Documentos de Académico
Documentos de Profesional
Documentos de Cultura
2 m
Cap. Port = 25 T/m2
Pd = 70 T Peso Suelo= 1.8 T/m3
Pl = 25 T f´c = 210 kg/cm2
fy = 4200 kg/cm2
Datos C2 : s/c = 0.2 T/m2
Pd = 120 T
Pl = 40 T
Az= 4.264 m2
B =2L
L= 1.46012223
Asumimos : 1.50 m
B= 3.00 m
h = L1/7 0.94 m
h = L1/9 0.73 m
asumimos: 0.90 m
𝒃=𝑷𝒆/𝟑𝟏𝑳𝒄 0.46 m
asumimos : 0.40 m
95T 160T
95T 160T
0.25 6.60 m
R2 154.81
R1 = 106.1 T
Az= 7.181 m2
L= 2.67980009
asumimos= 2.80
5. Diseño de la Viga
Pu1 = 140.5 T
Pu2 = 236 T
Wu = 1.2138 T/m
236T
140.5T
0.25 6.6
Ru2 = 228.12
Ru1 156.67 T
140.5T Mmax
x
0.25 V=0
𝑃𝑢+𝑊𝑣∗𝑋=𝑞𝑢∗𝑋
𝑋= 𝑃𝑢/(𝑞𝑢 −𝑊𝑢)
X= 1.36 m
𝑀𝑚𝑎𝑥=𝑞𝑢∗𝑋^2/2 −Pu∗(X−0.25)−(𝑊𝑢∗𝑋^2)/2
Mmax = 60.49 T -m
As = 20.52 cm2
As = 21.56 cm2
ρ= 0.00641667
ρmin = 0.00335714 OK
Usaremos : "4∅3/4"
As = 11.4 cm2
T
T/m