MANO DE OBRA
TOPOGRAFO hh 61.1700 6.85 419.01
CAPACITADOR hh 120.0000 6.85 822.00
OPERARIO hh 7,370.0652 6.85 50,484.95
OFICIAL hh 3,551.3987 6.16 21,876.62
PEON hh 33,843.8376 5.62 190,202.37
MATERIALES
LUBRICANTE PARA TUBERIA PVC UF gln 36.7925 27.00 993.40
ALAMBRE NEGRO RECOCIDO # 16 kg 33.2100 4.00 132.84
CLAVOS PARA MADERA C/C 3" kg 20.5000 4.00 82.00
TUERCAS DE ACOPLE Y EMPAQUE D=1/2"-3/4" C-10 und 374.0000 3.00 1,122.00
CACHIMBA PVC-UF KM ISO 4435 8"x6" und 374.0000 18.00 6,732.00
ACERO DE REFUERZO FY=4200 GRADO 60 kg 774.9820 3.20 2,479.94
ESTACAS DE FIERRO Ø1/2" var 16.5159 12.00 198.19
ARENA FINA m3 187.9840 75.00 14,098.80
PIEDRA CHANCADA DE 3/4" m3 12.6850 55.00 697.68
ARENA GRUESA m3 1,740.0188 45.00 78,300.85
CONFITILLO m3 13.4640 25.00 336.60
SOLADO DE CONCRETO fc=175Kg/cm2 C/04 ORIFICIOS DE DRENAJE und 374.0000 8.00 2,992.00
DADO DE SEGURO ANTI ROBO DE MEDIDOR und 374.0000 6.50 2,431.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 1,276.7474 21.50 27,450.07
YESO EN BOLSAS DE 25 KG. BOL 61.1700 6.50 397.61
CINTA TEFLON pza 187.0000 2.00 374.00
HORMIGON (PUESTO EN OBRA) m3 8.2551 45.00 371.48
ALQUILER DE CASA mes 4.0000 300.00 1,200.00
DISCO DE CORTE pza 2.7955 150.00 419.32
AGUA m3 552.0829 1.00 552.08
CINTA PLASTICA PARA SEÑAL DE SEGURIDAD DE OBRA rll 6.0000 60.00 360.00
POSTES PARA SEÑALIZACION EN OBRA H=1.20m, DADO DE 0.30x0.30x0.10m PINTADAS ROJO Y BLANCO und 10.0000 25.00 250.00
TRANQUERA DE MADERA DE 1.20m X 1.20m und 8.0000 45.00 360.00
MADERA TORNILLO p2 217.7100 4.00 870.84
MARCO FºFº Y TAPA DE Cº PARA BUZON D=0.60M und 41.0000 380.00 15,580.00
ESTRUCTURA METALICA PARA SOPORTE DEL CARTEL DE OBRA und 1.0000 700.00 700.00
HIPOCLORITO DE CALCIO AL 70% kg 3.0486 9.72 29.63
PINTURA ESMALTE SINTETICO gln 40.3722 28.00 1,130.42
ABRAZADERA DE FºFº DE 110MM PARA PVC und 415.0000 12.00 4,980.00
CODOS 45° HºDº BD DN 110mm pza 13.0000 150.00 1,950.00
TUBERIA PVC SAP C-10 DE 1/2" m 1,870.0000 2.00 3,740.00
TUBERIA PVC UF ISO 4422 DN 110mm ( Incluido anillos) m 2,586.9503 19.50 50,445.53
TUBERIA PVC UF ISO 4422, DN 150mm (Incluido anillos) m 58.3083 28.00 1,632.63
TUBERIA PVC UF ISO 4422 DN 250mm ( Incluido anillos) m 487.4887 48.50 23,643.20
TUBERIA PVC UF ISO 4435, DN 200mm S-25 (Incluido anillos) m 3,068.4000 29.70 91,131.48
CODO PVC DE 45º C-10 DE 1/2" C/ROSCA und 748.0000 2.00 1,496.00
CODO PVC DN=90mm C-10 und 748.0000 22.00 16,456.00
CRUZ HºDº 110MM ISO4422 und 4.0000 150.00 600.00
TUBERIA DE PVC UF ISO 4435 DN 160mm S-25 (Incluido anillos) m 1,683.0000 26.70 44,936.10
TEE HºDº DN 110-250mm pza 3.0000 150.00 450.00
TAPON PVC 110MM ISO 4422 und 17.0000 35.00 595.00
ADAPTADOR PVC SAP 1/2" und 748.0000 1.00 748.00
ADAPTADOR AC A PVC DN 110MM und 6.0000 96.00 576.00
CODO PVC-UF 45º ISO 4435 DN 160mm S-25 und 374.0000 32.00 11,968.00
UNION PRESION ROSCA PVC 1/2" und 374.0000 1.00 374.00
NIPLE SIN ROSCA PVC D=1/2-3/4" C-10 und 374.0000 2.00 748.00
CURVA DE 90º D=1/2"-3/4" C-10 und 374.0000 2.00 748.00
FORRO P/TUBERIA PVC ISO 4422 DN 90MM C-5 m 1,870.0000 9.00 16,830.00
VALVULA DE TOMA TERMOPLASTICA (CORPORATION) PVC-U D=1/2"-3/4" C-10 und 374.0000 12.00 4,488.00
VALVULA COMPUERTA HºDº 110MM ISO 4422 (incluido anillos y accesorios adicionales) und 14.0000 280.00 3,920.00
GIGANTOGRAFIA DE 2.40x3.60m und 1.0000 250.00 250.00
ELABORACION DE BOLETINES INFORMATIVOS (TRIPTICOS) GLB 1.0000 200.00 200.00
FORMATO FF-12
RELACION DE INSUMOS DEL COSTO DIRECTO
#REF!
#REF!
PRESUPUESTO
DEDUCTIVO DE PRESUPUESTO
PRESUPUESTO CONTRATO PRINCIPAL OBRA CONTRACTUAL
(REDUCCION DEDUCIDO
DE PRESTACIONES
METRADO
METRADO
COSTO S DEL METRADO
ITEM DESCRIPCION UND CONTRATA Parcial (S/.) Parcial (S/.) Parcial (S/.)
UNITARIO DEDUCTIV DEDUCIDO
DO
O
01 OBRAS PROVISIONALES
01.01 ALMACEN Y GUARDIANIA mes 6.00 800.00 4,800.00 0.00 6.00 4,800.00
01.02 OFICINA PARA RESIDENCIA Y SUPERVISION mes 6.00 800.00 4,800.00 0.00 6.00 4,800.00
01.03 SERVICIO HIGIENICOS PORTATIL und 2.00 1,500.00 3,000.00 0.00 2.00 3,000.00
01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 35,500.00 35,500.00 0.00 1.00 35,500.00
01.05 CARTEL DE IDENTIFICACION DE LA OBRA und 1.00 1,840.00 1,840.00 0.00 1.00 1,840.00
01.06 CERCO PERIMETRICO CON MALLA ARPILLERA m 722.06 4.66 3,364.80 0.00 722.06 3,364.80
01.07 MONUMENTACION DE HITOS PARA FAJA MARGINAL und 20.00 105.00 2,100.00 0.00 20.00 2,100.00
02.02 DESBROCE Y LIMPIEZA DE TERRENO m2 9,036.46 0.39 3,524.22 160.00 62.40 8,876.46 3,461.82
02.03 DEMOLICION DE ESTRUCTURAS EXISTENTES m3 203.18 3.10 629.86 0.00 203.18 629.86
02.04 TRAZO Y REPLANTEO PRELIMINAR m2 9,036.46 0.49 4,427.87 160.00 78.40 8,876.46 4,349.47
02.05 ENCAUSAMIENTO DE CURSOS DE AGUA m3 2,255.40 1.11 2,503.49 0.00 2,255.40 2,503.49
02.06 ELIMINACION DE DEMOLICIONES D=2.5KM m3 1,383.54 4.70 6,502.64 0.00 1,383.54 6,502.64
03.01 EQUIPOS DE PROTECCION INDIVIDUAL glb 1.00 4,985.72 4,985.72 0.00 1.00 4,985.72
03.02 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 2,048.36 2,048.36 0.00 1.00 2,048.36
03.03 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 1,500.00 1,500.00 0.00 1.00 1,500.00
03.04 RECURSOS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD glb 1.00 737.29 737.29 0.00 1.00 737.29
04.01.04 ELIMINACION DE MATERIAL EXCEDENTE m3 17,125.48 3.34 57,199.10 0.00 17,125.48 57,199.09
04.02.04 GEOTEXTIL NO TEJIDO CLASE 2 m2 11,353.43 6.50 73,797.30 720.00 4,680.00 10,633.43 69,117.30
04.03.02 JUNTAS DE CONTRACCION DE TECNOPORT DE E=1" m2 59.40 3.47 206.12 0.00 59.40 206.12
05.01 FORESTACION EN ZONA INESTABLE m2 1,256.00 13.52 16,981.12 0.00 1,256.00 16,981.12
05.02 LIMPIEZA GENERAL DE OBRA glb 1.00 2,500.00 2,500.00 0.00 1.00 2,500.00
05.03 FLETE TERRESTRE glb 1.00 10,304.82 10,304.82 0.00 1.00 10,304.82
06.01 DISEÑO DE MEZCLA DE CONCRETO HIDRAULICO und 1.00 338.98 338.98 0.00 1.00 338.98
06.03 ENSAYO DE MECANICA DE SUELOS glb 1.00 3,200.00 3,200.00 0.00 1.00 3,200.00
PRESUPUESTO
DEDUCTIVO DE PRESUPUESTO
PRESUPUESTO CONTRATO PRINCIPAL OBRA CONTRACTUAL
(REDUCCION DEDUCIDO
DE PRESTACIONES
METRADO
METRADO
COSTO S DEL METRADO
ITEM DESCRIPCION UND CONTRATA Parcial (S/.) Parcial (S/.) Parcial (S/.)
UNITARIO DEDUCTIV DEDUCIDO
DO
O
01.01.01 CAPACITACION EN IDENTIFICACION DE ACTORES glb 1.00 1,500.00 1,500.00 0.00 1.00 1,500.00
01.01.01.03 SEÑALIZACIÓN (CARTELES E INSTALACIÓN) und 4.00 150.00 600.00 0.00 4.00 600.00
01.01.02.02 INSTALACIÓN DE LETRINAS SANITARIAS und 2.00 350.00 700.00 0.00 2.00 700.00
01.01.03.02 CAPACITACION (CHARLAS. BOLETINES) glb 2.00 500.00 1,000.00 0.00 2.00 1,000.00
01.01.04.01 MONITOREO DE CALIDAD DE RUIDO pto 2.00 550.00 1,100.00 0.00 2.00 1,100.00
01.01.04.02 MONITOREO DE CALIDAD DE AIRE pto 2.00 3,000.00 6,000.00 0.00 2.00 6,000.00
01.01.05.04 SELLADO DE LETRINAS glb 2.00 800.00 1,600.00 0.00 2.00 1,600.00
01.01.05.05 REVEGETACION DE LA FORMA DEL TERRENO glb 1.00 2,000.00 2,000.00 0.00 1.00 2,000.00
01.01.05.06 RECONFORMACIÓN Y/O REFORESTACIÓN glb 2.00 1,500.00 3,000.00 0.00 2.00 3,000.00
01.02.01.03 SEÑALIZACIÓN (CARTELES E INSTALACIÓN) und 5.00 150.00 750.00 0.00 5.00 750.00
01.02.02.02 MANTENIMIENTO DE MUROS DE DEFENSA RIBEREÑA glb 2.00 1,500.00 3,000.00 0.00 2.00 3,000.00
PRESUPUESTO
DEDUCTIVO DE PRESUPUESTO
PRESUPUESTO CONTRATO PRINCIPAL OBRA CONTRACTUAL
(REDUCCION DEDUCIDO
DE PRESTACIONES
METRADO
METRADO
COSTO S DEL METRADO
ITEM DESCRIPCION UND CONTRATA Parcial (S/.) Parcial (S/.) Parcial (S/.)
UNITARIO DEDUCTIV DEDUCIDO
DO
O
2 Gastos generales