Nº MES
MONTO S/. ACUM. S/. % DE EJEC. % ACUM
1 May-23 50,597.40 50,597.40 11.69% 11.69%
2 Jun-23 76,167.13 126,764.53 17.60% 29.28%
3 Jul-23 238,589.03 365,353.56 55.12% 84.40%
4 Aug-23 67,516.79 432,870.35 15.60% 100.00%
432,870.35 100.00%
PROGRAMADO
Nº MES
MONTO S/. ACUM. S/. % DE EJEC. % ACUM
1 May-23 50,597.40 50,597.40 11.69% 11.69%
2 Jun-23 76,167.13 126,764.53 17.60% 29.28%
3 Jul-23 238,589.03 365,353.56 55.12% 84.40%
4 Aug-23 67,516.79 432,870.35 15.60% 100.00%
432,870.35 100.00%
PROGRAMADO
Nº MES
MONTO S/. ACUM. S/. % DE EJEC. % ACUM
1 May-23 50,597.40 50,597.40 11.69% 11.69%
2 Jun-23 76,167.13 126,764.53 17.60% 29.28%
3 Jul-23 238,589.03 365,353.56 55.12% 84.40%
4 Aug-23 67,516.79 432,870.35 15.60% 100.00%
432,870.35 100.00%
PROGRAMADO
Nº MES
MONTO S/. ACUM. S/. % DE EJEC. % ACUM
1 May-23 50,597.40 50,597.40 11.69% 11.69%
2 Jun-23 76,167.13 126,764.53 17.60% 29.28%
3 Jul-23 238,589.03 365,353.56 55.12% 84.40%
4 Aug-23 67,516.79 432,870.35 15.60% 100.00%
432,870.35 100.00%
PROGRAMADO
Nº MES
MONTO S/. ACUM. S/. % DE EJEC. % ACUM
1 May-23 53,816.40 53,816.40 11.69% 11.69%
2 Jun-23 81,012.87 134,829.27 17.60% 29.28%
3 Jul-23 253,768.04 388,597.31 55.12% 84.40%
4 Aug-23 67,908.78 456,506.09 14.75% 99.15%
5 Oct-23 3,903.41 460,409.50 0.85% 100.00%
460,409.50 100.00%
FISICO EJECUTADO FINANCIERO EJECUTADO
MONTO S/. ACUM. S/. % DE EJEC. % ACUM MONTO S/. ACUM. S/. % DE EJEC.
74,460.15 74,460.15 17.20% 17.20% 37,155.88 37,155.88 8.6%
0.00% 17.20% 0.00%
0.00% 17.20% 0.00%
0.00% 17.20% 0.00%
74,460.15 17.20% 8.58%
CUTADO
% ACUM
8.58%
45.67%
45.67%
45.67%
CUTADO
% ACUM
8.58%
45.67%
46.94%
46.94%
CUTADO
% ACUM
8.58%
45.67%
46.94%
69.57%
CUTADO
% ACUM
8.58%
45.67%
46.94%
69.57%
92.20%
460,409
452,997 7,412
PROGRAMADO
Nº MES
MONTO S/. ACUM. S/. % DE EJEC. % ACUM
1 Oct-24 1,202,207.00 1,202,207.00 32.09% 32.09%
2 Nov-24 958,487.90 2,160,694.90 25.58% 57.67%
3 Dec-24 766,496.84 2,927,191.74 20.46% 78.13%
4 Jan-25 463,112.75 3,390,304.49 12.36% 90.49%
Feb-25 356,357.99 3,746,662.48 9.51% 100.00%
3,746,662.48
FISICO EJECUTADO FINANCIERO EJECUTADO
MONTO S/. ACUM. S/. % DE EJEC. % ACUM MONTO S/. ACUM. S/. % DE EJEC.
74,460.15 74,460.15 #REF! #REF! 37,155.88 37,155.88 #REF!
74,614.57 149,074.72 #REF! #REF! 160,538.84 197,694.72 #REF!
108,976.82 258,051.54 #REF! #REF! 5,492.50 203,187.22 #REF!
128,048.91 386,100.45 #REF! #REF! 97,967.51 301,154.73 #REF!
386,100.45 108.35% 301,154.73 #REF!
CUTADO
% ACUM
#REF!
#REF!
#REF!
#REF!
DESCRIPCION
COMPONENTE Nº 01: SISTEMA DE ABASTECIMIENTO DE 1495105.41
1 AGUA POTABLE
COMPONENTE Nº 01: SISTEMA DE ABASTECIMIENTO DE 1495105.41
1.1 AGUA POTABLE
1.1.1 OBRAS PROVISIONALES Y TRABAJO PRELIMINARES 94,566.06
1.1.2 CAPTACION POZO TUBULAR 141,221.07
1.1.3 LINEA DE IMPULSION 58,315.74
1.1.4 TRATAMIENTO DE AGUA PARA CONSUMO HUMANO (PTAP) 544,401.50
1.1.5 LINEA DE ADUCCION Y RED DE DISTRIBUCION (L=15,545.78 ML) 504,214.80
1.1.6 VALVULA DE PURGA (05 UND) 4,779.99
1.1.7 VALVULA DE AIRE (02 UND) 1,977.97
1.1.8 VALVULA DE ALIVIO (01 UND) 990.97
1.1.9 VALVULA DE CONTROL (11 UND) 10,915.84
1.1.10 CRUCE EN ALCANTARILLAS (L=10 M) 06 UND. 3,972.00
1.1.11 CONEXIONES DOMICILIARIAS DE AGUA POTABLE T-NORMAL P/T 51,284.13
1.1.12 LAVADEROS MULTIUSOS (93 UNIDADES) 78,465.34
COMPONENTE Nº 02: SISTEMA DE ELIMINACION DE 948576.31
2 EXCRETAS
COMPONENTE Nº 02: SISTEMA DE ELIMINACION DE 948576.31
2.1 EXCRETAS
2.1.1 UBS ARRASTRE HIDRAULICO DOMESTICO S.CHAPA C. HILATA 9 948,576.31
COMPONENTE Nº 03: SUFICIENTE CAPACITACION DE 11,707.56
3 GESTION Y EDUCACION SANITARIA
3.1 PLAN DE CAPACITACION DE GESTION DE SERVICIO 6,905.18
3.1.1 ACTIVIDADES DE ADMINISTRACION 3,758.48
3.1.2 ACTIVIDADES DE OPERACION Y MANTENIMIENTO 3,146.70
3.2 PLAN DE EDUCACION SANITARIA 4802.38
4 COMPONENTE Nº 04: OTRAS PARTIDAS 125,335.16
4.1 COMPONENTE Nº 04: OTRAS PARTIDAS 125,335.16
4.1.1 MEDIDAS DE MITIGACION AMBIENTAL 58,200.00
SEGURIDAD Y SALUD EN EL TRABAJO 47,782.11
PLAN DE VIGILANCIA, PREVENCION Y CONTROL DEL COVID-19 19,353.05
210
33
120
363 12.1
DESCRIPCION
COMPONENTE Nº 01: SISTEMA DE ABASTECIMIENTO DE
1 AGUA POTABLE 11.94%
COMPONENTE Nº 01: SISTEMA DE ABASTECIMIENTO DE
1.1 AGUA POTABLE
1.1.1 OBRAS PROVISIONALES Y TRABAJO PRELIMINARES 94,812.57 11,316.14
1.1.2 CAPTACION POZO TUBULAR 149,299.58 17,819.31
1.1.3 LINEA DE IMPULSION 52,116.62 6,220.26
1.1.4 TRATAMIENTO DE AGUA PARA CONSUMO HUMANO (PTAP) 573,056.25 68,395.83
1.1.5 LINEA DE ADUCCION Y RED DE DISTRIBUCION (L=15,545.78 ML) 500,921.90 59,786.40
1.1.6 VALVULA DE PURGA (05 UND) 5,591.66 667.38
1.1.7 VALVULA DE AIRE (02 UND) 2,496.52 297.97
1.1.8 VALVULA DE ALIVIO (01 UND) 1250.34 149.23
1.1.9 VALVULA DE CONTROL (11 UND) 11,968.73 1,428.50
1.1.10 CRUCE EN ALCANTARILLAS (L=10 M) 06 UND. 4,695.94 560.47
1.1.11 CONEXIONES DOMICILIARIAS DE AGUA POTABLE T-NORMAL P/T 47,624.34 5,684.09
1.1.12 LAVADEROS MULTIUSOS (93 UNIDADES) 84,389.59 10,072.13
COMPONENTE Nº 02: SISTEMA DE ELIMINACION DE
2 EXCRETAS
COMPONENTE Nº 02: SISTEMA DE ELIMINACION DE
2.1 EXCRETAS
2.1.1 UBS ARRASTRE HIDRAULICO DOMESTICO S.CHAPA C. HILATA 9 ### 122,575.81
COMPONENTE Nº 03: SUFICIENTE CAPACITACION DE
3 GESTION Y EDUCACION SANITARIA
3.1 PLAN DE CAPACITACION DE GESTION DE SERVICIO
3.1.1 ACTIVIDADES DE ADMINISTRACION 3,758.48 448.58
3.1.2 ACTIVIDADES DE OPERACION Y MANTENIMIENTO 3,146.70 375.57
3.2 PLAN DE EDUCACION SANITARIA 4802.38 573.18
4 COMPONENTE Nº 04: OTRAS PARTIDAS
4.1 COMPONENTE Nº 04: OTRAS PARTIDAS
4.1.1 MEDIDAS DE MITIGACION AMBIENTAL 58,200.00 6,946.33
SEGURIDAD Y SALUD EN EL TRABAJO 47,782.11 5,702.93
PLAN DE VIGILANCIA, PREVENCION Y CONTROL DEL COVID-19 19,353.05 2,309.84
###
0.00
ÍTEM
COSTO TOTAL
DESCRIPCIÓN PAGO % VALORIZADO
1,136.96 -
1,659.46 -
1,506.89 -
6,811.31 -
881.98 -
- 8903.40
13,696.60 8,903.40
0.000%
DESCRIPCION MONTO S/.
COSTO DIRECTO 9,839,454.05
GASTOS GENERALES 643,770.06
GASTOS DE SUPERVICION 97,842.36
GASTOS DE SEGUIMIENTO Y MONITOREO 85,338.30
GASTOS DE LIQUIDACION 33,174.20
10,699,578.97
ESPECIALISTAS DEL PROYECTO
Jefe de proyecto Ing. Eulalia Silva Fur
Especialista en arquitectura Arq. Ivan Antonio Gomes Cruz
Especialista en estructuras Ing, Samuel Laura Huanca
Especialista en costos y presupuestos Ing. Ditmar Zapana Zea
877618.71
484362.49
CUTADO
% ACUM
15.87%
20.87%
22.16%
53.77%
55.19%
55.19%
55.19%
DESCRIPCION O CONCEPTO
DESCRIPCION O CONCEPTO
MONTO CONTRATADO
MONTO PAGAGO
RETENCION 10%
SALDO A PAGAR (RETENCION DE 10%)
DESCRIPCION O CONCEPTO
MONTO CONTRATADO
MONTO PAGAGO
RETENCION 10%
SALDO POR VALORIZACIONES NO PAGADAS Y FUERA DEL
PLAZO CONTRACTUAL
SALDO A PAGAR (RETENCION DE 10%)
MONTO EN S/. DESCRIPCION DE PAGOS TOTALES REALIZADOS
91,158.76
122,866.16
MONTO EN S/. pagados
a NICANOR
CARCAUSTO CUCHO
317,073.92
285,365.87
10,569.13
295,935.00
21,138.26 317,073.26 0.66
295,935.00
MONTO EN S/.
317,073.92
295,935.00
21,138.26
317,073.26
0.66
317,073.92 0.00
21,138.92
317,073.92
INSUMOS UNIDAD CANTIDAD PU S/. TOTAL S/
PANCETA KG 5.00 16.00 80.00
CARBON GLB 1.00 5.00 5.00
LIMON KG 1.00 3.00 3.00
SAL KG 1.00 1.00 1.00
CHOCLO UNIDAD 6.00 3.00 18.00
ENSALADA GLB 1.00 5.00 5.00
OCOPA GLB 1.00 LICENCIADA
PAPA GLB 1.00 EUDES
PAPA GLB 2.00 HIPOLITO
112.00
PARTICIPANTES PERSONAS 7 16 112.00