Está en la página 1de 1

ESQUEMA DE DISTRIBUCION

TAPA DE CISTERNA N.P.T. + 0.10


A Ø 1/2" @ .20
Ø 3/8" @ .20
N.T.N. + 0.00

Ø 1/2" @ .18 ARRIBA


Ø 1/2" @ .20 ABAJO

L = 30.00 m. HDPE Ø 2" Ø 1/2" @ .20

Ø 1/2" @ .18 ARRIBA


CISTERNA AGUA POTABLE C° f´c=210 Kg/cm2
Ø 1/2" @ .20 ABAJO

Ø 1/2" @ .18 ARRIBA


C° f´c=210 Kg/cm2
N.F.P - 2.15
5.00 Ø 1/2" @ .20 ABAJO

A Ø 1/2" @ .20

DETALLES TANQUE SEPTICO


LOSA DE TECHO - CISTERNA
CORTE A-A
ESCALA: 1/25

ESCALA: 1/25

TUBERIA REBOSE
HDPE Ø 2 IMPULSION AGUA
TUBERIA VENTILACION
HDPE Ø 2"
TUBO HDPE Ø 2 " TUBERIA VENTILACION
NIV. MAX. CAPACIDAD AGUA

BRECHA DE AIRE TANQUE ELEVADO TANQUE ELEVADO BOMBA CISTERNA CENTRIFUGA


0.05 m V = 2.5 m3 V = 2.5 m3

VALVULA Ø 2" MEIDOR DE SEDA PIURA


TAPA DE
CONCRETO F"C 210 Kg/cm2
2 LOSAS N.P.T. + 0.10
FLOTADOR N.T.N. + 0.00
VALVULA DE LLENADO 3/4"
DE RED GENERAL DE 1/2"

L = 30.00 m. TUBO PLUS 1"

PISO CERAMICO ANTIDESLIZANTE


IMPULSION AGUA
TUBO HDPE Ø 2 "

25X40 CM. PICHANCHA

N.F.P. - 2.15
N.F.P - 2.15
C° f´c=210 Kg/cm2

SOLADO

SISTEMA 2.0 HP c/u


DE CONTROL DE CLORO Y PH
ø2" HDPE
CORTE A-A
ESCALA: 1/25
Ø3/4" HDPE
CISTERNA
ø 2" HDPE

FONDO DE CISTERNA

MUNICIPALIDAD DISTRITAL DE PIURA


Ø 1/2" @ .10 CENTRADO

TAPAS PRE-FABRICADAS ( TIPICO)


ESCALA: 1/25

PROFESIONAL RESPONSABLE PLANO N°:

SANITARIO S-01