Drenaje Menor Yali
Drenaje Menor Yali
34
Estructura existente : 1 TCR 60"
Estructura Propuesta: 1 TCR Φ 60"
Longitud: 16.25
Pendiente: 2.00%
Esviaje: Normal
Clase II
CANTIDADES DE OBRA
Excavacion de Estructuras (m3): 0
Lecho (m3): 0
Relleno (m3): 0.00
Mamposteria (m3): 27.22
Canales Menores a 4m. (m3): 0
Remocion de Estructuras (C/U): 1
Remocion Cabezales (C/U): 2
ED-011 0.00
ED-058 0.00
ED-059 22+813.93 12.50 2.00% Normal Normal 0°00´0" 10.00
ED-059A 23+414.30 13.75 2.00% Normal Normal 0°00´0" 11.00
ED-060 0.00
ED-060 A 24+822.52 13.75 2.00% Normal Normal 0°00´0" 11.00
ED-060B R 25+082.56 13.75 2.00% Normal Normal 0°00´0" 11.00
ED-061 25+294.75 15.00 5.00% Normal Normal 0°00´0" 12.00
ED-061A 25+820.00 12.50 2.00% Normal Normal 0°00´0" 10.00
ED-062 0.00
ED-062 A 28+481.95 15.00 2.00% Normal Normal 0°00´0" 12.00
ED-001N 0+232.00 12.50 1.00% Normal
Canal Riego
ED-002N 0+524.00 12.50 2.50% Normal
ED-003N 0+698.00 12.50 0.50% Normal
ED-004N 1+272.73 12.50 0.50% Normal
Estructura
Qcambio Climatico=Q*Kc Estructura Propuesta H D
Existente
Si se encuentra en buen
Cabezal de salida colapsado, Mamp.
0.85 estado estructural,
Fisurada, Conformar entrada L= 20m
mantener
Mamp. Y tuberia fisurada, Verificar área
0.84
h
0.95
Mamp. Fisurada, Tuberia fisurada,
0.89
Verificar área h
Tuberia y Mamp. Fisurada, Verificar
1.03
área h
Mamp. Fisurada, Verificar área h,
0.83
Sedimentada 40%
Mamp. Y tuberia fisurada, Verificar área
0.87
h
Mamp. Fracturada insuficente, Verificar
0.89
área h
0.94 Sedimentada 40%, Verificar área h
Verificar área h, Conformar canal,
0.86
Mamp. Fisurada
0.82 Elevar rasante
Verificar área h, Mamp. Y tuberia
0.92
fisurada
0.87 Mamp. fisurada
0.87 Cruce
Verificar área h, se observa que hay
0.75
restos de ED colapsado
Fracturado, Proponer ALC, Construir
0.83
tragante
0.66
0.94 Elevar Rasante, Verificar área h
0.94 Elevar Rasante, Verificar área h
1.06 Erosionado en salida, Verificar área h
0.91 Verificar áea h, Reemplazar por ALC
0.91 Verificar área h, Proponer ALC
0.69 Reemplazar por ALC
0.92 Verificar área h
0.46
0.95 Verificar área h
0.34 Construir muro de contencion
0.95
1.00 Verificar area h
0.95
0.57
0.86
0.96 Mamp. Fisurada, Verificar área h
0.36
0.99 Verificar área h, Vado fracturado
0.85 Verificar área h, Reemplazar por ALC
0.59 Reemplazar por ALC
0.93
0.51
0.86
0.51
0.36
1.04 Verificar área h
0.57 Curva Vertical Concava
1.01
0.87 Verificar área h
0.91 Verificar area h, Reemplazar por ALC
0.83
0.93 Fracturado severamente
Mamp y tuberia fracturada, Verificar
0.96
área h
0.67
0.99 Fracturado severamente
0.96 Fracturado severamente
0.99 Mal estado
0.78
0.74 Verifica área h
0.59 Reemplazar por ALC
Mamposteria y tuberia fisurada, Verificar
área h
0.95
0.91 Verificar área h, Reemplazar por ALC
0.89 Verificar área h, Reemplazar
0.85
Verificar área h, Fracturada
0.87
severamente
Conformar canal entrada sedimentada
70% (basura)
0.77 Elevar rasante, Construir ALC
0.63 Elevar rasante, Construir ALC
Verificar área h
0.98 Elevar rasante
0.85 Curva Vertical Concava
0.92 Verificar área h
0.85
Reemplazar por ALC
0.73 Elevar rasante
1.03
Mantener dimensiones y caractrísticas
del canal
0.96
0.49
1.01
Cruce Estructura Existente No tubos Diámetro
ED-002 1 TCR 30" 1 30" Diámetro
ED-003 1 TCR 30" 1 30"
ED-004 1 TCR 30" 1 30" 30"
3 36"
42"
ED-005 1 TCR 36" 1 36" 48"
ED-006 1 TCR 36" 1 36" 60"
ED-007 1 TCR 36" (Aprox) 1 36" Mixta
Se desconoce, Azolvadas
ED-008 1 TCR 36" 1 36" 100%
ED-015 1 TCR 36" 1 36" Vados
ED-016 1 TCR 36" 1 36" Puente (9 TCR 72")
ED-017 1 TCR 36" 1 36" Total Existente
ED-020 1 TCR 36" 1 36" Nuevas propuestas
ED-048 1 TCR 36" 1 36" Total
9
SECCION II
LISTA DE CANTIDADES Y PRECIOS
LISTA DE CANTIDADES Y PRECIOS
MINISTERIO DE TRANSPORTE E INFRAESTRUCTURA
CONTRATO N 25-011-2020
PROGRAMA DE MEJORAMIENTO Y REHABILITACION DE CARRETERAS
TRAMO: SAN SEBASTIAN DE YALI-CONDEGA 25.39KM
ALCALDIA DE CONDEGA, LONGITUD 16.39KM
MCA 4: Trabajos Administrativos, Movimiento de Tierra 18+835-22+115 ( Long: 3.28 Km), Estructura de Pavimento: Mejoramiento de la Superficie
( Estabilizacion con Cemento de Capa Granular Existente), Capa de Agregados Tratados con Cemento 18+835-22+115 ( Long: 3.28Km), Cemento
18+835-22+115( Long: 3.28Km) Drenaje Menor 18+835-22+115 (Long: 3.28Km)
COSTO DESVIO PROVISIONAL CONDEGA CANTIDAD
Codigo Concepto de Obra Unidad de Medida TOTAL Costo Unitario Costo Total
DRENAJE MENOR 1,140,100.37
202(2) Remocion de Alcantarillas c/u 0.00 19,441.79 0.00
202(2A) Remocion de Cabezales de Alcantarillas c/u 0.00 8,574.99 0.00
202(2B) Remocion de Vado c/u 0.00 1,248.36 0.00
203(14) Canales Menores de 4m m³ 0.00 318.35 0.00
207(1) Excavacion para Estructuras m³ 120.00 429.91 51,589.20
207(3) Relleno para Cimientos m³ 0.00 1,240.24 0.00
608(1) Mamposteria Clase A m³ 218.12 3,568.98 778,465.92
701(1-A2) Tuberia de Concreto Reforzado de 76cm (30), Clase 2 ml 0.00 3,861.45 0.00
701(1-1B2) Tuberia de Concreto Reforzado de 91cm (36), Clase 2 ml 0.00 4,654.31 0.00
701(1-1C2) Tuberia de Concreto Reforzado de 106cm (42), Clase 2 ml 0.00 4,999.38 0.00
701(1-1D2) Tuberia de Concreto Reforzado de 122cm (48), Clase 2 ml 0.00 7,549.49 0.00
701(1-1E2) Tuberia de Concreto Reforzado de 137cm (54), Clase 2 ml 0.00 11,413.77 0.00
701(1-1F2) Tuberia de Concreto Reforzado de 152cm (60), Clase 2 ml 25.00 12,401.81 310,045.25
701(16) Material de Lecho de Tuberia Clase B m³ 0.00 970.41 0.00
701(18) Material de Relleno de Alcantarillas m³ 0.00 485.02 0.00
COSTO DIRECTO 1,140,100.37
COSTO INDIRECTO
TOTAL SIN IMPUESTOS
EXONERADO/ IVA (15%)
TOTAL CON IMPUESTOS
1,259,954.55
ESTRUCTURA
ITEM
CODIGO ESTACION EXISTENTE PROPUESTA
DISEÑO
TOTAL
INSTALACION DE TUBERIA
ESVIAJE PENDIENTE LONGITUD
36" 42" 48" 54" 60"
3.75 3.75
3.75 3.75
13.75 13.75
13.75 13.75
13.75 13.75
18.75 37.5
13.75 13.75
13.75 13.75
26.25 26.25
13.75 13.75
13.75 27.50
17.50 17.50
16.25 16.25
13.75 13.75
13.75 13.75
13.75 13.75
17.50 35
13.75 13.75
15.00 15.00
18.75 18.75
21.25 21.25
21.25 21.25
13.75 13.75
13.75 13.75
13.75 13.75
13.75 13.75
22.50 22.50
21.25 42.50
11.25 11.25
12.50 12.50
12.50 12.50
41.25 41.25
13.75 13.75
13.75 13.75
0.00 0.00
ESTRUCTURA
16.25 16.25
17.50 17.50
17.50 17.50
13.75 13.75
15.00 15.00
15.00 30
18.75 37.5
18.75 18.75
0.00
12.50 12.50
0.00
12.50 12.50
15.00 15.00
0.00
13.75 13.75
15.00 15.00
16.25 16.25
18.75 37.5
23.75 47.5
17.50 17.50
12.50 12.50
15.00 30
13.75 13.75
13.75 13.75
13.75 13.75
20.00 40
16.25 16.25
16.25 16.25
0.00
13.75 13.75
15.00 15.00
13.75 13.75
13.75 13.75
13.75 13.75
12.50 12.50
13.75 13.75
12.50 12.50
13.75 13.75
12.50 12.50
0.00
15.00 15.00
12.50 12.50
0.00
13.75 13.75
13.75 13.75
12.50 12.50
0.00
13.75 13.75
0.00
15.00 15.00
13.75 13.75
15.00 15.00
13.75 13.75
16.25 16.25
15.00 15.00
15.00 15.00
27.50 27.50
16.25 16.25
15.00 15.00
15.00 15.00
13.75 13.75
13.75 13.75
15.00 15.00
15.00 15.00
16.25 16.25
13.75 13.75
13.75 13.75
15.00 15.00
12.50 12.50
15.00 15.00
13.75 13.75 11
0.00
18.75 18.75
13.75 13.75
16.25 16.25
13.75 13.75
15.00 15.00
0.00
12.50 12.50
13.75 13.75
0.00
13.75 13.75
13.75 13.75
15.00 15.00
12.50 12.50
0.00
15.00 15.00
12.50 12.50
12.50 12.50
12.50 12.50
12.50 12.50
462.50 43.75 128.50 100.00 132.50 250.00 128.75
EXCAVACION PARA CANALES
LECHO RELLENO MAMPOSTERIA MENORES A REMOCION
ESTRUCTURAS 4m
0 0 0.00 27.22 0 1
0 0 0.00 14.16 0
2
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
Bajante
2.00
DIMENSIONES TUBERIA DIMENSIONES CABEZAL
ALC. DE ALTURA BASE m.
DI m AREA TUB. CORONA DIY
PULG. m m. H 0.45H
24" 0.61 0.77 0.47 0.4 1.74 0.78 0.69
30" 0.76 0.94 0.69 0.4 1.9 0.86 0.85
36" 0.91 1.11 0.97 0.4 2.06 0.93 1.01
42" 1.07 1.29 1.31 0.4 2.23 1.00 1.18
48" 1.22 1.48 1.72 0.4 2.4 1.08 1.35
54" 1.37 1.65 2.14 0.4 2.56 1.15 1.51
60" 1.52 1.82 2.6 0.4 2.72 1.22 1.67
72" 1.83 2.19 3.77 0.4 3.05 1.37 2.01
84" 2.13 2.54 5.07 0.4 3.21 1.44 2.35
DIAMETRO AREA
36 0.65
42 0.9
48 1.17 2.34 2.15X1.75
54 1.47 3.7625
60 1.81
72 2.63
0
S(DIENTE)
0.35
0.35
0.35
0.35
0.35
0.45
0.45
0.45
0.45
EXCAVACION PARA ESTRUCTURAS
ANCHO
LONGITUD 0.45 DE 0.45
DI
ALTURA
DI
VOLUMEN
24.12
30.75
61.08
77.09
87.03
365.7
90.65
159.19
247.46
170.52
154.22
136.83
102.89
66.61
69.92
67.16
360.8
80.7
85.02
141.71
199.04
167.86
94.8
62.74
77.39
89.27
307.7
126
53.37
46.98
74.87
378.08
116.63
69.37
4,443.55
LONGITUD TUBO
DE
DRENAJE ESTRUCTURA ESTACION LONG. TUB LONG. LECHO ANCHO ALTURA VOLUMEN
(DE)
0 VADO TIPO I 0+319 0.00 -1.86 0 0 0
Canal
0 Rectangular de Mamposteria de (0.40+305
x 0.4)m 0.00 -2.16 0 0 0
ED-Y1 1-91 cm ( 36 ' ) TCR 0+776 3.75 1.89 2.01 0.26 0.99
ED-Y2 1-91 cm ( 36 ' ) TCR 1+076 3.75 1.89 2.01 0.26 0.99
ED-Y3 1-91 cm ( 36 ' ) TCR 1+236 13.75 11.89 2.01 0.26 6.21
ED-Y4 1-107 cm ( 42 ' ) TCR 1+618 13.75 11.75 2.19 0.28 7.21
ED-Y5 1-107 cm ( 42 ' ) TCR 1+855 13.75 11.75 2.19 0.28 7.21
ED-Y6 2-152 cm ( 60 ' ) TCR 2+040 18.75 16.31 5.3 0.33 28.53
ED-Y7 1-91 cm ( 36 ' ) TCR 2+614 13.75 11.89 2.01 0.26 6.21
ED-Y8 1-91 cm ( 36 ' ) TCR 2+810 13.75 11.89 2.01 0.26 6.21
ED-Y9 1-91 cm ( 36 ' ) TCR 2+916 26.25 24.39 2.01 0.26 12.75
ED-Y10 1-91 cm ( 36 ' ) TCR 3+047 13.75 11.89 2.01 0.26 6.21
ED-Y11 2-107 cm ( 42 ' ) TCR 3+284 13.75 11.75 4.02 0.28 13.23
ED-Y12 1-91 cm ( 36 ' ) TCR 3+545 17.50 15.64 2.01 0.26 8.17
ED-Y13 1-91 cm ( 36 ' ) TCR 3+762 16.25 14.39 2.01 0.26 7.52
ED-Y14 1-91 cm ( 36 ' ) TCR 3+992 13.75 11.89 2.01 0.26 6.21
ED-Y15 1-91 cm ( 36 ' ) TCR 4+073 13.75 11.89 2.01 0.26 6.21
ED-Y16 1-91 cm ( 36 ' ) TCR 4+219 13.75 11.89 2.01 0.26 6.21
ED-Y17 2-152 cm ( 60 ' ) TCR 4+541 17.50 15.06 5.3 0.33 26.34
ED-Y18 1-107 cm ( 42 ' ) TCR 4+741 13.75 11.75 2.19 0.28 7.21
ED-Y19 1-91 cm ( 36 ' ) TCR 4+975 15.00 13.14 2.01 0.26 6.87
ED-Y20 1-91 cm ( 36 ' ) TCR 5+360 18.75 16.89 2.01 0.26 8.83
ED-Y21 1-91 cm ( 36 ' ) TCR 5+512 21.25 19.39 2.01 0.26 10.13
ED-Y22 1-91 cm ( 36 ' ) TCR 5+829 21.25 19.39 2.01 0.26 10.13
ED-Y23 1-91 cm ( 36 ' ) TCR 6+154 13.75 11.89 2.01 0.26 6.21
ED-Y24 1-91 cm ( 36 ' ) TCR 6+342 13.75 11.89 2.01 0.26 6.21
ED-Y25 1-91 cm ( 36 ' ) TCR 6+500 13.75 11.89 2.01 0.26 6.21
ED-Y26 1-91 cm ( 36 ' ) TCR 6+620 13.75 11.89 2.01 0.26 6.21
ED-Y27 1-91 cm ( 36 ' ) TCR 6+821 22.50 20.64 3.58 0.26 19.21
ED-Y28 2-91 cm ( 36 ' ) TCR 7+097 21.25 19.39 2.01 0.26 10.13
ED-Y29 PROPUESTA DE 1-36" 7+345 11.25 9.39 2.01 0.26 4.91
ED-Y30 1-91 cm ( 36 ' ) TCR 8+012 12.50 10.64 2.01 0.26 5.56
ED-Y31 1-91 cm ( 36 ' ) TCR 8+073 12.50 10.64 2.01 0.26 5.56
ED-Y32 1-91 cm ( 36 ' ) TCR 8+244 41.25 39.39 2.01 0.26 20.59
ED-Y33 1-91 cm ( 36 ' ) TCR 8+519 13.75 11.89 2.01 0.26 6.21
ED-Y34 1-91 cm ( 36 ' ) TCR 8+700 13.75 11.89 2.01 0.26 6.21
VOLUMEN TOTAL 302.8
LONGITUD TUBO
DE
DRENAJE ESTRUCTURA ESTACION LONG. TUB LONG. LECHO ANCHO ALTURA VOLUMEN
0 VADO TIPO I
Canal 0
Rectangular de Mamposteria de (0.4 x 0.4)m
ED-Y1 1-91 cm ( 36 ' ) TCR 0+776 3.75 1.89 2.01 0.5 3.77
ED-Y2 1-91 cm ( 36 ' ) TCR 1+076 3.75 1.89 2.01 0.5 3.77
ED-Y3 1-91 cm ( 36 ' ) TCR 1+236 13.75 11.89 2.01 0.5 13.82
ED-Y4 1-107 cm ( 42 ' ) TCR 1+618 13.75 11.75 2.19 0.5 15.06
ED-Y5 1-107 cm ( 42 ' ) TCR 1+855 13.75 11.75 2.19 0.5 15.06
ED-Y6 2-152 cm ( 60 ' ) TCR 2+040 18.75 16.31 5.3 0.5 49.69
ED-Y7 1-91 cm ( 36 ' ) TCR 2+614 13.75 11.89 2.01 0.5 13.82
ED-Y8 1-91 cm ( 36 ' ) TCR 2+810 13.75 11.89 2.01 0.5 13.82
ED-Y9 1-91 cm ( 36 ' ) TCR 2+916 26.25 24.39 2.01 0.5 26.38
ED-Y10 1-91 cm ( 36 ' ) TCR 3+047 13.75 11.89 2.01 0.5 13.82
ED-Y11 2-107 cm ( 42 ' ) TCR 3+284 13.75 11.75 4.02 0.5 27.64
ED-Y12 1-91 cm ( 36 ' ) TCR 3+545 17.50 15.64 2.01 0.5 17.59
ED-Y13 1-91 cm ( 36 ' ) TCR 3+762 16.25 14.39 2.01 0.5 16.33
ED-Y14 1-91 cm ( 36 ' ) TCR 3+992 13.75 11.89 2.01 0.5 13.82
ED-Y15 1-91 cm ( 36 ' ) TCR 4+073 13.75 11.89 2.01 0.5 13.82
ED-Y16 1-91 cm ( 36 ' ) TCR 4+219 13.75 11.89 2.01 0.5 13.82
ED-Y17 2-152 cm ( 60 ' ) TCR 4+541 17.50 15.06 5.3 0.5 46.38
ED-Y18 1-107 cm ( 42 ' ) TCR 4+741 13.75 11.75 2.19 0.5 15.06
ED-Y19 1-91 cm ( 36 ' ) TCR 4+975 15.00 13.14 2.01 0.5 15.08
ED-Y20 1-91 cm ( 36 ' ) TCR 5+360 18.75 16.89 2.01 0.5 18.84
ED-Y21 1-91 cm ( 36 ' ) TCR 5+512 21.25 19.39 2.01 0.5 21.36
ED-Y22 1-91 cm ( 36 ' ) TCR 5+829 21.25 19.39 2.01 0.5 21.36
ED-Y23 1-91 cm ( 36 ' ) TCR 6+154 13.75 11.89 2.01 0.5 13.82
ED-Y24 1-91 cm ( 36 ' ) TCR 6+342 13.75 11.89 2.01 0.5 13.82
ED-Y25 1-91 cm ( 36 ' ) TCR 6+500 13.75 11.89 2.01 0.5 13.82
ED-Y26 1-91 cm ( 36 ' ) TCR 6+620 13.75 11.89 2.01 0.5 13.82
ED-Y27 1-91 cm ( 36 ' ) TCR 6+821 22.50 20.64 3.58 0.5 40.28
ED-Y28 2-91 cm ( 36 ' ) TCR 7+097 21.25 19.39 2.01 0.5 21.36
ED-Y29 PROPUESTA DE 1-36" 7+345 11.25 9.39 2.01 0.5 11.31
ED-Y30 1-91 cm ( 36 ' ) TCR 8+012 12.50 10.64 2.01 0.5 12.56
ED-Y31 1-91 cm ( 36 ' ) TCR 8+073 12.50 10.64 2.01 0.5 12.56
ED-Y32 1-91 cm ( 36 ' ) TCR 8+244 41.25 39.39 2.01 0.5 41.46
ED-Y33 1-91 cm ( 36 ' ) TCR 8+519 13.75 11.89 2.01 0.5 13.82
ED-Y34 1-91 cm ( 36 ' ) TCR 8+700 13.75 11.89 2.01 0.5 13.82
VOLUMEN TOTAL 632.56
RELLENO ESTRUCTURAL
L1 = LONGITUD - (2 x CORONA)
S1 S1
L2 = LONGITUD - (2 x BASE)
RELLENO ESTRUCTURAL
LONG.
DRENAJE ESTRUCTURA ESTACION TUBO CANT. L1 L2 L PROM.
ANCHO EXCAVACION
PRESTAMO SELECTO
0.30
DIY
TURAL
VOL. VOL.
ANCHO ALTURA SECCION VOL. VACIO RELLENO
VIO PROVISIONAL
VOL. VOL.
ANCHO ALTURA VOL. VACIO
SECCION RELLENO
22 3 189.42 34.53 154.89
16 3 137.76 28.78 108.98
CALCULO DE MAMPOSTERIA EN CABEZAL DE ENTRADA Y SALIDA
VOL.CABEZAL VOL.CABEZAL
DRENAJE ESTRUCTURA ESTACION VOL.
ENTRADA SALIDA
BAJANTES
0 VADO TIPO I 0+319
Canal0Rectangular de Mamposteria de (0.4
0+305
x 0.4)m
ED-Y1 1-91 cm ( 36 ' ) TCR 0+776 7.08 7.08 9.05
ED-Y2 1-91 cm ( 36 ' ) TCR 1+076 7.08 7.08 9.05
ED-Y3 1-91 cm ( 36 ' ) TCR 1+236 7.08 7.08 9.05
ED-Y4 1-107 cm ( 42 ' ) TCR 1+618 8.39 8.39 9.45
ED-Y5 1-107 cm ( 42 ' ) TCR 1+855 8.39 8.39 9.45
ED-Y6 2-152 cm ( 60 ' ) TCR 2+040 25.65 25.65 16.45
ED-Y7 1-91 cm ( 36 ' ) TCR 2+614 7.08 7.08 9.05
ED-Y8 1-91 cm ( 36 ' ) TCR 2+810 7.08 7.08 9.05
ED-Y9 1-91 cm ( 36 ' ) TCR 2+916 7.08 7.08 9.05
ED-Y10 1-91 cm ( 36 ' ) TCR 3+047 7.08 7.08 9.05
ED-Y11 2-107 cm ( 42 ' ) TCR 3+284 14.81 14.81 13.55
ED-Y12 1-91 cm ( 36 ' ) TCR 3+545 7.08 7.08 9.05
ED-Y13 1-91 cm ( 36 ' ) TCR 3+762 7.08 7.08 9.05
ED-Y14 1-91 cm ( 36 ' ) TCR 3+992 7.08 7.08 9.05
ED-Y15 1-91 cm ( 36 ' ) TCR 4+073 7.08 7.08 9.05
ED-Y16 1-91 cm ( 36 ' ) TCR 4+219 7.08 7.08 9.05
ED-Y17 2-152 cm ( 60 ' ) TCR 4+541 25.65 25.65 16.45
ED-Y18 1-107 cm ( 42 ' ) TCR 4+741 8.39 8.39 9.45
ED-Y19 1-91 cm ( 36 ' ) TCR 4+975 7.08 7.08 9.05
ED-Y20 1-91 cm ( 36 ' ) TCR 5+360 7.08 7.08 9.05
ED-Y21 1-91 cm ( 36 ' ) TCR 5+512 7.08 7.08 9.05
ED-Y22 1-91 cm ( 36 ' ) TCR 5+829 7.08 7.08 9.05
ED-Y23 1-91 cm ( 36 ' ) TCR 6+154 7.08 7.08 9.05
ED-Y24 1-91 cm ( 36 ' ) TCR 6+342 7.08 7.08 9.05
ED-Y25 1-91 cm ( 36 ' ) TCR 6+500 7.08 7.08 9.05
ED-Y26 1-91 cm ( 36 ' ) TCR 6+620 7.08 7.08 9.05
ED-Y27 1-91 cm ( 36 ' ) TCR 6+821 7.08 7.08 12.55
ED-Y28 2-91 cm ( 36 ' ) TCR 7+097 11.43 11.43 9.05
ED-Y29 PROPUESTA DE 1-36" 7+345 7.08 7.08 9.05
ED-Y30 1-91 cm ( 36 ' ) TCR 8+012 7.08 7.08 9.05
ED-Y31 1-91 cm ( 36 ' ) TCR 8+073 7.08 7.08 9.05
ED-Y32 1-91 cm ( 36 ' ) TCR 8+244 7.08 7.08 9.05
ED-Y33 1-91 cm ( 36 ' ) TCR 8+519 7.08 7.08 9.05
ED-Y34 1-91 cm ( 36 ' ) TCR 8+700 7.08 7.08 9.05
VOLUMEN TOTAL DE MAMPOSTERIA PARA CABEZALES (m3)
DA
VOLUMEN
23.21
23.21
23.21
26.23
26.23
67.75
23.21
23.21
23.21
23.21
43.17
23.21
23.21
23.21
23.21
23.21
67.75
26.23
23.21
23.21
23.21
23.21
23.21
23.21
23.21
23.21
26.71
31.91
23.21
23.21
23.21
23.21
23.21
23.21
919.44
1778.45
859.01
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 1 TCR 36"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 0.93 m ) x 1.46 m x 1.91 m = 1.85 m³ 1.85 m³
0.40 2
0.60
VOLUMEN DE MURO DE CABEZAL = 2.44 m³
0.93 1.91
Aleton Izquierdo
MAMPOSTERIA
0.90
0.40 1.99
Aleton Derecho
0.90
0.40 1.99
Cortina
3.55 MAMPOSTERIA
1.72
0.35
1.11
Diente MAMPOSTERIA
3.55
DIENTE CORT. = ( 3.55 m + 3.55 m ) x 0.35 m x 0.90 m = 1.12 m³ 1.12 m³
0.35 0.90 2
3.55
Total 7.08 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 2 TCR 36"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.03 m ) x 1.46 m x 3.58 m = 3.74 m³ 3.74 m³
0.40 2
Aleton Izquierdo
MAMPOSTERIA
0.90
0.40 1.72
Aleton Derecho
0.90
0.40 1.72
Cortina
4.69 MAMPOSTERIA
1.72
0.35
3.58
Diente MAMPOSTERIA
4.69
DIENTE CORT. = ( 4.69 m + 4.69 m ) x 0.45 m x 0.90 m = 1.90 m³ 1.90 m³
0.45 0.90 2
4.69
Total 11.43 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 1 TCR 42"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.00 m ) x 1.63 m x 2.09 m = 2.38 m³ 2.38 m³
0.40 2
0.60
VOLUMEN DE MURO DE CABEZAL = 2.93 m³
1 2.09
Aleton Izquierdo
MAMPOSTERIA
1.00
0.40 2.15
Aleton Derecho
1.00
0.40 2.15
Cortina
3.93 MAMPOSTERIA
1.86
0.35
1.29
Diente MAMPOSTERIA
3.93
DIENTE CORT. = ( 3.93 m + 3.93 m ) x 0.35 m x 0.90 m = 1.24 m³ 1.24 m³
0.35 0.90 2
3.93
Total 8.39 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 2 TCR 42"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.12 m ) x 1.63 m x 4.02 m = 4.96 m³ 4.96 m³
0.40 2
Aleton Izquierdo
MAMPOSTERIA
1.00
0.40 2.15
Aleton Derecho
1.00
0.40 2.15
Cortina
5.31 MAMPOSTERIA
2.15
0.35
4.02
Diente MAMPOSTERIA
5.31
DIENTE CORT. = ( 5.31 m + 5.31 m ) x 0.45 m x 0.90 m = 2.15 m³ 2.15 m³
0.45 0.90 2
5.31
Total 14.81 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 1 TCR 48"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.00 m ) x 1.80 m x 2.28 m = 2.87 m³ 2.87 m³
0.40 2
0.60
VOLUMEN DE MURO DE CABEZAL = 2.81 m³
1 2.28
Aleton Izquierdo
MAMPOSTERIA
1.00
0.40 2.54
Aleton Derecho
1.00
0.40 2.54
Cortina
4.60 MAMPOSTERIA
2.2
0.35
1.48
Diente MAMPOSTERIA
4.6
DIENTE CORT. = ( 4.60 m + 4.60 m ) x 0.35 m x 0.90 m = 1.45 m³ 1.45 m³
0.35 0.90 2
4.6
Total 9.74 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 2 TCR 48"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.20 m ) x 1.80 m x 4.47 m = 6.44 m³ 6.44 m³
0.40 2
Aleton Izquierdo
MAMPOSTERIA
1.00
0.40 2.54
Aleton Derecho
1.00
0.40 2.54
Cortina
5.95 MAMPOSTERIA
2.54
0.35
4.47
Diente MAMPOSTERIA
5.95
DIENTE CORT. = ( 5.95 m + 5.95 m ) x 0.45 m x 0.90 m = 2.41 m³ 2.41 m³
0.45 0.90 2
5.95
Total 18.41 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 1 TCR 54"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.15 m ) x 1.96 m x 2.45 m = 3.72 m³ 3.72 m³
0.40 2
0.60
VOLUMEN DE MURO DE CABEZAL = 3.55 m³
1.15 2.45
Aleton Izquierdo
MAMPOSTERIA
1.10
0.40 2.68
Aleton Derecho
1.10
0.40 2.68
Cortina
4.94 MAMPOSTERIA
2.32
0.35
1.65
Diente MAMPOSTERIA
4.94
DIENTE CORT. = ( 4.94 m + 4.94 m ) x 0.45 m x 0.90 m = 2.00 m³ 2.00 m³
0.45 0.90 2
4.94
Total 11.83 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 1 TCR 60"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.22 m ) x 2.12 m x 2.62 m = 4.50 m³ 4.50 m³
0.40 2
0.60
VOLUMEN DE MURO DE CABEZAL = 4.05 m³
1.22 2.62
Aleton Izquierdo
MAMPOSTERIA
1.10
0.40 3.05
Aleton Derecho
1.10
0.40 3.05
Cortina
5.57 MAMPOSTERIA
2.32
0.35
1.82
Diente MAMPOSTERIA
5.57
DIENTE CORT. = ( 5.57 m + 5.57 m ) x 0.45 m x 0.90 m = 2.26 m³ 2.26 m³
0.45 0.90 2
5.57
Total 13.61 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 2 TCR 60"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.36 m ) x 2.12 m x 5.30 m = 9.89 m³ 9.89 m³
0.40 2
Aleton Izquierdo
MAMPOSTERIA
1.10
0.40 3.05
Aleton Derecho
1.10
0.40 3.05
Cortina
7.12 MAMPOSTERIA
3.05
0.35
5.30
Diente MAMPOSTERIA
7.12
DIENTE CORT. = ( 7.12 m + 7.12 m ) x 0.45 m x 0.90 m = 2.88 m³ 2.88 m³
0.45 0.90 2
7.12
Total 25.65 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 1 TCR 72"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.37 m ) x 2.45 m x 2.99 m = 6.48 m³ 6.48 m³
0.40 2
0.60
VOLUMEN DE MURO DE CABEZAL = 5.17 m³
1.37 2.99
Aleton Izquierdo
MAMPOSTERIA
1.10
0.40 3.81
Aleton Derecho
1.10
0.40 3.81
Cortina
6.88 MAMPOSTERIA
3.3
0.35
2.19
Diente MAMPOSTERIA
6.88
DIENTE CORT. = ( 6.88 m + 6.88 m ) x 0.45 m x 0.90 m = 2.79 m³ 2.79 m³
0.45 0.90 2
6.88
Total 19.06 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 1 TCR 84"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.44 m ) x 2.61 m x 3.34 m = 8.02 m³ 8.02 m³
0.40 2
0.60
VOLUMEN DE MURO DE CABEZAL = 5.34 m³
1.44 3.34
Aleton Izquierdo
MAMPOSTERIA
1.20
0.40 4.57
Aleton Derecho
1.20
0.40 4.57
Cortina
7.95 MAMPOSTERIA
3.81
0.35
2.54
Diente MAMPOSTERIA
7.95
DIENTE CORT. = ( 7.95 m + 7.95 m ) x 0.45 m x 0.90 m = 3.22 m³ 3.22 m³
0.45 0.90 2
7.95
Total 23.37 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 2 TCR 72"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.37 m ) x 2.45 m x 6.09 m = 13.20 m³ 13.20 m³
0.40 2
0.60
Aleton Izquierdo
MAMPOSTERIA
1.10
0.40 3.81
Aleton Derecho
1.10
0.40 3.81
Cortina
10.77 MAMPOSTERIA
3.3
0.35
6.09
Diente MAMPOSTERIA
10.77
DIENTE CORT. = ( 10.77 m + 10.77 m ) x 0.45 m x 0.90 m = 4.36 m³ 4.36 m³
0.45 0.90 2
10.77
Total 34.40 m³
Calculo de Mampostería Clase "A" Apartir de Dimenciones Tipicas 2 TCR 84"
Muro Cabezal MAMPOSTERIA Muro = ( 0.40 m + 1.44 m ) x 2.61 m x 6.94 m = 16.66 m³ 16.66 m³
0.40 2
0.60
Aleton Izquierdo
MAMPOSTERIA
1.20
0.40 4.57
Aleton Derecho
1.20
0.40 4.57
Cortina
12.35 MAMPOSTERIA
3.81
0.35
6.94
Diente MAMPOSTERIA
12.35
DIENTE CORT. = ( 12.35 m + 12.35 m ) x 0.45 m x 0.90 m = 5.00 m³ 5.00 m³
0.45 0.90 2
12.35
Total 42.77 m³
CALCULO DE MAMPOSTERIA PARA UN BAJANTE
0.3
1 0.6
0.5
DE+ Fig. 2
0.80 Area = 0.675 Area = 0.27 Area = 0.18
Fig. 3
2x No. VOL.
DRENAJE ESTACION ESTRUCTURA ANCHO VOL.FIG.2 VOL. FIG.3 VOL. GRADA
VOL.FIG1 GRADAS TOTAL
0 0+319.00 VADO TIPO I
0 0+305 Canal Rectangular de Mamposteria de (0.4 x 0.4)m
ED-Y1 0+776.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y2 1+076.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y3 1+236.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y4 1+618.00 1-107 cm ( 42 ' ) TCR 2.19 0.81 0.54 0.54 1.89 5 9.45
ED-Y5 1+855.00 1-107 cm ( 42 ' ) TCR 2.19 0.81 0.54 0.54 1.89 5 9.45
ED-Y6 2+040.00 2-152 cm ( 60 ' ) TCR 5.30 1.65 1.1 0.54 3.29 5 16.45
ED-Y7 2+614.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y8 2+810.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y9 2+916.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y10 3+047.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y11 3+284.00 2-107 cm ( 42 ' ) TCR 4.02 1.3 0.87 0.54 2.71 5 13.55
ED-Y12 3+545.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y13 3+762.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y14 3+992.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05 mca1
ED-Y15 4+073.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05 mca2
ED-Y16 4+219.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y17 4+541.00 2-152 cm ( 60 ' ) TCR 5.30 1.65 1.1 0.54 3.29 5 16.45
ED-Y18 4+741.00 1-107 cm ( 42 ' ) TCR 2.19 0.81 0.54 0.54 1.89 5 9.45
ED-Y19 4+975.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y20 5+360.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y21 5+512.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y22 5+829.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y23 6+154.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y24 6+342.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y25 6+500.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y26 6+620.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y27 6+821.00 1-91 cm ( 36 ' ) TCR 3.58 1.18 0.79 0.54 2.51 5 12.55
ED-Y28 7+097.00 2-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y29 7+345.00 PROPUESTA DE 1-36" 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y30 8+012.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y31 8+073.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y32 8+244.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y33 8+519.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
ED-Y34 8+700.00 1-91 cm ( 36 ' ) TCR 2.01 0.76 0.51 0.54 1.81 5 9.05
VOLUMEN TOTAL DE MAMPOSTERIA 331.7
139.4
138
CALCULO DE VOLUMEN DE CANALES MENORES A 4m
MURO
MAMPOSTERIA PARA DRENAJE MAYOR DIMENSIONES (m.) AREAS (m2)
SECCION MAYOR SECCION MAYOR S3
DIMENSIONES GENERALES DE ALETON CORONA 0.40 A1 CORONA *(ALTURA - TALON) 1.30
ALTURA 3.66 A2 BASE * TALON 0.88
BASE 2.20 A3 (ALTURA - TALON)*(BASE - CORONA)/2 2.93
CORONAn TALON 0.40 Area Total S3 5.12
SECCION MENOR SECCION MENOR S4
CORONA 0.40 A1 CORONA *(ALTURA - TALON) 1.30
ALTURA 3.66 A2 BASE * TALON 0.88
BASE 2.20 A3 (ALTURA - TALON)*(BASE - CORONA)/2 2.93
TALON 0.40 Area Total S4 5.12
LONGITUD (m.) Area promedio Muro M1(S3+S4)/2= (AMP) 5.12
A1 L 18.72
ALTURAn
A3
A2 TALONn
BASEn
VOLUMENES DE MAMPOSTERIA
Pág. 192