MEMORI A TÉCNI CA
HIDROSANI TARI A
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
CONTENIDO
1. Antecedentes .................................................................................................................... 5
2. Descripción Del Proyecto ................................................................................................ 6
3. Ubicación............................................................................................................................ 7
4. Normas Y Estándares ......................................................................................................... 8
5. Sistema De Agua Potable ................................................................................................ 9
6. Sistema De Alcantarillado Sanitario .............................................................................. 9
6.1 Parámetros de diseño............................................................................................. 11
6.1.1 Dotación ............................................................................................................ 11
6.1.2 Población........................................................................................................... 11
6.1.3 Densidad............................................................................................................ 11
6.1.4 Caudales de Diseño ........................................................................................ 11
6.2 Hidráulica del sistema de alcantarillado sanitario............................................ 13
6.2.1 Trazado y dimensionamiento de la red de colectores ............................. 13
6.2.2 Diámetro Interno Mínimo ................................................................................ 15
6.2.3 Velocidad Mínima ........................................................................................... 15
6.2.4 Velocidad Máxima .......................................................................................... 16
6.2.5 Pendiente Mínima ............................................................................................ 16
6.2.6 Profundidad Hidráulica Máxima ................................................................... 16
6.2.7 Materiales de Tubería...................................................................................... 16
6.2.8 Pozos de Revisión ............................................................................................. 17
6.2.9 Cajas Domiciliarias ........................................................................................... 17
6.2.10 Profundidad Mínima de Instalación ............................................................. 17
6.2.11 Profundidad Máxima de Instalación............................................................ 18
6.2.12 Gradiente Hidráulico ....................................................................................... 18
6.3 Diseño del sistema de alcantarillado sanitario .................................................. 18
7. Sistema De Drenaje Pluvial ............................................................................................ 20
7.1 Infraestructura existente ......................................................................................... 20
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
7.2 Parámetros de diseño............................................................................................. 22
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
TABLA DE ILUSTRACIONES
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
1. ANTECEDENTES
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Dadas las condiciones actuales de la vía vehicular (Terreno Natural) y al desaseo del
sector, se observa que los elementos que conforman la red pluvial se ven afectados
por obstrucciones o completamente cubiertos imposibilitando el funcionamiento
adecuado de los colectores, lo cual conlleva a un deterioro acelerado de las calles
durante la época de invierno resultado de las precipitaciones constantes y
elevadas.
Como descarga natural del sector se identifica el Canal 88G de longitud 565 m. El
mismo canal recibe la descarga de los terrenos ubicados aguas abajo hasta
finalmente descargar en el Canal 88, también conocido como Estero San Eduardo.
El sector presenta una topografía irregular que varía entre las cotas 58 msnm a 23
msnm en las áreas aledañas al Canal 88G. El norte del sector presenta pendientes
pronunciadas con inclinaciones de hasta 16.00%.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
El Sistema Pluvial diseñado integra los colectores de descarga existentes por lo que
se establecieron cinco descargas principales hacia el cuerpo receptor más
cercano que es el Canal 88G.
3. UBICACIÓN
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
4. NORMAS Y ESTÁNDARES
Para la elaboración del presente estudio técnico se aplican las siguientes normas y
estándares:
CPE INEN 5 Parte 9-1: Normas para estudio y diseño de sistemas de agua
potable y disposición de aguas residuales para poblaciones mayores a 1000
habitantes. (INEN, 1992)
Ajuste y Revisión del Plan Maestro de Agua Potable, Alcantarillado Sanitario
y Alcantarillado Pluvial. (INTERAGUA, Manual de Diseño de Redes de
Alcantarillado, 2015)
Manual de Diseño de Redes de Alcantarillado, MA-OED-003. (INTERAGUA,
Manual de Diseño de Redes de Alcantarillado, 2015)
Manual de Diseño de Acueductos, MA-OED-004. (INTERAGUA, Manual de
Diseño de Redes de Alcantarillado, 2015)
Norma técnica de Diseño, Construcción de Proyectos de Agua Potable y
Alcantarillado (ESTACIONES DE BOMBEO ALCANTARILLADO SANITARIO Y
PLUVIAL).
Inspección de información de redes existentes de AALL – Coop. Flor de
Bastión, Las Delicias, Ladrillera, Twinza, Nueva Guayaquil. Plan de
Mantenimiento AALL (INTERAGUA)
Oficio IOM-DO-060801-2021, Asfaltado de Sectores Marginales – Polígono 1 y
2.
Oficio IOM-GZ-09728-2021
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
atención a la solicitud realizada en el Oficio IOM-DO-06081-2021 se elevará a nivel
de rasante las cámaras de válvula, hidrantes y demás elementos hidrosanitarios
mencionados en el oficio.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Con la finalidad de llevar a cabo la correcta limpieza y reconformación del Canal
88B se realizó un re direccionamiento del colector de aguas servidas que atraviesa
esta área trazando un recorrido paralelo al canal con las profundidades necesarias
para no interferir el cauce del canal.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
En base al estudio descrito en el acápite 5.1, la dotación unitaria correspondiente a
la zona es de 200 l/hab/día para predios.
6.1.2 Población
La población de diseño debe estar acorde con las densidades o usos de suelos
establecidas por la M. I. Municipalidad de Guayaquil.
6.1.3 Densidad
La densidad tomada para el estudio es de 4.8 hab/predio.
= + + +
Donde:
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Dónde:
Qm es el caudal medio de aguas residuales
domésticas en l/s Cr es el coeficiente de retorno
D es la dotación unitaria de agua potable
(l/Hab/día) P es la población (Hab)
Estimación de Cr
El coeficiente de retorno es la fracción del agua de uso doméstico servida
(dotación neta), entregada como agua negra al sistema de recolección y
evacuación de aguas residuales. Su estimación debe provenir del análisis de
información existente de la localidad y/o de mediciones de campo. Cuando esta
información resulte inexistente o muy pobre, pueden utilizarse valores entre el rango
de 80% – 90%. Para este caso se tomará el 85%.
6.1.4.2 Caudal Máximo Horario de Aguas Residuales Domésticas.
El caudal máximo horario es la base para establecer el caudal de diseño. El caudal
máximo horario del día, se estima a partir del caudal medio diario, mediante el uso
del factor de mayoración, F.
Estimación de F
El coeficiente de mayoración (F) representa la relación entre el caudal medio diario
y el caudal máximo horario, puede ser estimado dependiendo de la población
servida, para el cálculo del coeficiente se emplea la ecuación de Harmon:
=(18 + √P)
(4 + √P)
Donde:
P es la población servida en miles de habitantes.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
6.1.4.3 Caudal de Infiltración
Es inevitable la infiltración de aguas sub superficiales a las redes de sistemas de
alcantarillado sanitario, principalmente freáticas. Estas aguas ingresan al sistema a
través de los siguientes puntos:
Siempre que sea posible, las tuberías de la red sanitaria se colocaran en el lado
opuesto de la calzada de aquél en el que se ha instalado la tubería de agua
potable.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Para el dimensionamiento de la red se usó la ecuación de Manning:
Dónde:
Coeficiente
Tipo de Cámara Diagrama
de Pérdida
0.5
Eje sin cruces en la intersección
0.6
Eje con desviación de 45° en la intersección
0.8
Eje con desviación de 90° en la intersección
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Coeficiente
Tipo de Cámara Diagrama
de Pérdida
0.6-0.7
Eje con una salida perpendicular
0.8
Dos tuberías de ingreso con un ángulo de 90°
entre ellos.
0.9
Dos tuberías de ingreso con un ángulo >90°
entre ellos con una sola salida
1.0
Tres o más tuberías de ingreso
= ∗ ℎ∗
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Donde:
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
permisible de la profundidad hidráulica para el caudal de diseño en un colector
será de 0.75%.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
permisibles de recubrimiento de los colectores se definen en la siguiente tabla:
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
7. SISTEMA DE DRENAJE PLUVIAL
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Canal Natural sin revestimiento (Canal 88B)
Ilustración 5 Cámara de Inspección Enterrada (1) Ilustración 6 Cámara de Inspección Enterrada (2)
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Ilustración 8 Tramo inicial: conducto Cajón Ilustración 7 Descarga: conducto Cajón Doble
Doble (2.50x2.50) m (2.50x2.50) m
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
antecedente, de la longitud del escurrimiento, etc. La CPE INEN 5 en el literal 5.4.2.7.
de la octava parte establece que “Se recomienda valores entre 10 min y 30 min
para áreas urbanas”.
= +
Donde:
es es tiempo de concentración en min.
es el tiempo inicial en min.
es el tiempo de recorrido en min.
Tiempo inicial(ti)
Es el tiempo requerido para que el agua fluya por la superficie del terreno hasta la
primera entrada del alcantarillado. Para el cálculo de este tiempo se utilizará la
ecuación de Kirpich que establece lo siguiente:
.
0.0195
= .
Donde:
es el tiempo de concentración inicial en min.
longitud del cauce principal en metros.
Pendiente entre el punto más alejado y la primera entrada del
alcantarillado. (m/m en decimales)
Tiempo de recorrido(tr)
Es el tiempo requerido, expresado en minutos, para que el agua fluya en la
alcantarilla desde la primera boca hasta el punto donde se desea determinar el
tamaño de esta.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Para el cálculo de este tiempo se empleará la siguiente expresión:
Donde:
T es el tiempo de recorrido en min.
longitud del tramo en metros.
Velocidad real del agua en el alcantarillado en m/s
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
7.2.4 Intensidad de lluvia
Para el cálculo de la intensidad de lluvia del sistema diseñado se ha utilizado las
ecuaciones pluviométricas derivadas por INTERAGUA (Curvas IDF – Intensidad –
Duración – Frecuencia), determinadas en el año 2011 en el Plan Maestro de Aguas
Lluvias. Las curvas IDF ajustadas paramétricamente se expresan con la siguiente
ecuación:
=
+
Ecuación Pluviométrica
Donde:
i es la intensidad de lluvia en mm/h.
c, e, f son los coeficientes de parametrización
td es la duración de la lluvia
T (Años) c e f
2 742.53 5.47 0.63
5 570.75 2.35 0.5
10 521 1.49 0.45
25 486.47 0.88 0.4
50 471.72 0.59 0.37
100 468.15 0.38 0.35
El sistema existente de alcantarillado Pluvial evacúa las aguas los sectores al Norte
y Este de la Cuenca. Con la finalidad de analizar el sistema como un conjunto se
incluye como dato en el cálculo el caudal de escorrentía del total de las áreas de
aportación que componen los territorios adyacentes.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Ilustración 9 Áreas de Aportación
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
7.2.6 Estimación de caudales
El dimensionamiento de las conducciones depende principalmente del tamaño del
área de aportación, del coeficiente de escurrimiento, caudal de diseño y del
periodo de retorno.
Para calcular el valor del caudal que circularán en los diferentes colectores se ha
empleado el método racional, este es el más utilizado en el cálculo del caudal pico
en cuencas urbanas y se fundamenta en las siguientes hipótesis: la intensidad de la
precipitación es uniforme en el espacio y no varía en el tiempo, la duración de la
precipitación que produce el caudal máximo dada una intensidad, es igual al
tiempo de concentración, el tiempo de concentración es el tiempo que tarda toda
el área de la cuenca en contribuir al escurrimiento mismo en que se produce el
gasto pico, el coeficiente de escurrimiento se mantiene uniforme en el tiempo.
= 0.00278
Dónde:
Q es el caudal en m3/s
C coeficiente de
escurrimiento(adimensional) I
intensidad de la lluvia en mm/h.
A es el área de la cuenca en Ha.
= ( ) ∗
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Se verifica que el caudal diseño sea menor o igual a un porcentaje de la
capacidad en tubería llena.
Dónde:
V es la velocidad del flujo en el colector,
R es el radio hidráulico, que es la relación entre el área y el perímetro mojado
de sección hidráulica del colector,
S pendiente del conducto,
n es el coeficiente de Manning.
7.4.1 Sumideros
El diseño de las calzadas ha previsto pendientes a fin de direccionar las aguas lluvias
hacia ciertas márgenes en que se ha previsto la colocación de sumideros que
capten estas aguas. Los sumideros se ubicarán generalmente en las esquinas de las
calzadas, en sitios bajos o zonas de requerimientos de recolección de aguas, por lo
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
que su capacidad dependerá de las aberturas y de la altura del agua sobre la
rejilla. El Cuerpo de Ingenieros del Ejército de los Estados Unidos (USACE), comprobó
que este elemento trabaja como vertedor para alturas de hasta 12 cm y como
orificio cuando las cargas sobre el sumidero superan los 42 cm. Se considera que
para alturas entre 12 cm y 42 cm el funcionamiento es indeterminado.
Cuando los sumideros trabajan como vertedor el caudal que ingresa se calcula
con siguiente ecuación:
Donde:
Q es Caudal en m3/s
P es Perímetro por donde ingresa el agua.
h es la carga en m
Donde:
Q es Caudal en m3/s
P es Perímetro por donde ingresa el
agua. h es la carga en m
Para este proyecto se han utilizado los tipos de sumidero recomendados por
INTERAGUA.
7.4.2 Tirantes
Los tirantes corresponden a los tramos de tuberías que unen los sumideros con los
pozos de inspección. Se ha definido que las tuberías de los tirantes tengan una
gradiente de al menos 1% y cuyo material sea de PVC de diámetro Ø280mm para
sumideros simples, y de Ø335mm para sumideros dobles. La metodología de diseño
es similar a la de los colectores.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Tabla 7-3. Diámetros utilizados para sumideros simples y dobles
D nominal D interno
(mm) (mm)
280 250
335 300
7.4.4 Colectores
Son obras que permitirán conducir las aguas lluvias captadas por los sumideros y
cunetas, y se ubican entre dos pozos (pozo de entrada y pozo de salida). El diseño
de estos colectores se realiza contabilizando los caudales de ingreso en el pozo de
entrada y tiene dos consideraciones: una definición de la capacidad del colector
considerando el área de aporte de precipitación; y, una estimación de los caudales
que se descargan desde tramos contiguos y/o anteriores al colector.
El diseño de cada colector depende del área de aportación que confluye hasta
los sumideros ubicados al inicio de cada tramo.
Las tuberías serán circulares de PVC con diámetros que fluctúan desde Ø400mm
hasta Ø760mm. Para diámetros mayores se empleará Hormigón Armado.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Tabla 7-4. Diámetros utilizados para el dimensionamiento del sistema
D nominal D interno
Material
(mm) (mm)
400 364 PVC
440 400 PVC
540 500 PVC
650 600 PVC
760 700 PVC
830 830 H.A.
900 900 H.A.
7.4.5 Jardines de Lluvia
Alineados con el concepto de calles completas y desarrollo urbano sostenible se
hace énfasis en la implementación de infraestructuras verdes (I.V.) que imiten
procesos naturales y posibiliten mejorar la calidad ambiental de forma que se
maneje y aproveche el recurso agua de forma sustentable.
Los Jardines de lluvia permitirán incrementar la infiltración de agua pluvial hacia los
mantos acuíferos; conservación del suelo por aporte de nutrientes e incrementar la
calidad del agua de descarga por medio de la filtración natural que ofrece el
sustrato. También permite la implementación de árboles y vegetación nativa que
se encargará de regular naturalmente la temperatura del sector, buscando
minimizar el efecto de isla de calor urbana y fomentando un ambiente idóneo para
el tránsito de peatones.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
7.4.6 Canales
Para la evaluación de los canales del polígono se efectuaron simulaciones en el
software libre HEC-RAS, que es una herramienta de modelización que permite
simular flujos de cauces en distintos tipos de régimen, para esto es necesario
ingresar los siguientes parámetros: datos geométricos, coeficiente de rugosidad,
caudal, condiciones de frontera, en la última sección aguas arriba y aguas abajo,
como resultado se obtiene el perfil hidráulico a lo largo del canal.
Se efectuó la modelación hidráulica de los canales 88B con un caudal de 5.87 m³/s
y 88G de 21.91 m³/s, siguiendo los mismos parámetros de diseño de las redes de
aguas lluvias proyectadas, con coeficientes de rugosidad n=0.030, valor que
corresponde a canales reconformados en tierra.
A partir del análisis canal 88B se estableció que era necesario incluir conductos
cajones en su reconformación, con el propósito de salvar interferencias con el
sistema de aguas servidas y a su vez facilitar la movilidad de los moradores. A
continuación, se presentan los resultados obtenidos para el canal 88B:
RS = 140
.04
35.0
34.5
34.0
33.5
33.0
32.5
32.0
31.5
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Elevation
RS = 20
.04
33.0 Legend
EG PF 1
WS PF 1
32.5
Ground
Bank Sta
32.0
31.5
Elevation (m)
31.0
30.5
30.0
29.5
29.0
10 15 20 25 30
Station (m)
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Ilustración 13 Perfil longitudinal - Canal 88G
RS = 340
.03 .03 .03
25.5
25.0
24.5
24.0
Elevation (m)
23.5
23.0
22.5
22.0
RS = 320
.03 .03 .03
25.5
25.0
24.5
24.0
Elevation (m)
23.5
23.0
22.5
22.0
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
RS = 140
.03 .03 .03
23.0
22.5
22.0
Elevation (m)
21.5
21.0
20.5
RS = 40
.03 .03 .03
24
23
22
Elevation (m)
21
20
19
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
Ilustración 17 Sección transversal RS: 40 - Canal 88G
Las cantidades de excavación y limpieza del canal se obtuvieron por medio del
Software HEC-RAS. Se realizó el cálculo para la protección y obras menores
necesarias para el correcto funcionamiento hidráulico dentro de la cuenca de
forma individual según corresponde a cada tramo de canal.
Ver anexo 1.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
7.6 Memoria de Cálculo
CALCULO HIDRAULICO PARA EL DISEÑO DE ALCANTARI LLADO PLUVIAL
OBRA: PAVIMENTACIÓN DE VIA
SECTOR: PROYECTO 1 - POLÍGONO 1
Fecha: AGOSTO 14 del 2023
PARROQUIA TARQUI.
AREA TIEMP. DE CONC.(') ESCURRIM. (lit/seg) DIAMETRO PENDIENTE VELOC. CAPAC. RELACIÓN DESNIVEL SALTO C O T A S
TRAMO ABSCISA LONG. DE DE POR TOTAL D J V Q CAUDAL HIDR. D IS EÑO T E RRENO OBSERVACIONES
PROPIA ADIC. TOTAL LLEGADA ESCURRIM. HAS. l/s mm. pulg. o/oo m/s l/s qu/Q<1 m Inicial Final Inicial Final
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
AREA TIEMP. DE CONC.(') ESCURRIM. (lit/seg) DIAMETRO PENDIENTE VELOC. CAPAC. RELACIÓN DESNIVEL SALTO C O T A S
TRAMO ABSCISA LONG. DE DE POR TOTAL D J V Q CAUDAL HIDR. DISEÑO T ERRENO OBSERVACIONES
PROPIA ADIC. TOTAL LLEGADA ESCURRIM. HAS. l/s mm. pulg. o/oo m/s l/s qu /Q<1 m Inicial Final Inicial Final
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
ARE A TIEMP. DE CONC.(') ESCURRIM. (lit/seg) DIAMETRO PENDIENTE VELOC. CAPAC. RELACIÓN DESNIVEL SALTO C O T A S
TRAMO ABSCISA LONG. DE DE POR TOTAL D J V Q CAUDAL HIDR. D I SE ÑO T ERRE NO OBSERVACIONES
PROPIA ADIC. TOTAL LLEGADA ESCURRIM. HAS. l/s mm. pulg. o/oo m/s l/s q u/Q<1 m Inicial Final Inicial Final
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
8. PRESUPUESTO
HIDROS ANITARIO
REPOS ICIÓN Y LIMPIEZA DE ELEMENTOS
HIDROS ANITARIOS EXIS TENTES
(AAPP,AALL,AASS )
ELEVACIÓN DE TAPAS DE HORM IGÓN
609-(8)E U 11,00
ARM ADO PARA CÁM ARA
BAJADA DE TAPAS DE HORMIGÓN ARM ADO
609-(8)1E U 11,00
PARA CÁM ARA
ELEVACIÓN DE TAPAS DE HORM IGÓN
609-(8)2E U 500,00
ARM ADO PARA CAJA DOM ICILIARIA
BAJADA DE TAPAS DE HORMIGÓN ARM ADO
609-(8)2E1 U 413,00
PARA CAJAS DOM ICILIARIAS
301-2(24)00 LIMPIEZA DE CAJAS DOM ICILIARIAS U 925,00
301-2(20)00 LIMPIEZA DE CÁM ARA U 10,00
301-2(23)00 LIMPIEZA DE SUM IDEROS U 2,00
301-2(29)A LIMPIEZA DE COLECTORES DE 760 A 1000MM M 83,00
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
SUMINISTRO E INSTALACIÓN DE M ANGUITO
AP-PEAD-4M E UNIÓN PEAD PE 100 PN 10 PARA U 6,00
ELECTROFUSIÓN Ø 110M M
SUMINISTRO E INSTALACIÓN DE M ANGUITO
AP-PEAD-6M E UNIÓN PEAD PE 100 PN 10 PARA U 13,00
ELECTROFUSIÓN Ø 160M M
SUMINISTRO E INSTALACIÓN DE M ANGUITO
AP-PEAD-13ME UNIÓN PEAD PE 100 PN 10 PARA U 3,00
ELECTROFUSIÓN Ø 280M M
SUMINISTRO E INSTALACIÓN DE TEE PEAD PE
AP-PEAD-004E 100 PN 10 PARA ELECTROFUSIÓN Ø 90M M X U 20,00
90MM INC. MANGUITO
SUMINISTRO E INSTALACIÓN DE CODO PEAD
AP-PEAD-001E PE 100 PN 10 PARA ELECTROFUSIÓN Ø 90M M U 15,00
45°
SUMINISTRO E INSTALACIÓN DE CODO PEAD
AP-PEAD-002E PE 100 PN 10 PARA ELECTROFUSIÓN Ø 90M M U 10,00
90°
SUMINISTRO E INSTALACIÓN DE TEE PEAD PE
AP-PEAD-005E 100 PN 10 PARA ELECTROFUSIÓN Ø 110M M X U 10,00
110MM INC. M ANGUITO
SUMINISTRO E INSTALACIÓN DE CODO PEAD
AP-PEAD-015E PE 100 PN 10 PARA ELECTROFUSIÓN Ø 160MM U 5,00
45°
SUMINISTRO E INSTALACIÓN DE TEE PEAD PE
AP-PEAD-016E 100 PN 10 PARA ELECTROFUSIÓN Ø 160M M X U 5,00
90MM INC. MANGUITO
SUMINISTRO E INSTALACIÓN DE CODO PEAD
AP-PEAD-019E PE 100 PN 10 PARA ELECTROFUSIÓN Ø 110MM U 10,00
90°
SUMINISTRO E INSTALACIÓN DE CODO PEAD
AP-PEAD-020E PE 100 PN 10 PARA ELECTROFUSIÓN Ø 110MM U 10,00
45°
SONDEO DE 1,00 M HASTA 2,00 M (INCLUYE
AP-SON-02-BA EXCAVACIÓN, RELLENOS, BOM BEO, U 5,00
DOCUM ENTACIÓN)
SONDEO DE 2,00 M HASTA 3,00 M (INCLUYE
AP-SON-03-BA EXCAVACIÓN, RELLENOS, BOM BEO, U 5,00
ENTIBADO Y DOCUM ENTACIÓN)
INSPECCIÓN CCTV DE RAM ALES
5.94 DOMICILIARIOS, TIRANTES Y CRUCES M 2.618,00
INCLUYE DOCUMENTACIÓN
INSPECC. CCTV DE COLECTORES DESDE 450 A
5.91 M 171,00
750 MM (INC. DOCUM)
PRUEBAS HIDROSTÁTICAS D=90M M A 200 MM
5.97 M 1.247,00
(INC. DESINFECCIÓN)
PRUEBAS HIDROSTÁTICAS D= 200MM A
5.98 M 20,00
400MM (INC. DESINFECCIÓN)
SUMINISTRO E INSTALACIÓN DE CAJA DE
5.3I REVISIÓN H.S. F´C=280 KG/CM 2 50 X 50 X 50 A U 50,00
80 CM M EDIDAS INTERIORES SIN TAPA.
SUMINISTRO E INSTALACIÓN DE CAJA DE
5.3J REVISIÓN H.S. F´C=280 KG/CM 2 50 X 50 X 81 A U 25,00
110 CM MEDIDAS INTERIORES SIN TAPA.
SUMINISTRO E INSTALACIÓN DE CAJA DE
5.3K REVISIÓN H.S. F´C=280 KG/CM 2 50 X 50 X 111 A U 25,00
170 CM MEDIDAS INTERIORES SIN TAPA.
SUMINISTRO E INSTALACIÓN DE TAPA DE
TAP125-60C HIERRO DÚCTIL DE 125 KN D=60CM (PARA U 100,00
CAJA DE 50X50 INT) INCLUYE LOSA
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
REPARACIÓN POR DAÑO DE GUÍAS
DOMICILIARIAS
SILLETA POR ELECTROFUSIÓN PARA PEAD
5.4F1 Ø90M M X 20M M INC. M ANGUITO POR U 160,00
ELECTROFUSIÓN Ø20M M
SILLETA POR ELECTROFUSIÓN PARA PEAD
5.4F2 Ø110M M X 20M M INC. M ANGUITO POR U 20,00
ELECTROFUSIÓN Ø20M M
SUM INISTRO E INSTALACIÓN DE TUBERÍA
5.69-E M 160,00
PEAD/POLIETILENO 20 M M (INC. ARENA)
ELEVACIÓN/BAJADA DE TAPAS DE
HORMIGÓN ARMADO DE DOMICILIARIA E
HIDRANTES
PICADA PARA RECONFORM ACIÓN DE CAJAS
3.31A M3 1,00
DE REGISTRO
SUM IN.COLOC.ADHESIVO EPÓXICO DE
2.25 M2 10,00
HORM IGÓN FRESCO A ENDURECIDO
HORM IGÓN ESTRUCT./CEM . PORTL. F´C=280
503(2)1E-(3) KG/CM 2 (INC. ENCOFRADO Y CURADOR) (EN M3 1,00
SITIO) PARA ELEVACIÓN/BAJADA DE TAPAS
ACERO DE REFUERZO EN BARRAS FY=4200
504(1) KG 80,00
KG/CM 2
ESTRUCTURA M ETÁLICA A36 PARA CAJAS
6.1-HS KG 50,00
INC M ONTAJE
REMOCIÓN Y RECONSTRUCCIÓN DE
CÁMARAS PARA VENTOS AS
301-3(1)3E REM OCIÓN DE HORM IGÓN M3 9,00
HORM IGÓN ESTRUCT./CEM . PORTL. F´C=280
503(2)1E2 KG/CM 2 (INC. ENCOFRADO, CURADOR E M3 9,00
INHIBIDOR DE CORROSIÓN)
ACERO DE REFUERZO EN BARRAS FY=4200
504(1) KG 644,00
KG/CM 2
SUM INISTRO E INSTALACIÓN DE PUERTA
AP-CAIRE-001 U 23,00
PARA CÁM ARA DE VÁLVULA DE AIRE
S UMINISTRO E INSTALACIÓN PARA EL
S IS TEMA DE REDES DE AALL
EXCAVACIÓN SIN CLASIFICACIÓN
303-2(1)E-E0-HS M3 6.820,00
(HIDROSANITARIO)
303-2(3)1E EXCAVACIÓN EN ROCA - ZONA POBLADA M3 682,00
309-(1)E DESALOJO DE M ATERIAL M 3/KM 93.775,00
OP-1.6 ENTIBADO (TABLAESTACADO M ETÁLICO) M2 4.916,00
304-1(1)E-E1 M ATERIAL DE PRÉSTAM O LOCAL M3 1.900,00
304-1(2)E-1 M ATERIAL DE PRÉSTAM O IM PORTADO M3 800,00
309 TRANSPORTE DE M ATERIAL M 3/KM 25.000,00
1.17 BOM BEO DE AGUA HORA 277,00
SUM INISTRO E INSTALACIÓN DE TUBO PVC
5.51 RÍGIDO DE PARED ESTRUCTURADA E M 320,00
INTERIOR LISA (De=280M M ; Di=250M M )
SUM INISTRO E INSTALACIÓN DE TUBO PVC
5.59M RÍGIDO DE PARED ESTRUCTURADA E M 450,00
INTERIOR LISA (De=335M M ; Di=300M M )
SUM INISTRO E INSTALACIÓN DE TUBO PVC
5.52A RÍGIDO DE PARED ESTRUCTURADA E M 300,00
INTERIOR LISA (De=400M M ; Di=364M M )
SUM INISTRO E INSTALACIÓN DE TUBO PVC
5.52 RÍGIDO DE PARED ESTRUCTURADA E M 580,00
INTERIOR LISA (De=440M M ; Di=400M M )
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
SUMINISTRO E INSTALACIÓN DE TUBO PVC
5.59 RÍGIDO DE PARED ESTRUCTURADA E M 450,00
INTERIOR LISA (De=540M M; Di=500MM)
SUMINISTRO E INSTALACIÓN DE TUBO PVC
5.59C RÍGIDO DE PARED ESTRUCTURADA E M 65,00
INTERIOR LISA (De=650M M; Di=600MM)
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE
601(1A)33E3 M 50,00
H.A. CLASE III D=33"
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE
601(1A)36E3 M 30,00
H.A. CLASE III D=36"
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE
601(1A)40E3 M 32,00
H.A. CLASE III D=40"
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE
601(1A)42E3 M 25,00
H.A. CLASE III D=42"
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE
601(1A)44E3 M 25,00
H.A. CLASE III D=44"
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE
601(1A)48E3 M 25,00
H.A. CLASE III D=48"
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE
601(1A)54E3 M 25,00
H.A. CLASE III D=54"
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE
601(1A)60E3 M 25,00
H.A. CLASE III D=60"
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE
601(1A)66E3 M 43,00
H.A. CLASE III D=66"
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE
601(1A)72E3 M 25,00
H.A. CLASE III D=72"
INSPECC. CCTV DE COLECTORES DESDE 200 A
5.90 M 1.070,00
400 M M (INC. DOCUM )
INSPECC. CCTV DE COLECTORES DESDE 450 A
5.91 M 1.095,00
750 M M (INC. DOCUM )
INSPECC. CCTV DE COLECTORES DESDE 825 A
5.92 M 280,00
1500 MM (INC. DOCUM)
SUMIDERO SENCILLO DE H.SIMPLE (INC.
607-(3)17E U 40,00
REJILLA DE HD) F´C=280 KG/CM2
SUMIDERO DOBLE DE HORMIGÓN ARM ADO
607-(3)2E3 U 90,00
F´C=280 KG/CM 2 (INC.REJILLA DE H.D.)
SUMINISTRO E INSTALACIÓN DE CAJA DE
5.3I REVISIÓN H.S. F´C=280 KG/CM 2 50 X 50 X 50 A U 50,00
80 CM MEDIDAS INTERIORES SIN TAPA.
SUMINISTRO E INSTALACIÓN DE TAPA DE
TAP125-60C HIERRO DÚCTIL DE 125 KN D=60CM (PARA U 50,00
CAJA DE 50X50 INT) INCLUYE LOSA
S UMIDERO TRANS VERS AL
EXCAVACIÓN SIN CLASIFICACIÓN MANUAL-
303-2(1)E-ES M3 5,00
MECÁNICA
309-(1)E DESALOJO DE M ATERIAL M 3/KM 63,00
MATERIAL DE PRÉSTAMO IMPORTADO
304-1(2)E2 M3 3,00
MANUAL
309 TRANSPORTE DE M ATERIAL M 3/KM 94,00
REPLANTILLO DE HORM IGÓN SIMPLE F´C=140
2.9 M2 8,00
KG/CM2 E=5CM
SUMIDERO TRANSVERSAL H.A. F´C=240
CHSRI003 KG/CM2 (0.60X0.53M ) E=0.15M CON REJILLA DE M 10,00
H.D 400KN
JUNTAS DE POLIURETANO INC. LIMPIEZA,
405-8(3)E1 M 5,00
CORDÓN Y SELLADO.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
CÁMARA DE INS PECCIÓN (37 CÁMARAS TIPO
II) - AALL
HORM IGÓN ESTRUCT./CEM . PORTL. F´C=210
503(2)E M3 4,00
KG/CM 2 (INC. ENCOFRADO Y CURADOR)
EXCAVACIÓN SIN CLASIFICACIÓN
303-2(1)E-E0-HS M3 1.006,00
(HIDROSANITARIO)
303-2(3)1E EXCAVACIÓN EN ROCA - ZONA POBLADA M3 101,00
309-(1)E DESALOJO DE M ATERIAL M 3/KM 13.838,00
OP-1.6 ENTIBADO (TABLAESTACADO M ETÁLICO) M2 1.381,00
304-1(1)1E M ATERIAL DE PRÉSTAM O LOCAL (M ANUAL) M3 596,00
M ATERIAL DE PRÉSTAM O IM PORTADO
304-1(2)E2 M3 256,00
M ANUAL
309 TRANSPORTE DE M ATERIAL M 3/KM 8.000,00
HORM IGÓN ESTRUCT./CEM . PORTL. F´C=280
503(2)1E2 KG/CM 2 (INC. ENCOFRADO, CURADOR E M3 79,00
INHIBIDOR DE CORROSIÓN)
ACERO DE REFUERZO EN BARRAS FY=4200
504(1) KG 9.500,00
KG/CM 2
SUM IN.COLOC.ADHESIVO EPÓXICO DE
2.25 M2 49,00
HORM IGÓN FRESCO A ENDURECIDO
SUM INISTRO Y COLOCACIÓN DE SELLADO
OP-3.4 M2 374,00
IM PERM EABLE
SUM INISTRO E INSTALACIÓN DE JUNTAS DE
405-8(3)1E M 145,00
PVC (10-18)CM
1.17 BOM BEO DE AGUA HORA 286,00
REPLANTILLO DE HORM IGÓN SIM PLE F´C=140
2.9 M2 112,00
KG/CM 2 E=5CM
HORM IGÓN ESTRUCT./CEM . PORTL. F´C=350
503(2)4E M3 15,00
KG/CM 2 (INC.ENCOFRADO Y CURADOR)
ESTRUCTURA M ETÁLICA A36 PARA CAJAS
6.1-HS KG 1.379,00
INC M ONTAJE
SUM INISTRO E INSTALACIÓN DE TAPA
609-(6)1 REDONDA/FUNDICIÓN DÚCTIL D=0.60M U 35,00
400KN
CÁMARA DE INS PECCIÓN (4 CÁMARAS TIPO
III) - AALL
HORM IGÓN ESTRUCT./CEM . PORTL. F´C=210
503(2)E M3 3,00
KG/CM 2 (INC. ENCOFRADO Y CURADOR)
EXCAVACIÓN SIN CLASIFICACIÓN
303-2(1)E-E0-HS M3 244,00
(HIDROSANITARIO)
303-2(3)1E EXCAVACIÓN EN ROCA - ZONA POBLADA M3 74,00
309-(1)E DESALOJO DE M ATERIAL M 3/KM 3.975,00
OP-1.6 ENTIBADO (TABLAESTACADO M ETÁLICO) M2 244,00
M ATERIAL DE PRÉSTAM O IM PORTADO
304-1(2)E2 M3 193,00
M ANUAL
309 TRANSPORTE DE M ATERIAL M 3/KM 6.031,00
HORM IGÓN ESTRUCT./CEM . PORTL. F´C=280
503(2)1E2 KG/CM 2 (INC. ENCOFRADO, CURADOR E M3 26,00
INHIBIDOR DE CORROSIÓN)
ACERO DE REFUERZO EN BARRAS FY=4200
504(1) KG 3.259,00
KG/CM 2
SUM IN.COLOC.ADHESIVO EPÓXICO DE
2.25 M2 10,00
HORM IGÓN FRESCO A ENDURECIDO
SUM INISTRO Y COLOCACIÓN DE SELLADO
OP-3.4 M2 91,00
IM PERM EABLE
SUM INISTRO E INSTALACIÓN DE JUNTAS DE
405-8(3)1E M 29,00
PVC (10-18)CM
1.17 BOM BEO DE AGUA HORA 42,00
REPLANTILLO DE HORM IGÓN SIM PLE F´C=140
2.9 M2 26,00
KG/CM 2 E=5CM
HORM IGÓN ESTRUCT./CEM . PORTL. F´C=350
503(2)4E M3 5,00
KG/CM 2 (INC.ENCOFRADO Y CURADOR)
ESTRUCTURA M ETÁLICA A36 PARA CAJAS
6.1-HS KG 193,00
INC M ONTAJE
SUM INISTRO E INSTALACIÓN DE TAPA
609-(6)1 REDONDA/FUNDICIÓN DÚCTIL D=0.60M U 4,00
400KN
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
CÁMARA DE INS PECCIÓN (2 CÁMARAS TIPO
V) - AALL
HORMIGÓN ESTRUCT./CEM. PORTL. F´C=210
503(2)E M3 9,00
KG/CM2 (INC. ENCOFRADO Y CURADOR)
EXCAVACIÓN SIN CLASIFICACIÓN
303-2(1)E-E0-HS M3 298,00
(HIDROSANITARIO)
303-2(3)1E EXCAVACIÓN EN ROCA - ZONA POBLADA M3 90,00
309-(1)E DESALOJO DE M ATERIAL M 3/KM 4.850,00
OP-1.6 ENTIBADO (TABLAESTACADO M ETÁLICO) M2 210,00
304-1(1)1E MATERIAL DE PRÉSTAM O LOCAL (M ANUAL) M3 162,00
MATERIAL DE PRÉSTAM O IM PORTADO
304-1(2)E2 M3 70,00
MANUAL
309 TRANSPORTE DE MATERIAL M 3/KM 2.188,00
HORMIGÓN ESTRUCT./CEM. PORTL. F´C=280
503(2)1E2 KG/CM2 (INC. ENCOFRADO, CURADOR E M3 36,00
INHIBIDOR DE CORROSIÓN)
ACERO DE REFUERZO EN BARRAS FY=4200
504(1) KG 4.205,00
KG/CM2
SUM IN.COLOC.ADHESIVO EPÓXICO DE
2.25 M2 10,00
HORMIGÓN FRESCO A ENDURECIDO
SUM INISTRO Y COLOCACIÓN DE SELLADO
OP-3.4 M2 101,00
IMPERM EABLE
SUM INISTRO E INSTALACIÓN DE JUNTAS DE
405-8(3)1E M 27,00
PVC (10-18)CM
1.17 BOM BEO DE AGUA HORA 31,00
REPLANTILLO DE HORM IGÓN SIMPLE F´C=140
2.9 M2 42,00
KG/CM2 E=5CM
HORMIGÓN ESTRUCT./CEM. PORTL. F´C=350
503(2)4E M3 1,00
KG/CM2 (INC.ENCOFRADO Y CURADOR)
ESTRUCTURA M ETÁLICA A36 PARA CAJAS
6.1-HS KG 126,00
INC MONTAJE
SUM INISTRO E INSTALACIÓN DE TAPA
609-(6)1 REDONDA/FUNDICIÓN DÚCTIL D=0.60M U 2,00
400KN
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
S UBDRENES - PAVIMENTO, ES CALINATAS
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
S UMINIS TRO E INSTALACIÓN PARA EL
S ISTEMA DE REDES DE AASS NUEVAS
HORM IGÓN ESTRUCT./CEM . PORTL. F´C=210
503(2)E M3 7,00
KG/CM2 (INC. ENCOFRADO Y CURADOR)
ACERO DE REFUERZO EN BARRAS FY=4200
504(1) KG 494,00
KG/CM2
EXCAVACIÓN SIN CLASIFICACIÓN
303-2(1)E-E0-HS M3 632,00
(HIDROSANITARIO)
EXCAVACIÓN SIN CLASIFICACIÓN MANUAL
303-2(1)E00-HS M3 20,00
(HIDROSANITARIO)
303-2(3)1E EXCAVACIÓN EN ROCA - ZONA POBLADA M3 95,00
309-(1)E DESALOJO DE MATERIAL M 3/KM 9.338,00
OP-1.6 ENTIBADO (TABLAESTACADO METÁLICO) M2 1.031,00
304-1(1)E-E1 M ATERIAL DE PRÉSTAMO LOCAL M3 347,00
304-1(2)E-1 M ATERIAL DE PRÉSTAMO IMPORTADO M3 149,00
309 TRANSPORTE DE MATERIAL M 3/KM 4.656,00
1.17 BOM BEO DE AGUA HORA 62,00
SUMINISTRO E INSTALACIÓN DE TUBO PVC
5.42 RÍGIDO DE PARED ESTRUCTURADA E M 93,00
INTERIOR LISA (De=175MM ; Di=160MM )
SUMINISTRO E INSTALACIÓN DE TUBO PVC
5.43 RÍGIDO DE PARED ESTRUCTURADA E M 250,00
INTERIOR LISA (De=220MM ; Di=200MM )
INSPECCIÓN CCTV DE RAM ALES
5.94 DOM ICILIARIOS, TIRANTES Y CRUCES M 343,00
INCLUYE DOCUM ENTACIÓN
SUMINISTRO E INSTALACIÓN DE CAJA DE
5.3J REVISIÓN H.S. F´C=280 KG/CM2 50 X 50 X 81 A U 8,00
110 CM M EDIDAS INTERIORES SIN TAPA.
SUMINISTRO E INSTALACIÓN DE CAJA DE
5.3K REVISIÓN H.S. F´C=280 KG/CM2 50 X 50 X 111 A U 3,00
170 CM M EDIDAS INTERIORES SIN TAPA.
SUMINISTRO E INSTALACIÓN DE TAPA DE
TAP125-60C HIERRO DÚCTIL DE 125 KN D=60CM (PARA U 11,00
CAJA DE 50X50 INT) INCLUYE LOSA
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
CÁMARAS DE INS PECCIÓN TIPO II - AAS S
HORMIGÓN ESTRUCT./CEM. PORTL. F´C=210
503(2)E M3 1,00
KG/CM2 (INC. ENCOFRADO Y CURADOR)
EXCAVACIÓN SIN CLASIFICACIÓN
303-2(1)E-E0-HS M3 183,00
(HIDROSANITARIO)
303-2(3)1E EXCAVACIÓN EN ROCA - ZONA POBLADA M3 19,00
309-(1)E DESALOJO DE M ATERIAL M 3/KM 2.525,00
OP-1.6 ENTIBADO (TABLAESTACADO M ETÁLICO) M2 249,00
304-1(1)1E MATERIAL DE PRÉSTAM O LOCAL (M ANUAL) M3 108,00
MATERIAL DE PRÉSTAM O IM PORTADO
304-1(2)E2 M3 47,00
MANUAL
309 TRANSPORTE DE MATERIAL M 3/KM 1.469,00
HORMIGÓN ESTRUCT./CEM. PORTL. F´C=280
503(2)1E2 KG/CM2 (INC. ENCOFRADO, CURADOR E M3 17,00
INHIBIDOR DE CORROSIÓN)
ACERO DE REFUERZO EN BARRAS FY=4200
504(1) KG 1.853,00
KG/CM2
SUM IN.COLOC.ADHESIVO EPÓXICO DE
2.25 M2 11,00
HORMIGÓN FRESCO A ENDURECIDO
SUM INISTRO Y COLOCACIÓN DE SELLADO
OP-3.4 M2 71,00
IMPERM EABLE
SUM INISTRO E INSTALACIÓN DE JUNTAS DE
405-8(3)1E M 32,00
PVC (10-18)CM
1.17 BOM BEO DE AGUA HORA 47,00
REPLANTILLO DE HORM IGÓN SIMPLE F´C=140
2.9 M2 19,00
KG/CM2 E=5CM
HORMIGÓN ESTRUCT./CEM. PORTL. F´C=350
503(2)4E M3 3,00
KG/CM2 (INC.ENCOFRADO Y CURADOR)
ESTRUCTURA M ETÁLICA A36 PARA CAJAS
6.1-HS KG 258,00
INC MONTAJE
SUM INISTRO E INSTALACIÓN DE TAPA
609-(6)1 REDONDA/FUNDICIÓN DÚCTIL D=0.60M U 6,00
400KN
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
9. CONCLUSIONES Y RECOMENDACIONES
Al momento del diseño, el área en estudio cuenta con servicio de Agua
Potable y Alcantarillado Sanitario en su totalidad, las tuberías que componen
dichos servicios se encuentran habilitadas y operativas.
Dado que la intervención a realizar consiste en la pavimentación del sitio, se
considera el alzado de tapas de las cámaras de válvulas y cámaras de
inspección existentes acorde a los registros y recomendaciones de
INTERAGUA.
Se realiza el re direccionamiento de la red de Alcantarillado Sanitario para
eliminar las interferencias con el Canal 88B y permitir el flujo libre de las aguas
lluvias.
La red de Alcantarillado Pluvial Existente se encuentra operativa por lo que
fue incluida al diseño realizado. Es de suma importancia cumplir
estrictamente con el mantenimiento periódico de la red existente puesto
que compone los conductos principales (conducto Cajón 2(2.5x2.5) m y
conducto cajón (2.0x2.0) m), en los cuales convergen todas las áreas de
aportación tanto de la zona de estudio como de cuencas adyacentes al
Norte y Este del Polígono de Intervención.
Se ha efectuado el diseño de 4 descargas para evacuar las aguas lluvias
para la zona de estudio aparte de la descarga existente del conducto
cajón.
Los diámetros proyectados varían desde: Ø280mm a Ø335mm para tirantes;
para colectores desde Ø400mm a Ø760mm en PVC y para diámetros
mayores en Hormigón Armado.
Se planifica la ubicación de Infraestructuras Verdes, Jardines de Lluvia, con
la finalidad permitir el retorno de las aguas al suelo y mitigar el deterioro de su
calidad. Se espera también invitar a comunidad a participar en el cuidado
de los Jardines y promover lazos afines a la protección del entorno.
El Polígono de intervención contempla colectores principales que servirán
de drenaje para el proyecto: “PROYECTO 2 - POLÍGONO 2 -
PAVIMENTACIÓN, INCLUYE CONSTRUCCIÓN DE ACERAS Y BORDILLOS E
IMPLEMENTACIÓN DE ALCANTARILLADO PLUVIAL - (COOP. FLOR DE BASTIÓN
BLOQUE 6, 7 Y 8
- COOP. LAS DELICIAS). - PROGRAMA CAF XV.” por lo que se debe tener
especial atención en las cotas de las cámaras: PLG1-2_A-03, PLG1-2_A-02,
PLG1-2_B- 11.2, PLG1-2_B-11, PLG1-2_B-10, PLG1-2_C-02, PLG1-2_C-03, PLG1-
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
2_C-04,
PLG1-2_C-05 puesto que a estas cámaras se conectarán los colectores del
proyecto en mención.
Es necesario se realice una limpieza adecuada del canal con la finalidad de
reconformar la sección necesaria para la correcta evacuación de
precipitaciones, además, se recomienda llevar mínimo un control semestral
del estado de los sumideros durante el verano y trimestral durante el invierno.
Deben respetarse la pendiente y diámetros durante la construcción del
sistema de drenaje.
Se efectuó el análisis de las interferencias entre los sistemas de alcantarillado
pluvial y sanitario.
Previo a la recepción de los trabajos, se deberá verificar la correcta
colocación de tuberías, interconexiones con cámaras de inspección y
sumideros, mediante el pase de cámara CCTV.
Se recomienda implementar un control más riguroso sobre los asentamientos
informales dado al grave impacto que tienen sobre los drenajes naturales de
la zona y la protección de estos drenajes mediante un estudio de parques
lineales integrales a lo largo de los canales. Se observó reiteradamente la
obstrucción o estrangulamiento de Canales debido al relleno no controlado
para la construcción de viviendas informales. Esta práctica perjudica
gravemente el escurrimiento de aguas lluvia generando vulnerabilidad
creciente a inundaciones. El estrangulamiento de canales es un problema
que actualmente ya incide en la mancha de inundación durante la época
de invierno.
A unos 10m. del cabezal aguas arriba del colector Ø1700mm existente, en el
Canal 88B; deberá realizarse un sedimentador con las siguientes
dimensiones: 1.50m de ancho por 1.0m de altura y por 20m de largo, que
servirá de retención de sedimentos, arrastres de troncos, rocas y palizada.
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
10. BIBLIOGRAFÍA
INEN. (1992). Normas para estudio y diseño de sistemas de agua potable y disposición de
aguas residuales para poblaciones mayores a 1000 habitantes. Ecuador.
INTERAGUA. (2015). Ajuste y Revisión del Plan Maestro de Agua Potable, Alcantarillado
Sanitario y Alcantarillado Pluvial. Guayaquil.
INTERAGUA. (2015). Manual de Diseño de Acueductos. Guayaquil.
INTERAGUA. (2015). Manual de Diseño de Redes de Alcantarillado.
Guayaquil.
APROBADO POR: