ANALISIS DEL CALCULO DE LOS COSTOS ML SOLDADURA

DATOS DEL PROCESO


PROCESO
POSICION
TIPO JUNTA
MATERIAL
DATOS DE COSTOS
COSTO ELECTRODO TUNGSTENO PUNTO ROJO
COSTO MATERIAL DE APORTE / Kg
COSTO DE ARGON / M3
COSTO KILOWATIO / HORA
COSTO MAQUINA DE SOLDADURA (Maquina/Hora)
COSTO OPERARIO DE SOLDADURA (Hora/Hombre)

(Pr)
(Po)
(Tj)
(Ma)

(Ce)
(Cap)
(Car)
(CKw/Hr)
(Cma/Hr)
(CHr/H)

TIG
Plana
A Tope
Acero Inox 304

$
$
$
$
$
$

ESPECIFICACIONES TECNICAS DEL PROCESO POR ESPESOR


ESPESOR LAMINA
DIAMETRO ELETRODO TUNGSTENO PUNTO ROJO
DIAMETRO VARILLA DE APORTE
AMPERAJE DC
VOLTAJE DE TRABAJO
FACTOR DE POTENCIA
FLUJO DE ARGON
EFICIENCIA DE DEPOSICION
VELOCIDAD DE DEPOSICION
FACTOR DE OPERACIN ( 5 - 20) %
CANTIDAD DE PASES
CANTIDAD DE OPERARIO DE SOLDADURA
SEPARACION DE RAIZ
LONGITUD DE LA JUNTA A SOLDAR
DENSIDAD MATERIAL DEPOSITADO

()
(De)
(Da)
(Amp)
(Vt)
(Fp)
(Fa)
(Ed)
(Vd)
(Fo)
(Cp)
(Cop)
(b)
(L )
(Dmd)

(M3/min)
(%)
(Mt/min)
(%)
(Und)
(Und)
(mm)
(M)
(Kg/M3)

CALCULOS SOLDADURA PROCESO TIG X ML


AREA DE LA SECCION DE LA JUNTA A SOLDAR
(S)= ()*(b)
PESO MATERIAL DEPOSITADO
(Pmd)=(S)*(L)*(Dmd)
CONSUMO ENERGIA
(KW / HORA) = ((Vt)*(Amp)*(Fp)*(Tt)/1000)
TIEMPO DE TRABAJO
(Tt)=(Pmd)/(Vd)*(Fo)*(Cop)

(S)
(Pmd)
(Ce)
(Tt)

(m2)
(Kg)
(KW/Hr)
(Min)

(Ce)

($E/ML)

COSTOS DIRECTOS SOLDADURA PROCESO TIG X ML


COSTO ELECTRODO DE TUNGTENO

(mm)
(Pulg)
(Pulg)
(Amp)
(Volts)

COSTO VARILLA APORTE DEPOSITADO


COSTO DE LA ENERGIA
COSTO DEL ARGON
COSTO MAQUINA DE SOLDAR
COSTO OPERARIO DE SOLDADURA
TOTAL COSTO DIRECTO SOLDADURA PROCESO TIG X ML
MARGEN
PRECIO VENTA SOLDADURA PROCESO TIG X ML
ML A SOLDAR
PRECIO TOTAL SOLDADURA PROCESO TIG
TIEMPO TOTAL DE TRABAJO

(Cap)
(CKw/Hr)
(Car)
(Cma/Hr)
(CHr/H)

($/Kg)*ML
($/Kw)*ML
($/M3)*ML
($/H.M)*ML
($/H.H)*ML

COSTOS ML SOLDADURA - PROCESO TIG

TIG
Plana
A Tope
Acero Inox 304

$
$
$
$
$
$

e
b

5,000
40,000
25,000
200
15,000
12,000

1.2

1.5

2.0

2.5

4.5

1/16"

1/16"

1/16"

1/16"

3/32"

3/32"

1/16"

1/16"

1/16"

1/16"

3/32"

1/8"

70

100

110

120

140

150

440

440

440

440

440

440

0.9

0.9

0.9

0.9

0.9

0.9

0.005

0.007

0.007

0.007

0.007

0.009

95%

95%

95%

95%

95%

95%

0.3048

0.3048

0.3048

0.3048

0.3048

0.254

20%

20%

20%

20%

20%

20%

1.2

1.5

2.5

4.5

7.85

7.85

7.85

7.85

7.85

7.85

0.0000014

0.0000023

0.0000040

0.0000063

0.0000090

0.0000203

0.000011

0.000018

0.000031

0.000049

0.000071

0.00016

0.00514

0.0115

0.0224

0.0382

0.0643

0.1859

0.00019

0.00029

0.00052

0.00080

0.0012

0.0031

$ 0.03709

0.04 $

0.04 $
0.04 $

ANALISIS DEL CALCULO DE LOS COSTOS HORA - MAQU


DATOS GENERALES DEL EQUIPO
NOMBRE DEL EQUIPO
CENTRO DE COSTOS
MODELO
CAPACIDAD
SERIE
MARCA
PRECIO DE ADQUISICION
PRECIO JUEGO DE LLANTAS
EQUIPO ADICIONAL
VIDA UTIL JUEGO LLANTAS
PRECIO PIEZAS ESPECIALES
VIDA UTIL PIEZAS ESPECIALES
VALOR DE LA MAQUINA
VALOR DE RESCATE
TASA DE INTERES ANUAL
PRIMA ANUAL PROMEDIO DE SEGUROS
TIEMPO CAMBIO LUBRICANTE

DEPRECIACION
INVERSION
SEGUROS
MANTENIMIENTO

CONSUMOS
COMBUSTIBLE
OTRAS FUENTES DE ENERGIA
LUBRICANTE
LLANTAS
PIEZAS ESPECIALES
OTROS CONSUMOS

(Pn)
(Vn)
(Pe)
(Va)
(Vm)
(Vr)
(I)
(S)
(Ca)

D=(Vm - Vr)/Ve
Im=(Vm+Vr)*(I/2)*(Hea)
Sm=(Vm+Vr)*((S)/2)*(Hea)
M=Ko*D
SUMA CARGOS FIJOS

Co=Fc*Pop*Pc

$
$
$

0 Hrs

0 Hrs

0% $
0%
0%
0 Hrs

CARGOS FIJOS
#DIV/0!
$
$

#DIV/0!
#DIV/0!

$
$

Lb=((Fa*Pop)+CC/Ca))*Pa
N=Pn/Vn
Ae=Pe/Va

#DIV/0!
#DIV/0!
#DIV/0!

SUMA CONSUMOS

#DIV/0!

COSTO DIRECTO HORA - MAQUINA

#DIV/0!

S COSTOS HORA - MAQUINA

ES DEL EQUIPO

VIDA UTIL
HORAS POR AO
VIDA UTIL
COSTO COMBUSTIBLE
COSTO LUBRICANTE
POTENCIA NOMINAL
FACTOR DE OPERACIN
POTENCIA DE OPERACIN
FACTOR DE MANTENIMIENTO
COEFICIENTE DE COMBUSTIBLE
COEFICIENTE DE LUBRICANTE
CAPACIDAD DEL CARTER
FACTOR DE RENDIMIENTO
FIJOS

(Hea)
(Ve)
(Pc)
(Pa)
(Fo)
(Pop)
(Ko)
(Fc)
(Fa)
(Cc)
(Fr)

$
$

0 Aos
0 Hrs
0 Hrs
- $/ Galon
- $/ Galon
0 HP
0
0
0
0
0
0
0

COSTO H.H POR ESPECIALIDAD AO 2015.


1. DIRECTOR DE PROYECTO.
TEM
DESCRIPCION
UND CANT
COSTO
COSTO TOTAL
1 Personal.
MES 1
4,462,980 COP 4,462,980 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
4,462,980 COP 23,245 COP
3 Administracion.
0.00%
0 COP
4 Imprevistos.
0%
0 COP
5 Utilidad.
0%
0 COP
TOTAL
0.00%
4,462,980 COP 23,245 COP
COSTO H.H POR ESPECIALIDAD AO 2015.
2. INGENIERO DE PRESUPUESTO.
TEM
DESCRIPCION
UND CANT
COSTO
COSTO TOTAL
1 Personal.
MES 1
2,677,788 COP 2,677,788 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
2,677,788 COP 13,947 COP
3 Administracion.
0.00%
0 COP
4 Imprevistos.
0%
0 COP
5 Utilidad.
0%
0 COP
TOTAL
0.00%
2,677,788 COP 13,947 COP
COSTO H.H POR ESPECIALIDAD AO 2015.
3. INGENIERO PLANEADOR DE PROYECTOS.
TEM
DESCRIPCION
UND CANT
COSTO
COSTO TOTAL
1 Personal.
MES 1
2,529,022 COP 2,529,022 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
2,529,022 COP 13,172 COP
3 Administracion.
0.00%
0 COP
4 Imprevistos.
0%
0 COP
5 Utilidad.
0%
0 COP
TOTAL
0.00%
2,529,022 COP 13,172 COP
COSTO H.H POR ESPECIALIDAD AO 2015.
4. INGENIERO QA/QC.
TEM
DESCRIPCION
UND CANT
COSTO
COSTO TOTAL
1 Personal.
MES 1
2,975,320 COP 2,975,320 COP
2 Herramienta y Equipo.
MES

3
4
5

SUBTOTAL
Administracion.
Imprevistos.
Utilidad.
TOTAL

0.00%
0%
0%
0.00%

2,975,320 COP 15,496 COP


0 COP
0 COP
0 COP
2,975,320 COP 15,496 COP

COSTO H.H POR ESPECIALIDAD AO 2015.


5. SUPERVISOR DE PROYECTOS.
TEM
DESCRIPCION
UND CANT
COSTO
COSTO TOTAL
1 Personal.
MES 1
2,231,490 COP 2,231,490 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
2,231,490 COP 11,622 COP
3 Administracion.
0.00%
0 COP
4 Imprevistos.
0%
0 COP
5 Utilidad.
0%
0 COP
TOTAL
0.00%
2,231,490 COP 11,622 COP
COSTO H.H POR ESPECIALIDAD AO 2015.
6. AUXILIAR ADMINISTRATIVA.
TEM
DESCRIPCION
UND CANT
COSTO
COSTO TOTAL
1 Personal.
MES 1
1,190,128 COP 1,190,128 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
1,190,128 COP 6,199 COP
3 Administracion.
0.00%
0 COP
4 Imprevistos.
0%
0 COP
5 Utilidad.
0%
0 COP
TOTAL
0.00%
1,190,128 COP 6,199 COP
COSTO H.H POR ESPECIALIDAD AO 2015.
7. COORDINADOR SISO.
TEM
DESCRIPCION
UND CANT
COSTO
COSTO TOTAL
1 Personal.
MES 1
2,008,341 COP 2,008,341 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
2,008,341 COP 10,460 COP
3 Administracion.
0.00%
0 COP
4 Imprevistos.
0%
0 COP
5 Utilidad.
0%
0 COP
TOTAL
0.00%
2,008,341 COP 10,460 COP

COSTO H.H POR ESPECIALIDAD AO 2015.


8. VIGIA SISO.
TEM
DESCRIPCION
UND CANT
COSTO
COSTO TOTAL
1 Personal.
MES 1
1,338,894 COP 1,338,894 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
1,338,894 COP 6,973 COP
3 Administracion.
0.00%
0 COP
4 Imprevistos.
0%
0 COP
5 Utilidad.
0%
0 COP
TOTAL
0.00%
1,338,894 COP 6,973 COP
COSTO H.H POR ESPECIALIDAD AO 2015.
9. DIBUJANTE.
TEM
DESCRIPCION
UND CANT
COSTO
COSTO TOTAL
1 Personal.
MES 1
1,487,660 COP 1,487,660 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
1,487,660 COP 7,748 COP
3 Administracion.
0.00%
0 COP
4 Imprevistos.
0%
0 COP
5 Utilidad.
0%
0 COP
TOTAL
0.00%
1,487,660 COP 7,748 COP
COSTO H.H POR ESPECIALIDAD AO 2015.
10. ALMACENISTA.
TEM
DESCRIPCION
UND CANT
COSTO
COSTO TOTAL
1 Personal.
MES 1
1,338,894 COP 1,338,894 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
1,338,894 COP 6,973 COP
3 Administracion.
0.00%
0 COP
4 Imprevistos.
0%
0 COP
5 Utilidad.
0%
0 COP
TOTAL
0.00%
1,338,894 COP 6,973 COP
COSTO H.H POR ESPECIALIDAD AO 2015.
11. SOLDADOR 1A.
TEM
DESCRIPCION
UND CANT
V/U
1 Personal.
MES 1
2,231,490 COP
2 Herramienta y Equipo.
MES
SUBTOTAL

Vr TOTAL
2,231,490 COP
2,231,490 COP 11,622 COP

3
4
5

Administracion.
Imprevistos.
Utilidad.
TOTAL

0.00%
0%
0%
0.00%

COSTO H.H POR ESPECIALIDAD AO 2015.


12. SOLDADOR 2.
TEM
DESCRIPCION
UND CANT
V/U
1 Personal.
MES 1
2,157,107 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
3 Administracion.
0.00%
4 Imprevistos.
0%
5 Utilidad.
0%
TOTAL
0.00%
COSTO H.H POR ESPECIALIDAD AO 2015.
13. MECANICO ARMADOR.
TEM
DESCRIPCION
UND CANT
V/U
1 Personal.
MES 1
1,785,192 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
3 Administracion.
0.00%
4 Imprevistos.
0%
5 Utilidad.
0%
TOTAL
0.00%
COSTO H.H POR ESPECIALIDAD AO 2015.
14. TUBERO 1A.
TEM
DESCRIPCION
UND CANT
V/U
1 Personal.
MES 1
2,529,022 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
3 Administracion.
0.00%
4 Imprevistos.
0%
5 Utilidad.
0%
TOTAL
0.00%
COSTO H.H POR ESPECIALIDAD AO 2015.

0 COP
0 COP
0 COP
2,231,490 COP 11,622 COP

Vr TOTAL
2,157,107 COP
2,157,107 COP 11,235 COP
0 COP
0 COP
0 COP
2,157,107 COP 11,235 COP

Vr TOTAL
1,785,192 COP
1,785,192 COP 9,298 COP
0 COP
0 COP
0 COP
1,785,192 COP 9,298 COP

Vr TOTAL
2,529,022 COP
2,529,022 COP 13,172 COP
0 COP
0 COP
0 COP
2,529,022 COP 13,172 COP

15. AYUDANTE PRACTICO.


TEM
DESCRIPCION
UND CANT
V/U
1 Personal.
MES 1
1,041,362 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
3 Administracion.
0.00%
4 Imprevistos.
0%
5 Utilidad.
0%
TOTAL
0.00%
COSTO H.H POR ESPECIALIDAD AO 2015.
16. AYUDANTE RAZO.
TEM
DESCRIPCION
UND CANT
V/U
1 Personal.
MES 1
876,976 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
3 Administracion.
0.00%
4 Imprevistos.
0%
5 Utilidad.
0%
TOTAL
0.00%
COSTO H.H POR ESPECIALIDAD AO 2015.
17. ROLADOR.
TEM
DESCRIPCION
UND CANT
V/U
1 Personal.
MES 1
1,413,277 COP
2 Herramienta y Equipo.
MES
SUBTOTAL
3 Administracion.
0.00%
4 Imprevistos.
0%
5 Utilidad.
0%
TOTAL
0.00%

Vr TOTAL
1,041,362 COP
1,041,362 COP 5,424 COP
0 COP
0 COP
0 COP
1,041,362 COP 5,424 COP

Vr TOTAL
876,976 COP
876,976 COP 4,568 COP
0 COP
0 COP
0 COP
876,976 COP 4,568 COP

Vr TOTAL
1,413,277 COP
1,413,277 COP 7,361 COP
0 COP
0 COP
0 COP
1,413,277 COP 7,361 COP

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO H.H

TARIFA H.H

COSTO MENSUAL PERSONAL POR ESPECIALIDAD AO 2015.

ESPECIALIDAD.
Director de Proyectos.
Ing. De Presupuestos.
Ing. Planeador de Proyectos.
Ing. QA/QC.
Supervisor de Proyectos.
ADTIVOS
Auxiliar Administrativa.
Coordinador SISO.
Vigia SISO.
Dibujante.
Almacenista.
Soldador 1A.
Soldador 2.
Mecanico Armador.
OPERATIVOS Tubero 1A.
Ayudante Practico.
Ayudante Razo.
Rolador.
TOTAL

UND. CANT.
MES
MES
MES
MES
MES
MES
MES
MES
MES
MES
MES
MES
MES
MES
MES
MES
MES

SALARIO
BASICO.

APORTE A
SALUD.

APORTE A
PENSION.

APORTE A ARL.

APORTE A
CAJA.

APORTE A
CESANTIAS.

APORTE A
INTERESES
CESANTIAS.

APORTE A
PRIMA.

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

3,000,000 COP
1,800,000 COP
1,700,000 COP
2,000,000 COP
1,500,000 COP
800,000 COP
1,350,000 COP
900,000 COP
1,000,000 COP
900,000 COP
1,500,000 COP
1,450,000 COP
1,200,000 COP
1,700,000 COP
700,000 COP
589,500 COP
950,000 COP

255,000 COP
153,000 COP
144,500 COP
170,000 COP
127,500 COP
68,000 COP
114,750 COP
76,500 COP
85,000 COP
76,500 COP
127,500 COP
123,250 COP
102,000 COP
144,500 COP
59,500 COP
50,108 COP
80,750 COP

360,000 COP
216,000 COP
204,000 COP
240,000 COP
180,000 COP
96,000 COP
162,000 COP
108,000 COP
120,000 COP
108,000 COP
180,000 COP
174,000 COP
144,000 COP
204,000 COP
84,000 COP
70,740 COP
114,000 COP

73,080 COP
43,848 COP
41,412 COP
48,720 COP
36,540 COP
19,488 COP
32,886 COP
21,924 COP
24,360 COP
21,924 COP
36,540 COP
35,322 COP
29,232 COP
41,412 COP
17,052 COP
14,360 COP
23,142 COP

120,000 COP
72,000 COP
68,000 COP
80,000 COP
60,000 COP
32,000 COP
54,000 COP
36,000 COP
40,000 COP
36,000 COP
60,000 COP
58,000 COP
48,000 COP
68,000 COP
28,000 COP
23,580 COP
38,000 COP

249,900 COP
149,940 COP
141,610 COP
166,600 COP
124,950 COP
66,640 COP
112,455 COP
74,970 COP
83,300 COP
74,970 COP
124,950 COP
120,785 COP
99,960 COP
141,610 COP
58,310 COP
49,105 COP
79,135 COP

30,000 COP
18,000 COP
17,000 COP
20,000 COP
15,000 COP
8,000 COP
13,500 COP
9,000 COP
10,000 COP
9,000 COP
15,000 COP
14,500 COP
12,000 COP
17,000 COP
7,000 COP
5,895 COP
9,500 COP

249,900 COP
149,940 COP
141,610 COP
166,600 COP
124,950 COP
66,640 COP
112,455 COP
74,970 COP
83,300 COP
74,970 COP
124,950 COP
120,785 COP
99,960 COP
141,610 COP
58,310 COP
49,105 COP
79,135 COP

17

23,039,500 COP

1,958,358 COP

2,764,740 COP

561,242 COP

921,580 COP

1,919,190 COP

230,395 COP

1,919,190 COP

APORTE A
VACACIONES.
125,100 COP
75,060 COP
70,890 COP
83,400 COP
62,550 COP
33,360 COP
56,295 COP
37,530 COP
41,700 COP
37,530 COP
62,550 COP
60,465 COP
50,040 COP
70,890 COP
29,190 COP
24,582 COP
39,615 COP

COSTO MES
COSTO MES
X
X AREA.
ESPECIALIDAD.
4,462,980 COP
2,677,788 COP
2,529,022 COP
2,975,320 COP
2,231,490 COP
22,240,517 COP
1,190,128 COP
2,008,341 COP
1,338,894 COP
1,487,660 COP
1,338,894 COP
2,231,490 COP
2,157,107 COP
1,785,192 COP
2,529,022 COP 12,034,426 COP
1,041,362 COP
876,976 COP
1,413,277 COP

960,747 COP 34,274,943 COP 34,274,943 COP

Hemograma.

Glucosa.

Colesterol.

Trigliceridos.

Espirometria.

Optometria.

9,602 COP

9,182 COP

25,362 COP ElectroCardiograma.

Audiometria.

10,182 COP

38,360 COP

32,360 COP

10,180 COP

Cant. Por ao por persona.

Director de Proyectos.
Ing. De Presupuestos.
Ing. Planeador de Proyectos.
Ing. QA/QC.
Supervisor de Proyectos.
Auxiliar Administrativa.
Coordinador SISO.
Vigia SISO.
Dibujante.
Almacenista
Soldador 1A.
Soldador 2.
Mecanico Armador.
Tubero 1A.
Ayudante Practico.
Ayudante Razo.

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

COSTO DE EXAMENES
MEDICOS DE INGRESO Y
EGRESO

# Trabajadores.

14,362 COP

COSTOS DE EXAMENES MEDICOS DE INGRESO Y EGRESO AO 2015.

COSTO ($) POR UNIDAD.

Rolador.
TOTAL

1
17

1
17

1
17

1
17

1
17

1
17

1
17

1
17

1
17

COSTO DE EXAMENES
MEDICOS DE INGRESO Y
EGRESO

COSTOS DE EXAMENES MEDICOS DE INGRESO Y EGRESO AO 2015.

# Trabajadores.

S MEDICOS DE INGRESO Y EGRESO AO 2015.

COSTO ($) POR UNIDAD.

COSTO TOTAL
($) ANUAL

Cant. Por ao por persona.

Director de Proyectos.
Ing. De Presupuestos.
Ing. Planeador de Proyectos.
Ing. QA/QC.
Supervisor de Proyectos.
Auxiliar Administrativa.
Coordinador SISO.
Vigia SISO.
Dibujante.
Almacenista
Soldador 1A.
Soldador 2.
Mecanico Armador.
Tubero 1A.
Ayudante Practico.
Ayudante Razo.

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP
149,590 COP

COSTO ($)
MENSUAL /
CARGO
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP
12,466 COP

COSTO ($)
DIARIO POR
CARGO
410 COP
410 COP
410 COP
410 COP
410 COP
410 COP
410 COP
410 COP
410 COP
410 COP
410 COP
410 COP
410 COP
410 COP
410 COP
410 COP

COSTO ($)
H.H POR
CARGO
65 COP
65 COP
65 COP
65 COP
65 COP
65 COP
65 COP
65 COP
65 COP
65 COP
65 COP
65 COP
65 COP
65 COP
65 COP
65 COP

Rolador.
TOTAL

1
17

149,590 COP
2,543,030 COP

12,466 COP
211,919 COP

410 COP
6,967 COP

65 COP
1,104 COP

Guantes Para Soldador.

Mangas de Carnaza.

Arnes de Seguridad
ARSEG.

Careta de Pulir.

Careta de Soldar.

Guantes de Carnaza.

10,000 COP

0 COP

19,483 COP

22,414 COP

7,155 COP

1
1
1
1
1
1
1
1
1
1
1
1
1

17,414 COP

Director de Proyectos.
Ing. De Presupuestos.
Ing. Planeador de Proyectos.
Ing.Qa/QC.
Supervisor de Proyectos.
Auxiliar Administrativa.
Coordinador SISO.
Vigia SISO.
Dibujante.
Almacenista.
Soldador 1A.
Soldador 2.
Mecanico Armador.

Delantal o Peto.

12,285 COP

Cant. Por ao por persona.

Polaina de Carnaza .

COSTO ($) POR UNIDAD.

11,638 COP

COSTO DE EPP

# Trabajadores.

COSTOS DE EPP AO 201

1
1
1
1
1
1
1
1

1
1
1

1
1

1
1
1

1
1
1

1
1
1

1
1
1

Tubero 1A.
Ayudante Practico.
Ayudante Razo.
Rolador.
TOTAL

1
1
1
1
17

1
1
1
6

1
1
1
1
7

1
1
1

1
1
1

1
1
1

11

1
1
1
1
5

1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1

1
1
1

Mascara Humo Soldador.

1
1
1
1
1
1
1
1
1

90,011 COP

Filtros de Repuesto
Mascara Soldador.

22,989 COP

Gafas de Seguridad
ARSEG.

12,500 COP Tapon Auditivo Anatomico.

3,534 COP

Casco de Seguridad
ARSEG.

1
1
1
1
1
1
1
1
1
1
1
1
1

17,241 COP

Director de Proyectos.
Ing. De Presupuestos.
Ing. Planeador de Proyectos.
Ing.Qa/QC.
Supervisor de Proyectos.
Auxiliar Administrativa.
Coordinador SISO.
Vigia SISO.
Dibujante.
Almacenista.
Soldador 1A.
Soldador 2.
Mecanico Armador.

Barbuquejo.

8,319 COP

Cant. Por ao por persona.

Guantes Tipo Ingeniero.

COSTO ($) POR UNIDAD.

COSTOS DE EPP AO 201

7,458 COP

COSTO DE EPP

# Trabajadores.

COSTOS DE EPP AO 2015.

1
1

1
1

Tubero 1A.
Ayudante Practico.
Ayudante Razo.
Rolador.
TOTAL

1
1
1
1
17

1
1
1
7

15

1
1
1
1
17

1
1
1
1
17

1
1
1
1
17

COSTO DE EPP

# Trabajadores.

COSTOS DE EPP AO 201

COSTO ($) POR UNIDAD.

COSTO TOTAL
($) ANUAL

Cant. Por ao por persona.

Director de Proyectos.
Ing. De Presupuestos.
Ing. Planeador de Proyectos.
Ing.Qa/QC.
Supervisor de Proyectos.
Auxiliar Administrativa.
Coordinador SISO.
Vigia SISO.
Dibujante.
Almacenista.
Soldador 1A.
Soldador 2.
Mecanico Armador.

1
1
1
1
1
1
1
1
1
1
1
1
1

41,594 COP
41,594 COP
41,594 COP
49,052 COP
49,052 COP
41,594 COP
49,052 COP
49,052 COP
49,052 COP
33,275 COP
255,286 COP
255,286 COP
102,155 COP

COSTO ($)
MENSUAL /
CARGO

3,466 COP
3,466 COP
3,466 COP
4,088 COP
4,088 COP
3,466 COP
4,088 COP
4,088 COP
4,088 COP
2,773 COP
21,274 COP
21,274 COP
8,513 COP

COSTO ($)
COSTO ($)
DIARIO
H.H POR
POR
CARGO
CARGO
114 COP
114 COP
114 COP
134 COP
134 COP
114 COP
134 COP
134 COP
134 COP
91 COP
699 COP
699 COP
280 COP

18 COP
18 COP
18 COP
21 COP
21 COP
18 COP
21 COP
21 COP
21 COP
14 COP
111 COP
111 COP
44 COP

Tubero 1A.
Ayudante Practico.
Ayudante Razo.
Rolador.
TOTAL

1
1
1
1
17

102,155 COP
8,513 COP
102,155 COP
8,513 COP
102,155 COP
8,513 COP
52,715 COP
4,393 COP
1,416,818 COP 118,068 COP

280 COP
280 COP
280 COP
144 COP
3,882 COP

44 COP
44 COP
44 COP
23 COP
615 COP

Camisa
Oxford.

Camisa Drill
Manga Larga.

Pantalon
Jean.

Bota Steel
Worker.

Botas con
Platina de
Acero.

17,800 COP

18,000 COP

101,714 COP

43,750 COP

COSTO ($) POR UNIDAD.

23,300 COP

COSTO DE UNIFORMES

#
Trabajadores.

COSTOS DE UNIFORMES AO 2015.

1
1
1
1
1
1
1
1
1
1

6
6
6
6
6
6
6

6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6

Cant. Por ao por persona.

Director de Proyectos.
Ing. Residente.
Ing. Planeador de Proyectos.
Ing. QA/QC.
Supervisor de Proyectos.
Auxiliar Administrativa.
Coordinador SISO.
Vigia SISO.
Dibujante
Almacenista
Soldador 1A.
Soldador 2.
Mecanico Armador.
Tubero 1A.
Ayudante Practico.
Ayudante Razo.
Rolador.

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

6
6
6
6
6
6
6
6
6
6

1
1
1
1
1
1
1

COSTO TOTAL
($) ANUAL

349,514 COP
349,514 COP
349,514 COP
349,514 COP
349,514 COP
349,514 COP
349,514 COP
349,514 COP
349,514 COP
349,514 COP
258,550 COP
258,550 COP
258,550 COP
258,550 COP
258,550 COP
258,550 COP
258,550 COP

COSTO ($)
MENSUAL /
CARGO
29,126 COP
29,126 COP
29,126 COP
29,126 COP
29,126 COP
29,126 COP
29,126 COP
29,126 COP
29,126 COP
29,126 COP
21,546 COP
21,546 COP
21,546 COP
21,546 COP
21,546 COP
21,546 COP
21,546 COP

TOTAL

17

60

42

102

10

5,304,993 COP 442,083 COP

COSTO DE UNIFORMES

COSTOS DE UNIFORMES AO 2015.


#
Trabajadores.

RMES AO 2015.

COSTO ($) POR UNIDAD.

Cant. Por ao por persona.

Director de Proyectos.
Ing. Residente.
Ing. Planeador de Proyectos.
Ing. QA/QC.
Supervisor de Proyectos.
Auxiliar Administrativa.
Coordinador SISO.
Vigia SISO.
Dibujante
Almacenista
Soldador 1A.
Soldador 2.
Mecanico Armador.
Tubero 1A.
Ayudante Practico.
Ayudante Razo.
Rolador.

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

COSTO ($)
COSTO ($)
DIARIO
H.H POR
POR
CARGO
CARGO
958 COP
958 COP
958 COP
958 COP
958 COP
958 COP
958 COP
958 COP
958 COP
958 COP
708 COP
708 COP
708 COP
708 COP
708 COP
708 COP
708 COP

152 COP
152 COP
152 COP
152 COP
152 COP
152 COP
152 COP
152 COP
152 COP
152 COP
112 COP
112 COP
112 COP
112 COP
112 COP
112 COP
112 COP

TOTAL

17

14,534 COP 2,303 COP

CARGA PRESTACIONAL COLOMBIA 2015


APORTE A LA SALUD.
Aporte a la Salud
8.50%
APORTE A LA PENSION
Aporte a la Pension
12.00%
APORTE A LA ARL
Aporte a la ARL
2.44%
APORTE A LA CAJA DE COMPENSACION
Aporte Caja de Compensacion
4.00%
APORTE A CESANTIAS
Aporte a Cesantias
8.33%
APORTE A INTERES DE CESANTIAS
Aporte a Interes deCesantias
1.00%
APORTE A PRIMA
Aporte a Prima
8.33%
APORTE A VACACIONES
Aporte a Vacaciones
4.17%
TOTAL % PRESTACIONES

48.77%