TUBERIAS NUDOS
PTO INCIO PTO FINAL LONGITUD DESCRIPCION COTA
RESER_01 J-1 56.29 J-1 1,848.62
J-1 J-2 50.22 J-2 1,846.25
J-1 CRP-01 91.29 J-3 1,814.69
CRP-01 J-3 15.41 J-4 1,804.40
J-3 J-4 207.69 J-5 1,721.96
J-3 CRP-02 147.14 J-6 1,691.84
CRP-02 J-5 47.49 J-7 1,605.00
J-5 J-6 203.06 J-8 1,706.72
J-5 CRP-03 86.65 J-9 1,700.46
CRP-03 CRP-04 195.62 J-10 1,646.24
CRP-04 J-7 87.79 J-11 1,628.84
J-5 J-8 51.34 RESER_01 1,863.02
J-8 J-9 16.78 CRP-01 1,824.46
J-8 CRP-05 226.72 CRP-02 1,740.93
CRP-05 J-10 51.01 CRP-03 1,697.34
J-10 J-11 115.62 CRP-04 1,648.38
CRP-05 1,666.59
Columna3

DEMANDA (L/S)
0
0.013
0 51 J-1 1,848.62 <None> <Collection: 0
0.013 53 J-2 1,846.25 <None> <Collection: 0.013
0 297 J-3 1,814.69 <None> <Collection: 0
0.013 56 J-4 1,804.40 <None> <Collection: 0.013
0.013 42 J-5 1,721.96 <None> <Collection: 0
0 62 J-6 1,691.84 <None> <Collection: 0.013
0.013 76 J-7 1,605.00 <None> <Collection: 0.013
0.013 68 J-8 1,706.72 <None> <Collection: 0
0.026 263 J-9 1,700.46 <None> <Collection: 0.013
0.1041 82 J-10 1,646.24 <None> <Collection: 0.013
84 J-11 1,628.84 <None> <Collection: 0.026

J-1
J-2
J-3
J-4
J-5
J-6
J-7
J-8
J-9
J-10
J-11
1,863.01 14.37
1,863.01 16.73
1,824.46 9.75
1,824.45 20.02
1,740.93 18.93
1,740.92 48.98
1,639.11 34.04
1,740.93 34.13
1,740.93 40.38
1,666.59 20.31
1,666.58 37.66
PEFIL TÉCNICO 

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE SANEAMIENTO INTEGRAL EN LOS SECTORES DE HUAYNAPATA, LIMOMPATA, TUNASCHAYA Y SULLUCUYOC EN LA ZONAL DE ECHARATI, DEL DISTRITO DE
ECHARTI - LA CONVENCION - CUSCO".

RED DE DISTRIBUCION ABIERTA


SITEMA 01
POBLACION FUTURA (Pf)= 32.00 habitantes
DOTACION= 120.00 lt/hab/dia
CAUDADL DE DISEÑO (Qd)= 0.11 lt/s
FAMILIAS BENEFICIADAS= 8.00

CALCULO DE GASTOS POR TRAMO


TRAMO N° DE HAB. GASTO
FAMILIAS
INICIO FIN Pf por tramo (l/s)
RESER_01 J-1 8 32 0.33
J-1 J-2 2 8 0.22
J-1 CRP-01 7 28 0.31
CRP-01 J-3 7 28 0.31
J-3 J-4 2 8 0.22
J-3 CRP-02 6 24 0.30
CRP-02 J-5 6 24 0.30
J-5 J-6 2 8 0.22
J-5 CRP-03 2 8 0.22
CRP-03 CRP-04 2 8 0.22
CRP-04 J-7 2 8 0.22
J-5 J-8 5 20 0.28
J-8 J-9 2 8 0.22
J-8 CRP-05 2 8 0.22
CRP-05 J-10 2 8 0.22
J-10 J-11 2 8 0.22
total 41

CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION

tramo gasto (l/s) perdida de carga COTA DE TERRENO ALTURA PIEZOMETRICA presion
long (m) diam(pulg) veloc (m/s)
INICIO FIN tramo diseño unit(S)m/km (m) inicial final inicial final inicial final

CAP-1 CRP-01 0.111 0.111 138.14 1 0.2 3.160 0.436 2069.770 2017.120 2069.77 2069.33 0.00 52.21

CRP-01 CRP-02 0.111 0.111 254.26 1 0.2 3.160 0.803 2017.120 1920.230 2017.12 2016.32 0.00 96.09

CRP-02 RESERV-01 0.111 0.111 150.13 1 0.2 3.160 0.474 1920.230 1863.020 2069.33 1919.76 0.00 56.74
542.53
PEFIL TÉCNICO 

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE SANEAMIENTO INTEGRAL EN LOS SECTORES DE HUAYNAPATA, LIMOMPATA, TUNASCHAYA Y SULLUCUYOC EN LA ZONAL DE ECHARATI, DEL DISTRITO DE
ECHARTI - LA CONVENCION - CUSCO".

RED DE DISTRIBUCION ABIERTA


SITEMA 01
CALCULO HIDRAULICO DE LA RED DE DISTRIBUCION- SISTEMA RAMIFICADO

tramo gasto (l/s) perdida de carga COTA DE TERRENO ALTURA PIEZOMETRICA presion
long (m) diam(pulg) veloc (m/s) OBSERV
INICIO FIN tramo diseño unit(S)m/km (m) inicial final inicial final inicial final ACIONES

RESER_01 J-1 0.333 0.333 56.29 1 0.7 24.069 1.355 1863.020 1848.620 1863.02 1861.67 0.00 13.05
J-1 J-2 0.220 0.220 50.22 1 0.4 11.195 0.562 1848.620 1846.250 1861.67 1861.10 13.05 14.85
J-1 CRP-01 0.314 0.314 91.29 1 0.6 21.680 1.979 1848.620 1824.460 1861.10 1861.49 14.85 37.03 CRP-01
CRP-01 J-3 0.314 0.314 20.58 1 0.6 21.680 0.446 1824.460 1814.690 1861.49 1824.01 0.00 9.32
J-3 J-4 0.314 0.314 56.22 3/4 1.1 88.014 4.948 1814.690 1804.400 1861.49 1819.07 9.32 14.67
J-3 CRP-02 0.220 0.220 122.9 3/4 0.8 45.450 5.586 1814.690 1740.930 1824.01 1818.43 9.32 77.50 CRP-02
CRP-02 J-5 0.220 0.220 71.57 3/4 0.8 45.450 3.253 1740.930 1721.960 1740.93 1737.68 0.00 15.72
J-5 J-6 0.295 0.295 203.06 3/4 1.0 78.324 15.904 1721.960 1691.840 1721.96 1721.77 15.72 29.93
J-5 CRP-03 0.295 0.295 67.22 3/4 1.0 78.324 5.265 1721.960 1697.340 1721.96 1746.63 29.93 49.29 CRP-03
CRP-03 CRP-04 0.295 0.295 12.29 3/4 1.0 78.324 0.963 1697.340 1648.380 1697.34 1696.38 0.00 48.00 CRP-04
CRP-04 J-7 0.220 0.220 87.79 3/4 0.8 45.450 3.990 1648.380 1605.000 1648.38 1644.39 0.00 39.39
J-5 J-8 0.220 0.220 51.34 1 0.4 11.195 0.575 1721.960 1706.720 1721.96 1737.10 15.72 30.38
J-8 J-9 0.220 0.220 163.14 3/4 0.8 45.450 7.415 1706.720 1700.460 1706.72 1729.69 30.38 29.23
J-8 CRP-05 0.220 0.220 15.44 1 0.4 11.195 0.173 1706.720 1666.590 1706.72 1735.77 29.23 69.18 CRP-05
CRP-05 J-10 0.220 0.220 51.01 3/4 0.8 45.450 2.318 1666.590 1646.240 1666.59 1664.27 0.00 18.03
J-10 J-11 0.275 0.275 68 3/4 1.0 68.706 4.672 1646.240 1628.840 1646.24 1659.60 18.03 30.76
257 T-1 54.42 56.29 RESER_01 J-1 43.4 PVC
54 T-2 50.16 50.22 J-1 J-2 43.4 PVC
296 T-3 88.04 91.29 J-1 CRP-01 43.4 PVC
298 T-4 11.91 15.41 CRP-01 J-3 43.4 PVC
300 T-5 207.44 207.69 J-3 J-4 29.4 PVC
299 T-6 127.33 147.14 J-3 CRP-02 43.4 PVC
43 T-7 43.54 47.49 CRP-02 J-5 43.4 PVC
289 T-8 200.81 203.06 J-5 J-6 29.4 PVC
302 T-9 83.08 86.65 J-5 CRP-03 29.4 PVC
303 T-10 186.75 195.62 CRP-03 CRP-04 29.4 PVC
294 T-11 80.89 87.79 CRP-04 J-7 29.4 PVC
69 T-12 49.03 51.34 J-5 J-8 43.4 PVC
264 T-13 15.57 16.78 J-8 J-9 29.4 PVC
282 T-14 223.14 226.72 J-8 CRP-05 43.4 PVC
283 T-15 46.78 51.01 CRP-05 J-10 43.4 PVC
85 T-16 114.3 115.62 J-10 J-11 29.4 PVC
150 False 0.1041 0.07 0.01
150 False 0.013 0.01 0
150 False 0.0911 0.06 0.02
150 False 0.0911 0.06 0
150 False 0.013 0.02 0.01
150 False 0.0781 0.05 0.02
150 False 0.0781 0.05 0
150 False 0.013 0.02 0.01
150 False 0.013 0.02 0
150 False 0.013 0.02 0.01
150 False 0.013 0.02 0
150 False 0.0521 0.04 0
150 False 0.013 0.02 0
150 False 0.039 0.03 0.01
150 False 0.039 0.03 0
150 False 0.026 0.04 0.01