CIELORRASOS
CIELORRASOS ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN
ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN
ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN ANÁLISIS UM CANT. BOGOTÁ CALI B/QUILLA MEDELLÍN
CIMIENTOS
BASE AGREGADO PÉTREO m³ RETIRO SOBRANTES TIERRA m³
HORA CUADRILLA AA - ALBAÑILERÍA hc 0.70 18,019 18,019 18,019 18,019 HERRAMIENTA MENOR % 10.00 1,030 1,030 1,030 1,030
RECEBO B-200 m³ 1.30 24,752 24,752 24,752 24,752 HORA CUADRILLA AA - ALBAÑILERÍA hc 0.40 10,296 10,296 10,296 10,296
VIBRADOR CONC.ESPALDA 2-3M 30-40MM ms 0.04 22,043 22,043 22,043 22,043 11,326 11,326 11,326 11,326
64,814 64,814 64,814 64,814
SOBRECIMIENTO BLOQUE DE CONCRETO m
BASE ARENA CEMENTO 1:20 m³
AGUA lt 234.00 5,850 5,850 5,850 5,850 BARRA CORRUGADA G-60 1/2” (6M) un 1.53 37,470 37,470 37,470 37,470
ARENA FINA m³ 1.61 306,544 306,544 306,544 306,544 BARRA CORRUGADA G-60 3/8” (6M) un 2.79 36,242 36,242 36,242 36,242
CEMENTO GRIS kg 113.10 65,372 67,860 68,991 75,777 BLOQUE ESTR. P-V A=20CM 39X19X19CM un 13.75 37,002 37,002 37,002 37,002
HERRAMIENTA MENOR % 2.00 7,996 8,046 8,069 8,204 CONCRETO FLUIDO 3000 PSI m³ 0.01 3,472 2,847 2,847 3,255
HORA CUADRILLA AA - ALBAÑILERÍA hc 0.70 18,019 18,019 18,019 18,019 HERRAMIENTA MENOR % 1.00 5,955 6,030 6,067 6,291
VIBRADOR CONC.ESPALDA 2-3M 30-40MM ms 0.04 22,043 22,043 22,043 22,043 HORA CUADRILLA AA - ALBAÑILERÍA hc 0.80 20,593 20,593 20,593 20,593
425,824 428,361 429,515 436,437 MORTERO 1:4 m³ 1.00 481,336 489,424 493,100 515,159
622,069 629,607 633,320 656,011
CIMENTACIÓN CICLÓPEA (MEZCLA OBRA) m³
AGUA lt 158.00 3,950 3,950 3,950 3,950 SOBRECIMIENTO CONCRETO 25X25CM m³
ARENA MEDIA m³ 0.57 56,544 56,544 56,544 56,544 CONCRETO CORR. GRAVA COMÚN 3000 PSI m³ 1.03 435,627 376,365 479,589 451,394
ARENA FINA m³ 0.30 57,120 57,120 57,120 57,120 DURMIENTE 4CMX4CMX2.9M -ORD. un 3.50 105,000 105,000 105,000 105,000
CEMENTO GRIS kg 180.00 104,040 108,000 109,800 120,600
HERRAMIENTA MENOR % 2.00 12,524 11,339 13,404 12,840
GRAVA N°7 - 1/2” m³ 0.57 37,903 29,915 29,915 35,809
HORA CUADRILLA AA - ALBAÑILERÍA hc 6.89 177,355 177,355 177,355 177,355
GRAVILLA DE RÍO m³ 0.57 46,926 46,926 46,926 46,926
PUNTILLA CON CABEZA 2” lb 2.67 2,403 2,403 2,403 2,403
HORA CUADRILLA AA - ALBAÑILERÍA hc 4.70 120,983 120,983 120,983 120,983
PIEDRA MEDIA ZONGA m³ 0.42 42,000 42,000 42,000 42,000 TABLA CHAPA 30X1.8-2CMX2.9M ORD. un 3.22 82,110 82,110 82,110 82,110
VIBRADOR CONC. GASOLINA 3-4M 25-40MM d 0.04 1,078 1,078 1,078 1,078
469,465 465,438 467,237 483,931
816,097 755,650 860,939 832,179
CONCRETO CICLÓPEO m³
ARENA MEDIA m³ 0.30 29,760 29,760 29,760 29,760
VIGA TEE 25X25X20X40CM m³
CONCRETO CORR. GRAVA COMÚN 3000 PSI m³ 0.25 105,735 91,351 116,405 109,562 CONCRETO CORR. GRAVA COMÚN 3000 PSI m³ 1.10 465,233 401,943 512,183 482,071
HERRAMIENTA MENOR % 2.00 9,728 9,440 9,941 9,804 DURMIENTE 4CMX4CMX2.9M -ORD. un 0.80 24,000 24,000 24,000 24,000
HORA CUADRILLA AA - ALBAÑILERÍA hc 5.00 128,705 128,705 128,705 128,705 HERRAMIENTA MENOR % 2.00 10,225 8,959 11,164 10,562
MIXTO m³ 0.25 50,575 50,575 50,575 50,575 HORA CUADRILLA AA - ALBAÑILERÍA hc 8.97 230,897 230,897 230,897 230,897
PIEDRA MEDIA ZONGA m³ 0.50 50,000 50,000 50,000 50,000 PUNTILLA CON CABEZA 2” lb 0.60 540 540 540 540
PUNTILLA CON CABEZA 2” lb 0.80 720 720 720 720 TABLA CHAPA 30X1.8-2CMX2.9M ORD. un 0.80 20,400 20,400 20,400 20,400
REPISA 8 X 4CM X 2.9M - ORDINARIO un 4.00 147,600 147,600 147,600 147,600 VIBRADOR CONC. GASOLINA 3-4M 25-40MM d 0.04 1,078 1,078 1,078 1,078
TABLA CHAPA 30X1.8-2CMX2.9M ORD. un 4.00 102,000 102,000 102,000 102,000 752,372 687,817 800,261 769,547
624,822 610,151 635,706 628,726
VIGA TEE 25X25X20X50CM m³
CONCRETO CICLÓPEO (0.60X0.40X1M) m CONCRETO CORR. GRAVA COMÚN 3000 PSI m³ 1.10 465,233 401,943 512,183 482,071
CONCRETO CORR. GRAVA COMÚN 3000 PSI m³ 0.06 25,376 21,924 27,937 26,295 DURMIENTE 4CMX4CMX2.9M -ORD. un 0.91 27,300 27,300 27,300 27,300
HERRAMIENTA MENOR % 2.00 2,242 2,173 2,293 2,260 HERRAMIENTA MENOR % 2.00 10,099 8,833 11,038 10,436
HORA CUADRILLA AA - ALBAÑILERÍA hc 3.00 77,223 77,223 77,223 77,223 HORA CUADRILLA AA - ALBAÑILERÍA hc 8.97 230,897 230,897 230,897 230,897
MIXTO m³ 0.06 12,138 12,138 12,138 12,138 PUNTILLA CON CABEZA 2” lb 0.70 630 630 630 630
PIEDRA MEDIA ZONGA m³ 0.12 12,000 12,000 12,000 12,000 TABLA CHAPA 30X1.8-2CMX2.9M ORD. un 0.42 10,710 10,710 10,710 10,710
PUNTILLA CON CABEZA 2” lb 0.20 180 180 180 180 VIBRADOR CONC. GASOLINA 3-4M 25-40MM d 0.04 1,078 1,078 1,078 1,078
REPISA 8 X 4CM X 2.9M - ORDINARIO un 1.00 36,900 36,900 36,900 36,900
745,946 681,391 793,835 763,121
TABLA CHAPA 30X1.8-2CMX2.9M ORD. un 1.00 25,500 25,500 25,500 25,500
191,559 188,038 194,171 192,496 ZAPATA EN CONCRETO COMÚN 3000 PSI m³
PLACA FLOTANTE 0.90M m² CONCRETO CORR. GRAVA COMÚN 3000 PSI m³ 1.03 435,627 376,365 479,589 451,394
HERRAMIENTA MENOR % 2.00 9,527 8,342 10,406 9,843
CONCRETO CORR. GRAVA COMÚN 3000 PSI m³ 0.46 194,552 168,085 214,186 201,593
COSTO ADICIONAL BOMBEO m³ 0.46 11,834 11,834 11,834 11,834 HORA CUADRILLA AA - ALBAÑILERÍA hc 8.27 212,878 212,878 212,878 212,878
HERRAMIENTA MENOR % 2.00 4,298 3,769 4,691 4,439 LISTÓN 3CM X 3CM X 2.9M - SAJO un 1.03 5,533 5,533 5,533 5,533
HORA CUADRILLA AA - ALBAÑILERÍA hc 1.83 47,106 47,106 47,106 47,106 PLANCHÓN 23 X 4CM X 2.9M - ORDINARIO un 0.10 2,935 2,935 2,935 2,935
POLIES.EXP. ICOPOR ESP. 2MM m² 0.80 6,384 6,384 6,384 6,384 PUNTILLA CON CABEZA 2” lb 0.10 90 90 90 90
PUNTILLA CON CABEZA 2” lb 0.03 27 27 27 27 TABLA CHAPA 30X1.8-2CMX2.9M ORD. un 1.03 26,265 26,265 26,265 26,265
TABLA CHAPA 30X1.8-2CMX2.9M ORD. un 0.04 1,020 1,020 1,020 1,020 VARA DE CLAVO Ø6 A 8CM (3M) EUCALIPTO un 0.16 3,216 3,216 3,216 3,216
VIBRADOR CONC. GASOLINA 3-4M 25-40MM d 0.04 1,078 1,078 1,078 1,078 VIBRADOR CONC. GASOLINA 3-4M 25-40MM d 0.10 2,694 2,694 2,694 2,694
266,299 239,303 286,325 273,481 698,765 638,318 743,607 714,847