0
0
0
0
DESPERDICIO MATERIAL % 1% 19,350
SUBTOTAL 19,350
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
CUADRILLA A-A 0.00 0.000
11,578.00 0.86 9,957
SUBTOTAL 9,957.080
CAPITULO: mamposteria
DESCRIPCION: alfajias en ladrillo prensado
UNIDAD : m2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 0.00 1,000.00
0.00
0.00
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
agua un 1.42 30 43
artena de ´peña m3 0.01 45,000.00 450
arena de revoque m3 0.01 45,000.00 450
arena fina m3 0.01 50,000.00 500
cemento griis kg 2.39 400.00 956
ladrillo prensado santafe un 12.87 1000.00 12,870
0
0
0
0
DESPERDICIO MATERIAL % 1% 15,269
SUBTOTAL 15,269
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
CUADRILLA A-A 0.00 0.000
11,578.00 1.00 11,578
SUBTOTAL 11,578.000
0
0
0
0
DESPERDICIO MATERIAL % 1% 4,534
SUBTOTAL 4,534
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
CUADRILLA A-A 0.00 0.000
11,578.00 0.50 5,789
SUBTOTAL 5,789.000
0
0
0
0
DESPERDICIO MATERIAL % 1% 2,045
SUBTOTAL 2,045
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
CUADRILLA C C 0.00 0.000
13,314.00 0.16 2,130
SUBTOTAL 2,130.240
TOTAL COSTOS DIRECTOS 4,175.2
UNIDAD : un
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 500.00 1.00 500.00
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
CODO 90°PRES PVC 1" UND 0.77 1,000.00 770.00
CODO 90°PRES PVC 1\2" UND 2.46 300.00 738.00
CODO 90°PRES PVC 3\4"" UND 1.07 450.00 481.50
REGISTRO TOYA 3\4" UND 1.00 7,000.00 7,000.00
SOLDADURA LIQUIDA PVC 1\4" GALON 0.04 5,500.00 220.00
TUBO APRESION 1" ML 0.49 2,800.00 1,372.00
TUBO APRESION 1\2" ML 2.62 1,400.00 3,668.00
TUBO APRESION 3/4" ML 0.58 1,900.00 1,102.00
LLAVE DE ALUMINIO MARIPO UND 1.00 12,000.00 12,000.00
DESPERDICIO MATERIAL % 0 0.00
SUBTOTAL 27,352
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla BB 12,043.00 3.00 36,129.00
SUBTOTAL 36,129.00
PROPONENTE
UNIDAD : ML
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 500.00 1.00 500.00
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
CODO 90° PRES PVC 1/2" UND 0.50 300.00 150.00
Subcontrato Inst. Hidraulicas y San % 0.38 7,144.72 2,714.99
Tubo PVC D= 1/2`` Rde 9 E.L. ML 1.05 1,970.00 2,068.50
soldadura liquida gl 0.01 49,390.00 493.90
DESPERDICIO MATERIAL % 0 0.00
SUBTOTAL 5,427
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla BB 12,043.00 0.35 4,215.05
SUBTOTAL 4,215.05
PROPONENTE
UNIDAD : ml
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
SOLDADURA PVC GALON 0.01 5,500.00 55.00
TUVO DE PRECION PVC 1/2 ML 1.00 1,400.00 1,400.00
CODO DE 90°PVC UNIDAD 2.46 300.00 738.00
MORTERO 1:4 M3
DESPERDICIO MATERIAL % 0 0.00
SUBTOTAL 2,193
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla BB 12,043.00 0.35 4,215.05
SUBTOTAL 4,215.05
PROPONENTE
UNIDAD : un
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
UNIONES UND 3.00 300.00 900.00
SEGUETA UND 0.03 2,500.00 75.00
TUBERIA PVC DE 1/2" 6 ML 1.00 8,000.00 8,000.00
SOLDADURA PVC GALON 0.01 5,500.00 55.00
TUVO DE PRECION PVC 1/2 ML 1.00 1,400.00 1,400.00
CODO DE 90°PVC UNIDAD 2.46 300.00 738.00
REGISTRO TOYA 1/2" UND 2.00 7,000.00 14,000.00
UNIVERSAL 1/2" UND 2.00 1,500.00 3,000.00
CINTA TEFLON UND 1.00 1,800.00 1,800.00
TANQUE ALMACENAMIENTO 1000 LT UNIDAD 1.00 450,000.00 450,000.00
DESPERDICIO MATERIAL % 0 0.00
SUBTOTAL 479,968
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla BB 12,043.00 3.00 36,129.00
SUBTOTAL 36,129.00
PROPONENTE
UNIDAD :
1. EQUIPO Y HERRAMIENTAS ML
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
SUBTOTAL
2. MATERIALES EN OBRA 1,000.00
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
TUBERIA SANITARIA P'VC 3" ML 1.05 10,137.00 10,643.85
SOLDADURA PVC GLN 0.01 44,000.00 440.00
CODOS PVC 3" UND 0.06 19,599.00 1,175.94
Subcontrato Inst. Hidraulicas y San % 0.38 18,533.26 7,042.64
DESPERDICIO MATERIAL % 0 0.00
SUBTOTAL 19,302
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla BB 12,043.00 0.50 6,021.50
SUBTOTAL 6,021.50
PROPONENTE
UNIDAD : UNIDAD
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
SOLDADURA PVC LIQUIDA 1/4 UN 0.10 49,390.00 4,939.00
Tubo PVC D= 3`` Sanitaria ML 0.93 10,137.00 9,427.41
Tubo PVC D= 4`` Sanitaria ML 0.27 16,130.00 4,355.10
Codo PVC D= 3`` Sanitaria UN 2.77 5,549.00 15,370.73
Codo PVC D= 4`` Sanitaria UN 1.37 6,512.00 8,921.44
DESPERDICIO MATERIAL % 0 0.00
SUBTOTAL 43,014
3. MANO DE OBRA 43,014
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla BB 12,043.00 1.60 19,268.80
SUBTOTAL 19,268.80
PROPONENTE
UNIDAD : UNIDAD
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
SOLDADURA PVC LIQUIDA 1/4 GALON 0.10 49,390.00 4,939.00
Tubo PVC D= 2`` Sanitaria ML 0.93 4,333.00 4,029.69
Codo PVC D= 2`` Sanitaria UN 2.77 1,500.00 4,155.00
DESPERDICIO MATERIAL % 0 0.00
SUBTOTAL 13,124
3. MANO DE OBRA 13,124
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla BB 12,043.00 1.60 19,268.80
SUBTOTAL 19,268.80
PROPONENTE
UNIDAD : UNIDAD
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
MEDIDOR RW 1/2" ML 1.00 70,000.00 70,000.00
ADAPTDOR MACHO UN 2.00 300.00 600.00
Codo PVC D= 1/2`` Sanitaria UN 2.00 300.00 600.00
DESPERDICIO MATERIAL % 0 0.00
SUBTOTAL 71,200
3. MANO DE OBRA 71,200
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla BB 12,043.00 0.53 6,382.79
SUBTOTAL 6,382.79
PROPONENTE
CAPITULO: PINTURA
DESCRIPCION: Estuco y Vinilo (Tipo 1) tres manos en muros
UNIDAD : M2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
llana metalica
espatula
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
CAOLIN BLT 0.09 18,000.00 1,620.00
CEMENTO GRIS KG 0.16 378.00 60.48
LIJA DE AGUA UND 0.02 500.00 10.00
VINILTEX GLN 0.05 24,330.00 1,216.50
YESO CTE BLT 0.01 47,500.00 475.00
DESPERDICIO MATERIAL % 0
SUBTOTAL 3,382
3. MANO DE OBRA 0
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.80 9,262.40
SUBTOTAL 9,262.40
PROPONENTE
CAPITULO: ENCHAPES
DESCRIPCION: Enchape Baño en porcelana Olimpia 20*20
UNIDAD : M2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
Agua LT 3.00 300.00 900.00
CEMENTO BLANCO KG 0.70 800.00 560.00
PEGACOR KG 3.15 900.00 2,835.00
PORCELANA VENECIA 20*20 M2 1.05 26500.00 27,825.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 32,120.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.16 1,852.48
SUBTOTAL 1,852.48
PROPONENTE
CAPITULO: ENCHAPES
DESCRIPCION: Rejillas de piso sosco 4*4*3 aluminio
UNIDAD : UND
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 200.00 1.00 200.00
SUBTOTAL 200.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
CEMENTO BLANCO KG 0.20 800.00 160.00
Rejillas Sosco 4*4*3 UND 1.00 4,500.00 4,500.00
0.00
0.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 4,660.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.16 1,852.48
SUBTOTAL 1,852.48
PROPONENTE
CAPITULO: ENCHAPES
DESCRIPCION: Tubo cortina ducha
UNIDAD : UND
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 500.00 1.00 500.00
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
Escudo Deco UND 2.00 250.00 500.00
Tubo Cortina Ducha 3/4`` ML 1.50 2,240.00 3,360.00
0.00
0.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 3,860.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.16 1,852.48
SUBTOTAL 1,852.48
PROPONENTE
ANALISIS DE PRECIOS UNITARIOS F-04
CAPITULO: ENCHAPES
DESCRIPCION: Enchape en granito para meson de cocina
UNIDAD : M2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 500.00 1.00 500.00
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
CEMENTO BLANCO KG 21.00 800.00 16,800.00
AGUA LT 7.41 300.00 2,223.00
ARENA LAVADA DE PEÑA M3 0.09 45000.00 4,050.00
GRANITO TRAVERTIANO NO. 3 BL 0.75 13350.00 10,012.50
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 33,085.50
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.16 1,852.48
SUBTOTAL 1,852.48
CAPITULO: ENCHAPES
DESCRIPCION: Murete Ducha 0.10*0.20
UNIDAD : ML
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 500.00 1.00 500.00
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
Bocel Porcelana Remates UND 9.50 2.10 19.95
CEMENTO BLANCO KG 0.58 800.00 464.00
HILASA KG 0.30 3795.00 1,138.50
PEGACOR KG 1.04 900.00 936.00
Porcelana Venecia 20*20 M2 0.50 26500.00 13,250.00
CONCRETO SIMPLE DE 2000
PSI M3 0.02 221000.00 4,420.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 20,228.45
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.16 1,852.48
SUBTOTAL 1,852.48
PROPONENTE
CAPITULO: PISOS
DESCRIPCION: BASE EN MATERIAL DE AFIRMADO
UNIDAD : M3
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
Rana 8,000.00 2.00 16,000.00
SUBTOTAL 17,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
Material de afirmado m3 1.25 25,000.00 31,250.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 31,250.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla BB 11,578.00 4.00 46,312.00
SUBTOTAL 46,312.00
PROPONENTE
CAPITULO: PISOS
DESCRIPCION: NEOPRENO
UNIDAD : M2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
NEOPRENO M2 1.00 0.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 0.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 4.00 46,312.00
SUBTOTAL 46,312.00
PROPONENTE
CAPITULO: PISOS
DESCRIPCION: PLACA BASE EN CONCRETO E= 0,05 MTS 2500 PSI
UNIDAD : M2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
Rana 8,000.00 2.00 16,000.00
SUBTOTAL 17,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
CEMENTO BLT 5.50 22,000.00 121,000.00
ARENA M3 0.52 50,000.00 26,000.00
AGUA LT 150.00 300.00 45,000.00
GRAVA M3 0.92 60000.00 55,200.00
0.00
DESPERDICIO MATERIAL % 0% 247,200.00
SUBTOTAL 494,400.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 6.00 69,468.00
SUBTOTAL 69,468.00
PROPONENTE
CAPITULO: PISOS
DESCRIPCION: Piso Baño en porcelana Olimpia 20*20
UNIDAD : M2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 1,000.00 1.00 1,000.00
SUBTOTAL 1,000.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
AGUA LT LT 3.00 300.00 900.00
ARENA LAVADA DE PEÑA M3 0.02 50,000.00 1,000.00
CEMENTO BLANCO BLT 0.70 22,000.00 15,400.00
CERAMICA CORONA M2 1.05 21,000.00 22,050.00
PEGACOR BLANCO KG 3.15 400.00 1,260.00
0.00
DESPERDICIO MATERIAL % 0% 40,610.00
SUBTOTAL 81,220.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.30 3,473.40
SUBTOTAL 3,473.40
PROPONENTE
CAPITULO: CUBIERTAS
DESCRIPCION: ASBESTO CEMENTO NO. 8
UNIDAD : M2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 500.00 1.00 500.00
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
Gancho Teja Eternit 55 Mm UND 2.00 500.00 1,000.00
Teja Eternit No 8 M2 1.67
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 1,000.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.16 1,852.48
SUBTOTAL 1,852.48
PROPONENTE
CAPITULO: CUBIERTAS
DESCRIPCION: Canaleta 43 L= 6.00 mts.
UNIDAD : M2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 500.00 1.00 500.00
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
Canaleta 43 x 400 UND 0.60 93,937.00 56,362.20
Sellador Sika Igas Gris KG 0.12 8,990.00 1,078.80
Tornillo P/Canaleta 43 Met UND 0.60 1230.00 738.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 58,179.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.16 1,852.48
SUBTOTAL 1,852.48
PROPONENTE
CAPITULO: CUBIERTAS
DESCRIPCION: Caballete ondulado asbesto cemento
UNIDAD : ML
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 500.00 1.00 500.00
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
Caballete Eternit Pf/7 Fijo UND 1.15 23,700.00 27,255.00
Gancho Teja Eternit 55 Mm UND 12.00 500.00 6,000.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 33,255.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.16 1,852.48
SUBTOTAL 1,852.48
PROPONENTE
UNIDAD : ML
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION MARCA TIPO TARIFA\HORA RENDIMIENTO V\PARCIAL
Herramienta menor Global 500.00 1.00 500.00
SUBTOTAL 500.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
PERFIL METALICO ML 51,000.00 0.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 0.00
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.16 72,362.50
SUBTOTAL 72,362.50
PROPONENTE
SUBTOTAL 300.00
2. MATERIALES EN OBRA
DESCRIPCION UNIDAD CANTIDAD PRECIO UNITARIO V\PARCIAL
Listón Cipres M2 1.10 18,000.00 19,800.00
Media Caña ML 0.54 250.00 135.00
Puntilla LB 0.27 2371.00 640.17
Tiras Alistado 3*3*3 MADERA ML 4.32 500.00 2,160.00
0.00
DESPERDICIO MATERIAL % 0% 0.00
SUBTOTAL 22,735.17
3. MANO DE OBRA
TRABAJADOR TIPO JORNAL TOT RENDIMIENTO V\UNITARIO
Cuadrilla AA 11,578.00 0.16 1,852.48
SUBTOTAL 1,852.48
PROPONENTE
ANALISIS DE PRECIOS UNITARIOS F-04
OBJETO:
SUBTOTAL 8,683.50
SUBTOTAL 31,580.00
SUBTOTAL 8,683.50
SUBTOTAL 8,683.50
SUBTOTAL 8,683.50
SUBTOTAL 1,445.16
SUBTOTAL 4,817.20
SUBTOTAL 3,612.90
SUBTOTAL 12,043.00
SUBTOTAL 6,946.80
SUBTOTAL 8,683.50
SUBTOTAL 8,683.50
SUBTOTAL 8,683.50