PRECIOS UNITARIOS

RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL


PRELIMINARES M2 4.72 Q 574.62 Q 2,712.20

MATERIALES Y EQUIPO
BODEGA Y GUARDIANIA UNIDAD 1.00
PARALES UNIDAD 11.00 Q 25.00 Q 275.00
LAMINAS 12" UNIDAD 2.00 Q 134.00 Q 268.00
CLAVOS DE 3' LIBRA 1.00 Q 10.00 Q 10.00
CLAVO DE LAMINA LIBRA 1.00 Q 15.00 Q 15.00
BISAGRAS UNIDAD 2.00 Q 15.00 Q 30.00
CANDADO UNIDAD 1.00 Q 60.00 Q 60.00
CADENA PIE 1.00 Q 25.00 Q 25.00
SANITARIO UNIDAD 1.00 Q 500.00 Q 500.00
TOTAL DE MATERIALES Q 1,183.00

MANO DE OBRA
BODEGA Y GUARDIANIA DIA 1.00 Q 525.00 Q 525.00
LIMPIEZA Y CHAPEO M2 4.72 Q 9.00 Q 42.48
NIVELACION DE TERRENO M2 4.72 Q 15.00 Q 70.80
TRAZO Y ESTAQUEO M2 4.72 Q 8.00 Q 37.76
TOTAL MANO DE OBRA Q 676.04

FLETES
TOTAL DE FLETES UNIDAD 1.00 Q 150.00 Q 150.00

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 2,009.04


COSTO INDIRECTO Q 703.16
COSTO TOTAL Q 2,712.20
COSTO UNITARIO Q 574.62
PRECIOS UNITARIOS
RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL
CIMIENTO CORRIDO ML 8.72 Q 373.85 Q 3,259.98

MATERIALES Y EQUIPO
CEMENTO SACO 7.00 Q 80.00 Q 560.00
ARENA M3 0.70 Q 150.00 Q 105.00
PIEDRIN 1/2" M3 0.70 Q 260.00 Q 182.00
ALAMBRE DE AMARRE LIBRA 2.75 Q 8.00 Q 22.00
VARILLA DE 3/8" VARILLA 5.00 Q 31.00 Q 155.00
VARILLA DE 1/4" VARILLA 5.00 Q 13.50 Q 67.50
SILLETAS UNIDAD 18.00 Q 2.00 Q 36.00
BAILARINA DIA 1.00 Q 300.00 Q 300.00
BASE (CASCAJO) M3 0.35 Q 150.00 Q 52.50

TOTAL DE MATERIALES Q 1,480.00

MANO DE OBRA
CIMIENTO CORRIDO ML 8.72 Q 90.00 Q 784.80

TOTAL MANO DE OBRA Q 784.80

FLETES
FLETES VIAJE 1.00 Q 150.00 Q 150.00

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 2,414.80


COSTO INDIRECTO Q 845.18
COSTO TOTAL Q 3,259.98
COSTO UNITARIO Q 373.85
PRECIOS UNITARIOS
RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL
ZAPATAS UNIDAD 4.00 Q 407.70 Q 1,630.80

MATERIALES Y EQUIPO
CEMENTO SACO 3.00 Q 80.00 Q 240.00
ARENA M3 0.30 Q 150.00 Q 45.00
PIEDRIN 1/2" M3 0.30 Q 260.00 Q 78.00
ALAMBRE DE AMARRE LIBRA 4.00 Q 8.00 Q 32.00
VARILLA DE 3/8" VARILLA 8.00 Q 35.00 Q 280.00
SILLETAS UNIDAD 16.00 Q 2.00 Q 32.00
BASE (CASCAJO) M3 0.14 Q 150.00 Q 21.00

TOTAL DE MATERIALES Q 728.00

MANO DE OBRA
ZAPATAS UNIDAD 4.00 Q 120.00 Q 480.00

TOTAL MANO DE OBRA Q 480.00

FLETES
FLETES Q - Q -

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 1,208.00


COSTO INDIRECTO Q 422.80
COSTO TOTAL Q 1,630.80
COSTO UNITARIO Q 407.70
PRECIOS UNITARIOS
RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL
LEVANTADO DE BLOCK DE 0..14*0.190.39 DE 50KG/CM2 M2 3.49 Q 402.58 Q 1,405.01

MATERIALES Y EQUIPO
BLOCK DE 0.14 * 0.19 * 0.39 DE 50 KG/CM2 UNIDAD 46.00 Q 6.00 Q 276.00
CEMENTO SACO 1.00 Q 80.00 Q 80.00
ARENA M3 0.10 Q 150.00 Q 15.00
CAL SACO 0.25 Q 32.00 Q 8.00

TOTAL DE MATERIALES Q 379.00

MANO DE OBRA
LEVANTADO DE BLOCK DE 0.14 * 0.19 * 0.39 DE 50 KG/CM2 M2 3.49 Q 75.00 Q 261.75

TOTAL MANO DE OBRA Q 261.75

FLETES
FLETES VIAJE 1.00 Q 400.00 Q 400.00

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 1,040.75


COSTO INDIRECTO Q 364.26
COSTO TOTAL Q 1,405.01
COSTO UNITARIO Q 402.58
PRECIOS UNITARIOS
RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL
LEVANTADO DE SOLERA DE HUMEDAD ML 8.72 Q 483.10 Q 4,212.68

MATERIALES Y EQUIPO
CEMENTO SACO 2.60 Q 80.00 Q 208.00
ARENA M3 0.26 Q 150.00 Q 39.00
PIEDRIN M3 0.26 Q 260.00 Q 67.60
ALAMBRE DE AMARRE LIBRA 4.00 Q 8.00 Q 32.00
VARILLA DE 3/8" UNIDAD 7.00 Q 35.00 Q 245.00
VARILLAS DE 1/4" UNIDAD 6.00 Q 13.15 Q 78.90
MADERA DOCENA 0.50 Q 600.00 Q 300.00

TOTAL DE MATERIALES Q 970.50

MANO DE OBRA
SOLERA DE HUMEDAD DE 0.15 * 0.20 * 35 ML ML 35.00 Q 50.00 Q 1,750.00
Q - Q -
Q - Q -
Q - Q -
TOTAL MANO DE OBRA Q 1,750.00

FLETES
FLETES VIAJE 1.00 Q 400.00 Q 400.00

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 3,120.50


COSTO INDIRECTO Q 1,092.18
COSTO TOTAL Q 4,212.68
COSTO UNITARIO Q 483.10
1 SACO DE CEMENTO
2-3 ARENA
1/4 - 1/2 SACO DE CAL
PRECIOS UNITARIOS
RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL
COLUMNA TIPO A DE 0.20*0.15 UNIDAD 4.00 Q 673.01 Q 2,692.04
.

MATERIALES Y EQUIPO
CEMENTO SACO 4.00 Q 80.00 Q 320.00
ARENA M3 0.40 Q 150.00 Q 60.00
PIEDRIN M3 0.40 Q 260.00 Q 104.00
ALAMBRE DE AMARRE LIBRA 7 Q 8.00 Q 56.00
VARILLA DE 3/8" UNIDAD 10 Q 35.00 Q 350.00
VARILLAS DE 1/4" UNIDAD 14 Q 13.15 Q 184.10
MADERA DOCENA 0.5 Q 600.00 Q 300.00
TOTAL DE MATERIALES Q 1,374.10

MANO DE OBRA
ARMADO DE COLUMNA TIPO A UNIDAD 4.00 Q 55.00 Q 220.00
Q - Q -
Q - Q -
Q - Q -
TOTAL MANO DE OBRA Q 220.00

FLETES
FLETES VIAJE 1.00 Q 400.00 Q 400.00

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 1,994.10


COSTO INDIRECTO Q 697.94
COSTO TOTAL Q 2,692.04
COSTO UNITARIO Q 673.01
PRECIOS UNITARIOS
RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL
COLUMNA TIPO B DE 0.15x0.15x3.40M UNIDAD 1.00 Q 1,325.70 Q 1,325.70

MATERIALES Y EQUIPO
CEMENTO SACO 0.70 Q 80.00 Q 56.00
ARENA M3 0.07 Q 150.00 Q 10.50
PIEDRIN M3 0.07 Q 260.00 Q 18.20
ALAMBRE DE AMARRE LIBRA 2 Q 8.00 Q 16.00
VARILLA DE 3/8" UNIDAD 3 Q 35.00 Q 105.00
VARILLAS DE 1/4" UNIDAD 2 Q 13.15 Q 26.30
MADERA DOCENA 0.5 Q 600.00 Q 300.00
TOTAL DE MATERIALES Q 532.00

MANO DE OBRA
ARMADO DE COLUMNA TIPO B UNIDAD 1.00 Q 50.00 Q 50.00
Q - Q -
Q - Q -
Q - Q -
TOTAL MANO DE OBRA Q 50.00

FLETES
FLETES VIAJE 1.00 Q 400.00 Q 400.00

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 982.00


COSTO INDIRECTO Q 343.70
COSTO TOTAL Q 1,325.70
COSTO UNITARIO Q 1,325.70
PRECIOS UNITARIOS
RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL
COLUMNA TIPO C DE 0.15x0.10x3.40M UNIDAD 3.00 Q 547.52 Q 1,642.55

MATERIALES Y EQUIPO
CEMENTO SACO 1.40 Q 80.00 Q 112.00
ARENA 0 0.14 Q 150.00 Q 21.00
PIEDRIN M3 0.14 Q 260.00 Q 36.40
ALAMBRE DE AMARRE LIBRA 2 Q 8.00 Q 16.00
VARILLA DE 3/8" UNIDAD 4 Q 35.00 Q 140.00
VARILLAS DE 1/4" UNIDAD 2 Q 13.15 Q 26.30
MADERA DOCENA 0.5 Q 600.00 Q 300.00
TOTAL DE MATERIALES Q 651.70

MANO DE OBRA
ARMADO DE COLUMNA TIPO C UNIDAD 3.00 Q 55.00 Q 165.00
Q - Q -
Q - Q -
Q - Q -
TOTAL MANO DE OBRA Q 165.00

FLETES
FLETES VIAJE 1.00 Q 400.00 Q 400.00

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 1,216.70


COSTO INDIRECTO Q 425.84
COSTO TOTAL Q 1,642.55
COSTO UNITARIO Q 547.52
PRECIOS UNITARIOS
RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL
LEVANTADO DE MURO CON BLOCK 0.14 * 0.19 0.39 DE 50 KG/ M2 17.90

MATERIALES Y EQUIPO
CEMENTO SACO 4.00 Q 80.00 Q 320.00
ARENA M3 0.40 Q 150.00 Q 60.00
CAL SACO 1.00 Q 32.00 Q 32.00
BLOCK UNIDAD 233 Q 5.45 Q 1,269.85

TOTAL DE MATERIALES Q 1,681.85

MANO DE OBRA
LEVANTADO DE BLOCK M2 17.90 Q 75.00 Q 1,342.50
Q - Q -
Q - Q -
Q - Q -
TOTAL MANO DE OBRA Q 1,342.50

FLETES
FLETES VIAJE 1.00 Q 400.00 Q 400.00

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 3,424.35


COSTO INDIRECTO Q 1,198.52
COSTO TOTAL Q 4,622.87
COSTO UNITARIO Q 258.26
PRECIOS UNITARIOS
RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL
LEVANTADO DE SOLERA INTERMEDIA 1ER NIVEL ML 7.82

MATERIALES Y EQUIPO
CEMENTO SACOS 2.30 Q 80.00 Q 184.00
ARENA M3 0.23 Q 150.00 Q 34.50
PIERDIN M3 0.23 Q 260.00 Q 59.80
ALAMBRE DE AMARRE LBS 4.00 Q 8.00 Q 32.00
HIERRO 1/4 UNIDAD 6 Q 13.15 Q 78.90
HIERRO 3/8 UNIDAD 6 Q 35.00 Q 210.00
MADERA DOCENA 0.5 Q 600.00 Q 300.00
Q - Q -
TOTAL DE MATERIALES Q 899.20

MANO DE OBRA
LEVANTADO DE SOLERA INTERMEDIA ML 7.82 Q 50.00 Q 391.00

TOTAL MANO DE OBRA Q 391.00

FLETES
FLETES VIAJE 1.00 Q 400.00 Q 400.00

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 1,690.20


COSTO INDIRECTO Q 591.57
COSTO TOTAL Q 2,281.77
COSTO UNITARIO Q 291.79
PRECIOS UNITARIOS
RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL
LEVANTADO DE SOLERA CORONA 1ER NIVEL ML 8.72

MATERIALES Y EQUIPO
CEMENTO SACOS 2.60 Q 80.00 Q 208.00
ARENA M3 0.26 Q 150.00 Q 39.00
PIERDIN M3 0.26 Q 260.00 Q 67.60
ALAMBRE DE AMARRE LBS 4.00 Q 8.00 Q 32.00
HIERRO 1/4 UNIDAD 6 Q 13.15 Q 78.90
HIERRO 3/8 UNIDAD 7 Q 35.00 Q 245.00
MADERA DOCENA 0.5 Q 600.00 Q 300.00
ANDAMIOS DIA 1 Q 20.00 Q 20.00
TOTAL DE MATERIALES Q 990.50

MANO DE OBRA
LEVANTADO DE SOLERA CORONA ML 8.72 Q 50.00 Q 436.00

TOTAL MANO DE OBRA Q 436.00

FLETES
FLETES VIAJE 1.00 Q 400.00 Q 400.00

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 1,826.50


COSTO INDIRECTO Q 639.28
COSTO TOTAL Q 2,465.78
COSTO UNITARIO Q 282.77
PRECIOS UNITARIOS
RENGLON UNIDAD CANTIDAD PRE. UNIT TOTAL
LOSA DE PRIMER NIVEL M2 4.75

MATERIALES Y EQUIPO
CEMENTO SACOS 4.70 Q 80.00 Q 376.00
ARENA M3 0.47 Q 150.00 Q 70.50
PIERDIN M3 0.47 Q 260.00 Q 122.20
ALAMBRE DE AMARRE LBS 2.00 Q 8.00 Q 16.00
HIERRO DE 3/8" UNIDAD 17 Q 35.00 Q 595.00
CLAVO LBS 2 Q -
TABLA RENTADA DOCENA 0 Q 75.00 Q -
TABLA DOCENA 0.5 Q 600.00 Q 300.00
PARALES UNIDAD 1 Q -
VIBRADOR DIA 1 Q 300.00 Q 300.00
TOTAL DE MATERIALES Q 1,779.70

MANO DE OBRA
LEVANTADO DE SOLERA CORONA ML 28.60 Q 50.00 Q 1,430.00
Q - Q -
Q - Q -
Q - Q -
TOTAL MANO DE OBRA Q 1,430.00

FLETES
FLETES VIAJE 1.00 Q 400.00 Q 400.00

COSTE DIRECTO (MATERIAL Y EQUIPO + FLETE + MANO DE OBRA) Q 3,609.70


COSTO INDIRECTO Q 1,263.39
COSTO TOTAL Q 4,873.09
COSTO UNITARIO Q 1,025.91
PRIMER NIVEL
NO RENGLON UNIDADCANTIDADP/UNITARIOPRECIO TOTAL
1 PRELIMINARES M2 90 Q 129.17 Q 11,625.30
2 CIMIENTO CORRIDO ML 35 Q 367.37 Q 12,857.95
3 ZAPATAS UNIDAD 9 Q 567.16 Q 5,104.44
4 LEVANTADO DE BLOCK CIMINETO M2 21 Q 260.61 Q 5,472.81
5LEVANTADO DE SOLERA DE HUMEDAD M2 35 Q 199.63 Q 6,987.05
6 COLUMNA TIPO A UNIDAD 9 Q 763.66 Q 6,872.92
7 COLUMNA TIPO B UNIDAD 3 Q 758.66 Q 2,275.97
8 COLUMNA TIPO C UNIDAD 9 Q 484.79 Q 4,363.07
9 LEVANTADO DE MURO M2 45.86 Q 235.40 Q 10,795.61
Q -
Q -
Q -
Q -
Q -
Q -
Q -
Q -
Q -
Q -
Q 66,355.11