DOMICILIO:

JOSE LUIS CASTILLO HERNANDEZ

FECHA

GALEANA No.1, CHIGNAHUAPAN, PUEBLA.

Oct-14

SOLICITANTE: XXXXXXXXXXXXXXXXXXXXX
LOCALIDAD:

XXXXXXXXXXXXXXXXXXXXX
UNIDAD

CANTIDAD

P.U

CEMENTO GRIS

ton

13.42

2,163.00

29,027.46

CAL

ton

1.53

1,312.00

2,007.36

VARILLA DE 3/8''

kg

647.67

12.00

7,772.04

ALAMBRE RECOCIDO

kg

53.00

13.00

689.00

CLAVO DE 2''

kg

25.00

21.00

525.00

LAMINA GALVANIZADA DE 5.50M * .82M CaL. 32

pzas

60.00

425.00

25,500.00

MONTEN ESTRUCTURAL DE 6'' * 2''

pzas

25.00

384.00

9,600.00

MONTEN ESTRUCTURAL DE 3'' POR 1 1/2''

pzas

44.00

286.00

12,584.00

BLOCKS DE CONCRETO DE 0.14*0.20*0.40 M.

pzas

4,484.22

4.83

21,658.78

10

HERRAJES PARA SUJETAR LAMINAS

pzas

240.00

4.00

960.00

11

ALAMBRON

kg

358.47

15.00

5,377.05

12

PIEDRA BRAZA (INCLUYE ACARREO)

m3

34.65

236.00

8,177.40

13

ARENA (INCLUYE ACARREO)

m3

27.86

205.00

5,711.30

14

GRAVA ( INCLUYE ACARREO)

m3

18.07

24.00

DESCRIPCION

SUB-TOTAL=

NOTA: LOS PRECIOS YA INCLUYEN FLETE

IMPORTE

433.68
130,023.07

I.V.A=

20,803.69

TOTAL=

150,826.76

GENERADORES DE OBRA
NOMBRE DE LA OBRA:
LOCALIDAD:
MUNICIPIO:

CONSTRUCCION Y EDIFICACION
CHIGNAHUPAN S.A. DE C.V.
CLAVE

PROPIETARIO
ELABORO

LOCALIZACION

CONCEPTO
EJE

LIMPIA, TRAZO Y
CONSTRUCCION)

NAVE INDUSTRIAL (26 X 35)


XXXXXXXXXXXXXXXXXXXXX
FECHA:
CHIGNAHUAPAN
XXXXXXXXXXXXXXXXXXXXX
Ing. FRANCISCO CORTS CASTILLA

NIVELACION

DEL

TERRENO

(AREA

TRAMO

LARGO

ANCHO

ALTO

TIPO

Oct-14

UNIDAD

PARCIAL

TOTAL

PZAS

DE

35.00

26.00

1.50

1.50

1.00

M2

910.00

16.00

910.00

EXCAVACION A MANO CUALQUIER TERRENO TIPO "A"


INVESTIGADO EN OBRA, CUALQUIER PROFUNDIDAD, INCLUYE
AFINE DE TALUD Y ACARREO DENTRO Y FUERA DE LA OBRA DE
MATERIAL NO UTILIZABLE

M3

43.20

1.20
-

M3

0.00

M3

0.00

M3

0.00

EXCAVACION

M3

43.20

MENOS ZAPATAS

M3

1.58

43.20

RELLENO Y COMPACTACION DE MATERIAL PRODUCTO DE LA


EXCAVACION CON PISON Y AGUA EN CAPAS DE 20 CM ESPESOR
INCLUYE ACARREO DENTRO DE LA OBRA, MEDIR COMPACTACION

CONCRETO F'c=200 KG/CM2 EN CIMENTACION,


INCLUYE COLOCADO, VIBRADO Y CURADO

41.62

T.M.A. 3/4",
desplante

1.50

1.50

0.20

16.00

M3

7.20

dado

0.45

0.45

1.00

16.00

M3

3.24

10.44

CIMBRA PARA CIMENTACION CON MADERA DE PINO DE 3a.


ACABADO COMUN, INCLUYE CIMBRADO Y DESCIMBRADO
desplante

1.50

4.00

8.00

M2

48.00

dado

0.45

4.00

8.00

M4

14.40
62.40

ACERO DE REFUERZO EN CIMENTACION CON ALAMBRON #2


F'y=2530 KG/CM2 INCLUYE SUMINISTRO, HABILITADO, ARMADO,
TRASLAPES, GANCHOS Y DESPERDICIO
PESO POR ML= 0.25 KG

CIM.INT.CER.

60.00 / 0.20 = 300 * 0.90 = 270 * 1.15 (desperdicio)= 310.5 ml * 0.25 = 77.63 kg

3.00

KG

77.63

232.89

CIM.INT.CER.

60 * 4 pzas = 240 ml * 1.15 (desperdicio) = 276 ml * 0.557 = 153.73 kg

3.00

KG

153.73

461.19

ACERO DE REFUERZO DIAMETRO #3 F'y=4200 KG/CM2 INCLUYE


SUMINISTRO, HABILITADO, ARMADO, TRASLAPES, GANCHOS Y
DESPERDICIO
PESO POR ML= 0.557 KG

Pgina 2 de 6

GENERADORES DE OBRA
NOMBRE DE LA OBRA:
LOCALIDAD:
MUNICIPIO:

CONSTRUCCION Y EDIFICACION
CHIGNAHUPAN S.A. DE C.V.
CLAVE

PROPIETARIO
ELABORO

NAVE INDUSTRIAL (26 X 35)


XXXXXXXXXXXXXXXXXXXXX
FECHA:
CHIGNAHUAPAN
XXXXXXXXXXXXXXXXXXXXX
Ing. FRANCISCO CORTS CASTILLA

LOCALIZACION

CONCEPTO
EJE

TRAMO

LARGO

ANCHO

ALTO

TIPO

Oct-14

UNIDAD

PARCIAL

TOTAL

PZAS

MAMPOSTERIA DE PIEDRA DE LA REGION ASENTADA CON


MORTERO
CEMENTO-CAL-ARENA
PROPORCION
1:2:6
EN
CIMENTACION
ANCHO= 0.30+0.80/2= 0.1.10/2= 0.55 CM

10.00

0.55

0.70

1.00

M3

3.85

20.00

0.55

0.70

1.00

M3

7.70

10.00

0.55

0.70

1.00

M3

3.85

20.00

0.55

0.70

1.00

M3

7.70

23.10

MURO DE BLOCK MACIZO COMUN DE 14 * 20 * 40 CM ASENTADO


CON MORTERO CEMENTO-ARENA 1:3 ACABADO COMUN

CONCRETO F'c=200 KG/CM2 EN CASTILLO, T.M.A. 3/4", INCLUYE


COLOCADO, VIBRADO Y CURADO

LATERALES

3.82X1.95

8.00

7.45

8.00

M2

59.59

LATERALES

3.72X1.95

12.00

7.25

12.00

M3

87.05

FRENTE

4.70X1.95

2.00

9.17

2.00

M2

36.66

POSTERIOR

4.70X1.95

4.00

9.17

4.00

M2

146.64

2.00

M2

15.00

344.94

4.50

14.00

M3

2.52

2.52

4.50

28.00

M2

25.20

25.20

5.2 / 0.15 = 34.67 * 0.90 = 31.20 * 1.15 (desperdicio)= 35.88 ml * 0.25 = 8.97 kg

14.00

KG

8.97

125.58

5.20 * 4 pzas = 20.8 ml * 1.15 (desperdicio) = 23.92 ml * 0.557 = 13.32 kg

14.00

KG

13.32

186.48

1.00

M3

19.11

19.11

1.00

PZA

25.00

25.00

PION

7.50

CAST. K1

0.20

CAST. K1

0.20

0.20

CIMBRA PARA COLUMNA CON MADERA DE PINO DE 3a. ACABADO


COMUN, INCLUYE CIMBRADO Y DESCIMBRADO

ACERO DE REFUERZO EN CASTILLO CON ALAMBRON #2 F'y=2530


KG/CM2
INCLUYE
SUMINISTRO,
HABILITADO,
ARMADO,
TRASLAPES, GANCHOS Y DESPERDICIO

CAST. K1
ACERO DE REFUERZO DIAMETRO #3 F'y=4200 KG/CM2 INCLUYE
SUMINISTRO, HABILITADO, ARMADO, TRASLAPES, GANCHOS Y
DESPERDICIO

CONCRETO F'c=200 KG/CM2 EN PISO, T.M.A. 3/4", INCLUYE


COLOCADO, VIBRADO Y CURADO

CAST. K1

PISO
19.70

9.70

0.10

MONTEN ESTRUCTURAL, SECCION 6" * 2"

25.00

Pgina 3 de 6

GENERADORES DE OBRA
NOMBRE DE LA OBRA:
LOCALIDAD:
MUNICIPIO:

CONSTRUCCION Y EDIFICACION
CHIGNAHUPAN S.A. DE C.V.
CLAVE

PROPIETARIO
ELABORO

NAVE INDUSTRIAL (26 X 35)


XXXXXXXXXXXXXXXXXXXXX
FECHA:
CHIGNAHUAPAN
XXXXXXXXXXXXXXXXXXXXX
Ing. FRANCISCO CORTS CASTILLA

LOCALIZACION

CONCEPTO
EJE

TRAMO

LARGO

ANCHO

ALTO

TIPO

Oct-14

UNIDAD

PARCIAL

TOTAL

PZAS

MONTEN ESTRUCTURAL, SECCION 3" * 1 1/2"


LARGEROS

44.00

1.00

PZA

44.00

44.00

60.00

PZA

60.00

60.00

4.00

PZAS

240.00

240.00

LAMINA GALVANIZADA CAL 32, 5.50 * 0.82

HERRAJES PARA FIJAR LAMINA

60.00

CUANTIFICACION DE MATERIALES PETREOS


CONCRETO f'c= 200 KG

CADENA + CASTILLO + PISO =

10.44

2.52

CEMENTO

32.07

0.37

11.80

ARENA

32.07

0.531

17.03

TON
M3

GRAVA

32.07

0.643

20.62

M3

MORTERO CEMENTO CAL HIDRA ARENA 1:1:6

19.11

32.07

MUROS = area muro M2 * 0.0113 M3/M2 = mortero M3


3.90
MUROS =
344.94
0.01
MAMPOSTERIA = volum mampo M3 * 0.33 M3/M3 = mortero M3
MAMP. =

23.10

0.33

7.62

CEMENTO

11.52

0.267

3.08

TON

CALHIDRA

11.52

0.1329

1.53

TON

ARENA

11.52

1.12

12.94

M3

BLOCK

344.94

13

4,484.22

PIEDRA BRAZA

23.10

1.5

34.65

PZAS
M3

Pgina 4 de 6

GENERADORES DE OBRA
NOMBRE DE LA OBRA:
LOCALIDAD:
MUNICIPIO:

CONSTRUCCION Y EDIFICACION
CHIGNAHUPAN S.A. DE C.V.
CLAVE

PROPIETARIO
ELABORO

NAVE INDUSTRIAL (26 X 35)


XXXXXXXXXXXXXXXXXXXXX
FECHA:
CHIGNAHUAPAN
XXXXXXXXXXXXXXXXXXXXX
Ing. FRANCISCO CORTS CASTILLA

LOCALIZACION

CONCEPTO
EJE

TRAMO

LARGO
TIPO

ANCHO

ALTO

Oct-14

UNIDAD

PARCIAL

TOTAL

PZAS

RESUMEN
CEMENTO

14.88

TON

CALHIDRA

1.53

TON

ARENA

29.97

M3

GRAVA

20.62

M3

BLOCK

4,484

PZA

PIEDRA BRAZA

34.65

M3

ALAMBRON

358.47

KG

VARILLA # 3

647.67

KG

MONTEN ESTRUCTURAL, SECCION 6" * 4"

PZA

MONTEN ESTRUCTURAL, SECCION 4" * 1 1/2"

PZA

LAMINA 3.60 * 0.80

60.00

PZA

HERRAJES

240.00

PZA

CIMBRA

87.60

Pgina 5 de 6

Presupuesto
Nombre del Proyecto:
Propietario:
Municipio:
Localidad:
Fecha

NAVE INDUSTRIAL (26 X 35)


XXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXX
Oct-14

Clave
Conceptos de Trabajo

No.

CONSTRUCCION Y EDIFICACION
CHIGNAHUPAN S.A. DE C.V.

Unidad

Cantidad

Precios Costos

de

Directos

Medida

Volumen

Importe
$

MATERIALES INDUSTRIALIZADOS.
1

CEMENTO GRIS

ton

13.42

2,163.00

29,027.46

CAL

ton

1.53

1,312.00

2,007.36

VARILLA DE 3/8''

kg

647.67

12.00

7,772.04

ALAMBRE RECOCIDO

kg

53.00

13.00

689.00

CLAVO DE 2''

kg

25.00

21.00

525.00

LAMINA GALVANIZADA DE 5.50M * .82M CaL. 32

pzas

60.00

425.00

25,500.00

MONTEN ESTRUCTURAL DE 6'' * 2''

pzas

25.00

384.00

9,600.00

MONTEN ESTRUCTURAL DE 3'' POR 1 1/2''

pzas

44.00

286.00

12,584.00

RENTA DE CIMBRA

m2

97.20

20.00

1,944.00

10

BLOCKS DE CONCRETO DE 0.14*0.20*0.40 M.

pzas

4,484.22

4.83

21,658.78

11

HERRAJES PARA SUJETAR LAMINAS

pzas

240.00

4.00

12

SAGUAN 4.7X4.10

pzas

1.00

18,500.00

18,500.00

13

ALAMBRON

kg

358.47
SUBTOTAL

15.00

5,377.05
136,144.69

14

MATERIALES PETREOS
PIEDRA BRAZA (INCLUYE ACARREO)

m3

34.65

236.00

8,177.40

15

ARENA (INCLUYE ACARREO)

m3

27.86

205.00

5,711.30

16

GRAVA ( INCLUYE ACARREO)

m3

18.07

24.00

433.68

17

AGUA

m3

0.00
SUBTOTAL

0.00

0.00
14,322.38

18

TRAZO Y NIVELACION DEL TERRENO

m2

200.00

2.70

540.00

19

EXCAVACION PARA MAMPOSTERIA.

m3

33.60

55.00

1,848.00

20

RELLENO CON MATERIAL PRODUCTO DE EXCAVACION

m3

10.50

35.00

367.50

21

CADENAS DE DESPLANTE Y CERRAMIENTO 0.20*0.15M.

ml

180.00

60.00

10,800.00

22

MAMPOSTERIA ASENTADA CON MORTERO C-A 1:1:6

m3

23.10

400.00

9,240.00

23

CASTILLO DE CONCRETO ARMADO 0.20*0.20M

ml

65.80

65.00

4,277.00

24

MURO DE BLOCKS

m2

344.94

55.00

18,971.70

25

COLOCACION DE MONTENES ESTRUCTURALES Y VIGAS


SOBRE
Y
COLUMNAS
PARA
RECIBIR
LAMINA
GALVANIZADA

lote

1.00

9,000.00

9,000.00

26

COLOCACION DE LAMINA GALVANIZADA

m2

200.00

11.00

2,200.00

27

CONSTRUCCION DE PISO DE CONCRETO ARMADO DE 10


CM.

m2

191.10

80.00

960.00

MANO DE OBRA

SUBTOTAL

15,288.00
72,532.20

MATERIALES INDUSTRIALIZADOS.

136,144.69

MATERIALES PETREOS

14,322.38

MANO DE OBRA

72,532.20

FORMULO

ING. FRANCISCO CORTS CASTILLA


CED. PROF. 3772810

COSTO DIRECTO =

222,999.27

SUB-TOTAL:
I.V.A. 16 %

222,999.27
35,679.88

TOTAL:

258,679.16