Está en la página 1de 761

OBRA: AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRIT

CONTRATISTA: CONSORCIO USA


SUPERVISION: SERING

NUMERO DE VALORIZACION: 23

1 OCTUBRE OCT_21 2021 1 - OCTUBRE - 2021


2 NOVIEMBRE NOV_21 2021 2 - NOVIEMBRE - 2021
3 DICIEMBRE DIC_21 2021 3 - DICIEMBRE - 2021
4 ENERO ENE_22 2022 4 - ENERO - 2022
5 FEBRERO FEB_22 2022 5 - FEBRERO - 2022
6 MARZO MAR_22 2022 6 - MARZO - 2022
7 ABRIL ABR_22 2022 7 - ABRIL - 2022
8 MAYO MAY_22 2022 8 - MAYO - 2022
9 JUNIO JUN_22 2022 9 - JUNIO - 2022
10 JULIO JUL_22 2022 10 - JULIO - 2022
11 AGOSTO AGO_22 2022 11 - AGOSTO - 2022
12 SETIEMBRE SET_22 2022 12 - SETIEMBRE - 2022
13 OCTUBRE OCT_22 2022 13 - OCTUBRE - 2022
14 NOVIEMBRE NOV_22 2022 14 - NOVIEMBRE - 2022
15 DICIEMBRE DIC_22 2022 15 - DICIEMBRE - 2022
16 ENERO ENE_23 2023 16 - ENERO - 2023
17 FEBRERO FEB_23 2023 17 - FEBRERO - 2023
18 MARZO MAR_23 2023 18 - MARZO - 2023
19 ABRIL ABR_23 2023 19 - ABRIL - 2023
20 MAYO MAY_23 2023 20 - MAYO - 2023
21 JUNIO JUN_23 2023 21 - JUNIO - 2023
22 JULIO JUL_23 2023 22 - JULIO - 2023
23 AGOSTO AGO_23 2023 23 - AGOSTO - 2023
24 SETIEMBRE SET_23 2023 24 - SETIEMBRE - 2023
25 OCTUBRE OCT_23 2023 25 - OCTUBRE - 2023
26 NOVIEMBRE NOV_23 2023 26 - NOVIEMBRE - 2023
27 DICIEMBRE DIC_23 2023 27 - DICIEMBRE - 2023
NERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO

N LOC LOCALIDAD FRENTE


01 TANTAMACO 1
02 CHILLCOUNO 1
03 CCARCCATIR 1
04 SAMILIA 1
05 JIPIAÑA 1
06 ANTAJAHUA 1
07 ACCOPUJIO ( 1
08 PACAJE 1
09 LIHUIÑA 1
10 CHILLI PUJRO 1
11 ANCOYO LIHU 1
12 HATUN URAP 1
13 TANTANUYO 1
14 ULO TIA 1
15 TOCCA BAJO 1
16 CCATACANCH 1
17.01 MACUSANI SE 3
17.02 MACUSANI SE 3
17.03A MACUSANI SE 3
17.03B MACUSANI SE 3
17.04 MACUSANI SE 3
17.05 MACUSANI SE 3
17.06A MACUSANI SE 3
17.06B MACUSANI SE 3
17.07 MACUSANI SE 2
17.08A MACUSANI SE 3
17.08B MACUSANI SE 3
17.09 MACUSANI SE 3
17.1 MACUSANI SE 3
17.11 MACUSANI SE 3
17.12 MACUSANI SE 3
17.13 MACUSANI SE 2
17.14A MACUSANI SE 2
17.14B MACUSANI SE 2
17.15 MACUSANI SE 2
17.16 MACUSANI SE 3
17.17 MACUSANI SE 3
17.18 MACUSANI SE 2
17.19 MACUSANI SE 2
17.2 MACUSANI SE 2
17.21 MACUSANI SE 2
17.22 MACUSANI SE 2
17.23 MACUSANI SE 2
17.24A MACUSANI SE 2
17.24B MACUSANI SE 2
17.25 MACUSANI SE 2
17.26 MACUSANI SE 2
17.27 MACUSANI SE 2
17.28 MACUSANI SE 2
17.29 MACUSANI SE 2
18 PAYAMICHIN 3
19 MACHACCOY 1
20 CALVARIO 1
21 HUACRAMAR 1
22 CCALUYO 1
23 LLULLUCHANI 2
24 CCARACCARA 2
25 HUAYLLUMA 2
26 SURAMAYO 2
27 LACCA PAMP 1
28 LACCA SORAT 1
29 CHUNGARA 1
30 NAQUECOTA 1
31 KELLUCHUPA 2
32 PANCUTA 2
33 MACHACCOYO 2
34 YANACATAHU 2
35 CANLLIMAYO 2
36 HATUN PINA 3
37 LACCA ALCC 3
38 PATAPAMPA 3
39 QUERACCUC 3
40 QUERACUCHO 3
41 PARKUTAÑA 3
42 JATUNCANCH 3
9/200 0
9/300 0
AGOSTO DE 2022

AGOSTO DE 2023
SEPTIEMBRE DE
EJECUTADO EN

EJECUTADO EN
MARZO DE 2022

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN
MARZO DE 2023

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN
ENERO DE 2023
NOVIEMBRE DE

DICIEMBRE DE
JUNIO DE 2022

JUNIO DE 2023
ABRIL DE 2022

ABRIL DE 2023
MAYO DE 2022

MAYO DE 2023
JULIO DE 2022

JULIO DE 2023
RESUMEN DEL SUSTENTO DE MONTAJE ELECTROMECANICO EN REDES SECUNDARIAS

OCTUBRE DE
FEBRERO DE

FEBRERO DE
METRADO
AVANCE

2022

2022

2022

2022

2022

2023
OBRA : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE
CARABAYA REGIÓN PUNO
CONTRATIST : CONSORCIO USA
SUPERVISION: SERING
TOTAL 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
I I I I I I I I I I I I I I I I III III III

1 OBRAS PRELIMINARES 0
Replanteo Topográfico, Ubicación de Estructuras en Redes Secundarias (incluye elaboración de planos / concesión
1.01
rural)
loc 42 23 15 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0
2 INSTALACIÓN DE POSTES 0
2.01 Transporte de Poste de concreto de 9 m de Almacen a Punto de Izaje u 2571 0 10 0 0 0 4 0 330 834 889 192 163 0 85 14 13 9 27 1
2.02 Transporte de Poste de madera importado de 8 m, de Almacen a Punto de Izaje u 1018 0 0 0 0 0 0 0 0 144 597 44 0 0 151 82 0 0 0 0
2.03 Transporte de Poste de madera importado de 11 m, de Almacen a Punto de Izaje u 18 0 0 0 0 0 0 0 0 0 8 7 3 0 0 0 0 0 0 0
2.04 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 1191 0 0 0 0 0 0.848 0 129.744 271.736 418.926 213.462 46.644 0 82.98 20.336 1.696 0 4.664 0.424
2.05 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 299 0 4.24 0 0 0 0.848 0 24.168 85.224 75.048 20.352 45.792 0 24.592 3.816 3.816 4.24 7.208 0
2.06 Izaje, identificación y señalización de poste de concreto de 9 m (*) u 2571 0 10 0 0 0 4 0 330 833 897 192 167 0 72 14 13 10 27 2
2.07 Izaje, Identificación y señalización de poste de madera de 8 m (*) u 976 0 0 0 0 0 0 0 0 32 298 370 60 0 170 46 0 0 0 0
2.08 Izaje, Identificación y señalización de poste de madera de 11 m (*) u 18 0 0 0 0 0 0 0 0 0 5 10 3 0 0 0 0 0 0 0
2.09 Relleno y Compactación de Postes, en Terreno Tipo I (inc, eliminación de desmonte) m³ 989 0 0 0 0 0 0.708 0 96.642 234.32 352.489 175.99 37.933 0 68.236 17.35 1.062 0.354 3.894 0.354
2.1 Relleno y Compactación de Postes, en Terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 198 0 0 0 0 0 0.708 0 0 13.452 3.186 0 2.832 0 7.08 33.63 36.462 84.96 11.328 3.894
3 INSTALACION DE RETENIDAS 0
3.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 744 0 0 0 0 0 0 0 0 0 152.096 194.557 76.783 0 248.489 40.339 0 7.056 18.028 7.052
3.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 137 0 0 0 0 0 1.568 0 0 0 0.784 0.784 23.52 0 34.496 60.368 0.784 9.408 5.488 0
3.03 Instalación de retenida inclinada u 433 0 0 0 0 0 0 0 0 0 0 87 0 0 284 45 13 4 0 0
3.04 Instalación de retenida vertical u 362 0 0 0 0 0 0 0 0 0 0 0 0 0 2 80 32 46 137 65
3.05 Instalación de retenida tipo "Y" inclinada y/o vertical u 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 27 27
3.06 Relleno y compactación de retenida en terreno Tipo I (inc, eliminación de desmonte) m³ 720 0 0 0 0 0 0 0 0 0 147.44 184.685 74.383 0 243.573 39.091 0 6.08 18.24 6.84
3.07 Relleno y compactación de retenida en terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 129 0 0 0 0 0 1.52 0 0 0 0.76 0 0.76 0 31.16 58.52 0.76 26.6 6.32 2.28
4 MONTAJE DE ARMADOS 0
4.01 Armado Tipo E1 u 1192 0 0 0 0 0 0 0 0 0 0 0 65 0 320 306 65 168 172 96
4.02 Armado Tipo E2 u 22 0 0 0 0 0 0 0 0 0 0 0 1 0 8 7 3 1 1 1
4.03 Armado Tipo E3 u 533 0 0 0 0 0 0 0 0 0 0 0 22 0 147 153 31 74 83 23
4.04 Armado Tipo E4 u 267 0 0 0 0 0 0 0 0 0 0 0 11 0 55 66 27 48 52 8
4.05 Armado Tipo E5 u 65 0 0 0 0 0 0 0 0 0 0 0 4 0 21 25 4 1 7 3
4.06 Armado Tipo E6 u 38 0 0 0 0 0 0 0 0 0 0 0 5 0 19 9 0 0 5 0
4.07 Armado Tipo E1P u 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 1
4.08 Armado Tipo E2P u 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0
4.09 Armado Tipo E3P u 61 0 0 0 0 0 0 0 0 0 0 0 3 0 0 28 15 0 11 4
4.1 Armado Tipo E4P u 45 0 0 0 0 0 0 0 0 0 0 0 1 0 0 36 4 0 3 1
4.11 Armado Tipo E5P u 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0
4.12 Armado Tipo E6P u 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 0
4.13 Armado Tipo E1B u 133 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36 86 11
4.14 Armado Tipo E3B u 34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 19 4
4.15 Armado Tipo E4B u 26 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 12 3
4.16 Armado Tipo E5B u 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 3
4.17 Armado Tipo E6B u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.18 Armado Tipo E4PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.19 Armado Tipo PA (portalíneas unipolares en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.2 Armado Tipo CD (caja de derivación en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.21 Armado Tipo E1PB u 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
4.22 Armado Tipo E3PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.23 Armado Tipo E5PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.24 Armado Tipo E6PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.25 Armado Tipo ET (empalme en "T") u 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 16
4.26 Armado Tipo EC (empalme en "Cruz") u 16 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 4 10
5 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 0
5.01 Conductor Autoportante de Aluminio 3x70+25/50 mm² Km 0.428 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.428
5.02 Conductor Autoportante de Aluminio 3x50+16/35 mm² Km 0.326 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.015 0.311
5.03 Conductor Autoportante de Aluminio 3x35+16/25 mm² Km 7.104 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.258 0.000 0.000 3.581 3.265
5.04 Conductor Autoportante de Aluminio 3x25+16/25 mm² Km 13.680 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.222 0.000 0.000 5.099 6.359
5.05 Conductor Autoportante de Aluminio 3x16+16/25 mm² Km 8.607 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.062 0.000 0.000 2.230 0.315
5.06 Conductor Autoportante de Aluminio 2X16+16/25 mm² Km 5.945 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.627 0.000 0.000 1.223 3.879 0.216 0.000 0.000 0.000
5.07 Conductor Autoportante de Aluminio 2X16/25 mm² Km 3.824 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.965 0.000 0.000 1.959 0.766 0.134 0.000 0.000 0.000
5.08 Conductor Autoportante de Aluminio 1X16+16/25 mm² Km 11.249 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.571 0.000 0.000 4.114 5.565 0.000 0.000 0.000 0.000
5.09 Conductor Autoportante de Aluminio 1X16/25 mm² Km 40.637 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 11.017 0.000 0.000 19.851 9.195 0.268 0.000 0.000 0.305
6 INSTALACION DE PUESTA A TIERRA 0
6.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 160 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17.3 142.46
6.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.32
6.03 Instalacion de puesta a tierra Tipo PAT-1 u 94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 94
Relleno y compactación de puesta a tierra Tipo PAT-1 con material adecuado (inc. Resane de vereda, eliminación de
6.04
desmonte)
m³ 163 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 162.62
7 PASTORALES, LUMINARIAS Y LÁMPARAS 0
7.01 Instalación de pastoral de A° G° u 112 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 50
7.02 Instalación de Luminaria, Lámpara y Accesorios u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8 CONEXIONES DOMICILIARIAS 0

8.01 Conexión de Acometidas Domiciliarias, Configuración: acometida con murete (no incluye medidor de energía activa) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.02 Conexión de acometidas domiciliarias, configuración: Corta u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.03 Conexión de acometida domiciliarias, configuración: Larga u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.04 Instalación de medidor monofásico de energia activa y caja u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.05 Instalación de medidor trifásico de energia activa y caja u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.06 Contraste de medidor de energía activa - electrónico u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.07 Murete de Concreto de 1,65m de altura libre y 0,30m de profundidad. F'c=100 kg/cm², incluye transporte (*) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 DESMONTAJE DE REDES EXISTENTES 0
9.01 Desmontaje de armados cualquier tipo (incluye embalaje, selección y devolución a almacén) u 0
9.02 Desmontaje de retenidas cualquier tipo (comprende corte de varilla, embalaje, selección y devolución a almacén) u 0
9.03 Desmontaje de luminarias cualquier tipo (comprende embalaje, selección y devolución a almacén) u 0
9.04 Desmontaje de conductores cualquier tipo (comprende clasificación, embalaje, selección y devolución a almacén) km 0
9.05 Desmontaje de postes cualquier tipo (incluye excavación, resane, selección, embalaje y devolución a almacén) u 0
9.06 Desmontaje de Caja portamedidor (Inc. Medidor) u 0
10 PRUEBAS Y PUESTA EN SERVICIO 0
10.01 Pruebas y Puesta en Servicio de Redes Secundarias Loc 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Expediente Técnico Final Conforme a Obra y de Concesión Rural de Redes Secundarias (1 Original + 3 Copias),
10.02
incluye la presentacion digitalizada de textos y planos en CD.
Loc 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SEPTIEMBRE DE
EJECUTADO EN

EJECUTADO EN

EJECUTADO EN

EJECUTADO EN
NOVIEMBRE DE

DICIEMBRE DE
RESUMEN DEL SUSTENTO DE MONTAJE ELECTROMECANICO EN REDES SECUNDARIAS

OCTUBRE DE
METRADO
AVANCE

2023

2023

2023

2023
OBRA : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE
CARABAYA REGIÓN PUNO
CONTRATIST : CONSORCIO USA
SUPERVISION: SERING
TOTAL 24 25 26 27
III III III III

1 OBRAS PRELIMINARES 0
Replanteo Topográfico, Ubicación de Estructuras en Redes Secundarias (incluye elaboración de planos / concesión
1.01
rural)
loc 42 0 0 0 0
2 INSTALACIÓN DE POSTES 0
2.01 Transporte de Poste de concreto de 9 m de Almacen a Punto de Izaje u 2571 0 0 0 0
2.02 Transporte de Poste de madera importado de 8 m, de Almacen a Punto de Izaje u 1018 0 0 0 0
2.03 Transporte de Poste de madera importado de 11 m, de Almacen a Punto de Izaje u 18 0 0 0 0
2.04 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 1191 0 0 0 0
2.05 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 299 0 0 0 0
2.06 Izaje, identificación y señalización de poste de concreto de 9 m (*) u 2571 0 0 0 0
2.07 Izaje, Identificación y señalización de poste de madera de 8 m (*) u 976 0 0 0 0
2.08 Izaje, Identificación y señalización de poste de madera de 11 m (*) u 18 0 0 0 0
2.09 Relleno y Compactación de Postes, en Terreno Tipo I (inc, eliminación de desmonte) m³ 989 0 0 0 0
2.1 Relleno y Compactación de Postes, en Terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 198 0 0 0 0
3 INSTALACION DE RETENIDAS 0
3.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 744 0 0 0 0
3.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 137 0 0 0 0
3.03 Instalación de retenida inclinada u 433 0 0 0 0
3.04 Instalación de retenida vertical u 362 0 0 0 0
3.05 Instalación de retenida tipo "Y" inclinada y/o vertical u 54 0 0 0 0
3.06 Relleno y compactación de retenida en terreno Tipo I (inc, eliminación de desmonte) m³ 720 0 0 0 0
3.07 Relleno y compactación de retenida en terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 129 0 0 0 0
4 MONTAJE DE ARMADOS 0
4.01 Armado Tipo E1 u 1192 0 0 0 0
4.02 Armado Tipo E2 u 22 0 0 0 0
4.03 Armado Tipo E3 u 533 0 0 0 0
4.04 Armado Tipo E4 u 267 0 0 0 0
4.05 Armado Tipo E5 u 65 0 0 0 0
4.06 Armado Tipo E6 u 38 0 0 0 0
4.07 Armado Tipo E1P u 10 0 0 0 0
4.08 Armado Tipo E2P u 1 0 0 0 0
4.09 Armado Tipo E3P u 61 0 0 0 0
4.1 Armado Tipo E4P u 45 0 0 0 0
4.11 Armado Tipo E5P u 2 0 0 0 0
4.12 Armado Tipo E6P u 9 0 0 0 0
4.13 Armado Tipo E1B u 133 0 0 0 0
4.14 Armado Tipo E3B u 34 0 0 0 0
4.15 Armado Tipo E4B u 26 0 0 0 0
4.16 Armado Tipo E5B u 4 0 0 0 0
4.17 Armado Tipo E6B u 0 0 0 0 0
4.18 Armado Tipo E4PB u 0 0 0 0 0
4.19 Armado Tipo PA (portalíneas unipolares en postes de BT y MT) u 0 0 0 0 0
4.2 Armado Tipo CD (caja de derivación en postes de BT y MT) u 0 0 0 0 0
4.21 Armado Tipo E1PB u 1 0 0 0 0
4.22 Armado Tipo E3PB u 0 0 0 0 0
4.23 Armado Tipo E5PB u 0 0 0 0 0
4.24 Armado Tipo E6PB u 0 0 0 0 0
4.25 Armado Tipo ET (empalme en "T") u 22 0 0 0 0
4.26 Armado Tipo EC (empalme en "Cruz") u 16 0 0 0 0
5 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 0
5.01 Conductor Autoportante de Aluminio 3x70+25/50 mm² Km 0.428 0.000 0.000 0.000 0.000
5.02 Conductor Autoportante de Aluminio 3x50+16/35 mm² Km 0.326 0.000 0.000 0.000 0.000
5.03 Conductor Autoportante de Aluminio 3x35+16/25 mm² Km 7.104 0.000 0.000 0.000 0.000
5.04 Conductor Autoportante de Aluminio 3x25+16/25 mm² Km 13.680 0.000 0.000 0.000 0.000
5.05 Conductor Autoportante de Aluminio 3x16+16/25 mm² Km 8.607 0.000 0.000 0.000 0.000
5.06 Conductor Autoportante de Aluminio 2X16+16/25 mm² Km 5.945 0.000 0.000 0.000 0.000
5.07 Conductor Autoportante de Aluminio 2X16/25 mm² Km 3.824 0.000 0.000 0.000 0.000
5.08 Conductor Autoportante de Aluminio 1X16+16/25 mm² Km 11.249 0.000 0.000 0.000 0.000
5.09 Conductor Autoportante de Aluminio 1X16/25 mm² Km 40.637 0.000 0.000 0.000 0.000
6 INSTALACION DE PUESTA A TIERRA 0
6.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 160 0 0 0 0
6.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 6 0 0 0 0
6.03 Instalacion de puesta a tierra Tipo PAT-1 u 94 0 0 0 0
Relleno y compactación de puesta a tierra Tipo PAT-1 con material adecuado (inc. Resane de vereda, eliminación de
6.04
desmonte)
m³ 163 0 0 0 0
7 PASTORALES, LUMINARIAS Y LÁMPARAS 0
7.01 Instalación de pastoral de A° G° u 112 0 0 0 0
7.02 Instalación de Luminaria, Lámpara y Accesorios u 0 0 0 0 0
8 CONEXIONES DOMICILIARIAS 0

8.01 Conexión de Acometidas Domiciliarias, Configuración: acometida con murete (no incluye medidor de energía activa) u 0 0 0 0 0
8.02 Conexión de acometidas domiciliarias, configuración: Corta u 0 0 0 0 0
8.03 Conexión de acometida domiciliarias, configuración: Larga u 0 0 0 0 0
8.04 Instalación de medidor monofásico de energia activa y caja u 0 0 0 0 0
8.05 Instalación de medidor trifásico de energia activa y caja u 0 0 0 0 0
8.06 Contraste de medidor de energía activa - electrónico u 0 0 0 0 0
8.07 Murete de Concreto de 1,65m de altura libre y 0,30m de profundidad. F'c=100 kg/cm², incluye transporte (*) u 0 0 0 0 0
9 DESMONTAJE DE REDES EXISTENTES 0
9.01 Desmontaje de armados cualquier tipo (incluye embalaje, selección y devolución a almacén) u 0
9.02 Desmontaje de retenidas cualquier tipo (comprende corte de varilla, embalaje, selección y devolución a almacén) u 0
9.03 Desmontaje de luminarias cualquier tipo (comprende embalaje, selección y devolución a almacén) u 0
9.04 Desmontaje de conductores cualquier tipo (comprende clasificación, embalaje, selección y devolución a almacén) km 0
9.05 Desmontaje de postes cualquier tipo (incluye excavación, resane, selección, embalaje y devolución a almacén) u 0
9.06 Desmontaje de Caja portamedidor (Inc. Medidor) u 0
10 PRUEBAS Y PUESTA EN SERVICIO 0
10.01 Pruebas y Puesta en Servicio de Redes Secundarias Loc 0 0 0 0 0
Expediente Técnico Final Conforme a Obra y de Concesión Rural de Redes Secundarias (1 Original + 3 Copias),
10.02
incluye la presentacion digitalizada de textos y planos en CD.
Loc 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 01 TANTAMACO
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00
OBRAS
DESCRIPCION 2.00 INSTALACIÓN DE POSTES 3.00 INSTALACIÓN DE RETENIDAS
PRELIMIN
ARES
CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04
N° ESTRUCTURA

Relleno y Relleno y
Transporte de Poste de Almacen Izaje, identificación y
Excavación Compactación de Excavación Instalación de Retenida Compactación de
N° DE SED

a punto de Izaje señalización de poste


Replanteo Poste Retenidas
Topográfi
co
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4

3 4 56 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
EJECUTADO EN FEBRERO D 23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 15 10 0 0 0 4.24 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2 4 4 0 0 0.848 0.848 4 0 0 0.708 0.708 0 1.568 0 0 0 0 1.52 0 0 0 0
EJECUTADO EN AGOSTO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBR 0 330 0 0 129.744 24.168 330 0 0 96.642 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE D 0 834 144 0 271.736 85.224 833 32 0 234.32 13.452 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE 0 889 597 8 418.926 75.048 897 298 5 352.489 3.186 152.096 0.784 0 0 0 147.44 0.76 0 0 0 0
EJECUTADO EN DICIEMBRE 0 192 44 7 213.462 20.352 192 370 10 175.99 0 194.557 0.784 87 0 0 184.685 0 0 0 0 0
EJECUTADO EN ENERO DE 0 163 0 3 46.644 45.792 167 60 3 37.933 2.832 76.783 23.52 0 0 0 74.383 0.76 65 1 22 11
EJECUTADO EN FEBRERO D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 0 85 151 0 82.98 24.592 72 170 0 68.236 7.08 248.489 34.496 284 2 0 243.573 31.16 320 8 147 55
EJECUTADO EN ABRIL DE 2 0 14 82 0 20.336 3.816 14 46 0 17.35 33.63 40.339 60.368 45 80 0 39.091 58.52 306 7 153 66
EJECUTADO EN MAYO DE 0 13 0 0 1.696 3.816 13 0 0 1.062 36.462 0 0.784 13 32 0 0 0.76 65 3 31 27
EJECUTADO EN JUNIO DE 0 9 0 0 0 4.24 10 0 0 0.354 84.96 7.056 9.408 4 46 0 6.08 26.6 168 1 74 48
EJECUTADO EN JULIO DE 2 0 27 0 0 4.664 7.208 27 0 0 3.894 11.328 18.028 5.488 0 137 27 18.24 6.32 172 1 83 52
EJECUTADO EN AGOSTO DE 0 1 0 0 0.424 0 2 0 0 0.354 3.894 7.052 0 0 65 27 6.84 2.28 96 1 23 8
EJECUTADO EN SEPTIEMBR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 42 2571 1018 18 1191.46 299.344 2571 976 18 989.332 197.532 744.4 137.2 433 362 54 720.332 128.68 1192 22 533 267
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.05 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26
N° ESTRUCTURA

Armado Tipo
N° DE SED

PA
CD (caja
(portalíne
de
as ET EC
derivación
E5 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B E4PB unipolares E1PB E3PB E5PB E6PB (empalme (empalme
en postes
en postes en "T") en "Cruz")
de BT y
de BT y
MT)
3 4 5 6 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94
MT)
EJECUTADO EN FEBRERO D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 4 5 0 1 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
EJECUTADO EN FEBRERO D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 21 19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2 25 9 9 0 28 36 2 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 4 0 0 0 15 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 1 0 0 0 0 0 0 0 36 11 11 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2 7 5 0 0 11 3 0 0 86 19 12 1 0 0 0 0 1 0 0 0 6 4
EJECUTADO EN AGOSTO DE 3 0 1 0 4 1 0 0 11 4 3 3 0 0 0 0 0 0 0 0 16 10
EJECUTADO EN SEPTIEMBR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 65 38 10 1 61 45 2 9 133 34 26 4 0 0 0 0 1 0 0 0 22 16


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES,
DESCRIPCION 5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA LUMINARIAS Y 8.00 CONEXIONES DOMICILIARIAS
LAMPARAS

CODIGO DE PARTIDA 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07
Murete
Instalació
N° ESTRUCTURA

Relleno y Conexión de Acometidas Instalació Contraste de


Conductor Autoportante de Aluminio Excavación Instalació n de
Instalacio compacta n de de Concreto
N° DE SED

Instalació n de Domiciliarias, Configuración medidor


n de ción de medidor medidor de 1,65m
n de Luminaria, monofásic
puesta a puesta a trifásico de energía de altura
pastoral Lámpara y o de
tierra Tipo tierra de energia activa - libre y
3x70+25/ 3x50+16/ 3x35+16/ 3x25+16/ 3x16+16/ 2X16+16/ 2X16/25 1X16+16/ 1X16/25 de A° G° Accesorio energia
Tipo I Tipo II PAT-1 Tipo PAT- Murete Corta Larga activa y electrónic 0,30m de
50 mm² 35 mm² 25 mm² 25 mm² 25 mm² 25 mm² mm² 25 mm² mm² s activa y
1 caja o profundid
caja
ad
3 4 5 6 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138
EJECUTADO EN FEBRERO D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE 0 0 0 0 0 0.62727 0.964801 1.570657 11.01748 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 0 0 0 0 0 1.22261 1.95906 4.113614 19.85088 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2 0 0 0.258067 2.222174 6.062219 3.878568 0.765805 5.565193 9.195428 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 0 0 0 0 0 0.2163 0.1339 0 0.2678 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2 0 0.01545 3.580527 5.098552 2.229806 0 0 0 0 17.3 0 0 0 62 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 0.42848 0.310597 3.26509 6.359158 0.314614 0 0 0 0.305302 142.46 6.32 94 162.62 50 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0.42848 0.326047 7.103683 13.67988 8.606639 5.963566 3.85251 11.30789 41.03766 159.76 6.32 94 162.62 112 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

10.00 PRUEBAS Y
DESCRIPCION PUESTA EN
SERVICIO.

CODIGO DE PARTIDA 10.01 10.02


N° ESTRUCTURA

Expedient
e tecnico
N° DE SED

Pruebas y finales
puesta en conforme
servicio a obra (1
Original +
3 Copias)

3 4 5 6 139 140 141 142


EJECUTADO EN FEBRERO D 0 0
EJECUTADO EN MARZO DE 0 0
EJECUTADO EN ABRIL DE 2 0 0
EJECUTADO EN MAYO DE 0 0
EJECUTADO EN JUNIO DE 0 0
EJECUTADO EN JULIO DE 2 0 0
EJECUTADO EN AGOSTO DE 0 0
EJECUTADO EN SEPTIEMBR 0 0
EJECUTADO EN OCTUBRE D 0 0
EJECUTADO EN NOVIEMBRE 0 0
EJECUTADO EN DICIEMBRE 0 0
EJECUTADO EN ENERO DE 0 0
EJECUTADO EN FEBRERO D 0 0
EJECUTADO EN MARZO DE 0 0
EJECUTADO EN ABRIL DE 2 0 0
EJECUTADO EN MAYO DE 0 0
EJECUTADO EN JUNIO DE 0 0
EJECUTADO EN JULIO DE 2 0 0
EJECUTADO EN AGOSTO DE 0 0
EJECUTADO EN SEPTIEMBR 0 0
EJECUTADO EN OCTUBRE D 0 0
EJECUTADO EN NOVIEMBRE 0 0
EJECUTADO EN DICIEMBRE 0 0

AVANCE TOTAL 0 0
METRADO AVANCE

MACUSANI SED 3A
MACUSANI SED 01

MACUSANI SED 02
ANCOYO LIHUIÑA

HATUN URAPATA
(HUARACCOLLO)
RESUMEN DEL SUSTENTO DE MONTAJE ELECTROMECANICO EN REDES SECUNDARIAS

CCATACANCHA
CCARCCATIRA

CHILLI PUJRO
CHILLCOUNO

TOCCA BAJO
TANTAMACO

TANTANUYO
ANTAJAHUA

ACCOPUJIO
GRANDE

SAMILIA

LIHUIÑA
PACAJE
JIPIAÑA

ULO TIA
OBRA : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE
CARABAYA REGIÓN PUNO
CONTRATIST : CONSORCIO USA
SUPERVISION: SERING

I I I I I I I I I I I I I I I I III III III


TOTAL 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17.01 17.02 17.03A
1 OBRAS PRELIMINARES 0
Replanteo Topográfico, Ubicación de Estructuras en Redes Secundarias (incluye elaboración de planos / concesión
1.01
rural)
loc 42 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
2 INSTALACIÓN DE POSTES 0
2.01 Transporte de Poste de concreto de 9 m de Almacen a Punto de Izaje u 2381 0 0 0 0 0 0 0 243 0 0 0 0 0 0 0 0 60 79 135
2.02 Transporte de Poste de madera importado de 8 m, de Almacen a Punto de Izaje u 1018 0 6 17 10 8 48 11 0 10 4 27 25 7 24 8 27 0 0 0
2.03 Transporte de Poste de madera importado de 11 m, de Almacen a Punto de Izaje u 18 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0
2.04 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 1111 0 2.376 8.04 3.96 3.168 19.008 4.356 103.456 3.96 1.584 10.692 9.9 2.772 9.504 3.168 11.346 25.44 32.224 56.816
2.05 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 299 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.272 0.424
2.06 Izaje, identificación y señalización de poste de concreto de 9 m (*) u 2381 0 0 0 0 0 0 0 243 0 0 0 0 0 0 0 0 60 79 135
2.07 Izaje, Identificación y señalización de poste de madera de 8 m (*) u 976 0 6 17 10 8 48 11 0 10 4 27 25 7 24 8 27 0 0 0
2.08 Izaje, Identificación y señalización de poste de madera de 11 m (*) u 18 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0
2.09 Relleno y Compactación de Postes, en Terreno Tipo I (inc, eliminación de desmonte) m³ 922 0 1.986 6.773 3.31 2.648 15.888 3.641 86.022 3.31 1.324 8.937 8.275 2.317 7.944 2.648 9.51 21.24 26.904 47.436
2.1 Relleno y Compactación de Postes, en Terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 198 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.354
3 INSTALACION DE RETENIDAS 0
3.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 673 0 2.253 9.045 2.253 5.257 12.8 5.257 61.936 4.506 1.502 11.265 10.514 3.004 11.265 4.506 5.29 10.192 12.544 26.656
3.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 137 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.568 0.784
3.03 Instalación de retenida inclinada u 401 0 3 11 3 7 16 7 32 6 2 15 14 4 15 6 6 0 0 0
3.04 Instalación de retenida vertical u 330 0 0 0 0 0 0 0 47 0 0 0 0 0 0 0 1 11 16 24
3.05 Instalación de retenida tipo "Y" inclinada y/o vertical u 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0
3.06 Relleno y compactación de retenida en terreno Tipo I (inc, eliminación de desmonte) m³ 651 0 2.181 8.757 2.181 5.089 12.392 5.089 59.28 4.362 1.454 10.905 10.178 2.908 10.905 4.362 5.122 9.88 12.16 25.84
3.07 Relleno y compactación de retenida en terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 129 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.52 0
4 MONTAJE DE ARMADOS 0
4.01 Armado Tipo E1 u 1153 0 1 8 2 1 19 4 139 5 0 9 13 2 9 0 17 39 54 0
4.02 Armado Tipo E2 u 20 0 1 1 0 0 3 0 0 0 0 0 0 0 1 0 0 0 0 0
4.03 Armado Tipo E3 u 495 0 4 9 6 6 16 6 62 3 3 16 9 3 9 5 8 17 13 8
4.04 Armado Tipo E4 u 247 0 0 2 2 0 5 3 27 1 0 4 2 1 5 0 3 6 3 12
4.05 Armado Tipo E5 u 59 0 0 1 1 1 4 0 7 0 1 2 2 1 1 1 1 1 0 0
4.06 Armado Tipo E6 u 37 0 1 1 0 1 3 0 4 1 0 1 1 0 1 2 0 0 0 0
4.07 Armado Tipo E1P u 10 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0
4.08 Armado Tipo E2P u 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.09 Armado Tipo E3P u 61 0 1 3 0 4 4 0 6 0 0 0 0 2 2 2 0 0 2 0
4.1 Armado Tipo E4P u 45 0 0 2 0 0 3 1 6 1 1 1 2 0 1 1 4 1 1 0
4.11 Armado Tipo E5P u 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0
4.12 Armado Tipo E6P u 9 0 0 0 1 0 1 0 0 0 0 1 0 0 1 0 0 0 0 0
4.13 Armado Tipo E1B u 133 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 4
4.14 Armado Tipo E3B u 34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1
4.15 Armado Tipo E4B u 26 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.16 Armado Tipo E5B u 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.17 Armado Tipo E6B u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.18 Armado Tipo E4PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.19 Armado Tipo PA (portalíneas unipolares en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.2 Armado Tipo CD (caja de derivación en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.21 Armado Tipo E1PB u 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0
4.22 Armado Tipo E3PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.23 Armado Tipo E5PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.24 Armado Tipo E6PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.25 Armado Tipo ET (empalme en "T") u 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 2 1
4.26 Armado Tipo EC (empalme en "Cruz") u 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1
5 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 0
5.01 Conductor Autoportante de Aluminio 3x70+25/50 mm² Km 0.428 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.428 0.000
5.02 Conductor Autoportante de Aluminio 3x50+16/35 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.03 Conductor Autoportante de Aluminio 3x35+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.04 Conductor Autoportante de Aluminio 3x25+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.05 Conductor Autoportante de Aluminio 3x16+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.06 Conductor Autoportante de Aluminio 2X16+16/25 mm² Km 0.646 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.07 Conductor Autoportante de Aluminio 2X16/25 mm² Km 0.994 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.08 Conductor Autoportante de Aluminio 1X16+16/25 mm² Km 2.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.09 Conductor Autoportante de Aluminio 1X16/25 mm² Km 13.760 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
6 INSTALACION DE PUESTA A TIERRA 0
6.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 160 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19.03 28.28 36.33
6.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.59 0
6.03 Instalacion de puesta a tierra Tipo PAT-1 u 94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 19 18
Relleno y compactación de puesta a tierra Tipo PAT-1 con material adecuado (inc. Resane de vereda, eliminación de
6.04
desmonte)
m³ 163 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19.03 32.87 31.14
7 PASTORALES, LUMINARIAS Y LÁMPARAS 0
7.01 Instalación de pastoral de A° G° u 112 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 0 0
7.02 Instalación de Luminaria, Lámpara y Accesorios u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8 CONEXIONES DOMICILIARIAS 0

8.01 Conexión de Acometidas Domiciliarias, Configuración: acometida con murete (no incluye medidor de energía activa) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.02 Conexión de acometidas domiciliarias, configuración: Corta u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.03 Conexión de acometida domiciliarias, configuración: Larga u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.04 Instalación de medidor monofásico de energia activa y caja u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.05 Instalación de medidor trifásico de energia activa y caja u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.06 Contraste de medidor de energía activa - electrónico u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.07 Murete de Concreto de 1,65m de altura libre y 0,30m de profundidad. F'c=100 kg/cm², incluye transporte (*) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 DESMONTAJE DE REDES EXISTENTES 0
9.01 Desmontaje de armados cualquier tipo (incluye embalaje, selección y devolución a almacén) u 0
9.02 Desmontaje de retenidas cualquier tipo (comprende corte de varilla, embalaje, selección y devolución a almacén) u 0
9.03 Desmontaje de luminarias cualquier tipo (comprende embalaje, selección y devolución a almacén) u 0
9.04 Desmontaje de conductores cualquier tipo (comprende clasificación, embalaje, selección y devolución a almacén) km 0
9.05 Desmontaje de postes cualquier tipo (incluye excavación, resane, selección, embalaje y devolución a almacén) u 0
9.06 Desmontaje de Caja portamedidor (Inc. Medidor) u 0
10 PRUEBAS Y PUESTA EN SERVICIO 0
10.01 Pruebas y Puesta en Servicio de Redes Secundarias Loc 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Expediente Técnico Final Conforme a Obra y de Concesión Rural de Redes Secundarias (1 Original + 3 Copias),
10.02
incluye la presentacion digitalizada de textos y planos en CD.
Loc 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MACUSANI SED 14A

MACUSANI SED 14B


METRADO AVANCE

MACUSANI SED 3B

MACUSANI SED 6A

MACUSANI SED 6B

MACUSANI SED 8A

MACUSANI SED 8B
MACUSANI SED 04

MACUSANI SED 05

MACUSANI SED 07

MACUSANI SED 09

MACUSANI SED 10

MACUSANI SED 11

MACUSANI SED 12

MACUSANI SED 13

MACUSANI SED 15

MACUSANI SED 16

MACUSANI SED 17

MACUSANI SED 18
RESUMEN DEL SUSTENTO DE MONTAJE ELECTROMECANICO EN REDES SECUNDARIAS
OBRA : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE
CARABAYA REGIÓN PUNO
CONTRATIST : CONSORCIO USA
SUPERVISION: SERING
III III III III III II III III III III III III II II II II III III II
TOTAL 17.03B 17.04 17.05 17.06A 17.06B 17.07 17.08A 17.08B 17.09 17.10 17.11 17.12 17.13 17.14A 17.14B 17.15 17.16 17.17 17.18
1 OBRAS PRELIMINARES 0
Replanteo Topográfico, Ubicación de Estructuras en Redes Secundarias (incluye elaboración de planos / concesión
1.01
rural)
loc 42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 INSTALACIÓN DE POSTES 0
2.01 Transporte de Poste de concreto de 9 m de Almacen a Punto de Izaje u 2381 113 76 80 56 52 105 58 20 68 74 61 48 79 61 42 67 78 71 10
2.02 Transporte de Poste de madera importado de 8 m, de Almacen a Punto de Izaje u 1018 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.03 Transporte de Poste de madera importado de 11 m, de Almacen a Punto de Izaje u 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.04 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 1111 43.672 32.224 31.376 11.872 19.928 19.08 14.84 3.816 24.592 28.832 14.84 15.264 17.808 18.656 10.176 20.776 24.592 30.104 4.24
2.05 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 299 4.24 0 2.544 11.872 2.12 25.44 9.752 4.664 4.24 2.544 11.448 5.088 15.688 7.208 7.632 7.632 8.48 0 0
2.06 Izaje, identificación y señalización de poste de concreto de 9 m (*) u 2381 113 76 80 56 52 105 58 20 68 74 61 48 79 61 42 67 78 71 10
2.07 Izaje, Identificación y señalización de poste de madera de 8 m (*) u 976 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.08 Izaje, Identificación y señalización de poste de madera de 11 m (*) u 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.09 Relleno y Compactación de Postes, en Terreno Tipo I (inc, eliminación de desmonte) m³ 922 36.108 26.904 26.196 9.912 16.638 15.93 12.744 3.186 20.532 24.072 12.39 12.744 14.514 15.576 8.496 17.346 20.532 25.134 3.54
2.1 Relleno y Compactación de Postes, en Terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 198 2.124 0 2.124 9.558 1.416 20.178 7.08 3.186 2.478 1.416 8.142 3.186 10.62 5.664 6.372 6.372 7.08 0 0
3 INSTALACION DE RETENIDAS 0
3.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 673 25.872 17.24 17.248 6.272 11.76 9.408 11.76 2.352 13.328 15.68 8.624 9.408 8.624 7.84 7.056 12.544 16.464 17.248 0
3.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 137 3.136 0 1.568 4.704 3.136 6.272 2.352 1.568 3.92 1.568 6.272 1.568 0.784 2.352 1.568 0 3.92 0 0
3.03 Instalación de retenida inclinada u 401 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.04 Instalación de retenida vertical u 330 22 19 21 10 13 0 11 0 14 21 9 10 0 0 0 0 14 19 0
3.05 Instalación de retenida tipo "Y" inclinada y/o vertical u 54 14 3 2 4 6 0 3 1 8 1 1 2 0 0 0 0 3 2 0
3.06 Relleno y compactación de retenida en terreno Tipo I (inc, eliminación de desmonte) m³ 651 25.08 16.72 16.72 6.84 11.4 9.12 11.4 2.28 12.92 15.2 8.36 9.12 8.36 7.6 6.84 12.16 15.2 16.72 0
3.07 Relleno y compactación de retenida en terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 129 3.04 0 1.52 4.04 3.04 6.08 2.28 1.52 2.28 1.52 4.56 1.52 0.76 2.28 1.52 0 4.56 0 0
4 MONTAJE DE ARMADOS 0
4.01 Armado Tipo E1 u 1153 0 48 44 20 19 0 0 0 29 33 17 16 0 0 0 0 15 41 9
4.02 Armado Tipo E2 u 20 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.03 Armado Tipo E3 u 495 2 16 16 6 10 0 3 0 10 16 4 6 0 0 0 0 7 17 0
4.04 Armado Tipo E4 u 247 11 6 8 4 3 0 2 0 4 9 4 6 0 0 0 0 8 10 0
4.05 Armado Tipo E5 u 59 0 2 1 1 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0
4.06 Armado Tipo E6 u 37 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 1 0 0
4.07 Armado Tipo E1P u 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0
4.08 Armado Tipo E2P u 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.09 Armado Tipo E3P u 61 0 0 4 1 0 0 0 0 3 2 0 0 0 0 0 0 0 1 3
4.1 Armado Tipo E4P u 45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1
4.11 Armado Tipo E5P u 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.12 Armado Tipo E6P u 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.13 Armado Tipo E1B u 133 0 0 8 16 9 0 0 0 11 15 8 1 0 0 0 0 19 3 0
4.14 Armado Tipo E3B u 34 2 1 2 4 1 0 0 0 3 1 0 2 0 0 0 0 1 2 0
4.15 Armado Tipo E4B u 26 0 0 1 1 2 0 2 0 6 2 0 0 0 0 0 0 1 0 0
4.16 Armado Tipo E5B u 4 0 0 0 0 0 0 0 0 1 2 0 0 0 0 0 0 1 0 0
4.17 Armado Tipo E6B u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.18 Armado Tipo E4PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.19 Armado Tipo PA (portalíneas unipolares en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.2 Armado Tipo CD (caja de derivación en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.21 Armado Tipo E1PB u 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.22 Armado Tipo E3PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.23 Armado Tipo E5PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.24 Armado Tipo E6PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.25 Armado Tipo ET (empalme en "T") u 22 0 1 6 0 0 0 0 0 0 3 0 0 0 0 0 0 0 6 0
4.26 Armado Tipo EC (empalme en "Cruz") u 16 0 0 4 0 0 0 0 0 0 2 0 0 0 0 0 0 0 4 0
5 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 0
5.01 Conductor Autoportante de Aluminio 3x70+25/50 mm² Km 0.428 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.02 Conductor Autoportante de Aluminio 3x50+16/35 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.03 Conductor Autoportante de Aluminio 3x35+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.04 Conductor Autoportante de Aluminio 3x25+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.05 Conductor Autoportante de Aluminio 3x16+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.06 Conductor Autoportante de Aluminio 2X16+16/25 mm² Km 0.646 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.07 Conductor Autoportante de Aluminio 2X16/25 mm² Km 0.994 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.08 Conductor Autoportante de Aluminio 1X16+16/25 mm² Km 2.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.09 Conductor Autoportante de Aluminio 1X16/25 mm² Km 13.760 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
6 INSTALACION DE PUESTA A TIERRA 0
6.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 160 25.95 0 27.68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22.49 0
6.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 6 0 0 1.73 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6.03 Instalacion de puesta a tierra Tipo PAT-1 u 94 15 0 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 0
Relleno y compactación de puesta a tierra Tipo PAT-1 con material adecuado (inc. Resane de vereda, eliminación de
6.04
desmonte)
m³ 163 25.95 0 31.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22.49 0
7 PASTORALES, LUMINARIAS Y LÁMPARAS 0
7.01 Instalación de pastoral de A° G° u 112 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 0
7.02 Instalación de Luminaria, Lámpara y Accesorios u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8 CONEXIONES DOMICILIARIAS 0

8.01 Conexión de Acometidas Domiciliarias, Configuración: acometida con murete (no incluye medidor de energía activa) u 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.02 Conexión de acometidas domiciliarias, configuración: Corta u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.03 Conexión de acometida domiciliarias, configuración: Larga u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.04 Instalación de medidor monofásico de energia activa y caja u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.05 Instalación de medidor trifásico de energia activa y caja u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.06 Contraste de medidor de energía activa - electrónico u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.07 Murete de Concreto de 1,65m de altura libre y 0,30m de profundidad. F'c=100 kg/cm², incluye transporte (*) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 DESMONTAJE DE REDES EXISTENTES 0
9.01 Desmontaje de armados cualquier tipo (incluye embalaje, selección y devolución a almacén) u 0
9.02 Desmontaje de retenidas cualquier tipo (comprende corte de varilla, embalaje, selección y devolución a almacén) u 0
9.03 Desmontaje de luminarias cualquier tipo (comprende embalaje, selección y devolución a almacén) u 0
9.04 Desmontaje de conductores cualquier tipo (comprende clasificación, embalaje, selección y devolución a almacén) km 0
9.05 Desmontaje de postes cualquier tipo (incluye excavación, resane, selección, embalaje y devolución a almacén) u 0
9.06 Desmontaje de Caja portamedidor (Inc. Medidor) u 0
10 PRUEBAS Y PUESTA EN SERVICIO 0
10.01 Pruebas y Puesta en Servicio de Redes Secundarias Loc 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Expediente Técnico Final Conforme a Obra y de Concesión Rural de Redes Secundarias (1 Original + 3 Copias),
10.02 Loc 0
incluye la presentacion digitalizada de textos y planos en CD. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MACUSANI SED 24A

MACUSANI SED 24B


METRADO AVANCE

MACUSANI SED 19

MACUSANI SED 20

MACUSANI SED 21

MACUSANI SED 22

MACUSANI SED 23

MACUSANI SED 25

MACUSANI SED 26

MACUSANI SED 27

MACUSANI SED 28

MACUSANI SED 29

HUACRAMARCA
RESUMEN DEL SUSTENTO DE MONTAJE ELECTROMECANICO EN REDES SECUNDARIAS

MACHACCOYO

CCARACCARA
PAYAMICHINA

LLULLUCHANI
CALVARIO

CCALUYO
OBRA : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE
CARABAYA REGIÓN PUNO
CONTRATIST : CONSORCIO USA
SUPERVISION: SERING
II II II II II II II II II II II II III I I I I II II
TOTAL 17.19 17.20 17.21 17.22 17.23 17.24A 17.24B 17.25 17.26 17.27 17.28 17.29 18 19 20 21 22 23 24
1 OBRAS PRELIMINARES 0
Replanteo Topográfico, Ubicación de Estructuras en Redes Secundarias (incluye elaboración de planos / concesión
1.01
rural)
loc 42 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1
2 INSTALACIÓN DE POSTES 0
2.01 Transporte de Poste de concreto de 9 m de Almacen a Punto de Izaje u 2381 10 30 32 49 56 57 36 71 47 77 95 85 0 0 0 0 0 0 0
2.02 Transporte de Poste de madera importado de 8 m, de Almacen a Punto de Izaje u 1018 0 0 0 0 0 0 0 0 0 0 0 0 17 38 23 36 53 29 0
2.03 Transporte de Poste de madera importado de 11 m, de Almacen a Punto de Izaje u 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.04 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 1111 1.696 2.544 1.272 1.696 0.848 21.624 4.24 7.632 0 19.928 17.808 27.136 6.732 15.048 9.108 14.256 20.988 11.484 0
2.05 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 299 2.544 10.176 12.296 19.08 22.896 2.544 11.024 22.472 19.928 12.72 22.472 8.904 0 0 0 0 0 0 0
2.06 Izaje, identificación y señalización de poste de concreto de 9 m (*) u 2381 10 30 32 49 56 57 36 71 47 77 95 85 0 0 0 0 0 0 0
2.07 Izaje, Identificación y señalización de poste de madera de 8 m (*) u 976 0 0 0 0 0 0 0 0 0 0 0 0 17 38 23 36 53 28 0
2.08 Izaje, Identificación y señalización de poste de madera de 11 m (*) u 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.09 Relleno y Compactación de Postes, en Terreno Tipo I (inc, eliminación de desmonte) m³ 922 1.416 2.124 0.708 0 0.708 18.408 3.54 6.372 0 14.16 14.868 22.302 5.627 12.578 7.613 11.916 17.543 9.268 0
2.1 Relleno y Compactación de Postes, en Terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 198 0 4.248 1.062 13.098 16.992 2.124 7.434 14.16 13.098 5.664 17.346 4.956 0 0 0 0 0 0 0
3 INSTALACION DE RETENIDAS 0
3.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 673 0 0.784 0.784 1.568 0 14.112 3.136 4.704 0 13.328 9.408 13.328 3.755 9.763 5.257 6.759 13.518 12.016 0
3.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 137 0 3.92 7.056 9.408 9.408 0 5.488 15.68 12.544 5.488 17.248 3.92 0 0 0 0 0 0 0
3.03 Instalación de retenida inclinada u 401 0 0 0 0 0 0 0 0 0 4 0 1 5 13 7 9 18 15 0
3.04 Instalación de retenida vertical u 330 0 0 0 0 0 0 0 0 0 14 14 18 0 0 0 0 0 0 0
3.05 Instalación de retenida tipo "Y" inclinada y/o vertical u 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.06 Relleno y compactación de retenida en terreno Tipo I (inc, eliminación de desmonte) m³ 651 0 0.76 0.76 1.52 0 13.68 3.04 4.56 0 12.92 9.12 12.92 3.635 9.451 5.089 6.543 13.086 11.632 0
3.07 Relleno y compactación de retenida en terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 129 0 3.8 6.84 9.12 9.12 0 5.32 15.2 12.16 5.32 16.72 3.04 0 0 0 0 0 0 0
4 MONTAJE DE ARMADOS 0
4.01 Armado Tipo E1 u 1153 3 0 0 0 0 0 0 0 0 22 29 37 5 25 17 30 38 13 0
4.02 Armado Tipo E2 u 20 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 0 1 0 0
4.03 Armado Tipo E3 u 495 0 0 0 0 0 0 0 0 0 14 17 18 3 6 5 3 11 5 0
4.04 Armado Tipo E4 u 247 0 0 0 0 0 0 0 0 0 10 14 12 0 4 1 3 0 3 0
4.05 Armado Tipo E5 u 59 0 0 0 0 0 0 0 0 0 2 2 1 1 2 0 0 3 1 0
4.06 Armado Tipo E6 u 37 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 2 1 0
4.07 Armado Tipo E1P u 10 0 0 0 0 0 0 0 0 0 0 0 0 0 3 2 0 0 0 0
4.08 Armado Tipo E2P u 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.09 Armado Tipo E3P u 61 3 0 0 0 0 0 0 0 0 3 3 3 1 0 0 2 0 0 0
4.1 Armado Tipo E4P u 45 3 0 0 0 0 0 0 0 0 0 0 0 1 3 2 1 2 0 0
4.11 Armado Tipo E5P u 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.12 Armado Tipo E6P u 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0
4.13 Armado Tipo E1B u 133 0 0 0 0 0 0 0 0 0 12 14 6 0 0 0 0 0 0 0
4.14 Armado Tipo E3B u 34 0 0 0 0 0 0 0 0 0 0 8 2 0 0 0 0 0 0 0
4.15 Armado Tipo E4B u 26 0 0 0 0 0 0 0 0 0 0 9 2 0 0 0 0 0 0 0
4.16 Armado Tipo E5B u 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.17 Armado Tipo E6B u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.18 Armado Tipo E4PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.19 Armado Tipo PA (portalíneas unipolares en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.2 Armado Tipo CD (caja de derivación en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.21 Armado Tipo E1PB u 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.22 Armado Tipo E3PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.23 Armado Tipo E5PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.24 Armado Tipo E6PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.25 Armado Tipo ET (empalme en "T") u 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.26 Armado Tipo EC (empalme en "Cruz") u 16 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0
5 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 0
5.01 Conductor Autoportante de Aluminio 3x70+25/50 mm² Km 0.428 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.02 Conductor Autoportante de Aluminio 3x50+16/35 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.03 Conductor Autoportante de Aluminio 3x35+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.04 Conductor Autoportante de Aluminio 3x25+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.05 Conductor Autoportante de Aluminio 3x16+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.06 Conductor Autoportante de Aluminio 2X16+16/25 mm² Km 0.646 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.07 Conductor Autoportante de Aluminio 2X16/25 mm² Km 0.994 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.08 Conductor Autoportante de Aluminio 1X16+16/25 mm² Km 2.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.299 0.000
5.09 Conductor Autoportante de Aluminio 1X16/25 mm² Km 13.760 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.684 0.000
6 INSTALACION DE PUESTA A TIERRA 0
6.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 160 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6.03 Instalacion de puesta a tierra Tipo PAT-1 u 94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Relleno y compactación de puesta a tierra Tipo PAT-1 con material adecuado (inc. Resane de vereda, eliminación de
6.04
desmonte)
m³ 163 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 PASTORALES, LUMINARIAS Y LÁMPARAS 0
7.01 Instalación de pastoral de A° G° u 112 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7.02 Instalación de Luminaria, Lámpara y Accesorios u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8 CONEXIONES DOMICILIARIAS 0

8.01 Conexión de Acometidas Domiciliarias, Configuración: acometida con murete (no incluye medidor de energía activa) u 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.02 Conexión de acometidas domiciliarias, configuración: Corta u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.03 Conexión de acometida domiciliarias, configuración: Larga u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.04 Instalación de medidor monofásico de energia activa y caja u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.05 Instalación de medidor trifásico de energia activa y caja u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.06 Contraste de medidor de energía activa - electrónico u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.07 Murete de Concreto de 1,65m de altura libre y 0,30m de profundidad. F'c=100 kg/cm², incluye transporte (*) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 DESMONTAJE DE REDES EXISTENTES 0
9.01 Desmontaje de armados cualquier tipo (incluye embalaje, selección y devolución a almacén) u 0
9.02 Desmontaje de retenidas cualquier tipo (comprende corte de varilla, embalaje, selección y devolución a almacén) u 0
9.03 Desmontaje de luminarias cualquier tipo (comprende embalaje, selección y devolución a almacén) u 0
9.04 Desmontaje de conductores cualquier tipo (comprende clasificación, embalaje, selección y devolución a almacén) km 0
9.05 Desmontaje de postes cualquier tipo (incluye excavación, resane, selección, embalaje y devolución a almacén) u 0
9.06 Desmontaje de Caja portamedidor (Inc. Medidor) u 0
10 PRUEBAS Y PUESTA EN SERVICIO 0
10.01 Pruebas y Puesta en Servicio de Redes Secundarias Loc 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Expediente Técnico Final Conforme a Obra y de Concesión Rural de Redes Secundarias (1 Original + 3 Copias),
10.02 Loc 0
incluye la presentacion digitalizada de textos y planos en CD. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
METRADO AVANCE

LACCA SORATIRA

QUERACCUCHO
RESUMEN DEL SUSTENTO DE MONTAJE ELECTROMECANICO EN REDES SECUNDARIAS

JATUNCANCHA
CHURQUINUYO
HATUN PINAYA
TUPAC AMARU

ALCCAMARINE
MACHACCOYO
LACCA PAMPA

QUERACUCHO
YANACATAHUI
KELLUCHUPA

CANLLIMAYO
NAQUECOTA

PATAPAMPA
HUAYLLUMA

PARKUTAÑA
CHUNGARA
CHUNGARA
SURAMAYO

PANCUTA

PAKITIRA
LACCA
OBRA : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE
CARABAYA REGIÓN PUNO
CONTRATIST : CONSORCIO USA
SUPERVISION: SERING
II II III I I I II II II II II III III III III III III III
TOTAL 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
1 OBRAS PRELIMINARES 0
Replanteo Topográfico, Ubicación de Estructuras en Redes Secundarias (incluye elaboración de planos / concesión
1.01
rural)
loc 42 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 INSTALACIÓN DE POSTES 0
2.01 Transporte de Poste de concreto de 9 m de Almacen a Punto de Izaje u 2381 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.02 Transporte de Poste de madera importado de 8 m, de Almacen a Punto de Izaje u 1018 0 24 105 52 12 69 7 50 36 0 46 25 36 25 4 44 16 39
2.03 Transporte de Poste de madera importado de 11 m, de Almacen a Punto de Izaje u 18 0 0 5 0 0 2 0 0 0 0 0 0 0 0 0 4 2 2
2.04 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 1111 0 9.504 44.058 20.592 4.752 28.632 2.772 19.8 0 0 18.216 9.9 14.256 9.9 1.584 20.04 7.644 16.752
2.05 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 299 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.06 Izaje, identificación y señalización de poste de concreto de 9 m (*) u 2381 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.07 Izaje, Identificación y señalización de poste de madera de 8 m (*) u 976 0 21 103 52 12 69 7 50 0 0 46 25 36 25 4 44 16 39
2.08 Izaje, Identificación y señalización de poste de madera de 11 m (*) u 18 0 0 5 0 0 2 0 0 0 0 0 0 0 0 0 4 2 2
2.09 Relleno y Compactación de Postes, en Terreno Tipo I (inc, eliminación de desmonte) m³ 922 0 6.951 36.958 17.212 3.972 23.985 2.317 16.55 0 0 15.226 8.275 11.916 8.275 1.324 16.856 6.442 14.055
2.1 Relleno y Compactación de Postes, en Terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 198 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 INSTALACION DE RETENIDAS 0
3.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 673 0 6.008 23.347 11.265 4.506 13.551 1.568 10.514 0 0 9.763 7.51 11.265 9.763 3.004 14.269 5.257 10.514
3.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 137 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.03 Instalación de retenida inclinada u 401 0 7 29 15 6 18 0 13 0 0 12 10 15 13 4 19 7 14
3.04 Instalación de retenida vertical u 330 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0
3.05 Instalación de retenida tipo "Y" inclinada y/o vertical u 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.06 Relleno y compactación de retenida en terreno Tipo I (inc, eliminación de desmonte) m³ 651 0 5.816 22.603 10.905 4.362 13.119 1.52 10.178 0 0 9.451 7.27 10.905 9.451 2.908 13.813 5.089 10.178
3.07 Relleno y compactación de retenida en terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 129 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 MONTAJE DE ARMADOS 0
4.01 Armado Tipo E1 u 1153 0 10 72 32 6 53 1 35 0 0 26 15 21 14 0 16 6 14
4.02 Armado Tipo E2 u 20 0 0 1 0 0 1 0 2 0 0 2 1 1 0 0 0 0 0
4.03 Armado Tipo E3 u 495 0 6 23 5 3 9 4 9 0 0 8 4 10 7 1 4 1 3
4.04 Armado Tipo E4 u 247 0 3 14 4 1 7 1 3 0 0 2 2 3 2 1 4 1 1
4.05 Armado Tipo E5 u 59 0 0 3 0 1 2 0 3 0 0 2 2 1 2 0 1 0 0
4.06 Armado Tipo E6 u 37 0 1 2 1 1 1 0 0 0 0 0 1 2 1 0 1 0 2
4.07 Armado Tipo E1P u 10 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0
4.08 Armado Tipo E2P u 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0
4.09 Armado Tipo E3P u 61 0 0 0 0 2 0 0 0 0 0 0 3 0 0 1 0 0 0
4.1 Armado Tipo E4P u 45 0 0 4 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0
4.11 Armado Tipo E5P u 2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.12 Armado Tipo E6P u 9 0 0 3 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0
4.13 Armado Tipo E1B u 133 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.14 Armado Tipo E3B u 34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.15 Armado Tipo E4B u 26 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.16 Armado Tipo E5B u 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.17 Armado Tipo E6B u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.18 Armado Tipo E4PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.19 Armado Tipo PA (portalíneas unipolares en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.2 Armado Tipo CD (caja de derivación en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.21 Armado Tipo E1PB u 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.22 Armado Tipo E3PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.23 Armado Tipo E5PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.24 Armado Tipo E6PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.25 Armado Tipo ET (empalme en "T") u 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.26 Armado Tipo EC (empalme en "Cruz") u 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 0
5.01 Conductor Autoportante de Aluminio 3x70+25/50 mm² Km 0.428 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5.02 Conductor Autoportante de Aluminio 3x50+16/35 mm² Km 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5.03 Conductor Autoportante de Aluminio 3x35+16/25 mm² Km 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5.04 Conductor Autoportante de Aluminio 3x25+16/25 mm² Km 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5.05 Conductor Autoportante de Aluminio 3x16+16/25 mm² Km 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5.06 Conductor Autoportante de Aluminio 2X16+16/25 mm² Km 0.646 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6460881 0 0
5.07 Conductor Autoportante de Aluminio 2X16/25 mm² Km 0.994 0 0 0 0 0 0 0 0 0 0 0 0 0.64895253 0 0 0 0 0.3447925
5.08 Conductor Autoportante de Aluminio 1X16+16/25 mm² Km 2.006 0 0.38033265 0 0 0 0 0 0 0 0 0 0.22492141 0.2047537 0.33991236 0 0.2811385 0.21218 0.063654
5.09 Conductor Autoportante de Aluminio 1X16/25 mm² Km 13.760 0 1.04901792 0 0 0 0 0 0 0 0 0 1.59214568 1.45810096 1.35922508 0.24315828 2.62625795 1.32966841 2.4177911
6 INSTALACION DE PUESTA A TIERRA 0
6.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 160 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6.03 Instalacion de puesta a tierra Tipo PAT-1 u 94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Relleno y compactación de puesta a tierra Tipo PAT-1 con material adecuado (inc. Resane de vereda, eliminación de
6.04
desmonte)
m³ 163 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 PASTORALES, LUMINARIAS Y LÁMPARAS 0
7.01 Instalación de pastoral de A° G° u 112 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7.02 Instalación de Luminaria, Lámpara y Accesorios u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8 CONEXIONES DOMICILIARIAS 0

8.01 Conexión de Acometidas Domiciliarias, Configuración: acometida con murete (no incluye medidor de energía activa) u 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.02 Conexión de acometidas domiciliarias, configuración: Corta u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.03 Conexión de acometida domiciliarias, configuración: Larga u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.04 Instalación de medidor monofásico de energia activa y caja u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.05 Instalación de medidor trifásico de energia activa y caja u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.06 Contraste de medidor de energía activa - electrónico u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.07 Murete de Concreto de 1,65m de altura libre y 0,30m de profundidad. F'c=100 kg/cm², incluye transporte (*) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 DESMONTAJE DE REDES EXISTENTES 0
9.01 Desmontaje de armados cualquier tipo (incluye embalaje, selección y devolución a almacén) u 0
9.02 Desmontaje de retenidas cualquier tipo (comprende corte de varilla, embalaje, selección y devolución a almacén) u 0
9.03 Desmontaje de luminarias cualquier tipo (comprende embalaje, selección y devolución a almacén) u 0
9.04 Desmontaje de conductores cualquier tipo (comprende clasificación, embalaje, selección y devolución a almacén) km 0
9.05 Desmontaje de postes cualquier tipo (incluye excavación, resane, selección, embalaje y devolución a almacén) u 0
9.06 Desmontaje de Caja portamedidor (Inc. Medidor) u 0
10 PRUEBAS Y PUESTA EN SERVICIO 0
10.01 Pruebas y Puesta en Servicio de Redes Secundarias Loc 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Expediente Técnico Final Conforme a Obra y de Concesión Rural de Redes Secundarias (1 Original + 3 Copias),
10.02 Loc 0
incluye la presentacion digitalizada de textos y planos en CD. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MACUSANI SED 14A

MACUSANI SED 14B


METRADO AVANCE
RESUMEN MENSUAL DEL SUSTENTO DE MONTAJE ELECTROMECANICO EN REDES

MACUSANI SED 3A

MACUSANI SED 3B

MACUSANI SED 6A

MACUSANI SED 6B

MACUSANI SED 8A

MACUSANI SED 8B
MACUSANI SED 01

MACUSANI SED 02

MACUSANI SED 04

MACUSANI SED 05

MACUSANI SED 07

MACUSANI SED 09

MACUSANI SED 10

MACUSANI SED 11

MACUSANI SED 12

MACUSANI SED 13

MACUSANI SED 15
SECUNDARIAS
OBRA : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE
CARABAYA REGIÓN PUNO
CONTRATIST : CONSORCIO USA
SUPERVISION: SERING
MES : AGO_23
III III III III III III III III II III III III III III III II II II II
TOTAL 17.01 17.02 17.03A 17.03B 17.04 17.05 17.06A 17.06B 17.07 17.08A 17.08B 17.09 17.10 17.11 17.12 17.13 17.14A 17.14B 17.15
1 OBRAS PRELIMINARES 0
Replanteo Topográfico, Ubicación de Estructuras en Redes Secundarias (incluye elaboración de planos / concesión
1.01
rural)
loc 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 INSTALACIÓN DE POSTES 0
2.01 Transporte de Poste de concreto de 9 m de Almacen a Punto de Izaje u 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.02 Transporte de Poste de madera importado de 8 m, de Almacen a Punto de Izaje u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.03 Transporte de Poste de madera importado de 11 m, de Almacen a Punto de Izaje u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.04 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 0.424 0 0 0 0 0.424 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.05 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.06 Izaje, identificación y señalización de poste de concreto de 9 m (*) u 2 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.07 Izaje, Identificación y señalización de poste de madera de 8 m (*) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.08 Izaje, Identificación y señalización de poste de madera de 11 m (*) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.09 Relleno y Compactación de Postes, en Terreno Tipo I (inc, eliminación de desmonte) m³ 0.354 0 0 0 0 0.354 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.1 Relleno y Compactación de Postes, en Terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 3.894 0 0 0 0 0 1.416 2.478 0 0 0 0 0 0 0 0 0 0 0 0
3 INSTALACION DE RETENIDAS 0
3.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 7.052 0 0 0 0 6.268 0 0 0 0 0.784 0 0 0 0 0 0 0 0 0
3.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.03 Instalación de retenida inclinada u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.04 Instalación de retenida vertical u 65 4 13 4 2 8 4 5 3 0 3 0 9 8 0 0 0 0 0 0
3.05 Instalación de retenida tipo "Y" inclinada y/o vertical u 27 0 2 0 13 2 0 0 1 0 1 0 4 1 0 0 0 0 0 0
3.06 Relleno y compactación de retenida en terreno Tipo I (inc, eliminación de desmonte) m³ 6.84 0 0 0 0 6.08 0 0 0 0 0.76 0 0 0 0 0 0 0 0 0
3.07 Relleno y compactación de retenida en terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 2.280 0 0 0 0 0 0.76 0 0.76 0 0.76 0 0 0 0 0 0 0 0 0
4 MONTAJE DE ARMADOS 0
4.01 Armado Tipo E1 u 96 1 2 0 0 48 5 20 2 0 0 0 0 3 0 0 0 0 0 0
4.02 Armado Tipo E2 u 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.03 Armado Tipo E3 u 23 0 0 0 0 11 1 4 3 0 0 0 1 2 0 0 0 0 0 0
4.04 Armado Tipo E4 u 8 0 1 0 0 4 1 1 0 0 0 0 0 0 0 0 0 0 0 0
4.05 Armado Tipo E5 u 3 0 0 0 0 2 0 1 0 0 0 0 0 0 0 0 0 0 0 0
4.06 Armado Tipo E6 u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.07 Armado Tipo E1P u 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.08 Armado Tipo E2P u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.09 Armado Tipo E3P u 4 0 0 0 0 0 0 1 0 0 0 0 3 0 0 0 0 0 0 0
4.1 Armado Tipo E4P u 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.11 Armado Tipo E5P u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.12 Armado Tipo E6P u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.13 Armado Tipo E1B u 11 0 0 0 0 0 0 1 0 0 0 0 9 0 0 0 0 0 0 0
4.14 Armado Tipo E3B u 4 0 0 0 0 0 0 2 0 0 0 0 1 0 0 0 0 0 0 0
4.15 Armado Tipo E4B u 3 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0
4.16 Armado Tipo E5B u 3 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0
4.17 Armado Tipo E6B u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.18 Armado Tipo E4PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.19 Armado Tipo PA (portalíneas unipolares en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.2 Armado Tipo CD (caja de derivación en postes de BT y MT) u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.21 Armado Tipo E1PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.22 Armado Tipo E3PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.23 Armado Tipo E5PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.24 Armado Tipo E6PB u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.25 Armado Tipo ET (empalme en "T") u 16 3 2 1 0 1 6 0 0 0 0 0 0 3 0 0 0 0 0 0
4.26 Armado Tipo EC (empalme en "Cruz") u 10 0 3 1 0 0 4 0 0 0 0 0 0 2 0 0 0 0 0 0
5 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 0
5.01 Conductor Autoportante de Aluminio 3x70+25/50 mm² Km 0.428 0.000 0.428 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.02 Conductor Autoportante de Aluminio 3x50+16/35 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.03 Conductor Autoportante de Aluminio 3x35+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.04 Conductor Autoportante de Aluminio 3x25+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.05 Conductor Autoportante de Aluminio 3x16+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.06 Conductor Autoportante de Aluminio 2X16+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.07 Conductor Autoportante de Aluminio 2X16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.08 Conductor Autoportante de Aluminio 1X16+16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.09 Conductor Autoportante de Aluminio 1X16/25 mm² Km 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
6 INSTALACION DE PUESTA A TIERRA 0
6.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 142.46 1.73 28.28 36.33 25.95 0 27.68 0 0 0 0 0 0 0 0 0 0 0 0 0
6.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 6.32 0 4.59 0 0 0 1.73 0 0 0 0 0 0 0 0 0 0 0 0 0
6.03 Instalacion de puesta a tierra Tipo PAT-1 u 94.00 11 19 18 15 0 18 0 0 0 0 0 0 0 0 0 0 0 0 0
Relleno y compactación de puesta a tierra Tipo PAT-1 con material adecuado (inc. Resane de vereda, eliminación de
6.04
desmonte)
m³ 162.62 19.03 32.87 31.14 25.95 0 31.14 0 0 0 0 0 0 0 0 0 0 0 0 0
7 PASTORALES, LUMINARIAS Y LÁMPARAS 0
7.01 Instalación de pastoral de A° G° u 50.00 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7.02 Instalación de Luminaria, Lámpara y Accesorios u 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8 CONEXIONES DOMICILIARIAS 0

8.01 Conexión de Acometidas Domiciliarias, Configuración: acometida con murete (no incluye medidor de energía activa) u 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.02 Conexión de acometidas domiciliarias, configuración: Corta u 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.03 Conexión de acometida domiciliarias, configuración: Larga u 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.04 Instalación de medidor monofásico de energia activa y caja u 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.05 Instalación de medidor trifásico de energia activa y caja u 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.06 Contraste de medidor de energía activa - electrónico u 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.07 Murete de Concreto de 1,65m de altura libre y 0,30m de profundidad. F'c=100 kg/cm², incluye transporte (*) u 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 DESMONTAJE DE REDES EXISTENTES 0.00
9.01 Desmontaje de armados cualquier tipo (incluye embalaje, selección y devolución a almacén) u 0
9.02 Desmontaje de retenidas cualquier tipo (comprende corte de varilla, embalaje, selección y devolución a almacén) u 0
9.03 Desmontaje de luminarias cualquier tipo (comprende embalaje, selección y devolución a almacén) u 0
9.04 Desmontaje de conductores cualquier tipo (comprende clasificación, embalaje, selección y devolución a almacén) km 0
9.05 Desmontaje de postes cualquier tipo (incluye excavación, resane, selección, embalaje y devolución a almacén) u 0
9.06 Desmontaje de Caja portamedidor (Inc. Medidor) u 0
10 PRUEBAS Y PUESTA EN SERVICIO 0
10.01 Pruebas y Puesta en Servicio de Redes Secundarias Loc 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Expediente Técnico Final Conforme a Obra y de Concesión Rural de Redes Secundarias (1 Original + 3 Copias),
10.02
incluye la presentacion digitalizada de textos y planos en CD.
Loc 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MACUSANI SED 24A

MACUSANI SED 24B


METRADO AVANCE
RESUMEN MENSUAL DEL SUSTENTO DE MONTAJE ELECTROMECANICO EN REDES

MACUSANI SED 16

MACUSANI SED 17

MACUSANI SED 18

MACUSANI SED 19

MACUSANI SED 20

MACUSANI SED 21

MACUSANI SED 22

MACUSANI SED 23

MACUSANI SED 25

MACUSANI SED 26

MACUSANI SED 27

MACUSANI SED 28

MACUSANI SED 29

HUACRAMARCA
MACHACCOYO
PAYAMICHINA
TANTAMACO
SECUNDARIAS

CALVARIO

CCALUYO
OBRA : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE
CARABAYA REGIÓN PUNO
CONTRATIST : CONSORCIO USA
SUPERVISION: SERING
MES : AGO_23
IIII III II II II II II II II II II II II II II III I I I I
TOTAL 01 17.16 17.17 17.18 17.19 17.20 17.21 17.22 17.23 17.24A 17.24B 17.25 17.26 17.27 17.28 17.29 18 19 20 21 22
1 OBRAS PRELIMINARES 0
Replanteo Topográfico, Ubicación de Estructuras en Redes Secundarias (incluye elaboración de planos / concesión
1.01
rural)
loc 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 INSTALACIÓN DE POSTES 0
2.01 Transporte de Poste de concreto de 9 m de Almacen a Punto de Izaje u 1 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.02 Transporte de Poste de madera importado de 8 m, de Almacen a Punto de Izaje u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.03 Transporte de Poste de madera importado de 11 m, de Almacen a Punto de Izaje u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.04 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 0.424 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.05 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 0.000 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.06 Izaje, identificación y señalización de poste de concreto de 9 m (*) u 2 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.07 Izaje, Identificación y señalización de poste de madera de 8 m (*) u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.08 Izaje, Identificación y señalización de poste de madera de 11 m (*) u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.09 Relleno y Compactación de Postes, en Terreno Tipo I (inc, eliminación de desmonte) m³ 0.354 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.1 Relleno y Compactación de Postes, en Terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 3.894 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 INSTALACION DE RETENIDAS 0
3.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 7.052 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.03 Instalación de retenida inclinada u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.04 Instalación de retenida vertical u 65 ### 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.05 Instalación de retenida tipo "Y" inclinada y/o vertical u 27 ### 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.06 Relleno y compactación de retenida en terreno Tipo I (inc, eliminación de desmonte) m³ 6.84 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.07 Relleno y compactación de retenida en terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 2.280 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 MONTAJE DE ARMADOS 0
4.01 Armado Tipo E1 u 96 ### 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.02 Armado Tipo E2 u 1 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.03 Armado Tipo E3 u 23 ### 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.04 Armado Tipo E4 u 8 ### 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.05 Armado Tipo E5 u 3 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.06 Armado Tipo E6 u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.07 Armado Tipo E1P u 1 ### 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.08 Armado Tipo E2P u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.09 Armado Tipo E3P u 4 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.1 Armado Tipo E4P u 1 ### 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.11 Armado Tipo E5P u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.12 Armado Tipo E6P u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.13 Armado Tipo E1B u 11 ### 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.14 Armado Tipo E3B u 4 ### 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.15 Armado Tipo E4B u 3 ### 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.16 Armado Tipo E5B u 3 ### 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.17 Armado Tipo E6B u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.18 Armado Tipo E4PB u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.19 Armado Tipo PA (portalíneas unipolares en postes de BT y MT) u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.2 Armado Tipo CD (caja de derivación en postes de BT y MT) u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.21 Armado Tipo E1PB u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.22 Armado Tipo E3PB u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.23 Armado Tipo E5PB u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.24 Armado Tipo E6PB u 0 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.25 Armado Tipo ET (empalme en "T") u 16 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4.26 Armado Tipo EC (empalme en "Cruz") u 10 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 0
5.01 Conductor Autoportante de Aluminio 3x70+25/50 mm² Km 0.428 ### 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.02 Conductor Autoportante de Aluminio 3x50+16/35 mm² Km 0.000 ### 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.03 Conductor Autoportante de Aluminio 3x35+16/25 mm² Km 0.000 ### 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.04 Conductor Autoportante de Aluminio 3x25+16/25 mm² Km 0.000 ### 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.05 Conductor Autoportante de Aluminio 3x16+16/25 mm² Km 0.000 ### 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.06 Conductor Autoportante de Aluminio 2X16+16/25 mm² Km 0.000 ### 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.07 Conductor Autoportante de Aluminio 2X16/25 mm² Km 0.000 ### 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.08 Conductor Autoportante de Aluminio 1X16+16/25 mm² Km 0.000 ### 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.09 Conductor Autoportante de Aluminio 1X16/25 mm² Km 0.000 ### 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
6 INSTALACION DE PUESTA A TIERRA 0
6.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 142.46 ### 0 22.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 6.32 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6.03 Instalacion de puesta a tierra Tipo PAT-1 u 94.00 ### 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Relleno y compactación de puesta a tierra Tipo PAT-1 con material adecuado (inc. Resane de vereda, eliminación de
6.04
desmonte)
m³ 162.62 ### 0 22.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 PASTORALES, LUMINARIAS Y LÁMPARAS 0
7.01 Instalación de pastoral de A° G° u 50.00 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7.02 Instalación de Luminaria, Lámpara y Accesorios u 0.00 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8 CONEXIONES DOMICILIARIAS 0

8.01 Conexión de Acometidas Domiciliarias, Configuración: acometida con murete (no incluye medidor de energía activa) u 0.00 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.02 Conexión de acometidas domiciliarias, configuración: Corta u 0.00 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.03 Conexión de acometida domiciliarias, configuración: Larga u 0.00 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.04 Instalación de medidor monofásico de energia activa y caja u 0.00 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.05 Instalación de medidor trifásico de energia activa y caja u 0.00 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.06 Contraste de medidor de energía activa - electrónico u 0.00 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8.07 Murete de Concreto de 1,65m de altura libre y 0,30m de profundidad. F'c=100 kg/cm², incluye transporte (*) u 0.00 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 DESMONTAJE DE REDES EXISTENTES 0.00
9.01 Desmontaje de armados cualquier tipo (incluye embalaje, selección y devolución a almacén) u 0
9.02 Desmontaje de retenidas cualquier tipo (comprende corte de varilla, embalaje, selección y devolución a almacén) u 0
9.03 Desmontaje de luminarias cualquier tipo (comprende embalaje, selección y devolución a almacén) u 0
9.04 Desmontaje de conductores cualquier tipo (comprende clasificación, embalaje, selección y devolución a almacén) km 0
9.05 Desmontaje de postes cualquier tipo (incluye excavación, resane, selección, embalaje y devolución a almacén) u 0
9.06 Desmontaje de Caja portamedidor (Inc. Medidor) u 0
10 PRUEBAS Y PUESTA EN SERVICIO 0
10.01 Pruebas y Puesta en Servicio de Redes Secundarias Loc 0.00 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Expediente Técnico Final Conforme a Obra y de Concesión Rural de Redes Secundarias (1 Original + 3 Copias),
10.02
incluye la presentacion digitalizada de textos y planos en CD.
Loc 0.00 ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
METRADO AVANCE
RESUMEN MENSUAL DEL SUSTENTO DE MONTAJE ELECTROMECANICO EN REDES

CCARACCARA
LLULLUCHANI
TANTAMACO
SECUNDARIAS
OBRA : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE
CARABAYA REGIÓN PUNO
CONTRATIST : CONSORCIO USA
SUPERVISION: SERING
MES : AGO_23
III II
TOTAL 01 23 24
1 OBRAS PRELIMINARES 0
Replanteo Topográfico, Ubicación de Estructuras en Redes Secundarias (incluye elaboración de planos / concesión
1.01
rural)
loc 0 ### 0 0
2 INSTALACIÓN DE POSTES 0
2.01 Transporte de Poste de concreto de 9 m de Almacen a Punto de Izaje u 1 ### 0 0
2.02 Transporte de Poste de madera importado de 8 m, de Almacen a Punto de Izaje u 0 ### 0 0
2.03 Transporte de Poste de madera importado de 11 m, de Almacen a Punto de Izaje u 0 ### 0 0
2.04 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 0.424 ### 0 0
2.05 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 0.000 ### 0 0
2.06 Izaje, identificación y señalización de poste de concreto de 9 m (*) u 2 ### 0 0
2.07 Izaje, Identificación y señalización de poste de madera de 8 m (*) u 0 ### 0 0
2.08 Izaje, Identificación y señalización de poste de madera de 11 m (*) u 0 ### 0 0
2.09 Relleno y Compactación de Postes, en Terreno Tipo I (inc, eliminación de desmonte) m³ 0.354 ### 0 0
2.1 Relleno y Compactación de Postes, en Terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 3.894 ### 0 0
3 INSTALACION DE RETENIDAS 0
3.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 7.052 ### 0 0
3.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 0 ### 0 0
3.03 Instalación de retenida inclinada u 0 ### 0 0
3.04 Instalación de retenida vertical u 65 ### 0 0
3.05 Instalación de retenida tipo "Y" inclinada y/o vertical u 27 ### 0 0
3.06 Relleno y compactación de retenida en terreno Tipo I (inc, eliminación de desmonte) m³ 6.84 ### 0 0
3.07 Relleno y compactación de retenida en terreno Tipo II (inc. Resane de vereda, eliminación de desmonte) m³ 2.280 ### 0 0
4 MONTAJE DE ARMADOS 0
4.01 Armado Tipo E1 u 96 ### 0 0
4.02 Armado Tipo E2 u 1 ### 0 0
4.03 Armado Tipo E3 u 23 ### 0 0
4.04 Armado Tipo E4 u 8 ### 0 0
4.05 Armado Tipo E5 u 3 ### 0 0
4.06 Armado Tipo E6 u 0 ### 0 0
4.07 Armado Tipo E1P u 1 ### 0 0
4.08 Armado Tipo E2P u 0 ### 0 0
4.09 Armado Tipo E3P u 4 ### 0 0
4.1 Armado Tipo E4P u 1 ### 0 0
4.11 Armado Tipo E5P u 0 ### 0 0
4.12 Armado Tipo E6P u 0 ### 0 0
4.13 Armado Tipo E1B u 11 ### 0 0
4.14 Armado Tipo E3B u 4 ### 0 0
4.15 Armado Tipo E4B u 3 ### 0 0
4.16 Armado Tipo E5B u 3 ### 0 0
4.17 Armado Tipo E6B u 0 ### 0 0
4.18 Armado Tipo E4PB u 0 ### 0 0
4.19 Armado Tipo PA (portalíneas unipolares en postes de BT y MT) u 0 ### 0 0
4.2 Armado Tipo CD (caja de derivación en postes de BT y MT) u 0 ### 0 0
4.21 Armado Tipo E1PB u 0 ### 0 0
4.22 Armado Tipo E3PB u 0 ### 0 0
4.23 Armado Tipo E5PB u 0 ### 0 0
4.24 Armado Tipo E6PB u 0 ### 0 0
4.25 Armado Tipo ET (empalme en "T") u 16 ### 0 0
4.26 Armado Tipo EC (empalme en "Cruz") u 10 ### 0 0
5 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 0
5.01 Conductor Autoportante de Aluminio 3x70+25/50 mm² Km 0.428 ### 0.000 0.000
5.02 Conductor Autoportante de Aluminio 3x50+16/35 mm² Km 0.000 ### 0.000 0.000
5.03 Conductor Autoportante de Aluminio 3x35+16/25 mm² Km 0.000 ### 0.000 0.000
5.04 Conductor Autoportante de Aluminio 3x25+16/25 mm² Km 0.000 ### 0.000 0.000
5.05 Conductor Autoportante de Aluminio 3x16+16/25 mm² Km 0.000 ### 0.000 0.000
5.06 Conductor Autoportante de Aluminio 2X16+16/25 mm² Km 0.000 ### 0.000 0.000
5.07 Conductor Autoportante de Aluminio 2X16/25 mm² Km 0.000 ### 0.000 0.000
5.08 Conductor Autoportante de Aluminio 1X16+16/25 mm² Km 0.000 ### 0.000 0.000
5.09 Conductor Autoportante de Aluminio 1X16/25 mm² Km 0.000 ### 0.000 0.000
6 INSTALACION DE PUESTA A TIERRA 0
6.01 Excavación en terreno Tipo I (arcilloso y conglomerado) m³ 142.46 ### 0 0
6.02 Excavación en terreno Tipo II (rocoso y/o vereda) m³ 6.32 ### 0 0
6.03 Instalacion de puesta a tierra Tipo PAT-1 u 94.00 ### 0 0
Relleno y compactación de puesta a tierra Tipo PAT-1 con material adecuado (inc. Resane de vereda, eliminación de
6.04
desmonte)
m³ 162.62 ### 0 0
7 PASTORALES, LUMINARIAS Y LÁMPARAS 0
7.01 Instalación de pastoral de A° G° u 50.00 ### 0 0
7.02 Instalación de Luminaria, Lámpara y Accesorios u 0.00 ### 0 0
8 CONEXIONES DOMICILIARIAS 0

8.01 Conexión de Acometidas Domiciliarias, Configuración: acometida con murete (no incluye medidor de energía activa) u 0.00 ### 0 0
8.02 Conexión de acometidas domiciliarias, configuración: Corta u 0.00 ### 0 0
8.03 Conexión de acometida domiciliarias, configuración: Larga u 0.00 ### 0 0
8.04 Instalación de medidor monofásico de energia activa y caja u 0.00 ### 0 0
8.05 Instalación de medidor trifásico de energia activa y caja u 0.00 ### 0 0
8.06 Contraste de medidor de energía activa - electrónico u 0.00 ### 0 0
8.07 Murete de Concreto de 1,65m de altura libre y 0,30m de profundidad. F'c=100 kg/cm², incluye transporte (*) u 0.00 ### 0 0
9 DESMONTAJE DE REDES EXISTENTES 0.00
9.01 Desmontaje de armados cualquier tipo (incluye embalaje, selección y devolución a almacén) u 0
9.02 Desmontaje de retenidas cualquier tipo (comprende corte de varilla, embalaje, selección y devolución a almacén) u 0
9.03 Desmontaje de luminarias cualquier tipo (comprende embalaje, selección y devolución a almacén) u 0
9.04 Desmontaje de conductores cualquier tipo (comprende clasificación, embalaje, selección y devolución a almacén) km 0
9.05 Desmontaje de postes cualquier tipo (incluye excavación, resane, selección, embalaje y devolución a almacén) u 0
9.06 Desmontaje de Caja portamedidor (Inc. Medidor) u 0
10 PRUEBAS Y PUESTA EN SERVICIO 0
10.01 Pruebas y Puesta en Servicio de Redes Secundarias Loc 0.00 ### 0 0
Expediente Técnico Final Conforme a Obra y de Concesión Rural de Redes Secundarias (1 Original + 3 Copias),
10.02
incluye la presentacion digitalizada de textos y planos en CD.
Loc 0.00 ### 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 01 TANTAMACO
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP20 SE-13CAC 3E3P 1 Mar Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2 9/300 E2 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 A2.1 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0
1 A2.2 9/300 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 A2.3 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 A2.4 9/300 E3B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 A3 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 A4 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0
1 A5 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 A6 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0
1 A7 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 A8 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 A9 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 A9.1 9/300 E2 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 A9.2 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0
1 A9.3 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 A9.4 9/300 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 A9.5 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 A9.6 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.751
1 A10 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A11 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 A12 9/200 E1 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec
1 A13 9/300 E5 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.751
1 A14 9/200 E1 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec
1 A15 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 1.568
1 A16 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.751
1 A13.1 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 1.568
1 A13.2 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.784
1 B1 13/500 CON E4PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B2 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 B3 13/400 CON E1PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B4 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 B5 13/400 CON E6PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B6 13/400 CON E1PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B7 13/500 CON E3PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B8 13/500 CON E4PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B9 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B10 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 B11 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.751
1 B12 9/300 E5B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 B13 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.751
1 B12.1 9/300 E3B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 B5.1 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 B5.2 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 B5.3 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.751
1 B5.4 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 C1 9/300 E4B 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.784
1 C1.1 9/300 E4B 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.784
1 C1.2 9/300 E6 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 C1.2.1.1 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 C1.2.1.2 9/300 E3B 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec
1 C1.3 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 C1.4 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 C1.5 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 C1.6 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 C1.7 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 C1.8 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.751
1 C1.2.2.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C1.2.2.2 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 C1.2.2.3 9/300 E4 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.784
1 C1.2.2.4 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.751
1 C1.1.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C1.1.2 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 C1.1.3 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec
1 C2 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C3 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 C4 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 C5 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 C6 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 C7 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 C8 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 C9 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0
1 C10 9/300 E5B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
1 C10.1 9/300 E3B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 C11 9/300 E3B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
2 RP32 SE-13CAC 3E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 A1 13/500 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A2 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 A3 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
2 A4 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 01 TANTAMACO
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

2 A5 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 A6 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 A7 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A8 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A10 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
2 A11 0 ET Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 A12 9/300 E6 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
2 A12.1.1 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 A12.1.2 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.751
2 A12.2.1 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 A12.2.2 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0.354 Dec 0 Dec 0.784
2 A12.2.3 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0
2 A13 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A14 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A15 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.751
2 A16 13/500 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A17 13/400 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A18 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.784
2 A3.1 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
2 A3.2 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 A3.3 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 A3.4 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.751
2 B1 9/300 CON E3 1 Nov 0 Dec 0 Dec 0.424 Nov 0 Dec 1 Nov 0 Dec 0 Dec 0.354 Nov 0 Dec
2 B2 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 B3 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 B4 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 B5 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 B6 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
2 B7 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 B8 9/300 E2B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.751
2 B9 9/300 E3B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 B10 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 B11 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 B12 9/300 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 B13 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 B14 9/300 E5 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.751
2 B15 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 B16 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 1.502
2 B17 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.751
2 B14.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B14.2 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.751
2 B8.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 B8.2 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
2 B8.3 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 B8.4 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 B8.5 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 B8.6 9/300 E3B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.751
2 C1 9/300 E5B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C2 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C3 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 C4 9/300 E2B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
2 C5 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
2 C6 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C7 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 C8 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C10 9/300 E5 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
2 C11 9/300 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C12 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
2 C13 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C14 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C15 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C16 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C17 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.751
2 C10.1 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
2 C10.2 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C10.3 9/300 E5 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C10.3.1 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.751
2 C10.4 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.751
2 C6.1 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C4.1 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 C4.2 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
2 C4.3 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C4.4 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 RP38 SE-13CAC 3E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 A1 9/200 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 A2 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 A3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 A4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 A5 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 01 TANTAMACO
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

3 A6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B1 9/200 CON E5 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 B2 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 B3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B5 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B6 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 C1 13/500 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 C2 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 C3 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C4 9/300 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 C5 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C6 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C7 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C8 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C10 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 C11 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 C12 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 C13 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov 0 Dec 1 Nov 0 Dec 0 Dec 0.354 Nov 0 Dec 0.784
4 RP42 SE-13CAC 3E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 A1 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 A2 0 ET 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A3 9/200 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 A4 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 A5 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 A6 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 A7 9/300 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 A8 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 A9 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 A10 13/400 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 A11 13/400 CON E1P 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 A12 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 A13 13/500 CON E1P 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 A14 9/300 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.751
4 A15 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 A16 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.751
4 B1 13/500 CON E5P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 B2 9/300 E5 1 Dec 0 Dec 0 Dec 0.424 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0.354 Dec 0 Dec 0
4 B3 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 B4 13/500 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 B5 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 B6 13/400 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 B7 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 B8 13/400 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 B1.1.1 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 B1.1.2 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 B1.1.3 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 B1.1.4 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 B1.1.5 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.784
4 B1.2.1 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 B1.2.2 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 B1.2.3 9/300 E3B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 B2.1 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.751
4 B2.2 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.751
4 C1 9/300 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 C2 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 C3 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 C4 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 C5 9/300 E6B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 C5.2.1 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 C5.2.2 9/300 E3B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 C6 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 C7 9/300 E4B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 C8 9/200 E1B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
4 C9 9/300 E3B 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
4 C10 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 C11 9/300 E4 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.784
4 C12 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0
4 C5.1.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 C5.1.2 9/300 E4B 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec
4 C5.1.3 9/300 E3 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 01 TANTAMACO
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 01 TANTAMACO
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 01 TANTAMACO
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 1 190 0 0 75.048 0 190 0 0 62.658 0 78.516

EJECUTADO % 100% 0% 0% 0% 107% 0% 0% 0% 107% 91%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP20 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/300 E2 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec
1 A2.1 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.2 9/300 E1B Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.3 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.4 9/300 E3B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 9/300 E4B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 9/200 E1B Dec Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.1 9/300 E2 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec
1 A9.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 A9.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.4 9/300 E1 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.6 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 A10 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 9/300 E5 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
1 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A15 9/300 E3 Mar 0 Dec Dec 2 Apr Dec 1.52 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 A16 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 A13.1 9/300 E3 Mar 0 Dec Dec 2 Apr Dec 1.52 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 A13.2 9/300 E3 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 B1 13/500 CON E4PB Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 13/400 CON E6PB Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 13/500 CON E3PB Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 13/500 CON E4PB Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/300 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 B12 9/300 E5B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 B12.1 9/300 E3B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 B5.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.3 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 B5.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 C1 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.1 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.2 9/300 E6 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.2.1.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 C1.2.1.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.4 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.6 9/300 E3 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 C1.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.8 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 C1.2.2.1 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.2.2.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.2.2.3 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 C1.2.2.4 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 C1.1.1 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.1.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.1.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 C2 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/300 E5B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10.1 9/300 E3B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/300 E3B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 RP32 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A1 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A2 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A3 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 A4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

2 A5 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A6 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A8 9/300 E4B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A10 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 A11 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A12 9/300 E6 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A12.1.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A12.1.2 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 A12.2.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 A12.2.2 9/200 E1 Dec Dec 1 Mar Dec Dec 0.76 Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A12.2.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 A13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A15 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 A16 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A17 13/400 CON E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A18 9/300 E3 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 A3.1 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 A3.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A3.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A3.4 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 B1 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 B2 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B4 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B5 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B8 9/300 E2B Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B9 9/300 E3B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B10 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B11 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B12 9/300 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 B14 9/300 E5 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
2 B15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 B16 9/300 E3 Mar 0 Dec 2 Mar Dec Dec 1.454 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 B17 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B14.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 B14.2 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 B8.1 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B8.2 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B8.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B8.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B8.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B8.6 9/300 E3B Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C1 9/300 E5B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C2 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C3 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C4 9/300 E2B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C5 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 C6 9/300 E4B Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C7 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C8 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C10 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
2 C11 9/300 E1 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C12 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 C13 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C17 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 C10.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 C10.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C10.3 9/300 E5 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
2 C10.3.1 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 C10.4 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 C6.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 C4.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C4.2 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C4.3 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C4.4 9/300 E3 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 RP38 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 A1 9/200 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 A2 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
3 A3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 A4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 A5 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

3 A6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 B1 9/200 CON E5 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
3 B2 9/300 E4 Dec Dec 1 Mar Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
3 B3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B6 9/300 E3 Dec Dec 1 Mar Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 C1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 C2 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 C3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 C4 9/300 E1 Dec Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C10 9/300 E4 Dec Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
3 C11 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 C12 9/300 E3 Dec Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 C13 9/300 E3 Dec Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 RP42 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A1 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A2 0 ET Dec Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A3 9/200 E4 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 A4 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 A5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A7 9/300 E1 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 A9 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 A10 13/400 CON E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A11 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 A12 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A13 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 A14 9/300 E1 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 A15 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A16 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 B1 13/500 CON E5P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B2 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
4 B3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B4 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B5 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B6 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B7 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B8 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B1.1.1 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 B1.1.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 B1.1.3 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 B1.1.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 B1.1.5 9/300 E3 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 B1.2.1 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B1.2.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B1.2.3 9/300 E3B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B2.1 9/300 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B2.2 9/300 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 C1 9/300 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C2 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C3 9/300 E4B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C5 9/300 E6B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C5.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C5.2.2 9/300 E3B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C6 9/300 E4B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C7 9/300 E4B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C9 9/300 E3B Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C10 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C11 9/300 E4 Mar 0 Dec Dec 1 Apr Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C12 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 C5.1.1 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C5.1.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C5.1.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 78.516 0 38 0 34 76.052 0 37 2 53 22 6

EJECUTADO % 91% 0% 0% 0% 91% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP20 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 9/300 E2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.1 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.2 9/300 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.3 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.4 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9.1 9/300 E2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9.4 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9.6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A13 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A15 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A16 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A13.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A13.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1 13/500 CON E4PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 13/400 CON E1PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5 13/400 CON E6PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 13/400 CON E1PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7 13/500 CON E3PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8 13/500 CON E4PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B11 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B12 9/300 E5B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B13 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B12.1 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.1 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.2 9/300 E6 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.2.1.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.2.1.2 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.4 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.8 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.2.2.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.2.2.2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.2.2.3 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.2.2.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.1.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.1.2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.1.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 9/300 E5B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10.1 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 RP32 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A1 13/500 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A2 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A3 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

2 A5 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A6 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A8 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A10 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A11 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A12 9/300 E6 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A12.1.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A12.1.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A12.2.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A12.2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A12.2.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A15 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A16 13/500 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A17 13/400 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A18 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A3.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A3.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A3.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A3.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B1 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B4 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B5 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B8 9/300 E2B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B9 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B10 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B11 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B12 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B14 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B16 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B17 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B14.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B14.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B8.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B8.2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B8.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B8.4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B8.5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B8.6 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C1 9/300 E5B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C4 9/300 E2B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C5 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C6 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C7 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C8 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C10 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C11 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C12 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C13 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C16 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C17 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C10.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C10.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C10.3 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C10.3.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C10.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C6.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C4.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C4.2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C4.3 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C4.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 RP38 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A1 9/200 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

3 A6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B1 9/200 CON E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C1 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C4 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C10 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C11 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C12 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C13 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 RP42 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A2 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A3 9/200 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A7 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A9 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A10 13/400 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A11 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A12 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A13 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A14 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A15 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A16 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B1 13/500 CON E5P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B2 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B3 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B4 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B5 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B6 13/400 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B7 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B8 13/400 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B1.1.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B1.1.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B1.1.3 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B1.1.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B1.1.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B1.2.1 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B1.2.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B1.2.3 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B2.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B2.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C1 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C3 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C4 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C5 9/300 E6B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C5.2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C5.2.2 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C6 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C7 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C8 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C9 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C11 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C12 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C5.1.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C5.1.2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C5.1.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 2 6 0 6 4 1 0 34 11 32 3 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP20 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2 9/300 E2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.1 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.2 9/300 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.3 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.4 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A5 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A6 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A8 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A9 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A9.1 9/300 E2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A9.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A9.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A9.4 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A9.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A9.6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A10 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A11 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A13 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A15 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A16 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A13.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A13.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B1 13/500 CON E4PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B3 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B5 13/400 CON E6PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B6 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B7 13/500 CON E3PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B8 13/500 CON E4PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B9 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B11 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B12 9/300 E5B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B13 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B12.1 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B5.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B5.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B5.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B5.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.1 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.2 9/300 E6 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.2.1.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.2.1.2 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.4 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.8 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.2.2.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.2.2.2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.2.2.3 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.2.2.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.1.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.1.2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1.1.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C2 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C7 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C8 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C9 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C10 9/300 E5B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C10.1 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C11 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 RP32 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A1 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A2 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A3 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

2 A5 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A6 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A8 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A10 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A11 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A12 9/300 E6 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A12.1.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A12.1.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A12.2.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A12.2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A12.2.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A15 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A16 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A17 13/400 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A18 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A3.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A3.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A3.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A3.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B1 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B4 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B5 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B8 9/300 E2B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B9 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B10 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B11 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B12 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B14 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B16 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B17 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B14.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B14.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B8.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B8.2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B8.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B8.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B8.5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B8.6 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C1 9/300 E5B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C4 9/300 E2B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C5 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C6 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C7 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C8 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C10 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C11 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C12 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C13 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C17 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C10.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C10.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C10.3 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C10.3.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C10.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C6.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C4.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C4.2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C4.3 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C4.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 RP38 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A1 9/200 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

3 A6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B1 9/200 CON E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C1 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C4 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C10 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C11 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C12 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 C13 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 RP42 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A1 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A2 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A3 9/200 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A7 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A9 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A10 13/400 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A11 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A12 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A13 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A14 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A15 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A16 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B1 13/500 CON E5P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B2 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B3 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B4 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B5 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B6 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B7 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B8 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B1.1.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B1.1.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B1.1.3 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B1.1.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B1.1.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B1.2.1 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B1.2.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B1.2.3 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B2.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B2.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C1 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C3 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C4 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C5 9/300 E6B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C5.2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C5.2.2 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C6 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C7 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C8 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C9 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C10 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C11 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C12 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C5.1.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C5.1.2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C5.1.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 1 2 46 38 2 2 0 1 16 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP20 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/300 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.1 9/300 E4B Dec Dec 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.2 9/300 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.3 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.4 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.1 9/300 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.4 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 13/500 CON E4PB Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 13/400 CON E6PB Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 13/500 CON E3PB Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 13/500 CON E4PB Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/300 E5B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12.1 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2 9/300 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.1.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.1.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.8 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.2.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.2.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.2.3 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.2.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.1.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.1.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.1.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/300 E5B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10.1 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 RP32 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A1 13/500 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

2 A5 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A6 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A8 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A10 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A11 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12 9/300 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12.1.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12.1.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12.2.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A12.2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12.2.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A15 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A16 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A17 13/400 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A18 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B1 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B5 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8 9/300 E2B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B9 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B10 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B11 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B12 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B14 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B14.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B14.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.6 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C1 9/300 E5B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C3 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C4 9/300 E2B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C6 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C7 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C8 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C11 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C12 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C13 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10.3 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10.3.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C6.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C4.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C4.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C4.3 9/300 E4B Dec Dec 0 Dec Dec Dec Dec Dec Dec Dec Dec
2 C4.4 9/300 E3 Dec Dec 0 Dec Dec Dec Dec Dec Dec Dec Dec
3 RP38 SE-13CAC 3E3P Dec Dec 0 Dec Dec Dec Dec Dec Dec Dec Dec
3 A1 9/200 E3 Dec Dec 0.025 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 A2 9/300 E4 Dec Dec 0.025 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 A3 9/200 E1 Dec Dec 0.035 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 A4 9/200 E1 Dec Dec 0.035 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 A5 9/300 E3 Dec Dec 0.035 Apr Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

3 A6 9/300 E3 Dec Dec 0 Dec Dec Dec Dec Dec Dec Dec Dec
3 B1 9/200 CON E5 Dec Dec 0.03 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 B2 9/300 E4 Dec Dec 0.03 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 B3 9/200 E1 Dec Dec 0.035 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 B4 9/200 E1 Dec Dec 0.035 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 B5 9/200 E1 Dec Dec 0.035 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 B6 9/300 E3 Dec Dec 0.035 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C1 13/500 CON E4P Dec Dec 0.02 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C2 9/300 E4B Dec Dec 0.026 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C3 9/200 E1B Dec Dec 0.043 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C4 9/300 E1 Dec Dec 0.035 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C5 9/200 E1 Dec Dec 0.045 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C6 9/200 E1 Dec Dec 0.045 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C7 9/200 E1 Dec Dec 0.045 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C8 9/200 E1 Dec Dec 0.0261 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C9 9/200 E1 Dec Dec 0.04 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C10 9/300 E4 Dec Dec 0.04 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C11 0 ET Dec Dec 0.017 Apr Dec Dec Dec Dec Dec Dec Dec Dec
3 C12 9/300 E3 0 Dec 0 Dec 0.017 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C13 9/300 E3 Dec Dec 0.037 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 RP42 SE-13CAC 3E3P Dec Dec 0 Dec Dec Dec Dec Dec Dec Dec Dec
4 A1 9/300 CON E3 Dec Dec 0.0186 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A2 0 ET Dec Dec 0.005 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A3 9/200 E4 Dec Dec 0.0161 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A4 9/300 E4 Dec Dec 0.0173 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A5 9/200 E1B Dec Dec 0.037 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A6 9/200 E1B Dec Dec 0.0335 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A7 9/300 E1 Dec Dec 0.0325 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A8 9/200 E1 Dec Dec 0.032 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A9 9/300 E4 Dec Dec 0.0367 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A10 13/400 CON E4P Dec Dec 0.036 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A11 13/400 CON E1P Dec Dec 0.035 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A12 13/400 CON E1P Dec Dec 0.035 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A13 13/500 CON E1P Dec Dec 0.0355 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A14 9/300 E1 0 Dec 0 Dec 0.043 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A15 9/200 E1B Dec Dec 0.044 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 A16 9/300 E3 Dec Dec 0.0415 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B1 13/500 CON E5P Dec Dec 0.0263 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B2 9/300 E5 Dec Dec 0.025 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B3 13/400 CON E1P Dec Dec 0.04 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B4 13/500 CON E4P Dec Dec 0.04 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B5 0 ET Dec Dec 0.008 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B6 13/400 CON E3P Dec Dec 0.0026 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B7 13/400 CON E1P Dec Dec 0.036 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B8 13/400 CON E3P Dec Dec 0.045 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.1.1 9/300 E4 Dec Dec 0.021 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.1.2 9/300 E3 Dec Dec 0.029 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.1.3 9/300 E4 Dec Dec 0.0176 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.1.4 9/200 E1 Dec Dec 0.039 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.1.5 9/300 E3 0 Dec 0 Dec 0.039 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B1.2.1 9/300 E4B Dec Dec 0.019 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.2.2 9/200 E1B Dec Dec 0.0335 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.2.3 9/300 E3B Dec Dec 0.0335 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B2.1 9/300 E4 Dec Dec 0.0082 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 B2.2 9/300 E3 Dec Dec 0.0416 Apr Dec Dec Dec Dec Dec Dec Dec Dec
4 C1 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C3 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5 9/300 E6B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5.2.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C6 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C7 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C9 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C11 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C12 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5.1.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5.1.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5.1.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.340 1.129 5.268 0.000 0.000 0.000 0.000 53.723 0 33 57.123 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP20 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/300 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.2 9/300 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.3 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.4 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.1 9/300 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.4 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 13/500 CON E4PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 13/400 CON E6PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 13/500 CON E3PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 13/500 CON E4PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/300 E5B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12.1 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2 9/300 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.1.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.1.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.8 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.2.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.2.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.2.3 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.2.2.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.1.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.1.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1.1.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/300 E5B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10.1 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 RP32 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A1 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

2 A5 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A6 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A8 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A10 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A11 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12 9/300 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12.1.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12.1.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12.2.1 9/300 E4 Dec 0 Dec Dec Dec Dec Dec Dec Dec Dec
2 A12.2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12.2.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A15 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A16 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A17 13/400 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A18 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B1 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B5 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8 9/300 E2B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B9 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B10 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B11 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B12 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B14 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B14.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B14.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8.6 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C1 9/300 E5B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C3 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C4 9/300 E2B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C6 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C7 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C8 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C11 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C12 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C13 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10.3 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10.3.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C6.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C4.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C4.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C4.3 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C4.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 RP38 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A1 9/200 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

3 A6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B1 9/200 CON E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C4 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C10 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C11 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C12 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 C13 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 RP42 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A3 9/200 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A7 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A9 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A10 13/400 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A11 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A12 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A13 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A14 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A15 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B1 13/500 CON E5P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B2 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B4 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B5 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B6 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B7 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B8 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.1.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.1.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.1.3 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.1.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.1.5 9/300 E3 Dec 0 Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.2.1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.2.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B1.2.3 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B2.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B2.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C1 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C3 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5 9/300 E6B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5.2.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C6 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C7 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C9 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C11 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C12 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5.1.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5.1.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5.1.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec


0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec


0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 37 213 42 290 2 292 37 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 02 CHILLCOUNO GRANDE
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP05 SE-12MAD E3P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E6 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A2 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A3 8/C6 E2 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A4 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A5 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A1.1 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 6 0 2.376 0 0 6 0 1.986 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 2.253
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 6 0 2.376 0 0 6 0 1.986 0 2.253

METRADO TOTAL 1 0 6 0 2.376 0 0 6 0 1.986 0 2.253

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP05 SE-12MAD E3P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 8/C6 E6 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 2 Apr 0 0
1 A3 8/C6 E2 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 1 Mar 0 0 0
1 A4 8/C6 E1 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 1 Mar 0 0 0 0
1 A5 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 A1.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 2.253 0 3 0 0 2.181 0 1 1 2 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 2 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 2.253 0 3 0 0 2.181 0 1 1 4 0 0

METRADO TOTAL 2.253 0 3 0 0 2.181 0 1 1 4 0 0

EJECUTADO % 100% 100% 0% 0% 100% 100% 100% 100% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP05 SE-12MAD E3P 0 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 0 0 0 0


1 A1 8/C6 E6 1 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3 8/C6 E2 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A5 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A1.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 1 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 0 1 0 0 0 0 0 0 0 0

METRADO TOTAL 1 0 0 1 0 0 0 0 0 0 0 0

EJECUTADO % 100% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP05 SE-12MAD E3P 0 0 0 0 0 0 0 0 0 0 0


1 A1 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
1 A2 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A3 8/C6 E2 0 0 0 0 0 0 0 0 0 0 0
1 A4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A5 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A1.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 2 2 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP05 SE-12MAD E3P 0 0 0 0.015 Apr 0 0 0 Dec Dec Dec Dec


1 A1 8/C6 E6 0 0 0 0.016 Apr 0 0 0 Dec Dec Dec Dec
1 A2 8/C6 E3 0 0 0 0.019 Apr 0 0 0 Dec Dec Dec Dec
1 A3 8/C6 E2 0 0 0 0 0 0.018 Apr 0 Dec Dec Dec Dec
1 A4 8/C6 E1 0 0 0 0 0 0 Dec 0.058 Apr Dec Dec Dec Dec
1 A5 8/C6 E3 0 0 0 0 0 0 Dec 0.071 Apr Dec Dec Dec Dec
1 A1.1 8/C6 E3 0 0 0 0 0 0.03 Apr 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.052 0.000 0.049 0.133 3.466 0 2 3.462 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP05 SE-12MAD E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 8/C6 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 1 9 2 12 0 12 1 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 03 CCARCCATIRA
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP05 SE-12MAD E4P 1 Jul Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 A2 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A3 11/C6 E5 Dec 0 Dec 1 Nov 0.654 Dec 0 Dec Dec Dec 1 Dec 0.573 Dec Dec
1 A4 11/C6 E3 Dec 0 Dec 1 Nov 0.654 Dec 0 Dec Dec Dec 1 Dec 0.573 Dec Dec 0.784
1 A5 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A6 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A7 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A8 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A9 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A10 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A11 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 A3.1 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 B1 12/C5 CON E4P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 B2 12/C5 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 B3 8/C6 E6 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 1.502
1 B3.1 8/C6 E2 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B3.2 8/C6 E4 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 B3.3 12/C5 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 B4 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B5 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 1.502
1 B6 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 1.502
1 B7 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 17 2 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 8.04 0 0 17 2 6.773 0 9.045
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 17 2 8.04 0 0 17 2 6.773 0 9.045

METRADO TOTAL 1 0 17 2 8.04 0 0 17 2 6.773 0 9.045

EJECUTADO % 100% 0% 100% 100% 100% 0% 100% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP05 SE-12MAD E4P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 8/C6 E4 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 0 1 Mar 0
1 A2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A3 11/C6 E5 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 1 Apr
1 A4 11/C6 E3 Dec 0 Dec 1 Mar Dec Dec 0.76 Dec 0 Dec 0 0 2 Mar 0 0
1 A5 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A6 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A7 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A8 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A9 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A10 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 0 0
1 A11 8/C6 E3 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 Dec 0 1 Mar 0 0
1 A3.1 8/C6 E3 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 Dec 0 1 Mar 0 0
1 B1 12/C5 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 0 0 0
1 B2 12/C5 CON E3P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 0 0 0
1 B3 8/C6 E6 Dec 0 Dec 2 Mar Dec Dec 1.454 Dec 0 Dec 0 Dec 0 0 0 0
1 B3.1 8/C6 E2 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Mar 0 0 0
1 B3.2 8/C6 E4 Dec 0 Dec Dec Dec Dec 0.727 Dec 0 Dec 0 Dec 0 0 1 Mar 0
1 B3.3 12/C5 CON E3P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 0 0 0
1 B4 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 0 0
1 B5 8/C6 E3 Dec 0 Dec 2 Mar Dec Dec 1.454 Dec 0 Dec 0 0 2 Mar 0 0
1 B6 8/C6 E3 Dec 0 Dec 2 Mar Dec Dec 1.454 Dec 0 Dec 0 0 2 Apr 0 0
1 B7 8/C6 E3 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 1 Mar 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 9.045 0 0 0 0 8.757 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 11 0 0 0 0 6 1 7 2 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 2 0 2 0 1
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 9.045 0 11 0 0 8.757 0 8 1 9 2 1

METRADO TOTAL 9.045 0 8 0 0 8.757 0 8 1 9 2 1

EJECUTADO % 100% 138% 0% 0% 100% 100% 100% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP05 SE-12MAD E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0


1 A1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3 11/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A4 11/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A5 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A6 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A7 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A8 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A9 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A10 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A11 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 12/C5 CON E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0
1 B2 12/C5 CON E3P 0 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B3 8/C6 E6 1 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B3.1 8/C6 E2 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B3.2 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B3.3 12/C5 CON E3P 0 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B5 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B6 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B7 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 3 2 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 0 3 2 0 0 0 0 0 0 0

METRADO TOTAL 1 0 0 3 2 0 0 0 0 0 0 0

EJECUTADO % 100% 0% 0% 100% 100% 0% 0% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP05 SE-12MAD E4P 0 0 0 0 0 0 0 0 0 0 0


1 A1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 A2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A3 11/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 A4 11/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A5 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A6 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A7 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A8 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A9 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A10 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A11 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A3.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 12/C5 CON E4P 0 0 0 0 0 0 0 0 0 0 0
1 B2 12/C5 CON E3P 0 0 0 0 0 0 0 0 0 0 0
1 B3 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
1 B3.1 8/C6 E2 0 0 0 0 0 0 0 0 0 0 0
1 B3.2 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 B3.3 12/C5 CON E3P 0 0 0 0 0 0 0 0 0 0 0
1 B4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B5 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B6 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B7 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 3 0 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP05 SE-12MAD E4P 0 0 0 0 0 0.015 Mar 0 Dec Dec Dec Dec


1 A1 8/C6 E4 0 0 0 0 0 0.02 Mar 0 Dec Dec Dec Dec
1 A2 8/C6 E1 0 0 0 0 0 0.048 Mar 0 Dec Dec Dec Dec
1 A3 11/C6 E5 0 0 0 0 0 0.0445 Mar 0 Dec Dec Dec Dec
1 A4 11/C6 E3 0 0 0 0 0 0.0242 Mar 0 Dec Dec Dec Dec
1 A5 8/C6 E1 0 0 0 0 0 0 0.038 Mar Dec Dec Dec Dec
1 A6 8/C6 E1 0 0 0 0 0 0 0.04 Mar Dec Dec Dec Dec
1 A7 8/C6 E1 0 0 0 0 0 0 0.038 Mar Dec Dec Dec Dec
1 A8 8/C6 E1 0 0 0 0 0 0 0.041 Mar Dec Dec Dec Dec
1 A9 8/C6 E1 0 0 0 0 0 0 0.04 Mar Dec Dec Dec Dec
1 A10 8/C6 E1 0 0 0 0 0 0 0.038 Mar Dec Dec Dec Dec
1 A11 8/C6 E3 0 0 0 0 0 0 0.035 Mar Dec Dec Dec Dec
1 A3.1 8/C6 E3 0 0 0 0 0 0.0445 Mar 0 Dec Dec Dec Dec
1 B1 12/C5 CON E4P 0 0 0 0 0 0.03 Mar 0 Dec Dec Dec Dec
1 B2 12/C5 CON E3P 0 0 0 0 0 0.075 Mar 0 Dec Dec Dec Dec
1 B3 8/C6 E6 0 0 0 0 0 0.049 Dec 0 Dec Dec Dec Dec
1 B3.1 8/C6 E2 0 0 0 0 0 0.028 Dec 0 Dec Dec Dec Dec
1 B3.2 8/C6 E4 0 0 0 0 0 0 0.028 Mar Dec Dec Dec Dec
1 B3.3 12/C5 CON E3P 0 0 0 0 0 0 0.0567 Mar Dec Dec Dec Dec
1 B4 8/C6 E1 0 0 0 0 0 0 0.042 Mar Dec Dec Dec Dec
1 B5 8/C6 E3 0 0 0 0 0 0 0.042 Mar Dec Dec Dec Dec
1 B6 8/C6 E3 0 0 0 0 0 0 0.042 Dec Dec Dec Dec Dec
1 B7 8/C6 E3 0 0 0 0 0 0 0.042 Dec Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.000 0.000 0.390 0.538 8.665 0 5 8.655 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP05 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 11/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 11/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 12/C5 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.1 8/C6 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.2 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.3 12/C5 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 1 10 4 15 0 15 1 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 04 SAMILIA
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP01 SE-12MAD E6P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 12/C5 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 A2 12/C5 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 A3 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 A4 12/C5 CON E4P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 A5 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A6 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B1 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C1 8/C6 E4 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 C2 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C3 8/C6 E5 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C4 8/C6 E4 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 C5 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C3.1 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 10 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 3.96 0 0 10 0 3.31 0 2.253
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 10 0 3.96 0 0 10 0 3.31 0 2.253

METRADO TOTAL 1 0 10 0 3.96 0 0 10 0 3.31 0 2.253

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP01 SE-12MAD E6P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 12/C5 CON E3P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A2 12/C5 CON E3P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A3 8/C6 E3 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 2 Mar 0 0
1 A4 12/C5 CON E4P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A5 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A6 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
1 B1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
1 C1 8/C6 E4 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 0 Dec 1 Mar 0
1 C2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 Dec 0 0
1 C3 8/C6 E5 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 Dec 0 1 Mar
1 C4 8/C6 E4 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 0 Dec 1 Apr 0
1 C5 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
1 C3.1 8/C6 E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 0 1 Apr 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 2.253 0 0 0 0 2.181 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 3 0 0 0 0 2 0 5 1 1
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 1 1 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 2.253 0 3 0 0 2.181 0 2 0 6 2 1

METRADO TOTAL 2.253 0 3 0 0 2.181 0 2 0 6 2 1

EJECUTADO % 100% 100% 0% 0% 100% 100% 0% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP01 SE-12MAD E6P 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 0 0 0 0


1 A1 12/C5 CON E3P 0 0 Dec 0 Dec 2 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2 12/C5 CON E3P 0 0 Dec 0 Dec 2 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A4 12/C5 CON E4P 0 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A5 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A6 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C3 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C4 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C5 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C3.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 1 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 1 0 0 0 0 0

METRADO TOTAL 0 0 0 4 1 0 1 0 0 0 0 0

EJECUTADO % 0% 0% 0% 0% 0% 0% 100% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP01 SE-12MAD E6P 0 0 0 0 0 0 0 0 0 0 0


1 A1 12/C5 CON E3P 0 0 0 0 0 0 0 0 0 0 0
1 A2 12/C5 CON E3P 0 0 0 0 0 0 0 0 0 0 0
1 A3 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A4 12/C5 CON E4P 0 0 0 0 0 0 0 0 0 0 0
1 A5 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A6 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 C1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 C2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C3 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 C4 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 C5 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 C3.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP01 SE-12MAD E6P 0 0 0 0 0 0.015 Dec 0 Dec Dec Dec Dec


1 A1 12/C5 CON E3P 0 0 0 0 0 0 Dec 0.0265 Dec Dec Dec Dec Dec
1 A2 12/C5 CON E3P 0 0 0 0 0 0 Dec 0.0147 Dec Dec Dec Dec Dec
1 A3 8/C6 E3 0 0 0 0 0 0 Dec 0.027 Dec Dec Dec Dec Dec
1 A4 12/C5 CON E4P 0 0 0 0 0 0 Dec 0.0833 Dec Dec Dec Dec Dec
1 A5 8/C6 E1 0 0 0 0 0 0 Dec 0.025 Dec Dec Dec Dec Dec
1 A6 8/C6 E3 0 0 0 0 0 0 Dec 0.03 Dec Dec Dec Dec Dec
1 B1 8/C6 E3 0 0 0 0 0 0 Dec 0.026 Apr Dec Dec Dec Dec
1 C1 8/C6 E4 0 0 0 0 0 0.027 Apr 0 Dec Dec Dec Dec Dec
1 C2 8/C6 E1 0 0 0 0 0 0.048 Apr 0 Dec Dec Dec Dec Dec
1 C3 8/C6 E5 0 0 0 0 0 0.048 Apr 0 Dec Dec Dec Dec Dec
1 C4 8/C6 E4 0 0 0 0 0 0.05 Apr 0 Dec Dec Dec Dec Dec
1 C5 8/C6 E3 0 0 0 0 0 0.026 Apr 0 Dec Dec Dec Dec Dec
1 C3.1 8/C6 E3 0 0 0 0 0 0 Dec 0.025 Apr Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.000 0.000 0.220 0.265 6.932 0 4 6.924 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP01 SE-12MAD E6P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 12/C5 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 12/C5 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 1 4 5 10 0 10 1 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 05 JIPIAÑA
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP01 SE-12MAD E3P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 12/C5 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 A2 8/C6 E3 Dec 1 Dec 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 B1 8/C6 E6 Dec 1 Dec 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 B2 8/C6 E5 Dec 1 Dec 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 B2.1 8/C6 E3 Dec 1 Dec 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 B3 8/C6 E1 Dec 1 Dec 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B4 8/C6 E3 Dec 1 Dec 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 1.502
1 B5 8/C6 E3 Dec 1 Dec 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 B1.1 8/C6 E3 Dec 1 Dec 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 8 0 3.168 0 0 8 0 2.648 0 2.253
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 3.004
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 8 0 3.168 0 0 8 0 2.648 0 5.257

METRADO TOTAL 1 0 8 0 3.168 0 0 8 0 2.648 0 5.257

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP01 SE-12MAD E3P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 12/C5 CON E3P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 B1 8/C6 E6 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 0 0
1 B2 8/C6 E5 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 0 1 Apr
1 B2.1 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 B3 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 B4 8/C6 E3 Dec 0 Dec 2 Mar Dec Dec 1.454 Dec 0 Dec 0 0 2 Mar 0 0
1 B5 8/C6 E3 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 1 Apr 0 0
1 B1.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 2.253 0 0 0 0 2.181 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 3.004 0 7 0 0 2.908 0 1 0 5 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 1 0 1
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 5.257 0 7 0 0 5.089 0 1 0 6 0 1

METRADO TOTAL 5.257 0 6 0 0 5.089 0 1 0 6 0 1

EJECUTADO % 100% 117% 0% 0% 100% 100% 0% 100% 0% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP01 SE-12MAD E3P 0 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec 0 Dec 0 0 0 0 0


1 A1 12/C5 CON E3P 0 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 8/C6 E6 1 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B2 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B2.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B3 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B4 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B5 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 4 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 0 4 0 0 0 0 0 0 0 0

METRADO TOTAL 1 0 0 4 0 0 0 0 0 0 0 0

EJECUTADO % 100% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP01 SE-12MAD E3P 0 0 0 0 0 0 0 0 0 0 0


1 A1 12/C5 CON E3P 0 0 0 0 0 0 0 0 0 0 0
1 A2 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
1 B2 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 B2.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B3 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B4 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B5 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 2 1 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP01 SE-12MAD E3P 0 0 0 0 0 0.015 Apr 0 Dec Dec Dec Dec


1 A1 12/C5 CON E3P 0 0 0 0 0 0.031 Apr 0 Dec Dec Dec Dec
1 A2 8/C6 E3 0 0 0 0 0 0.06 Apr 0 Dec Dec Dec Dec
1 B1 8/C6 E6 0 0 0 0 0 0 Dec 0.025 Apr Dec Dec Dec Dec
1 B2 8/C6 E5 0 0 0 0 0 0 0.06 Apr Dec Dec Dec Dec
1 B2.1 8/C6 E3 0 0 0 0 0 0 0.06 Apr Dec Dec Dec Dec
1 B3 8/C6 E1 0 0 0 0 0 0 0.097 Apr Dec Dec Dec Dec
1 B4 8/C6 E3 0 0 0 0 0 0 0.057 Apr Dec Dec Dec Dec
1 B5 8/C6 E3 0 0 0 0 0 0 0.066 Apr Dec Dec Dec Dec
1 B1.1 8/C6 E3 0 0 0 0 0 0 0.02 Apr Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.000 0.000 0.109 0.397 5.199 0 3 5.193 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP01 SE-12MAD E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 12/C5 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 1 5 3 9 0 9 1 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 06 ANTAJAHUA
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP08 SE-12MAD E6P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 12/C5 CON E4P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 A2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A3 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A4 8/C6 E5 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 A5 8/C6 E2 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A6 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 A4.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 B1 8/C6 E5 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B2 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B1.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C1 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 C2 8/C6 E6 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 1.502
1 C3 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C4 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C5 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C6 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C7 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C8 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 C9 8/C6 E6 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 C10 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C11 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 C9.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 C2.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 RP06 SE-12MAD E3P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
2 A1 12/C5 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
2 A2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 A3 12/C5 CON E1P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
2 A4 8/C6 E5 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 A5 12/C5 CON E4P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
2 A6 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
2 A7 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.784
2 A8 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 A4.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B1 12/C5 CON E4P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
2 B2 8/C6 E2 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B2.1.1 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
2 B2.1.2 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B3 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B4 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B5 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B6 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B7 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
2 B8 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B9 8/C6 E5 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B9.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B10 8/C6 E6 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
2 B10.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B11 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
2 B12 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B13 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B14 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
2 B15 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B16 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
2 B2.2.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 48 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 19.008 0 0 48 0 15.888 0 1.502
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 11.298
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 48 0 19.008 0 0 48 0 15.888 0 12.8

METRADO TOTAL 1 0 48 0 19.008 0 0 48 0 15.888 0 12.8

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP08 SE-12MAD E6P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 12/C5 CON E4P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A3 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A4 8/C6 E5 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 0 1 Mar
1 A5 8/C6 E2 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 1 Apr 0 0 0 Dec
1 A6 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0 Dec
1 A4.1 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0 Dec
1 B1 8/C6 E5 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 1 Apr
1 B2 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
1 B1.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
1 C1 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
1 C2 8/C6 E6 Mar 0 Dec 2 Mar Dec Dec 1.454 Mar 0 Dec 0 0 0 0 0
1 C3 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 C4 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 C5 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 C6 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 C7 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 C8 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Apr 0
1 C9 8/C6 E6 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 0 0
1 C10 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 C11 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 C9.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
1 C2.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
2 RP06 SE-12MAD E3P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
2 A1 12/C5 CON E3P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
2 A2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
2 A3 12/C5 CON E1P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
2 A4 8/C6 E5 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 1 Mar
2 A5 12/C5 CON E4P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
2 A6 8/C6 E4 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 0 1 Mar 0
2 A7 8/C6 E3 Mar 0 Dec Dec Dec Dec 0.76 Mar 0 Dec 0 0 2 Mar 0 0
2 A8 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
2 A4.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
2 B1 12/C5 CON E4P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
2 B2 8/C6 E2 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 2 Mar 0 0 0
2 B2.1.1 8/C6 E4 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 0 1 Mar 0
2 B2.1.2 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
2 B3 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
2 B4 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
2 B5 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
2 B6 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
2 B7 8/C6 E1 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 1 Mar 0 0 0 0
2 B8 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
2 B9 8/C6 E5 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 1 Mar
2 B9.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
2 B10 8/C6 E6 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 Dec 0 0
2 B10.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Apr 0 0
2 B11 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
2 B12 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 0 0
2 B13 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 0 0
2 B14 8/C6 E1 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 1 Apr 0 0 0 0
2 B15 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 0 0
2 B16 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Apr 0 0
2 B2.2.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Apr 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 1.502 0 0 0 0 1.454 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 11.298 0 16 0 0 10.938 0 15 2 13 4 3
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 4 1 3 1 1
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 12.8 0 16 0 0 12.392 0 19 3 16 5 4

METRADO TOTAL 12.8 0 15 0 0 12.392 0 19 3 16 5 4

EJECUTADO % 100% 107% 0% 0% 100% 100% 100% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP08 SE-12MAD E6P 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 0 0 0 0


1 A1 12/C5 CON E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A4 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A5 8/C6 E2 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A6 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A4.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B2 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C2 8/C6 E6 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C3 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C5 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C6 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C7 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C8 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C9 8/C6 E6 1 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C10 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C11 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C9.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C2.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 RP06 SE-12MAD E3P 0 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 A1 12/C5 CON E3P 0 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 A2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 A3 12/C5 CON E1P 0 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 A4 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 A5 12/C5 CON E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0
2 A6 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 A7 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 A8 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 A4.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B1 12/C5 CON E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0
2 B2 8/C6 E2 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B2.1.1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B2.1.2 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B3 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B5 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B6 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B7 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B8 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B9 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B9.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B10 8/C6 E6 1 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B10.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B11 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B12 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B13 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B14 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B15 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B16 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
2 B2.2.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 2 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 1 1 0 4 3 0 1 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 3 1 0 4 3 0 1 0 0 0 0 0

METRADO TOTAL 3 1 0 4 3 0 1 0 0 0 0 0

EJECUTADO % 100% 100% 0% 100% 100% 0% 100% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP08 SE-12MAD E6P 0 0 0 0 0 0 0 0 0 0 0


1 A1 12/C5 CON E4P 0 0 0 0 0 0 0 0 0 0 0
1 A2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A3 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A4 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 A5 8/C6 E2 0 0 0 0 0 0 0 0 0 0 0
1 A6 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A4.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 B2 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 C1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 C2 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
1 C3 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C5 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C6 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C7 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C8 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 C9 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
1 C10 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C11 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 C9.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 C2.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
2 RP06 SE-12MAD E3P 0 0 0 0 0 0 0 0 0 0 0
2 A1 12/C5 CON E3P 0 0 0 0 0 0 0 0 0 0 0
2 A2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
2 A3 12/C5 CON E1P 0 0 0 0 0 0 0 0 0 0 0
2 A4 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
2 A5 12/C5 CON E4P 0 0 0 0 0 0 0 0 0 0 0
2 A6 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
2 A7 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
2 A8 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
2 A4.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
2 B1 12/C5 CON E4P 0 0 0 0 0 0 0 0 0 0 0
2 B2 8/C6 E2 0 0 0 0 0 0 0 0 0 0 0
2 B2.1.1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
2 B2.1.2 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
2 B3 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
2 B4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
2 B5 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
2 B6 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
2 B7 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
2 B8 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
2 B9 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
2 B9.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
2 B10 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
2 B10.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
2 B11 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
2 B12 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
2 B13 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
2 B14 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
2 B15 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
2 B16 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
2 B2.2.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 9 4 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP08 SE-12MAD E6P 0 0 0 0.015 Apr 0 0 0 Dec Dec Dec Dec


1 A1 12/C5 CON E4P 0 0 0 0 0 0.035 Apr 0 Dec Dec Dec Dec
1 A2 8/C6 E1 0 0 0 0 0 0.0633 Apr 0 Dec Dec Dec Dec
1 A3 8/C6 E1 0 0 0 0 0 0.064 Apr 0 Dec Dec Dec Dec
1 A4 8/C6 E5 0 0 0 0 0 0.064 Apr 0 Dec Dec Dec Dec
1 A5 8/C6 E2 0 0 0 0 0 0.07 Apr 0 Dec Dec Dec Dec
1 A6 8/C6 E3 0 0 0 0 0 0.07 Apr 0 Dec Dec Dec Dec
1 A4.1 8/C6 E3 0 0 0 0 0 0.06 Apr 0 Dec Dec Dec Dec
1 B1 8/C6 E5 0 0 0 0 0 0.024 Apr 0 Dec Dec Dec Dec
1 B2 8/C6 E3 0 0 0 0 0 0.024 Apr 0 Dec Dec Dec Dec
1 B1.1 8/C6 E3 0 0 0 0 0 0 0.024 Mar Dec Dec Dec Dec
1 C1 8/C6 E4 0 0 0 0.02 Apr 0 0 0 Dec Dec Dec Dec
1 C2 8/C6 E6 0 0 0 0.046 Apr 0 0 0 Dec Dec Dec Dec
1 C3 8/C6 E1 0 0 0 0 0 0.063 Apr 0 Dec Dec Dec Dec
1 C4 8/C6 E1 0 0 0 0 0 0.063 Apr 0 Dec Dec Dec Dec
1 C5 8/C6 E1 0 0 0 0 0 0.07 Apr 0 Dec Dec Dec Dec
1 C6 8/C6 E1 0 0 0 0 0 0.071 Mar 0 Dec Dec Dec Dec
1 C7 8/C6 E1 0 0 0 0 0 0.061 Mar 0 Dec Dec Dec Dec
1 C8 8/C6 E4 0 0 0 0 0 0.08 Mar 0 Dec Dec Dec Dec
1 C9 8/C6 E6 0 0 0 0 0 0.035 Mar 0 Dec Dec Dec Dec
1 C10 8/C6 E1 0 0 0 0 0 0.063 Mar 0 Dec Dec Dec Dec
1 C11 8/C6 E3 0 0 0 0 0 0.063 Mar 0 Dec Dec Dec Dec
1 C9.1 8/C6 E3 0 0 0 0 0 0 0.028 Mar Dec Dec Dec Dec
1 C2.1 8/C6 E3 0 0 0 0 0 0.03 Mar 0 Dec Dec Dec Dec
2 RP06 SE-12MAD E3P 0 0 0 0.015 Apr 0 0 0 Dec Dec Dec Dec
2 A1 12/C5 CON E3P 0 0 0 0.0215 Apr 0 0 0 Dec Dec Dec Dec
2 A2 8/C6 E1 0 0 0 0 0 0.04 Apr 0 Dec Dec Dec Dec
2 A3 12/C5 CON E1P 0 0 0 0 0 0.04 Apr 0 Dec Dec Dec Dec
2 A4 8/C6 E5 0 0 0 0 0 0.05 Apr 0 Dec Dec Dec Dec
2 A5 12/C5 CON E4P 0 0 0 0 0 0.07 Apr 0 Dec Dec Dec Dec
2 A6 8/C6 E4 0 0 0 0 0 0.016 Apr 0 Dec Dec Dec Dec
2 A7 8/C6 E3 0 0 0 0 0 0.057 Apr 0 Dec Dec Dec Dec
2 A8 8/C6 E3 0 0 0 0 0 0 0.03 Apr Dec Dec Dec Dec
2 A4.1 8/C6 E3 0 0 0 0 0 0.0218 Apr 0 Dec Dec Dec Dec
2 B1 12/C5 CON E4P 0 0 0 0.0215 Apr 0 0 0 Dec Dec Dec Dec
2 B2 8/C6 E2 0 0 0 0.023 Apr 0 0 0 Dec Dec Dec Dec
2 B2.1.1 8/C6 E4 0 0 0 0 0 0 0.053 Mar Dec Dec Dec Dec
2 B2.1.2 8/C6 E3 0 0 0 0 0 0 0.03 Mar Dec Dec Dec Dec
2 B3 8/C6 E1 0 0 0 0.063 Apr 0 0 0 Dec Dec Dec Dec
2 B4 8/C6 E1 0 0 0 0.063 Apr 0 0 0 Dec Dec Dec Dec
2 B5 8/C6 E1 0 0 0 0.063 Apr 0 0 0 Dec Dec Dec Dec
2 B6 8/C6 E1 0 0 0 0.063 Apr 0 0 0 Dec Dec Dec Dec
2 B7 8/C6 E1 0 0 0 0.063 Apr 0 0 0 Dec Dec Dec Dec
2 B8 8/C6 E1 0 0 0 0.0635 Apr 0 0 0 Dec Dec Dec Dec
2 B9 8/C6 E5 0 0 0 0.064 Apr 0 0 0 Dec Dec Dec Dec
2 B9.1 8/C6 E3 0 0 0 0 Dec 0 0.025 Apr 0 Dec Dec Dec Dec
2 B10 8/C6 E6 0 0 0 0.068 Apr 0 0 Dec 0 Dec Dec Dec Dec
2 B10.1 8/C6 E3 0 0 0 0 0 0.03 Apr 0 Dec Dec Dec Dec
2 B11 8/C6 E4 0 0 0 0 0 0 0.029 Mar Dec Dec Dec Dec
2 B12 8/C6 E1 0 0 0 0 0 0 0.068 Mar Dec Dec Dec Dec
2 B13 8/C6 E1 0 0 0 0 0 0 0.068 Mar Dec Dec Dec Dec
2 B14 8/C6 E1 0 0 0 0 0 0 0.065 Mar Dec Dec Dec Dec
2 B15 8/C6 E1 0 0 0 0 0 0 0.069 Apr Dec Dec Dec Dec
2 B16 8/C6 E3 0 0 0 0 0 0 0.068 Apr Dec Dec Dec Dec
2 B2.2.1 8/C6 E3 0 0 0 0 0 0 0.0314 Apr Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.693 0.000 1.466 0.580 27.728 0 16 27.696 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP08 SE-12MAD E6P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 8/C6 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 RP06 SE-12MAD E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A1 12/C5 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3 12/C5 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A4 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A5 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A6 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A7 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A8 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A4.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B1 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B2 8/C6 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B2.1.1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B2.1.2 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B3 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B5 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B9 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B9.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B10 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B10.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B11 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B12 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B13 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B14 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B15 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B16 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B2.2.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 3 13 26 42 0 42 3 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 07 ACCOPUJIO (HUARACCOLLO)
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP01 SE-12MAD E4P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A2 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A3 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A4 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A5 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B1 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B3 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B4 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B5 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B6 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 11 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 4.356 0 0 11 0 3.641 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 5.257
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 11 0 4.356 0 0 11 0 3.641 0 5.257

METRADO TOTAL 1 0 11 0 4.356 0 0 11 0 3.641 0 5.257

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP01 SE-12MAD E4P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
1 A2 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 2 Mar 0 0
1 A3 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
1 A4 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A5 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 B1 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Apr 0
1 B2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 B3 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 B4 8/C6 E1 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 1 Apr 0 0 0 0
1 B5 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 2 Mar 0 0
1 B6 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Apr 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 5.257 0 7 0 0 5.089 0 3 0 5 2 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 1 0 1 1 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 5.257 0 7 0 0 5.089 0 4 0 6 3 0

METRADO TOTAL 5.257 0 7 0 0 5.089 0 4 0 6 3 0

EJECUTADO % 100% 100% 0% 0% 100% 100% 0% 100% 100% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP01 SE-12MAD E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0


1 A1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A5 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B3 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B5 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B6 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 1 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 1 0 0 0 0 0 0 0

METRADO TOTAL 0 0 0 0 1 0 0 0 0 0 0 0

EJECUTADO % 0% 0% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP01 SE-12MAD E4P 0 0 0 0 0 0 0 0 0 0 0


1 A1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 A2 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A3 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 A4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A5 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 B2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B3 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B5 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B6 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 4 0 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP01 SE-12MAD E4P 0 0 0 0 0 0.015 Apr 0 Dec Dec Dec Dec


1 A1 8/C6 E4 0 0 0 0 0 0 0.02 Apr Dec Dec Dec Dec
1 A2 8/C6 E3 0 0 0 0 0 0 0.057 Apr Dec Dec Dec Dec
1 A3 8/C6 E4 0 0 0 0 0 0 0.031 Apr Dec Dec Dec Dec
1 A4 8/C6 E1 0 0 0 0 0 0 0.043 Mar Dec Dec Dec Dec
1 A5 8/C6 E3 0 0 0 0 0 0 0.043 Mar Dec Dec Dec Dec
1 B1 8/C6 E4 0 0 0 0 0 0.022 Apr 0 Dec Dec Dec Dec
1 B2 8/C6 E1 0 0 0 0 0 0.065 Mar 0 Dec Dec Dec Dec
1 B3 8/C6 E1 0 0 0 0 0 0.065 Mar 0 Dec Dec Dec Dec
1 B4 8/C6 E1 0 0 0 0 0 0.034 Mar 0 Dec Dec Dec Dec
1 B5 8/C6 E3 0 0 0 0 0 0.058 Apr 0 Dec Dec Dec Dec
1 B6 8/C6 E3 0 0 0 0 0 0 0.035 Mar Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.000 0.000 0.267 0.236 5.199 0 3 5.193 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP01 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 2 4 5 11 0 11 2 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 08 PACAJE
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP15 SE-13CAC 3 E3P 1 Mar Dec 0 Dec 0 Dec 0.424 Oct Dec Dec 0 Dec 0 Dec Dec Dec
1 A1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A3 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A4 9/300 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 A5 13/400 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A6 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A7 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A8 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A10 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A11 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A12 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A13 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A14 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 A7.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A7.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A7.3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A7.4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A7.5 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A7.6 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 A2.1 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A2.3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A2.4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A2.4.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A2.4.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A2.4.3 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
1 A2.5 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2.6 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 A2.7 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A2.8 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A2.9 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B1 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B2 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B4.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.2 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B4.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.4 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B4.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.6 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B4.7 12/C5 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B4.8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.9 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B4.2.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B4.2.2 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B4.2.2.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.2.2.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.2.2.3 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B4.2.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.2.4 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B4.2.5 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B5 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B6 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B7 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B8 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B10 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B11 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B12 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B13 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B14 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B15 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B16 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B17 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B6.1 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B6.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B6.3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C1 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C2 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C3.1 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C3.2 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C3.2.1 13/400 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C3.3 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C3.4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C3.4.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C3.4.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C3.4.3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 08 PACAJE
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 C3.5 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C3.6 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C3.7 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C3.8 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C3.9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C3.10 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C4 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C5 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C6 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C7 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C8 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C9.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C9.2 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C9.3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C10 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C11 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C11.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C11.2 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C12 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C13 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C14 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C5.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C5.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C5.3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 RP33 SE-13CAC 3E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 A1 13/500 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 A2 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 A3 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 A4 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 A5 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 A5.1 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 A5.2 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 A5.3 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
2 A6 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 A7 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A7.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A7.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A7.3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 A8 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A10 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 A11 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 A12 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A12.1 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A13 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A14 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 A15 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 B1 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 B2 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 B3 9/200 E5 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 B4 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 B5 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
2 B6 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 B7 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 B8 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 B9 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
2 B3.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 B3.2 9/300 E4 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
2 B3.3 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 B3.4 9/200 E1 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec
2 B3.5 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 C2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C2.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C2.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C2.3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C4 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C5 9/300 E6B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C5.1 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C5.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C5.3 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 C6 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C7 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C8 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C9 9/300 E6 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C9.1 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C9.2 9/300 E3B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C10 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C11 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 08 PACAJE
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

2 C11.1 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 1.568
2 C11.2 9/300 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C11.3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C12 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
2 C13 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C14 9/300 E5B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C14.1 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 C15 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C16 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
2 C13.1 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
2 D1 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 RP12 SE-13CAC 3E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 A1 13/500 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 A2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 A3 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 A4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 A5 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 A5.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 A5.2 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 A5.3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 A5.4 13/400 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 A6 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 A7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
3 A8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
3 A9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
3 A10 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
3 A7.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
3 B1 13/500 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 B2 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 B3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B3.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B3.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B3.3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B3.4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B3.4.1 9/300 E3 1 Dec 0 Dec 0 Dec 0.424 Dec Dec 1 Dec 0 Dec 0 Dec 0.354 Dec Dec 0.784
3 B3.5 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 B3.6 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 B3.7 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B3.8 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 B3.1.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 B3.1.2 9/200 E5 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
3 B3.1.2.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
3 B3.1.2.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
3 B3.1.2.3 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
3 B3.1.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
3 B3.1.4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B3.1.5 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 B4 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B5 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 B6 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 B7 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 B8 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B10 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B11 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B12 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B13 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B14 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B15 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 B8.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 B8.2 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 B8.3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 C4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
3 C5 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C6 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C7 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C8 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C10 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
3 C5.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
3 C5.2 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
4 RP24 SE-13CAC 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 A1 13/500 CON E2P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 A2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 A3 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 A4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 A5 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 A6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 08 PACAJE
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

4 A7 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 A8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 A9 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 A1.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1.2 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
4 A1.3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
4 A1.3.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
4 A1.3.2 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
4 A1.4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
4 A1.5 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
4 A1.6 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
4 A1.7 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
4 A1.8 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
4 B1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 B2 9/300 E5 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 B3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 B4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 B5 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 B6 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
4 B7 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
4 B8 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
4 B9 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
4 B10 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
4 B2.1 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
4 B2.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 B2.3 9/300 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 B2.4 9/300 E6 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 B2.5 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
4 B2.6 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Oct Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
4 B2.4.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C1 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C4 9/300 E5 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C8 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C9 9/300 E6 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C10 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C11 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C12 9/300 E5 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C13 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C14 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C15 9/300 E6 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C16 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C17 9/300 E6 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C18 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 1.568
4 C19 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C17.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C17.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C15.1 9/300 E4 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0.784
4 C15.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C15.3 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C12.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C12.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C12.3 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C9.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
4 C9.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
4 C4.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 68 0 0 33.92 0 67 0 0 23.718 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 157 0 0 61.904 0 158 0 0 55.932 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 18 0 0 7.632 0 18 0 0 6.372 0 51.744
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 10.192
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 08 PACAJE
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 243 0 0 103.456 0 243 0 0 86.022 0 61.936

METRADO TOTAL 1 244 0 0 98.368 0 244 0 0 82.128 0 61.631

EJECUTADO % 100% 100% 0% 0% 105% 100% 0% 0% 105% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP15 SE-13CAC 3 E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 9/300 E1 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 A5 13/400 CON E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 9/200 E1 Dec Dec 0 Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A14 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 A7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.6 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 A2.1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.4.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.4.3 9/300 E3 Apr Dec 1 Apr Dec Dec 0.76 Apr Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 A2.5 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.6 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 A2.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.9 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 B1 9/300 E4 Apr Dec Dec 1 Apr Dec 0.76 Apr Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 B2 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.4 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.6 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.7 12/C5 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.9 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 B4.2.1 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.2 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.2.3 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 B4.2.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.4 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.5 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 B5 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 B13 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 B15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B17 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 B6.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.3 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 C1 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 C2 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.1 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 C3.2.1 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.3 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.4.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.4.3 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 C3.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.10 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 C4 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.2 9/300 E4 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 C9.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 C10 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.2 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
1 C12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
1 C5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.3 9/300 E3 Apr Dec Dec 1 Apr Dec 0.76 Apr Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 RP33 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A5.2 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A5.3 9/300 E3 Apr Dec Dec 1 Apr Dec 0.76 Apr Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 A6 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A7.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A7.3 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A10 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 A11 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 A12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A12.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 A13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 A15 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 B1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 B2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 B3 9/200 E5 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
2 B4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 B5 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec
2 B6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 B7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 B9 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 B3.1 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 B3.2 9/300 E4 Apr Dec Dec 1 Apr Dec 0.76 Apr Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 B3.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 B3.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 B3.5 9/300 E3 Apr Dec Dec 1 Apr Dec 0.76 Apr Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 C1 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C2.3 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 C3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C4 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 C5 9/300 E6B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C5.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C5.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C5.3 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C7 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C8 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec
2 C9 9/300 E6 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C9.1 9/200 E1B Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C9.2 9/300 E3B Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C10 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
2 C11 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

2 C11.1 9/300 E3 Dec Dec Dec 2 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec
2 C11.2 9/300 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C11.3 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 C12 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 C13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C14 9/300 E5B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
2 C14.1 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 C15 9/300 E4 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
2 C16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
2 C13.1 9/300 E3 Apr Dec Dec 1 Apr Dec 0.76 Apr Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
2 D1 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 RP12 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 A1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 A3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 A4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 A5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 A5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 A5.2 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 A5.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 A5.4 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 A6 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 A7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 A9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 A10 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 A7.1 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 B1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 B2 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 B3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B3.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B3.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B3.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B3.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B3.4.1 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 B3.5 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 B3.6 9/300 E4 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
3 B3.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
3 B3.8 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 B3.1.1 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 B3.1.2 9/200 E5 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
3 B3.1.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B3.1.2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B3.1.2.3 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 B3.1.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B3.1.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B3.1.5 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 B4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 B5 9/300 E4B Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 B6 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 B7 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B15 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 B8.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 B8.2 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
3 B8.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 C1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 C2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 C3 9/300 E3 Apr Dec Dec 1 Apr Dec 0.76 Apr Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 C4 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
3 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C10 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
3 C5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
3 C5.2 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 RP24 SE-13CAC 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A1 13/500 CON E2P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 A3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 A5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

4 A7 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 A9 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A1.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A1.2 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 A1.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 A1.3.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 A1.3.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 A1.4 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A1.5 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 A1.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 A1.7 9/300 E4 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 A1.8 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 B1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 B2 9/300 E5 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
4 B3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 B4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 B5 9/300 E3 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec
4 B6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec
4 B7 9/300 E4 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 B8 9/300 E4 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 B9 9/300 E4 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 B10 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 B2.1 9/300 E4 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 B2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 B2.3 9/300 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 B2.4 9/300 E6 Apr Dec Dec 1 Apr Dec 0.76 Apr Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 B2.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 1 Apr 0 Dec
4 B2.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 B2.4.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 C1 9/300 E4 Dec Dec Dec 1 Apr Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 C2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C4 9/300 E5 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
4 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C7 9/200 E1 Apr Dec 1 Apr Dec Dec 0.76 Apr Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C8 9/300 E4 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 C9 9/300 E6 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C12 9/300 E5 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
4 C13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C14 9/300 E4 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C15 9/300 E6 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr
4 C16 9/200 E1 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 1 Apr 0 Dec 0 Dec 1 Apr 0 Dec
4 C17 9/300 E6 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 C18 9/300 E3 Dec Dec 2 Apr Dec Dec 1.52 Dec Dec 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec
4 C19 9/300 E3 Apr Dec 1 Apr Dec Dec 0.76 Apr Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 C17.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C17.2 9/300 E3 Apr Dec 1 Apr Dec Dec 0.76 Apr Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 C15.1 9/300 E4 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec
4 C15.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C15.3 9/300 E3 Apr Dec 1 Apr Dec Dec 0.76 Apr Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 C12.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C12.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C12.3 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 C9.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec
4 C9.2 9/300 E3 Dec Dec 1 Apr Dec Dec 0.76 Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
4 C4.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 51.744 0 0 0 0 49.4 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 10.192 0 32 47 0 9.88 0 139 0 62 27 7
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 61.936 0 32 47 0 59.28 0 139 0 62 27 7

METRADO TOTAL 61.631 0 31 0 1 59.711 0 140 0 63 26 5

EJECUTADO % 100% 103% 0% 0% 99% 99% 0% 98% 104% 140%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP15 SE-13CAC 3 E3P 0 Dec 0 Dec 0 Dec 3 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 13/400 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A14 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.1 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.4.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.4.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.5 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.6 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.9 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.4 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.6 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.7 12/C5 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.9 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2.2 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2.2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2.2.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2.4 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B12 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B13 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B16 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B17 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.1 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.2.1 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.3 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.4.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.4.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 C3.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.10 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C14 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 RP33 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A1 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A3 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A5 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A5.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A5.2 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A5.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A6 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A7.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A7.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A7.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A10 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A11 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A12.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 A15 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B3 9/200 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B9 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B3.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B3.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B3.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B3.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 B3.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C2.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C5 9/300 E6B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C5.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C5.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C5.3 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C7 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C8 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C9 9/300 E6 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C9.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C9.2 9/300 E3B 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C10 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C11 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

2 C11.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C11.2 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C11.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C12 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C14 9/300 E5B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C14.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C15 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C16 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 C13.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
2 D1 13/500 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 RP12 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A1 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A3 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A5 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A5.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A5.2 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A5.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A5.4 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A6 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A10 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 A7.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B1 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B2 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.4.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.5 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.6 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.8 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.1.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.1.2 9/200 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.1.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.1.2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.1.2.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.1.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.1.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B3.1.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B5 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B6 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B7 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B15 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B8.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B8.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 B8.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C10 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C5.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
3 C5.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 RP24 SE-13CAC 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1 13/500 CON E2P 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A3 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A5 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

4 A7 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A9 13/500 CON E3P 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1.3.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1.3.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1.4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1.5 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1.7 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 A1.8 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B2 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B7 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B8 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B9 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B10 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B2.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B2.3 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B2.4 9/300 E6 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B2.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B2.6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 B2.4.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C4 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C8 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C9 9/300 E6 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C12 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C14 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C15 9/300 E6 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C16 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C17 9/300 E6 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C18 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C19 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C17.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C17.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C15.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C15.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C15.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C12.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C12.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C12.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C9.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C9.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
4 C4.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 4 0 0 6 6 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 4 0 0 6 6 0 0 0 0 0 0 0

METRADO TOTAL 5 21 1 4 4 0 0 10 1 1 1 1

EJECUTADO % 80% 0% 0% 150% 150% 0% 0% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP15 SE-13CAC 3 E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A3 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A4 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A5 13/400 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A6 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A14 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A7.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A7.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A7.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A7.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A7.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A7.6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.1 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.4.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.4.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.5 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.6 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 A2.9 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B2 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.2 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.4 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.6 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.7 12/C5 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.9 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.2.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.2.2 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.2.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.2.2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.2.2.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.2.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.2.4 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B4.2.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B5 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B12 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B13 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B14 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B17 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B6.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B6.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 B6.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C2 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.1 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.2.1 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.3 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.4.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.4.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 C3.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C3.10 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C4 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C9.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C9.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C9.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C10 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C11.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C11.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C14 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C5.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
1 C5.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 RP33 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A1 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A3 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A5 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A5.2 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A5.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A6 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A7.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A7.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A7.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A10 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A11 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A12.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 A15 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B3 9/200 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B9 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B3.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B3.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B3.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B3.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 B3.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C2.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C5 9/300 E6B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C5.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C5.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C5.3 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C7 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C8 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C9 9/300 E6 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C9.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C9.2 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C10 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C11 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

2 C11.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C11.2 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C11.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C12 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C14 9/300 E5B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C14.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C15 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C16 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 C13.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
2 D1 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 RP12 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A1 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A3 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A5 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A5.2 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A5.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A5.4 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A6 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A10 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 A7.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B1 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B2 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.4.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.5 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.6 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.8 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.1.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.1.2 9/200 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.1.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.1.2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.1.2.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.1.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.1.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B3.1.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B5 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B6 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B7 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B15 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B8.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B8.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 B8.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C10 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
3 C5.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 RP24 SE-13CAC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A1 13/500 CON E2P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A3 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A5 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

4 A7 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A9 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A1.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
4 A1.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A1.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A1.3.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A1.3.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A1.4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A1.5 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A1.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A1.7 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 A1.8 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B2 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B7 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B8 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B9 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B10 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B2.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B2.3 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B2.4 9/300 E6 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B2.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B2.6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 B2.4.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C4 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C8 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C9 9/300 E6 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C12 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C14 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C15 9/300 E6 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C17 9/300 E6 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C18 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C19 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C17.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C17.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C15.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C15.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C15.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C12.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C12.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C12.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C9.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C9.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
4 C4.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 1 0 50 55 0 0 0 0 10 12 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP15 SE-13CAC 3 E3P 0.015 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
1 A1 0 ET 0 0.0056 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1 0 0.0066 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A3 13/400 CON E1P 0 0.0323 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A4 9/300 E1 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A5 13/400 CON E4P 0 0.0325 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A6 0 ET 0 0.0054 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1B 0 0.006 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A8 9/200 E1 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A9 9/200 E1 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A10 9/200 E1 0 0 0.033 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A11 9/200 E1 0 0 0.033 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1 0 0 0.033 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A13 9/200 E1 0 0 0.033 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A14 9/300 E3 0 0 0.033 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A7.1 9/200 E1 0 0 0.029 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A7.2 9/200 E1 0 0 0.029 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A7.3 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A7.4 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A7.5 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A7.6 9/300 E3 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A2.1 13/500 CON E1P 0 0.028 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A2.2 9/200 E1 0 0.035 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A2.3 9/200 E1 0 0.035 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A2.4 9/200 E1 0 0.031 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A2.4.1 9/200 E1 0 0.0325 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A2.4.2 9/200 E1 0 0.033 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A2.4.3 9/300 E3 0 0.0345 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 A2.5 0 ET 0 0 0.0039 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A2.6 9/300 E4 0 0 0.0062 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A2.7 9/200 E1 0 0 0.0259 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A2.8 9/200 E1 0 0 0.0377 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 A2.9 9/300 E3 0 0 0.0316 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 B1 9/300 E4 0 0.024 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B2 13/400 CON E1P 0 0.031 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B3 9/200 E1B 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B4 13/400 CON E1P 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B4.1 9/200 E1 0 0.025 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B4.2 13/400 CON E1P 0 0.025 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B4.3 9/200 E1 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B4.4 13/400 CON E1P 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B4.5 9/200 E1 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B4.6 13/500 CON E1P 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B4.7 12/C5 CON E1P 0 0.0258 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B4.8 9/200 E1 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B4.9 9/300 E3 0 0.029 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B4.2.1 0 EC 0 0 0.0074 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 B4.2.2 13/500 CON E1P 0 0 0.0114 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 B4.2.2.1 9/200 E1 0 0 0.027 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 B4.2.2.2 9/200 E1 0 0 0.027 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 B4.2.2.3 9/300 E3 0 0 0.026 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 B4.2.3 9/200 E1 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 B4.2.4 13/400 CON E1P 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 B4.2.5 9/300 E3 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 B5 0 EC 0 0.0092 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B6 9/200 E1B 0 0.0052 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B7 9/200 E1 0 0.035 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B8 9/200 E1 0 0.033 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1 0 0.035 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B10 9/200 E1 0 0.034 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B11 9/200 E1 0 0.032 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B12 9/300 E4 0 0.034 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B13 0 ET 0 0.0092 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B14 9/300 E3 0 0.0073 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B15 9/200 E1 0 0.032 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B16 9/200 E1 0 0.032 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B17 9/300 E3 0 0.032 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B6.1 9/200 E1B 0 0.032 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B6.2 9/200 E1 0 0.031 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 B6.3 9/300 E3 0 0.033 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 C1 9/300 E4 0 0.022 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 C2 13/400 CON E1P 0 0.033 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1 0 0.033 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 C3.1 13/400 CON E1P 0 0.033 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 C3.2 9/300 E4 0 0.035 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 C3.2.1 13/400 CON E3P 0 0.035 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
1 C3.3 0 EC 0 0 0.0164 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C3.4 9/200 E1 0 0 0.0058 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C3.4.1 9/200 E1 0 0 0.035 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C3.4.2 9/200 E1 0 0 0.033 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C3.4.3 9/300 E3 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 C3.5 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C3.6 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C3.7 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C3.8 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C3.9 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C3.10 9/300 E3 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C4 0 EC 0 0 0.0079 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C5 9/200 E1 0 0 0.004 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C6 9/200 E1B 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1B 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C9.1 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C9.2 9/300 E4 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C9.3 9/300 E3 0 0 0.024 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C10 0 EC 0 0 0.0062 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C11 9/200 E1 0 0 0.0076 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C11.1 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C11.2 9/300 E4 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C12 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C13 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C14 9/300 E3 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C5.1 9/200 E1 0 0 0.033 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C5.2 9/200 E1 0 0 0.033 Apr 0 0 Dec Dec Dec Dec Dec Dec
1 C5.3 9/300 E3 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 RP33 SE-13CAC 3E3P 0.015 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
2 A1 13/500 CON E4P 0 0.02 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A2 9/200 E1 0 0.0265 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A3 13/400 CON E1P 0 0.0285 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A4 9/200 E1 0 0.0265 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A5 13/400 CON E1P 0 0.0295 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A5.1 9/200 E1 0 0.027 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A5.2 13/400 CON E1P 0 0.028 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A5.3 9/300 E3 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A6 0 EC 0 0 0.006 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 A7 9/200 E1 0 0 0.003 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 A7.1 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 A7.2 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 A7.3 9/300 E3 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 A8 9/200 E1 0 0 0.029 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 A9 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 A10 9/300 CON E3 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 A11 0 EC 0 0 0.0097 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 A12 9/200 E1 0 0.0102 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A12.1 9/300 E3 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A13 9/200 E1 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A14 9/200 E1 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 A15 9/300 E3 0 0.028 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 B1 9/200 E1 0 0.025 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 B2 9/200 E1 0 0.028 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 B3 9/200 E5 0 0.028 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 B4 9/300 E4 0 0.032 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 B5 9/300 E3 0 0 Dec 0.0032 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 B6 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 B7 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 B8 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 B9 9/300 E3 0 0 0.0278 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 B3.1 0 ET 0 0.0042 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 B3.2 9/300 E4 0 0 0.0044 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 B3.3 9/200 E1 0 0 0.026 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 B3.4 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 B3.5 9/300 E3 0 0 0.028 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C1 0 EC 0.0093 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
2 C2 9/200 E1 0.0048 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
2 C2.1 9/200 E1 0.03 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
2 C2.2 9/200 E1 0.0325 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
2 C2.3 9/300 E3 0.031 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
2 C3 9/200 E1 0.0313 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
2 C4 9/300 E4 0.032 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
2 C5 9/300 E6B 0.0197 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
2 C5.1 9/200 E1B 0 0.031 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 C5.2 9/200 E1 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 C5.3 9/300 CON E3 0 0.0287 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 C6 9/200 E1 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 C7 9/300 E4 0 0.03 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 C8 9/300 E3 0 0.0205 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 C9 9/300 E6 0 0 0.008 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C9.1 9/200 E1B 0 0.028 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 C9.2 9/300 E3B 0 0.032 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
2 C10 9/300 E4 0 0 0.0076 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C11 9/200 E1B 0 0 0.0319 Apr 0 0 Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

2 C11.1 9/300 E3 0 0 0.0389 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C11.2 9/300 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C11.3 9/300 E3 0 0 0.0285 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C12 0 EC 0 0 0.0034 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C13 9/200 E1 0 0 0.0031 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C14 9/300 E5B 0 0 0.0245 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C14.1 9/300 E3 0 0 0.026 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C15 9/300 E4 0 0 0.0148 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C16 9/300 E3 0 0 0.0166 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 C13.1 9/300 E3 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
2 D1 13/500 CON E3P 0 0 0.02 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 RP12 SE-13CAC 3E3P 0.015 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
3 A1 13/500 CON E4P 0 0 0.024 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A2 9/200 E1 0 0 0.029 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A3 13/400 CON E1P 0 0 0.029 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A4 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A5 13/400 CON E1P 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A5.1 9/200 E1 0 0 0.026 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A5.2 13/400 CON E1P 0 0 0.026 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A5.3 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A5.4 13/400 CON E3P 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A6 0 EC 0 0 0.0108 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A7 9/200 E1 0 0 0.0044 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A8 9/200 E1 0 0 0.0325 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A9 9/200 E1 0 0 0.0335 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A10 9/300 E3 0 0 0.033 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 A7.1 9/300 E3 0 0 0.035 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B1 13/500 CON E4P 0 0.024 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
3 B2 0 ET 0 0.0111 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
3 B3 9/200 E1 0 0.0085 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
3 B3.1 9/200 E1 0 0 0.033 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.2 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.3 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.4 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.4.1 9/300 E3 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.5 0 ET 0 0 0.0064 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.6 9/300 E4 0 0 0.0071 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.7 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.8 9/300 E3 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.1.1 0 EC 0 0 0.0061 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.1.2 9/200 E5 0 0 0.0065 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.1.2.1 9/200 E1 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.1.2.2 9/200 E1 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.1.2.3 9/300 E3 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.1.3 9/200 E1 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.1.4 9/200 E1 0 0 0.034 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B3.1.5 9/300 E3 0 0 0.034 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B4 9/200 E1B 0 0.027 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
3 B5 9/300 E4B 0 0.027 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
3 B6 9/300 CON E3 0 0.0245 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
3 B7 0 EC 0 0.0071 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
3 B8 9/200 E1 0 0.0028 Apr 0 0 0 Dec Dec Dec Dec Dec Dec
3 B9 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B10 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B11 9/200 E1 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B12 9/200 E1 0 0 0.033 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B13 9/200 E1 0 0 0.028 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B14 9/200 E1 0 0 0.028 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B15 9/300 E3 0 0 0.028 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B8.1 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B8.2 9/300 E4 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 B8.3 9/300 E3 0 0 0.025 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C1 9/200 E1 0 0 0.027 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C2 9/200 E1 0 0 0.026 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C3 9/300 E3 0 0 0.025 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C4 0 ET 0 0 0.0036 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C5 9/200 E1 0 0 0.0056 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C6 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C7 9/200 E1 0 0 0.029 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C8 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C9 9/200 E1 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C10 9/300 E3 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C5.1 9/200 E1 0 0 0.03 Apr 0 0 Dec Dec Dec Dec Dec Dec
3 C5.2 9/300 E3 0 0 0.031 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 RP24 SE-13CAC 0 0.015 Apr 0 0 0 0 Dec Dec Dec Dec Dec Dec
4 A1 13/500 CON E2P 0 0 0 Dec 0.025 Apr 0 Dec Dec Dec Dec Dec Dec
4 A2 9/200 E1 0 0 0 0.033 Apr 0 Dec Dec Dec Dec Dec Dec
4 A3 13/400 CON E1P 0 0 0 0.033 Apr 0 Dec Dec Dec Dec Dec Dec
4 A4 9/200 E1 0 0 0 0.03 Apr 0 Dec Dec Dec Dec Dec Dec
4 A5 13/400 CON E1P 0 0 0 0.03 Apr 0 Dec Dec Dec Dec Dec Dec
4 A6 9/200 E1 0 0 0 0.027 Apr 0 Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

4 A7 13/400 CON E1P 0 0 0 0.027 Apr 0 Dec Dec Dec Dec Dec Dec
4 A8 9/200 E1 0 0 0 0.03 Apr 0 Dec Dec Dec Dec Dec Dec
4 A9 13/500 CON E3P 0 0 0 0.0301 Apr 0 Dec Dec Dec Dec Dec Dec
4 A1.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
4 A1.2 9/300 E4 0 0 0.0113 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 A1.3 9/200 E1 0 0 0.029 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 A1.3.1 9/200 E1 0 0 0.025 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 A1.3.2 9/300 E3 0 0 0.026 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 A1.4 0 ET 0 0 0.0081 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 A1.5 9/300 E4 0 0 0.0048 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 A1.6 9/200 E1 0 0 0.029 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 A1.7 9/300 E4 0 0 0.029 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 A1.8 9/300 E3 0 0 0.028 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 B1 9/200 E1 0 0 0 0.025 Apr 0 Dec Dec Dec Dec Dec Dec
4 B2 9/300 E5 0 0 0 0.03 Apr 0 Dec Dec Dec Dec Dec Dec
4 B3 9/200 E1 0 0 0 0.03 Apr 0 Dec Dec Dec Dec Dec Dec
4 B4 9/200 E1 0 0 0 0.03 Apr 0 Dec Dec Dec Dec Dec Dec
4 B5 9/300 E3 0 0 0 0.03 Apr 0 Dec Dec Dec Dec Dec Dec
4 B6 9/300 E3 0 0 0 0 0 0 0.026 Apr Dec Dec Dec Dec
4 B7 9/300 E4 0 0 0 0 0 0 0.02 Apr Dec Dec Dec Dec
4 B8 9/300 E4 0 0 0 0 0 0 0.096 Apr Dec Dec Dec Dec
4 B9 9/300 E4 0 0 0 0 0 0 0.024 Apr Dec Dec Dec Dec
4 B10 9/300 E3 0 0 0 0 0 0 0.039 Apr Dec Dec Dec Dec
4 B2.1 9/300 E4 0 0 0 0 0 0.025 Apr 0 Dec Dec Dec Dec Dec
4 B2.2 9/200 E1 0 0 0 0 0 0.0385 Apr Dec Dec Dec Dec Dec
4 B2.3 9/300 E1 0 0 0 0 0 0.037 Apr Dec Dec Dec Dec Dec
4 B2.4 9/300 E6 0 0 0 0 0 0.037 Apr Dec Dec Dec Dec Dec
4 B2.5 9/200 E1 0 0 0 0 0 0.023 Apr Dec Dec Dec Dec Dec
4 B2.6 9/300 E3 0 0 0 0 0 0.024 Apr Dec Dec Dec Dec Dec
4 B2.4.1 9/300 E3 0 0 0 0 0 0.02 Apr Dec Dec Dec Dec Dec
4 C1 9/300 E4 0 0 0.0152 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 C2 9/200 E1 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 C3 9/200 E1 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 C4 9/300 E5 0 0 0.032 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 C5 9/200 E1 0 0 0.035 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 C6 9/200 E1 0 0 0.035 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 C7 9/200 E1 0 0 0.0325 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 C8 9/300 E4 0 0 0.02 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 C9 9/300 E6 0 0 0.04 Apr 0 0 Dec Dec Dec Dec Dec Dec
4 C10 9/200 E1 0 0 0 0.035 Apr 0 Dec Dec Dec Dec Dec Dec
4 C11 9/200 E1 0 0 0 0.035 Apr 0 Dec Dec Dec Dec Dec Dec
4 C12 9/300 E5 0 0 0 0.035 Apr 0 Dec Dec Dec Dec Dec Dec
4 C13 9/200 E1 0 0 0 0.035 Apr 0 Dec Dec Dec Dec Dec Dec
4 C14 9/300 E4 0 0 0 0.038 Apr 0 Dec Dec Dec Dec Dec Dec
4 C15 9/300 E6 0 0 0 0.045 Apr 0 Dec Dec Dec Dec Dec Dec
4 C16 9/200 E1 0 0 0 0.034 Apr 0 Dec Dec Dec Dec Dec Dec
4 C17 9/300 E6 0 0 0 0.038 Apr 0 Dec Dec Dec Dec Dec Dec
4 C18 9/300 E3 0 0 0 0 0 0 0.04 Apr Dec Dec Dec Dec
4 C19 9/300 E3 0 0 0 0 0 0 0.073 Apr Dec Dec Dec Dec
4 C17.1 9/200 E1 0 0 0 0 0 0.06 Apr 0 Dec Dec Dec Dec
4 C17.2 9/300 E3 0 0 0 0 0 0.05 Apr 0 Dec Dec Dec Dec
4 C15.1 9/300 E4 0 0 0 0 0 0.015 Apr 0 Dec Dec Dec Dec
4 C15.2 9/200 E1 0 0 0 0 0 0.041 Apr 0 Dec Dec Dec Dec
4 C15.3 9/300 E3 0 0 0 0 0 0.041 Apr 0 Dec Dec Dec Dec
4 C12.1 9/200 E1 0 0 0 0 0 0 0.045 Apr Dec Dec Dec Dec
4 C12.2 9/200 E1 0 0 0 0 0 0 0.045 Apr Dec Dec Dec Dec
4 C12.3 9/300 E3 0 0 0 0 0 0 0.045 Apr Dec Dec Dec Dec
4 C9.1 9/200 E1 0 0 0 0 0 0.047 Apr 0 Dec Dec Dec Dec
4 C9.2 9/300 E3 0 0 0 0 0 0.047 Apr 0 Dec Dec Dec Dec
4 C4.1 9/300 E3 0 0 0 0 0 0.0246 Apr 0 Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.266 2.257 4.247 0.704 0.000 0.496 0.426 102.247 0 59 102.129 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP15 SE-13CAC 3 E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 13/400 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.4.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.4.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.5 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.6 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.9 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.4 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.6 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.7 12/C5 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.9 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.2 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.2.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.4 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.1 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.2.1 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.3 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.4.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.4.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 C3.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.10 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 RP33 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A5.2 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A5.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A7.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A7.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A10 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A11 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A12.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A15 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B3 9/200 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B9 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B3.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B3.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B3.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B3.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B3.5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C2.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C5 9/300 E6B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C5.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C5.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C5.3 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C7 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C8 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C9 9/300 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C9.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C9.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C10 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C11 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

2 C11.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C11.2 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C11.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C12 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C14 9/300 E5B Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C14.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C15 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 C13.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 D1 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 RP12 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A5.2 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A5.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A5.4 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A10 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 A7.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.4.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.5 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.6 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.8 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.1.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.1.2 9/200 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.1.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.1.2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.1.2.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.1.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.1.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B3.1.5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B5 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B6 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B7 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B15 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B8.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B8.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 B8.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C10 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
3 C5.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 RP24 SE-13CAC 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1 13/500 CON E2P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

4 A7 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A9 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1.3.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1.3.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1.4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1.5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1.7 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 A1.8 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B2 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B7 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B8 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B9 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B10 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B2.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B2.3 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B2.4 9/300 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B2.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B2.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 B2.4.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C4 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C8 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C9 9/300 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C12 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C14 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C15 9/300 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C17 9/300 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C18 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C19 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C17.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C17.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C15.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C15.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C15.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C12.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C12.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C12.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C9.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C9.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
4 C4.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 14 330 57 401 0 401 14 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 09 LIHUIÑA
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP01 SE-12MAD E4P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A3 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A4 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A5 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A6 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B1 8/C6 E6 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 1.502
1 B1.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B3 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 10 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 3.96 0 0 10 0 3.31 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 4.506
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 10 0 3.96 0 0 10 0 3.31 0 4.506

METRADO TOTAL 1 0 10 0 3.96 0 0 10 0 3.31 0 4.506

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP01 SE-12MAD E4P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
1 A2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A3 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A4 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A5 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A6 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 1 Mar 0 0
1 B1 8/C6 E6 Mar 0 Dec 2 Mar Dec Dec 1.454 Mar 0 Dec 0 Dec 0 0 0 0
1 B1.1 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 1 Mar 0 0
1 B2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 Dec 0 0
1 B3 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Apr 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 4.506 0 6 0 0 4.362 0 4 0 2 1 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 1 0 1 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 4.506 0 6 0 0 4.362 0 5 0 3 1 0

METRADO TOTAL 4.506 0 5 0 0 4.362 0 5 0 3 1 0

EJECUTADO % 100% 120% 0% 0% 100% 100% 0% 100% 100% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP01 SE-12MAD E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0


1 A1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A5 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A6 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 8/C6 E6 1 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B3 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 1 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 0 0 1 0 0 0 0 0 0 0

METRADO TOTAL 1 0 0 0 1 0 0 0 0 0 0 0

EJECUTADO % 100% 0% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP01 SE-12MAD E4P 0 0 0 0 0 0 0 0 0 0 0


1 A1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 A2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A3 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A5 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A6 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
1 B1.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B3 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 1 0 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP01 SE-12MAD E4P 0 0 0 0 0 0.015 Apr 0 Dec Dec Dec Dec


1 A1 8/C6 E4 0 0 0 0 0 0 0.032 Apr Dec Dec Dec Dec
1 A2 8/C6 E1 0 0 0 0 0 0 0.07 Apr Dec Dec Dec Dec
1 A3 8/C6 E1 0 0 0 0 0 0 0.07 Mar Dec Dec Dec Dec
1 A4 8/C6 E1 0 0 0 0 0 0 0.07 Mar Dec Dec Dec Dec
1 A5 8/C6 E1 0 0 0 0 0 0 0.07 Mar Dec Dec Dec Dec
1 A6 8/C6 E3 0 0 0 0 0 0 0.07 Mar Dec Dec Dec Dec
1 B1 8/C6 E6 0 0 0 0 0 0.035 Apr 0 Dec Dec Dec Dec
1 B1.1 8/C6 E3 0 0 0 0 0 0.055 Mar 0 Dec Dec Dec Dec
1 B2 8/C6 E1 0 0 0 0 0 0 0.031 Mar Dec Dec Dec Dec
1 B3 8/C6 E3 0 0 0 0 0 0 0.05 Mar Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.000 0.000 0.108 0.477 6.932 0 4 6.924 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP01 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 3 4 7 0 7 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 10 CHILLI PUJRO
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP01 SE-12MAD E4P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B1 8/C6 E5 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B1.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B2 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 4 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 1.584 0 0 4 0 1.324 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 1.502
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 4 0 1.584 0 0 4 0 1.324 0 1.502

METRADO TOTAL 1 0 4 0 1.584 0 0 4 0 1.324 0 1.502

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP01 SE-12MAD E4P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 B1 8/C6 E5 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 1 Mar
1 B1.1 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Apr 0 0
1 B2 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 1.502 0 2 0 0 1.454 0 0 0 2 0 1
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 1 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1.502 0 2 0 0 1.454 0 0 0 3 0 1

METRADO TOTAL 1.502 0 2 0 0 1.454 0 0 0 3 0 1

EJECUTADO % 100% 100% 0% 0% 100% 0% 0% 100% 0% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP01 SE-12MAD E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0


1 A1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B2 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 1 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 1 0 0 0 0 0 0 0

METRADO TOTAL 0 0 0 0 1 0 0 0 0 0 0 0

EJECUTADO % 0% 0% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP01 SE-12MAD E4P 0 0 0 0 0 0 0 0 0 0 0


1 A1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 B1.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B2 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 0 3 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP01 SE-12MAD E4P 0 0 0 0 0 0.015 Apr 0 Dec Dec Dec Dec


1 A1 8/C6 E3 0 0 0 0 0 0 Dec 0.046 Apr Dec Dec Dec Dec
1 B1 8/C6 E5 0 0 0 0 0 0.033 Apr 0 Dec Dec Dec Dec
1 B1.1 8/C6 E3 0 0 0 0 0 0.027 Apr 0 Dec Dec Dec Dec
1 B2 8/C6 E3 0 0 0 0 0 0.03 Apr 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.000 0.000 0.108 0.047 1.733 0 1 1.731 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP01 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 1 4 7 12 0 12 1 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 11 ANCOYO LIHUIÑA
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP01 SE-12MAD E6P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A3 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A4 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A5 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B1 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B3 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 1.502
1 B4 8/C6 E5 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B5 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 1.502
1 B6 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B7 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B7.1.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B7.2.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B8 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B9 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B4.1 8/C6 E6 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B4.2 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B4.3 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B4.1.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 C1 12/C5 CON E4P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec 0.751
1 C2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 C3 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Mar 0 Dec Dec 1 Mar 0 Dec 0.331 Mar Dec
1 C4 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 C5 8/C6 E5 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 C6 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 C7 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 C5.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 27 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 10.296 0 0 26 0 8.606 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0.396 0 0 1 0 0.331 0 11.265
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 27 0 10.692 0 0 27 0 8.937 0 11.265

METRADO TOTAL 1 0 27 0 10.692 0 0 27 0 8.937 0 11.265

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP01 SE-12MAD E6P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
1 A2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A3 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A4 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 2 Mar 0 0
1 A5 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
1 B1 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
1 B2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 B3 8/C6 E3 Mar 0 Dec 2 Mar Dec Dec 1.454 Mar 0 Dec 0 0 2 Mar 0 0
1 B4 8/C6 E5 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 1 Mar
1 B5 8/C6 E3 Mar 0 Dec 2 Mar Dec Dec 1.454 Mar 0 Dec 0 0 2 Mar 0 0
1 B6 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 B7 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 2 Mar 0 0 0 0
1 B7.1.1 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 1 Mar 0 0
1 B7.2.1 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 1 Mar 0 0
1 B8 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 0 Dec 1 Mar 0
1 B9 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 1 Mar 0 0
1 B4.1 8/C6 E6 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 0 0 0
1 B4.2 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 2 Mar 0 0
1 B4.3 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 1 Mar 0 0
1 B4.1.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 1 Apr 0 0
1 C1 12/C5 CON E4P Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 0 Dec 0 0
1 C2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 Dec 0 0
1 C3 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 Dec 0 0
1 C4 8/C6 E1 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 1 Apr 0 0 Dec 0 0
1 C5 8/C6 E5 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 Dec 0 1 Apr
1 C6 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 Dec 1 Apr 0
1 C7 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Apr 0 0
1 C5.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Apr 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 11.265 0 15 0 0 10.905 0 7 0 13 3 1
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 2 0 3 1 1
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 11.265 0 15 0 0 10.905 0 9 0 16 4 2

METRADO TOTAL 11.265 0 13 0 0 10.905 0 9 0 16 4 2

EJECUTADO % 100% 115% 0% 0% 100% 100% 0% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP01 SE-12MAD E6P 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 0 0 0 0


1 A1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A4 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A5 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B3 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B4 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B5 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B6 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B7 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B7.1.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B7.2.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B8 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B9 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B4.1 8/C6 E6 1 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B4.2 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B4.3 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B4.1.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C1 12/C5 CON E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0
1 C2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C3 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C5 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C6 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C7 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C5.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 1 0 1 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 0 0 1 0 1 0 0 0 0 0

METRADO TOTAL 1 0 0 0 1 0 1 0 0 0 0 0

EJECUTADO % 100% 0% 0% 0% 100% 0% 100% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP01 SE-12MAD E6P 0 0 0 0 0 0 0 0 0 0 0


1 A1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 A2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A3 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A4 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A5 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 B2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B3 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B4 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 B5 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B6 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B7 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B7.1.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B7.2.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B8 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 B9 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B4.1 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
1 B4.2 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B4.3 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B4.1.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 C1 12/C5 CON E4P 0 0 0 0 0 0 0 0 0 0 0
1 C2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C3 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C5 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 C6 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 C7 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 C5.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 2 2 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP01 SE-12MAD E6P 0 0 0 0.015 Apr 0 0 0 Dec Dec Dec Dec


1 A1 8/C6 E4 0 0 0 0 0 0.026 Apr 0 Dec Dec Dec Dec
1 A2 8/C6 E1 0 0 0 0 0 0.06 Apr 0 Dec Dec Dec Dec
1 A3 8/C6 E1 0 0 0 0 0 0.06 Apr 0 Dec Dec Dec Dec
1 A4 8/C6 E3 0 0 0 0 0 0.072 Apr 0 Dec Dec Dec Dec
1 A5 8/C6 E3 0 0 0 0 0 0.026 Mar 0 Dec Dec Dec Dec
1 B1 8/C6 E4 0 0 0 0.025 Apr 0 0 0 Dec Dec Dec Dec
1 B2 8/C6 E1 0 0 0 0.0615 Apr 0 0 0 Dec Dec Dec Dec
1 B3 8/C6 E3 0 0 0 0.0615 Apr 0 0 0 Dec Dec Dec Dec
1 B4 8/C6 E5 0 0 0 0.0515 Mar 0 0 0 Dec Dec Dec Dec
1 B5 8/C6 E3 0 0 0 0.0515 Mar 0 0 0 Dec Dec Dec Dec
1 B6 8/C6 E1 0 0 0 0 0 0.06 Mar 0 Dec Dec Dec Dec
1 B7 8/C6 E1 0 0 0 0 0 0.081 Mar 0 Dec Dec Dec Dec
1 B7.1.1 8/C6 E3 0 0 0 0 0 0.055 Mar 0 Dec Dec Dec Dec
1 B7.2.1 8/C6 E3 0 0 0 0 0 0.024 Mar 0 Dec Dec Dec Dec
1 B8 8/C6 E4 0 0 0 0 0 0.06 Mar 0 Dec Dec Dec Dec
1 B9 8/C6 E3 0 0 0 0 0 0.03 Mar 0 Dec Dec Dec Dec
1 B4.1 8/C6 E6 0 0 0 0 0 0 0.0295 Mar Dec Dec Dec Dec
1 B4.2 8/C6 E3 0 0 0 0 0 0 0.052 Mar Dec Dec Dec Dec
1 B4.3 8/C6 E3 0 0 0 0 0 0 0.024 Mar Dec Dec Dec Dec
1 B4.1.1 8/C6 E3 0 0 0 0 0 0 0.0245 Mar Dec Dec Dec Dec
1 C1 12/C5 CON E4P 0 0 0 0 0 0 0.0345 Apr Dec Dec Dec Dec
1 C2 8/C6 E1 0 0 0 0 0 0 0.062 Mar Dec Dec Dec Dec
1 C3 8/C6 E1 0 0 0 0 0 0 0.054 Mar Dec Dec Dec Dec
1 C4 8/C6 E1 0 0 0 0 0 0 0.057 Mar Dec Dec Dec Dec
1 C5 8/C6 E5 0 0 0 0 0 0 0.073 Mar Dec Dec Dec Dec
1 C6 8/C6 E4 0 0 0 0 0 0 0.072 Apr Dec Dec Dec Dec
1 C7 8/C6 E3 0 0 0 0 0 0 0.03 Apr Dec Dec Dec Dec
1 C5.1 8/C6 E3 0 0 0 0 0 0 0.025 Apr Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.274 0.000 0.571 0.554 15.597 0 9 15.579 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP01 SE-12MAD E6P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.1.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.2.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.1 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.1.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 2 8 9 19 0 19 2 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 12 HATUN URAPATA
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP01 SE-12MAD E4P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E6 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 1.502
1 A2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 A3 8/C6 E5 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 A4 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 A5 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 A6 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 A6.1.1 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 A6.1.2 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 A7 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 A8 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 A9 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 A10 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 A6.2.1 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 A6.2.2 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 A3.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 A1.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 B1 12/C5 CON E4P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec 0.751
1 B2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 B3 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 B4 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 B5 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 B6 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 1.502
1 B7 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 B8 8/C6 E5 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 B8.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 B9 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 25 0 9.9 0 0 25 0 8.275 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 10.514
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 25 0 9.9 0 0 25 0 8.275 0 10.514

METRADO TOTAL 1 0 25 0 9.9 0 0 25 0 8.275 0 10.514

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP01 SE-12MAD E4P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 8/C6 E6 Mar 0 Dec 2 Mar Dec Dec 1.454 Mar 0 Dec 0 0 0 0 0
1 A2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A3 8/C6 E5 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 1 Mar
1 A4 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A5 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A6 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 2 Mar 0 0 0 0
1 A6.1.1 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A6.1.2 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 A7 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A8 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
1 A9 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Apr 0
1 A10 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 A6.2.1 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A6.2.2 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 A3.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
1 A1.1 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 B1 12/C5 CON E4P Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 Dec 0 0
1 B2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 Dec 0 0
1 B3 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 Dec 0 0
1 B4 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 Dec 0 0
1 B5 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 Dec 0 0
1 B6 8/C6 E3 Mar 0 Dec 2 Mar Dec Dec 1.454 Mar 0 Dec 0 Dec 0 2 Mar 0 0
1 B7 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 Dec 0 0
1 B8 8/C6 E5 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 Dec 0 1 Mar
1 B8.1 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Apr 0 0
1 B9 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Apr 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 10.514 0 14 0 0 10.178 0 10 0 7 1 2
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 3 0 2 1 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 10.514 0 14 0 0 10.178 0 13 0 9 2 2

METRADO TOTAL 10.514 0 12 0 0 10.178 0 13 0 9 2 2

EJECUTADO % 100% 117% 0% 0% 100% 100% 0% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP01 SE-12MAD E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0


1 A1 8/C6 E6 1 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A5 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A6 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A6.1.1 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A6.1.2 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A7 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A8 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A9 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A10 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A6.2.1 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A6.2.2 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A1.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 12/C5 CON E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0
1 B2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B3 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B5 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B6 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B7 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B8 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B8.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B9 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 2 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 0 0 2 0 0 0 0 0 0 0

METRADO TOTAL 1 0 0 0 2 0 0 0 0 0 0 0

EJECUTADO % 100% 0% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP01 SE-12MAD E4P 0 0 0 0 0 0 0 0 0 0 0


1 A1 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
1 A2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A3 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 A4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A5 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A6 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A6.1.1 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A6.1.2 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A7 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A8 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 A9 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 A10 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A6.2.1 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A6.2.2 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A3.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A1.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 12/C5 CON E4P 0 0 0 0 0 0 0 0 0 0 0
1 B2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B3 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B5 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B6 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B7 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B8 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 B8.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B9 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 1 0 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP01 SE-12MAD E4P 0 0 0 0 0 0.015 Apr 0 Dec Dec Dec Dec


1 A1 8/C6 E6 0 0 0 0 0 0.0324 Apr 0 Dec Dec Dec Dec
1 A2 8/C6 E1 0 0 0 0 0 0.086 Mar 0 Dec Dec Dec Dec
1 A3 8/C6 E5 0 0 0 0 0 0.065 Mar 0 Dec Dec Dec Dec
1 A4 8/C6 E1 0 0 0 0 0 0.06 Mar 0 Dec Dec Dec Dec
1 A5 8/C6 E1 0 0 0 0 0 0.065 Mar 0 Dec Dec Dec Dec
1 A6 8/C6 E1 0 0 0 0 0 0.0675 Mar 0 Dec Dec Dec Dec
1 A6.1.1 8/C6 E1 0 0 0 0 0 0 0.059 Mar Dec Dec Dec Dec
1 A6.1.2 8/C6 E3 0 0 0 0 0 0 0.059 Mar Dec Dec Dec Dec
1 A7 8/C6 E1 0 0 0 0 0 0 0.068 Mar Dec Dec Dec Dec
1 A8 8/C6 E4 0 0 0 0 0 0 0.06 Mar Dec Dec Dec Dec
1 A9 8/C6 E4 0 0 0 0 0 0 0.0285 Mar Dec Dec Dec Dec
1 A10 8/C6 E3 0 0 0 0 0 0 0.0755 Mar Dec Dec Dec Dec
1 A6.2.1 8/C6 E1 0 0 0 0 0 0.07 Mar 0 Dec Dec Dec Dec
1 A6.2.2 8/C6 E3 0 0 0 0 0 0.0735 Mar 0 Dec Dec Dec Dec
1 A3.1 8/C6 E3 0 0 0 0 0 0 0.03 Mar Dec Dec Dec Dec
1 A1.1 8/C6 E3 0 0 0 0 0 0 0.069 Mar Dec Dec Dec Dec
1 B1 12/C5 CON E4P 0 0 0 0 0 0.0285 Apr 0 Dec Dec Dec Dec
1 B2 8/C6 E1 0 0 0 0 0 0.065 Apr 0 Dec Dec Dec Dec
1 B3 8/C6 E1 0 0 0 0 0 0.065 Mar 0 Dec Dec Dec Dec
1 B4 8/C6 E1 0 0 0 0 0 0.065 Apr 0 Dec Dec Dec Dec
1 B5 8/C6 E1 0 0 0 0 0 0.065 Apr 0 Dec Dec Dec Dec
1 B6 8/C6 E3 0 0 0 0 0 0.067 Apr 0 Dec Dec Dec Dec
1 B7 8/C6 E1 0 0 0 0 0 0 0.065 Mar Dec Dec Dec Dec
1 B8 8/C6 E5 0 0 0 0 0 0 0.065 Apr Dec Dec Dec Dec
1 B8.1 8/C6 E3 0 0 0 0 0 0 0.065 Apr Dec Dec Dec Dec
1 B9 8/C6 E3 0 0 0 0 0 0 0.069 Apr Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.000 0.000 0.917 0.734 13.864 0 8 13.848 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP01 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1.1 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1.2 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.1 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.2 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 7 6 13 0 13 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 13 TANTANUYO
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP01 SE-12MAD E3P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 A2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 A3 8/C6 E5 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 A3.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 A4 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
1 A5 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec 0.751
1 B1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Oct 0 Dec Dec 1 Oct 0 Dec 0.331 Oct Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 7 0 2.772 0 0 7 0 2.317 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 3.004
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 7 0 2.772 0 0 7 0 2.317 0 3.004

METRADO TOTAL 1 0 7 0 2.772 0 0 7 0 2.317 0 3.004

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP01 SE-12MAD E3P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
1 A2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A3 8/C6 E5 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 0 1 Mar
1 A3.1 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 A4 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 0 0
1 A5 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 0
1 B1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Apr 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 3.004 0 4 0 0 2.908 0 1 0 2 1 1
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 1 0 1 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 3.004 0 4 0 0 2.908 0 2 0 3 1 1

METRADO TOTAL 3.004 0 4 0 0 2.908 0 2 0 3 1 1

EJECUTADO % 100% 100% 0% 0% 100% 100% 0% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP01 SE-12MAD E3P 0 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec 0 Dec 0 0 0 0 0


1 A1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A5 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 2 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 2 0 0 0 0 0 0 0 0

METRADO TOTAL 0 0 0 2 0 0 0 0 0 0 0 0

EJECUTADO % 0% 0% 0% 100% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP01 SE-12MAD E3P 0 0 0 0 0 0 0 0 0 0 0


1 A1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 A2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A3 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 A3.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A5 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP01 SE-12MAD E3P 0 0 0 0 0 0 0.015 Apr Dec Dec Dec Dec


1 A1 8/C6 E4 0 0 0 0 0 0 0.025 Apr Dec Dec Dec Dec
1 A2 8/C6 E1 0 0 0 0 0 0 0.0595 Mar Dec Dec Dec Dec
1 A3 8/C6 E5 0 0 0 0 0 0 0.0595 Mar Dec Dec Dec Dec
1 A3.1 8/C6 E3 0 0 0 0 0 0 0.074 Mar Dec Dec Dec Dec
1 A4 8/C6 E1 0 0 0 0 0 0 0.05 Mar Dec Dec Dec Dec
1 A5 8/C6 E3 0 0 0 0 0 0 0.05 Apr Dec Dec Dec Dec
1 B1 8/C6 E3 0 0 0 0 0 0 0.03 Apr Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.374 5.199 0 3 5.193 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP01 SE-12MAD E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 3 1 4 0 4 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 14 ULO TIA
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP04 SE-12MAD E6P 1 Mar Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A2 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A3 8/C6 E5 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A3.1 8/C6 E2 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A3.2 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A3.3 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A3.4 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A4 8/C6 E4 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A5 8/C6 E6 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 1.502
1 A6 8/C6 E1 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 A7 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 A5.1 8/C6 E3 Dec 1 Oct 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B1 8/C6 E4 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B2 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B3 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 B4 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 B5 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 C1 12/C5 CON E4P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 C2 12/C5 CON E1P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 C3 12/C5 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 C4 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 C5 8/C6 E4 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
1 C6 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 C7 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 C8 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 1.502
1 C9 8/C6 E1 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec
1 C10 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Nov 0 Dec Dec 1 Nov 0 Dec 0.331 Nov Dec 0.751
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 12 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 12 0 9.504 0 0 24 0 7.944 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 11.265
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 24 0 9.504 0 0 24 0 7.944 0 11.265

METRADO TOTAL 1 0 24 0 9.504 0 0 24 0 7.944 0 11.265

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP04 SE-12MAD E6P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
1 A2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 0
1 A3 8/C6 E5 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 1 Apr
1 A3.1 8/C6 E2 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 1 Mar 0 0 0
1 A3.2 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 2 Mar 0 0
1 A3.3 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
1 A3.4 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
1 A4 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 1 Mar 0
1 A5 8/C6 E6 Mar 0 Dec 2 Mar Dec Dec 1.454 Mar 0 Dec 0 0 0 0 Dec 0
1 A6 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 0 Dec 0
1 A7 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Mar 0 Dec 0
1 A5.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 Dec 0
1 B1 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 Dec 1 Mar 0
1 B2 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 Dec 0 Dec 0
1 B3 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 Dec 0 Dec 0
1 B4 8/C6 E1 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 1 Mar 0 0 Dec 0 Dec 0
1 B5 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 1 Mar 0 Dec 0
1 C1 12/C5 CON E4P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 0 Dec 0 Dec 0
1 C2 12/C5 CON E1P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 0 Dec 0 Dec 0
1 C3 12/C5 CON E3P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 0 Dec 0 Dec 0
1 C4 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 Dec 0 Dec 0
1 C5 8/C6 E4 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 Dec 0 0 Dec 1 Apr 0
1 C6 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Mar 0 0 Dec 0 0
1 C7 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 Dec 0 0
1 C8 8/C6 E3 Mar 0 Dec 2 Mar Dec Dec 1.454 Mar 0 Dec 0 Dec 0 2 Apr 0 0
1 C9 8/C6 E1 Dec 0 Dec Dec Dec Dec Dec 0 Dec 1 Apr 0 0 Dec 0 0
1 C10 8/C6 E3 Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 1 Apr 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 11.265 0 15 0 0 10.905 0 7 1 6 4 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 2 0 3 1 1
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 11.265 0 15 0 0 10.905 0 9 1 9 5 1

METRADO TOTAL 11.265 0 13 0 0 10.905 0 9 1 9 5 1

EJECUTADO % 100% 115% 0% 0% 100% 100% 100% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP04 SE-12MAD E6P 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Apr 0 0 0 0 0


1 A1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3.1 8/C6 E2 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3.2 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3.3 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3.4 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A4 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A5 8/C6 E6 1 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A6 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A7 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A5.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B2 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B3 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B5 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C1 12/C5 CON E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0
1 C2 12/C5 CON E1P 0 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C3 12/C5 CON E3P 0 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C4 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C5 8/C6 E4 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C6 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C7 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C8 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C9 8/C6 E1 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 C10 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 1 0 2 1 0 1 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 1 0 2 1 0 1 0 0 0 0 0

METRADO TOTAL 1 1 0 2 1 0 1 0 0 0 0 0

EJECUTADO % 100% 100% 0% 100% 100% 0% 100% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP04 SE-12MAD E6P 0 0 0 0 0 0 0 0 0 0 0


1 A1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 A2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A3 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 A3.1 8/C6 E2 0 0 0 0 0 0 0 0 0 0 0
1 A3.2 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A3.3 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 A3.4 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A4 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 A5 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
1 A6 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 A7 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A5.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 B2 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B3 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 B5 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 C1 12/C5 CON E4P 0 0 0 0 0 0 0 0 0 0 0
1 C2 12/C5 CON E1P 0 0 0 0 0 0 0 0 0 0 0
1 C3 12/C5 CON E3P 0 0 0 0 0 0 0 0 0 0 0
1 C4 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C5 8/C6 E4 0 0 0 0 0 0 0 0 0 0 0
1 C6 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C7 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C8 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 C9 8/C6 E1 0 0 0 0 0 0 0 0 0 0 0
1 C10 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 4 0 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP04 SE-12MAD E6P 0 0 0 0 0 0.015 Apr 0 Dec Dec Dec Dec


1 A1 8/C6 E4 0 0 0 0 0 0.028 Apr 0 Dec Dec Dec Dec
1 A2 8/C6 E1 0 0 0 0 0 0.0505 Mar 0 Dec Dec Dec Dec
1 A3 8/C6 E5 0 0 0 0 0 0.0505 Mar 0 Dec Dec Dec Dec
1 A3.1 8/C6 E2 0 0 0 0 0 0.067 Mar 0 Dec Dec Dec Dec
1 A3.2 8/C6 E3 0 0 0 0 0 0 0.024 Mar Dec Dec Dec Dec
1 A3.3 8/C6 E4 0 0 0 0 0 0 0.065 Mar Dec Dec Dec Dec
1 A3.4 8/C6 E3 0 0 0 0 0 0 0.025 Mar Dec Dec Dec Dec
1 A4 8/C6 E4 0 0 0 0 0 0.026 Mar 0 Dec Dec Dec Dec
1 A5 8/C6 E6 0 0 0 0 0 0.06 Mar 0 Dec Dec Dec Dec
1 A6 8/C6 E1 0 0 0 0 0 0 0.061 Mar Dec Dec Dec Dec
1 A7 8/C6 E3 0 0 0 0 0 0 0.061 Mar Dec Dec Dec Dec
1 A5.1 8/C6 E3 0 0 0 0 0 0 0.0255 Mar Dec Dec Dec Dec
1 B1 8/C6 E4 0 0 0 0 0 0.026 Apr 0 Dec Dec Dec Dec
1 B2 8/C6 E1 0 0 0 0 0 0.07 Mar 0 Dec Dec Dec Dec
1 B3 8/C6 E1 0 0 0 0 0 0.068 Apr 0 Dec Dec Dec Dec
1 B4 8/C6 E1 0 0 0 0 0 0.07 Apr 0 Dec Dec Dec Dec
1 B5 8/C6 E3 0 0 0 0 0 0.07 Apr 0 Dec Dec Dec Dec
1 C1 12/C5 CON E4P 0 0 0 0 0 0 0.0265 Apr Dec Dec Dec Dec
1 C2 12/C5 CON E1P 0 0 0 0 0 0 0.0663 Apr Dec Dec Dec Dec
1 C3 12/C5 CON E3P 0 0 0 0 0 0 0.0605 Apr Dec Dec Dec Dec
1 C4 8/C6 E1 0 0 0 0 0 0 0.0305 Apr Dec Dec Dec Dec
1 C5 8/C6 E4 0 0 0 0 0 0 0.0305 Apr Dec Dec Dec Dec
1 C6 8/C6 E1 0 0 0 0 0 0 0.065 Apr Dec Dec Dec Dec
1 C7 8/C6 E1 0 0 0 0 0 0 0.06 Apr Dec Dec Dec Dec
1 C8 8/C6 E3 0 0 0 0 0 0 0.06 Apr Dec Dec Dec Dec
1 C9 8/C6 E1 0 0 0 0 0 0 0.054 Apr Dec Dec Dec Dec
1 C10 8/C6 E3 0 0 0 0 0 0 0.054 Apr Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.000 0.000 0.619 0.792 13.864 0 8 13.848 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP04 SE-12MAD E6P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.1 8/C6 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.2 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.3 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.4 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 12/C5 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 12/C5 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 3 5 9 17 0 17 3 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 15 TOCCA BAJO
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP01 SE-12MAD E4P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E6 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 A1.1 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A2 8/C6 E5 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A3 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 A2.1 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B1 12/C5 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec 0.751
1 B2 8/C6 E6 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 B2.1 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
1 B3 8/C6 E3 Dec 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec 0.751
0 0 0 0 Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 8 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 3.168 0 0 8 0 2.648 0 3.755
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0.751
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 8 0 3.168 0 0 8 0 2.648 0 4.506

METRADO TOTAL 1 0 8 0 3.168 0 0 8 0 2.648 0 4.506

EJECUTADO % 100% 0% 100% 0% 100% 0% 100% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP01 SE-12MAD E4P Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
1 A1 8/C6 E6 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 0 0 0
1 A1.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
1 A2 8/C6 E5 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 1 Mar
1 A3 8/C6 E3 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 1 Mar 0 0
1 A2.1 8/C6 E3 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 1 Mar 0 0
1 B1 12/C5 CON E3P Mar 0 Dec 1 Mar Dec Dec 0.727 Mar 0 Dec 0 0 0 0 0
1 B2 8/C6 E6 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 0 0 0
1 B2.1 8/C6 E3 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 1 Mar 0 0
1 B3 8/C6 E3 Dec 0 Dec 1 Mar Dec Dec 0.727 Dec 0 Dec 0 0 1 Apr 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0
0 0 0 0 Dec 0 Dec Dec Dec Dec Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 3.755 0 0 0 0 3.635 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.751 0 6 0 0 0.727 0 0 0 4 0 1
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 1 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 4.506 0 6 0 0 4.362 0 0 0 5 0 1

METRADO TOTAL 4.506 0 6 0 0 4.362 0 0 0 5 0 1

EJECUTADO % 100% 100% 0% 0% 100% 0% 0% 100% 0% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP01 SE-12MAD E4P 0 0 Dec 0 Dec 0 Dec 1 Apr 0 Dec 0 Dec 0 0 0 0 0


1 A1 8/C6 E6 1 Mar 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A1.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2 8/C6 E5 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A3 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 A2.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B1 12/C5 CON E3P 0 0 Dec 0 Dec 2 Apr 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B2 8/C6 E6 1 Apr 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B2.1 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
1 B3 8/C6 E3 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 1 0 0 2 1 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 2 0 0 2 1 0 0 0 0 0 0 0

METRADO TOTAL 2 0 0 2 1 0 0 0 0 0 0 0

EJECUTADO % 100% 0% 0% 100% 100% 0% 0% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP01 SE-12MAD E4P 0 0 0 0 0 0 0 0 0 0 0


1 A1 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
1 A1.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A2 8/C6 E5 0 0 0 0 0 0 0 0 0 0 0
1 A3 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 A2.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B1 12/C5 CON E3P 0 0 0 0 0 0 0 0 0 0 0
1 B2 8/C6 E6 0 0 0 0 0 0 0 0 0 0 0
1 B2.1 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
1 B3 8/C6 E3 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 0 1 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP01 SE-12MAD E4P 0 0 0 0 0 0 0.015 Mar Dec Dec Dec Dec


1 A1 8/C6 E6 0 0 0 0 0 0 0.028 Mar Dec Dec Dec Dec
1 A1.1 8/C6 E3 0 0 0 0 0 0 0.03 Mar Dec Dec Dec Dec
1 A2 8/C6 E5 0 0 0 0 0 0 0.0415 Mar Dec Dec Dec Dec
1 A3 8/C6 E3 0 0 0 0 0 0 0.0415 Mar Dec Dec Dec Dec
1 A2.1 8/C6 E3 0 0 0 0 0 0 0.026 Mar Dec Dec Dec Dec
1 B1 12/C5 CON E3P 0 0 0 0 0 0 0.0256 Mar Dec Dec Dec Dec
1 B2 8/C6 E6 0 0 0 0 0 0 0.067 Apr Dec Dec Dec Dec
1 B2.1 8/C6 E3 0 0 0 0 0 0 0.042 Apr Dec Dec Dec Dec
1 B3 8/C6 E3 0 0 0 0 0 0 0.0845 Apr Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec
0 0 0 0 0 0 0 0 0 0 0 Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.413 3.466 0 2 3.462 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP01 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 12/C5 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 8/C6 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 3 4 1 8 0 8 3 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 16 CCATACANCHA
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

1 RP02 SE-12MAD E4P 1 Feb Dec 0 Dec 0 Dec Dec 0 Dec Dec Dec Dec Dec Dec
1 A1 12/C5 CON E4P 0 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 A2 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A3 12/C5 CON E1P 0 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 A4 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A5 12/C5 CON E4P 0 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
1 A6 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A7 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A8 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 A9 8/C6 E3 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec Dec
1 B1 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B2 8/C6 E4 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B3 8/C6 E3 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B4 8/C6 E4 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec Dec
1 B5 8/C6 E4 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B6 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B7 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B8 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B9 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B10 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B11 8/C6 E5 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec Dec
1 B12 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B13 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B14 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B15 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B16 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
1 B17 8/C6 E3 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec Dec
1 B11.1 8/C6 E3 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec Dec
2 RP01 SE-12MAD E4P 0 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
2 A1 8/C6 E3 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B1 12/C5 CON E5P 0 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
2 B1.1 11/C6 E3 0 0 Dec 1 Nov 0.654 Dec 0 Dec Dec Dec 1 Dec 0.573 Dec Dec Dec
2 B2 8/C6 E1 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec
2 B3 8/C6 E3 0 1 Nov 0 Dec 0.396 Dec 0 Dec Dec 1 Dec 0 Dec 0.331 Dec Dec Dec
0 0 0 0 0 0 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec Dec Dec
0 0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 27 1 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 11.346 0 0 27 1 9.51 0 3.788
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 1.502
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 1 0 27 1 11.346 0 0 27 1 9.51 0 5.29

METRADO TOTAL 1 0 27 1 11.346 0 0 27 1 9.51 0 5.29

EJECUTADO % 100% 0% 100% 100% 100% 0% 100% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

Tipo I Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

1 RP02 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A3 12/C5 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A5 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A8 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A9 8/C6 E3 Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec
1 B1 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 B2 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec
1 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Jan Mar Dec Dec
1 B4 8/C6 E4 Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec
1 B5 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Apr Dec
1 B6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 B7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 B8 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 B9 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 B10 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 B11 8/C6 E5 Mar Dec Dec Dec Mar Dec Dec Dec Mar Dec Dec Dec Dec Dec Dec Dec Mar
1 B12 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 B13 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 B14 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 B15 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec
1 B16 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec
1 B17 8/C6 E3 Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec
1 B11.1 8/C6 E3 Mar Dec Dec Dec Mar Dec Dec Dec Mar Dec Dec Dec Dec Dec Dec Mar Dec Dec
2 RP01 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec
2 B1 12/C5 CON E5P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B1.1 11/C6 E3 Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec
2 B2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec
2 B3 8/C6 E3 Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 3.788 0 0 0 0 3.668 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 1.502 0 6 0 0 1.454 0 14 0 6 2 1
EJECUTADO EN ABRIL DE 2023 0 0 0 1 0 0 0 3 0 2 1 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 5.29 0 6 1 0 5.122 0 17 0 8 3 1

METRADO TOTAL 5.29 0 6 0 0 5.122 0 17 0 8 3 1

EJECUTADO % 100% 100% 0% 0% 100% 100% 0% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

1 RP02 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 12/C5 CON E1P Dec Dec Apr Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B16 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B17 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 RP01 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B1 12/C5 CON E5P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec Dec Dec
2 B1.1 11/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 1 0 0 4 1 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 1 0 0 4 1 0 0 0 0 0 0

METRADO TOTAL 0 1 0 0 4 1 0 0 0 0 0 0

EJECUTADO % 0% 100% 0% 0% 100% 100% 0% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
E6B E4PB unipolares en derivación en E1PB E3PB E5PB E6PB ET (empalme EC (empalme 3x70+25/50 3x50+16/35
postes de BT y postes de BT y en "T") en "Cruz") mm² mm²
MT) MT)

1 RP02 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 A1 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 A3 12/C5 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 A4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 A5 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 A6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 A7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 A8 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 A9 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B1 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B2 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B4 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B5 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B8 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B9 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B10 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B11 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B12 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B13 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B14 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B15 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B16 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B17 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
1 B11.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
2 RP01 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
2 A1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
2 B1 12/C5 CON E5P Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
2 B1.1 11/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
2 B2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
2 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 4 0 0 0 0 0 0 0 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
3x35+16/25 3x25+16/25 3x16+16/25 2X16+16/25 2X16/25 mm² 1X16+16/25 1X16/25 mm² Tipo I Tipo II PAT-1
mm² mm² mm² mm² mm²

1 RP02 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec
1 A1 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A3 12/C5 CON E1P Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A5 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A8 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 A9 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
1 B1 8/C6 E1 Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec
1 B2 8/C6 E4 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B4 8/C6 E4 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B5 8/C6 E4 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B6 8/C6 E1 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B7 8/C6 E1 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B8 8/C6 E1 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B9 8/C6 E1 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B10 8/C6 E1 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B11 8/C6 E5 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B12 8/C6 E1 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B13 8/C6 E1 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B14 8/C6 E1 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B15 8/C6 E1 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B16 8/C6 E1 Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec Dec
1 B17 8/C6 E3 Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec
1 B11.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec
2 RP01 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec Dec
2 A1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
2 B1 12/C5 CON E5P Dec Dec Dec Dec Dec Dec Dec Mar Dec Dec Dec Dec
2 B1.1 11/C6 E3 Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec
2 B2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec
2 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Apr Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.000 0.000 0.000 0.000 0.000 1.127 0.651 20.796 0 12 20.772 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
Murete Corta Larga caja caja + 3 Copias)
profundidad

1 RP02 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 12/C5 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 12/C5 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 8/C6 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 8/C6 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B16 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B17 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11.1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 RP01 SE-12MAD E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 A1 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B1 12/C5 CON E5P Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B1.1 11/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B2 8/C6 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
2 B3 8/C6 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 8 7 15 0 15 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.01 MACUSANI SED 01
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC EX 1 Mar Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2 MT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3 0 EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A4 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A5 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A6 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A7 0 EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A7.1.1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A7.1.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 A7.2.1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A7.2.2 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A8 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A9 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A10 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A11 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A12 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A13 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A14 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A14.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A15 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A16 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 A3.1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.2 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.3 0 EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.3.1.1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.3.1.2 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.3.2.1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.3.2.2 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.4 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.5 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.6 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.7 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.8 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.9 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.10 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3.11 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 A2.1 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2.2 MT-REU E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2.3 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2.4 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 A2.6 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2.7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 A2.8 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2.9 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A2.4.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 A2.4.2 13/400 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B2 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B2.1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B2.2 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B2.2.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.3 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B2.4 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B2.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.9 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B3 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B7 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B8 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B10 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B11 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B12 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B13 9/300 E5 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B14 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B15 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B13.1 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B13.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B4.5 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.01 MACUSANI SED 01
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 C2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C2.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C2.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C2.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C2.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C2.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C2.6 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C2.7 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C2.8 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C2.9 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C7 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C8 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C10 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C11 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C12 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C13 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C14 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C15 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C9.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C9.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C9.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C9.4 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 1 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 60 0 0 25.44 0 60 0 0 21.24 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 9.408
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0.784

AVANCE TOTAL 1 60 0 0 25.44 0 60 0 0 21.24 0 10.192

METRADO TOTAL 1 61 0 0 25.864 0 61 0 0 21.594 0 10.192

EJECUTADO % 100% 98% 0% 0% 98% 98% 0% 0% 98% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 MT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 0 EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 0 EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.1.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A7.1.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A7.2.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.2.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A14 9/300 E4 Jul Dec Dec 1 Jul Dec 0.76 Jul Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 A14.1 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A15 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A3.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.3 0 EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.3.1.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.3.1.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.3.2.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.3.2.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.5 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.6 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.7 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.8 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.9 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.10 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A3.11 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.2 MT-REU E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.3 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.4 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.6 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.8 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.9 9/300 E3B Nov Dec Dec Dec 1 Jul 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.4.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.4.2 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B2.2.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B2.3 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.4 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B2.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.9 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B3 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B8 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 9/300 E5 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul
1 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B15 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B13.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B13.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B4.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.5 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C1 0 EC Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 C2 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.6 9/300 E4 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 C2.7 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.8 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C2.9 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/300 E4 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 C8 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C15 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C9.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.4 9/300 E3B Nov Dec Dec Dec 1 Jul 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 9.408 0 0 0 0 9.12 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.784 0 0 7 2 0.76 0 38 0 17 6 1

AVANCE TOTAL 10.192 0 0 11 2 9.88 0 39 0 17 6 1

METRADO TOTAL 10.192 0 0 0 2 9.88 0 39 0 17 6 1

EJECUTADO % 100% 0% 0% 100% 100% 100% 0% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC EX 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 MT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 0 EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7 0 EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.1.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.1.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.2.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.2.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A10 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A13 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A14 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A14.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A15 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A16 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.3 0 EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.3.1.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.3.1.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.3.2.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.3.2.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.4 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.5 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.6 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.7 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.8 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.9 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.10 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.11 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.2 MT-REU E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.4 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.6 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.8 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.9 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
1 A2.4.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.4.2 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.2.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.3 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.9 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B13 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B15 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B13.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B13.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 C2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.6 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.7 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.8 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.9 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C15 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.4 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 1 0 0 0 2 0 0 0

AVANCE TOTAL 0 0 0 0 1 0 0 0 2 0 0 0

METRADO TOTAL 0 3 0 2 1 0 0 0 2 0 0 0

EJECUTADO % 0% 0% 0% 0% 100% 0% 0% 0% 100% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.015 Jul
1 A1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 MT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 0 EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 0 EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.1.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.1.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.2.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.2.2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A14 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A14.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A15 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 A16 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.3 0 EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.3.1.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.3.1.2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.3.2.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.3.2.2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.5 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.6 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.7 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.8 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.9 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.10 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.11 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.2 MT-REU E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A2.4 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.6 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.8 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.9 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.4.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.4.2 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.2.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B2.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.9 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B15 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 C2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.6 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.7 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 C2.8 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.9 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C15 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.4 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 3 0 0.000 0.000

METRADO TOTAL 0 0 20 12 0 0 0 0 4 3 0.000 0.015

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 75% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2 MT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec Dec
1 A3 0 EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7 0 EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7.1.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7.1.2 9/300 E3 0 Dec 0.026 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 A7.2.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7.2.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A8 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A10 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A13 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A14 9/300 E4 0 Dec 0.0267 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 A14.1 9/300 E3 0 Dec 0.0353 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 A15 0 ET 0 Dec 0.0047 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A16 9/300 E3 0 Dec 0.0104 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 A3.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.3 0 EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.3.1.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.3.1.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.3.2.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.3.2.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.4 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.5 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.6 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.7 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.8 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.9 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.10 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.11 9/300 E3 0 Dec 0.02 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec 0 Dec 1
1 A2.1 9/200 E1 0.0325 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2.2 MT-REU E4P 0.0371 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2.3 0 ET 0.0147 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2.4 13/400 CON E1P 0.0055 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2.5 9/200 E1 0 Dec 0.0195 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2.6 13/400 CON E1P 0 Dec 0.0344 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2.7 9/200 E1 0 Dec 0.031 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2.8 13/400 CON E1P 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2.9 9/300 E3B 0 Dec 0.022 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Jul Dec 1 Aug 1.73 Aug
1 A2.4.1 9/200 E1 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2.4.2 13/400 CON E3P 0 Dec 0.0366 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.2.1 9/300 E3 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B2.3 0 EC 0 Dec 0.0076 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.4 9/300 E3 0 Dec 0.009 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B2.5 9/200 E1 0 Dec 0.024 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B2.6 9/200 E1 0 Dec 0.0305 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B2.7 9/200 E1 0 Dec 0.0357 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B2.8 9/200 E1 0 Dec 0.0263 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B2.9 9/300 E3 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug 1
1 B3 0 EC 0 Dec 0.0119 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4 9/200 E1 0 Dec 0.0057 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B5 9/200 E1 0 Dec 0.0282 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B6 9/200 E1 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B7 9/300 E4 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Jul Dec 1 Aug 1.73 Aug 1
1 B8 9/300 E4 0 Dec 0.0228 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B9 9/200 E1 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B10 9/200 E1 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B11 9/200 E1 0 Dec 0.025 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B12 9/200 E1 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B13 9/300 E5 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B14 9/200 E1 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B15 9/300 E3 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Jul Dec 1 Aug 1.73 Aug
1 B13.1 9/300 E4 0 Dec 0.0207 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B13.2 9/300 E3 0 Dec 0.025 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Jul Dec 1 Aug 1.73 Aug
1 B4.1 9/200 E1 0 Dec 0.0236 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B4.2 9/200 E1 0 Dec 0.0287 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B4.3 9/200 E1 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B4.4 9/200 E1 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 B4.5 9/300 E3 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C1 0 EC 0 Dec 0.0114 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 C2 9/200 E1 0 Dec 0.0058 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Jul Dec 1 Aug 1.73 Aug 1
1 C2.1 9/200 E1 0 Dec 0.0351 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C2.2 9/200 E1 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C2.3 9/200 E1 0 Dec 0.034 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C2.4 9/200 E1 0 Dec 0.033 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C2.5 9/200 E1 0 Dec 0.033 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C2.6 9/300 E4 0 Dec 0.0202 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C2.7 0 ET 0 Dec 0.0046 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 0
1 C2.8 9/300 E3 0 Dec 0.0198 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Jul Dec 1 Aug 1.73 Aug 1
1 C2.9 9/300 E3 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C3 9/200 E1 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C4 9/200 E1 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C5 9/200 E1 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C6 9/200 E1 0 Dec 0.0271 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C7 9/300 E4 0 Dec 0.0269 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C8 0 ET 0 Dec 0.0035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9 9/200 E1 0 Dec 0.0068 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C10 9/200 E1 0 Dec 0.0355 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C11 9/200 E1 0 Dec 0.0355 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Jul Dec 1 Aug 1.73 Aug 1
1 C12 9/200 E1 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C13 9/200 E1 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C14 9/200 E1 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec 1
1 C15 9/300 E3 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Jul Dec 1 Aug 1.73 Aug 1
1 C9.1 9/200 E1 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Jul Dec 1 Aug 1.73 Aug 1
1 C9.2 9/200 E1 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec 0 Dec 1
1 C9.3 9/200 E1 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec 0 Dec 1
1 C9.4 9/300 E3B 0 Dec 0.0352 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Jul Dec 1 Aug 1.73 Aug 1
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec 0 Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 17.3 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 19.03 0 11 19.03 50

METRADO TOTAL 0.092 1.850 0.000 0.000 0.000 0.000 0.000 20.796 0 12 20.772 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 92% 92% 92% 13%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 MT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 0 EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 0 EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.1.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.1.2 9/300 E3 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.2.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.2.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/300 E4 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 A14.1 9/300 E3 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/300 E3 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.3 0 EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.3.1.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.3.1.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.3.2.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.3.2.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.4 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.5 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.6 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.7 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.8 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.9 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.10 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.11 9/300 E3 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.2 MT-REU E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.3 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.4 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.6 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.8 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.9 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.4.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.4.2 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.2.1 9/300 E3 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.4 9/300 E3 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.5 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.6 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.7 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.8 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9 9/300 E3 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/300 E4 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/300 E4 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.1 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.3 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.4 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.5 9/300 E3 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 C2 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.1 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.2 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.3 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.4 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.5 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.6 9/300 E4 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.7 0 ET Dec 0 Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.8 9/300 E3 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.9 9/300 E3 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/300 E4 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C15 9/300 E3 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.1 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.2 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.3 9/200 E1 Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.4 9/300 E3B Aug 1 Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 50 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 78 31 108 1 109 0 1 1

EJECUTADO % 13% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.02 MACUSANI SED 02
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 A3 13/400 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 A7 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 A9 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A10 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 A11 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 A13 13/500 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.1 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 A5.2 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.3 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 A5.4 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.5 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 A5.6 13/400 CON E1PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.7 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0.424 Jan 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 B1 13/400 CON E3P 0 Dec 0 Dec 0 Dec -0.424 Jan 0 Dec 0 Dec 0 Dec 0 Dec -0.354 Jan 0 Dec 0
1 C1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C3 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C4 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C5 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C6 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C6.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.2 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C6.2.1 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C6.2.2 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C6.3 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C6.4 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C7 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C8 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C9 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C10 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C11 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C12 9/300 E4 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C13 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C14 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C15 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C16 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C14.1 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C14.2 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C9.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.2 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C9.3 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C9.4 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C9.2.1 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C9.2.2 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C4.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4.2 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C4.3 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C4.4 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C4.2.1 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C4.2.2 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C3.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.2 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C3.2.1 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C3.2.2 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C3.3 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C3.4 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C2.1 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C2.2 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C2.3 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C2.4 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C2.5 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C2.6 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C2.7 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C2.8 9/300 E4 1 Sep 0 Dec 0 Dec 0.424 Sep 0.424 Jan 1 Sep 0 Dec 0 Dec 0.354 Sep 0.354 Dec 0
1 C2.9 0 ET 0 Dec 0 Dec 0 Dec -0.424 Jan 0 Dec 0 Dec 0 Dec 0 Dec -0.354 Jan 0 Dec 0
1 C2.10 9/200 E1 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Dec 0
1 C2.10.1 13/400 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.11 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.12 9/200 E1 1 Jan 0 Dec 0 Dec 0.424 Jan 0 Dec 1 Jan 0 Dec 0 Dec 0.354 Jan 0 Dec 0
1 C2.13 13/400 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.4.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.4.2 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C2.4.2.1 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.02 MACUSANI SED 02
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 C2.4.2.2 9/300 E3B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C2.4.3 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C2.4.4 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 D1 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D2 9/300 E4 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 D3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D4 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D5 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D6 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D7 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D8 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D9 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D10 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D11 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D12 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D13 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 D4.1 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D4.2 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D4.3 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D4.4 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D4.5 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D4.6 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 D4.7 9/300 E3B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 77 0 0 32.648 0 77 0 0 27.258 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 10.192
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 2 0 0 -0.424 1.272 2 0 0 -0.354 0 2.352
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 79 0 0 32.224 1.272 79 0 0 26.904 0 12.544

METRADO TOTAL 1 79 0 0 31.376 2.12 79 0 0 26.196 1.77 11.76

EJECUTADO % 0% 100% 0% 0% 100% 100% 0% 0% 96% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 13/400 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.2 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.4 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.6 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.7 9/300 E3 Dec 0.784 Jan Dec 1 Jul Dec Dec 0.76 Jul 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B1 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.2.2 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C6.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.4 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/300 E4 Nov 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Nov 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 C13 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C16 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C14.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14.2 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C9.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.4 9/300 E3 Jan Dec Dec 1 Jul Dec 0.76 Jan Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C9.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.2.2 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C4.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C4.4 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C4.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C4.2.2 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C3.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2.2 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C3.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.4 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.8 9/300 E4 Dec 0.784 Jan Dec 1 Aug Dec Dec 0.76 Jun 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec
1 C2.9 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.10.1 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.11 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.13 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4.2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 C2.4.2.2 9/300 E3B Jan Dec Dec Dec 1 Aug 0.76 Jan Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4.4 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 D1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D2 9/300 E4 Jan Dec Dec 1 Aug Dec 0.76 Jan Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 D3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D13 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 D4.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.7 9/300 E3B Nov Dec Dec Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 10.192 0 0 0 0 9.88 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 2.352 1.568 0 0 0 2.28 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0.76 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 3 0 0 0.76 52 0 13 2 0

AVANCE TOTAL 12.544 1.568 0 16 2 12.16 1.52 54 0 13 3 0

METRADO TOTAL 11.76 2.352 0 0 2 11.4 2.28 54 0 13 3 0

EJECUTADO % 100% 0% 0% 100% 100% 100% 0% 100% 100% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 13/400 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A13 13/500 CON E3P 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.2 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.4 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.6 13/400 CON E1PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.7 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.2.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C12 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C13 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C16 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C14.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C14.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.2.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4.2.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.2.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C2.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.8 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.9 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.10.1 13/400 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.11 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.13 13/400 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.4.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.4.2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 C2.4.2.2 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
1 C2.4.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C2.4.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D13 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D4.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D4.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D4.4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 D4.5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 D4.6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 D4.7 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 2 1 0 0 7 2 0 0 0

AVANCE TOTAL 0 0 0 2 1 0 0 7 2 0 0 0

METRADO TOTAL 0 8 0 4 1 0 0 7 2 0 0 0

EJECUTADO % 0% 0% 0% 50% 100% 0% 0% 100% 100% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.015 Dec 0 Dec
1 A1 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 13/400 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 A5 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.2 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.4 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.6 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.7 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0284 Aug 0 Dec
1 C1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0.0141 Aug 0 Dec
1 C2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0049 Aug 0 Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0325 Aug 0 Dec
1 C4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0286 Aug 0 Dec
1 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.028 Aug 0 Dec
1 C6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.025 Aug 0 Dec
1 C6.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0.0036 Aug 0 Dec
1 C6.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0041 Aug 0 Dec
1 C6.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.2.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C16 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C9.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.2.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 C4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4.2.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C3.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.027 Aug 0 Dec
1 C2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.029 Aug 0 Dec
1 C2.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.029 Aug 0 Dec
1 C2.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.033 Aug 0 Dec
1 C2.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.032 Aug 0 Dec
1 C2.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.028 Aug 0 Dec
1 C2.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.028 Aug 0 Dec
1 C2.8 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.024 Aug 0 Dec
1 C2.9 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0.0034 Aug 0 Dec
1 C2.10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0134 Aug 0 Dec
1 C2.10.1 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.11 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.13 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 C2.4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4.2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 C2.4.2.2 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 D4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D13 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4.7 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 1 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 1 0 0 0 2 3 0.428 0.000

METRADO TOTAL 0 0 16 20 1 0 0 0 4 6 0.444 0.000

EJECUTADO % 0% 0% 0% 0% 100% 0% 0% 0% 50% 50% 97% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1 13/400 CON E1P 0 Dec 0.0284 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2 9/200 E1 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3 13/400 CON E4P 0 Dec 0.026 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4 0 ET 0 Dec 0.0036 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5 13/400 CON E1P 0 Dec 0.0022 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6 9/200 E1 0 Dec 0 Dec 0.036 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7 13/400 CON E1P 0 Dec 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A8 9/200 E1 0 Dec 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9 13/400 CON E1P 0 Dec 0 Dec 0.036 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A10 9/200 E1 0 Dec 0 Dec 0.034 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11 13/400 CON E1P 0 Dec 0 Dec 0.036 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12 9/200 E1 0 Dec 0 Dec 0.0365 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0.6 Aug 1.13 Aug 1 Aug 1.73 Aug
1 A13 13/500 CON E3P 0 Dec 0 Dec 0.0375 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.1 9/200 E1 0 Dec 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A5.2 13/400 CON E1P 0 Dec 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.3 9/200 E1 0 Dec 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.4 13/400 CON E1P 0 Dec 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.5 9/200 E1 0 Dec 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.6 13/400 CON E1PB 0 Dec 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.7 9/300 E3 0 Dec 0 Dec 0.0307 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec 1.73 Aug 1 Aug 1.73 Aug
1 B1 13/400 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.2.1 9/200 E1 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.2.2 9/300 E3 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C6.3 9/200 E1 0 Dec 0.0345 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.4 9/300 E3 0 Dec 0.031 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C7 9/200 E1 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C8 9/200 E1 0 Dec 0.031 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9 9/200 E1 0 Dec 0.025 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C10 9/200 E1 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11 9/200 E1 0 Dec 0.022 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C12 9/300 E4 0 Dec 0.022 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C13 0 ET 0 Dec 0.0049 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C14 9/200 E1 0 Dec 0.0044 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C15 9/200 E1 0 Dec 0 Dec 0.034 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C16 9/300 E3 0 Dec 0 Dec 0.034 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C14.1 9/200 E1B 0 Dec 0 Dec 0.025 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C14.2 9/300 E3 0 Dec 0 Dec 0.025 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C9.1 0 EC 0 Dec 0 Dec 0.006 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9.2 9/200 E1 0 Dec 0 Dec 0.0065 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9.3 9/200 E1 0 Dec 0 Dec 0.026 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9.4 9/300 E3 0 Dec 0 Dec 0.031 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C9.2.1 9/200 E1 0 Dec 0 Dec 0.025 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9.2.2 9/300 E3 0 Dec 0 Dec 0.025 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C4.1 0 EC 0 Dec 0 Dec 0.0033 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4.2 9/200 E1 0 Dec 0 Dec 0.0036 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4.3 9/200 E1 0 Dec 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4.4 9/300 E3 0 Dec 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C4.2.1 9/200 E1 0 Dec 0 Dec 0.024 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4.2.2 9/300 E3 0 Dec 0 Dec 0.0304 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C3.1 0 EC 0 Dec 0 Dec 0.0033 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.2 9/200 E1 0 Dec 0 Dec 0.0044 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.2.1 9/200 E1 0 Dec 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.2.2 9/300 E3 0 Dec 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C3.3 9/200 E1 0 Dec 0 Dec 0.026 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.4 9/300 E3 0 Dec 0 Dec 0.031 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.8 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.9 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 1.73 Aug 1 Aug 1.73 Aug
1 C2.10.1 13/400 CON E3P 0 Dec 0.0299 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.11 13/400 CON E1P 0 Dec 0.0291 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.12 9/200 E1 0 Dec 0.0252 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.13 13/400 CON E3P 0 Dec 0.026 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.4.1 0 EC 0 Dec 0 Dec 0.0021 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.4.2 9/200 E1 0 Dec 0 Dec 0.0033 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.4.2.1 9/200 E1B 0 Dec 0 Dec 0.0288 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 C2.4.2.2 9/300 E3B 0 Dec 0 Dec 0.0267 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C2.4.3 9/200 E1B 0 Dec 0 Dec 0.0312 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.4.4 9/300 E3 0 Dec 0 Dec 0.0336 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 D1 9/200 E1 0 Dec 0 Dec 0.0225 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D2 9/300 E4 0 Dec 0 Dec 0.0225 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D3 0 ET 0 Dec 0 Dec 0.003 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D4 9/200 E1 0 Dec 0 Dec 0.004 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D5 9/200 E1 0 Dec 0 Dec 0.031 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6 9/200 E1 0 Dec 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D7 9/200 E1 0 Dec 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D8 9/200 E1 0 Dec 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D9 9/200 E1 0 Dec 0 Dec 0.0315 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D10 9/200 E1 0 Dec 0 Dec 0.0302 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D11 9/200 E1 0 Dec 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D12 9/200 E1 0 Dec 0 Dec 0.0263 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D13 9/300 E3 0 Dec 0 Dec 0.034 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 D4.1 9/200 E1 0 Dec 0 Dec 0.026 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D4.2 9/200 E1 0 Dec 0 Dec 0.0265 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D4.3 9/200 E1 0 Dec 0 Dec 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D4.4 9/200 E1B 0 Dec 0 Dec 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D4.5 9/200 E1B 0 Dec 0 Dec 0.036 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D4.6 9/200 E1B 0 Dec 0 Dec 0.0335 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D4.7 9/300 E3B 0 Dec 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 28.28 4.59 19 32.87 0

METRADO TOTAL 0.000 0.506 1.693 0.000 0.000 0.000 0.000 27.728 2.319 19 32.889 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 109% 100% 100% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 13/400 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.2 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.4 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.6 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.7 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.2.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.2.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4.2.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.2.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.8 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.9 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.10.1 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.11 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.13 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.4.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.4.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 C2.4.2.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.4.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.4.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D3 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D13 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D4.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D4.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D4.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D4.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D4.6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D4.7 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 77 50 126 1 127 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.03A MACUSANI SED 3A
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A2 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3.1 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3.2 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A3.3 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A3.4 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A3.5 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A3.6 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3.7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3.8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3.9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3.10 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3.11 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A3.4.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3.4.2 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A3.4.3 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3.4.4 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A3.4.5 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3.4.6 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A4 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A8 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A9 9/300 E4B 1 Jan 0 Dec 0 Dec 0.424 Jan Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec 0.784
1 A10 9/200 E1 1 Jan 0 Dec 0 Dec 0.424 Jan Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec 0
1 A11 9/200 E1 1 Jan 0 Dec 0 Dec 0.424 Jan Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec 0
1 A12 9/300 E4B 1 Jan 0 Dec 0 Dec 0.424 Jan Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec 0.784
1 A13 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A14 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A15 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A16 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A17 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A14.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A14.2 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A9.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A9.2 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A9.3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A9.4 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A5.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A5.1.1 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A5.1.2 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A5.2 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A5.3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A5.3.1 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A5.4 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A5.5 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B1 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B8 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B9 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B10 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B10.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B10.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B11 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B12 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B13 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B14 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B15 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B5.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B5.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B5.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B5.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B5.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B5.5.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B5.5.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B5.6 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B5.7 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B5.8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B5.9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B5.10 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B5.2.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B5.2.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B4.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.03A MACUSANI SED 3A
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 B4.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4.4 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4.6 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4.7 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B4.2.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4.2.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B1.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B1.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B1.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B1.4 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B1.2.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B1.2.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C1 13/500 CON E4PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C2 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C3 13/500 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C4 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C5 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C10 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C11 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 D1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D2 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Nov Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 D3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D9 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 D10 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D11 9/300 E3 1 Jan 0 Dec 0 Dec 0.424 Jan Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec
1 D12 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D13 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D14 13/400 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D15 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D16 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D17 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D18 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D19 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D20 13/500 CON E2P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D21 13/500 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D22 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D23 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D24 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 D25 13/400 CON E5P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D26 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D27 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D28 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D29 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D30 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D31 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D32 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D33 13/400 CON E5P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D34 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D35 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D36 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D37 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D38 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 D33.1 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 D25.1 9/300 E3 1 Jul 0 Dec 0 Dec Dec 0.424 Jul 1 Aug 0 Dec 0 Dec Dec 0.354 Jul
1 D25.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 D25.3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 D6.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D6.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.2.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.2.2 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.2.3 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 D6.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.5.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D6.5.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.5.2.1 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D6.5.2.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.5.2.3 13/400 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D6.5.3 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.03A MACUSANI SED 3A
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 D6.5.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.5.5 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D6.5.6 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 D6.6 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.7 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.10 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D6.11 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 D6.12 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 E1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E2 9/300 CON E4 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E3 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E4 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E5 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E6 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E7 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E8 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E9 9/300 CON E4 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E10 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E11 9/300 CON E6 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E12 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E13 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E14 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 124 0 0 52.152 0 124 0 0 43.896 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 5 0 0 2.544 0 5 0 0 1.77 0 24.304
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 5 0 0 2.12 0 5 0 0 1.77 0 0.784
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 1 0 0 0 0.424 0 0 0 0 0.354 1.568
EJECUTADO EN AGOSTO DE 2023 0 0 0 0 0 0 1 0 0 0 0 0

AVANCE TOTAL 0 135 0 0 56.816 0.424 135 0 0 47.436 0.354 26.656

METRADO TOTAL 1 135 0 0 56.816 0.424 135 0 0 47.436 0.354 26.656

EJECUTADO % 0% 100% 0% 0% 100% 100% 0% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.2 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 A3.3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 A3.5 9/300 E4B Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.11 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A3.4.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4.2 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 A3.4.3 9/300 E4 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 A3.4.4 9/300 E4B Nov Dec Dec Dec Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4.5 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4.6 9/300 E3B Nov Dec Dec Dec Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 0 EC Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/300 E4B Nov Dec Dec Dec Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 9/300 E4B Jul 0 Dec 0 Dec 0 Dec 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 9/300 E4B Jul 0 Dec 0 Dec 0 Dec 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 0 EC Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A14 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A15 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A16 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A17 9/300 CON E3 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 A14.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A14.2 9/300 E3B Nov Dec Dec 0 Dec Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.1 0 ET Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.2 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 A9.3 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.4 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A5.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.1.1 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.1.2 9/300 E3B Nov Dec Dec Dec Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.2 0 EC Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.3 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.3.1 9/300 CON E3 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 A5.4 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.5 9/300 E3B Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B9 0 ET Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10.2 9/300 E3 Nov Dec Dec Dec Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B15 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B5.1 0 EC Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.2 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.3 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.4 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.5 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.5.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.5.2 9/300 E3 Nov Dec Dec Dec Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B5.6 0 ET Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.7 9/300 E4 Nov Dec Dec Dec Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 B5.8 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.9 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.10 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B5.2.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.2.2 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B4.1 0 EC Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 B4.2 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.3 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.4 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.5 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.6 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.7 9/300 E3B Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.2 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B1.1 0 EC Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1.2 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1.3 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1.4 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B1.2.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1.2.2 9/300 E3 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C1 13/500 CON E4PB Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 13/500 CON E4P Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 C5 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 D1 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D2 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 D3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D9 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 D10 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D11 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 D12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D13 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D14 13/400 CON E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D16 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D17 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D18 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D19 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D20 13/500 CON E2P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D21 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D22 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D23 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D24 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D25 13/400 CON E5P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D26 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D27 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D28 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D29 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D30 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D31 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D32 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D33 13/400 CON E5P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D34 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D35 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D36 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D37 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D38 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 D33.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 D25.1 9/300 E3 Dec 0.784 Jul Dec 1 Aug Dec Dec Dec 0 Dec 0 Dec 2 Dec 0 Dec 0 Dec
1 D25.2 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D25.3 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 D6.1 0 EC Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.2 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.2.1 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.2.2 9/200 E1B Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.2.3 9/300 E3B Jan Dec Dec 0 Dec Dec 0.76 Jan Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.3 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.4 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.1 0 EC Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.2 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.2.1 13/400 CON E1P Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.2.2 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.2.3 13/400 CON E3P Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.3 13/400 CON E1P Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 D6.5.4 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.5 13/400 CON E1P Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.6 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 D6.6 9/200 E1B Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.7 9/200 E1B Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.8 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.9 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.10 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.11 9/300 E4 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 D6.12 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 E1 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E2 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 E3 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E4 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E5 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E6 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E7 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E8 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E9 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 E10 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E11 9/300 CON E6 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E12 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E13 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E14 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 24.304 0 0 0 0 23.56 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.784 0 0 0 0 0.76 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 1.568 0.784 0 20 0 1.52 0 0 0 8 12 0
EJECUTADO EN AGOSTO DE 2023 0 0 0 4 0 0 0 0 0 0 0 0

AVANCE TOTAL 26.656 0.784 0 24 0 25.84 0 0 0 8 12 0

METRADO TOTAL 26.656 0.784 0 0 11 25.84 0.76 85 0 21 14 0

EJECUTADO % 100% 0% 0% 0% 97% 0% 0% 38% 86% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC 4E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 A3.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 A3.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.5 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 A3.6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.11 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.4.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.4.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.4.3 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.4.4 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 A3.4.5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.4.6 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 A4 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 A9 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 A10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 A13 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A16 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A17 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A14.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A14.2 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 A9.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A9.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.1.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.1.2 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 A5.2 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 A5.3.1 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.5 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 B1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B15 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.5.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.5.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.6 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.7 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.10 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 B4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.7 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
1 B4.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1.2.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1 13/500 CON E4PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D9 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D11 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D13 13/500 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D14 13/400 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D16 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D17 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D18 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D19 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D20 13/500 CON E2P 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D21 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D22 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D23 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D24 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D25 13/400 CON E5P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D26 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D27 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D28 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D29 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D30 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D31 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D32 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D33 13/400 CON E5P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D34 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D35 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D36 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D37 13/500 CON E3P 0 Dec 0 Dec 0 Dec 2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D38 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D33.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D25.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D25.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D25.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.2.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 D6.2.3 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 D6.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.5.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.5.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.5.2.1 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.5.2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.5.2.3 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.5.3 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 D6.5.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.5.5 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.5.6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.11 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6.12 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E2 9/300 CON E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E3 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E4 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E5 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E6 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E7 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E8 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E9 9/300 CON E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E11 9/300 CON E6 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E12 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E13 13/500 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E14 13/500 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 4 1 0 0 0
EJECUTADO EN AGOSTO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 4 1 0 0 0

METRADO TOTAL 1 12 1 4 3 2 0 16 6 5 0 0

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 25% 17% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.015 Dec 0 Dec
1 A1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A3.4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.5 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.11 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4.3 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4.4 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4.5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.4.6 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 A5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 A14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A17 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A14.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A14.2 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A9.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.1.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.1.2 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.2 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 A5.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.3.1 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.5 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B15 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B5.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.5.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.6 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 B5.7 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.10 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.2.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 B4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.7 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 B1.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1.2.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 13/500 CON E4PB Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0.0079 Dec 0 Dec
1 D2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0038 Dec 0 Dec
1 D3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 D4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 D5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 D6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0235 Dec 0 Dec
1 D7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 D8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 D9 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.032 Dec 0 Dec
1 D10 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0.0037 Dec 0 Dec
1 D11 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0051 Dec 0 Dec
1 D12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 D13 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0328 Dec 0 Dec
1 D14 13/400 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 D15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.029 Dec 0 Dec
1 D16 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.031 Dec 0 Dec
1 D17 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0302 Dec 0 Dec
1 D18 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0299 Dec 0 Dec
1 D19 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 D20 13/500 CON E2P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0299 Dec 0 Dec
1 D21 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D22 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D23 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D24 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D25 13/400 CON E5P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D26 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D27 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D28 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D29 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D30 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D31 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D32 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D33 13/400 CON E5P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D34 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D35 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D36 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D37 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D38 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D33.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D25.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D25.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D25.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 D6.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.2.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.2.3 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 D6.5.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.2.1 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.2.3 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.3 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 D6.5.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.5 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.5.6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.11 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6.12 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 E2 9/300 CON E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E3 9/200 CON E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E4 9/200 CON E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E5 9/200 CON E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E6 9/200 CON E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E7 9/200 CON E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E8 9/200 CON E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E9 9/300 CON E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E10 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 E11 9/300 CON E6 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E12 9/200 CON E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E13 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E14 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2023 0 0 0 0 0 0 0 0 1 1 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 1 1 0.000 0.000

METRADO TOTAL 0 1 23 17 0 0 0 0 8 8 0.529 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 13% 13% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC 4E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1 9/200 E1 0.0281 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A2 9/200 E1B 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec Dec
1 A3 9/200 E1B 0.034 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.1 9/200 E1B 0.0295 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.2 9/300 E4 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.3 0 ET 0.006 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.4 9/300 E4 0.0057 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.5 9/300 E4B 0 Dec 0.0253 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.6 9/200 E1B 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.7 9/200 E1 0 Dec 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.8 9/200 E1 0 Dec 0.031 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.9 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.10 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.11 9/300 E3 0 Dec 0.0281 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A3.4.1 9/200 E1 0 Dec 0.0299 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.4.2 9/300 E4 0 Dec 0.0295 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.4.3 9/300 E4 0 Dec 0.028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.4.4 9/300 E4B 0 Dec 0.028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.4.5 9/200 E1B 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.4.6 9/300 E3B 0 Dec 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A4 0 EC 0.0043 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5 9/200 E1 0.0123 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A8 9/300 E4B 0.0293 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9 9/300 E4B 0.0185 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A10 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11 9/200 E1 0.028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A12 9/300 E4B 0.021 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A13 0 EC 0.0079 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A14 9/200 E1 0.0067 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A15 9/200 E1 0 Dec 0.033 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A16 9/200 E1 0 Dec 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec Dec Dec
1 A17 9/300 CON E3 0 Dec 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A14.1 9/200 E1 0 Dec 0.0314 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A14.2 9/300 E3B 0 Dec 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A9.1 0 ET 0 Dec 0.0055 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9.2 9/300 E4 0 Dec 0.0065 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9.3 9/200 E1B 0 Dec 0.0261 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9.4 9/300 E3 0 Dec 0.029 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A5.1 9/200 E1 0.031 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.1.1 9/200 E1B 0.0306 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.1.2 9/300 E3B 0.0325 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.2 0 EC 0.004 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.3 9/200 E1B 0.0073 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.3.1 9/300 CON E3 0.0306 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.4 9/200 E1B 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.5 9/300 E3B 0.029 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B1 9/300 E4 0 Dec 0.024 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2 9/200 E1 0 Dec 0.027 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3 9/200 E1 0 Dec 0.033 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4 9/200 E1 0 Dec 0.02 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5 9/200 E1 0 Dec 0.028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6 9/200 E1 0 Dec 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B8 9/300 E4 0 Dec 0.023 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9 0 ET 0 Dec 0.0059 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10 9/200 E1 0 Dec 0.0075 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10.1 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10.2 9/300 E3 0 Dec 0.034 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B11 9/200 E1 0 Dec 0.028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B12 9/200 E1 0 Dec 0.028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B13 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B14 9/200 E1 0 Dec 0.028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B15 9/300 E3 0 Dec 0.026 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B5.1 0 EC 0 Dec 0.009 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.2 9/200 E1 0 Dec 0.0062 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.3 9/200 E1 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.4 9/200 E1 0 Dec 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.5 9/200 E1 0 Dec 0.028 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.5.1 9/200 E1 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.5.2 9/300 E3 0 Dec 0.025 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B5.6 0 ET 0 Dec 0.0095 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.7 9/300 E4 0 Dec 0.0109 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.8 9/200 E1 0 Dec 0.032 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.9 9/200 E1 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.10 9/300 E3 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B5.2.1 9/200 E1 0 Dec 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.2.2 9/300 E3 0 Dec 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B4.1 0 EC 0 Dec 0.003 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 B4.2 9/200 E1 0 Dec 0.0068 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.3 9/200 E1 0 Dec 0.031 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.4 9/200 E1B 0 Dec 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.5 9/200 E1 0 Dec 0.032 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.6 9/200 E1B 0 Dec 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.7 9/300 E3B 0 Dec 0.02 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B4.2.1 9/200 E1 0 Dec 0.032 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.2.2 9/300 E3 0 Dec 0.0324 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B1.1 0 EC 0 Dec 0.0057 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B1.2 9/200 E1 0 Dec 0.0058 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B1.3 9/200 E1 0 Dec 0.034 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B1.4 9/300 E3 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B1.2.1 9/200 E1 0 Dec 0.0295 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B1.2.2 9/300 E3 0 Dec 0.0295 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C1 13/500 CON E4PB 0 Dec 0.017 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2 9/200 E1B 0 Dec 0.0275 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3 13/500 CON E4P 0 Dec 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4 9/300 E4 0 Dec 0.0238 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5 9/200 E1B 0 Dec 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6 9/200 E1 0 Dec 0.029 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7 9/200 E1 0 Dec 0.028 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C8 9/200 E1 0 Dec 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9 9/200 E1 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C10 9/200 E1 0 Dec 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11 9/300 E3 0 Dec 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 D1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D9 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D11 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec Dec Dec
1 D13 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D14 13/400 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D16 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D17 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec Dec Dec
1 D18 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D19 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D20 13/500 CON E2P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D21 13/500 CON E4P 0 Dec 0.031 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D22 9/200 E1 0 Dec 0.0299 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D23 13/400 CON E1P 0 Dec 0.0301 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D24 9/200 E1 0 Dec 0.0264 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D25 13/400 CON E5P 0 Dec 0.0266 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D26 9/200 E1 0 Dec 0.0335 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D27 13/400 CON E1P 0 Dec 0.0335 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D28 9/200 E1 0 Dec 0.026 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D29 13/400 CON E1P 0 Dec 0.0341 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D30 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D31 13/400 CON E1P 0 Dec 0.0281 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D32 9/200 E1 0 Dec 0.0309 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D33 13/400 CON E5P 0 Dec 0.0311 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D34 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D35 13/400 CON E1P 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D36 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D37 13/500 CON E3P 0 Dec 0.0301 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D38 9/300 E3 0 Dec 0.0156 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D33.1 9/300 E3 0 Dec 0.0199 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D25.1 9/300 E3 0 Dec 0.0147 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D25.2 9/200 E1 0 Dec 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D25.3 9/300 E3 0 Dec 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.1 0 EC 0 Dec 0.007 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.2 9/200 E1 0 Dec 0.0026 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.2.1 9/200 E1 0 Dec 0.027 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.2.2 9/200 E1B 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.2.3 9/300 E3B 0 Dec 0.021 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 D6.3 9/200 E1 0 Dec 0.0315 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.4 9/200 E1 0 Dec 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.5 9/200 E1 0 Dec 0.025 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.5.1 0 EC 0 Dec 0.0076 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.5.2 9/200 E1 0 Dec 0.0045 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.5.2.1 13/400 CON E1P 0 Dec 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.5.2.2 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.5.2.3 13/400 CON E3P 0 Dec 0.0325 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.5.3 13/400 CON E1P 0 Dec 0.0255 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 D6.5.4 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.5.5 13/400 CON E1P 0 Dec 0.028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.5.6 9/300 E3 0 Dec 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 D6.6 9/200 E1B 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.7 9/200 E1B 0 Dec 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.8 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.9 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.10 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.11 9/300 E4 0 Dec 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6.12 9/300 E3 0 Dec 0.025 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 E1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0097 Aug Dec Dec Dec Dec
1 E2 9/300 CON E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0055 Aug Dec Dec Dec Dec
1 E3 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Aug Dec Dec Dec Dec
1 E4 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Aug Dec Dec Dec Dec
1 E5 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0301 Aug Dec Dec Dec Dec
1 E6 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0234 Aug Dec Dec Dec Dec
1 E7 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Aug Dec Dec Dec Dec
1 E8 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0301 Aug Dec Dec Dec Dec
1 E9 9/300 CON E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0318 Aug Dec Dec Dec Dec
1 E10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0058 Aug Dec Dec Dec Dec
1 E11 9/300 CON E6 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0073 Aug Dec Dec Dec Dec
1 E12 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0299 Aug Dec Dec Dec Dec
1 E13 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0328 Aug Dec Dec Dec Dec
1 E14 13/500 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 36.33 0 18 31.14 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 36.33 0 18 31.14 0

METRADO TOTAL 0.594 3.379 0.000 0.000 0.000 0.000 0.336 51.99 0 30 51.93 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 70% 60% 60% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC 4E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.3 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.5 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.11 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.4.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.4.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.4.3 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.4.4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.4.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.4.6 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A17 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.1.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.1.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.2 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.3.1 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.5 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.5.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.6 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.7 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.10 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 B4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.7 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1.2.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 13/500 CON E4PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D9 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D11 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D13 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D14 13/400 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D16 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D17 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D18 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D19 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D20 13/500 CON E2P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D21 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D22 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D23 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D24 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D25 13/400 CON E5P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D26 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D27 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D28 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D29 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D30 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D31 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D32 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D33 13/400 CON E5P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D34 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D35 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D36 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D37 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D38 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D33.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D25.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D25.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D25.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.2.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.2.3 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.5.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.5.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.5.2.1 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.5.2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.5.2.3 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.5.3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 D6.5.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.5.5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.5.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.11 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6.12 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E2 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E3 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E4 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E5 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E6 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E7 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E8 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E9 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E11 9/300 CON E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E12 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E13 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E14 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 115 35 149 1 150 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.03B MACUSANI SED 3B
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A1 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A2 9/200 E1B2 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3 9/200 E1B2 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4 9/300 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A4.1 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4.2.1 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4.2.2 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A4.3 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A4.4 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4.4.1 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4.4.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4.4.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4.4.4 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct 0.424 Mar 1 Oct 0 Dec 0 Dec 0.354 Oct 0.354 Dec 0
1 A4.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4.6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4.7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4.8 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A5 0 EC Dec 0 Dec 0 Dec -0.424 Mar 0 Dec Dec 0 Dec 0 Dec -0.354 Mar Dec 0
1 A6 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.2.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.2.2 9/300 E4B 1 Jan 0 Dec 0 Dec 0.424 Jan Dec 1 Jan 0 Dec 0 Dec Dec 0.354 Dec 0
1 A6.3 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A6.4 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A6.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.8 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A6.9 0 ET Dec 0 Dec 0 Dec -0.424 Jan 0 Dec Dec 0 Dec 0 Dec -0.354 Jan 0 Dec 0
1 A6.10 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.10.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A6.11 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.12 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct 0.424 Jan 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A7 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A8 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A10 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A10.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A11 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A12 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A13 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A14 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A15 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A16 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A17 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A18 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A18.1 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A19 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A20 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A21 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A12.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A12.1.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A12.1.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A12.2 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A12.3 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A12.4 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3 9/300 E6B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B4 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B5 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B9 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B10 9/300 E4B 1 Jul 0 Dec 0 Dec 0.424 Jul Dec 1 Jul 0 Dec 0 Dec 0.354 Jul Dec 0.784
1 B11 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B12 9/200 E1B 1 Jan 0 Dec 0 Dec 0.424 Mar Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec 0
1 B12.1 9/300 E3 1 Jan 0 Dec 0 Dec 0.424 Mar Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec 0.784
1 B13 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Jan 0
1 B14 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B15 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Jan 0
1 B16 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B17 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Jan 0
1 B18 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B19 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Dec 0
1 B20 13/400 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B7.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.03B MACUSANI SED 3B
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 B7.2 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B7.3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B7.4 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B3.1 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B3.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.3 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B3.4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B3.5 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B3.5.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.5.2 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.5.3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.5.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.5.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.5.6 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B3.6 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B3.7 9/200 E1 1 Jul 0 Dec 0 Dec 0.424 Jul Dec 1 Jul 0 Dec 0 Dec 0.354 Jul Dec 0
1 B3.8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.10 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.11 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.12 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C1 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C3 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C4 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C6 13/500 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C7 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C8 13/400 CON E1PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C8.1 9/200 E1 1 Jan 0 Dec 0 Dec 0.424 Jan Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec
1 C8.2 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C9 9/200 E1B 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Jun
1 C10 9/200 E1B 1 Jan 0 Dec 0 Dec 0.424 Jan Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec
1 C11 13/400 CON E1PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C13 13/400 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C5.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C5.2 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C5.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C5.4 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C5.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C5.6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 C5.7 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 D1 9/300 CON E4 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D2 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D3 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D3.1 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D5 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 D6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D8 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D9 13/500 CON E4PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D10 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D11 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D12 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D13 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Jun
1 D14 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D15 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Jun
1 D16 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D17 9/300 E3 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Dec 0
1 D11.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D11.2 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 D1.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D1.2 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 D1.3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D1.4 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 D1.5 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 98 0 0 41.552 0 98 0 0 34.692 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 18.816
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.03B MACUSANI SED 3B
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
EJECUTADO EN ENERO DE 2023 0 13 0 0 0.848 3.816 13 0 0 1.062 1.062 5.488
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0.424 0.424 0 0 0 -0.354 0 0.784
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 1.062 0
EJECUTADO EN JULIO DE 2023 0 2 0 0 0.848 0 2 0 0 0.708 0 0.784

AVANCE TOTAL 0 113 0 0 43.672 4.24 113 0 0 36.108 2.124 25.872

METRADO TOTAL 1 114 0 0 44.096 4.24 114 0 0 36.816 3.54 25.872

EJECUTADO % 0% 99% 0% 0% 99% 99% 0% 0% 95% 103%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 A2 9/200 E1B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 9/200 E1B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 9/300 E1 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.2.2 9/300 E3B Nov Dec Dec 0 Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.3 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 A4.4.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.4.4 9/300 E3 Dec 0.784 Jan 0 Dec 1 Jul 0 Dec 0 Dec 0.76 Jun 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 A4.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.8 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 A5 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 A6.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.2 9/300 E4B Dec 0.784 Jan 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.4 9/300 E4 Jan Dec Dec 1 Jul Dec 0.76 Jan Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 A6.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.8 9/300 E4 Mar Dec Dec 1 Jul Dec 0.76 Mar Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 A6.9 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.10.1 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 A6.11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.12 9/300 E3 Dec 0.784 Jan 0 Dec 1 Jul 0 Dec 0 Dec 0.76 Jun 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 A7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/200 E1 Jan Dec Dec Dec Dec 0.76 Jan Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10.1 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 A11 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A16 9/300 E4 Jan Dec Dec 1 Jul Dec 0.76 Jan Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 A17 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A18 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A18.1 9/300 E3B Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A19 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A20 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A21 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A12.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.1.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.1.2 9/300 E3 Jan Dec Dec 1 Jul Dec 0.76 Jan Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A12.2 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.3 9/300 E4B Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.4 9/300 E3B Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/300 E6B Nov Dec Dec 0 Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/300 E3B Nov Dec Dec Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/300 E4B Jul Dec Dec Dec 1 Aug 0.76 Jul Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B12.1 9/300 E3 Jan Dec Dec Dec 1 Aug 0.76 Jan Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B16 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B17 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B18 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B19 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B20 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 B7.2 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B7.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7.4 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B3.1 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B3.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.3 9/300 E4 Jan Dec Dec 1 Jul Dec 0.76 Jan Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B3.4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5 9/300 E4B Nov Dec Dec Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5.6 9/300 E3 Nov Dec Dec Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B3.6 9/300 E4B Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.10 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.11 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.12 9/300 E3B Nov Dec Dec 0 Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8.2 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.1 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.2 9/300 E4 Nov Dec Dec 0 Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 C5.3 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.4 9/200 E1B Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.5 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.6 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.7 9/300 E3B Nov Dec Dec 0 Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1 9/300 CON E4 Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 D2 9/200 CON E1BC Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D3 9/200 CON E1BC Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D3.1 9/300 CON E3 Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 D4 0 ET Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D5 9/300 E4 Nov Dec Dec 0 Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 D6 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D7 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D8 9/200 E1B Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D9 13/500 CON E4PB Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D10 0 ET Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D11 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D12 13/500 CON E1P Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D13 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D14 13/400 CON E1P Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D15 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D16 13/400 CON E1P Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D17 9/300 E3 Dec 0.784 Jan 0 Dec 1 Aug 0 Dec 0 Dec 0.76 Jun 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 D11.1 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D11.2 9/300 E4 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 D1.1 0 ET Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1.2 9/300 E4B Nov Dec Dec 0 Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1.3 9/200 E1B Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1.4 9/200 E1B Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1.5 9/300 E3B Jan Dec Dec 0 Dec 1 Aug 0.76 Jan Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 18.816 0 0 0 0 18.24 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
EJECUTADO EN ENERO DE 2023 5.488 3.136 0 0 0 5.32 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.784 0 0 0 0 0.76 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 2.28 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.784 0 0 20 1 0.76 0.76 0 0 2 11 0

AVANCE TOTAL 25.872 3.136 0 22 14 25.08 3.04 0 0 2 11 0

METRADO TOTAL 25.872 2.352 0 0 14 25.08 2.28 54 0 10 15 0

EJECUTADO % 103% 0% 0% 100% 103% 0% 0% 20% 73% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC 4E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.2.2 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 A4.3 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.4.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.4.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.4.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.8 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2.2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 A6.3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.8 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.9 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.10.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.12 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A10.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A16 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A17 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A18 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A18.1 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
1 A19 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A20 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A21 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.1.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.1.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.2 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.3 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 A12.4 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 B1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 9/300 E6B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1
1 B4 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 2 Dec 0 Dec 0 Dec 0
1 B5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B10 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 B11 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B12 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B12.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B16 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B17 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B18 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B19 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B20 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 B7.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B7.4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.3 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.5 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 B3.5.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.5.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.5.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.5.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.5.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.5.6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.6 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 B3.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.10 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.11 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.12 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 C1 13/500 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 13/400 CON E1PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8.2 13/500 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 13/400 CON E1PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C13 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.7 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 D1 9/300 CON E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D2 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 D3 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 D3.1 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D5 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D8 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 D9 13/500 CON E4PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D12 13/500 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D14 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D16 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D17 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D11.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D11.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D1.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D1.2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 D1.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 D1.4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 D1.5 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 2 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 2 0 0 0

METRADO TOTAL 0 8 0 3 1 0 0 25 8 6 0 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 25% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.015 Dec 0 Dec
1 A1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0229 Dec 0 Dec
1 A2 9/200 E1B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.027 Dec 0 Dec
1 A3 9/200 E1B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.026 Dec 0 Dec
1 A4 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.027 Dec 0 Dec
1 A4.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.028 Dec 0 Dec
1 A4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.028 Dec 0 Dec
1 A4.2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.026 Dec 0 Dec
1 A4.2.2 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.026 Dec 0 Dec
1 A4.3 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0.0069 Dec 0 Dec
1 A4.4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0108 Dec 0 Dec
1 A4.4.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.4.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.8 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0.0071 Dec 0 Dec
1 A6 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0044 Dec 0 Dec
1 A6.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.02 Dec 0 Dec
1 A6.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.022 Dec 0 Dec
1 A6.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.031 Dec 0 Dec
1 A6.2.2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.029 Dec 0 Dec
1 A6.3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A6.4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.8 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.9 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A6.10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.10.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.12 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0184 Dec 0 Dec
1 A8 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0305 Dec 0 Dec
1 A9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0315 Dec 0 Dec
1 A10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0266 Dec 0 Dec
1 A10.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0434 Dec 0 Dec
1 A11 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0.005 Dec
1 A12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0067 Dec
1 A13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.025 Dec
1 A14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.026 Dec
1 A15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.027 Dec
1 A16 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.027 Dec
1 A17 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0.0071 Dec
1 A18 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0064 Dec
1 A18.1 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A19 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A20 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A21 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0246 Dec
1 A12.1.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.031 Dec
1 A12.1.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.029 Dec
1 A12.2 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A12.3 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.4 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.028 Dec 0 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.028 Dec 0 Dec
1 B3 9/300 E6B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.028 Dec 0 Dec
1 B4 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0145 Dec 0 Dec
1 B5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.032 Dec
1 B6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.035 Dec
1 B7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0315 Dec
1 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.027 Dec
1 B9 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0265 Dec
1 B10 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0265 Dec
1 B11 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0.0058 Dec
1 B12 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0082 Dec
1 B12.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B16 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B17 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B18 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B19 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B20 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 B7.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7.4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0194 Dec
1 B3.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.028 Dec
1 B3.3 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.026 Dec
1 B3.4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0.003 Dec
1 B3.5 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0074 Dec
1 B3.5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5.6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.6 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.10 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.11 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.12 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 C8 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8.2 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0.0046 Dec
1 C5.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0048 Dec
1 C5.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.7 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1 9/300 CON E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D2 9/200 CON E1BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D3 9/200 CON E1BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D3.1 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 D5 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D8 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D9 13/500 CON E4PB Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D10 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 D11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D12 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D14 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D16 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D17 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D11.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D11.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 D1.2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1.5 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 1 1 25 39 2 0 0 0 12 3 0.624 0.516

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC 4E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec Dec
1 A3 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.2.2 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A4.3 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.4.1 9/200 E1B 0.0184 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.4.2 9/200 E1 0.022 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.4.3 9/200 E1 0.028 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.4.4 9/300 E3 0.029 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A4.5 9/200 E1 0.0257 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.6 9/200 E1 0.025 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.7 9/200 E1 0.025 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.8 9/300 E4 0.025 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.3 0 ET 0.007 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.4 9/300 E4 0.0067 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.5 9/200 E1 0.034 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.6 9/200 E1 0.034 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.7 9/200 E1 0.0255 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.8 9/300 E4 0.0225 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.9 0 ET 0.0068 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.10 9/200 E1 0.0059 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.10.1 9/300 E3 0.039 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A6.11 9/200 E1 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.12 9/300 E3 0.031 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A8 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A10.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A11 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A16 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A17 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A18 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A18.1 9/300 E3B 0.031 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A19 9/200 E1 0.034 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A20 9/200 E1 0.034 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A21 9/300 E3 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.1.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.1.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A12.2 0 ET 0 Dec 0 Dec 0.0035 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.3 9/300 E4B 0 Dec 0 Dec 0.0056 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.4 9/300 E3B 0 Dec 0 Dec 0.0381 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3 9/300 E6B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B11 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B12 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B12.1 9/300 E3 0.037 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B13 9/200 E1 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B14 13/400 CON E1P 0.034 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B15 9/200 E1 0.036 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B16 13/400 CON E1P 0.036 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B17 9/200 E1 0.036 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B18 13/400 CON E1P 0.0365 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B19 9/200 E1 0.0312 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B20 13/400 CON E3P 0.0284 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7.1 0 ET 0 Dec 0.0045 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 B7.2 9/300 E4 0 Dec 0.0048 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7.3 9/200 E1B 0 Dec 0.021 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7.4 9/300 E4 0 Dec 0.021 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.3 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.5 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.5.1 9/200 E1 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.5.2 9/200 E1B 0.029 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.5.3 9/200 E1B 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.5.4 9/200 E1 0.035 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.5.5 9/200 E1 0.035 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.5.6 9/300 E3 0.0335 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B3.6 9/300 E4B 0.0303 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B3.7 9/200 E1 0.035 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.8 9/200 E1 0.0267 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.9 9/200 E1 0.034 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.10 9/200 E1B 0.026 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.11 9/200 E1B 0.028 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.12 9/300 E3B 0.028 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C1 13/500 CON E1P 0.021 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2 9/200 E1 0.0236 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3 13/400 CON E1P 0.0325 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4 9/200 E1B 0.0214 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5 9/200 E1 0.0191 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6 13/500 CON E4P 0.0167 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7 0 ET 0.008 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C8 13/400 CON E1PB 0.0054 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C8.1 9/200 E1 0.0306 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C8.2 13/500 CON E3P 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9 9/200 E1B 0.0255 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C10 9/200 E1B 0.0255 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11 13/400 CON E1PB 0.0251 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C12 9/200 E1 0.0325 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C13 13/400 CON E3P 0.0327 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.3 9/200 E1 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.4 9/200 E1B 0.0294 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.5 9/200 E1 0.032 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.6 9/200 E1 0.032 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.7 9/300 E3B 0.025 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 D1 9/300 CON E4 0.023 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D2 9/200 CON E1BC 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D3 9/200 CON E1BC 0.0258 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D3.1 9/300 CON E3 0.0273 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D4 0 ET 0.0046 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D5 9/300 E4 0.0097 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6 9/200 E1 0.0255 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D7 9/200 E1 0.0255 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D8 9/200 E1B 0.0255 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D9 13/500 CON E4PB 0.0231 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D10 0 ET 0.0049 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D11 9/200 E1 0.004 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D12 13/500 CON E1P 0.0343 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D13 9/200 E1 0.0235 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D14 13/400 CON E1P 0.0235 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D15 9/200 E1 0.0179 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D16 13/400 CON E1P 0.0291 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D17 9/300 E3 0.0199 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 D11.1 9/200 E1 0.0219 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D11.2 9/300 E4 0.0215 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 D1.1 0 ET 0.0058 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D1.2 9/300 E4B 0.0082 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D1.3 9/200 E1B 0.0285 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D1.4 9/200 E1B 0.028 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D1.5 9/300 E3B 0.032 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 25.95 0 15 25.95 0

METRADO TOTAL 2.368 0.053 0.049 0.000 0.000 0.000 0.000 36.393 3.136 25 43.275 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 66% 60% 60% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC 4E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.3 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.8 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.3 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.8 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.9 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.10.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.12 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A17 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A18 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A18.1 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A19 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A20 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A21 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12.1.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12.1.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12.2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12.3 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12.4 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/300 E6B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B16 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B17 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B18 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B19 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 B7.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.3 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.5 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.5.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.5.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.5.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.5.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.5.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.6 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.10 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.11 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.12 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8.2 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.7 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D2 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D3 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D3.1 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D9 13/500 CON E4PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D12 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D14 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D16 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D11.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D11.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1.5 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 150 61 203 8 211 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.04 MACUSANI SED 04
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A1.1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A1.2 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A2 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A3 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A4 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A5 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A6 0 EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A7 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A8 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A9 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A10 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A11 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A12 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A12.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A12.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A12.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A12.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A12.5 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A13 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A14 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A15 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A16 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A17 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A6.1.1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A6.1.2 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A6.1.3 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A6.1.3.1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A6.1.4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A6.1.5 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A6.1.6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.1.7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.1.8 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A6.2.1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A6.2.2 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A6.2.3 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A6.2.4 9/300 E4 1 Aug 0 Dec 0 Dec 0.424 Aug Dec 1 Aug 0 Dec 0 Dec 0.354 Aug Dec 0.784
1 A6.2.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.2.6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.2.7 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A6.2.8 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A6.2.3.1 BT-REU EX 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B2 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B3 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B4 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B5 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B6 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B7 9/300 E5 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B7.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B7.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B7.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B7.4 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B10 9/300 E2 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B11 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B12 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B13 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B14 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B15 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B16 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B17 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B3.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.6 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B3.2.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.2.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3.2.3 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C1 BT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C2 MT-REU EX Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C3 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C4 MT-REU E1PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C5 MT-REU E4PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C6 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.04 MACUSANI SED 04
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 C9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C10 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C11 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C12 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C13 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C14 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C15 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.78
1 C7.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C7.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C7.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C7.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C7.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C7.6 9/200 E1 1 Jul 0 Dec 0 Dec 0.424 Jul Dec 1 Jul 0 Dec 0 Dec 0.354 Jul Dec 0
1 C7.7 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.78
1 C2.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C2.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C2.2.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C2.2.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C2.2.3 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C2.2.3.1 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C2.2.4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C2.2.5 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C2.2.6 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C2.2.7 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C2.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C2.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C2.5 9/300 E5 1 Jan 0 Dec 0 Dec 0.424 Jan Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec 0
1 C2.5.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C2.6 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C2.7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C2.8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C2.9 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 69 0 0 29.256 0 69 0 0 24.426 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 4 0 0 1.696 0 4 0 0 1.416 0 7.056
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 1 0 0 0.424 0 1 0 0 0.354 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0.784
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 1 0 0 0.424 0 1 0 0 0.354 0 3.132

AVANCE TOTAL 0 76 0 0 32.224 0 76 0 0 26.904 0 17.24

METRADO TOTAL 1 76 0 0 30.952 0 76 0 0 25.842 0 17.248

EJECUTADO % 0% 100% 0% 0% 104% 100% 0% 0% 104% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1.2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 0 EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 A11 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.5 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A17 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A6.1.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.3 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.3.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 A6.1.4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.5 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 A6.1.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.8 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 A6.2.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.3 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.4 9/300 E4 Nov 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Nov 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec
1 A6.2.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.8 9/300 E3B Jul 0 Dec 0 Dec 0 Dec 1 Jul 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.3.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/300 E5 Jul 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug
1 B7.1 9/300 E3 Aug 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Aug 0 Dec 0 Dec 0 Dec 2 Aug 0 Dec 0 Dec
1 B7.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B7.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B7.4 9/300 E3 Aug 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Aug 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/300 E2 Aug 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Aug 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec
1 B13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B14 9/300 E4 Aug 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Aug 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec
1 B15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B16 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec
1 B17 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 B3.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.6 9/300 E3 Aug 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Aug 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 B3.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.2.3 9/300 E3 Aug 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Aug 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 C1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 MT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 MT-REU E1PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 MT-REU E4PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C15 9/300 E3 Aug 0 Dec 0 Dec 0 Dec 1 Aug 0.76 Aug 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 C7.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.7 9/300 E3 Jul 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 C2.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.1 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.2 9/200 E1 Dec Dec Dec 0 Dec Dec Dec Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.3 9/200 E1B Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.3.1 9/300 E3 Mar Dec Dec 1 Jul Dec 0.76 Mar Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C2.2.4 0 ET Dec Dec Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.5 9/300 E4B Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.6 9/200 E1B Aug Dec Dec 1 Jul Dec 0.76 Aug Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.7 9/300 E3B Nov Dec Dec Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.5 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug
1 C2.5.1 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C2.6 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 C2.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.9 9/300 E3 Jul Dec Dec 1 Jul Dec 0.76 Jul Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 7.056 0 0 0 0 6.84 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.784 0 0 0 0 0.76 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 3.132 0 0 11 1 3.04 0 0 0 5 2 0

AVANCE TOTAL 17.24 0 0 19 3 16.72 0 48 1 16 6 2

METRADO TOTAL 17.248 0 0 0 3 16.72 0 48 1 16 6 2

EJECUTADO % 100% 0% 0% 100% 100% 100% 100% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 0 EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A10 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A16 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A17 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.1.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.1.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.1.3 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.1.3.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.1.4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.1.5 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.1.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.1.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.1.8 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2.3 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2.4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2.7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2.8 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
1 A6.2.3.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10 9/300 E2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B12 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B16 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B17 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.2.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 MT-REU EX 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 MT-REU E1PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 MT-REU E4PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 C9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C15 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.7 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.2.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.2.3.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.2.4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.2.5 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 C2.2.6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.2.7 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 C2.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.5 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.5.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.6 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2.9 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 1 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 1 0 0 0

METRADO TOTAL 0 0 0 1 0 0 0 3 2 1 0 0

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 50% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1.2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 0 EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A17 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.3 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.3.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 A6.1.5 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1.8 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.3 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.8 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.3.1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/300 E2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B16 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B17 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B3.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.2.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 BT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 MT-REU EX Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 MT-REU E1PB Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 MT-REU E4PB Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C15 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.7 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.3.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.5 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.2.7 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.5 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.5.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.6 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2.9 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 1 0 0.000 0.000

METRADO TOTAL 0 1 18 20 1 0 0 0 5 2 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 20% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC EX 0.015 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec Dec
1 A1.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6 0 EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A8 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A10 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11 0 ET 0.0082 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12 9/200 E1 0.0099 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.1 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.2 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.3 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.4 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.5 9/300 E3 0.0295 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A13 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A14 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A15 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A16 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A17 9/300 E3 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.1.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.1.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.1.3 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.1.3.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.1.4 0 ET 0.0045 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.1.5 9/300 E4 0.0064 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.1.6 9/200 E1 0.0302 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.1.7 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.1.8 9/300 E3 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.3 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.4 9/300 E4 0.0175 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.5 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.6 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.7 9/200 E1B 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.8 9/300 E3B 0.0295 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.3.1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6 0 ET 0 Dec 0.0097 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7 9/300 E5 0 Dec 0.0073 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7.1 9/300 E3 0 Dec 0.0248 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7.2 9/200 E1 0 Dec 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7.3 9/200 E1 0 Dec 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7.4 9/300 E3 0 Dec 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B8 9/200 E1 0 Dec 0.0305 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9 9/200 E1 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10 9/300 E2 0 Dec 0.025 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B11 9/200 E1 0 Dec 0.021 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B12 9/300 E4 0 Dec 0.0165 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B13 9/200 E1 0 Dec 0.0276 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B14 9/300 E4 0 Dec 0.0284 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B15 9/200 E1 0 Dec 0.0248 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B16 9/300 E4 0 Dec 0.0246 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B17 9/300 E3 0 Dec 0.0198 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.1 0 EC 0 Dec 0.0054 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.2 9/200 E1 0 Dec 0.007 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.3 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.4 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.5 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.6 9/300 E3 0 Dec 0.028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.2.1 9/200 E1 0 Dec 0.0311 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.2.2 9/200 E1 0 Dec 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.2.3 9/300 E3 0 Dec 0.033 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C1 BT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2 MT-REU EX 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3 9/200 E1 0.0254 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4 MT-REU E1PB 0.0303 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5 MT-REU E4PB 0.0314 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6 0 ET 0.0109 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7 9/200 E1 0.0042 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C8 9/200 E1 0 Dec 0.027 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 C9 9/200 E1 0 Dec 0.027 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C10 9/200 E1 0 Dec 0.027 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C12 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C13 9/200 E1 0 Dec 0.033 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C14 9/200 E1 0 Dec 0.033 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C15 9/300 E3 0 Dec 0.033 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.1 9/200 E1 0 Dec 0.0263 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.2 9/200 E1 0 Dec 0.0267 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.3 9/200 E1 0 Dec 0.0374 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.4 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.5 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.6 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.7 9/300 E3 0 Dec 0.0301 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.1 0 EC 0.0129 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.2 9/200 E1 0.0118 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.2.1 9/200 E1 0.024 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.2.2 9/200 E1 0.024 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.2.3 9/200 E1B 0.0277 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.2.3.1 9/300 E3 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.2.4 0 ET 0.0051 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.2.5 9/300 E4B 0.0104 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.2.6 9/200 E1B 0.024 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.2.7 9/300 E3B 0.024 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.3 9/200 E1 0.031 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.4 9/200 E1 0.028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.5 9/300 E5 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.5.1 9/300 E3 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.6 9/300 E4 0 Dec 0.013 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.7 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.8 9/200 E1 0 Dec 0.0265 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2.9 9/300 E3 0 Dec 0.0265 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 1.020 1.197 0.000 0.000 0.000 0.000 0.000 24.262 0 16 27.696 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 0 EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12.5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1.3 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1.3.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1.4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1.5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1.8 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.3 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.8 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.3.1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/300 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B16 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.2.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 BT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 MT-REU EX Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 MT-REU E1PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 MT-REU E4PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C15 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.7 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.2.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.2.3.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.2.4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.2.5 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.2.6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.2.7 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.5 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.5.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.6 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.9 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 95 39 132 2 134 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.05 MACUSANI SED 05
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A3 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A3.2 13/400 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 A6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A7.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A7.2 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 A7.3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A7.4.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 A7.5 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A7.6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A7.7 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A7.8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A7.9 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 A8 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A9.1 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 A10 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A11 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A11.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A11.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A11.2.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A11.2.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 A11.3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11.4 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A11.5 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A12 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A13 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 A14 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A15 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A16 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A17 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A18 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 A6.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A6.2.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 A6.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A6.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 A6.5 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 B1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 B2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 B3 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 B4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 B5.1 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 B6 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 B7 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 B8 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 B9 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 B10 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 B11 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 B12 9/300 E4 1 Jan 0 Dec 0 Dec 0.424 Jan 0 Dec 1 Jan 0 Dec 0 Dec 0.354 Jan 0 Dec 0.784
1 B13 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14 9/200 E1 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Jun 0
1 B15 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B16 9/200 E1 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Jun 0
1 B17 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B18 9/200 E1 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Aug 0
1 B19 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B20 9/300 E3 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Aug 0
1 B14.1 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14.2 9/200 E1 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Aug 0
1 B14.3 13/400 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 B9.2.1 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 B9.2.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 B9.2.3 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 B9.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 B9.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 B9.5 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 C1 13/500 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C3.1 9/300 E3B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.05 MACUSANI SED 05
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 C4 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C5 9/300 E5 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 C7 9/200 E1 1 Jan 0 Dec 0 Dec 0.424 Jan 0 Dec 1 Jan 0 Dec 0 Dec 0.354 Jan 0 Dec 0
1 C8 9/200 E1 1 Jan 0 Dec 0 Dec 0.424 Jan 0 Dec 1 Jan 0 Dec 0 Dec 0.354 Jan 0 Dec 0
1 C9 9/200 E1 1 Jan 0 Dec 0 Dec 0.424 Jan 0 Dec 1 Jan 0 Dec 0 Dec 0.354 Jan 0 Dec 0
1 C9.1 9/300 E3 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Aug 0
1 C10 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C11.1 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0
1 C11.2 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C12 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec
1 C13 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec
1 C14 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C7.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.2 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 C7.3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 C7.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0
1 C7.5 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
1 C5.1 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct 0 Dec 0.784
1 C5.2 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep 0 Dec 0.784
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 19 0 0 22.048 0 19 0 0 6.726 0 0
EJECUTADO EN OCTUBRE DE 2022 0 51 0 0 7.632 0 51 0 0 18.054 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 14.896
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 10 0 0 1.696 2.544 10 0 0 1.416 0 1.568
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.708 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0.784

AVANCE TOTAL 0 80 0 0 31.376 2.544 80 0 0 26.196 2.124 17.248

METRADO TOTAL 1 80 0 0 31.376 2.544 80 0 0 26.196 2.124 16.464

EJECUTADO % 0% 100% 0% 0% 100% 100% 0% 0% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 13/500 CON E1P Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 13/400 CON E1P Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.2 13/400 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 0 ET Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec
1 A6 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.2 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec
1 A7.3 0 ET Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.4 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.4.1 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 A7.5 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.6 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.7 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.8 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.9 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 A8 0 EC Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.1 9/300 E3B Nov Dec Dec 0 Dec 1 Jul 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/300 E4 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec
1 A11 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A11.2 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A11.2.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A11.2.2 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 A11.3 0 ET Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11.4 9/300 E4 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec
1 A11.5 9/300 E3 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 A12 0 ET Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec
1 A14 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A15 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A16 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A17 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A18 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 A6.1 0 EC Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.1 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 A6.3 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.4 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.5 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 B1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec
1 B4 0 ET Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 B6 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/300 E4 Jan Dec Dec 1 Jul Dec 0.76 Jan 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B13 0 ET Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B15 13/400 CON E1P Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B16 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B17 13/400 CON E1P Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B18 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B19 13/400 CON E1P Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B20 9/300 E3 Dec 0.784 Jan Dec 1 Jul Dec Dec 0.76 Aug 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 B14.1 13/400 CON E1P Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14.2 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B14.3 13/400 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.1 0 EC Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.2 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.2.1 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.2.2 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.2.3 9/300 E3 Jan Dec Dec 1 Jul Dec 0.76 Jan Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 B9.3 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.4 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.5 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 C1 13/500 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 0 EC Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.1 9/300 E3B Nov Dec Dec Dec 1 Jul 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 C4 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/300 E5 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul
1 C6 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.1 9/300 E3 Dec 0.784 Jan Dec 1 Jul Dec Dec 0.76 Jun 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C10 0 EC Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.1 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.2 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/300 E3 Jul 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C7.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.2 9/300 E4B Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.5 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C5.1 9/300 E4 Nov Dec Dec 0 Dec Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec
1 C5.2 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 14.896 0 0 0 0 14.44 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 1.568 1.568 0 0 0 1.52 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0.76 31 0 11 6 0
EJECUTADO EN JULIO DE 2023 0.784 0 0 17 2 0.76 0 8 0 4 1 1

AVANCE TOTAL 17.248 1.568 0 21 2 16.72 1.52 44 0 16 8 1

METRADO TOTAL 16.464 2.352 0 0 3 15.96 2.28 44 0 16 8 1

EJECUTADO % 100% 0% 0% 67% 100% 100% 0% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 13/500 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3.2 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.4.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 A7.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7.9 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 A9.1 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
1 A10 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 A11.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11.2.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11.3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11.4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A11.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A13 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A16 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A17 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A18 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.2.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B12 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B13 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B15 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B16 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B17 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B18 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B19 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B20 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14.1 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14.3 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9.2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B9.2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9.2.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1 13/500 CON E3P 0 Dec 0 Dec 0 Dec 2 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C3.1 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 C4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C11.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C11.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C14 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.2 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0
1 C7.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C7.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 4 0 0 0 8 2 1 0 0

AVANCE TOTAL 0 0 0 4 0 0 0 8 2 1 0 0

METRADO TOTAL 0 6 0 4 0 0 0 8 2 1 0 0

EJECUTADO % 0% 0% 0% 100% 0% 0% 0% 100% 100% 100% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3.2 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 A5 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 A7.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.4.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7.9 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 A9 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9.1 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11.2.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11.3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 A11.4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 A13 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A17 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A18 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 A6.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.2.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 B5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 B14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B15 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B17 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B18 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B19 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B20 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14.1 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14.3 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 B9.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.2.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.1 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 C4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 C11 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec
1 C7.2 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 6 4 0.000 0.000

METRADO TOTAL 0 0 17 5 0 0 0 0 7 5 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 86% 80% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC 3E3P 0.015 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1 13/500 CON E1P 0.024 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2 9/200 E1 0.021 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3 13/400 CON E1P 0.021 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3.1 9/200 E1 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A3.2 13/400 CON E3P 0.0333 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4 0 ET 0.0035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5 9/300 E4 0.0035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6 9/200 E1 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7 9/200 E1 0.0325 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7.1 9/200 E1 0.025 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7.2 9/300 E4 0.024 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7.3 0 ET 0.0025 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7.4 9/200 E1 0.0033 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7.4.1 9/300 E3 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A7.5 9/200 E1B 0.034 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7.6 9/200 E1 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7.7 9/200 E1 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7.8 9/200 E1 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A7.9 9/300 E3 0.0278 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A8 0 EC 0 Dec 0.0047 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9 9/200 E1B 0 Dec 0.0046 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9.1 9/300 E3B 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A10 9/300 E4 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11 9/200 E1B 0 Dec 0.036 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11.1 9/200 E1 0 Dec 0.0285 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11.2 9/200 E1 0 Dec 0.0255 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11.2.1 9/200 E1 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A11.2.2 9/300 E3 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11.3 0 ET 0 Dec 0 Dec 0.0015 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11.4 9/300 E4 0 Dec 0 Dec 0.004 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11.5 9/300 E3 0 Dec 0 Dec 0.02 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12 0 ET 0 Dec 0 Dec 0.0023 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A13 9/300 E4 0 Dec 0 Dec 0.003 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A14 9/200 E1 0 Dec 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A15 9/200 E1 0 Dec 0 Dec 0.021 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A16 9/200 E1 0 Dec 0 Dec 0.031 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A17 9/200 E1 0 Dec 0 Dec 0.026 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A18 9/300 E3 0 Dec 0 Dec 0.026 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A6.1 0 EC 0 Dec 0.0063 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2 9/200 E1 0 Dec 0.004 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.2.1 9/300 E3 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 A6.3 9/200 E1 0 Dec 0.0295 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.4 9/200 E1 0 Dec 0.033 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6.5 9/300 E3 0 Dec 0.0276 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B1 9/200 E1 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B2 9/200 E1 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3 9/300 E4 0 Dec 0.024 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4 0 ET 0 Dec 0.0031 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5 9/200 E1 0 Dec 0.003 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.1 9/300 E3 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B6 9/200 E1 0 Dec 0.026 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7 9/200 E1 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B8 9/200 E1 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9 9/200 E1 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10 9/200 E1 0 Dec 0.0355 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B11 9/200 E1 0 Dec 0.0355 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B12 9/300 E4 0 Dec 0.036 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 1.73 Aug 1 Aug 1.73 Aug
1 B13 0 ET 0 Dec 0.0117 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B14 9/200 E1 0 Dec 0.0054 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B15 13/400 CON E1P 0 Dec 0.024 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B16 9/200 E1 0 Dec 0.0305 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B17 13/400 CON E1P 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B18 9/200 E1 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B19 13/400 CON E1P 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B20 9/300 E3 0 Dec 0.0347 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B14.1 13/400 CON E1P 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B14.2 9/200 E1 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B14.3 13/400 CON E3P 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9.1 0 EC 0 Dec 0 Dec 0.0036 Aug 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9.2 9/200 E1 0 Dec 0 Dec 0.006 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9.2.1 9/200 E1B 0 Dec 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9.2.2 9/200 E1 0 Dec 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9.2.3 9/300 E3 0 Dec 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 B9.3 9/200 E1 0 Dec 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9.4 9/200 E1 0 Dec 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9.5 9/300 E3 0 Dec 0 Dec 0.031 Aug 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C1 13/500 CON E3P 0.024 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2 0 EC 0.0043 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3 9/200 E1B 0.0045 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.1 9/300 E3B 0.0275 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 C4 9/200 E1 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5 9/300 E5 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6 9/200 E1 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7 9/200 E1 0.0305 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C8 9/200 E1 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9 9/200 E1 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9.1 9/300 E3 0.038 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 1 Aug 1.73 Aug
1 C10 0 EC 0 Dec 0.0048 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11 9/200 E1B 0 Dec 0.003 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11.1 9/200 E1B 0 Dec 0.037 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11.2 9/300 E3 0 Dec 0.037 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C12 9/200 E1 0 Dec 0.031 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C13 9/200 E1 0 Dec 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C14 9/300 E3 0 Dec 0.0325 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C7.1 0 ET 0 Dec 0.0048 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.2 9/300 E4B 0 Dec 0.0032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.3 9/200 E1B 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.4 9/200 E1 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.5 9/300 E3 0 Dec 0.027 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1.73 Aug Dec 1 Aug 1.73 Aug
1 C5.1 9/300 E4 0.02 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.2 9/300 E3 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 27.68 1.73 18 31.14 0

METRADO TOTAL 0.817 1.282 0.356 0.000 0.000 0.000 0.000 27.728 1.568 18 31.158 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 100% 100% 100% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3.2 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.3 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.4.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7.9 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9.1 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11.2.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11.3 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11.4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11.5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A17 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A18 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.2.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6.5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B17 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B18 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B19 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14.1 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14.3 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9.2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9.2.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9.5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.1 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 C4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.2 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 53 21 72 2 74 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.06A MACUSANI SED 6A
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC 3E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A1 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A2 9/200 E1 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Aug 0
1 A3 13/500 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A5 9/200 E1 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Aug 0
1 A5.1 9/200 E1B 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Jan 0
1 A5.2 9/200 E1B 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Jan 0
1 A5.3 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Jan 0
1 A5.4 9/300 E3 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Aug
1 A6 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Aug 0
1 A7 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Jan 0
1 A8 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar 0
1 A9 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Jan 0
1 A10 9/300 E3 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Aug
1 B1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B2 9/200 E1 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Mar 0
1 B2.1 9/200 E1B 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar 0
1 B2.2 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar 0
1 B2.3 9/200 E1B 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar 0
1 B2.4 9/200 E1B Dec 0 Dec 0 Dec -0.424 Jan Dec Dec 0 Dec 0 Dec -0.354 Jan Dec 0
1 B2.5 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov 0.424 Nov 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B2.6 0 ET 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B2.7 9/200 E5 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B2.8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B2.9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B2.10 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B2.7.1 9/200 E1B 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar 0
1 B2.7.2 9/300 E3B 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar
1 B2.3.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B2.3.2 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B2.3.3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B2.3.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B2.3.5 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B2.3.2.1 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B2.3.2.2 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B3 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar 0
1 B4 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar 0
1 B5 9/300 E4 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar
1 B6 9/300 E4B 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Aug 0
1 B7 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar 0
1 B8 13/500 CON E4PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B9 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B10 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B10.1 9/200 E1B 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar 0
1 B10.2 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B11 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar 0
1 B12 13/400 CON E1PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B13 9/300 E3B 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar
1 B6.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B6.2 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B6.3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B6.4 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B6.5 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B6.2.1 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B6.2.2 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C1 9/200 E1B2 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 C2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 C3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C4 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C5 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C6 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C7 13/500 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C8 9/200 E1B 1 Jul 0 Dec 0 Dec 0.424 Jul Dec 1 Jul 0 Dec 0 Dec 0.354 Jul Dec 0
1 C9 13/400 CON E1PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C10 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C11 13/400 CON E1PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C12 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C13 13/500 CON E3PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C6.1 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C6.2 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C6.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C6.4 9/200 E1 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Jun 0
1 C6.5 9/300 E3 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Aug
1 D1 9/200 CON E3BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.06A MACUSANI SED 6A
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 22 0 0 9.328 0 22 0 0 7.788 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 6 0 0 2.544 0.424 6 0 0 2.124 0 4.704
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 22 0 0 -0.424 9.328 27 0 0 -0.354 1.77 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 5 0 0 0 2.12 0 0 0 0 4.956 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.354 0
EJECUTADO EN JULIO DE 2023 0 1 0 0 0.424 0 1 0 0 0.354 0 1.568

AVANCE TOTAL 0 56 0 0 11.872 11.872 56 0 0 9.912 9.558 6.272

METRADO TOTAL 1 56 0 0 13.144 8.904 56 0 0 10.974 7.434 6.272

EJECUTADO % 0% 100% 0% 0% 108% 100% 0% 0% 106% 127%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.4 9/300 E3 Dec 0.784 Jan Dec 1 Jul Dec Dec 1 Jul 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 A6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/300 E3 Dec 0.784 Jan Dec 1 Jul Dec Dec 0.76 Mar 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.5 9/300 E4 Jul 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B2.6 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.7 9/200 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug
1 B2.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.10 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 B2.7.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.7.2 9/300 E3B Dec 0.784 Jan Dec 0 Dec 1 Jul 0.76 Jul Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3.5 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B2.3.2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3.2.2 9/300 E3 Jul 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 B3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/300 E4 Dec 0.784 Mar Dec 1 Aug Dec 0 Dec 0.76 Mar 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B6 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 13/500 CON E4PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10.2 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 9/300 E3B Dec 0.784 Jan Dec 0 Dec 1 Jul Dec 0.76 Jan 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.5 9/300 E3B Nov Dec Dec 0 Dec 1 Jul 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.2.2 9/300 E3B Nov Dec Dec 0 Dec 1 Jul 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 9/200 E1B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/300 E4 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec
1 C5 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/300 E4 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 C7 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 13/500 CON E3PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.5 9/300 E3 Dec 0.784 Mar Dec 1 Aug Dec Dec 0.76 Jun 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 D1 9/200 CON E3BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 4.704 0 0 0 0 4.56 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 3.136 0 0 0 0 0.76 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 1.568 0 0 0 0 1.52 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0.76 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 1.568 0 0 5 4 2.28 1 0 0 2 3 0

AVANCE TOTAL 6.272 4.704 0 10 4 6.84 4.04 20 0 6 4 1

METRADO TOTAL 6.272 2.352 0 0 4 6.08 2.28 20 0 6 4 1

EJECUTADO % 127% 0% 0% 100% 130% 100% 0% 100% 100% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 13/500 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 A5.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A10 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B2.4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B2.5 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.6 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.7 9/200 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.10 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.7.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B2.7.2 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0
1 B2.3.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.3.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0
1 B2.3.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B2.3.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.3.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.3.2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B2.3.2.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0
1 B7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8 13/500 CON E4PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B10.2 13/500 CON E3P 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B12 13/400 CON E1PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B13 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0
1 B6.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B6.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B6.4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B6.5 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
1 B6.2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B6.2.2 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
1 C1 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C9 13/400 CON E1PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C11 13/400 CON E1PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C12 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C13 13/500 CON E3PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C6.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C6.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D1 9/200 CON E3BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 15 2 1 0 0

AVANCE TOTAL 0 0 0 1 0 0 0 16 4 1 0 0

METRADO TOTAL 0 2 0 1 2 0 0 20 5 1 0 0

EJECUTADO % 0% 0% 0% 100% 0% 0% 0% 80% 80% 100% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.015 Dec
1 A1 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0.0126 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0063 Dec
1 B2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0314 Dec
1 B2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.028 Dec
1 B2.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.028 Dec
1 B2.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.022 Dec
1 B2.5 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.035 Dec
1 B2.6 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 B2.7 9/200 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.10 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.7.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.7.2 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0.0098 Dec
1 B2.3.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0058 Dec
1 B2.3.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3.2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3.2.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0354 Dec
1 B4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.033 Dec
1 B5 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0384 Dec
1 B6 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0278 Dec
1 B7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0247 Dec
1 B8 13/500 CON E4PB Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0158 Dec
1 B9 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0.0152 Dec
1 B10 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0139 Aug
1 B10.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10.2 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B6.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.5 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.2.2 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 9/200 E1B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 13/400 CON E1PB Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 13/500 CON E3PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1 9/200 CON E3BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0297 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 1 13 35 3 1 0 0 4 3 0.000 0.441

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1 13/500 CON E1P 0 Dec 0.0273 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2 9/200 E1 0 Dec 0.0189 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec Dec
1 A3 13/500 CON E4P 0 Dec 0.0184 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4 0 ET 0 Dec 0.0061 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5 9/200 E1 0 Dec 0.0085 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.1 9/200 E1B 0 Dec 0.0354 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.2 9/200 E1B 0 Dec 0.0346 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.3 9/200 E1 0 Dec 0.034 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.4 9/300 E3 0 Dec 0.0287 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6 9/200 E1 0 Dec 0.0375 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7 9/200 E1 0 Dec 0.0355 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A8 9/200 E1 0 Dec 0.0365 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9 9/200 E1 0 Dec 0.033 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A10 9/300 E3 0 Dec 0.033 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.5 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.6 0 ET 0 Dec 0.0066 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.7 9/200 E5 0 Dec 0.01 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.8 9/200 E1 0 Dec 0.0248 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.9 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.10 9/300 E3 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.7.1 9/200 E1B 0 Dec 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.7.2 9/300 E3B 0 Dec 0.0261 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.3.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.3.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.3.3 9/200 E1B 0 Dec 0.0295 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.3.4 9/200 E1 0 Dec 0.029 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.3.5 9/300 E3 0 Dec 0.029 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.3.2.1 9/200 E1B 0 Dec 0.0358 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.3.2.2 9/300 E3 0 Dec 0.0311 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B8 13/500 CON E4PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10.1 9/200 E1B 0.0355 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10.2 13/500 CON E3P 0.0365 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B11 9/200 E1 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B12 13/400 CON E1PB 0.033 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B13 9/300 E3B 0.0224 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6.1 0 EC 0.0077 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6.2 9/200 E1B 0.016 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6.3 9/200 E1B 0.029 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6.4 9/200 E1B 0.0336 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6.5 9/300 E3B 0.0305 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6.2.1 9/200 E1B 0.0275 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6.2.2 9/300 E3B 0.0305 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C1 9/200 E1B2 0.0323 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2 9/200 E1 0.0202 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3 9/200 E1 0.0225 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4 9/300 E4 0.022 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5 0 ET 0.0042 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6 9/300 E4 0.0115 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7 13/500 CON E4P 0.0208 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C8 9/200 E1B 0.0325 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9 13/400 CON E1PB 0.0275 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C10 9/200 E1B 0.033 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11 13/400 CON E1PB 0.029 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C12 9/200 E1B 0.0305 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C13 13/500 CON E3PB 0.0295 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.1 9/200 E1B 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.2 9/200 E1B 0.0274 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.3 9/200 E1 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.4 9/200 E1 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.5 9/300 E3 0.0296 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D1 9/200 CON E3BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.818 0.725 0.000 0.000 0.000 0.000 0.000 12.131 4.638 16 27.696 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.6 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.7 9/200 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.10 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.7.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.7.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3.5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3.2.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 13/500 CON E4PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10.2 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6.5 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6.2.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 13/400 CON E1PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 13/500 CON E3PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1 9/200 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 112 64 172 4 176 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.06B MACUSANI SED 6B
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC 3E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A1 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A3 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A4 9/300 E4B 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Jun
1 A5 9/200 E1 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Jun 0
1 A6 9/300 E4B 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Dec
1 A7 9/200 E1B 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0
1 A8 13/500 CON E3PB Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A4.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A4.2 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A4.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 A4.4 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B1 9/300 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B6 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B7 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B8 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B8.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B8.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B10 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B11 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B4.1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B4.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4.4 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4.5 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B4.2.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 B4.2.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C1 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C2 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C3.1 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C3.2 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C3.3 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C3.4 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C3.5 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C3.6 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C3.7 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C3.2.1 13/400 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C4 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C5.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C5.2 9/300 E6 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C5.3 9/300 E2B 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.784
1 C5.4 9/200 E1B 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0
1 C5.5 9/300 E3B 1 Mar 0 Dec 0 Dec 0.424 Mar Dec 1 Mar 0 Dec 0 Dec 0.354 Mar Dec 0.784
1 C5.2.1 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C6 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C7 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C7.1 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C7.2 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C8 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C9 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0
1 C10 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 C11 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C12 9/200 E1 1 Jul 0 Dec 0 Dec Dec 0.424 Jul 1 Jul 0 Dec 0 Dec Dec 0.354 Jul
1 C12.1 9/300 E3 1 Jul 0 Dec 0 Dec 0.424 Jul Dec 1 Jul 0 Dec 0 Dec 0.354 Jul Dec 0
1 C13 9/200 E1 1 Jul 0 Dec 0 Dec 0.424 Jul Dec 1 Jul 0 Dec 0 Dec 0.354 Jul Dec 0
1 C14 9/300 E3 1 Jul 0 Dec 0 Dec Dec 0.424 Jul 1 Jul 0 Dec 0 Dec Dec 0.354 Jul
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 4 0 0 0.848 0.848 4 0 0 0.708 0.708 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 41 0 0 17.384 0 41 0 0 14.514 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 8.624
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.06B MACUSANI SED 6B
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 3 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 7 0 0 1.696 1.272 4 0 0 1.416 0 1.568
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.708 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 1.568

AVANCE TOTAL 0 52 0 0 19.928 2.12 52 0 0 16.638 1.416 11.76

METRADO TOTAL 1 52 0 0 17.384 2.12 52 0 0 14.514 1.77 10.192

EJECUTADO % 0% 100% 0% 0% 113% 100% 0% 0% 111% 119%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 9/300 E4B Nov Dec Dec Dec 1 Jul 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 9/300 E4B Dec 0.784 Mar Dec Dec 1 Jul Dec 0.76 Jun 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/300 E4B Dec 0.784 Mar Dec Dec 1 Aug 0 Dec 0.76 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 13/500 CON E3PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.2 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 A4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.4 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 B1 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B7 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B8.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B8.2 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B4.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.5 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B4.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.2 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C1 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C2 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.1 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.4 9/300 E4B Nov Dec Dec 0 Dec 1 Jul 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.7 9/300 E3 Jul 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C3.2.1 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.2 9/300 E6 Jul 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.3 9/300 E2B Mar Dec Dec 0 Dec 1 Jul 0.76 Mar Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.5 9/300 E3B Mar Dec Dec 0 Dec 1 Jul 0.76 Mar Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.2.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 C6 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.2 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C8 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/300 E4 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 C11 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1 Dec 0 Dec Dec 0 Dec Dec Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C12.1 9/300 E3 Dec 0.784 Jul 0 Dec 1 Aug 0 Dec 0 Dec 0.76 Jul 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 C13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/300 E3 Dec 0.784 Jul Dec 1 Aug Dec Dec 0.76 Jul 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 1.568 0 0 0 0 1.52 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 8.624 0 0 0 0 8.36 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 1.568 1.568 0 0 0 1.52 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0.76 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 1.568 0 0 10 5 1.52 0 17 0 7 3 0

AVANCE TOTAL 11.76 3.136 0 13 6 11.4 3.04 19 0 10 3 0

METRADO TOTAL 10.192 2.352 0 0 6 9.88 2.28 22 0 11 3 0

EJECUTADO % 119% 0% 0% 100% 119% 86% 0% 91% 100% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC 3E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 A2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 A4 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 A5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 A7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 A8 13/500 CON E3PB 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1 9/300 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 B5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B11 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.5 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.1 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.4 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0
1 C3.5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C3.6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.7 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.2.1 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.2 9/300 E6 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.3 9/300 E2B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0
1 C5.4 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C5.5 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
1 C5.2.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C7.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C7.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 C9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C12.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C14 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 1 0 0 0 0 0 0 9 1 2 0 0

AVANCE TOTAL 1 0 0 0 0 0 0 9 1 2 0 0

METRADO TOTAL 1 1 0 1 0 0 0 10 1 4 0 0

EJECUTADO % 100% 0% 0% 0% 0% 0% 0% 90% 100% 50% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC 3E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 13/500 CON E3PB Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A4.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 9/300 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.5 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.1 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 C3.4 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.7 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2.1 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.2 9/300 E6 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.3 9/300 E2B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.4 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.5 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5.2.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 13 16 0 1 0 0 4 3 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC 3E3P 0.015 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1 9/200 E1B 0 Dec 0.0187 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2 9/200 E1 0 Dec 0.0367 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec Dec
1 A3 9/300 E4B 0 Dec 0.0366 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4 9/300 E4B 0 Dec 0.029 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5 9/200 E1 0 Dec 0.031 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6 9/300 E4B 0 Dec 0.032 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7 9/200 E1B 0 Dec 0.0182 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A8 13/500 CON E3PB 0 Dec 0.017 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.1 0 ET 0 Dec 0 Dec 0.0078 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.2 9/300 E4 0 Dec 0 Dec 0.0083 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.3 9/200 E1 0 Dec 0 Dec 0.0275 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.4 9/300 E3 0 Dec 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B1 9/300 E1 0 Dec 0.02 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2 9/200 E1 0 Dec 0.0236 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3 9/200 E1B 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4 9/200 E1B 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5 9/200 E1 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6 9/300 E4 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7 0 ET 0 Dec 0.0078 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B8 9/200 E1 0 Dec 0.0032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B8.1 9/200 E1 0 Dec 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B8.2 9/300 E3 0 Dec 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9 9/200 E1 0 Dec 0 Dec 0.0285 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10 9/200 E1 0 Dec 0 Dec 0.0285 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B11 9/300 E3 0 Dec 0 Dec 0.0285 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.1 0 EC 0 Dec 0 Dec 0.0116 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.2 9/200 E1 0 Dec 0 Dec 0.003 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.3 9/200 E1 0 Dec 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.4 9/200 E1 0 Dec 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.5 9/300 E3 0 Dec 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.2.1 9/200 E1 0 Dec 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.2.2 9/300 E3 0 Dec 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C1 9/300 CON E3 0.0201 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2 0 EC 0.0081 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3 9/200 E1 0.0053 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.1 13/400 CON E1P 0.0251 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.2 9/200 E1 0.0335 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.3 0 ET 0 Dec 0.0028 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.4 9/300 E4B 0 Dec 0.0059 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.5 9/200 E1B 0 Dec 0.0295 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.6 9/200 E1 0 Dec 0.0308 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.7 9/300 E3 0 Dec 0.0298 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.2.1 13/400 CON E3P 0.0301 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4 9/200 E1B 0.0361 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5 9/200 E1 0.0375 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.1 9/200 E1 0.0306 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.2 9/300 E6 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.3 9/300 E2B 0.0117 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.4 9/200 E1B 0 Dec 0.038 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.5 9/300 E3B 0 Dec 0.04 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.2.1 9/300 E3 0.02 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6 0 EC 0 Dec 0.0044 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7 9/200 E1B 0 Dec 0.0035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.1 9/200 E1B 0 Dec 0.0385 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7.2 9/300 E3 0 Dec 0.0385 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C8 9/200 E1B 0 Dec 0.0305 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9 9/200 E1 0 Dec 0.033 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C10 9/300 E4 0 Dec 0.033 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11 0 ET 0 Dec 0.0158 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C12 9/200 E1 0 Dec 0.0038 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C12.1 9/300 E3 0 Dec 0.033 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C13 9/200 E1 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C14 9/300 E3 0 Dec 0.037 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.314 0.901 0.387 0.000 0.000 0.000 0.000 12.131 0.751 11 19.041 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC 3E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 13/500 CON E3PB Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 9/300 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.5 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4.2.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.1 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.3 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.7 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.2.1 13/400 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.2 9/300 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.3 9/300 E2B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.5 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.2.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 73 34 106 1 107 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.07 MACUSANI SED 07
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC 4E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 9/300 E4B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A2 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A3 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A4 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A5 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A6 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A7 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A8 9/300 E4B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A8.1 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 A8.2 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 A8.3 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 A8.4 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 A9 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 A10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 A11 9/300 CON E3BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 A12 9/200 E1B 1 Apr 0 Dec 0 Dec 0 Dec 0.424 Apr 1 Apr 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A13 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A14 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A15 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A16 9/300 E3 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 A4.1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 A4.2 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 A4.3 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 A4.4 9/300 E4B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec 0.784
1 A4.5 9/300 E3B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 A4.2.1 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 A4.2.2 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 A4.2.3 9/300 E3B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec 0.784
1 B1 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B2 13/400 CON E1PBC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B3 9/200 E1B2 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 B4 13/400 CON E1PB2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B5 9/200 E1B2 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 B5.1 13/500 CON E4PB2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B5.2 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B5.3 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 B5.3.1 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B5.3.2 9/300 E3B 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B5.4 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 B5.5 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B5.6 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B6 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B7 9/300 E4B2 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec 0.784
1 B7.1 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 B7.2 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 B8 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 B9 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 B10 9/300 E4 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec 0.784
1 B11 9/300 E4 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec 0.784
1 B12 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B13 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B14 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B15 9/300 E4B2 1 May 0 Dec 0 Dec 0 Dec 0.424 May 1 May 0 Dec 0 Dec 0 Dec 0.354 Dec
1 B16 9/200 E1B 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B17 9/300 E4 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B18 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B19 9/300 E4B 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B20 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B21 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B22 9/300 E4B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B23 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B24 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B25 9/300 E4B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B26 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B27 9/300 E3B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B20.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B20.2 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B20.3 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B20.4 9/300 E3 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.1 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B2.2 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 B2.3 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B2.4 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 B2.5 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B2.6 9/200 E1 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 B2.7 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B2.8 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B2.9 9/300 E2 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B2.10 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B2.11 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.07 MACUSANI SED 07
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 B2.12 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B2.13 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Oct
1 B2.14 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.15 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.16 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.17 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.18 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B2.18.1 9/300 CON E3BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B2.19 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 B2.20 9/300 E4 1 Jun 0 Dec 0 Dec 0.424 Jun 0 Dec 1 Jun 0 Dec 0 Dec 0.354 Jun Dec 0.784
1 B2.21 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.22 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.23 9/200 E1 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec
1 B2.24 9/300 E4 1 Oct 0 Dec 0 Dec 0.424 Oct 0 Dec 1 Oct 0 Dec 0 Dec 0.354 Oct Dec 0.784
1 B2.9.1 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 B2.9.2 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 B2.9.3 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 B2.9.4 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 B2.9.5 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 B2.9.6 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Dec
1 B2.9.7 9/300 E3B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 C2 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 C3 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 C4 9/200 E1B 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 C5 9/300 E4 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec
1 C6 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 C7 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C7.1 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C7.2 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C7.3 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C7.4 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C7.5 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C7.6 9/300 E3 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Dec
1 C8 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C9 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C10 9/200 E1B 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C11 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C12 9/300 E4 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C13 9/300 E4 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C14 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C15 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C16 9/200 E1 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C17 9/300 E3 1 Oct 0 Dec 0 Dec 0 Dec 0.424 Oct 1 Oct 0 Dec 0 Dec 0 Dec 0.354 Jun
1 C2.1 9/300 E3 1 Sep 0 Dec 0 Dec 0.424 Sep 0 Dec 1 Sep 0 Dec 0 Dec 0.354 Sep Dec 0.784
1 D1 13/500 CON E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E1 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E2 13/400 CON E1PBC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E3 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E4 13/400 CON E1PBC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E5 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E5.1 13/500 CON E3PBC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E6 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E7 9/300 CON E3BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E8 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E9 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E10 9/300 CON E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E11 9/300 CON E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E12 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E13 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E14 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
1 E15 9/300 CON E3BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 22 0 0 9.328 0 22 0 0 7.788 0 0
EJECUTADO EN OCTUBRE DE 2022 0 80 0 0 9.328 24.592 80 0 0 7.788 6.372 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 7.056
EJECUTADO EN ABRIL DE 2023 0 1 0 0 0 0.424 1 0 0 0 0 2.352
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.07 MACUSANI SED 07
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
EJECUTADO EN MAYO DE 2023 0 1 0 0 0 0.424 1 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 1 0 0 0.424 0 1 0 0 0.354 13.806 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 105 0 0 19.08 25.44 105 0 0 15.93 20.178 9.408

METRADO TOTAL 1 105 0 0 15.264 26.712 105 0 0 12.744 22.302 9.408

EJECUTADO % 0% 100% 0% 0% 106% 100% 0% 0% 103% 80%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC 4E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 9/300 E4B Dec 0.784 Apr Dec Dec Dec Dec 0.76 Apr Dec Dec Dec Dec Dec
1 A2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/300 E4B Dec 0.784 Apr Dec Dec Dec Dec 0.76 Apr Dec Dec Dec Dec Dec
1 A8.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.4 9/300 E3B Apr Dec Dec Dec Dec 0.76 Apr Dec Dec Dec Dec Dec Dec
1 A9 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/300 E3 Dec 0.784 Apr Dec Dec Dec Dec 0.76 Apr Dec Dec Dec Dec Dec
1 A4.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4 9/300 E4B Mar Dec Dec Dec Dec 0.76 Mar Dec Dec Dec Dec Dec Dec
1 A4.5 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.3 9/300 E3B Mar Dec Dec Dec Dec 0.76 Mar Dec Dec Dec Dec Dec Dec
1 B1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 13/400 CON E1PB2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1 13/500 CON E4PB2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3.2 9/300 E3B Apr Dec Dec Dec Dec 0.76 Apr Dec Dec Dec Dec Dec Dec
1 B5.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/300 E4B2 Mar Dec Dec Dec Dec 0.76 Mar Dec Dec Dec Dec Dec Dec
1 B7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/300 E4 Mar Dec Dec Dec Dec 0.76 Mar Dec Dec Dec Dec Dec Dec
1 B11 9/300 E4 Mar Dec Dec Dec Dec 0.76 Mar Dec Dec Dec Dec Dec Dec
1 B12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 9/300 E4B2 Dec 0.784 May Dec Dec Dec Dec 0.76 May Dec Dec Dec Dec Dec
1 B16 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B17 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B18 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B19 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B21 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B22 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B23 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B24 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B25 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B26 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B27 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.2 9/300 E4 Apr Dec Dec Dec Dec 0.76 Apr Dec Dec Dec Dec Dec Dec
1 B20.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.7 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.8 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9 9/300 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 B2.12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.17 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.18 9/300 E4 Mar Dec Dec Dec Dec 0.76 Mar Dec Dec Dec Dec Dec Dec
1 B2.18.1 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.19 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.20 9/300 E4 Mar Dec Dec Dec Dec 0.76 Mar Dec Dec Dec Dec Dec Dec
1 B2.21 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.22 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.23 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.24 9/300 E4 Mar Dec Dec Dec Dec 0.76 Mar Dec Dec Dec Dec Dec Dec
1 B2.9.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.7 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.6 9/300 E3 Dec 0.784 Apr Dec Dec Dec Dec 0.76 Apr Dec Dec Dec Dec Dec
1 C8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/300 E4 Dec 0.784 Apr Dec Dec Dec Dec 0.76 Apr Dec Dec Dec Dec Dec
1 C13 9/300 E4 Dec 0.784 Apr Dec Dec Dec Dec 0.76 Apr Dec Dec Dec Dec Dec
1 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C17 9/300 E3 Dec 0.784 Apr Dec Dec Dec Dec 0.76 Apr Dec Dec Dec Dec Dec
1 C2.1 9/300 E3 Mar Dec Dec Dec Dec 0.76 Mar Dec Dec Dec Dec Dec Dec
1 D1 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E2 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E3 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E4 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E5 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E5.1 13/500 CON E3PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E7 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E8 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E9 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E10 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E11 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E12 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E13 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E14 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E15 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 7.056 0 0 0 0 6.84 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 2.352 5.488 0 0 0 2.28 5.32 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
EJECUTADO EN MAYO DE 2023 0 0.784 0 0 0 0 0.76 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 9.408 6.272 0 0 0 9.12 6.08 0 0 0 0 0

METRADO TOTAL 9.408 10.192 0 0 8 9.12 9.88 39 1 7 13 0

EJECUTADO % 80% 0% 0% 0% 80% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC 4E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.4 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.5 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.3 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 13/400 CON E1PB2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1 13/500 CON E4PB2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/300 E4B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 9/300 E4B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B16 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B17 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B18 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B19 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B21 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B22 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B23 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B24 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B25 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B26 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B27 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.7 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.8 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9 9/300 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 B2.12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.17 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.18 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.18.1 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.19 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.20 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.21 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.22 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.23 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.24 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.7 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E2 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E3 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E4 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E5 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E5.1 13/500 CON E3PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E7 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E8 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E9 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E10 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E11 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E12 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E13 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E14 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E15 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 0 4 0 1 2 0 0 40 10 8 0 0

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC 4E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.4 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.5 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.3 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 13/400 CON E1PB2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1 13/500 CON E4PB2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/300 E4B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 9/300 E4B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B16 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B17 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B18 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B19 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B21 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B22 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B23 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B24 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B25 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B26 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B27 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.7 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.8 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9 9/300 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 B2.12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.17 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.18 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.18.1 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.19 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.20 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.21 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.22 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.23 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.24 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.7 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E2 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E3 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E4 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E5 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E5.1 13/500 CON E3PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E7 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E8 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E9 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E10 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E11 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E12 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E13 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E14 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E15 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 1 17 36 4 2 0 0 7 4 1.401 0.293

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC 4E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.4 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.5 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.3 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 13/400 CON E1PB2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1 13/500 CON E4PB2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/300 E4B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 9/300 E4B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B16 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B17 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B18 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B19 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B21 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B22 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B23 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B24 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B25 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B26 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B27 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.7 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.8 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9 9/300 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 B2.12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.17 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.18 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.18.1 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.19 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.20 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.21 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.22 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.23 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.24 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.7 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E2 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E3 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E4 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E5 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E5.1 13/500 CON E3PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E7 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E8 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E9 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E10 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E11 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E12 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E13 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E14 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E15 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.986 0.000 0.443 0.000 0.000 0.000 0.443 17.33 9.21 22 38.082 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC 4E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8.4 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A11 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A12 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A13 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A14 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A15 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A16 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.5 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2.3 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 13/400 CON E1PB2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1 13/500 CON E4PB2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.3.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/300 E4B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 9/300 E4B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B16 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B17 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B18 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B19 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B21 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B22 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B23 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B24 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B25 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B26 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B27 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B20.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.1 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.7 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.8 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9 9/300 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 B2.12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.17 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.18 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.18.1 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.19 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.20 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.21 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.22 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.23 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.24 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.9.7 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7.6 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2.1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E2 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E3 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E4 13/400 CON E1PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E5 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E5.1 13/500 CON E3PBC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E6 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E7 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E8 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E9 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E10 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E11 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E12 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E13 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E14 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E15 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 155 27 170 12 182 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.08A MACUSANI SED 8A
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A1 9/300 E3 1 Nov 0 Dec 0 Dec Dec 0.424 Nov 1 Nov 0 Dec 0 Dec Dec 0.354 Nov
1 A2 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A2.1 9/200 E1 1 Nov 0 Dec 0 Dec Dec 0.424 Nov 1 Nov 0 Dec 0 Dec Dec 0.354 Nov
1 A2.2 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A3 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A4 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 A5 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A6 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A7 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B2 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B3 9/300 E5B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B4 9/300 E4B 1 Jul 0 Dec 0 Dec 0.424 Jul Dec 1 Jul 0 Dec 0 Dec 0.354 Jul Dec 0.784
1 B5 9/300 E6 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B6 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B7 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B8 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B9 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B10 9/300 E2 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Mar
1 B10.1 9/200 E1 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Mar
1 B10.2 9/200 E1B Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B10.3 9/300 E3B 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Jun 0
1 B11 9/200 E1 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Mar
1 B12 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar
1 B13 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar
1 B14 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Mar
1 B15 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Jan 0 Dec 0 Dec Dec 0.354 Dec
1 B16 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B5.1.1 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B5.1.2 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B5.1.3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B5.1.4 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B5.2.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B5.2.2 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B5.2.3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B5.2.4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B5.2.5 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B5.2.6 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B5.2.7 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B5.2.8 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B3.1 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B3.2 9/300 E3B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B2.1 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B2.2 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B2.3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C1 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C2 9/200 E1 1 Nov 0 Dec 0 Dec Dec 0.424 Nov 1 Nov 0 Dec 0 Dec Dec 0.354 Nov
1 C3 13/400 CON E5P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C3.1 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C3.2 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C3.3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C3.4 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C4 9/200 E1 1 Nov 0 Dec 0 Dec Dec 0.424 Nov 1 Nov 0 Dec 0 Dec Dec 0.354 Nov
1 C5 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C6 9/300 E5 1 Nov 0 Dec 0 Dec Dec 0.424 Nov 1 Nov 0 Dec 0 Dec Dec 0.354 Nov
1 C7 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C8 9/200 E1 1 Nov 0 Dec 0 Dec Dec 0.424 Nov 1 Nov 0 Dec 0 Dec Dec 0.354 Nov
1 C9 13/500 CON E4P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C10 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec -0.07 Mar Dec
1 C11 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1B 1 Jan 0 Dec 0 Dec 0.424 Jan 0.424 Jun 1 Jan 0 Dec 0 Dec 0.424 Jan 0.354 Jun
1 C13 13/500 CON E1P 0 Dec 0 Dec 0 Dec -0.424 Jun 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Jun
1 C15 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Jun
1 C16 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Jun
1 C17 9/300 E3 1 Jan 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Dec 0
1 C11.1 9/300 E4B 1 Jan 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Jun 0.784
1 C11.2 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Jun -0.784
1 C11.3 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Jun
1 C11.4 9/300 E3 1 Jan 0 Dec 0 Dec Dec 0.424 Mar 1 Jan 0 Dec 0 Dec Dec 0.354 Dec 0
1 C6.1 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C6.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C6.3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 C6.4 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C4.1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C4.2 9/300 E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D1 9/300 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.08A MACUSANI SED 8A
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 40 0 0 14.416 2.544 40 0 0 12.036 2.124 6.272
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 13 0 0 0.424 1.696 17 0 0 0.424 0 2.352
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 4 0 0 0 5.088 0 0 0 -0.07 2.124 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 -0.424 0.424 0 0 0 0 2.832 -0.784
EJECUTADO EN JULIO DE 2023 0 1 0 0 0.424 0 1 0 0 0.354 0 3.136

AVANCE TOTAL 0 58 0 0 14.84 9.752 58 0 0 12.744 7.08 11.76

METRADO TOTAL 1 61 0 0 15.264 10.6 61 0 0 12.744 8.85 12.544

EJECUTADO % 0% 95% 0% 0% 95% 95% 0% 0% 92% 82%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 9/300 E3 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 2 Dec 0 Dec 0 Dec
1 A2 13/500 CON E1P Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.2 13/500 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 9/300 E4 Nov 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Nov 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 A5 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/300 E3 Nov 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Nov 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B1 0 EC Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/300 E5B Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/300 E4B Jul Dec Dec Dec 1 Jul 0.76 Jul Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/300 E6 Nov 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Nov 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/300 E4B Jul 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 0 ET Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/300 E2 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 B10.1 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10.2 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10.3 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B15 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B16 13/500 CON E3P Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1.1 9/300 E4B Jul 0 Dec 0 Dec Dec 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1.2 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1.3 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1.4 9/300 E3 Jan Dec Dec Dec Dec 0.76 Jan 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B5.2.1 0 ET Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.2.2 9/300 E4 Nov 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Nov 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 B5.2.3 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.2.4 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.2.5 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.2.6 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.2.7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.2.8 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 B3.1 9/300 E4B Nov 0 Dec 0 Dec Dec 0 Dec 0.76 Nov 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.2 9/300 E3B Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.1 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3 9/300 E3 Nov 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Nov 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C1 13/500 CON E1P Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 13/400 CON E5P Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.1 9/300 E4 Jul 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 C3.2 9/200 E1B Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.3 9/200 E1 Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.4 9/300 E3 Nov 0 Dec 0 Dec 0 Dec 1 Aug 0.76 Nov 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec
1 C7 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C10 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C12 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C17 9/300 E3 Dec 0.784 Jan Dec 1 Aug Dec Dec 0.76 Aug 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C11.1 9/300 E4B Jan 0.784 Jun Dec 0 Dec 1 Jul 0.76 Jan 0.76 Jun 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.2 9/200 E1 Jun 0 Dec 0 Dec 0 Dec 0 Dec -0.76 Jun 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.4 9/300 E3 Dec 0.784 Jan Dec 1 Aug Dec Dec 0.76 Jun 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C6.1 9/300 E4 Aug 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Aug 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 C6.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.4 9/300 E3 Jan Dec Dec 0 Dec Dec 0.76 Jan 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C4.1 0 ET Dec 0 Dec 0 Dec Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 D1 9/300 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 6.272 0 0 0 0 6.08 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 2.352 1.568 0 0 0 2.28 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 -0.784 0.784 0 0 0 -0.76 1.52 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 3.136 0 0 8 2 3.04 0 0 0 3 2 0

AVANCE TOTAL 11.76 2.352 0 11 3 11.4 2.28 0 0 3 2 0

METRADO TOTAL 12.544 4.704 0 0 10 12.16 4.56 24 1 11 4 1

EJECUTADO % 82% 0% 0% 30% 82% 0% 0% 27% 50% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC 4E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 13/500 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2.2 13/500 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 9/300 E5B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0
1 B4 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0
1 B5 9/300 E6 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B8 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 B9 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10 9/300 E2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B10.3 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 B11 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B16 13/500 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.1.1 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 B5.1.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.1.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.1.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2.5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2.6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2.7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B5.2.8 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3.1 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 B3.2 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 B2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1 13/500 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 13/400 CON E5P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C9 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 C12 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C13 13/500 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C15 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C16 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C17 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11.1 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0
1 C11.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6.4 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D1 9/300 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 1 0 0 0 0 0 0 0 0 2 0 0

AVANCE TOTAL 1 0 0 0 0 0 0 0 0 2 0 0

METRADO TOTAL 1 5 0 3 1 1 0 11 2 6 1 0

EJECUTADO % 100% 0% 0% 0% 0% 0% 0% 0% 0% 33% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.015 Dec 0 Dec
1 A1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2.2 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A4 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0.0087 Dec 0 Dec
1 B2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0062 Dec 0 Dec
1 B3 9/300 E5B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.031 Dec 0 Dec
1 B4 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.029 Dec 0 Dec
1 B5 9/300 E6 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.016 Dec 0 Dec
1 B6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.031 Dec 0 Dec
1 B7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.031 Dec 0 Dec
1 B8 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0294 Dec 0 Dec
1 B9 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0.0036 Dec 0 Dec
1 B10 9/300 E2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0089 Dec 0 Dec
1 B10.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.029 Dec
1 B10.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0325 Dec
1 B10.3 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0345 Dec
1 B11 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B16 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1.1 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.1.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5.2.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0.0027 Dec
1 B5.2.2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0043 Dec
1 B5.2.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0361 Dec
1 B5.2.4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec
1 B5.2.5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.031 Dec
1 B5.2.6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0325 Dec
1 B5.2.7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0312 Dec
1 B5.2.8 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.031 Dec
1 B3.1 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3.2 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0365 Dec 0 Dec
1 B2.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.036 Dec 0 Dec
1 B2.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.036 Dec 0 Dec
1 C1 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.025 Dec 0 Dec
1 C2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 C3 13/400 CON E5P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0311 Dec 0 Dec
1 C3.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 C5 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.034 Dec 0 Dec
1 C6 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.034 Dec 0 Dec
1 C7 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0275 Dec 0 Dec
1 C8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.025 Dec 0 Dec
1 C9 13/500 CON E4P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 C10 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0.0091 Dec 0 Dec
1 C11 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.006 Dec 0 Dec
1 C12 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C15 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C17 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.1 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6.4 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4.1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 C4.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1 9/300 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 13 39 0 0 0 0 5 1 0.618 0.304

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC 4E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1 9/300 E3 0 Dec 0.011 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2 13/500 CON E1P 0 Dec 0.029 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec Dec
1 A2.1 9/200 E1 0 Dec 0.0318 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2.2 13/500 CON E3P 0 Dec 0.0342 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A3 0 ET 0 Dec 0.009 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4 9/300 E4 0 Dec 0.0047 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5 9/200 E1 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6 9/200 E1 0 Dec 0.029 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7 9/300 E3 0 Dec 0.0306 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3 9/300 E5B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5 9/300 E6 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B8 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10 9/300 E2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10.3 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B11 9/200 E1 0 Dec 0 Dec 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B12 9/200 E1 0 Dec 0 Dec 0.0305 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B13 9/200 E1 0 Dec 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B14 9/200 E1 0 Dec 0 Dec 0.032 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B15 9/200 E1 0 Dec 0 Dec 0.032 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B16 13/500 CON E3P 0 Dec 0 Dec 0.032 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.1.1 9/300 E4B 0.0165 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.1.2 9/200 E1B 0.0355 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.1.3 9/200 E1 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.1.4 9/300 E3 0.0342 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.2.1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.2.2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.2.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.2.4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.2.5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.2.6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.2.7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5.2.8 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.1 9/300 E4B 0 Dec 0.014 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3.2 9/300 E3B 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C1 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3 13/400 CON E5P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.1 9/300 E4 0 Dec 0.0215 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.2 9/200 E1B 0 Dec 0.0315 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.3 9/200 E1 0 Dec 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.4 9/300 E3 0 Dec 0.0272 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7 13/400 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9 13/500 CON E4P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C12 9/200 E1B 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C13 13/500 CON E1P 0 Dec 0.0336 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C14 9/200 E1 0 Dec 0.035 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C15 9/200 E1 0 Dec 0.035 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C16 9/200 E1 0 Dec 0.035 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C17 9/300 E3 0 Dec 0.035 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11.1 9/300 E4B 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11.2 9/200 E1 0 Dec 0.03 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11.3 9/200 E1 0 Dec 0.0315 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11.4 9/300 E3 0 Dec 0.0252 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.1 9/300 E4 0 Dec 0.0258 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.2 9/200 E1 0 Dec 0.034 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.3 9/200 E1 0 Dec 0.031 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6.4 9/300 E3 0 Dec 0.027 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4.1 0 ET 0 Dec 0 Dec 0.0108 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4.2 9/300 E3 0 Dec 0 Dec 0.01 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D1 9/300 CON E3P 0.025 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.145 0.822 0.210 0.000 0.000 0.000 0.000 17.33 3.103 14 24.234 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC 4E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2.2 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/300 E5B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/300 E6 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B8 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B9 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10 9/300 E2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10.1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B10.3 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B11 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B16 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1.1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.1.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2.2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2.4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2.5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2.6 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2.7 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5.2.8 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3.2 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 13/400 CON E5P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 9/300 E5 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 13/400 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 13/500 CON E4P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 13/500 CON E1P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C15 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C16 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C17 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11.1 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.1 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6.4 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4.1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4.2 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1 9/300 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 136 83 210 9 219 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.08B MACUSANI SED 8B
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A1 9/200 E1 1 Nov 0 Dec 0 Dec Dec 0.424 Nov 1 Nov 0 Dec 0 Dec Dec 0.354 Nov
1 A2 9/200 E1 1 Nov 0 Dec 0 Dec Dec 0.424 Nov 1 Nov 0 Dec 0 Dec Dec 0.354 Nov
1 A3 9/300 E4 1 Nov 0 Dec 0 Dec Dec 0.424 Nov 1 Nov 0 Dec 0 Dec Dec 0.354 Nov
1 A4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 A5 9/200 E1B2 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Nov 0 Dec 0 Dec Dec 0.354 Jun
1 A5.1 9/200 E1B2 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Nov 0 Dec 0 Dec Dec 0.354 Jun
1 A5.2 9/200 E1B2 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Nov 0 Dec 0 Dec Dec 0.354 Jun
1 A5.3 9/300 E3B2 1 Mar 0 Dec 0 Dec Dec 0.424 Mar 1 Mar 0 Dec 0 Dec Dec 0.354 Dec
1 A6 9/300 E4B2 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Nov 0 Dec 0 Dec Dec 0.354 Jun
1 A7 9/200 E1 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Nov 0 Dec 0 Dec Dec 0.354 Jun
1 A8 9/300 E3 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Nov 0 Dec 0 Dec Dec 0.354 Dec 0.784
1 B1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 B2 9/300 E1BC 1 Nov 0 Dec 0 Dec 0.424 Jan Dec 1 Nov 0 Dec 0 Dec 0.354 Jan Dec
1 B3 9/200 E1B2 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B4 9/200 E1B2 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B5 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B6 9/300 E3B2 1 Jul 0 Dec 0 Dec 0.424 Jul Dec 1 Jul 0 Dec 0 Dec 0.354 Jul Dec 0.784
1 B2.1 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B2.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 B2.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.4 9/300 E3B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C1 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C2 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C3 9/300 CON E4 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C5 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C6 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C7 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C8 9/300 CON E4BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C9 9/300 E4 1 Jan 0 Dec 0 Dec Dec 0.424 Jan 1 Nov 0 Dec 0 Dec Dec 0.354 Jun
1 C10 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C11 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C13 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C14 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C15 9/300 E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 C5.1 9/300 CON E3BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D2 9/300 CON E4B2 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D3 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D4 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D5 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D6 9/300 CON E4BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D7 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 D8 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D9 9/200 E1B Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D10 9/300 E4B Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D11 9/300 E4 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D12 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D13 9/300 E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 D9.1 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 E1 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec
1 F1 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 11 0 0 2.968 1.272 18 0 0 2.478 1.062 0.784
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 7 0 0 0.424 2.968 0 0 0 0.354 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 1 0 0 0 0.424 1 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 2.124 0
EJECUTADO EN JULIO DE 2023 0 1 0 0 0.424 0 1 0 0 0.354 0 1.568

AVANCE TOTAL 0 20 0 0 3.816 4.664 20 0 0 3.186 3.186 2.352

METRADO TOTAL 1 30 0 0 3.392 8.48 30 0 0 2.832 7.08 1.568

EJECUTADO % 0% 67% 0% 0% 71% 67% 0% 0% 64% 56%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 9/200 E1 Dec 0 Dec 0 Dec Dec Dec 0 Dec Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/200 E1 Dec 0 Dec 0 Dec Dec Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 9/300 E4 Dec 0.784 Nov Dec Dec Dec Dec 0.76 Nov 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 A4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 9/200 E1B2 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.1 9/200 E1B2 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.2 9/200 E1B2 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5.3 9/300 E3B2 Dec 0.784 Mar Dec Dec Dec Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/300 E4B2 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/300 E3 Jul 0 Dec 0 Dec Dec Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B1 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/300 E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/200 E1B2 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/200 E1B2 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/200 E1B Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/300 E3B2 Jul 0 Dec 0 Dec Dec Dec 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.1 9/200 E1B Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.2 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3 9/200 E1B Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.4 9/300 E3B Nov Dec Dec Dec 1 Jul 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/300 CON E4 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 C4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C7 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C8 9/300 CON E4BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C9 9/300 E4 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 C10 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C11 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C13 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C14 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C15 9/300 E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C5.1 9/300 CON E3BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D2 9/300 CON E4B2 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D3 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4 9/200 CON E1BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D5 9/200 CON E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6 9/300 CON E4BC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D7 9/300 E4B Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D8 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D9 9/200 E1B Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D10 9/300 E4B Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D11 9/300 E4 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec
1 D12 9/200 E1 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D13 9/300 E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 D9.1 9/300 CON E3 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 E1 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 F1 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.784 0.784 0 0 0 0.76 0.76 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0.784 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 1.568 0 0 0 1 1.52 0.76 0 0 0 0 0

AVANCE TOTAL 2.352 1.568 0 0 1 2.28 1.52 0 0 0 0 0

METRADO TOTAL 1.568 5.488 0 0 5 1.52 5.32 11 0 5 4 0

EJECUTADO % 56% 0% 0% 20% 56% 0% 0% 0% 0% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC 4E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.1 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.2 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 A5.3 9/300 E3B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 A6 9/300 E4B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 A7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 9/300 E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B4 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 9/300 E3B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 B2.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.4 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 C1 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 9/300 CON E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C7 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 C8 9/300 CON E4BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 C9 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C11 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C15 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5.1 9/300 CON E3BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0
1 D1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D2 9/300 CON E4B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 D3 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 D4 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 D5 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D6 9/300 CON E4BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 D7 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 D8 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D9 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 D10 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0
1 D11 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D13 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D9.1 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 E1 13/500 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 F1 13/500 CON E3P 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 0 0 0 2 0 0 0 15 4 6 0 0

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.015 Dec 0 Dec
1 A1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0287 Dec 0 Dec
1 A2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0285 Dec 0 Dec
1 A3 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.031 Dec 0 Dec
1 A4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0.0067 Dec 0 Dec
1 A5 9/200 E1B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0242 Dec 0 Dec
1 A5.1 9/200 E1B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0284 Dec 0 Dec
1 A5.2 9/200 E1B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 A5.3 9/300 E3B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0237 Dec 0 Dec
1 A6 9/300 E4B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0303 Dec 0 Dec
1 A7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0389 Dec 0 Dec
1 A8 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0354 Dec 0 Dec
1 B1 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B2 9/300 E1BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 9/200 E1B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/200 E1B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/300 E3B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.4 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 9/200 CON E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0287 Dec 0 Dec
1 C2 9/200 CON E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0285 Dec 0 Dec
1 C3 9/300 CON E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.031 Dec 0 Dec
1 C4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0.0081 Dec 0 Dec
1 C5 9/200 CON E1BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0226 Dec 0 Dec
1 C6 9/200 CON E1BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0284 Dec 0 Dec
1 C7 9/200 CON E1BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.03 Dec 0 Dec
1 C8 9/300 CON E4BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0237 Dec 0 Dec
1 C9 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0216 Dec 0 Dec
1 C10 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0.0024 Dec 0 Dec
1 C11 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0056 Dec 0 Dec
1 C12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0272 Dec 0 Dec
1 C13 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0255 Dec 0 Dec
1 C14 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.032 Dec 0 Dec
1 C15 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.032 Dec 0 Dec
1 C5.1 9/300 CON E3BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0303 Dec 0 Dec
1 D1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0.0092 Dec
1 D2 9/300 CON E4B2 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0124 Dec
1 D3 9/200 CON E1BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0306 Dec
1 D4 9/200 CON E1BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0318 Dec
1 D5 9/200 CON E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0323 Dec
1 D6 9/300 CON E4BC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0253 Dec
1 D7 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.022 Dec
1 D8 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0.0049 Dec
1 D9 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0082 Dec
1 D10 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0265 Dec
1 D11 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.018 Dec
1 D12 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0305 Dec
1 D13 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0215 Dec
1 D9.1 9/300 CON E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0.0314 Dec
1 E1 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 F1 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 2 3 26 0 0 0 0 5 1 0.719 0.314

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC 4E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec Dec
1 A3 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.1 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.2 9/200 E1B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5.3 9/300 E3B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6 9/300 E4B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A8 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B1 0 EC 0.0072 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2 9/300 E1BC 0.0135 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3 9/200 E1B2 0.0306 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4 9/200 E1B2 0.0318 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5 9/200 E1B 0.0323 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6 9/300 E3B2 0.0255 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.1 9/200 E1B 0.0281 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.2 9/200 E1 0.0275 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.3 9/200 E1B 0.0263 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.4 9/300 E3B 0.028 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C1 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3 9/300 CON E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C7 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C8 9/300 CON E4BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C9 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C10 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C11 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C13 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C14 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C15 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5.1 9/300 CON E3BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D2 9/300 CON E4B2 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D3 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D4 9/200 CON E1BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D5 9/200 CON E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6 9/300 CON E4BC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D7 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D8 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D9 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D10 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D11 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D12 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D13 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D9.1 9/300 CON E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 E1 13/500 CON E3P 0.0343 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 F1 13/500 CON E3P 0.0343 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.329 0.000 0.000 0.000 0.000 0.000 0.000 3.466 4.638 8 13.848 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC 4E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.1 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.2 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5.3 9/300 E3B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/300 E4B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B1 0 EC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2 9/300 E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B3 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B4 9/200 E1B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B5 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B6 9/300 E3B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.2 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.3 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 B2.4 9/300 E3B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C1 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C2 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C3 9/300 CON E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C6 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C7 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C8 9/300 CON E4BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C9 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C10 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C11 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C13 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C14 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C15 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 C5.1 9/300 CON E3BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D2 9/300 CON E4B2 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D3 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D4 9/200 CON E1BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D5 9/200 CON E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D6 9/300 CON E4BC Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D7 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D8 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D9 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D10 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D11 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D12 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D13 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 D9.1 9/300 CON E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 E1 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 F1 13/500 CON E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0

METRADO TOTAL 400 400 0 109 30 133 6 139 0 1 1

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.09 MACUSANI SED 09
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A1 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A2 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 A3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A4.1 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A4.2 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A4.3 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 A4.4 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A4.5 9/300 E4B 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Dec 0
1 A4.5.1 9/200 E1B 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Jun 0
1 A4.5.2 9/200 E1B 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Jun 0
1 A4.5.3 9/300 E3 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Jun 0
1 A4.6 9/300 E4B 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Jun 0
1 A4.7 9/200 E1 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Jun 0
1 A4.8 9/200 E1 1 Jan 0 Dec 0 Dec 0.424 Jan Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec 0
1 A4.9 9/200 E1 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Jun 0
1 A4.10 9/200 E1 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Jun 0
1 A4.11 9/300 E3 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Dec 0
1 A5 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A6 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 A7 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A8 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A9 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec
1 A10 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 A11 0 ET Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 A12 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A13 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A14 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A15 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A16 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A17 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A18 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 A12.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A12.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 A12.3 9/300 E3 1 Jan 0 Dec 0 Dec 0 Dec 0.424 Jan 1 Jan 0 Dec 0 Dec 0 Dec 0.354 Dec 0
1 B1 13/500 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B2.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B2.2 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B2.3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B2.4 13/400 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B3 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B5 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B6 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B6.1 13/400 CON E1P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B6.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B6.3 13/400 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B7 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 B8 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B8.1 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B9 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B10 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B11 9/300 E3B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B4.1 13/500 CON E1P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2 9/200 E1 1 Jan 0 Dec 0 Dec 0.424 Jan Dec 1 Jan 0 Dec 0 Dec 0.354 Jan Dec 0
1 B4.3 9/300 E5 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B4.3.1 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B4.4 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 B4.5 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 B4.6 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 C1.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 C1.2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 C1.3 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C2 0 EC Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
1 C3 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 C3.1 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 C3.2 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 C4 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 C5 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 C6 9/300 E3 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 D1 9/300 E4 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 D2 9/200 E1 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 D3 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 D4 9/300 E4B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 D5 9/300 E5B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 D5.1 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 D5.2 9/300 E3B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 D6 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION : AGO_23
PROYECTO : AFIANZAMIENTO DEL SUMINISTRO DE ENERGIA ELECTRICA DEL DISTRITO DE MACUSANI PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD : 17.09 MACUSANI SED 09
CONTRATISTA : CONSORCIO USA
SUPERVISION: : SERING

1.00 OBRAS 2.00 INSTALACIÓN DE POSTES


DESCRIPCION PRELIMINARES

CODIGO DE PARTIDA 1.01 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.1 3.01
N° ESTRUCTURA

Transporte de Poste de Almacen a punto de Excavación Izaje, identificación y señalización de poste Relleno y Compactación de Excavación

PRINCIPAL
N° DE SED

ARMADO
Izaje Poste
POSTE

Replanteo
Topográfico
0 CAC 9m MAD 8m MAD 11m Tipo I Tipo II CAC 9m MAD 8m MAD 11m Tipo I Tipo II Tipo I

0
1 D7 9/200 E1B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0
1 D8 9/300 E3B 1 Nov 0 Dec 0 Dec 0.424 Nov Dec 1 Nov 0 Dec 0 Dec 0.354 Nov Dec 0.784
1 E1 13/500 CON E3P Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec 0
0 0 0 0 Dec 0 Dec 0 Dec Dec Dec Dec 0 Dec 0 Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 56 0 0 23.744 0 56 0 0 19.824 0 10.192
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 12 0 0 0.848 4.24 12 0 0 0.708 0 2.352
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 2.478 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0.784

AVANCE TOTAL 0 68 0 0 24.592 4.24 68 0 0 20.532 2.478 13.328

METRADO TOTAL 1 68 0 0 23.744 5.088 68 0 0 19.824 4.248 12.544

EJECUTADO % 0% 100% 0% 0% 100% 100% 0% 0% 96% 100%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/300 E4 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec
1 A3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.3 9/300 E4 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec
1 A4.4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.5 9/300 E4B Dec 0.784 Jan Dec 1 Aug Dec Dec 0.76 Jun 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.5.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.5.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.5.3 9/300 E3 Dec 0.784 Jan Dec Dec 1 Jul Dec 0.76 Jun 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 A4.6 9/300 E4B Dec 0.784 Jan Dec Dec 1 Jul Dec 0.76 Jun 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.11 9/300 E3 Dec 0.784 Jan Dec 1 Aug Dec Dec 0.76 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 A5 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/300 E4 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec
1 A7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/300 E4B Jul 0 Dec 0 Dec 0 Dec 1 Jul 0.76 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A14 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A15 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A17 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A18 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 A12.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.3 9/300 E3 Dec 0.784 Jan Dec 1 Jul Dec Dec 0.76 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 B1 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.2 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.4 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.1 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.3 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B8.1 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 B9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/300 E3B Nov Dec Dec 0 Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.1 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.3 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec
1 B4.3.1 9/300 E3 Nov Dec Dec 1 Aug Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 B4.4 9/300 E4B Nov Dec Dec Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.6 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jun 0 Dec 0 Dec
1 C1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.3 9/300 E3 Jan 0 Dec 0 Dec 1 Jul 0 Dec 0.76 Jan 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C2 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2 9/300 E3 Nov Dec Dec 1 Jul Dec 0.76 Nov Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec
1 C4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/300 E3 Jan 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Jan 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec
1 D1 9/300 E4 Jan 0 Dec 0 Dec 1 Aug 0 Dec 0.76 Jan 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec
1 D2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0 Dec
1 D3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4 9/300 E4B Nov Dec Dec Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D5 9/300 E5B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D5.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D5.2 9/300 E3B Nov Dec Dec Dec 1 Jul 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
A DEL DISTRITO DE MACUSANI
PROYECTO
PROVINCIA DE CARABAYA REGIÓN PUNO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 3.00 INSTALACIÓN DE RETENIDAS

CODIGO DE PARTIDA 3.01 3.02 3.03 3.04 3.05 3.06 3.07 4.01 4.02 4.03 4.04 4.05
N° ESTRUCTURA

Excavación Instalación de Retenida Relleno y Compactación de

PRINCIPAL
N° DE SED

ARMADO
Retenidas
POSTE

0 I
Tipo Tipo II RI RV RIY / RVY Tipo I Tipo II E1 E2 E3 E4 E5

0
1 D7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D8 9/300 E3B Nov Dec Dec Dec 1 Aug 0.76 Nov Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E1 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec Dec Dec Dec Dec Dec Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 10.192 0 0 0 0 9.88 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 2.352 3.92 0 0 0 2.28 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 2.28 21 0 7 3 0
EJECUTADO EN JULIO DE 2023 0.784 0 0 5 4 0.76 0 8 0 2 1 0

AVANCE TOTAL 13.328 3.92 0 14 8 12.92 2.28 29 0 10 4 0

METRADO TOTAL 12.544 4.704 0 0 8 12.16 4.56 30 0 10 4 1

EJECUTADO % 100% 0% 0% 100% 91% 97% 0% 100% 100% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 RP01 SE-13CAC 4E3P 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A1 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A2 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0
1 A4.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0
1 A4.3 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.4 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.5 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0
1 A4.5.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 A4.5.2 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0 Dec 0
1 A4.5.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.6 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0
1 A4.7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A4.11 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A5 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A6 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A7 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A9 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0
1 A10 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0
1 A11 0 ET 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0
1 A13 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0
1 A14 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0
1 A15 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0
1 A16 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A17 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A18 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 A12.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B1 13/500 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.2 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B2.4 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B3 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B5 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6.1 13/400 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B6.3 13/400 CON E3P 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B7 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B8.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B9 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B10 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B11 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
1 B4.1 13/500 CON E1P 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.3 9/300 E5 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.3.1 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.4 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0
1 B4.5 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
1 B4.6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C1.3 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C2 0 EC 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.1 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C3.2 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C4 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C5 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 C6 9/300 E3 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D1 9/300 E4 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D2 9/200 E1 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
1 D3 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0
1 D4 9/300 E4B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0
1 D5 9/300 E5B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0
1 D5.1 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0
1 D5.2 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Jul 0 Dec 0 Dec 0
1 D6 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec 0
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

DESCRIPCION 4.00 MONTAJE DE ARMADOS

CODIGO DE PARTIDA 4.06 4.07 4.08 4.09 4.1 4.11 4.12 4.13 4.14 4.15 4.16 4.17
N° ESTRUCTURA

Armado Tipo

PRINCIPAL
N° DE SED

ARMADO
POSTE

0 E6 E1P E2P E3P E4P E5P E6P E1B E3B E4B E5B E6B

0
1 D7 9/200 E1B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0
1 D8 9/300 E3B 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0
1 E1 13/500 CON E3P 0 Dec 0 Dec 0 Dec 1 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 2 2 4 0 0

AVANCE TOTAL 0 0 0 3 0 0 0 11 3 6 1 0

METRADO TOTAL 0 5 0 3 0 0 0 13 3 6 1 0

EJECUTADO % 0% 0% 0% 100% 0% 0% 0% 85% 100% 100% 100% 0%


SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 RP01 SE-13CAC 4E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A1 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A2 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.3 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.4 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A4.5 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.5.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.5.2 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.5.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.6 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A4.11 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A5 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A6 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A7 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A9 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A10 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A11 0 ET Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec 0 Dec
1 A12 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A13 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A14 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A15 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A16 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A17 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A18 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 A12.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B1 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.2 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B2.4 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B3 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B5 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.1 13/400 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B6.3 13/400 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B7 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 B8 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B8.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B9 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B10 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B11 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.1 13/500 CON E1P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.3 9/300 E5 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.3.1 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.4 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.5 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 B4.6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C1.3 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C2 0 EC Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 1 Dec 0 Dec 0 Dec
1 C3 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.1 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C3.2 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C4 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C5 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 C6 9/300 E3 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D1 9/300 E4 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D2 9/200 E1 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D3 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D4 9/300 E4B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D5 9/300 E5B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D5.1 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D5.2 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D6 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

4.00 MONTAJE DE ARMADOS


DESCRIPCION 5.00 MONTAJE DE CONDUCTORES A

CODIGO DE PARTIDA 4.17 4.18 4.19 4.2 4.21 4.22 4.23 4.24 4.25 4.26 5.01 5.02
N° ESTRUCTURA

Armado Tipo Conduc

PRINCIPAL
N° DE SED

ARMADO
POSTE

PA (portalíneas CD (caja de
unipolares en derivación en ET (empalme EC (empalme 3x70+25/50 3x50+16/35
0E6B E4PB
postes de BT y postes de BT y
E1PB E3PB E5PB E6PB
en "T") en "Cruz") mm² mm²
MT) MT)
0
1 D7 9/200 E1B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 D8 9/300 E3B Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
1 E1 13/500 CON E3P Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec
0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec

EJECUTADO EN FEBRERO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000


EJECUTADO EN MARZO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN AGOSTO DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN SEPTIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN OCTUBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN NOVIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN DICIEMBRE DE 2022 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ENERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN FEBRERO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MARZO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN ABRIL DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN MAYO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JUNIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000
EJECUTADO EN JULIO DE 2023 0 0 0 0 0 0 0 0 0 0 0.000 0.000

AVANCE TOTAL 0 0 0 0 0 0 0 0 0 0 0.000 0.000

METRADO TOTAL 0 0 16 27 0 0 0 0 4 3 0.000 0.000

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 RP01 SE-13CAC 4E3P 0.015 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A1 0 ET 0.0049 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A2 9/300 E4 0.0034 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec 0 Dec Dec
1 A3 9/200 E1 0.036 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4 9/200 E1 0.037 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.1 9/200 E1B 0.0305 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.2 9/200 E1B 0.025 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.3 9/300 E4 0.0265 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.4 0 ET 0.0057 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.5 9/300 E4B 0.0055 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.5.1 9/200 E1B 0 Dec 0.034 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.5.2 9/200 E1B 0 Dec 0.0325 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.5.3 9/300 E3 0 Dec 0.032 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.6 9/300 E4B 0 Dec 0.0245 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.7 9/200 E1 0 Dec 0.0222 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.8 9/200 E1 0 Dec 0.0233 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.9 9/200 E1 0 Dec 0.0372 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.10 9/200 E1 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A4.11 9/300 E3 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A5 0 ET 0.0029 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A6 9/300 E4 0.0053 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A7 9/200 E1 0.0283 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A8 9/200 E1 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A9 9/200 E1B 0.0305 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A10 9/300 E4B 0.0302 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A11 0 ET 0.0036 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12 9/200 E1B 0.0045 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A13 9/300 E4B 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A14 9/200 E1B 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A15 9/200 E1B 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A16 9/200 E1 0 Dec 0.031 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A17 9/200 E1 0 Dec 0.031 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A18 9/300 E3 0 Dec 0.031 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.1 9/200 E1 0 Dec 0.03 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.2 9/200 E1 0 Dec 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 A12.3 9/300 E3 0 Dec 0.025 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B1 13/500 CON E1P 0 Dec 0.026 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2 9/200 E1 0 Dec 0.023 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.1 9/200 E1 0 Dec 0.02 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.2 13/400 CON E1P 0 Dec 0.024 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.3 9/200 E1 0 Dec 0.022 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B2.4 13/400 CON E3P 0 Dec 0.0285 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B3 0 EC 0 Dec 0.0028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4 9/200 E1 0 Dec 0.0089 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B5 13/400 CON E1P 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6 9/200 E1 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6.1 13/400 CON E1P 0 Dec 0.025 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6.2 9/200 E1 0 Dec 0.028 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B6.3 13/400 CON E3P 0 Dec 0.0294 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B7 0 EC 0 Dec 0.0039 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B8 9/200 E1 0 Dec 0.0042 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B8.1 9/300 E3 0 Dec 0.0325 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B9 9/200 E1 0 Dec 0.03 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B10 9/200 E1 0 Dec 0.0275 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B11 9/300 E3B 0 Dec 0.035 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.1 13/500 CON E1P 0 Dec 0.024 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.2 9/200 E1 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.3 9/300 E5 0 Dec 0.029 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.3.1 9/300 E3 0 Dec 0.0291 Jul 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.4 9/300 E4B 0 Dec 0.014 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.5 9/200 E1B 0 Dec 0.0345 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 B4.6 9/300 E3 0 Dec 0.0352 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C1 9/200 E1 0 Dec 0.038 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C1.1 9/200 E1 0 Dec 0.0325 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C1.2 9/200 E1 0 Dec 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C1.3 9/300 E3 0 Dec 0.036 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C2 0 EC 0 Dec 0.0055 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3 9/200 E1 0 Dec 0.0061 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.1 9/200 E1 0 Dec 0.036 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C3.2 9/300 E3 0 Dec 0.034 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C4 9/200 E1 0 Dec 0.036 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C5 9/200 E1 0 Dec 0.032 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 C6 9/300 E3 0 Dec 0.036 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D1 9/300 E4 0 Dec 0.0182 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D2 9/200 E1 0 Dec 0.028 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D3 9/200 E1B 0 Dec 0.0318 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D4 9/300 E4B 0 Dec 0.027 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D5 9/300 E5B 0 Dec 0.0118 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D5.1 9/200 E1B 0 Dec 0.0315 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D5.2 9/300 E3B 0 Dec 0.0282 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D6 9/200 E1B 0 Dec 0.035 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES (Comprende Tendido y puesta en Flecha) 6.00 INSTALACIÓN DE PUESTA A TIERRA 7.00 PASTORALES,
DESCRIPCION LUMINARIAS Y LAMPARAS

CODIGO DE PARTIDA 5.03 5.04 5.05 5.06 5.07 5.08 5.09 6.01 6.02 6.03 6.04 7.01
N° ESTRUCTURA

Conductor Autoportante de Aluminio Excavación Relleno y

PRINCIPAL
N° DE SED

ARMADO
Instalacion de compactación Instalación de
POSTE

puesta a tierra de puesta a pastoral de A°


Tipo PAT-1 tierra Tipo G°
0 3x35+16/25
mm²
3x25+16/25
mm²
3x16+16/25
mm²
2X16+16/25
mm²
2X16/25 mm² 1X16+16/25
mm²
1X16/25 mm² Tipo I Tipo II PAT-1

0
1 D7 9/200 E1B 0 Dec 0.036 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 D8 9/300 E3B 0 Dec 0.038 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
1 E1 13/500 CON E3P 0.026 Aug 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec
0 0 0 0 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec 0 Dec Dec Dec Dec Dec

EJECUTADO EN FEBRERO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN AGOSTO DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN SEPTIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN OCTUBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN NOVIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN DICIEMBRE DE 2022 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ENERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN FEBRERO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MARZO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN ABRIL DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN MAYO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JUNIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0
EJECUTADO EN JULIO DE 2023 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

AVANCE TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0

METRADO TOTAL 0.361 1.826 0.000 0.000 0.000 0.000 0.000 24.262 3.103 18 31.158 400

EJECUTADO % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SUSTENTO DE REDES SECUNDARIAS
MES DE VALORIZACION
PROYECTO
LOCALIDAD
CONTRATISTA
SUPERVISION:

7.00 PASTORALES, 8.00 CONEXIONES DOMICILIARIAS 10.00 PRUEBAS Y PUESTA EN


DESCRIPCION LUMINARIAS Y LAMPARAS SERVICIO.

CODIGO DE PARTIDA 7.01 7.02 8.01 8.02 8.03 8.04 8.05 8.06 8.07 10.01 10.02
N° ESTRUCTURA

Conexión de Acometidas Domiciliarias, Murete de


Instalación de Instalación de Expediente

PRINCIPAL
N° DE SED

ARMADO
Instalación de Configuración Contraste de Concreto de
Instalación de medidor medidor Pruebas y tecnico finales
POSTE

Luminaria, medidor de 1,65m de


pastoral de A° monofásico de trifásico de puesta en conforme a
Lámpara y energía activa - altura libre y
G° energia activa y energia activa y servicio obra (1 Original
Accesorios electrónico 0,30m de
0 Murete Corta Larga caja caja + 3 Copias)
profundidad

0
1 RP01 SE-13CAC 4E3P Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A1 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A2 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A3 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.3 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.4 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.5 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.5.1 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.5.2 9/200 E1B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.5.3 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.6 9/300 E4B Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.9 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.10 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A4.11 9/300 E3 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A5 0 ET Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A6 9/300 E4 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A7 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A8 9/200 E1 Dec Dec Dec Dec Dec Dec Dec Dec Dec
1 A9 9/200 E1

También podría gustarte