Documentos de Académico
Documentos de Profesional
Documentos de Cultura
PROYECTO
: MEJORAMIENTO DEL ESTADIO DEPORTIVO EN LA COMUNIDAD DE CHACOLLA, DISTRITO DE CHUSCHI -, PROVINCIA DE CANGALLO AYACUCHO
ENTIDAD
DISTRITO
: CHUSCHI
PROVINCIA
: CANGALLO
REGION
: AYACUCHO
FECHA:
: JULIO -2012
Item
Descripcin de la Partida
01.00.00
OBRAS PRELIMINARES
01.01.00
01.02.00
Und.
Cantidad
UND
1.00
Largo
Ancho
Altura
rea
Sub Total
Total
1.00
1.00
M2
1.00
3.00
4.00
12.00
12.00
UND
1.00
1.00
1.00
1.00
1.00
01.03.00
01.04.00
M2
1.00
54.00
80.00
4,320.00
4,320.00
01.05.00
M2
1.00
54.00
17.00
918.00
918.00
01.06.00
M2
1.00
54.00
97.00
5,238.00
5,238.00
01.07.00
UND
2.00
1.00
2.00
2.00
01.08.00
01.08.01
UND
1.00
1,439.38
1,439.38
1,439.38
01.08.02
M3
1.00
74.27
74.27
74.27
01.08.03
M3
1.00
246.82
246.82
246.82
01.08.04
UND
1.00
30,500.90
30,500.90
30,500.90
01.08.05
1.00
4,111.36
4,111.36
4,111.36
DE 0MT A 20 ML
1.00
20.00
54.00
0.90
972.00
DE 20 MT A 40 ML
1.00
20.00
54.00
0.75
810.00
DE 0MT A 20 ML
1.00
0.00
0.00
0.90
0.00
DE 20 MT A 40 ML
1.00
0.00
0.00
0.75
0.00
DE 40 MT A 60 ML
1.00
20.00
54.00
0.70
756.00
DE 60 MT A 80 ML
1.00
20.00
54.00
0.80
864.00
DE 60 MT A 80 ML
1.00
5.00
54.00
1.30
351.00
1.00
12.00
20.00
1.60
384.00
02.00.00
ESTADIO DEPORTIVO
02.01.00
MOVIMIENTO DE TIERRAS
02.01.01
M3
M3
1,782.00
DE 40 MT A 60 ML
DE 60 MT A 80 ML
02.01.02
02.01.03
M3
1,971.00
M3
DE 80 MT A 100 ML
Pgina 1 de 25
384.00
HOJA DE METADOS
PROYECTO
: MEJORAMIENTO DEL ESTADIO DEPORTIVO EN LA COMUNIDAD DE CHACOLLA, DISTRITO DE CHUSCHI -, PROVINCIA DE CANGALLO AYACUCHO
ENTIDAD
DISTRITO
: CHUSCHI
PROVINCIA
: CANGALLO
REGION
: AYACUCHO
FECHA:
: JULIO -2012
Item
02.01.04
Descripcin de la Partida
Und.
Cantidad
Largo
Ancho
Altura
1.00
15.00
24.00
1.30
468.00
1.00
4.00
10.00
0.90
36.00
1.00
1.27
54.00
68.40
1.00
1.10
87.00
95.70
DE 0MT A 20 ML
1.00
0.00
DE 20 MT A 40 ML
1.00
0.00
0.00
DE 40 MT A 60 ML
1.00
13.00
13.00
DE 60 MT A 80 ML
1.00
15.50
15.50
DE 80 MT A 100 ML
1.00
0.00
0.00
1.00
4,612.50
4,612.50
02.01.07
02.01.08
02.01.09
CONSTRUCCION DE TRIBUNA
02.02.01
68.40
M2
02.02.00
36.00
M2
95.70
M3
28.50
4,612.50
1.00
260.00
52.00
02.02.02
02.02.04
02.02.05
5.00
260.00
M3
38.13
1.00
02.02.03
0.00
M3
M2
M3
52.00
A1
0.80
A2
0.80
A3
0.60
38.13
1.00
27.41
26.61
1.03
27.41
2.00
24.00
0.80
0.30
11.52
24.00
7.00
0.10
0.90
15.12
24.00
7.00
0.10
0.20
3.36
24.00
0.80
0.40
0.30
2.30
2.00
2.00
10.00
0.10
4.00
M3
11.52
M3
Pgina 2 de 25
Total
468.00
M3
DE 80 MT A 100 ML
02.01.06
Sub Total
M3
DE 80 MT A 100 ML
02.01.05
rea
24.78
HOJA DE METADOS
PROYECTO
: MEJORAMIENTO DEL ESTADIO DEPORTIVO EN LA COMUNIDAD DE CHACOLLA, DISTRITO DE CHUSCHI -, PROVINCIA DE CANGALLO AYACUCHO
ENTIDAD
DISTRITO
: CHUSCHI
PROVINCIA
: CANGALLO
REGION
: AYACUCHO
FECHA:
: JULIO -2012
Item
02.02.06
02.02.07
Descripcin de la Partida
Und.
Cantidad
Largo
Ancho
5.00
0.33
24.00
Altura
rea
Sub Total
M2
46.48
39.60
4.00
0.90
0.20
10.00
2.00
0.20
1/2"
4.00
2.88
96.00
5.50
1.50
1.02
807.84
3/8"
24.00
24.00
1.20
0.56
387.07
4.00
KG
Total
1,194.91
0.00
02.02.08
02.02.09
CERCO PERIMETRICO
03.01.00
TRABAJOS PRELIMINARES
03.01.01
260.00
10.00
12.00
120.00
10.00
12.00
120.00
5.00
2.00
10.00
5.00
2.00
10.00
18.00
3.00
54.00
10.00
5.50
55.00
2.00
95.70
0.40
76.56
2.00
57.77
0.40
46.22
2.00
95.70
0.40
76.56
2.00
57.77
0.40
46.22
2.00
78.00
0.40
0.80
49.92
1.00
57.77
0.40
0.80
18.49
03.00.00
03.01.02
109.00
M2
122.78
M2
03.02.00
MOVIMIENTO DE TIERRAS
03.02.01
122.78
M3
68.41
03.02.02
M3
29.81
03.02.03
03.03.00
2.00
17.70
0.40
0.80
11.33
1.00
57.77
0.40
0.80
18.49
1.00
98.22
1.03
M3
OBRAS DE CONCRETO
Pgina 3 de 25
101.17
101.17
HOJA DE METADOS
PROYECTO
: MEJORAMIENTO DEL ESTADIO DEPORTIVO EN LA COMUNIDAD DE CHACOLLA, DISTRITO DE CHUSCHI -, PROVINCIA DE CANGALLO AYACUCHO
ENTIDAD
DISTRITO
: CHUSCHI
PROVINCIA
: CANGALLO
REGION
: AYACUCHO
FECHA:
: JULIO -2012
Item
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
Descripcin de la Partida
Und.
Cantidad
Largo
Ancho
Altura
2.00
95.70
0.40
0.80
03.03.07
03.03.08
03.03.09
03.03.10
61.25
2.00
57.77
0.40
0.80
36.97
107.00
0.80
0.40
0.80
-27.39
2.00
95.70
0.15
0.30
8.61
12.61
2.00
57.77
0.15
0.30
5.20
107.00
0.25
0.15
0.30
-1.20
4.00
57.77
0.15
0.30
10.40
M2
19.59
4.00
57.77
0.15
0.30
10.40
107.00
0.25
0.15
0.30
-1.20
107.00
0.80
0.80
0.60
41.09
107.00
0.80
8.00
1.00
1.02
698.50
107.00
0.25
0.25
2.70
1.00
18.06
107.00
0.25
2.70
2.00
144.45
107.00
0.15
2.70
2.00
86.67
1/2"
107.00
4.00
4.50
1.00
1.02
1,964.52
1/4"
107.00
4.00
6.00
1.00
0.25
642.00
309.54
0.12
0.15
1.00
5.57
309.54
0.12
2.00
1.00
74.29
1.00
1.00
46.43
M3
41.09
KG
698.50
18.06
M2
144.45
KG
2,606.52
M3
5.57
M2
Total
70.83
120.72
309.54
03.03.11
Sub Total
M3
1/2"
03.03.06
rea
0.15
KG
1/2"
03.04.00
MURO DE LADRILLO
03.04.01
309.54
4.00
1.00
1.02
1,262.92
49.00
2.50
3.50
1.00
428.75
30.00
2.50
3.50
1.00
262.50
1.00
25.00
M2
Pgina 4 de 25
1,262.92
716.25
25.00
HOJA DE METADOS
PROYECTO
: MEJORAMIENTO DEL ESTADIO DEPORTIVO EN LA COMUNIDAD DE CHACOLLA, DISTRITO DE CHUSCHI -, PROVINCIA DE CANGALLO AYACUCHO
ENTIDAD
DISTRITO
: CHUSCHI
PROVINCIA
: CANGALLO
REGION
: AYACUCHO
FECHA:
: JULIO -2012
Item
Und.
Cantidad
Largo
Ancho
Altura
03.04.02
KG
107.00
25.00
0.70
0.25
03.04.03
107.00
2.50
03.05.00
PORTON DE INGRESO
03.05.01
1.00
4.75
0.25
1.00
0.70
1.20
1.08
0.91
1.00
1.80
1.10
1.08
2.14
1.00
0.70
1.20
0.84
1.00
1.80
1.10
1.98
1.00
0.70
1.20
0.60
0.50
1.00
1.80
1.10
0.60
1.19
3.00
1.20
0.56
2.02
6.00
0.70
0.56
2.35
8.00
1.10
0.56
4.93
6.00
1.80
0.56
6.05
2.00
0.35
0.25
3.11
0.54
1.00
0.15
0.25
3.11
0.12
2.00
1.20
2.60
6.24
1.00
0.80
2.60
2.08
8.00
4.40
0.99
20.00
1.20
0.22
5.28
4.00
4.40
0.99
17.49
20.00
0.80
0.22
3.52
1.00
4.75
0.25
0.45
0.53
1.00
3.35
0.25
0.45
0.38
1.00
2.15
0.25
0.45
0.24
2.00
4.75
0.45
4.28
03.05.02
03.05.03
03.05.04
03.05.05
03.05.06
03.05.07
03.05.08
03.05.09
03.05.10
Descripcin de la Partida
rea
M2
M3
M3
KG
COEF
M2
KG
COEF
468.13
267.50
267.50
1.19
1.19
3.05
3.05
2.82
2.82
1.69
1.69
15.34
15.34
0.66
0.66
8.32
8.32
61.28
61.28
1.15
1.15
9.23
9.23
34.99
M3
M2
Pgina 5 de 25
Total
468.13
1.19
M2
Sub Total
HOJA DE METADOS
PROYECTO
: MEJORAMIENTO DEL ESTADIO DEPORTIVO EN LA COMUNIDAD DE CHACOLLA, DISTRITO DE CHUSCHI -, PROVINCIA DE CANGALLO AYACUCHO
ENTIDAD
DISTRITO
: CHUSCHI
PROVINCIA
: CANGALLO
REGION
: AYACUCHO
FECHA:
: JULIO -2012
Item
03.05.11
03.05.12
03.05.13
03.05.14
03.05.15
Descripcin de la Partida
Und.
TRABAJOS PRELIMINARES
Trazo y replanteo en Terreno Normal con Equipo
M2
M2
04.02.00
MOVIMIENTO DE TIERRAS
04.02.01
04.02.02
2.15
Altura
rea
0.45
3.02
0.45
1.94
COEF
4.00
4.75
1.55
29.49
1.00
3.35
0.56
1.88
1.00
2.15
0.56
1.20
34.00
1.40
0.22
10.47
4.00
1.00
0.22
0.88
7.00
1.30
0.22
2.00
2.00
0.95
2.60
4.94
1.00
0.65
2.60
1.69
2.00
4.75
0.45
4.28
2.00
3.35
0.45
3.02
2.00
2.15
0.45
1.94
M2
04.01.01
2.00
Ancho
M2
3.35
M2
04.01.00
Largo
2.00
KG
04.00.00
Cantidad
M3
04.02.03
04.03.00
M3
Pgina 6 de 25
Sub Total
Total
45.92
45.92
6.63
6.63
9.23
9.23
15.86
15.86
10.40
2.00
0.95
2.60
4.94
1.00
0.65
2.60
1.69
2.00
4.75
0.45
4.28
2.00
3.35
0.45
3.02
2.00
2.15
0.45
1.94
3.00
2.60
7.80
1.00
2.60
2.60
2.00
45.00
0.40
36.00
2.00
90.00
0.40
72.00
2.00
45.00
0.40
0.60
21.60
2.00
90.00
0.40
0.60
43.20
2.00
45.00
0.40
0.60
1.03
22.25
2.00
90.00
0.40
0.60
1.03
44.50
1.00
66.74
66.74
108.00
64.80
66.74
66.74
HOJA DE METADOS
PROYECTO
: MEJORAMIENTO DEL ESTADIO DEPORTIVO EN LA COMUNIDAD DE CHACOLLA, DISTRITO DE CHUSCHI -, PROVINCIA DE CANGALLO AYACUCHO
ENTIDAD
DISTRITO
: CHUSCHI
PROVINCIA
: CANGALLO
REGION
: AYACUCHO
FECHA:
: JULIO -2012
Item
Cantidad
Largo
Ancho
Altura
Sub Total
Total
2.00
45.00
0.40
0.50
18.00
54.00
2.00
90.00
0.40
0.50
36.00
2.00
45.00
0.20
0.20
3.60
2.00
90.00
0.20
0.20
7.20
4.00
45.00
0.20
36.00
4.00
90.00
0.20
72.00
4.00
45.00
0.20
36.00
4.00
90.00
0.20
72.00
2.00
45.00
0.20
18.00
2.00
90.00
0.20
36.00
4.00
45.00
0.20
36.00
4.00
90.00
0.20
72.00
2.00
45.00
0.20
18.00
2.00
90.00
0.20
36.00
4.00
45.00
0.20
36.00
4.00
90.00
0.20
72.00
2.00
45.00
0.20
18.00
2.00
90.00
0.20
36.00
05.01.00
135.00
05.02.00
M3
1.00
135.00
05.03.00
Cama de Apoyo para tubo hasta 10" con material propio incluye zarandeo
1.00
135.00
05.04.00
2.00
2.00
04.03.01
04.03.02
04.03.03
Descripcin de la Partida
REVOQUES Y ENLUCIDOS
04.04.01
04.04.03
05.00.00
M3
04.04.00
04.04.02
Und.
M2
M2
rea
10.80
108.00
162.00
162.00
162.00
135.00
21.60
21.60
135.00
135.00
45.00
90.00
270.00
90.00
180.00
0.40
0.40
05.05.00
UND
1.00
2.00
2.00
2.00
05.06.00
UND
1.00
12.00
12.00
12.00
05.07.00
UND
1.00
10.00
10.00
10.00
05.08.00
UND
1.00
2.00
2.00
2.00
06.00.00
06.01.00
M2
1.00
45.00
4,050.00
4,050.00
Pgina 7 de 25
90.00
HOJA DE METADOS
PROYECTO
: MEJORAMIENTO DEL ESTADIO DEPORTIVO EN LA COMUNIDAD DE CHACOLLA, DISTRITO DE CHUSCHI -, PROVINCIA DE CANGALLO AYACUCHO
ENTIDAD
DISTRITO
: CHUSCHI
PROVINCIA
: CANGALLO
REGION
: AYACUCHO
FECHA:
: JULIO -2012
Item
Descripcin de la Partida
Und.
Cantidad
Largo
Ancho
Altura
rea
Sub Total
Total
06.02.00
M2
1.00
45.00
90.00
4,050.00
4,050.00
06.03.00
M2
1.00
45.00
90.00
4,050.00
4,050.00
06.04.00
M3
1.00
45.00
90.00
1,620.00
1,620.00
06.05.00
UND
1.00
6.00
1.00
6.00
6.00
07.00.00
VARIOS
07.01.00
Flete Terrestre
GLB
1.00
1.00
1.00
1.00
07.02.00
Arco de futbol
UND
2.00
1.00
2.00
2.00
07.03.00
4.00
1.00
4.00
4.00
08.00.00
08.01.00
M2
1.00
54.00
5,238.00
5,238.00
08.02.00
UND
1.00
1.00
1.00
1.00
08.03.00
Kit DE HERRAMIENTAS
UND
1.00
1.00
1.00
1.00
Pgina 8 de 25
97.00
0.40
FECHA:
: JULIO -2012
: CHUSCHI
: CANGALLO
: AYACUCHO
Item
Partida
Unidad Metrado
Precio
Presup.S/.
01.00.00
OBRAS PRELIMINARES
01.01.00
948.50
948.50
01.02.00
146.58
1,758.96
01.03.00
1.00
852.62
852.62
01.04.00
M2
4,320.00
0.45
1,944.00
01.05.00
M2
918.00
0.56
514.08
01.06.00
M2
5,238.00
0.41
2,147.58
01.07.00
UND
2.00
5.62
11.24
01.08.00
01.08.01
UND
1,439.38
0.56
806.05
01.08.02
M3
74.27
14.99
1,113.31
01.08.03
M3
01.08.04
UND
01.08.05
02.00.00
ESTADIO DEPORTIVO
02.01.00
MOVIMIENTO DE TIERRAS
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
UND
1.00
246.82
22.48
5,548.51
30,500.90
0.04
1,220.04
4,111.36
22.48
92,423.37
M3
1,782.00
7.49
13,347.18
M3
1,971.00
3.07
6,050.97
M3
384.00
14.99
5,756.16
M3
468.00
3.36
1,572.48
(000202010107) Corte en Terreno Rocoso (Manual , inc insumos para rotura de roca por calentamiento)
M3
36.00
103.47
3,724.92
02.01.06
M2
68.40
0.80
54.72
02.01.07
M2
95.70
1.12
107.18
02.01.08
M3
28.50
13.48
384.18
02.01.09
4,612.50
20.68
95,386.50
02.02.00
CONSTRUCCION DE TRIBUNA
02.02.01
M2
260.00
0.41
106.60
02.02.02
(000202010406) Excavacin de Zanjas y/o Zapatas Hmx <= 1.00m en Terreno Normal M3
38.13
8.99
342.82
02.02.03
27.41
20.68
566.87
02.02.04
M3
11.52
13.48
155.29
02.02.05
M3
24.78
327.31
8,112.05
02.02.06
M2
46.48
21.23
986.77
02.02.07
KG
1,194.91
4.42
5,281.51
02.02.08
260.00
2.13
553.80
02.02.09
109.00
0.45
49.05
03.00.00
CERCO PERIMETRICO
03.01.00
TRABAJOS PRELIMINARES
Total
109,288.26
126,384.29
16,154.77
Item
Partida
Unidad Metrado
Precio
Presup.S/.
Total
03.01.01
M2
122.78
0.45
55.25
03.01.02
M2
122.78
0.41
50.34
03.02.00
MOVIMIENTO DE TIERRAS
03.02.01
(000202010406) Excavacin de Zanjas y/o Zapatas Hmx <= 1.00m en Terreno Normal M3
68.41
8.99
615.01
03.02.02
(000202010407) Excavacin de Zanjas y/o Zapatas Hmx <= 1.00m en Terreno Semirocoso
M3
29.81
8.99
267.99
03.02.03
101.17
20.68
2,092.20
03.03.00
OBRAS DE CONCRETO
03.03.01
70.83
184.29
13,053.26
03.03.02
M3
12.61
208.79
2,632.84
03.03.03
M2
19.59
21.20
415.31
03.03.04
(000204020103) Zapatas - Concreto F'c= 210 kg/cm2 con mezcladora (inc curado)
M3
41.09
337.61
13,872.39
03.03.05
KG
698.50
4.42
3,087.37
03.03.06
353.03
6,375.72
03.03.07
M2
144.45
30.89
4,462.06
03.03.08
KG
2,606.52
4.42
11,520.82
03.03.09
5.57
358.29
1,995.68
03.03.10
M2
120.72
46.65
5,631.59
03.03.11
KG
1,262.92
4.42
5,582.11
03.04.00
MURO DE LADRILLO
03.04.01
(000207010103) Muro de Ladrillo KK 18H (9x13x24) Soga mezcla C:A 1:5, e=1.5cm
M2
716.25
47.08
33,721.05
03.04.02
KG
468.13
4.42
2,069.13
03.04.03
267.50
0.45
120.38
03.05.00
PORTON DE INGRESO
03.05.01
M2
1.19
0.45
0.54
03.05.02
(000202010406) Excavacin de Zanjas y/o Zapatas Hmx <= 1.00m en Terreno Normal M3
3.05
8.99
27.42
03.05.03
M2
2.82
12.27
34.60
03.05.04
(000204020103) Zapatas - Concreto F'c= 210 kg/cm2 con mezcladora (inc curado)
M3
1.69
337.61
570.56
03.05.05
KG
15.34
4.42
67.80
03.05.06
353.03
233.00
03.05.07
M2
8.32
30.89
257.00
03.05.08
KG
61.28
4.42
270.86
03.05.09
1.15
358.29
412.03
03.05.10
M2
9.23
46.65
430.58
03.05.11
KG
45.92
4.42
202.97
03.05.12
M2
6.63
18.56
123.05
03.05.13
M2
9.23
35.27
325.54
03.05.14
M2
15.86
4.12
65.34
03.05.15
(000213010108) Puerta metlica con Tubo Cuadrado de 2" x 2" incluye instalacin
M2
10.40
414.33
4,309.03
7,330.32
04.00.00
04.01.00
TRABAJOS PRELIMINARES
04.01.01
M2
108.00
0.41
44.28
44.28
04.02.00
MOVIMIENTO DE TIERRAS
04.02.01
(000202010406) Excavacin de Zanjas y/o Zapatas Hmx <= 1.00m en Terreno Normal M3
64.80
8.99
582.55
04.02.02
66.74
22.48
1,500.32
04.02.03
66.74
20.68
1,380.18
105.59
2,975.19
68,629.15
35,910.56
3,463.05
Item
Partida
04.03.00
Unidad Metrado
Precio
Presup.S/.
04.03.01
54.00
184.29
9,951.66
04.03.02
M3
10.80
208.79
2,254.93
04.03.03
M2
108.00
21.20
2,289.60
04.04.00
REVOQUES Y ENLUCIDOS
04.04.01
M2
162.00
15.23
2,467.26
04.04.02
162.00
0.09
14.58
04.04.03
162.00
2.13
345.06
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
14.99
2,023.65
21.60
7.49
161.78
(000202010902) Cama de Apoyo para tubo hasta 10" con material propio incluye zarandeoM
135.00
0.75
101.25
270.00
5.24
1,414.80
05.05.00
UND
2.00
249.50
499.00
05.06.00
UND
12.00
13.74
164.88
05.07.00
UND
10.00
9.26
92.60
05.08.00
UND
2.00
78.67
157.34
06.00.00
06.01.00
1.69
6,844.50
06.02.00
M2
4,050.00
1.15
4,657.50
06.03.00
M2
4,050.00
0.05
202.50
06.04.00
M3
1,620.00
0.05
81.00
06.05.00
UND
6.00
13.96
83.76
07.00.00
VARIOS
07.01.00
GLB
1.00
17,536.69
17,536.69
07.02.00
UND
2.00
3,594.96
7,189.92
07.03.00
4.00
743.44
2,973.76
08.00.00
08.01.00
M2
5,238.00
0.22
1,152.36
08.02.00
UND
1.00
5,890.00
5,890.00
08.03.00
UND
1.00
5,010.00
5,010.00
COSTO DIRECTO
COSTOS INDIRECTOS
============================================
TOTAL PRESUPUESTO
M3
443,845.86
50,661.92
================
494,507.78
Total
14,496.19
2,826.90
4,615.30
11,869.26
27,700.37
12,052.36
Item
01.00.00 OBRAS PRELIMINARES
Partida
Unidad Metrado
UND
Precio
Presup.S/.
1.00
948.50
948.50
01.02.00 Caseta de Almacn y Guardiana c/triplay y parantes de madera tornillo (aprox. 12m2)
M2 + calamina 12.00
146.58
1,758.96
UND
M2
1.00
852.62
852.62
4,320.00
0.45
1,944.00
M2
918.00
0.56
514.08
M2
5,238.00
0.41
2,147.58
UND
2.00
5.62
11.24
UND
1,439.38
0.56
806.05
M3
74.27
14.99
1,113.31
M3
246.82
22.48
5,548.51
UND
30,500.90
0.04
1,220.04
4,111.36
22.48
92,423.37
Total
109,288.26
M3
1,782.00
7.49
13,347.18
M3
1,971.00
3.07
6,050.97
M3
384.00
14.99
5,756.16
M3
468.00
3.36
1,572.48
02.01.05 Corte en Terreno Rocoso (Manual , inc insumos para rotura de roca por calentamiento)
M3
36.00
103.47
3,724.92
M2
68.40
0.80
54.72
M2
95.70
1.12
107.18
M3
28.50
13.48
384.18
M3
4,612.50
20.68
95,386.50
M2
260.00
0.41
106.60
02.02.02 Excavacin de Zanjas y/o Zapatas Hmx <= 1.00m en Terreno Normal
M3
38.13
8.99
342.82
M3
27.41
20.68
566.87
M3
11.52
13.48
155.29
M3
24.78
327.31
8,112.05
M2
46.48
21.23
986.77
KG
1,194.91
4.42
5,281.51
260.00
2.13
553.80
109.00
0.45
49.05
M2
122.78
0.45
55.25
M2
122.78
0.41
50.34
03.02.01 Excavacin de Zanjas y/o Zapatas Hmx <= 1.00m en Terreno Normal
M3
68.41
8.99
615.01
03.02.02 Excavacin de Zanjas y/o Zapatas Hmx <= 1.00m en Terreno Semirocoso
M3
29.81
8.99
267.99
126,384.29
16,154.77
105.59
Item
Partida
03.02.03 Eliminacin de Mat.Exced.C/Volquete de 6 m3 carguio manual d<= 5Km
Unidad Metrado
M3
101.17
Precio
20.68
Presup.S/.
2,092.20
Total
2,975.20
M3
70.83
184.29
13,053.26
M3
12.61
208.79
2,632.84
M2
19.59
21.20
415.31
03.03.04 Zapatas - Concreto F'c= 210 kg/cm2 con mezcladora (inc curado)
M3
41.09
337.61
13,872.39
KG
698.50
4.42
3,087.37
18.06
353.03
6,375.72
M2
144.45
30.89
4,462.06
KG
2,606.52
4.42
11,520.82
M3
5.57
358.29
1,995.68
M2
120.72
46.65
5,631.59
KG
1,262.92
4.42
5,582.11
03.04.01 Muro de Ladrillo KK 18H (9x13x24) Soga mezcla C:A 1:5, e=1.5cm
M2
716.25
47.08
33,721.05
KG
468.13
4.42
2,069.13
267.50
0.45
120.38
68,629.15
35,910.56
M2
1.19
0.45
0.54
03.05.02 Excavacin de Zanjas y/o Zapatas Hmx <= 1.00m en Terreno Normal
M3
3.05
8.99
27.42
M2
2.82
12.27
34.60
03.05.04 Zapatas - Concreto F'c= 210 kg/cm2 con mezcladora (inc curado)
M3
1.69
337.61
570.56
KG
15.34
4.42
67.80
0.66
353.03
233.00
M2
8.32
30.89
257.00
KG
61.28
4.42
270.86
M3
1.15
358.29
412.03
M2
9.23
46.65
430.58
KG
45.92
4.42
202.97
M2
6.63
18.56
123.05
M2
9.23
35.27
325.54
M2
15.86
4.12
65.34
03.05.15 Puerta metlica con Tubo Cuadrado de 2" x 2" incluye instalacin
M2
10.40
414.33
4,309.03
7,330.32
M2
108.00
0.41
44.28
44.28
M3
64.80
8.99
582.55
66.74
22.48
1,500.32
M3
66.74
20.68
1,380.18
M3
54.00
184.29
9,951.66
M3
10.80
208.79
2,254.93
M2
108.00
21.20
2,289.60
M2
162.00
15.23
2,467.26
162.00
0.09
14.58
162.00
2.13
345.06
3,463.05
14,496.19
135.00
14.99
2,023.65
M3
21.60
7.49
161.78
05.03.00 Cama de Apoyo para tubo hasta 10" con material propio incluye zarandeo
135.00
0.75
101.25
270.00
5.24
1,414.80
2,826.90
Item
Partida
05.05.00 Tapa de Fierro de 0.60x0.50 para Caja de Valvulas (Sum y Coloc)
Unidad Metrado
UND
2.00
Precio
249.50
Presup.S/.
499.00
UND
UND
12.00
13.74
164.88
10.00
9.26
UND
92.60
2.00
78.67
157.34
06.01.00 Preparacin de Tierra de Chacra incluye fertilizante (no incluye suministro de tierraM2
de chacra) 4,050.00
1.69
6,844.50
M2
4,050.00
1.15
4,657.50
M2
4,050.00
0.05
202.50
M3
1,620.00
0.05
81.00
UND
6.00
13.96
83.76
GLB
1.00
17,536.69
17,536.69
UND
2.00
3,594.96
7,189.92
4.00
743.44
2,973.76
Total
4,615.30
11,869.26
07.00.00 VARIOS
27,700.37
M2
5,238.00
0.22
1,152.36
UND
1.00
5,890.00
5,890.00
UND
1.00
5,010.00
COSTO DIRECTO
COSTOS INDIRECTOS
============================================
TOTAL PRESUPUESTO
5,010.00
443,845.86
50,661.92
================
494,507.78
12,052.36
DISTRITO
: CHUSCHI
PROVINCIA : CANGALLO
REGION
: AYACUCHO
FECHA:
: JULIO -2012
Cdigo
Recurso
Unidad
Precio S/.
Cantidad
Presupuestado S/.
MANO DE OBRA
050032
PARTICIPANTE
HH
2.8125
62,211.14
174,968.82
174,968.82
MATERIALES DE OBRA
029704
KG
3.50
065310
BOL
21.50
170021
LADRILLO CORRIENTE 6 x 12 x 24 CM
UND
0.65
020409
KG
4.50
020410
ALAMBRE NEGRO N8
KG
4.50
6,680.27
1,439.15
18,887.74
382.42
93.71
23,380.96
30,941.80
12,277.03
1,720.87
421.70
68,742.36
EQUIPOS
296007
296006
HERRAMIENTAS MANUALES
IMPLEMENTOS DE SEGURIDAD
EST
EST
5,010.00
5,890.00
1.00
1.00
5,010.00
5,890.00
10,900.00
TOTAL COSTO DIRECTO PROGRAMA
254,611.18
glb
glb
glb
glb
glb
glb
glb
1,062.00
10,620.00
5,479.92
0.00
0.00
4,000.00
500.00
TOTAL COSTO INDIRECTO PROGRAMA
21,661.92
276,273.10
Cdigo
Recurso
Unidad
Precio S/.
Cantidad
Presupuestado S/.
MANO DE OBRA
470391
470303
470032
ASISTENTE DE CUADRILLA
JEFE DE CUADRILLA
TOPOGRAFO
HH
HH
HH
5.0000
6.2500
6.2500
117.43
2,010.66
91.70
587.14
12,566.64
573.12
13,726.90
MATERIALES DE OBRA
308680
KG
14.00
390500
AGUA
M3
2.00
510158
ANGULO DE ACERO
PZA
45.00
296005
UND
3,500.00
040112
ARENA FINA
M3
90.00
050104
ARENA GRUESA
M3
85.00
590275
UND
260392
PAR
8.00
391610
BROCHA
UND
12.00
590100
PZA
21.00
308151
CALAMINA DE 2.44X.83X3MM
PZA
23.00
795203
PLN
21.00
663001
PZA
30.00
261406
CANDADO 45 MM.
UND
45.00
263146
UND
65.00
290405
CINTA TEFLON
PZA
1.00
291351
CINTA TEFLON
1.00
100491
KG
4.30
021206
PZA
0.10
021339
UND
0.10
020103
KG
4.30
020105
KG
4.30
021336
KG
7.00
021338
KG
4.30
021337
KG
4.30
725369
UND
4.50
292201
CORDEL
313122
FICUS
UND
10.00
325101
GLB
17,538.09
299831
FOSFATO DIAMONICO
KG
15.00
530103
GRASS
BOL
10.00
390235
HOJA DE SIERRA
UND
380000
HORMIGON
M3
85.00
313123
HUMUS
KG
6.00
301812
INSUMO DE AGRICUKTURA
KG
0.90
301811
PQT
12.00
340201
KEROSENE
GLN
15.00
170021
LADRILLO CORRIENTE 6 x 12 x 24 CM
UND
0.65
309919
LIJA
PLG
2.00
421051
MADERA
P2
4.30
435755
PZA
7.00
435756
PZA
10.50
435754
PZA
11.20
435753
PZA
16.80
430103
MADERA TORNILLO
P2
4.30
450101
P2
4.30
2" X 3/8"
3.00
0.10
5.00
1.45
79.64
1.82
2.00
2.94
64.25
8.00
12.93
0.70
16.00
24.00
6.00
4.43
4.00
0.94
27.10
2.00
1.60
168.00
16.80
1.81
138.08
0.04
2.00
0.13
10.00
9.30
6.00
1.00
81.00
283.50
2.60
107.74
0.60
2,025.00
216.00
3.60
11,613.17
0.32
4.51
87.00
14.80
32.00
16.00
467.67
1,977.23
20.30
159.27
81.95
7,000.00
264.69
5,461.03
24.00
103.44
8.44
336.00
552.00
126.00
132.96
180.00
60.84
27.10
2.00
6.88
16.80
1.68
7.80
593.76
0.29
8.60
0.56
45.00
0.93
60.00
17,538.09
1,215.00
2,835.00
13.00
9,158.15
3.60
1,822.50
2,592.00
54.00
7,548.56
0.63
19.38
609.00
155.40
358.40
268.80
2,010.99
8,502.07
393502
MALLA MOSQUITERO
M2
6.00
651405
UND
5.00
304638
UND
90.00
050009
M3
85.00
050011
M3
85.00
050360
M3
90.00
550001
KG
22.00
540236
GLN
45.00
540242
GLN
38.00
375373
PLOMO
PZA
5.00
431652
REGLA DE MADERA
P2
4.50
069901
SOLDADURA
KG
16.00
120153
PZA
145.00
393004
TECNOPORT
PLN
17.00
731322
UND
6.00
292010
THINNER CORRIENTE
GLN
17.00
450107
TRIPLAY 4 X 8 X 6 MM.
PLN
23.00
730134
PZA
8.00
720126
UND
19.00
510703
29.00
725805
PZA
4.50
650513
UND
5.40
539168
UREA
KG
780004
UND
45.00
544480
XILOL
GLN
32.00
290301
YESO
KG
0.25
4.00
2.40
4.00
0.24
64.91
9.36
71.89
2.38
4.22
0.86
4.00
7.71
6.24
2.00
5.76
12.00
0.50
11.59
4.00
56.70
90.48
27.00
4.00
40.50
2.00
1.32
229.16
14.40
20.00
21.60
5,517.49
795.94
6,470.10
52.34
189.90
32.68
20.00
34.70
99.84
290.00
97.89
72.00
8.50
266.64
32.00
1,077.30
2,623.92
121.50
21.60
162.00
90.00
42.20
57.29
88,218.72
EQUIPOS
480107
375401
482105
491021
480700
305511
490703
491701
HM
HM
HM
HM
HM
HM
HM
HM
10.00
2.00
15.00
12.00
8.00
270.00
8.00
120.00
64.24
85.93
55.47
22.88
93.09
27.57
30.83
641.11
642.44
171.86
832.00
274.54
744.74
7,443.36
246.66
76,933.46
87,289.06
APORTE DE LA MUNICIPALIDAD DE CHUSCHI
189,234.68
glb
glb
glb
glb
glb
glb
glb
14,000.00
8,000.00
4,000.00
3,000.00
glb
TOTAL COSTO INDIRECTO MUNICIPIO
29,000.00
RESUMEN
C.D
C.IND
254,611.18
21,661.92
276,273.10
C.D
C.IND
189,234.68
29,000.00
218,234.68
TOTAL
494,507.78
FORMATO N 16
DESAGREGADO DE HERRAMIENTAS
: MEJORAMIENTO DEL ESTADIO DEPORTIVO EN LA COMUNIDAD DE CHACOLLA, DISTRITO DE CHUSCHI -, PROVINCIA DE CANGALLO - AYACUCHO
Insumo
Herramientas Aporte del Programa
Unidad
Cantidad
Precio S/.
Parcial S/.
Picos
unidad
50.00
30.00
1,500.00
Lampas
unidad
35.00
30.00
1,050.00
carretillas
unidad
15.00
120.00
1,800.00
Combas de 8Libras
unidad
10.00
15.00
150.00
Combas de 20 Libras
unidad
4.00
25.00
100.00
Puntas
unidad
15.00
8.00
120.00
Barretas
unidad
4.00
60.00
240.00
Wincha de lona 50 ml
unidad
1.00
50.00
50.00
5,010.00
0.00
5,010.00
FORMATO N 12
PROYECTO: MEJORAMIENTO DEL ESTADIO DEPORTIVO EN LA COMUNIDAD DE CHACOLLA, DISTRITO DE CHUSCHI -, PROVINCIA DE
CANGALLO - AYACUCHO
N participantes
promedio
Precio
Unitario
(S/.) (**)
Parcial (S/.)
CASCOS
1.00
95.00
15.00
1,425.00
1.00
95.00
10.00
950.00
0.50
95.00
6.00
285.00
MASCARILLAS
1.00
95.00
4.00
380.00
POLOS
1.00
95.00
8.00
760.00
BOTAS
1.00
95.00
22.00
2,090.00
Implementos
5,890.00
Cantidad (Und)
Precio
Unitario
(S/.)
Parcial (S/.)
FORMATO 05
Distrito
: Chuschi
Provincia
Lugar
: Chacolla
: Cangallo
1. Costos Directos
0.00
0.00 254,611.18
0.00
COFINANCIAMIENTO
Otras
Organismo proponente
cofinanciantes
(c)
( d)
S/.
%
S/.
%
Costo Total
del Proyecto
Total
Cofinanciamiento
(e) =(c)+(d)
S/.
%
( CT = c+e)
S/.
51.49
254,611.18
51.49
189,234.68
86.71
0.00
0.00
189,234.68
38.27
443,845.86
0.00
0.00
0.00
13,726.90
6.29
0.00
0.00
13,726.90
2.78
13,726.90
0.00
0.00
0.00
0.00
174,968.82
35.38
174,968.82
35.38
0.00
0.00
0.00
0.00
0.00
0.00
174,968.82
-Materiales
0.00
0.00
68,742.36
13.90
68,742.36
13.90
88,218.72
40.42
0.00
0.00
88,218.72
17.84
156,961.08
-Equipos y Maquinarias
0.00
0.00
0.00
0.00
0.00
0.00
87,289.06
40.00
0.00
0.00
87,289.06
17.65
87,289.06
-Kit Herramientas
0.00
0.00
5,010.00
1.01
5,010.00
1.01
0.00
0.00
0.00
5,010.00
0.00
0.00
5,890.00
1.19
5,890.00
1.19
0.00
0.00
0.00
0.00
0.00
0.00
5,890.00
0.00
0.00
21,661.92
4.38
21,661.92
4.38
29,000.00
13.29
0.00
0.00
29,000.00
5.86
50,661.92
0.00
0.00
21,161.92
4.28
21,161.92
4.28
29,000.00
13.29
0.00
0.00
29,000.00
0.00
50,161.92
-Otros
0.00
0.00
500.00
0.10
500.00
0.10
0.00
0.00
0.00
0.00
0.00
0.00
500.00
0.00 276,273.10
55.87
276,273.10
55.87
218,234.68
44.13
0.00
0.00
218,234.68
44.13
494,507.78
2. Costos Indirectos
TOTAL S/.
0.00
0.00
0.00
0.00
Costo Total
del Proyecto
( CT = c+e)
%
89.76
2.78
35.38
31.74
17.65
1.01
1.19
10.24
10.14
0.10
100.00
FORMATO N 11
DESAGREGADO DE COSTOS INDIRECTOS SEGN FUENTES DEL PROYECTO PERFIL
PROYECTO : MEJORAMIENTO DEL ESTADIO DEPORTIVO EN LA COMUNIDAD DE CHACOLLA, DISTRITO DE CHUSCHI -, PROVINCIA DE CANGALLO - AYACUCHO
UBICACIN
Departamento : Ayacucho
Provincia
: Cangallo
Distrito
: Chuschi
Concepto
Costo base
del servicio
(S/.)
(H)
N de
meses
(Nm)
Factor de
distancia
(K)
900.00
4.0
0.18
Costo del
total servicio
Frmula de clculo de costo
(S/.)
(Cs)
Aporte del
Programa (OTROSPago directo por el
Programa)
Cofinanciamiento
1,000.00
4.0
0.18
860.00
4.0
0.18
1,300.00
4.0
0.18
Asistente tcnico
2,000.00
Maestro de obra
Otros
Bonificacion Economica por formulacion de
Proyecto BEFP(*)
2,000.00
Coordinador Tecnico
Promotor Social
500.00
Guardiana
750.00
1,062.00
1,062.00
10,620.00
10,620.00
5,479.92
5,479.92
Cs-rt= [H x (Nm+0.5)]Cp
11,700.00
4.0
Cs-at= [H x Nm]
8,000.00
4.0
Cs-mo= [H x Nm]
8,000.00
0.00
Cs-e = [(1+K) x H]
Cs-s = [(1+K ) x H x (Nm +
0.5)]Cp
Cs-psc= [(1+K ) x H x (Nm +
0.5)]Np
Costo nico
14,000.00
8,000.00
4,000.00
0.00
4,000.00
0.00
500.00
4.0
Cs-g= [H x Nm]
3,000.00
Totales
3,000.00
21,661.92
29,000.00
FACTOR K DE DISTANCIA
Tiempo de traslado desde la O.Z. hasta el convenio
<=2hrs acceso transporte publico
de 2hrs a 4hrs acceso transporte publico
de4hrs a 8hrs acceso transporte publico
> 8hrs acceso transporte publico
>12 hrs acceso con movilidad privada
C.IND.
50,661.92
669,288.05
719,949.97
538,655.00
1- DATOS GENERALES
A- POR PESO
MATERIALES
CEMENTO
FIERRO, CLAVOS, ALAMBRES, ETC.
MADERA
LADRILLO PARED
PINTURA, PEGAMENTO, OTROS
YESO
TEJA
OTROS
UNIDAD
BL.
KG
P2
UND
GAL
KG
PL
GLB
AFECTO IGV
1,439.28
7,474.80
3,043.14
30,500.00
9.92
143.22
0.00
5,000.00
PESO.UNIT.
42.50
1.00
1.80
2.00
4.00
1.00
1.50
1.00
PESO.TOTAL
61,169.40
7,474.80
5,477.65
61,000.00
39.68
143.22
0.00
5,000.00
PESO TOTAL
140,304.75
B- POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC.
ARENA FINA
PIEDRA GRANDE Y MEDIANA
HORMIGN
MADERA
ARENA GRUESA
FILTRO O GRAVA
PIEDRA ZARANDEADA
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
UNIDAD
M3
M3
M3
P2
M3
M3
M3
EN TUBERIA
CAPACIDAD DEL CAMION EN TUBOS / VIAJEVOLUMEN
Tub, 1"
0.00
Tub,1 1/2"
0.00
Tub 2:"
0.00
Tub, 3"
0.00
Tub 4":
0.00
Tub 6:" U-PVC
0.00
Tub 8" PVC-SAP
0.00
Tub 6'; CSN
Tub 8'; CSN
AFECTO IGV
SIN IGV
COSTO
AGREGADOS
PUESTO EN OBRA
CAPACIDAD TRANSPORTE
ML
No de tubos
U
U
U
U
U
U
U
U
U
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NUMERO TOTAL DE VIAJES
REDONDEO
TUBERIA EN VOLUMEN
12.00
No VIAJES
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2- FLETE TERRESTRE
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION (KG)
FLETE POR KG
0.12500
AFECTO IGV
17,536.69
0.00
0.00
17,536.69
SIN IGV
3- FLETE FLUVIAL
UNIDAD DE TRANSPORTE QUE DA COMPROBANTE
UNIDAD DE TRANSPORTE QUE NO DA COMPROB.
CAPACIDAD DEL BOTE EN PESO
(KG)
CAPACIDAD DEL BOTE EN VOLUMEN (M3)
COSTO POR VIAJE
COSTO POR PESO
AFECTO IGV
SIN IGV
AGREGADOS
TUBERIA
COSTO FLETE FLUVIAL
4- FLETE EN ACEMILA
MATERIALES:
(Carguio a obra)
Costos de transporte por viaje
Acmila
Peon S/.
UND.
0.00
0.00
Cantidad
Capacidad de
Carga
Unidades de
Carga
Nmero de
Viajes
Flete no
Afecto a IGV
15
60.00
0.00
0.00
TUBERIA
UND.
0.00
CEMENTO
BOL
1,439.28
42.50
1,439.28
0.00
KG
7,474.80
60
60.00
124.58
0.00
MADERA P/ ENCOFRADO
P2
3,043.14
55
55.00
55.33
0.00
CALAMINA
PL
0.00
10
60.00
0.00
0.00
AGREGADO
M3
0.00
0.090
60.00
0.00
0.00
40.00
298.43
0.00
OTROS
GLOB.
298.43
SIN IGV
17,536.69
FLETE FLUVIAL
FLETE EN ACEMILA
17,536.69
FLETE TOTAL: