γc = 2.5 t/m3
Ø = 30o
γ = 2 t/m3
σ adm = 30 K/cm2
HA30
fck = 300 k/cm2
B400 fyd = 4000 k/cm2
μ terreno = 0.5
Planteamiento:
Ka = tan2 (45 - Ø/2) = 0.333
σv (0) = q = 1 T/m2
σv (4.1) = q + ((H+h)* γ ) =
=1 + ((3.5+ 0.6)* 2) = 9.2 T/m2
Zg = (Δh/3) * ((2q2+q1)/(q2+q1)) =
=(4.1/3)*((2*3.07)+0.333)/(3.07+0.333)) = 2.60 m
Equilibrio y Deslizamiento:
Sector Vector Brazo de palanca ME = V * B
1 1*0,35*3,5*2,5 = 3,06 1,1+(0,35/2) = 1,27 3,90
2 1*0,3*3,5*2 = 2,1 1,75-(0,3/2) =1,6 3,36
3 1*1,75*0,6*2,5 = 2,62 1,75/2 = 0,87 2,30
Total = 7,78 Total = 9,56
Mv = E * Zg = 6.97 * 1.5 = 10.45 Tm
MV < ME K
10.45 < 9.56 K; siendo
1.2 ≤ K ≤ 1.8 (Usualmente 1.5 – 1.6)
EH K ≤ (P + q) μ
6.97 K ≤ (7.78 + 1) * 0.5 = 4.39; siendo
1.1 ≤ K ≤ 1.8 (Usualmente 1.4 – 1.6)
σv (0) = q = 1 T/m2
σv (4.3) = q + ((H+h)* γ ) =
=1 + ((3.5+ 0.8)* 2) = 9.6 T/m2
Zg = (Δh/3) * ((2q2+q1)/(q2+q1)) =
=(4.3/3)*((2*3.2)+0.333)/(3.2+0.333)) = 2.73 m
1 1*0,45*3,5*2,5 = 3,94 1,5+(0,45/2) = 1,725 6,80
2 1*0,8*3,5*2 = 5,6 2,7-(0,8/2) =2,3 12,88
3 1*2,80*0,8*2,5 = 5,6 2,70/2 = 1,35 7,56
Total = 15,14 Total = 27,24
Datos:
Solución
Zg = (Δh/3) * ((2q2+q1)/(q2+q1)) =
= (3.5/3)*((2*2.66)+0.333)/(2.66+0.333)) =2.20 m
Utilizaremos 816/ml
Nota: Realizar el cálculo del Ap para el resto de las secciones del muro
Diagrama de armaduras
Despiece de armaduras
3,5+0,35 = 3,85*1,58 =
1 8/ml 16 1,58
3,85 6,08
3 15 1 8 0,22 0,22