Está en la página 1de 1

ADELANTO DE MATERIALES N° 01

Obra: ADECUACION, MEJORAMIENTO Y SUSTITUCION DE LA I.E. "SANTA TERESITA"


Cliente: MINISTERIO DE EDUCACION
Contratista: CONSORCIO SANTA TERESITA
Lugar: CAJAMARCA - CAJAMARCA - CAJAMARCA
P. Base: S/. 25,890,382.86 S/. 5,178,076.57
Area Geo: 1
Factor: 1.00000
FORMULA DEL MONTO MAXIMO A OTORGAR = Coef Incid x % de participación x saldo por valorizar x Ima / Imo

INCIDENCIA SALDO POR Io Ir MONTO MAXIMO MONTO MONTO


IU DESCRIPCION DEL INSUMO PRESUPUESTO VALORIZADO
COEF. % VALORIZAR Ago-12 Ene-13 A SOLICITAR DEL 01 SOLICITADO SOLICITADO
POR FORMULA SEGUN CRONOGRAMA ADELANTO N° 01

FORMULA Nº 01 ESTRUCTURAS 2,335,780.64


17 BLOQUE Y LADRILLO 0.203 5.91% 535.71 536.66 88,473.78 92,903.76 88,473.78
21 CEMENTO PORTLAND TIPO I 0.203 77.34% 432.21 452.44 1,209,635.40 850,941.02 850,941.02
05 AGREGADO GRUESO 0.058 100.00% 8,362,335.61 1,002,161.32 7,360,174.30 427.04 435.13 434,977.27 367,141.47 367,141.47
43 MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA 0.068 100.00% 615.62 607.79 494,126.15 334,084.53 334,084.53
03 ACERO DE CONSTRUCCIÓN CORRUGADO 0.120 100.00% 431.43 422.64 865,226.08 695,139.85 695,139.85

FORMULA Nº 02 ARQUITECTURA 1,154,364.02


05 AGREGADO GRUESO 0.062 45.16% 427.04 435.13 205,125.67 102,199.40 102,199.40
57 PLANCHA DE ACERO LAF 0.058 25.86% 390.45 376.61 104,023.35 14,325.14 14,325.14
03 ACERO DE CONSTRUCCION CORRUGADO 0.087 6.90% 431.43 422.64 42,262.39 98.83 98.83
43 MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA 0.087 41.38% 615.62 607.79 255,537.35 217,837.42 217,837.42
7,189,758.67 7,189,758.67
21 CEMENTO PORTLAND TIPO I 0.087 51.72% 432.21 452.44 338,681.79 115,626.41 115,626.41
26 CERRAJERIA NACIONAL 0.137 11.68% 360.09 360.29 115,101.69 54,412.70 54,412.70
17 BLOQUE Y LADRILLO 0.138 48.55% 535.71 536.66 482,570.81 376,774.20 376,774.20
52 PERFIL DE ALUMINIO 0.138 51.45% 257.88 265.51 525,573.62 273,089.92 273,089.92

FORMULA Nº 03 INSTALACIONES SANITARIAS 41,693.34


05 AGREGADO GRUESO 0.075 60.00% 427.04 435.13 51,862.30 22,321.18 22,321.18
21 CEMENTO PORTLAND TIPO I 0.075 38.67% 432.21 452.44 34,336.55 13,884.98 13,884.98
52 PERFIL DE ALUMINIO 0.062 93.55% 1,131,068.09 1,131,068.09 257.88 265.51 67,542.66 227.36 227.36
61 PLANCHA GALVANIZADA 0.062 1.61% 282.43 275.41 1,103.02 699.85 699.85
03 ACERO DE CONSTRUCCION CORRUGADO 0.097 100.00% 431.43 422.64 107,478.29 4,559.96 4,559.96

FORMULA Nº 04 INSTALACIONES ELECTRICAS 124,995.73


72 TUBERIA DE PVC 0.144 92.36% 1,601,006.31 1,601,006.31 346.50 350.98 215,686.66 124,995.73 124,995.73

COSTO DIRECTO 3,656,833.73


GASTOS GENERALES Y UTILIDADES (20%) 731,366.75
SUBTOTAL 4,388,200.48
IGV (18%) 789,876.09
MONTO SOLICITADO ADELANTO DE MATERIALES N° 01 (INCLUIDO IGV) 5,178,076.57