Está en la página 1de 9

OPERADORA CICSA, S. A. DE C. V.

REPORTE DE INTERPRETACION PARA LA PRUEBA RADIOGRAFICA TECNICA/RESULTADOS


(INTERPRETATION REPORT FOR THE RADIOGRAPHIC TEST TECHNIQUE/RESULTS)

No. RT-003-22-TX

TAREA (JOB): 13145 UNIDAD (UNIT): 1 No. TOTAL PELICULAS (TOTAL FILMS): 7
CLIENTE (CUSTOMER): PTI-INFRAESTRUCTURA DE DESARROLLO S.A. DE C.V. No. IDENT. (TAG): DT-22103
PROCEDIMIENTO (PROCEDURE): X IS-CAL-006-TX A3 OTRO (OTHER) N/A
CODIGOS (CODES): X ASME ED. 2019 ADD. N/A SEC. V ART. 2; SEC. VIII DIV 1 ; API-660;
X OTROS (OTHERS): ET-028-PEMEX-2019 XEVALUACION (EVALUATION): UW-51
FUENTE (SOURCE): X IR-192; CO-60; Se 75; OTRO (OTHER): N/A ACTIVIDAD (ACTIVITY): 51 Ci
PUNTO FOCAL (FOCAL SPOT): 1.8 X 2.6mm DIST. FUENTE-OBJETO. (SOURCE TO OBJECT DISTANCE) : 428.7 mm
MAX. DIST. LADO FUENTE-PELICULA (MAX. DISTANCE SOURCE SIDE TO FILM): 457.2 mm
MATERIAL BASE (BASE MAT'L.) SA-516-70 ESPESOR (THICKNESS): 34.9 REFUERZO (REINFORC.): 2.5 mm
PANTALLAS(SCREENS): MATERIAL/ESPESOR (THICKNESS): PLOMO ANTERIOR (FRONT) 0.005 mm ,POSTERIOR (REAR): 0.01 mm
TECNICA (TECHNIQUE): EXPOSICION (EXPOSURE): PARED (WALL) X SENCILLA (SINGLE); DOBLE (DOUBLE) UNIDADES: PULG
VISTA (VIEWING): PARED (WALL); X SENCILLA (SINGLE) DOBLE (DOUBLE) X MILIMETROS
No. PELICULA (FILM): FUJI IX TIPO (TYPE): II FABRICANTE (MANUFACTURER): FUJI
PELICULAS POR CHASIS(FILM PER HOLDER): 1 RANGO DENSIDAD (DENSITY RANGE): 2.0-4.0

DISCONTINUIDAD (INDICATION) REPARACION (REPAIR)

CONTRASTE (WINDOW)
(FILM)/ F:FUENTE(SOURCE)

TIPO ALAMBRE

RESULTADO (RESULT)
PROCESO (PROCCES)

SOLDADOR (WELDER)

IDENTIFICACION (I.D.)

ILUMINACION (LEVEL)
DENSIDAD (DENSITY)
POR PUNTOS (SPOT)
(RADIOGRAPHY N°)
No. RADIOGRAFIA

CORDON (SEAM)

FECHA (DATE)

LADO(SIDE): P: PELICULA
(PENETRAMETER)
PENETRAMETRO

TAMAÑO (SIZE) OBSERVACIONES


100%

TIPO (TYPE)

RESULTADO
(PROCCES)

SOLDADOR
(NUMBER)

PROCESO

(WELDER)

(RESULT)
NUMERO
(REMARKS)

COLUMNA DE LAVADO DE ALQUILADO CON AGUA 2015-2015


0-1 - 100% - 1B/10 S E - A - - - - 3.1 - - -
1-2 - 100% - 1B/10 S D - A - - - - 3.1 - - -
2-3 - 100% - 1B/10 S - - A - - - - 3.2 - - -
3-4 FCAW 3T/43T LONGITUDINAL - 11-02-22 100% - 1B/10 S - - A - - - - 3.2 - - -
4-5 - 100% - 1B/10 S - - A - - - - 3.2 - - -
5-6 - 100% - 1B/10 S - - A - - - - 3.2 - - -
6-7 - 100% - 1B/10 S D - A - - - - 3.3 - - -

A) FUSION INCOMPLETA (INCOMPLETE FUSION) I) DEFECTOS DE SUPERFICIE (SURFACE DEFECTS) AS (SAW): ARCO SUMERGIDO.
B) PENETRACION INCOMPLETA (INCOMPLETE PENETRATION) J) HOYO DE ARQUEO (CRATER PIT) AMP (SMAW): ARCO METALICO PROTEGIDO
C) FRACTURA (CRACK) K) RAIZ CONCAVA (ROOT CONCAVITY) AMPG (GMAW): ARCO METALICO PROTEGIDO CON GAS
D) ESCORIA (SLAG) L) INCLUSION DE GAS (GAS INCL) AMCF (FCAW) ARCO METALICO CON CENTRO DE FUNDENTE.
E) POROSIDAD (POROSITY) M) SEGREGACION (SEGREGATION) ATPG (GTAW): ARCO TUNGSTENO PROTEGIDO CON GAS
F) SOCAVADO (UNDERCUT) N) RECHUPE (SHRINKAGE CAVITY)
G) QUEMADA PASADA (BURNTHOUGH) O) PENETRACION EXCESIVA (EXCESSIVE PENETRATION)
H) INCLUSION DE TUNGSTENO (TUNGSTEN INCL) RESULTADO (RESULT)
A - ACEPTACIÓN FINAL (FINAL ACCEPTANCE)
R - RECHAZADA (REJECTED)

ORLANDO DE LA LUZ HERNANDEZ II 11-Feb-22


ACEPTACION FINAL (FINAL ACCEPTANCE): NIVEL ASNT (LEVEL): FECHA (DATE):

FO-CAL-020/A3
OPERADORA CICSA, S. A. DE C. V.

REPORTE DE INTERPRETACION PARA LA PRUEBA RADIOGRAFICA TECNICA/RESULTADOS


(INTERPRETATION REPORT FOR THE RADIOGRAPHIC TEST TECHNIQUE/RESULTS)

No. RT-004-22-TX

TAREA (JOB): 13145 UNIDAD (UNIT): 1 No. TOTAL PELICULAS (TOTAL FILMS): 8
CLIENTE (CUSTOMER): PTI-INFRAESTRUCTURA DE DESARROLLO S.A. DE C.V. No. IDENT. (TAG): DT-22103
PROCEDIMIENTO (PROCEDURE): X IS-CAL-006-TX A3 OTRO (OTHER) N/A
CODIGOS (CODES): X ASME ED. 2019 ADD. N/A SEC. V ART. 2; SEC. VIII DIV 1 ; API-660;
X OTROS (OTHERS): ET-028-PEMEX-2019 XEVALUACION (EVALUATION): UW-51
FUENTE (SOURCE): X IR-192; CO-60; Se 75; OTRO (OTHER): N/A ACTIVIDAD (ACTIVITY): 51 Ci
PUNTO FOCAL (FOCAL SPOT): 1.8 X 2.6mm DIST. FUENTE-OBJETO. (SOURCE TO OBJECT DISTANCE) : 428.7 mm
MAX. DIST. LADO FUENTE-PELICULA (MAX. DISTANCE SOURCE SIDE TO FILM): 457.2 mm
MATERIAL BASE (BASE MAT'L.) SA-516-70 ESPESOR (THICKNESS): 34.9 REFUERZO (REINFORC.): 2.5 mm
PANTALLAS(SCREENS): MATERIAL/ESPESOR (THICKNESS): PLOMO ANTERIOR (FRONT) 0.005 mm ,POSTERIOR (REAR): 0.01 mm
TECNICA (TECHNIQUE): EXPOSICION (EXPOSURE): PARED (WALL) X SENCILLA (SINGLE); DOBLE (DOUBLE) UNIDADES: PULG
VISTA (VIEWING): PARED (WALL); X SENCILLA (SINGLE) DOBLE (DOUBLE) X MILIMETROS
No. PELICULA (FILM): FUJI IX TIPO (TYPE): II FABRICANTE (MANUFACTURER): FUJI
PELICULAS POR CHASIS(FILM PER HOLDER): 1 RANGO DENSIDAD (DENSITY RANGE): 2.0-4.0

DISCONTINUIDAD (INDICATION) REPARACION (REPAIR)

CONTRASTE (WINDOW)
(FILM)/ F:FUENTE(SOURCE)

TIPO ALAMBRE

RESULTADO (RESULT)
PROCESO (PROCCES)

SOLDADOR (WELDER)

IDENTIFICACION (I.D.)

ILUMINACION (LEVEL)
DENSIDAD (DENSITY)
POR PUNTOS (SPOT)
(RADIOGRAPHY N°)
No. RADIOGRAFIA

CORDON (SEAM)

FECHA (DATE)

LADO(SIDE): P: PELICULA
(PENETRAMETER)
PENETRAMETRO

TAMAÑO (SIZE) OBSERVACIONES


100%

TIPO (TYPE)

RESULTADO
(PROCCES)

SOLDADOR
(NUMBER)

PROCESO

(WELDER)

(RESULT)
NUMERO
(REMARKS)

COLUMNA DE LAVADO DE ALQUILADO CON AGUA 2016-2016


0-1 - 100% - 1B/10 S D/E - A - - - - 3.2 - - -
1-2 - 100% - 1B/10 S - - A - - - - 3.1 - - -
2-3 - 100% - 1B/10 S - - A - - - - 3.0 - - -
3-4 - 100% - 1B/10 S - - A - - - - 3.1 - - -
FCAW 35T/54T LONGITUDINAL 11-02-22
4-5 - 100% - 1B/10 S D - A - - - - 3.1 - - -
5-6 - 100% - 1B/10 S - - A - - - - 3.0 - - -
6-7 - 100% - 1B/10 S E - A - - - - 3.2 - - -
7-8 - 100% - 1B/10 S E/D - A - - - - 3.2 - - -

A) FUSION INCOMPLETA (INCOMPLETE FUSION) I) DEFECTOS DE SUPERFICIE (SURFACE DEFECTS) AS (SAW): ARCO SUMERGIDO.
B) PENETRACION INCOMPLETA (INCOMPLETE PENETRATION) J) HOYO DE ARQUEO (CRATER PIT) AMP (SMAW): ARCO METALICO PROTEGIDO
C) FRACTURA (CRACK) K) RAIZ CONCAVA (ROOT CONCAVITY) AMPG (GMAW): ARCO METALICO PROTEGIDO CON GAS
D) ESCORIA (SLAG) L) INCLUSION DE GAS (GAS INCL) AMCF (FCAW) ARCO METALICO CON CENTRO DE FUNDENTE.
E) POROSIDAD (POROSITY) M) SEGREGACION (SEGREGATION) ATPG (GTAW): ARCO TUNGSTENO PROTEGIDO CON GAS
F) SOCAVADO (UNDERCUT) N) RECHUPE (SHRINKAGE CAVITY)
G) QUEMADA PASADA (BURNTHOUGH) O) PENETRACION EXCESIVA (EXCESSIVE PENETRATION)
H) INCLUSION DE TUNGSTENO (TUNGSTEN INCL) RESULTADO (RESULT)
A - ACEPTACIÓN FINAL (FINAL ACCEPTANCE)
R - RECHAZADA (REJECTED)

ORLANDO DE LA LUZ HERNANDEZ II 11-Feb-22


ACEPTACION FINAL (FINAL ACCEPTANCE): NIVEL ASNT (LEVEL): FECHA (DATE):

FO-CAL-020/A3
OPERADORA CICSA, S. A. DE C. V.

REPORTE DE INTERPRETACION PARA LA PRUEBA RADIOGRAFICA TECNICA/RESULTADOS


(INTERPRETATION REPORT FOR THE RADIOGRAPHIC TEST TECHNIQUE/RESULTS)

No. RT-005-22-TX

TAREA (JOB): 13145 UNIDAD (UNIT): 1 No. TOTAL PELICULAS (TOTAL FILMS): 9
CLIENTE (CUSTOMER): PTI-INFRAESTRUCTURA DE DESARROLLO S.A. DE C.V. No. IDENT. (TAG): DT-22103
PROCEDIMIENTO (PROCEDURE): X IS-CAL-006-TX A3 OTRO (OTHER) N/A
CODIGOS (CODES): X ASME ED. 2019 ADD. N/A SEC. V ART. 2; SEC. VIII DIV 1 ; API-660;
X OTROS (OTHERS): ET-028-PEMEX-2019 XEVALUACION (EVALUATION): UW-51
FUENTE (SOURCE): X IR-192; CO-60; Se 75; OTRO (OTHER): N/A ACTIVIDAD (ACTIVITY): 51 Ci
PUNTO FOCAL (FOCAL SPOT): 1.8 X 2.6mm DIST. FUENTE-OBJETO. (SOURCE TO OBJECT DISTANCE): 428.7 mm
MAX. DIST. LADO FUENTE-PELICULA (MAX. DISTANCE SOURCE SIDE TO FILM): 457.2 mm
MATERIAL BASE (BASE MAT'L.) SA-516-70 ESPESOR (THICKNESS): 28.5 REFUERZO (REINFORC.): 2.5 mm
PANTALLAS(SCREENS): MATERIAL/ESPESOR (THICKNESS): PLOMO ANTERIOR (FRONT) 0.005 mm ,POSTERIOR (REAR): 0.01 mm
TECNICA (TECHNIQUE): EXPOSICION (EXPOSURE): PARED (WALL) X SENCILLA (SINGLE); DOBLE (DOUBLE) UNIDADES: PULG
VISTA (VIEWING): PARED (WALL); X SENCILLA (SINGLE) DOBLE (DOUBLE) X MILIMETROS
No. PELICULA (FILM): FUJI IX TIPO (TYPE): II FABRICANTE (MANUFACTURER): FUJI
PELICULAS POR CHASIS(FILM PER HOLDER): 1 RANGO DENSIDAD (DENSITY RANGE): 2.0-4.0

DISCONTINUIDAD (INDICATION) REPARACION (REPAIR)

CONTRASTE (WINDOW)
(FILM)/ F:FUENTE(SOURCE)

TIPO ALAMBRE

RESULTADO (RESULT)
PROCESO (PROCCES)

IDENTIFICACION (I.D.)
SOLDADOR (WELDER)

ILUMINACION (LEVEL)
DENSIDAD (DENSITY)
POR PUNTOS (SPOT)
(RADIOGRAPHY N°)
No. RADIOGRAFIA

CORDON (SEAM)

FECHA (DATE)

LADO(SIDE): P: PELICULA
(PENETRAMETER)
PENETRAMETRO

TAMAÑO (SIZE)
OBSERVACIONES
100%

TIPO (TYPE)

RESULTADO
(PROCCES)

SOLDADOR
(NUMBER)

PROCESO

(WELDER)

(RESULT)
NUMERO
(REMARKS)

COLUMNA DE LAVADO DE ALQUILADO CON AGUA 2018-2018


0-1 - 100% - 1B/10 S I - A - - - - 3.1 - - -
1-2 - 100% - 1B/10 S D 30-70/130-150/280-310 R - - - - 3.2 - - -
2-3 - 100% - 1B/10 S D 160.5-200/210.5-222/240-255.5 R - - - - 3.2 - - -
3-4 - 100% - 1B/10 S D 80-130.5/140-160 R - - - - 3.1 - - -
4-5 FCAW 35T LONGITUDINAL - 11-02-22 100% - 1B/10 S D - A - - - - 3.0 - - -
5-6 - 100% - 1B/10 S D 30-80 R - - - - 3.0 - - -
6-7 - 100% - 1B/10 S D 170-200/210-221.5/280.5-330 R - - - - 2.9 - - -
7-8 - 100% - 1B/10 S D 0-20.5/90-120/190-220 R - - - - 3.0 - - -
8-9 - 100% - 1B/10 S D - A - - - - 3.2 - - -

A) FUSION INCOMPLETA (INCOMPLETE FUSION) I) DEFECTOS DE SUPERFICIE (SURFACE DEFECTS) AS (SAW): ARCO SUMERGIDO.
B) PENETRACION INCOMPLETA (INCOMPLETE PENETRATION) J) HOYO DE ARQUEO (CRATER PIT) AMP (SMAW): ARCO METALICO PROTEGIDO
C) FRACTURA (CRACK) K) RAIZ CONCAVA (ROOT CONCAVITY) AMPG (GMAW): ARCO METALICO PROTEGIDO CON GAS
D) ESCORIA (SLAG) L) INCLUSION DE GAS (GAS INCL) AMCF (FCAW) ARCO METALICO CON CENTRO DE FUNDENTE.
E) POROSIDAD (POROSITY) M) SEGREGACION (SEGREGATION) ATPG (GTAW): ARCO TUNGSTENO PROTEGIDO CON GAS
F) SOCAVADO (UNDERCUT) N) RECHUPE (SHRINKAGE CAVITY)
G) QUEMADA PASADA (BURNTHOUGH) O) PENETRACION EXCESIVA (EXCESSIVE PENETRATION)
H) INCLUSION DE TUNGSTENO (TUNGSTEN INCL) RESULTADO (RESULT)
A - ACEPTACIÓN FINAL (FINAL ACCEPTANCE)
R - RECHAZADA (REJECTED)

ORLANDO DE LA LUZ HERNANDEZ II 11-Feb-22


ACEPTACION FINAL (FINAL ACCEPTANCE): NIVEL ASNT (LEVEL): FECHA (DATE):

FO-CAL-020/A3
OPERADORA CICSA, S. A. DE C. V.

REPORTE DE INTERPRETACION PARA LA PRUEBA RADIOGRAFICA TECNICA/RESULTADOS


(INTERPRETATION REPORT FOR THE RADIOGRAPHIC TEST TECHNIQUE/RESULTS)

No. RT-006-22-TX

TAREA (JOB): 13145 UNIDAD (UNIT): 1 No. TOTAL PELICULAS (TOTAL FILMS): 1
CLIENTE (CUSTOMER): PTI-INFRAESTRUCTURA DE DESARROLLO S.A. DE C.V. No. IDENT. (TAG): DT-22103 R
PROCEDIMIENTO (PROCEDURE): X IS-CAL-006-TX A3 OTRO (OTHER) N/A
CODIGOS (CODES): X ASME ED. 2019 ADD. N/A SEC. V ART. 2; SEC. VIII DIV 1 ; API-660;
X OTROS (OTHERS): ET-028-PEMEX-2019 XEVALUACION (EVALUATION): UW-51
FUENTE (SOURCE): X IR-192; CO-60; Se 75; OTRO (OTHER): N/A ACTIVIDAD (ACTIVITY): 51 Ci
PUNTO FOCAL (FOCAL SPOT): 1.8 X 2.6mm DIST. FUENTE-OBJETO. (SOURCE TO OBJECT DISTANCE): 428.7 mm
MAX. DIST. LADO FUENTE-PELICULA (MAX. DISTANCE SOURCE SIDE TO FILM): 457.2 mm
MATERIAL BASE (BASE MAT'L.) SA-516-70 ESPESOR (THICKNESS): 28.5 REFUERZO (REINFORC.): 2.5 mm
PANTALLAS(SCREENS): MATERIAL/ESPESOR (THICKNESS): PLOMO ANTERIOR (FRONT) 0.005 mm ,POSTERIOR (REAR): 0.01 mm
TECNICA (TECHNIQUE): EXPOSICION (EXPOSURE): PARED (WALL) X SENCILLA (SINGLE); DOBLE (DOUBLE) UNIDADES: PULG
VISTA (VIEWING): PARED (WALL); X SENCILLA (SINGLE) DOBLE (DOUBLE) X MILIMETROS
No. PELICULA (FILM): FUJI IX TIPO (TYPE): II FABRICANTE (MANUFACTURER): FUJI
PELICULAS POR CHASIS(FILM PER HOLDER): 1 RANGO DENSIDAD (DENSITY RANGE): 2.0-4.0

DISCONTINUIDAD (INDICATION) REPARACION (REPAIR)

CONTRASTE (WINDOW)
(FILM)/ F:FUENTE(SOURCE)

TIPO ALAMBRE

RESULTADO (RESULT)
PROCESO (PROCCES)

IDENTIFICACION (I.D.)
SOLDADOR (WELDER)

ILUMINACION (LEVEL)
DENSIDAD (DENSITY)
POR PUNTOS (SPOT)
(RADIOGRAPHY N°)
No. RADIOGRAFIA

CORDON (SEAM)

FECHA (DATE)

LADO(SIDE): P: PELICULA
(PENETRAMETER)
PENETRAMETRO

TAMAÑO (SIZE)
OBSERVACIONES
100%

TIPO (TYPE)

RESULTADO
(PROCCES)

SOLDADOR
(NUMBER)

PROCESO

(WELDER)

(RESULT)
NUMERO
(REMARKS)

COLUMNA DE LAVADO DE ALQUILADO CON AGUA 2013-2013


-
-
-
-
2-3 FCAW 34T LONGITUDINAL - 11-02-22 100% - 1B/10 S D/E - A - - - - 3.5 - - -
-
-
-
-

A) FUSION INCOMPLETA (INCOMPLETE FUSION) I) DEFECTOS DE SUPERFICIE (SURFACE DEFECTS) AS (SAW): ARCO SUMERGIDO.
B) PENETRACION INCOMPLETA (INCOMPLETE PENETRATION) J) HOYO DE ARQUEO (CRATER PIT) AMP (SMAW): ARCO METALICO PROTEGIDO
C) FRACTURA (CRACK) K) RAIZ CONCAVA (ROOT CONCAVITY) AMPG (GMAW): ARCO METALICO PROTEGIDO CON GAS
D) ESCORIA (SLAG) L) INCLUSION DE GAS (GAS INCL) AMCF (FCAW) ARCO METALICO CON CENTRO DE FUNDENTE.
E) POROSIDAD (POROSITY) M) SEGREGACION (SEGREGATION) ATPG (GTAW): ARCO TUNGSTENO PROTEGIDO CON GAS
F) SOCAVADO (UNDERCUT) N) RECHUPE (SHRINKAGE CAVITY)
G) QUEMADA PASADA (BURNTHOUGH) O) PENETRACION EXCESIVA (EXCESSIVE PENETRATION)
H) INCLUSION DE TUNGSTENO (TUNGSTEN INCL) RESULTADO (RESULT)
A - ACEPTACIÓN FINAL (FINAL ACCEPTANCE)
R - RECHAZADA (REJECTED)

ORLANDO DE LA LUZ HERNANDEZ II 11-Feb-22


ACEPTACION FINAL (FINAL ACCEPTANCE): NIVEL ASNT (LEVEL): FECHA (DATE):

FO-CAL-020/A3
OPERADORA CICSA, S. A. DE C. V.

REPORTE DE INTERPRETACION PARA LA PRUEBA RADIOGRAFICA TECNICA/RESULTADOS


(INTERPRETATION REPORT FOR THE RADIOGRAPHIC TEST TECHNIQUE/RESULTS)

No. RT-007-22-TX

TAREA (JOB): 13145 UNIDAD (UNIT): 1 No. TOTAL PELICULAS (TOTAL FILMS): 7
CLIENTE (CUSTOMER): PTI-INFRAESTRUCTURA DE DESARROLLO S.A. DE C.V. No. IDENT. (TAG): DT-22103
PROCEDIMIENTO (PROCEDURE): X IS-CAL-006-TX A3 OTRO (OTHER) N/A
CODIGOS (CODES): X ASME ED. 2019 ADD. N/A SEC. V ART. 2; SEC. VIII DIV 1 ; API-660;
X OTROS (OTHERS): ET-028-PEMEX-2019 XEVALUACION (EVALUATION): UW-51
FUENTE (SOURCE): X IR-192; CO-60; Se 75; OTRO (OTHER): N/A ACTIVIDAD (ACTIVITY): 51 Ci
PUNTO FOCAL (FOCAL SPOT): 1.8 X 2.6mm DIST. FUENTE-OBJETO. (SOURCE TO OBJECT DISTANCE) : 457.2 mm
MAX. DIST. LADO FUENTE-PELICULA (MAX. DISTANCE SOURCE SIDE TO FILM): 488.9 mm
MATERIAL BASE (BASE MAT'L.) SA-516-70 ESPESOR (THICKNESS): 31.7 REFUERZO (REINFORC.): 2.5 mm
PANTALLAS(SCREENS): MATERIAL/ESPESOR (THICKNESS): PLOMO ANTERIOR (FRONT) 0.005 mm ,POSTERIOR (REAR): 0.01 mm
TECNICA (TECHNIQUE): EXPOSICION (EXPOSURE): PARED (WALL) X SENCILLA (SINGLE); DOBLE (DOUBLE) UNIDADES: PULG
VISTA (VIEWING): PARED (WALL); X SENCILLA (SINGLE) DOBLE (DOUBLE) X MILIMETROS
No. PELICULA (FILM): FUJI IX TIPO (TYPE): II FABRICANTE (MANUFACTURER): FUJI
PELICULAS POR CHASIS(FILM PER HOLDER): 1 RANGO DENSIDAD (DENSITY RANGE): 2.0-4.0

DISCONTINUIDAD (INDICATION) REPARACION (REPAIR)

CONTRASTE (WINDOW)
(FILM)/ F:FUENTE(SOURCE)

TIPO ALAMBRE

RESULTADO (RESULT)
PROCESO (PROCCES)

SOLDADOR (WELDER)

IDENTIFICACION (I.D.)

ILUMINACION (LEVEL)
DENSIDAD (DENSITY)
POR PUNTOS (SPOT)
(RADIOGRAPHY N°)
No. RADIOGRAFIA

CORDON (SEAM)

FECHA (DATE)

LADO(SIDE): P: PELICULA
(PENETRAMETER)
PENETRAMETRO

TAMAÑO (SIZE) OBSERVACIONES


100%

TIPO (TYPE)

RESULTADO
(PROCCES)

SOLDADOR
(NUMBER)

PROCESO

(WELDER)

(RESULT)
NUMERO
(REMARKS)

COLUMNA DE LAVADO DE ALQUILADO CON AGUA 2011-2011


0-1 - 100% - 1B/10 S E - A - - - - 2.8 - - -
1-2 - 100% - 1B/10 S D - A - - - - 3.0 - - -
2-3 - 100% - 1B/10 S E - A - - - - 2.9 - - -
3-4 FCAW 2T/8T LONGITUDINAL - 13-02-22 100% - 1B/10 S E-D - A - - - - 2.8 - - -
4-5 - 100% - 1B/10 S E-K - A - - - - 2.9 - - -
5-6 - 100% - 1B/10 S E-K - A - - - - 3.0 - - -
6-7 - 100% - 1B/10 S D 180-340 R - - - - 2.8 - - -

A) FUSION INCOMPLETA (INCOMPLETE FUSION) I) DEFECTOS DE SUPERFICIE (SURFACE DEFECTS) AS (SAW): ARCO SUMERGIDO.
B) PENETRACION INCOMPLETA (INCOMPLETE PENETRATION) J) HOYO DE ARQUEO (CRATER PIT) AMP (SMAW): ARCO METALICO PROTEGIDO
C) FRACTURA (CRACK) K) RAIZ CONCAVA (ROOT CONCAVITY) AMPG (GMAW): ARCO METALICO PROTEGIDO CON GAS
D) ESCORIA (SLAG) L) INCLUSION DE GAS (GAS INCL) AMCF (FCAW) ARCO METALICO CON CENTRO DE FUNDENTE.
E) POROSIDAD (POROSITY) M) SEGREGACION (SEGREGATION) ATPG (GTAW): ARCO TUNGSTENO PROTEGIDO CON GAS
F) SOCAVADO (UNDERCUT) N) RECHUPE (SHRINKAGE CAVITY)
G) QUEMADA PASADA (BURNTHOUGH) O) PENETRACION EXCESIVA (EXCESSIVE PENETRATION)
H) INCLUSION DE TUNGSTENO (TUNGSTEN INCL) RESULTADO (RESULT)
A - ACEPTACIÓN FINAL (FINAL ACCEPTANCE)
R - RECHAZADA (REJECTED)

ORLANDO DE LA LUZ HERNANDEZ II 13-Feb-22


ACEPTACION FINAL (FINAL ACCEPTANCE): NIVEL ASNT (LEVEL): FECHA (DATE):

FO-CAL-020/A3
OPERADORA CICSA, S. A. DE C. V.

REPORTE DE INTERPRETACION PARA LA PRUEBA RADIOGRAFICA TECNICA/RESULTADOS


(INTERPRETATION REPORT FOR THE RADIOGRAPHIC TEST TECHNIQUE/RESULTS)

No. RT-008-22-TX

TAREA (JOB): 13145 UNIDAD (UNIT): 1 No. TOTAL PELICULAS (TOTAL FILMS): 6
CLIENTE (CUSTOMER): PTI-INFRAESTRUCTURA DE DESARROLLO S.A. DE C.V. No. IDENT. (TAG): DT-22103
PROCEDIMIENTO (PROCEDURE): X IS-CAL-006-TX A3 OTRO (OTHER) N/A
CODIGOS (CODES): X ASME ED. 2019 ADD. N/A SEC. V ART. 2; SEC. VIII DIV 1 ; API-660;
X OTROS (OTHERS): ET-028-PEMEX-2019 XEVALUACION (EVALUATION): UW-51
FUENTE (SOURCE): X IR-192; CO-60; Se 75; OTRO (OTHER): N/A ACTIVIDAD (ACTIVITY): 51 Ci
PUNTO FOCAL (FOCAL SPOT): 1.8 X 2.6mm DIST. FUENTE-OBJETO. (SOURCE TO OBJECT DISTANCE): 428.7 mm
MAX. DIST. LADO FUENTE-PELICULA (MAX. DISTANCE SOURCE SIDE TO FILM): 457.2 mm
MATERIAL BASE (BASE MAT'L.) SA-516-70 ESPESOR (THICKNESS): 28.5 REFUERZO (REINFORC.): 2.5 mm
PANTALLAS(SCREENS): MATERIAL/ESPESOR (THICKNESS): PLOMO ANTERIOR (FRONT) 0.005 mm ,POSTERIOR (REAR): 0.01 mm
TECNICA (TECHNIQUE): EXPOSICION (EXPOSURE): PARED (WALL) X SENCILLA (SINGLE); DOBLE (DOUBLE) UNIDADES: PULG
VISTA (VIEWING): PARED (WALL); X SENCILLA (SINGLE) DOBLE (DOUBLE) X MILIMETROS
No. PELICULA (FILM): FUJI IX TIPO (TYPE): II FABRICANTE (MANUFACTURER): FUJI
PELICULAS POR CHASIS(FILM PER HOLDER): 1 RANGO DENSIDAD (DENSITY RANGE): 2.0-4.0

DISCONTINUIDAD (INDICATION) REPARACION (REPAIR)

CONTRASTE (WINDOW)
(FILM)/ F:FUENTE(SOURCE)

TIPO ALAMBRE

RESULTADO (RESULT)
PROCESO (PROCCES)

IDENTIFICACION (I.D.)
SOLDADOR (WELDER)

ILUMINACION (LEVEL)
DENSIDAD (DENSITY)
POR PUNTOS (SPOT)
(RADIOGRAPHY N°)
No. RADIOGRAFIA

CORDON (SEAM)

FECHA (DATE)

LADO(SIDE): P: PELICULA
(PENETRAMETER)
PENETRAMETRO

TAMAÑO (SIZE)
OBSERVACIONES
100%

TIPO (TYPE)

RESULTADO
(PROCCES)

SOLDADOR
(NUMBER)

PROCESO

(WELDER)

(RESULT)
NUMERO
(REMARKS)

COLUMNA DE LAVADO DE ALQUILADO CON AGUA 2018-2018 R


1-2 - 100% - 1B/10 S - - A - - - - 2.8 - - -
2-3 - 100% - 1B/10 S E-D - A - - - - 2.8 - - -
3-4 - 100% - 1B/10 S - - A - - - - 2.7 - - -
5-6 - 100% - 1B/10 S - - A - - - - 2.8 - - -
6-7 FCAW 43T/8T LONGITUDINAL - 13-02-22 100% - 1B/10 S E-D - A - - - - 2.8 - - -
7-8 - 100% - 1B/10 S - - A - - - - 2.7 - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -

A) FUSION INCOMPLETA (INCOMPLETE FUSION) I) DEFECTOS DE SUPERFICIE (SURFACE DEFECTS) AS (SAW): ARCO SUMERGIDO.
B) PENETRACION INCOMPLETA (INCOMPLETE PENETRATION) J) HOYO DE ARQUEO (CRATER PIT) AMP (SMAW): ARCO METALICO PROTEGIDO
C) FRACTURA (CRACK) K) RAIZ CONCAVA (ROOT CONCAVITY) AMPG (GMAW): ARCO METALICO PROTEGIDO CON GAS
D) ESCORIA (SLAG) L) INCLUSION DE GAS (GAS INCL) AMCF (FCAW) ARCO METALICO CON CENTRO DE FUNDENTE.
E) POROSIDAD (POROSITY) M) SEGREGACION (SEGREGATION) ATPG (GTAW): ARCO TUNGSTENO PROTEGIDO CON GAS
F) SOCAVADO (UNDERCUT) N) RECHUPE (SHRINKAGE CAVITY)
G) QUEMADA PASADA (BURNTHOUGH) O) PENETRACION EXCESIVA (EXCESSIVE PENETRATION)
H) INCLUSION DE TUNGSTENO (TUNGSTEN INCL) RESULTADO (RESULT)
A - ACEPTACIÓN FINAL (FINAL ACCEPTANCE)
R - RECHAZADA (REJECTED)

ORLANDO DE LA LUZ HERNANDEZ II 13-Feb-22


ACEPTACION FINAL (FINAL ACCEPTANCE): NIVEL ASNT (LEVEL): FECHA (DATE):

FO-CAL-020/A3
OPERADORA CICSA, S. A. DE C. V.

REPORTE DE INTERPRETACION PARA LA PRUEBA RADIOGRAFICA TECNICA/RESULTADOS


(INTERPRETATION REPORT FOR THE RADIOGRAPHIC TEST TECHNIQUE/RESULTS)

No. RT-009-22-TX

TAREA (JOB): 13145 UNIDAD (UNIT): 1 No. TOTAL PELICULAS (TOTAL FILMS): 7
CLIENTE (CUSTOMER): PTI-INFRAESTRUCTURA DE DESARROLLO S.A. DE C.V. No. IDENT. (TAG): DT-22103
PROCEDIMIENTO (PROCEDURE): X IS-CAL-006-TX A3 OTRO (OTHER) N/A
CODIGOS (CODES): X ASME ED. 2019 ADD. N/A SEC. V ART. 2; SEC. VIII DIV 1 ; API-660;
X OTROS (OTHERS): ET-028-PEMEX-2019 XEVALUACION (EVALUATION): UW-51
FUENTE (SOURCE): X IR-192; CO-60; Se 75; OTRO (OTHER): N/A ACTIVIDAD (ACTIVITY): 50 Ci
PUNTO FOCAL (FOCAL SPOT): 1.8 X 2.6mm DIST. FUENTE-OBJETO. (SOURCE TO OBJECT DISTANCE) : 457.2 mm
MAX. DIST. LADO FUENTE-PELICULA (MAX. DISTANCE SOURCE SIDE TO FILM): 488.9 mm
MATERIAL BASE (BASE MAT'L.) SA-516-70 ESPESOR (THICKNESS): 31.7 REFUERZO (REINFORC.): 2.5 mm
PANTALLAS(SCREENS): MATERIAL/ESPESOR (THICKNESS): PLOMO ANTERIOR (FRONT) 0.005 mm ,POSTERIOR (REAR): 0.01 mm
TECNICA (TECHNIQUE): EXPOSICION (EXPOSURE): PARED (WALL) X SENCILLA (SINGLE); DOBLE (DOUBLE) UNIDADES: PULG
VISTA (VIEWING): PARED (WALL); X SENCILLA (SINGLE) DOBLE (DOUBLE) X MILIMETROS
No. PELICULA (FILM): FUJI IX TIPO (TYPE): II FABRICANTE (MANUFACTURER): FUJI
PELICULAS POR CHASIS(FILM PER HOLDER): 1 RANGO DENSIDAD (DENSITY RANGE): 2.0-4.0

DISCONTINUIDAD (INDICATION) REPARACION (REPAIR)

CONTRASTE (WINDOW)
(FILM)/ F:FUENTE(SOURCE)

TIPO ALAMBRE

RESULTADO (RESULT)
PROCESO (PROCCES)

SOLDADOR (WELDER)

IDENTIFICACION (I.D.)

ILUMINACION (LEVEL)
DENSIDAD (DENSITY)
POR PUNTOS (SPOT)
(RADIOGRAPHY N°)
No. RADIOGRAFIA

CORDON (SEAM)

FECHA (DATE)

LADO(SIDE): P: PELICULA
(PENETRAMETER)
PENETRAMETRO

TAMAÑO (SIZE) OBSERVACIONES


100%

TIPO (TYPE)

RESULTADO
(PROCCES)

SOLDADOR
(NUMBER)

PROCESO

(WELDER)

(RESULT)
NUMERO
(REMARKS)

COLUMNA DE LAVADO DE ALQUILADO CON AGUA 2012-2012


0-1 - 100% - 1B/10 S - - A - - - - 3.2 - - -
1-2 - 100% - 1B/10 S - - A - - - - 3.1 - - -
2-3 - 100% - 1B/10 S - - A - - - - 3.0 - - -
3-4 FCAW 3T LONGITUDINAL - 14-02-22 100% - 1B/10 S - - A - - - - 3.2 - - -
4-5 - 100% - 1B/10 S - - A - - - - 3.2 - - -
5-6 - 100% - 1B/10 S - - A - - - - 3.1 - - -
6-7 - 100% - 1B/10 S - - A - - - - 3.2 - - -

A) FUSION INCOMPLETA (INCOMPLETE FUSION) I) DEFECTOS DE SUPERFICIE (SURFACE DEFECTS) AS (SAW): ARCO SUMERGIDO.
B) PENETRACION INCOMPLETA (INCOMPLETE PENETRATION) J) HOYO DE ARQUEO (CRATER PIT) AMP (SMAW): ARCO METALICO PROTEGIDO
C) FRACTURA (CRACK) K) RAIZ CONCAVA (ROOT CONCAVITY) AMPG (GMAW): ARCO METALICO PROTEGIDO CON GAS
D) ESCORIA (SLAG) L) INCLUSION DE GAS (GAS INCL) AMCF (FCAW) ARCO METALICO CON CENTRO DE FUNDENTE.
E) POROSIDAD (POROSITY) M) SEGREGACION (SEGREGATION) ATPG (GTAW): ARCO TUNGSTENO PROTEGIDO CON GAS
F) SOCAVADO (UNDERCUT) N) RECHUPE (SHRINKAGE CAVITY)
G) QUEMADA PASADA (BURNTHOUGH) O) PENETRACION EXCESIVA (EXCESSIVE PENETRATION)
H) INCLUSION DE TUNGSTENO (TUNGSTEN INCL) RESULTADO (RESULT)
A - ACEPTACIÓN FINAL (FINAL ACCEPTANCE)
R - RECHAZADA (REJECTED)

ORLANDO DE LA LUZ HERNANDEZ. II 14-Feb-22


ACEPTACION FINAL (FINAL ACCEPTANCE): NIVEL ASNT (LEVEL): FECHA (DATE):

FO-CAL-020/A3
OPERADORA CICSA, S. A. DE C. V.

REPORTE DE INTERPRETACION PARA LA PRUEBA RADIOGRAFICA TECNICA/RESULTADOS


(INTERPRETATION REPORT FOR THE RADIOGRAPHIC TEST TECHNIQUE/RESULTS)

No. RT-010-22-TX

TAREA (JOB): 13145 UNIDAD (UNIT): 1 No. TOTAL PELICULAS (TOTAL FILMS): 1
CLIENTE (CUSTOMER): PTI-INFRAESTRUCTURA DE DESARROLLO S.A. DE C.V. No. IDENT. (TAG): DT-22103 R
PROCEDIMIENTO (PROCEDURE): X IS-CAL-006-TX A3 OTRO (OTHER) N/A
CODIGOS (CODES): X ASME ED. 2019 ADD. N/A SEC. V ART. 2; SEC. VIII DIV 1 ; API-660;
X OTROS (OTHERS): ET-028-PEMEX-2019 XEVALUACION (EVALUATION): UW-51
FUENTE (SOURCE): X IR-192; CO-60; Se 75; OTRO (OTHER): N/A ACTIVIDAD (ACTIVITY): 51 Ci
PUNTO FOCAL (FOCAL SPOT): 1.8 X 2.6mm DIST. FUENTE-OBJETO. (SOURCE TO OBJECT DISTANCE): 428.7 mm
MAX. DIST. LADO FUENTE-PELICULA (MAX. DISTANCE SOURCE SIDE TO FILM): 457.2 mm
MATERIAL BASE (BASE MAT'L.) SA-516-70 ESPESOR (THICKNESS): 28.5 REFUERZO (REINFORC.): 2.5 mm
PANTALLAS(SCREENS): MATERIAL/ESPESOR (THICKNESS): PLOMO ANTERIOR (FRONT) 0.005 mm ,POSTERIOR (REAR): 0.01 mm
TECNICA (TECHNIQUE): EXPOSICION (EXPOSURE): PARED (WALL) X SENCILLA (SINGLE); DOBLE (DOUBLE) UNIDADES: PULG
VISTA (VIEWING): PARED (WALL); X SENCILLA (SINGLE) DOBLE (DOUBLE) X MILIMETROS
No. PELICULA (FILM): FUJI IX TIPO (TYPE): II FABRICANTE (MANUFACTURER): FUJI
PELICULAS POR CHASIS(FILM PER HOLDER): 1 RANGO DENSIDAD (DENSITY RANGE): 2.0-4.0

DISCONTINUIDAD (INDICATION) REPARACION (REPAIR)

CONTRASTE (WINDOW)
(FILM)/ F:FUENTE(SOURCE)

TIPO ALAMBRE

RESULTADO (RESULT)
PROCESO (PROCCES)

IDENTIFICACION (I.D.)
SOLDADOR (WELDER)

ILUMINACION (LEVEL)
DENSIDAD (DENSITY)
POR PUNTOS (SPOT)
(RADIOGRAPHY N°)
No. RADIOGRAFIA

CORDON (SEAM)

FECHA (DATE)

LADO(SIDE): P: PELICULA
(PENETRAMETER)
PENETRAMETRO

TAMAÑO (SIZE)
OBSERVACIONES
100%

TIPO (TYPE)

RESULTADO
(PROCCES)

SOLDADOR
(NUMBER)

PROCESO

(WELDER)

(RESULT)
NUMERO
(REMARKS)

COLUMNA DE LAVADO DE ALQUILADO CON AGUA 2011-2011


-
6-7 FCAW 2T LONGITUDINAL 15-02-22 100% - 1B/10 S D 180.1-190.5/210-250/270-280.5/300-300.5 R - - - - 3.1 - - -
-

A) FUSION INCOMPLETA (INCOMPLETE FUSION) I) DEFECTOS DE SUPERFICIE (SURFACE DEFECTS) AS (SAW): ARCO SUMERGIDO.
B) PENETRACION INCOMPLETA (INCOMPLETE PENETRATION) J) HOYO DE ARQUEO (CRATER PIT) AMP (SMAW): ARCO METALICO PROTEGIDO
C) FRACTURA (CRACK) K) RAIZ CONCAVA (ROOT CONCAVITY) AMPG (GMAW): ARCO METALICO PROTEGIDO CON GAS
D) ESCORIA (SLAG) L) INCLUSION DE GAS (GAS INCL) AMCF (FCAW) ARCO METALICO CON CENTRO DE FUNDENTE.
E) POROSIDAD (POROSITY) M) SEGREGACION (SEGREGATION) ATPG (GTAW): ARCO TUNGSTENO PROTEGIDO CON GAS
F) SOCAVADO (UNDERCUT) N) RECHUPE (SHRINKAGE CAVITY)
G) QUEMADA PASADA (BURNTHOUGH) O) PENETRACION EXCESIVA (EXCESSIVE PENETRATION)
H) INCLUSION DE TUNGSTENO (TUNGSTEN INCL) RESULTADO (RESULT)
A - ACEPTACIÓN FINAL (FINAL ACCEPTANCE)
R - RECHAZADA (REJECTED)

ORLANDO DE LA LUZ HERNANDEZ II 15-Feb-22


ACEPTACION FINAL (FINAL ACCEPTANCE): NIVEL ASNT (LEVEL): FECHA (DATE):

FO-CAL-020/A3
OPERADORA CICSA, S. A. DE C. V.

REPORTE DE INTERPRETACION PARA LA PRUEBA RADIOGRAFICA TECNICA/RESULTADOS


(INTERPRETATION REPORT FOR THE RADIOGRAPHIC TEST TECHNIQUE/RESULTS)

No. RT-011-22-TX

TAREA (JOB): 13145 UNIDAD (UNIT): 1 No. TOTAL PELICULAS (TOTAL FILMS): 1
CLIENTE (CUSTOMER): PTI-INFRAESTRUCTURA DE DESARROLLO S.A. DE C.V. No. IDENT. (TAG): DT-22103 RR
PROCEDIMIENTO (PROCEDURE): X IS-CAL-006-TX A3 OTRO (OTHER) N/A
CODIGOS (CODES): X ASME ED. 2019 ADD. N/A SEC. V ART. 2; SEC. VIII DIV 1 ; API-660;
X OTROS (OTHERS): ET-028-PEMEX-2019 XEVALUACION (EVALUATION): UW-51
FUENTE (SOURCE): X IR-192; CO-60; Se 75; OTRO (OTHER): N/A ACTIVIDAD (ACTIVITY): 51 Ci
PUNTO FOCAL (FOCAL SPOT): 1.8 X 2.6mm DIST. FUENTE-OBJETO. (SOURCE TO OBJECT DISTANCE): 428.7 mm
MAX. DIST. LADO FUENTE-PELICULA (MAX. DISTANCE SOURCE SIDE TO FILM): 457.2 mm
MATERIAL BASE (BASE MAT'L.) SA-516-70 ESPESOR (THICKNESS): 28.5 REFUERZO (REINFORC.): 2.5 mm
PANTALLAS(SCREENS): MATERIAL/ESPESOR (THICKNESS): PLOMO ANTERIOR (FRONT) 0.005 mm ,POSTERIOR (REAR): 0.01 mm
TECNICA (TECHNIQUE): EXPOSICION (EXPOSURE): PARED (WALL) X SENCILLA (SINGLE); DOBLE (DOUBLE) UNIDADES: PULG
VISTA (VIEWING): PARED (WALL); X SENCILLA (SINGLE) DOBLE (DOUBLE) X MILIMETROS
No. PELICULA (FILM): FUJI IX TIPO (TYPE): II FABRICANTE (MANUFACTURER): FUJI
PELICULAS POR CHASIS(FILM PER HOLDER): 1 RANGO DENSIDAD (DENSITY RANGE): 2.0-4.0

DISCONTINUIDAD (INDICATION) REPARACION (REPAIR)

CONTRASTE (WINDOW)
(FILM)/ F:FUENTE(SOURCE)

TIPO ALAMBRE

RESULTADO (RESULT)
PROCESO (PROCCES)

IDENTIFICACION (I.D.)
SOLDADOR (WELDER)

ILUMINACION (LEVEL)
DENSIDAD (DENSITY)
POR PUNTOS (SPOT)
(RADIOGRAPHY N°)
No. RADIOGRAFIA

CORDON (SEAM)

FECHA (DATE)

LADO(SIDE): P: PELICULA
(PENETRAMETER)
PENETRAMETRO

TAMAÑO (SIZE)
OBSERVACIONES
100%

TIPO (TYPE)

RESULTADO
(PROCCES)

SOLDADOR
(NUMBER)

PROCESO

(WELDER)

(RESULT)
NUMERO
(REMARKS)

COLUMNA DE LAVADO DE ALQUILADO CON AGUA 2011-2011


-
6-7 FCAW 8T LONGITUDINAL 16-02-22 100% - 1B/10 S D - A - - - - 3.0 - - -
-

A) FUSION INCOMPLETA (INCOMPLETE FUSION) I) DEFECTOS DE SUPERFICIE (SURFACE DEFECTS) AS (SAW): ARCO SUMERGIDO.
B) PENETRACION INCOMPLETA (INCOMPLETE PENETRATION) J) HOYO DE ARQUEO (CRATER PIT) AMP (SMAW): ARCO METALICO PROTEGIDO
C) FRACTURA (CRACK) K) RAIZ CONCAVA (ROOT CONCAVITY) AMPG (GMAW): ARCO METALICO PROTEGIDO CON GAS
D) ESCORIA (SLAG) L) INCLUSION DE GAS (GAS INCL) AMCF (FCAW) ARCO METALICO CON CENTRO DE FUNDENTE.
E) POROSIDAD (POROSITY) M) SEGREGACION (SEGREGATION) ATPG (GTAW): ARCO TUNGSTENO PROTEGIDO CON GAS
F) SOCAVADO (UNDERCUT) N) RECHUPE (SHRINKAGE CAVITY)
G) QUEMADA PASADA (BURNTHOUGH) O) PENETRACION EXCESIVA (EXCESSIVE PENETRATION)
H) INCLUSION DE TUNGSTENO (TUNGSTEN INCL) RESULTADO (RESULT)
A - ACEPTACIÓN FINAL (FINAL ACCEPTANCE)
R - RECHAZADA (REJECTED)

ORLANDO DE LA LUZ HERNANDEZ II 16-Feb-22


ACEPTACION FINAL (FINAL ACCEPTANCE): NIVEL ASNT (LEVEL): FECHA (DATE):

FO-CAL-020/A3

También podría gustarte