Cota tanque cerca de hatillo 208 msmm

cota zona de planta potabilizadora 120 msmm

Analisis de simulacion desde la zona alta hasta la zona de planta

Diámetro tuberias (pulgadas) Material Caudal simulado


Número
(lps) tubería en la conducción
Caudal por linea (lps) Velocidad (m/s) Longitud (mt) C

78 H.D. 10,000.0 2.0 5,000.0 1.62 51,264.00 130

Nudo Inicial Nudo Final Longitud (m) Diametro (in) Caudal (L/s) Hazen-Williams C Velocidad (m/s) Perdida (m)
DEPOSITO J-102 424 78 5,000 130 1.62 0.39
J-102 J-103 122 78 5,000 130 1.62 0.11
J-103 J-104 531 78 5,000 130 1.62 0.49
J-104 J-105 156 78 5,000 130 1.62 0.14
J-105 J-106 112 78 5,000 130 1.62 0.1
J-106 J-107 74 78 5,000 130 1.62 0.07
J-107 J-108 47 78 5,000 130 1.62 0.04
J-108 J-109 310 78 5,000 130 1.62 0.28
J-109 J-110 494 78 5,000 130 1.62 0.45
J-110 J-111 347 78 5,000 130 1.62 0.32
J-111 J-112 207 78 5,000 130 1.62 0.19
J-112 J-113 271 78 5,000 130 1.62 0.25
J-113 J-114 256 78 5,000 130 1.62 0.23
J-114 J-115 314 78 5,000 130 1.62 0.29
J-116 J-117 949 78 5,000 130 1.62 0.87
J-118 J-119 353 78 5,000 130 1.62 0.32
J-119 J-120 506 78 5,000 130 1.62 0.46
J-120 J-121 318 78 5,000 130 1.62 0.29
J-122 J-123 847 78 5,000 130 1.62 0.77
J-123 J-124 373 78 5,000 130 1.62 0.34
J-125 J-126 587 78 5,000 130 1.62 0.54
J-126 J-127 274 78 5,000 130 1.62 0.25
J-127 J-128 1,362 78 5,000 130 1.62 1.25
J-129 J-130 273 78 5,000 130 1.62 0.25
J-131 J-132 438 78 5,000 130 1.62 0.4
J-132 J-133 191 78 5,000 130 1.62 0.18
J-134 J-135 595 78 5,000 130 1.62 0.54
J-174 J-173 471 78 5,000 130 1.62 0.43
J-135 J-178A 639 78 5,000 130 1.62 0.58
J-133 J-179 651 78 5,000 130 1.62 0.6
J-179 J-134 793 78 5,000 130 1.62 0.73
J-178A J-178B 1,064 78 5,000 130 1.62 0.97
J-178B J-136 171 78 5,000 130 1.62 3.04
J-136 J-181 368 78 5,000 130 1.62 0.34
J-181 J-182 657 78 5,000 130 1.62 0.6
J-182 J-174 451 78 5,000 130 1.62 0.41
J-173 J-183 190 78 5,000 130 1.62 0.17
Nudo Inicial Nudo Final Longitud (m) Diametro (in) Caudal (L/s) Hazen-Williams C Velocidad (m/s) Perdida (m)
J-183 J-184 78 78 5,000 130 1.62 0.07
J-184 J-172 375 78 5,000 130 1.62 0.34
J-172 J-185 204 78 5,000 130 1.62 0.19
J-185 J-137 376 78 5,000 130 1.62 0.34
J-137 J-186 177 78 5,000 130 1.62 0.16
J-186 J-187 172 78 5,000 130 1.62 0.16
J-187 J-259 168 78 5,000 130 1.62 0.15
J-117 J-193 175 78 5,000 130 1.62 0.16
J-193 J-118 272 78 5,000 130 1.62 0.25
J-115 J-194 164 78 5,000 130 1.62 0.15
J-194 J-116 189 78 5,000 130 1.62 0.17
J-259 J-260 240 78 5,000 130 1.62 0.22
J-260 J-261 461 78 5,000 130 1.62 0.42
J-261 J-262 340 78 5,000 130 1.62 0.31
J-262 J-263 238 78 5,000 130 1.62 0.22
J-263 J-264 76 78 5,000 130 1.62 0.07
J-264 J-265 245 78 5,000 130 1.62 0.22
J-265 J-266 133 78 5,000 130 1.62 0.12
J-266 J-267 180 78 5,000 130 1.62 0.16
J-267 J-268 63 78 5,000 130 1.62 0.06
J-268 J-269 252 78 5,000 130 1.62 0.23
J-269 J-270 724 78 5,000 130 1.62 0.66
J-270 J-271 314 78 5,000 130 1.62 0.29
J-271 J-272 373 78 5,000 130 1.62 0.34
J-272 J-273 344 78 5,000 130 1.62 0.31
J-273 J-274 352 78 5,000 130 1.62 0.32
J-274 J-275 754 78 5,000 130 1.62 0.69
J-275 J-276 729 78 5,000 130 1.62 0.67
J-276 J-277 292 78 5,000 130 1.62 0.27
J-277 J-278 527 78 5,000 130 1.62 0.48
J-278 J-279 735 78 5,000 130 1.62 0.67
J-279 J-280 1,564 78 5,000 130 1.62 1.43
J-282 J-283 396 78 5,000 130 1.62 0.36
J-284 J-285 1,222 78 5,000 130 1.62 1.12
J-285 J-286 435 78 5,000 130 1.62 0.4
J-286 J-287 404 78 5,000 130 1.62 0.37
J-287 J-288 578 78 5,000 130 1.62 0.53
J-288 J-289 450 78 5,000 130 1.62 0.41
J-290 J-291 380 78 5,000 130 1.62 0.35
J-291 J-292 798 78 5,000 130 1.62 0.73
J-294 J-295 1,219 78 5,000 130 1.62 1.11
J-295 J-296 1,021 78 5,000 130 1.62 0.93
J-296 J-297 1,618 78 5,000 130 1.62 1.48
J-297 J-298 154 78 5,000 130 1.62 0.14
J-298 J-299 772 78 5,000 130 1.62 0.71
J-299 J-300 461 78 5,000 130 1.62 0.42
Nudo Inicial Nudo Final Longitud (m) Diametro (in) Caudal (L/s) Hazen-Williams C Velocidad (m/s) Perdida (m)
J-280 J-315 211 78 5,000 130 1.62 0.19
J-315 J-316 253 78 5,000 130 1.62 0.23
J-316 J-281 241 78 5,000 130 1.62 0.22
J-281 J-317 562 78 5,000 130 1.62 0.51
J-317 J-318 308 78 5,000 130 1.62 0.28
J-318 J-282 346 78 5,000 130 1.62 0.32
J-283 J-319 950 78 5,000 130 1.62 0.87
J-319 J-284 1,201 78 5,000 130 1.62 1.1
J-292 J-320 598 78 5,000 130 1.62 0.55
J-320 J-293 240 78 5,000 130 1.62 0.22
J-293 J-321 254 78 5,000 130 1.62 0.23
J-321 J-322 392 78 5,000 130 1.62 0.36
J-322 J-294 1,402 78 5,000 130 1.62 1.28
J-325 J-122 825 78 5,000 130 1.62 0.75
J-121 J-326 673 78 5,000 130 1.62 0.62
J-326 J-325 241 78 5,000 130 1.62 0.22
J-124 J-327 292 78 5,000 130 1.62 0.27
J-327 J-125 516 78 5,000 130 1.62 0.47
J-128 J-328 859 78 5,000 130 1.62 0.79
J-328 J-129 219 78 5,000 130 1.62 0.2
J-130 J-329 142 78 5,000 130 1.62 0.13
J-329 J-330 291 78 5,000 130 1.62 0.27
J-330 J-131 539 78 5,000 130 1.62 0.49
J-289 J-331 1,139 78 5,000 130 1.62 1.04
J-331 J-290 136 78 5,000 130 1.62 0.12
J-300 PLANTA 1,054 78 5,000 130 1.62 0.96

Cota tanque cerca de la potabilizadora 105 msmm


cota zona empalme circunvalacion 29.9 msmm

Analisis de simulación desde la zona de los depositos hasta la circunvalacion


Número tubería en la
Diámetro tuberias (pulgadas) Material Caudal simulado (lps) Caudal por linea (lps) Velocidad (m/s) Longitud (mt) C
conducción
78 H.D. 10,000.0 2.0 5,000.0 1.62 15,440.00 130

Nudo Inicial Nudo Final Longitud (m) Diametro (in) Caudal (L/s) Hazen-Williams C Velocidad (m/s) Perdida (m)
R-4 J-334 664 78 5,000 130 1.62 0.61
J-334 J-335 100 78 5,000 130 1.62 0.09
J-335 J-336 245 78 5,000 130 1.62 0.22
J-336 J-337 223 78 5,000 130 1.62 0.2
J-337 J-338 176 78 5,000 130 1.62 0.16
J-338 J-339 161 78 5,000 130 1.62 0.15
J-339 J-340 144 78 5,000 130 1.62 0.13
J-340 J-341 297 78 5,000 130 1.62 0.27
J-341 J-342 236 78 5,000 130 1.62 0.22
J-342 J-343 75 78 5,000 130 1.62 0.07
J-343 J-344 59 78 5,000 130 1.62 0.05
J-344 J-345 257 78 5,000 130 1.62 0.24
J-345 J-346 228 78 5,000 130 1.62 0.21
J-346 J-347 370 78 5,000 130 1.62 0.34
J-347 J-348 508 78 5,000 130 1.62 0.46
J-348 J-349 584 78 5,000 130 1.62 0.53
J-349 J-350 375 78 5,000 130 1.62 0.34
J-350 J-351 254 78 5,000 130 1.62 0.23
J-351 J-352 134 78 5,000 130 1.62 0.12
J-352 J-353 344 78 5,000 130 1.62 0.31
J-353 J-354 215 78 5,000 130 1.62 0.2
J-354 J-355 273 78 5,000 130 1.62 0.25
J-355 J-356 369 78 5,000 130 1.62 0.34
J-356 J-357 531 78 5,000 130 1.62 0.49
J-357 J-358 346 78 5,000 130 1.62 0.32
J-358 J-359 634 78 5,000 130 1.62 0.58
J-359 J-360 286 78 5,000 130 1.62 0.26
J-360 J-361 331 78 5,000 130 1.62 0.3
J-361 J-362 389 78 5,000 130 1.62 0.36
J-362 J-363 1,238 78 5,000 130 1.62 1.13
J-363 J-364 863 78 5,000 130 1.62 0.79
J-364 J-365 227 78 5,000 130 1.62 0.21
J-365 J-366 164 78 5,000 130 1.62 0.15
J-366 J-367 506 78 5,000 130 1.62 0.46
J-367 J-368 797 78 5,000 130 1.62 0.73
J-368 J-369 1,054 78 5,000 130 1.62 0.96
J-369 J-370 658 78 5,000 130 1.62 0.6
J-370 J-371 205 78 5,000 130 1.62 0.19
J-371 J-372 421 78 5,000 130 1.62 0.38
J-372 J-373 211 78 5,000 130 1.62 0.19
J-373 J-374 89 78 5,000 130 1.62 0.08
J-374 J-375 199 78 5,000 130 1.62 0.18
Presión de llegada en
Ancho de las tuberias una del lado de otra zona de planta (mH2O)
cota de referencia 120
msnm
3.96341463414634 38.00

Presión (inicio) (m H2O) Presión (final) (m H2O)


0 69
69 72
72 72
72 71
71 76
76 75
75 79
79 80
80 90
90 101
101 98
98 99
99 103
103 117
122 108
109 113
113 110
110 124
121 110
110 100
89 88
88 85
85 83
98 90
95 95
95 80
70 64
17 38
64 68
80 77
77 70
68 46
46 43
43 49
49 27
27 17
38 49
Presión (inicio) (m H2O) Presión (final) (m H2O)
49 38
38 41
41 55
55 68
68 65
65 75
75 69
108 103
103 109
117 113
113 122
69 68
68 65
65 71
71 67
67 73
73 79
79 79
79 82
82 85
85 100
100 87
87 94
94 89
89 99
99 83
83 85
85 68
68 68
68 98
98 73
73 73
107 108
118 123
123 127
127 130
130 121
121 121
127 134
134 137
130 129
129 102
102 135
135 134
134 115
115 104
Presión (inicio) (m H2O) Presión (final) (m H2O)
73 78
78 89
89 101
101 103
103 103
103 107
108 112
112 118
137 137
137 134
134 133
133 126
126 130
124 121
124 131
131 124
100 94
94 89
83 102
102 98
90 94
94 97
97 95
121 125
125 127
104 38

on
Presión de llegada en
zona de la autopista
Ancho de las tuberias una del lado de otra
(mH2O) cota de
referencia 29.9 msnm
3.96341463414634 65.00

Presión (inicio) (m H2O) Presión (final) (m H2O)


0 33
33 34
34 50
50 40
40 51
51 58
58 61
61 55
55 50
50 51
51 47
47 35
35 42
42 35
35 34
34 42
42 34
34 33
33 32
32 29
29 22
22 19
19 12
12 10
10 6
6 5
5 3
3 14
14 11
11 22
22 38
38 35
35 36
36 31
31 44
44 44
44 49
49 52
52 48
48 57
57 60
60 65
Simulación desde presa don juan hata zona
Lugar Y x
Zona de planta 2,064,650.41 405,496.69
zona de tanque
ponto de empalme
Nudo Inicial Nudo Final Longitud (m) Diametro (in)
PRESA DON JUAN J-403 401 78
J-386 J-385 751 78
J-387 J-386 1,198 78
J-388 J-387 651 78
J-389 J-388 3,843 78
J-390 J-389 317 78
J-391 J-390 747 78
J-392 J-391 511 78
J-393 J-392 1,294 78
J-394 J-393 640 78
J-395 J-394 1,038 78
J-396 J-395 832 78
J-397 J-396 1,675 78
J-398 J-397 513 78
J-399 J-398 801 78
J-400 J-399 615 78
J-401 J-400 938 78
J-402 J-401 902 78
J-403 J-402 827 78
J-385 J-405 1,699 78
J-405 J-406 1,776 78
J-406 ZONA DE PLANTA 2 M3/S 1,524 78

Simulación desde E.B. hasta deposito reg


Lugar Y x
Zona de tanque 2,061,583.70 404,121.17
Longitud linea 4,995.00 mts
TDH 29.5 mts
Potencia total requerida 912.774010408453 HP

Nudo Inicial Nudo Final Longitud (m) Diametro (in)


R-6 PMP-4 19 48
PMP-4 J-409 13 48
J-409 J-410 158 48
J-410 J-411 631 48
J-411 J-412 335 48
J-412 J-413 1,300 48
J-413 J-414 162 48
J-414 J-415 903 48
J-415 T-4 784 48

Simulación desde deposito regulador hasta cir


Nudo Inicial Nudo Final Longitud (m) Diametro (in)
T-4 J-417 190 78
J-417 J-418 545 78
J-418 J-419 996 78
J-419 J-420 1,090 78
J-420 J-421 249 78
J-421 J-422 651 78
J-422 J-423 354 78
J-423 J-424 607 78
J-424 CIRCUNVALACION 493 78
desde presa don juan hata zona de planta

Caudal (L/s) Hazen-Williams C Velocidad (m/s) Perdida (m) Presión (inicio) (m H2O) Presión (final) (m H2O)
2,000 130 0.65 0.07 0 18
2,000 130 0.65 0.13 20 16
2,000 130 0.65 0.2 16 20
2,000 130 0.65 0.14 29 16
2,000 130 0.65 0.64 25 29
2,000 130 0.65 0.05 23 25
2,000 130 0.65 0.13 27 23
2,000 130 0.65 0.09 19 27
2,000 130 0.65 0.22 15 19
2,000 130 0.65 0.11 11 15
2,000 130 0.65 0.17 14 11
2,000 130 0.65 0.14 15 14
2,000 130 0.65 0.28 17 15
2,000 130 0.65 0.09 18 17
2,000 130 0.65 0.13 16 18
2,000 130 0.65 0.1 16 16
2,000 130 0.65 0.16 21 16
2,000 130 0.65 0.15 19 21
2,000 130 0.65 0.14 18 19
2,000 130 0.65 0.28 16 24
2,000 130 0.65 0.3 24 18
2,000 130 0.65 0.26 18 9

ión desde E.B. hasta deposito regulador

Caudal (L/s) Hazen-Williams C Velocidad (m/s) Perdida (m) Presión (inicio) (m H2O) Presión (final) (m H2O)
2,008 130 1.72 0.03 0 0
2,008 130 1.72 0.02 28 27
2,008 130 1.72 0.28 27 25
2,008 130 1.72 1.13 25 37
2,008 130 1.72 0.6 37 23
2,008 130 1.72 2.33 23 24
2,008 130 1.72 0.29 24 19
2,008 130 1.72 1.62 19 10
2,008 130 1.72 1.41 10 2

sde deposito regulador hasta circunvalacion


Caudal (L/s) Hazen-Williams C Velocidad (m/s) Perdida (m) Presión (inicio) (m H2O) Presión (final) (m H2O)
2,000 130 0.65 0.03 1 4
2,000 130 0.65 0.09 4 7
2,000 130 0.65 0.17 7 15
2,000 130 0.65 0.18 15 12
2,000 130 0.65 0.04 12 12
2,000 130 0.65 0.11 12 17
2,000 130 0.65 0.06 17 19
2,000 130 0.65 0.1 19 20
2,000 130 0.65 0.08 20 23