RESUMEN DE VALORIZACION N°04 - DEL 01 AL 31 OCTUBRE 2020

PROYECTO :MEJORAMIENTO DEL SERVICIO DE EDUCACION SECUNDARIA DE LA I.E. BERNARDO CHACON TELLO, ASTOBAMBA-HUARAUTAMBO DEL DISTRITO DE YANAHUANCA, DANIEL ALCIDES CARRION-PASCO

ENTIDAD UNIDAD EJECUTORA SUB REGIONAL DANIEL ALCIDES CARRION SUPERVISOR ING. JERYL CABANILLAS MORALES FECHA DE INICIO DE OBRA 4/12/2019
CONSULTOR CONSORCIO ASTOBAMBA RESIDENTE ING. FREDDY ESTRADA ALBA PLAZO DE EJECUCION 210 d.c.
CONTRATO Nº003-2019-GRP-GGR-GSRDC/OSRAJ VALORIZACION ANTERIOR - - FECHA DE TERMINO PROGRAMADO 1/07/2020
MODALIDAD EJECUCION PRESUPUESTARIA DIRECTA VALORIZACION ACTUAL 13.12% S/. 728,391.69 FECHA DE TERMINO REAL -------------
PRESUPUESTO S/5,553,451.34 VALORIZACION ACUMULADO 20.55% S/. 1,141,213.32 VALORIZACION DEL 01/10/2020 AL 31/10/2020
MONTO DE CONTRATO S/. 5,553,451.34 SALDO POR VALORIZAR 79.45% S/. 4,412,238.02 FECHA DE PRESENTACION 05/11/2020

ANTERIOR ACUMULADO ACTUAL ACUMULADO SALDO


ITEM DESCRIPCION UND TOTAL
% VALORIZ % VALORIZ % VALORIZ % VALORIZ

01 OBRAS PRELIMINARES 276,933.82 84.56% 234,172.92 0.00% 0.00 84.56% 234,172.92 15.44% 42,760.90

02 MODULO I - LABORATORIO - BIBLIOTECA - AULA 01 2,602,755.77 1.70% 44,318.82 6.92% 180,169.36 8.63% 224,488.18 91.37% 2,378,267.59

03 OBRAS EXTERIORES 685,419.59 2.98% 20,394.73 0.00% 0.00 2.98% 20,394.73 97.02% 665,024.86

04 OBRAS COMPLEMENTARIAS 818,183.12 2.31% 18,932.26 59.43% 486,214.39 61.74% 505,146.65 38.26% 313,036.47

05 MOBILIARIO Y EQUIPAMIENTO 339,304.07 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 339,304.07

06 CAPACITACION A LOS DOCENTES 17,640.92 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 17,640.92

07 MITIGACIÓN DE IMPACTO AMBIENTAL Y PMA 37,063.78 30.53% 11,313.78 0.38% 140.00 30.90% 11,453.78 69.10% 25,610.00

08 PLAN DE SEGURIDAD, SEÑALIZACION Y EVACUACION 71,301.78 74.49% 53,109.74 11.10% 7,913.00 85.58% 61,022.74 14.42% 10,279.04

09 SISTEMA DE COMUNICACIONES 293,481.72 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 293,481.72

COSTO DIRECTO C.D. 5,142,084.57 382,242.25 674,436.75 1,056,679.00 4,085,405.57

GASTOS GENERALES G.G.= 8.00% del C.D. 411,366.77 30,579.38 53,954.94 84,534.32 326,832.45

SUB TOTAL S.T.= G.G. + U = 5,553,451.34 412,821.63 728,391.69 1,141,213.32 4,412,238.02

VALORIZACION BRUTA DE OBRA S.T. + IGV = 5,553,451.34 412,821.63 728,391.69 1,141,213.32 4,412,238.02

PORCENTAJE 100% 7.43% 13.12% 20.55% 79.45%


CUADRO DE CONTROL DE VALORIZACIONES MENSUALES

PROYECTO :MEJORAMIENTO DEL SERVICIO DE EDUCACION SECUNDARIA DE LA I.E. BERNARDO CHACON TELLO, ASTOBAMBA-HUARAUTAMBO DEL DISTRITO DE YANAHUANCA, DANIEL ALCIDES CARRION-PASCO

ENTIDAD UNIDAD EJECUTORA SUB REGIONAL DANIEL ALCIDES CARRION


SUPERVISOR ING. JERYL CABANILLAS MORALES
CONTRATISTA CONSORCIO ASTOBAMBA RESIDENTE ING. FREDDY ESTRADA ALBA
CONTRATO Nº 001-2018-CS-MDP-I FECHA DE INICIO DE OBRA 4/12/2019
MODALIDAD PRECIOS UNITARIOS PLAZO DE EJECUCION 210 d.c.
PRESUPUESTO S/. 5,553,451.34 FECHA DE TERMINO REPROGRAMADO 1/07/2020
MONTO DE CONTRATO S/. 5,553,451.34 AMPLIACION DE PLAZO 01 239 dias calendarios
SUSPENSION DE OBRA N°01 del 01/01/2020 al 27/07/2020
PARALIZACION DE OBRA N°01 del 28/07/2020 al 26/08/2020
NUEVA FECHA DE TERMINO DE OBRA 24/02/2021

TIEMPO REPROGRAMADO DE INICIO DE OBRA


DESCRIPCION % TOTALES
DIC/2019 AGO/2020 SET/2020 OCT/2020 NOV/2020 DIC/2020 ENE/2021 FEB/2021

COSTO DIRECTO 5,142,084.57 70,096.12 12,969.63 289,044.74 609,358.20 1,135,223.48 1,113,684.55 1,061,648.44 849,899.41 5,141,924.57

GASTOS GENERALES 8.00% 411,366.77 5,607.69 1,037.57 23,123.58 48,748.66 90,817.88 89,094.76 84,931.88 67,991.95 411,353.97

SUB TOTAL 5,553,451.34 75,703.81 14,007.20 312,168.32 658,106.86 1,226,041.36 1,202,779.31 1,146,580.32 917,891.36 5,553,278.54
FACTOR RELACION F= 1 5,553,451.34 75,703.81 14,007.20 312,168.32 658,106.86 1,226,041.36 1,202,779.31 1,146,580.32 917,891.36 5,553,278.54

PRESUPUESTO CONTRACTUAL 5,553,451.34 75,703.81 14,007.20 312,168.32 658,106.86 1,226,041.36 1,202,779.31 1,146,580.32 917,891.36 5,553,278.54
% MENSUAL 100.00% 1.36% 0.25% 5.62% 11.85% 22.08% 21.66% 20.65% 16.53% 100%

PRESUPUESTO CONTRACTUAL ACUML. S/. 5,553,451.34 75,703.81 89,711.01 401,879.33 1,059,986.19 2,286,027.55 3,488,806.86 4,635,387.18 5,553,278.54 5,553,278.54
% ACUMULADO 0.00% 1.36% 1.62% 7.24% 19.09% 41.16% 62.82% 83.47% 100.00% 100.00%
TIEMPO REPROGRAMADO DE CALENDARIO POR REINICIO DE OBRA
DESCRIPCION % TOTALES
DIC/2019 AGO/2020 SET/2020 OCT/2020 NOV/2020 DIC/2020 ENE/2021 FEB/2021

COSTO DIRECTO 5,142,084.57 76,816.12 64,216.33 241,209.80 674,436.75 0.00 0.00 0.00 0.00 1,056,679.00

GASTOS GENERALES 8.00% 411,366.77 6,145.29 5,137.31 19,296.78 53,954.94 0.00 0.00 0.00 0.00 84,534.32

SUB TOTAL 5,553,451.34 82,961.41 69,353.64 260,506.58 728,391.69 0.00 0.00 0.00 0.00 1,141,213.32
FACTOR RELACION F= 1 5,553,451.34 82,961.41 69,353.64 260,506.58 728,391.69 0.00 0.00 0.00 0.00 1,141,213.32

PRESUPUESTO CONTRACTUAL 5,553,451.34 82,961.41 69,353.64 260,506.58 728,391.69 0.00 0.00 0.00 0.00 1,141,213.32
% MENSUAL 100.00% 1.49% 1.23% 4.69% 13.12% 0.00% 0.00% 0.00% 0.00% 20.55%

PRESUPUESTO CONTRACTUAL ACUML. S/. 5,553,451.34 82,961.41 152,315.05 412,821.63 1,141,213.32 1,141,213.32 1,141,213.32 1,141,213.32 1,141,213.32 1,141,213.32
% ACUMULADO 0.00% 1.49% 2.74% 7.43% 20.55% 20.55% 20.55% 20.55% 20.55%

AVANCE FINANCIERO DE OBRA


DESCRIPCION % TOTALES
DIC/2019 AGO/2020 SET/2020 OCT/2020 NOV/2020 DIC/2020 ENE/2021 FEB/2021

MONTO DE ADQUISICION 0.00 360,963.10 0.00 430,475.27 537,897.65 0.00 0.00 0.00 0.00 1,329,336.02

PRESUPUESTO FINANCIERO ACUMULADO S/. - 360,963.10 360,963.10 791,438.37 1,329,336.02 1,329,336.02 1,329,336.02 1,329,336.02 1,329,336.02 0.00
% ACUMULADO EJECUTADO 0.00% 6.50% 6.50% 14.25% 23.94% 23.94% 23.94% 23.94% 23.94%

CURVA "S" SEGUIMIENTO


120.00%

100.00%
100.00%
83.47%

80.00%

62.82%
% de avance

60.00%

41.16%
40.00%

23.94% 23.94% 23.94% 23.94% 23.94%

20.00% 14.25%
20.55% 19.09% 20.55% 20.55% 20.55% 20.55%
6.50% 6.50%
7.43%
0.00% 1.49% 2.74%
7.24%
0.00% 1.36% 1.62%
DIC/2019 AGO/2020 SET/2020 OCT/2020 NOV/2020 DIC/2020 ENE/2021 FEB/2021
0.00%
Programado 0.00% 1.36% 1.62% 7.24% 19.09% 41.16% 62.82% 83.47% 100.00%
Series2 0.00% 6.50% 6.50% 14.25% 23.94% 23.94% 23.94% 23.94% 23.94%
Series3 0.00% 1.49% 2.74% 7.43% 20.55% 20.55% 20.55% 20.55% 20.55%
Meses

La Ejecución de la Obra se encuentra ADELANTADO en: 1.46%


CUADRO DE CONTROL DE VALORIZACIONES MENSUALES

PROYECTO :MEJORAMIENTO DEL SERVICIO DE EDUCACION SECUNDARIA DE LA I.E. BERNARDO CHACON TELLO, ASTOBAMBA-HUARAUTAMBO DEL DISTRITO DE YANAHUANCA, DANIEL ALCIDES CARRION-PASCO

ENTIDAD UNIDAD EJECUTORA SUB REGIONAL DANIEL ALCIDES CARRION


SUPERVISOR ING. JERYL CABANILLAS MORALES
CONTRATISTA CONSORCIO ASTOBAMBA RESIDENTE ING. FREDDY ESTRADA ALBA
CONTRATO Nº 001-2018-CS-MDP-I FECHA DE INICIO DE OBRA 4/12/2019
MODALIDAD PRECIOS UNITARIOS PLAZO DE EJECUCION 210 d.c.
PRESUPUESTO S/. 5,553,451.34 FECHA DE TERMINO REPROGRAMADO 1/07/2020
MONTO DE CONTRATO S/. 5,553,451.34 AMPLIACION DE PLAZO 01 239 dias calendarios
SUSPENSION DE OBRA N°01 del 01/01/2020 al 27/07/2020
PARALIZACION DE OBRA N°01 del 28/07/2020 al 26/08/2020
NUEVA FECHA DE TERMINO DE OBRA 24/02/2021
RESUMEN GENERAL DE VALORIZACION N°04 - DEL 01 AL 31 DE OCTUBRE DEL 2020
OBRA : MEJORAMIENTO DEL SERVICIO DE EDUCACION SECUNDARIA DE LA I.E. BERNARDO CHACON TELLO, ASTOBAMBA-HUARAUTAMBO DEL DISTRITO DE YANAHUANCA, DANIEL ALCIDES CARRION-PASCO

ENTIDAD : UNIDAD EJECUTORA SUB REGIONAL DANIEL ALCIDES CARRION

SUPERVISOR : CONSORCIO ASTOBAMBA INICIO DE OBRA : 4/12/2019 SUSPENSION DE OBRA N°01 1/01/2020

CONTRATO : Nº 001-2018-CS-MDP-I PLAZO DE EJECUCION : 210 d.c. REINICIO DE OBRA N°01 27/08/2020

MODALIDAD : EJECUCION PRESUPUESTARIA DIRECTA TERMINO DE LA OBRA : 24/02/2020 TERMINO DE LA OBRA 24/02/2020

PRESUPUESTO : S/. 5,553,451.34 TERMINO REAL DE LA OBRA : ------------- AMPLIA. DE PLAZO N° 01 239 D.C.
MONTO CONTRATO : S/. 5,553,451.34 VALORIZACION PRACTICADA : DEL 01/10/2020 AL 31/10/2020
JEFE SUPERVION : ING. JERYL CABANILLAS MORALES FECHA DE PRESENTACION : 05/11/2020
RESIDENTE : ING. FREDDY ESTRADA ALBA

RESUMEN DE LA VALORIZACION N°04 - DEL 01 AL 31 DE OCTUBRE DEL 2020


VALORIZACIÓN
MONTO DEL % DE AVANCE SALDO POR
ITEM DESCRIPCIÓN
CONTRATO ANTERIOR S/. ACTUAL S/. ACUMULADO ACUMULADO VALORIZAR

I VALORIZACION (V ) 5,553,451.34 412,821.63 728,391.69 1,141,213.32 4,412,238.02


Costo Directo + GG 5,553,451.34 412,821.63 728,391.69 1,141,213.32 20.55% 4,412,238.02
Adicionales

II REAJUSTES Y REINTEGROS (R ) 0.00 0.00 0.00 0.00


Reajuste del mes 0.00 0.00 0.00 0.00
Reintegros del mes anterior 0.00 0.00 0.00 0.00 0.00
III DEDUCCIONES DE REAJUSTES (D ) 0.00 0.00 0.00 0.00
Deduccion del Reajuste por Adelanto Directo (-) 0.00 0.00 0.00 0.00
Deduccion del Reajuste por Adelanto de Materiales (-) 0.00 0.00 0.00 0.00 0.00

IV VALORIZACION BRUTA ( VB = V +R - D ) 5,553,451.34 412,821.63 728,391.69 1,141,213.32 4,412,238.02

V VALORIZACION NETA* (VB - A) 5,553,451.34 412,821.63 728,391.69 1,141,213.32 4,412,238.02

VI VALORIZACION NETA 5,553,451.34 412,821.63 728,391.69 1,141,213.32 4,412,238.02

VII RETENCION
Multa por atraso de Obra (-) 0.00 0.00 0.00 0.00 0.00

VIII MONTO VALORIZADO 5,553,451.34 412,821.63 728,391.69 1,141,213.32 4,412,238.02