1.7.1.2.1 EXCAVACION MANUAL DE ZANJAS, ZAPATAS Y MUROS (MATERIAL SEMIROCOSO) M3 31.47 28.41 S/894.06
1.7.2.2.1 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE CAMARA SEPTICA M2 13.65 55.52 S/757.85
#REF! #REF!
#REF! #REF!
#REF! #REF!
AREA GEOGRAFICA1
INDICE DEL MES
#REF! #REF!
#REF! #REF!
#REF! #REF!
01.04.03.1 CONCRETO F'C=210 KG/CM2 PARA SOBRECIMIENTOS REFORZADOS M3 Err:509 PIEDRA CHANCADA DE 3/4" M3 0.72 Err:509 237.00 5 452.66 465.76 Err:509
CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.72 Err:509 22.00 21 471.42 473.39 Err:509
01.04.03.3 ACERO FY=4200 KG/CM2 EN SOBRECIMIENTO REFORZADOS kg Err:509 ALAMBRE NEGRO RECOCIDO # 16 KG 0.05 Err:509 4.00 2 575.97 795.07 Err:509
ACERO DE REFUERZO FY=4200 GRADO 6 KG 1.05 Err:509 3.30 2 575.97 795.07 Err:509
01.04.04.1 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 Err:509 PIEDRA CHANCADA DE 3/4" M3 0.72 Err:509 237.00 5 452.66 465.76 Err:509
CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.72 Err:509 22.00 21 471.42 473.39 Err:509
01.04.04.3 ACERO FY=4200 KG/CM2 EN COLUMNAS kg Err:509 ALAMBRE NEGRO RECOCIDO # 16 KG 0.05 Err:509 4.00 2 575.97 795.07 Err:509
ACERO DE REFUERZO FY=4200 GRADO 6 KG 1.05 Err:509 3.30 2 575.97 795.07 Err:509
01.04.05.1 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 Err:509 PIEDRA CHANCADA DE 1/2" M3 0.72 Err:509 237.00 5 452.66 465.76 Err:509
CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.72 Err:509 22.00 21 471.42 473.39 Err:509
01.04.05.3 ACERO FY=4200 KG/CM2 EN VIGAS kg Err:509 ALAMBRE NEGRO RECOCIDO # 16 KG 0.05 Err:509 4.00 2 575.97 795.07 Err:509
ACERO DE REFUERZO FY=4200 GRADO 6 KG 1.05 Err:509 3.30 2 575.97 795.07 Err:509
01.04.06.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 Err:509 PIEDRA CHANCADA DE 1/2" M3 0.72 Err:509 237.00 5 452.66 465.76 Err:509
CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.72 Err:509 22.00 21 471.42 473.39 Err:509
01.04.06.2 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA MADERA TORNILLO INC.CORTE
M2 Err:509 P2 5.20 Err:509 4.80 45 330.25 358.48 Err:509
P/ENCOFRADO P2
CLAVOS PARA MADERA C/C 3" KG 0.15 Err:509 5.00 2 575.97 795.07 Err:509
ALAMBRE NEGRO RECOCIDO # 8 KG 0.30 Err:509 4.00 2 575.97 795.07 Err:509
01.04.06.3 ACERO FY=4200 KG/CM2 EN LOSA ALIGERADA kg Err:509 ALAMBRE NEGRO RECOCIDO # 16 KG 0.05 Err:509 4.00 2 425.04 795.07 Err:509
ACERO DE REFUERZO FY=4200 GRADO 6 KG 1.05 Err:509 3.30 2 575.97 795.07 Err:509
01.05.01.1 MURO DE SOGA DE LADRILLO C/M 1:4 X 1.5CM. M2 Err:509 CLAVOS PARA MADERA C/C 3" KG 0.001 Err:509 4.00 2 575.97 795.07 Err:509
ARENA GRUESA PUESTO EN OBRA M3 0.03 Err:509 237.00 5 452.66 465.76 Err:509
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.20 Err:509 22.00 21 471.42 473.39 Err:509
01.05.01.2 MURO DE CABEZA DE LADRILLO DE ARCILLA K.K. C/M 1:4 X 1.5CM. M2 Err:509 CLAVOS PARA MADERA C/C 3" KG 0.001 Err:509 4.00 2 619.99 795.07 Err:509
ARENA GRUESA PUESTO EN OBRA M3 0.03 Err:509 237.00 5 452.66 465.76 Err:509
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.20 Err:509 22.00 21 471.42 473.39 Err:509
01.05.04.5 FALSO PISO DE 10 CM DE CONCRETO 1:10 M2 Err:509 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.43 Err:509 22.00 21 471.42 473.39 Err:509
HORMIGON M3 0.12 Err:509 170.00 5 452.66 465.76 Err:509
03.01.03.2 Err:509 M3 Err:509 PIEDRA CHANCADA DE 3/4" M3 0.72 Err:509 237.00 5 452.66 465.76 Err:509
CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.00 Err:509 22.00 21 471.42 473.39 Err:509
03.02.01.2 TRAZO Y REPLANTEO Err:509 Err:509 CLAVOS PARA MADERA C/C 3/4" KG 0.04 Err:509 4.00 2 575.97 795.07 Err:509
ACERO FY=4200 KG/CM2 KG 0.01 Err:509 3.30 2 575.97 795.07 Err:509
CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.02 Err:509 22.00 21 471.42 473.39 Err:509
HORMIGON (PUESTO EN OBRA) M3 0.01 Err:509 211.00 5 452.66 465.76 Err:509
Err:509 Err:509 M2 Err:509 PIEDRA CHANCADA DE 1/2" M3 0.07 Err:509 237.00 5 452.66 465.76 Err:509
CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.63 Err:509 22.00 21 471.42 473.39 Err:509
Err:509 Err:509 M3 Err:509 PIEDRA CHANCADA DE 1/2" M3 0.72 Err:509 237.00 5 452.66 465.76 Err:509
CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.00 Err:509 22.00 21 471.42 473.39 Err:509
Err:509 Err:509 kg Err:509 ALAMBRE NEGRO RECOCIDO # 16 KG 0.05 Err:509 4.00 2 575.97 795.07 Err:509
ACERO DE REFUERZO FY=4200 GRADO 6 KG 1.05 Err:509 3.30 2 575.97 795.07 Err:509
RESUMEN DE MONTOS DEFLECTADOS
ACERO DE COSNTRUCCIÓN LISO Err:509
AGREGADO GRUESO Err:509
MADERA TERCIADA PARA ENCOFRADO Err:509
CEMENTO PORTLAND TIPO I Err:509
AMORTIZACION Err:509
CÁLCULO DE LA CONSTANTE DE REAJUSTES DE PRECIOS "K"
MES DE ABRIL DEL 2021
OBRA:
#REF!
ENTIDAD : #REF!
UBICACIÓN : #REF!
CONTRATISTA : #REF!
SUPERVISOR : #REF!
PRESUP. BASE :
FECHA BASE : MAYO DEL 2018.
RT
RT == V
V xx (( K-1
K-1 ))
Err:509
K = 0.406*(MOr / MOo) + 0.14*(Ar / Ao) + 0.139*(AGr / AGo) + 0.126*(Cr / Co) + 0.105*(MAr / To) + 0.084*(IBr / IBo)
Err:509
K = 0.423*(MOr / MOo) + 0.156*(Cr / Co) + 0.133*(AGr / AGo) + 0.116*(Ar / Ao) + 0.106*(Ir / Io)
Err:509
Err:509
K = 0.396*(MOr / MOo) + 0.212*(Ar / Ao) + 0.103*(Cr / Co) + 0.15*(Mr / Mo) + 0.14*(Ir / Io)
Err:509
K = 0.082*(Ir / Io) + 0.331*(MOr / MOo) + 0.252*(AGr / AGo) + 0.202*(Cr / Co) + 0.13*(Ar / Ao)
K = 0.135*(Ir / Io) + 0.187*(MOr / MOo) + 0.173*(Pr / Po) + 0.254*(AGr / AGo) + 0.157*(Ar / Ao) + 0.09*(Cr / Co)
fecha Ene.21
k= 1.100
RT= Err:508
DEDUCCION POR ADELANTO DE MATERIALES - REJUSTE QUE NO CORRESPONDE
MES DE ABRIL DEL 2021
ENTIDAD : #REF!
UBICACIÓN : #REF!
CONTRATISTA : #REF!
SUPERVISOR : #REF!
PRESUP. BASE : #REF!
VALORIZACION ADELANTO PAGADO COEFICIENTE ADELANTO INDICES ADELANTO ADELANTO DEDUCCION AMORTIZACION
MONTO MONTO COEF.INCID. INCID. UTILIZADO DEFLACT. UTILIZADO
No. MES V FECHA A C % AU=C*%*V Io Ia Ir AD=A*Io/Ia APROBADO D A
AGREGADO GRUESO
05 Jan-21 Err:508 Dec-20 114,676.74 0.139 100.000% Err:508 452.66 456.88 456.88 113,617.52 Err:509 Err:509 Err:509
VALORIZACION ADELANTO PAGADO COEFICIENTE ADELANTO INDICES ADELANTO ADELANTO DEDUCCION AMORTIZACION
MONTO MONTO COEF.INCID. INCID. UTILIZADO DEFLACT. UTILIZADO
No. MES V FECHA A C % AU=C*%*V Io Ia Ir AD=A*Io/Ia APROBADO D A
CEMENTO PORTLAND TIPO I
21 Jan-21 Err:508 Dec-20 100,132.42 0.126 100.000% Err:508 452.66 471.42 471.42 96,147.68 Err:509 Err:509 Err:509
CONSORCIO MILENIO
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE PACORA
CONTRATISTA : CONSORCIO EJECUTOR CIMENTA
RESIDENTE : Ing. LUCILO DÍAZ DÍAZ
SUPERVISION : CONSORCIO MILENIO
SUPERVISOR : ing. JORGE PEREZ ACUÑA
FECHA : OCTUBRE DEL 2017
EXIST. SP6 7.60 5.70 53.209 53.356 50.131 50.165 3.078 3.191 0.20 3.278 3.391 3.334 200 0.00 0.00 0.00 0.00 7.60 0.00 0.00 0.00 7.780
SP6 SP7 65.00 63.10 53.356 53.469 50.165 50.425 3.191 3.044 0.20 3.391 3.244 3.318 200 0.00 0.00 0.00 0.00 65.00 0.00 0.00 0.00 86.132
SP7 SP8 65.00 63.10 53.469 53.486 50.425 50.685 3.044 2.801 0.20 3.244 3.001 3.123 200 0.00 0.00 0.00 0.00 65.00 0.00 0.00 0.00 86.132
SP8 SP9 65.00 63.10 53.486 53.558 50.685 50.945 2.801 2.613 0.20 3.001 2.813 2.907 200 0.00 0.00 0.00 65.00 0.00 0.00 0.00 0.00 86.132
SP9 SP10 65.00 63.10 53.558 53.575 50.945 51.205 2.613 2.370 0.20 2.813 2.570 2.692 200 0.00 0.00 0.00 65.00 0.00 0.00 0.00 0.00 86.132
SP10 SP11 65.00 63.10 53.575 53.570 51.205 51.530 2.370 2.040 0.20 2.570 2.240 2.405 200 0.00 0.00 65.00 0.00 0.00 0.00 0.00 0.00 86.132
SP11 SP12 65.00 63.10 53.570 53.655 51.530 51.855 2.040 1.800 0.20 2.240 2.000 2.120 200 0.00 0.00 65.00 0.00 0.00 0.00 0.00 0.00 86.132
CANTIDAD ACUMULADA 0.00 0.00 130.00 130.00 137.60 0.00 0.00 0.00 524.57
TOTAL 397.60 384.30 BZ<3m 200 0.00 0.00 130.00 130.00 137.60 0.00 0.00 0.00
DIFERENCIADO POR
BZ>3m 315 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DIAMETRO DE TUBERÍA