693465080.xlsx - 09/24/2023
ALCANTARILLADO
esquema
CANAL TRAPEZOIDAL
Velocidad Area
1.654 0.568
m/s m2
LOMGITUD DE TRANSICION
Lt = -2.40 m
blender ENGINEERING
693465080.xlsx - 09/24/2023
DE = E1 - E4 = -0.202 m
1
2
z
1
100.623
100
S=3‰
100.43
2.40
blender ENGINEERING
693465080.xlsx - 09/24/2023
2.50 102
1
2 3
Z
1
4
100
S
9
Qmáx
93.8% diam.
(m3/s)
0.51
1.50
2.94
5.80
9.50
R
[ohm-cm]
>2000
1500-2000
<1500
blender ENGINEERING
693465080.xlsx - 09/24/2023
.20
1.50
1.25
.20
1.02428 m
3.0 m
22.5 ° 0.39269908 rad
blender ENGINEERING
693465080.xlsx - 09/24/2023
2.50 102
1 2.00
3
z
4
100.4
1.50
S=3‰
102
S=3‰
10.00 2.40
blender ENGINEERING
693465080.xlsx - 09/24/2023
2.50 102
S
99.92
alcantarilla transic.
blender ENGINEERING
693465080.xlsx - 09/24/2023
blender ENGINEERING
693465080.xlsx - 09/24/2023
4
100.43
99.92
S=3‰
102
2.40
blender ENGINEERING
693465080.xlsx - 09/24/2023
input/output
SIFÓN INVERTIDO
Diseñar el sifón invertido con un camino vehicular
La pendiente del canal de acceso y salida es S=1‰
El lecho y los taludes son de tierra
Características del canal entrada y salida (sin revestir)
Q= 0.94 m3/s
b= 0.8 m
n= 0.025
z= 1.5 (canal)
S= 2‰
Las cotas de la solera del canal, según el perfil:
Progr. (m) 1040 46.725 msnm
Progr. (m) 1080 46.433 msnm
Solución
Con la información de relevamiento topográfico se realiza el predimensionamiento
previo. Si cumple con las condiciones hidráulicas, se acepta como solución,
de lo contrario se replantea realizando los ajustes necesarios
Esquema preliminar Fig. 1
Km 1+040 Km
3.00
47.419
1.5:1
1.5hv
46.719
46.344
.9144
45.304
5.00
3.70 4.89 1
1 2 3
.9144
45.304
5.00
blender ENGINEERING
693465080.xlsx - 09/24/2023
3.70 4.89 1
1 2 3
1 d
z
𝐴=(𝑏+𝑧𝑑)𝑑 (1)
𝑄= 1/𝑛 (((𝑏+𝑧𝑑)𝑑)^(5⁄3)
𝑆^(1⁄2))/(𝑏+2𝑑√(1+𝑧^2 ))^(2 (4)
⁄3)
Di = 0.8933 m
Usando tubería HDPE, se escoge un dámetro comercial
Di = 0.9144 m (36")
2.2 Recalculando área y velocidad
A= 0.657 m2
V= 1.431 m/s
3 LONGITUD DE TRANSICIONES
Ancho de espejos
T1 = b + 2zd1 (5) Canal trapezoidal
T1 = 2.645 m
blender ENGINEERING
693465080.xlsx - 09/24/2023
T2 = D Diametro tubería
T2 = 0.9144 m
La longitud de transición
𝐿𝑡= (𝑇_1−𝑇_2)/(2 (6)
tan𝛼 )
También Lt = 4D = 3.6576 m
Se escoge el mayor y redondeando:
Lt = 3.70 m
Entonces:
a= 13.399 °
47.419
Fig. 2
1.5hv
d1=.70
46.719
Hte
46.344
P
1 2
h= 1.040 m
Reemplazando en:
Cota fondo (3) = Cota de fondo (2) - h (13)
Cota fondo (3) = 45.247 msnm
h= 0.832 m
Reemplazando en:
Cota fondo (5) = Cota de fondo (4) + h (16)
Cota fondo (5) = 46.028 msnm
47.140
m
d6=.70
46.440
Hts
46.086
P
47.140
d6=.70
blender ENGINEERING
693465080.xlsx - 09/24/2023 46.440
Hts
46.086
P
5 6
10 COMPROBACIÓN DE P
P = Cota fondo (6) - Cota fondo (5) (18)
P= 0.416 m
DH = 0.174 m
ℎ_𝑓= 〖 10.67(𝑄/
(𝐶×𝐷^2.6296 )) 〗 ^1.852×𝐿
L= 19 m C= 140 para HDPE
Reemplazando
hf = 0.02963 m
Datos: q1 = q2 = 12 °
Para 2 codos:
hL = 0.0191 m
blender ENGINEERING
693465080.xlsx - 09/24/2023
14 SUMERGENCIA DE SALIDA
De la Fig. 3
cos〖𝜃 _2=
𝐷_𝑖/𝐻_𝑡𝑒 〗
Datos: q2 = 9 ° de predim. Di = 0.9144 m
Hte = 0.926 m
Altura de sumergencia en la salida:
m = d6 + P - Hte
m= 0.10 m
Este valor no debe exceder a
Hte / 6 = 0.154 m OK
Por lo tanto:
El trazado preliminar cumple con los requisitos hidráulicos, lo cual
constituye la solución al problema
blender ENGINEERING
693465080.xlsx - 09/24/2023
Km 1+060
7.20 3.00
47.553
47.140
1.5:1
46.086
.9144 12°0'0"
45.254
4.00
10.00 3.912 3.70
4 5
.9144 12°0'0"
45.254
Km 1+070
47.140
46.440
°0'0"
3.70
6
°0'0"
blender ENGINEERING
3.70 693465080.xlsx - 09/24/2023
6