N° DE DIAS MARZO ABRIL MAYO PRECIO / JORNADA PARCIAL LUNES MARTES MIÉRCOLES JUEVES VIERNES SÁBADO
DIA 3/13/2023 3/14/2023 3/15/2023 3/16/2023 3/17/2023 3/18/2023
PEONES
1 LIMBER DELGADO COPIA 37 12 840 24 1680 1 70 70 2590
2 JOSELITO DELGADO COPIA 13 12 840 1 70 0 0 70 910
3 JUAN CARLOS LOPEZ FRIAS 4 4 280 0 0 0 0 70 280
5 CRISTHIAN CHERO HUIMAN 7 7 490 0 0 0 0 70 490
JHONY PEREZ 14 0 0 13 1040 1 80 80 1120
BRAYAN ZAPATA SOSA 7 0 0 7 616 0 0 88 616
KEVIN ZAPATA SOSA 1 1 70 0 0 70 70
6
OPERARIOS
1 DANIEL SIVA INGA 25 10 1200 15 1800 0 0 120 3000
2 EDUARDO SILUPU HUERTAS 28 9 1080 18.5 2220 0 0 120 3300
3 JOSE ALEJANDRO HUIMAN QUINTANA 4 4 480 0 0 0 0 120 480
JOSE HUERTAS COBEÑAS 4 0 0 4 400 0 0 100 400
4 ADOLFO HUAMURO-GATO 30 18 1800 12 1200 0 0 100 3000 1 1 1 1 1 1
ABEL CINFUEGO ROSALES 7 0 0 6 720 1 120 120 840
APOYO
3 DILMER
NEGRO
MARIANO
FLACO
1 : ASISTIO
DOMINGO LUNES MARTES MIERCOLES JUEVES VIERNES SÁBADO DOMINGO LUNES MARTES MIÉRCOLES JUEVES VIERNES SÁBADO DOMINGO LUNES MARTES
3/19/2023 3/20/2023 3/21/2023 3/22/2023 3/23/2023 3/24/2023 3/25/2023 3/26/2023 3/27/2023 3/28/2023 3/29/2023 3/30/2023 3/31/2023 4/1/2023 4/2/2023 4/3/2023 4/4/2023
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
1 1 1 1 0 0 0 0 0 0 0 0 0
1 1 1 1 0 1 0 1 1 0 0 0 0
1 1 1 1 1 1 1 1 1 1 1 0 0
1 1 1 1 0 1 1 1 1 1 1 1 1
1 1 1 1 0 0 0 0 0 0 0 0 0
1
1 1 1 1 1 1 1 1 1 1 1 1 1 0 1
1 1 1 1 1 1 1 1
1 1 1 0
1 1 0 0
1 1
1 1 1
MIÉRCOLES JUEVES VIERNES SABADO DOMINGO LUNES MARTES MIÉRCOLES JUEVES VIERNES SÁBADO
4/5/2023 4/6/2023 4/7/2023 4/8/2023 4/9/2023 4/10/2023 4/11/2023 4/12/2023 4/13/2023 4/14/2023 4/15/2023
1 1 0 1 1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
1
1 1 0 1 1 1 1 0 0 0
1 1 0 1 1 1 1 0.5 0 0
0 0 0 0 0 0 0 0 0 0
1 1 0 1 0 0 0 0 0 0
1 1 0 1 1 1 1 1 1 1
1
1
0
1 1 1 1 1
Materiales PRESTADO
VARILLAS DE 3/4" 32
VARILLAS DE 3/8" 100
CEMENTO 100
DEPARTAMENTO PIURA
"REHABILITACIÓN DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA LA UNION CON CODICO LOCAL
PROYECTO:
414811, LA UNION - PIURA - PIURA" PROVINCIA PIURA
DISTRITO LA UNION
02 ESTRUCTURAS
02.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
02.01.01.00 LIMPIEZA DE TERRENO, MANUAL M2 879.65 1.40 1,231.51 879.65 1231.510 100.0% 0 0.00 0.00% 879.65 1,231.51 100.00%
02.01.02.00 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 879.65 0.44 387.05 879.65 387.046 100.0% 0 0.00 0.00% 879.65 387.05 100.00%
02.02 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZAPATAS, VIGAS DE CIMENTACION, CIMIENTOS CORRIDOS Y VIG. CONEX.
02.02.01 M3 174.66 46.62 8,142.52 60.8832 2838.375 34.9% 113.77 5,304.14 65.14% 174.66 8,142.52 100.00%
02.02.02
ACARREO DE MATERIAL EXCEDENTE DIST. 50 m (A MANO USANDO CARRETILLA) M3 209.59 31.75 6,654.44 104.795 3327.241 50.0% 104.79 3,327.22 50.00% 209.59 6,654.46 100.00%
02.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 23.66 22.42 530.36
RELLENO Y COMPACTO CON AFIRMADO H=0.20M EN PISO INTERIOR m2 161.00 51.65 8,315.65
02.02.06 ELIMINACION DE MATERIAL EXEDENTE, D = 0.5 KM. M3 209.59 10.21 2,139.90 104.79 1069.9499 50.0% 104.7943125 1,069.95 50.00% 209.59 2,139.90 100.00%
02.03 OBRAS DE CONCRETO SIMPLE
02.03.01 SOLADO - CONCRETO 1:12 (C-H) M2 58.32 25.63 1,494.95 58.32 1,494.95 100.00% 58.32 1,494.95 100.00%
02.03.02 CIMIENTO CORRIDO - CONCRETO 1:10 (C-H) + 30% P.G. M3 44.67 261.24 11,670.42 31.271625 8,169.29 70.00% 31.27 8,169.29 70.00%
02.03.03 SOBRECIMIENTO - CONCRETO 1:8 (C-H) + 25% P.M. M3 5.31 241.89 1,283.23
02.03.04 SOBRECIMIENTO - ENCOFRADO Y DESENCOFRADO NORMAL M2 42.44 40.34 1,712.03
02.04 OBRAS DE CONCRETO ARMADO
02.04.01 ZAPATAS
ENCOFRADO EN ZAPATAS M2 155.52 40.34 6,273.68 95.04 3833.9136 61.1% 60.48 2,439.76 38.89% 155.52 6,273.68 100.00%
02.04.01.01 CONCRETO F'C= 210 KG/CM2. EN ZAPATAS M3 34.99 492.60 17,237.14 21.384 10533.8076 61.1% 13.61 6,703.33 38.89% 34.99 17,237.14 100.00%
02.04.01.02 ACERO ESTRUCTURAL FY = 4200 KG/CM2 KG 767.57 6.42 4,927.47 767.57 4927.4718 100.0% 0 0.00 0.00% 767.57 4,927.47 100.00%
02.04.03.01 CONCRETO F'C= 210 KG/CM2. EN VIGA DE CONEXION M3 18.96 491.60 9,322.25 0 0.00 0.00% 0.00 0.00 0.00%
02.04.03.02 ENCOFRADO Y DESENCOFRADO, EN VIGAS DE CONEXIÓN M2 126.42 40.34 5,099.78 63.21 2,549.89 50.00% 63.21 2,549.89 50.00%
02.04.03.03 ACERO ESTRUCTURAL FY = 4200 KG/CM2 KG 1,908.98 6.42 12,254.90 954.490688 6,127.45 50.00% 954.49 6,127.45 50.00%
02.04.05 COLUMNAS
02.04.05.01 CONCRETO F'C= 210 KG/CM2. EN COLUMNAS M3 35.86 491.35 17,619.70 0.00 0.00 0.00%
02.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNAS M2 473.70 40.34 19,109.06 0.00 0.00 0.00%
02.04.05.03 ACERO ESTRUCTURAL FY = 4200 KG/CM2 kg 4,858.99 6.42 31,192.78 2683.9736 17230.0369226 55.2% 1707.9832 10,964.57 35.15% 4,391.96 28,194.61 90.39%
02.04.06.02.01 CONCRETO F'C= 210 KG/CM2. EN VIGAS DE AMARRE M3 1.59 491.60 782.38 0.00 0.00 0.00%
02.04.06.02.02 ENCOFRADO Y DESENCOFRADO, EN VIGAS DE AMARRE M2 15.92 40.34 642.01 0.00 0.00 0.00%
02.04.06.02.03 ACERO ESTRUCTURAL FY = 4200 KG/CM2 KG 81.06 6.42 520.40 0.00 0.00 0.00%
PISOS Y PAVIMENTOS
PINTURAS
3.13 VARIOS
unid 1.00
SUMINISTRO E INSTALACION DE ARCOS DE FULBITO Y VOLEY 6,500.00 6,500.00 0.00 0.00 0.00%
COSTO DIRECTO …........................................ 288,698.91 45,379.35 15.72% 48,150.56 16.68% 93,529.91 32.40%
UTILIDAD 4% …........................................... 11,547.96 1,815.17 1,926.02 3,741.20
01:34:00 AM
195
METRADOS
EXCAVACION
CIMIENTOS CORRIDOS
EJE E
TRAMO 1-2 5.137 0.5 1.2 3.0822
TRAMO 2-3 5.137 0.5 1.2 3.0822
TRAMO 3-4 5.137 0.5 1.2 3.0822
TRAMO 4-5 5.137 0.5 1.2 3.0822
TRAMO 5-6 5.137 0.5 1.2 3.0822
EJE 1
TRAMO A-B 3.776 0.5 1.2 2.2656
TRAMO B-C 3.776 0.5 1.2 2.2656
TRAMO C-D 3.776 0.5 1.2 2.2656
TRAMO D-E 3.776 0.5 1.2 2.2656
EJE 6
TRAMO A-B 3.776 0.5 1.2 2.2656
TRAMO B-C 3.776 0.5 1.2 2.2656
TRAMO C-D 3.776 0.5 1.2 2.2656
TRAMO D-E 3.226 0.5 1.2 1.9356
ZAPATAS
EJE E
TRAMO 1-2 5.137 0.5 0.6 1.5411
TRAMO 2-3 5.137 0.5 0.6 1.5411
TRAMO 3-4 5.137 0.5 0.6 1.5411
TRAMO 4-5 5.137 0.5 0.6 1.5411
TRAMO 5-6 5.137 0.5 0.6 1.5411
EJE 1
TRAMO A-B 3.776 0.5 0.6 1.1328
TRAMO B-C 3.776 0.5 0.6 1.1328
TRAMO C-D 3.776 0.5 0.6 1.1328
TRAMO D-E 3.776 0.5 0.6 1.1328
EJE 6
TRAMO A-B 3.776 0.5 0.6 1.1328
TRAMO B-C 3.776 0.5 0.6 1.1328
TRAMO C-D 3.776 0.5 0.6 1.1328
TRAMO D-E 3.226 0.5 0.6 0.9678
ZAPATAS
15.411
9.0624
8.7324
7.7055
7.7055
4.5312
4.3662