Está en la página 1de 4

Cálculo de Fundaciones Aisladas

SOLICITACIONES
V= 8.90 Ton. AXIAL
H= 1.64 Ton. CORTE
M= 3.05 Ton-mt. MOMENTO
DIMENSIONES
H1 = 0.6 mt. OK
B1 = 1.6 mt.
L1 = 1.2 mt.

H2 = 0.25 mt.
B2 = 0.4 mt.
L2 = 0.2 mt.

D= 0.25 mt. OK

Wf = 2.81 Ton. ZAPATA MAS PEDESTAL


Wg = 0.83 Ton. SUELO
Wt = 12.54 Ton. CARGA TOTAL

Mt = 4.44 Ton-mt. MOMENTO TOTAL

e= 0.3536 mt.

b/6= 0.267 mt. TRIANGULO o Aumentar B1


COMPRESION smax = 18.08 Ton/mt2 1.81 Kgf/cm2

TRACCION smin = -5.02 Ton/mt2 -0.50 Kgf/cm2

CAPACIDAD DE SOPORTE ADMISIBLE DE FUNDACIONES

DIMENSIONES DATOS SUELO


B= 1.2 m g = 1.8 T/m3
L= 1.2 m C = 0 T/m3
Df = 1 m f = 27 grados

PARAMETROS SEGÚN HANSEN CAPACIDAD DE SOPORTE

Nq = 13.20 Q trabajo = 59.04 T/m2


Nc = 23.94
Ng = 9.32 F.S. = 3
Sc = 1.55
Sq = 1.51 Qadm = 19.68 T/m2
Sg = 1.4
dc = 1.33 Qadm = 1.97 Kgf/cm2
dq = 1.25
dg = 1 smax = 1.81 Kgf/cm2 OK
Cálculo de Fundaciones Aisladas

SOLICITACIONES
P= 8.90 Ton. AXIAL
V= 1.64 Ton. CORTE
M= 3.05 Ton-mt. MOMENTO
DIMENSIONES
H1 = 0.6 mt.
B1 = 1.6 mt.
L1 = 1.2 mt.

H2 = 0.25 mt.
B2 = 0.4 mt.
L2 = 0.2 mt.

D= 0.25 mt.

Wf = 2.81 Ton. ZAPATA MAS PEDESTAL


Wg = 0.83 Ton. SUELO
Wt = 12.54 Ton. CARGA TOTAL

Mt = 4.44 Ton-mt. MOMENTO TOTAL

e= 0.35 mt.
b/4 = 0.40 mt. OK
b/6= 0.27 mt. OK
b' = 1.34 mt. ANCHO COMPRIMIDO

b'/b = 83.70 % CUMPLE CON EL 80% MINIMO A COMPRESION


COMPRESION smax = 15.61 Ton/mt2 1.56 Kgf/cm2

TRACCION smin = 3.04 Ton/mt2 0.30 Kgf/cm2

CAPACIDAD DE SOPORTE ADMISIBLE DE FUNDACIONES

DIMENSIONES DATOS SUELO


B= 1.2 m g = 1.8 T/m3
L= 1.2 m C = 0 T/m3
Df = 1 m f = 27 grados

PARAMETROS SEGÚN HANSEN CAPACIDAD DE SOPORTE

Nq = 13.20 Q trabajo = 59.04 T/m2


Nc = 23.94
Ng = 9.32 F.S. = 3
Sc = 1.55
Sq = 1.51 Qadm = 19.68 T/m2
Sg = 1.4
dc = 1.33 Qadm = 1.97 Kgf/cm2
dq = 1.25
dg = 1 smax = 1.56 Kgf/cm2 OK
NIMO A COMPRESION
CAPACIDAD DE SOPORTE ADMISIBLE DE FUNDACIONES

DIMENSIONES DATOS SUELO


B = 1.6 m g= 1.8 T/m3
L = 1.2 m C= 0 T/m3
Df = 0.85 m f= 27 grados

PARAMETROS SEGÚN HANSEN

Nq = 13.20 CAPACIDAD DE SOPORTE


Nc = 23.94
Ng = 9.32 Q trabajo = 59.97 T/m2
Sc = 1.74
Sq = 1.68 F.S. = 3
Sg = 1.53333
dc = 1.21 Qadm = 19.99 T/m2
dq = 1.16
dg = 1 Qadm = 2.00 Kgf/cm2

TRAPECIO smax = 1.81 Kgf/cm2 OK


TRIANGULO smax = 1.56 Kgf/cm2 OK