Está en la página 1de 10

FORMATO FF-12

RELACION DE INSUMOS DEL COSTO DIRECTO

#REF!

DESCRIPCION UND CANTIDAD PRECIO PARCIAL

MANO DE OBRA
TOPOGRAFO hh 61.1700 6.85 419.01
CAPACITADOR hh 120.0000 6.85 822.00
OPERARIO hh 7,370.0652 6.85 50,484.95
OFICIAL hh 3,551.3987 6.16 21,876.62
PEON hh 33,843.8376 5.62 190,202.37
MATERIALES
LUBRICANTE PARA TUBERIA PVC UF gln 36.7925 27.00 993.40
ALAMBRE NEGRO RECOCIDO # 16 kg 33.2100 4.00 132.84
CLAVOS PARA MADERA C/C 3" kg 20.5000 4.00 82.00
TUERCAS DE ACOPLE Y EMPAQUE D=1/2"-3/4" C-10 und 374.0000 3.00 1,122.00
CACHIMBA PVC-UF KM ISO 4435 8"x6" und 374.0000 18.00 6,732.00
ACERO DE REFUERZO FY=4200 GRADO 60 kg 774.9820 3.20 2,479.94
ESTACAS DE FIERRO Ø1/2" var 16.5159 12.00 198.19
ARENA FINA m3 187.9840 75.00 14,098.80
PIEDRA CHANCADA DE 3/4" m3 12.6850 55.00 697.68
ARENA GRUESA m3 1,740.0188 45.00 78,300.85
CONFITILLO m3 13.4640 25.00 336.60
SOLADO DE CONCRETO fc=175Kg/cm2 C/04 ORIFICIOS DE DRENAJE und 374.0000 8.00 2,992.00
DADO DE SEGURO ANTI ROBO DE MEDIDOR und 374.0000 6.50 2,431.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 1,276.7474 21.50 27,450.07
YESO EN BOLSAS DE 25 KG. BOL 61.1700 6.50 397.61
CINTA TEFLON pza 187.0000 2.00 374.00
HORMIGON (PUESTO EN OBRA) m3 8.2551 45.00 371.48
ALQUILER DE CASA mes 4.0000 300.00 1,200.00
DISCO DE CORTE pza 2.7955 150.00 419.32
AGUA m3 552.0829 1.00 552.08
CINTA PLASTICA PARA SEÑAL DE SEGURIDAD DE OBRA rll 6.0000 60.00 360.00
POSTES PARA SEÑALIZACION EN OBRA H=1.20m, DADO DE 0.30x0.30x0.10m PINTADAS ROJO Y BLANCO und 10.0000 25.00 250.00
TRANQUERA DE MADERA DE 1.20m X 1.20m und 8.0000 45.00 360.00
MADERA TORNILLO p2 217.7100 4.00 870.84
MARCO FºFº Y TAPA DE Cº PARA BUZON D=0.60M und 41.0000 380.00 15,580.00
ESTRUCTURA METALICA PARA SOPORTE DEL CARTEL DE OBRA und 1.0000 700.00 700.00
HIPOCLORITO DE CALCIO AL 70% kg 3.0486 9.72 29.63
PINTURA ESMALTE SINTETICO gln 40.3722 28.00 1,130.42
ABRAZADERA DE FºFº DE 110MM PARA PVC und 415.0000 12.00 4,980.00
CODOS 45° HºDº BD DN 110mm pza 13.0000 150.00 1,950.00
TUBERIA PVC SAP C-10 DE 1/2" m 1,870.0000 2.00 3,740.00
TUBERIA PVC UF ISO 4422 DN 110mm ( Incluido anillos) m 2,586.9503 19.50 50,445.53
TUBERIA PVC UF ISO 4422, DN 150mm (Incluido anillos) m 58.3083 28.00 1,632.63
TUBERIA PVC UF ISO 4422 DN 250mm ( Incluido anillos) m 487.4887 48.50 23,643.20
TUBERIA PVC UF ISO 4435, DN 200mm S-25 (Incluido anillos) m 3,068.4000 29.70 91,131.48
CODO PVC DE 45º C-10 DE 1/2" C/ROSCA und 748.0000 2.00 1,496.00
CODO PVC DN=90mm C-10 und 748.0000 22.00 16,456.00
CRUZ HºDº 110MM ISO4422 und 4.0000 150.00 600.00
TUBERIA DE PVC UF ISO 4435 DN 160mm S-25 (Incluido anillos) m 1,683.0000 26.70 44,936.10
TEE HºDº DN 110-250mm pza 3.0000 150.00 450.00
TAPON PVC 110MM ISO 4422 und 17.0000 35.00 595.00
ADAPTADOR PVC SAP 1/2" und 748.0000 1.00 748.00
ADAPTADOR AC A PVC DN 110MM und 6.0000 96.00 576.00
CODO PVC-UF 45º ISO 4435 DN 160mm S-25 und 374.0000 32.00 11,968.00
UNION PRESION ROSCA PVC 1/2" und 374.0000 1.00 374.00
NIPLE SIN ROSCA PVC D=1/2-3/4" C-10 und 374.0000 2.00 748.00
CURVA DE 90º D=1/2"-3/4" C-10 und 374.0000 2.00 748.00
FORMATO FF-12
RELACION DE INSUMOS DEL COSTO DIRECTO

#REF!

DESCRIPCION UND CANTIDAD PRECIO PARCIAL

FORRO P/TUBERIA PVC ISO 4422 DN 90MM C-5 m 1,870.0000 9.00 16,830.00
VALVULA DE TOMA TERMOPLASTICA (CORPORATION) PVC-U D=1/2"-3/4" C-10 und 374.0000 12.00 4,488.00
VALVULA COMPUERTA HºDº 110MM ISO 4422 (incluido anillos y accesorios adicionales) und 14.0000 280.00 3,920.00
GIGANTOGRAFIA DE 2.40x3.60m und 1.0000 250.00 250.00
ELABORACION DE BOLETINES INFORMATIVOS (TRIPTICOS) GLB 1.0000 200.00 200.00
PROYECTOR MULTIMEDIA H.E 12.0000 20.00 240.00
FORMATO FF-12
RELACION DE INSUMOS DEL COSTO DIRECTO

#REF!

DESCRIPCION UND CANTIDAD PRECIO PARCIAL

EQUIPOS
HERRAMIENTAS MANUALES %MO 9732.72
BOTAS DE JEBE PAR 49.0000 20.00 980.00
CASCO AMARILLO und 49.0000 8.00 392.00
GUANTES DE CUERO PAR 49.0000 8.00 392.00
BALDE PRUEBA-TAPON -ABRAZ. Y ACCESORIOS hm 60.9720 20.00 1,219.44
GUANTES DE JEBE PAR 49.0000 7.50 367.50
CORTADORA DE PAVIMENTO hm 11.4616 19.68 225.56
PROTECTOR DE NARIZ (MASCARA) CON FILTRO pza 49.0000 18.00 882.00
CHALECOS PARA OBRA und 49.0000 15.00 735.00
ANTEOJOS DE PROTECCION und 49.0000 6.00 294.00
MOVILIZACIÓN Y DESMOVILIZACIÓN DE MAQUINARIAS Y EQUIPOS GLB 2.0000 1,500.00 3,000.00
MEZCLADORA DE CONCRETO DE 9 -11P3 hm 1,646.9793 7.50 12,352.34
CAMION VOLQUETE 6x4 330 HP 10 M3. hm 228.3416 140.00 31,967.82
MOLDE METALICO PARA BUZON m2 41.0000 50.00 2,050.00
COMPACTADOR VIBR. TIPO PLANCHA 7 HP hm 2,279.1318 15.00 34,186.98
CARGADOR S/LLANTAS 125-155 HP 3 YD3. hm 50.2352 160.00 8,037.63
VIBRADOR DE CONCRETO 4 HP 2.40" hm 87.9625 12.00 1,055.55
NIVEL TOPOGRAFICO hm 61.1700 4.23 258.75

TOTAL PRESUPUESTADO 815,722.93


CRONOGRAMA VALORIZADO DE EJECUCION DEL PROYECTO
PROYECTO: “CREACION Y MEJORAMIENTO DE LA CARRETERA SAN JOSÉ CHOYMACOTA TRAMO PUTIS-APULEMA-PACHACHACA-CHONGOS, DISTRITO DE SANTILLANA, SIVIA Y LLOCHEGUA, PROVINCIA DE HUANTA-AYACUCHO”

EJECUTADO SETIEMBRE - 2022 OCTUBRE - 2022 NOVIEMBRE - 2022 DICIEMBRE - 2022 ENERO - 2023 FEBRERO - 2023 MARZO - 2023 ABRIL - 2023 MAYO - 2023 JUNIO - 2023 JULIO - 2023 AGOSTO - 2023 SETIEMBRE - 2023 OCTUBRE - 2023 NOVIEMBRE - 2023 DICIEMBRE - 2023 ENERO - 2024
ITEM DESCRIPCION UND Metrado Parcial (S/.)
METRADO COSTO % Valorización mensual % Valorización mensual % Valorización mensual % % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % %

01 MEJORAMIENTO DE LA CARRETERA DE LA CARRETERA SAN JOSE DE CHOYMACOTA TRAMO PUTIS - APULEMA 9,778,639.23
01.01 OBRAS PRELIMINARES
01.01.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA GLB 1.00 140,400.00 0.00% - 0.00% - 0.00% - 0.00% - 15.85% 22,253.40 34.15% 47,946.60 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 70,200.00 0.00% - 0.00% - 0.00% -
01.01.02 TRAZO Y REPLANTEO KM 20.96 17,486.09 0.00% - 0.00% - 0.00% - 0.00% - 15.85% 2,771.55 34.15% 5,971.50 50.00% 8,743.05 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.01.03 ACCESOS A CANTERAS, DME KM 0.08 333.32 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 166.66 40.00% 133.33 10.00% 33.33 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.01.04 DESBROCE Y LIMPIEZA MANUAL DEL TERRENO m2 78,940.50 61,573.59 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 30,786.80 40.00% 24,629.44 10.00% 6,157.36 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.02 MOVIMIENTO DE TIERRA
01.02.01 CORTE DE MATERIAL SUELTO m3 93,508.80 489,986.11 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 20.00% 97,997.22 30.00% 146,995.83 25.00% 122,496.53 15.00% 73,497.92 10.00% 48,998.61 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.02.02 CORTE DE ROCA SUELTA PERFORACION Y DISPARO m3 62,914.79 1,269,620.46 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 20.00% 253,924.09 30.00% 380,886.14 25.00% 317,405.12 15.00% 190,443.07 10.00% 126,962.05 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.02.04 CORTE DE ROCA FIJA PERFORACION Y DISPARO m3 88,822.78 3,394,806.65 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 20.00% 678,961.33 30.00% 1,018,442.00 25.00% 848,701.66 15.00% 509,221.00 10.00% 339,480.67 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.02.06 RELLENO CON MATERIAL PROPIO PARA EXPLANACIONES m3 412.28 4,081.57 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 2,040.79 50.00% 2,040.79 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.03 PAVIMENTO
01.03.01 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 78,857.75 116,709.47 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 30.00% 35,012.84 35.00% 40,848.31 35.00% 40,848.31 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.03.02 AFIRMADO E= 20 CM CON MATERIAL SELECCIONADO m3 15,771.55 389,241.85 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 15.00% 58,386.28 20.00% 77,848.37 25.00% 97,310.46 25.00% 97,310.46 10.00% 38,924.19 5.00% 19,462.09 0.00% - 0.00% - 0.00% -
01.04 OBRAS DE ARTE Y DRENAJE
01.04.01 BADEN
01.04.01.01 REHABILITACION DE BADEN (06UND)
01.04.01.01.01 DEMOLICION DE BADEN EXISTENTE m3 511.20 62,606.66 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 80.00% 50,085.33 20.00% 12,521.33 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 426.00 541.02 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 541.02 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.01.03 EXCAVACION BAJO AGUA m3 500.78 33,361.96 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 90.00% 30,025.76 10.00% 3,336.20 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.01.04 NIVELACION Y COMPACTADO DE BASE m2 642.60 2,943.11 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 80.00% 2,354.49 20.00% 588.62 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.01.05 ENCOFRADO Y DESENCOFRADO m2 263.28 14,024.93 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 14,024.93 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.01.06 CONCRETO F'C= 210 KG/CM2+30% P.G. m3 197.00 117,053.46 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 60.00% 70,232.08 40.00% 46,821.38 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.01.07 JUNTA ASFALTICA DE 1" ANCHO POR 0.40 MTS. DE PROF m 145.20 2,371.12 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 2,371.12 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.01.08 MAMPOSTERIA DE PIEDRA GRANDE, ASENTADO MORTERO 1:5 C-A m3 160.68 56,911.25 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 30.00% 17,073.38 70.00% 39,837.88 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.02 BADEN TIPO I L=8.00m (04 UND)
01.04.01.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 227.20 288.54 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 288.54 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.02.02 EXCAVACION BAJO AGUA m3 269.45 17,950.76 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 8,975.38 50.00% 8,975.38 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.02.03 NIVELACION Y COMPACTADO DE BASE m2 322.80 1,478.42 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 739.21 50.00% 739.21 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.02.04 ENCOFRADO Y DESENCOFRADO m2 156.32 8,327.17 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 8,327.17 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.02.05 CONCRETO F'C= 210 KG/CM2+30% P.G. m3 123.60 73,440.65 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 36,720.33 50.00% 36,720.33 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.02.06 JUNTA ASFALTICA DE 1" ANCHO POR 0.40 MTS. DE PROF m 88.80 1,450.10 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 1,450.10 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.02.07 MAMPOSTERIA DE PIEDRA GRANDE, ASENTADO MORTERO 1:5 C-A m3 87.90 31,133.30 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 30.00% 9,339.99 70.00% 21,793.31 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.03 BADEN TIPO II L=10m (01 UND)
01.04.01.03.01 TRAZO Y REPLANTEO PRELIMINAR m2 71.00 90.17 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 90.17 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.03.02 EXCAVACION BAJO AGUA m3 83.46 5,560.11 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 5,560.11 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.03.03 NIVELACION Y COMPACTADO DE BASE m2 107.10 490.52 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 490.52 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.03.04 ENCOFRADO Y DESENCOFRADO m2 43.88 2,337.49 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 2,337.49 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.03.05 CONCRETO F'C= 210 KG/CM2+30% P.G. m3 32.83 19,506.93 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 20.00% 3,901.39 80.00% 15,605.54 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.03.06 JUNTA ASFALTICA DE 1" ANCHO POR 0.40 MTS. DE PROF m 24.20 395.19 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 395.19 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.03.07 MAMPOSTERIA DE PIEDRA GRANDE, ASENTADO MORTERO 1:5 C-A m3 26.78 9,485.21 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 9,485.21 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.04 BADEN TIPO III L=12m (04 UND)
01.04.01.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 340.80 432.82 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 432.82 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.04.02 EXCAVACION BAJO AGUA m3 412.11 27,454.77 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 30.00% 8,236.43 70.00% 19,218.34 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.04.03 NIVELACION Y COMPACTADO DE BASE m2 556.40 2,548.31 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 1,274.16 50.00% 1,274.16 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.04.04 ENCOFRADO Y DESENCOFRADO m2 194.72 10,372.73 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 10,372.73 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.04.05 CONCRETO F'C= 210 KG/CM2+30% P.G. m3 154.43 91,759.22 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 70.00% 64,231.45 30.00% 27,527.77 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.04.06 JUNTA ASFALTICA DE 1" ANCHO POR 0.40 MTS. DE PROF m 104.80 1,711.38 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 1,711.38 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.04.07 MAMPOSTERIA DE PIEDRA GRANDE, ASENTADO MORTERO 1:5 C-A m3 133.14 47,156.86 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 23,578.43 50.00% 23,578.43 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.05 BADEN TIPO IV L=15m (01 UND)
01.04.01.05.01 TRAZO Y REPLANTEO PRELIMINAR m2 106.50 135.26 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 135.26 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.05.02 EXCAVACION BAJO AGUA m3 126.88 8,452.75 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 90.00% 7,607.48 10.00% 845.28 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.05.03 NIVELACION Y COMPACTADO DE BASE m2 232.10 1,063.02 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 1,063.02 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.05.04 ENCOFRADO Y DESENCOFRADO m2 55.88 2,976.73 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 2,976.73 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.05.05 CONCRETO F'C= 210 KG/CM2+30% P.G. m3 47.27 28,086.89 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 28,086.89 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.05.06 JUNTA ASFALTICA DE 1" ANCHO POR 0.40 MTS. DE PROF m 36.30 592.78 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 592.78 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.01.05.07 MAMPOSTERIA DE PIEDRA GRANDE, ASENTADO MORTERO 1:5 C-A m3 62.85 22,260.84 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 22,260.84 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.02 ALCANTARILLAS
01.04.02.01 ALCANTARILLA TIPO II DIAME. 36" TMC (13 UND)
01.04.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 333.65 423.74 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 423.74 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.02.01.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCION m2 333.65 1,307.91 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 1,307.91 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.02.01.03 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 405.40 14,189.00 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 80.00% 11,351.20 20.00% 2,837.80 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.02.01.04 ALCANTARILLA DE ACERO GALVANIZADO TMC DIÁM.36"=0.90M m 96.20 72,438.60 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 20.00% 14,487.72 20.00% 14,487.72 20.00% 14,487.72 20.00% 14,487.72 20.00% 14,487.72 0.00% - 0.00% - 0.00% - 0.00% -
01.04.02.01.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 291.27 6,996.31 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 60.00% 4,197.79 40.00% 2,798.52 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.02.01.06 ELIMINACION DE MATERIAL EXEDENTE C/MAQUINARIA D= 1 KM m3 5,270.14 44,848.89 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 44,848.89 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.02.01.07 SOLADO CONCRETO FC=100 KG/CM2 , E=10CMS m3 15.81 1,191.60 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 1,191.60 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.02.01.08 ENCOFRADO Y DESENCOFRADO ALCANTARILLA m2 368.52 25,273.10 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 12,636.55 50.00% 12,636.55 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.02.01.09 ACERO DE REFUERZO GRADO 60 kg 477.20 3,097.03 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 96.00% 2,973.15 4.00% 123.88 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.02.01.10 CONCRETO F'C=210 KG/CM2 m3 37.33 27,286.74 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 27,286.74 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.02.01.11 EMBOQUILLADO DE INGRESO Y SALIDA m2 40.50 6,872.45 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 3,436.23 50.00% 3,436.23 0.00% - 0.00% - 0.00% - 0.00% -
01.04.03 CUNETA
01.04.03.01 CUNETA TRIANGULAR DE CONCRETO EN MATERIAL SUELTO
01.04.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 6,120.00 7,772.40 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 7,772.40 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
01.04.03.01.02 EXCAVACION MANUAL m3 4,773.76 194,864.88 0.00% - 0.00% - 0.00%
CRONOGRAMA VALORIZADO DE EJECUCION DEL PROYECTO
PROYECTO: “CREACION Y MEJORAMIENTO DE LA CARRETERA SAN JOSÉ CHOYMACOTA TRAMO PUTIS-APULEMA-PACHACHACA-CHONGOS, DISTRITO DE SANTILLANA, SIVIA Y LLOCHEGUA, PROVINCIA DE HUANTA-AYACUCHO”

EJECUTADO SETIEMBRE - 2022 OCTUBRE - 2022 NOVIEMBRE - 2022 DICIEMBRE - 2022 ENERO - 2023 FEBRERO - 2023 MARZO - 2023 ABRIL - 2023 MAYO - 2023 JUNIO - 2023 JULIO - 2023 AGOSTO - 2023 SETIEMBRE - 2023 OCTUBRE - 2023 NOVIEMBRE - 2023 DICIEMBRE - 2023 ENERO - 2024
ITEM DESCRIPCION UND Metrado Parcial (S/.) Valorización Valorización Valorización
METRADO COSTO % Valorización mensual % Valorización mensual % Valorización mensual % % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % Valorización mensual % %
mensual mensual mensual
02.06.02.02 CONTROL TOPOGRAFICO mes 6.00 15,071.70 30.00% 4,521.51 30.00% 4,521.51 25.00% 3,767.93 15.00% 2,260.76 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.02.03 PASE PROVISIONAL (BADO)
02.06.02.03.01 TRAZO NIVELACION Y REPLANTEO m2 250.00 825.00 250.00 825.00 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.02.03.02 CORTE DE MATERIAL DE ROCA SUELTA m3 1,655.66 30,149.57 1,655.66 30,149.57 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.02.03.03 ELIMINACION DE MATERIAL EXEDENTE C/MAQUINARIA D= 1 KM m3 1,890.61 13,593.49 1,890.61 13,593.49 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.02.03.04 RELLENO CON MATERIAL PROPIO PARA EXPLANACIONES m3 80.15 724.56 80.15 724.56 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.02.03.05 MANTENIMIENTO DE PASE PROVISIONAL mes 5.00 7,713.64 3.00 4,573.86 40.70% 3,139.78 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.03 MOVIMIENTO DE TIERRAS PARA PUENTES
02.06.03.01 EXCAVACION EN ROCA FIJA m3 230.19 8,484.57 76.10 2,203.86 44.03% 3,735.34 30.00% 2,545.37 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.03.02 EXCAVACION EN MATERIAL COMPACTO m3 1,509.23 14,102.25 296.10 5,391.98 61.77% 8,710.27 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.03.03 EXCAVACION EN MATERIAL COMPACTO (BAJO AGUA) m3 732.86 12,964.29 85.00% 11,019.65 15.00% 1,944.64 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.03.04 RELLENO Y COMPACTACION C/MAT. PROPIO EN ESPALDON DE ESTRIBO (Capa de 20cm) m3 1,949.49 26,376.60 0.00% - 0.00% - 60.00% 15,825.96 40.00% 10,550.64 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.03.05 RELLENO Y COMPACTACION C/MAT. DE PRESTAMO EN ESPALDON DE ESTRIBO (Capa de 20cm) m3 111.51 5,857.62 0.00% - 0.00% - 50.00% 2,928.81 50.00% 2,928.81 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.03.06 ELIMINACION DE MATERIAL EXCAVADO m3 985.11 13,835.21 31.40 225.77 28.37% 3,924.79 70.00% 9,684.65 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.03.07 ANCLAJE EN ROCA m 16.00 3,017.60 0.00% - 100.00% 3,017.60 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.03.08 ENROCADO DE PROTECCION DE ESTRIBO Y ALETA m3 177.51 43,736.69 0.00% - 100.00% 43,736.69 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.04 OBRAS DE CONCRETO SIMPLE
02.06.04.01 SOLADO CONCRETO C:H, 1:10 (E=0.20 m) m2 107.90 11,586.30 50.00% 5,793.15 50.00% 5,793.15 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.04.02 SOLADO CONCRETO C:H, 1:10 (E=0.10 m) m2 16.27 820.17 50.00% 410.09 50.00% 410.09 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05 OBRAS DE CONCRETO ARMADO
02.06.05.01 SUPERESTRUCTURA DE PUENTE
02.06.05.01.01 CONCRETO F'c=280 kg/cm2 - LOSA m3 30.44 23,716.72 0.00% - 0.00% - 15.00% 3,557.51 85.00% 20,159.21 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.01.02 ENCOFRADO Y DESENCOFRADO - LOSA m2 141.90 15,586.30 0.00% - 0.00% - 50.00% 7,793.15 50.00% 7,793.15 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.01.03 ACERO Fy=4200 kg/cm2 - LOSA kg 7,440.20 54,685.47 0.00% - 0.00% - 100.00% 54,685.47 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.01.04 CONCRETO F'c=280 kg/cm2 - VEREDA m3 14.77 11,632.70 0.00% - 0.00% - 5.00% 581.64 95.00% 11,051.07 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.01.05 ENCOFRADO Y DESENCOFRADO - VEREDA m2 64.84 7,122.03 0.00% - 0.00% - 20.00% 1,424.41 80.00% 5,697.62 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.01.06 ACERO Fy=4200 kg/cm2 - VEREDA kg 1,294.49 9,514.50 0.00% - 0.00% - 0.00% - 100.00% 9,514.50 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.02 SUBESTRUCTURA DE PUENTE
02.06.05.02.01 CONCRETO F'c=210kg/cm2 - ESTRIBO m3 28.86 22,305.89 0.00% - 0.00% - 100.00% 22,305.89 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.02.02 CONCRETO F'c=210kg/cm2 - ESTRIBO (BAJO AGUA) m3 65.39 52,893.97 0.00% - 0.00% - 100.00% 52,893.97 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.02.03 ENCOFRADO Y DESENCOFRADO - ESTRIBO m2 161.07 16,532.22 0.00% - 0.00% - 100.00% 16,532.22 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.02.04 ENCOFRADO Y DESENCOFRADO - ESTRIBO (BAJO AGUA) m2 122.80 14,736.00 0.00% - 0.00% - 100.00% 14,736.00 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.02.05 ACERO Fy=4200 kg/cm2 - ESTRIBO kg 10,253.26 78,437.44 0.00% - 0.00% - 100.00% 78,437.44 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.02.06 CONCRETO F'c=210kg/cm2 - ALETA m3 32.14 24,841.01 0.00% - 0.00% - 100.00% 24,841.01 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.02.07 CONCRETO F'c=210kg/cm2 - ALA (BAJO AGUA) m3 86.45 69,929.41 0.00% - 0.00% - 100.00% 69,929.41 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.02.08 ENCOFRADO Y DESENCOFRADO - ALETAS m2 199.57 20,483.86 0.00% - 0.00% - 100.00% 20,483.86 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.02.09 ENCOFRADO Y DESENCOFRADO - ALA (BAJO AGUA) m2 169.48 19,398.68 0.00% - 0.00% - 100.00% 19,398.68 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.05.02.10 ACERO Fy=4200 kg/cm2 - ALETAS kg 14,057.63 107,540.87 0.00% - 0.00% - 100.00% 107,540.87 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.06 ESTRUCTURA METALICA DEL PUENTE
02.06.06.01 FABRICACION DE VIGAS, DIAFRAGMA, ATIESADORES Y CONECTORES DE ACERO A-572 (inc. Pintura) P GLB 1.00 446,887.44 35.00% 156,410.60 35.00% 156,410.60 30.00% 134,066.23 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.06.02 TRANSPORTE DE ESTRUCTURA METALICA PULPERIA GLB 1.00 36,449.63 0.00% - 0.00% - 100.00% 36,449.63 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.06.03 ENSAMBLAJE DE ESTRUCTURA METALICA PULPERIA GLB 1.00 10,255.09 0.00% - 0.00% - 100.00% 10,255.09 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.06.04 MONTAJE LANZAMIENTO DE ESTRUCTURA METALICA PULPERIA GLB 1.00 165,909.71 0.00% - 0.00% - 100.00% 165,909.71 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.06.05 CONTROL DE CALIDAD DE ESTRUCTURA METALICA GLB 1.00 22,602.00 35.00% 7,910.70 35.00% 7,910.70 30.00% 6,780.60 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.07 PINTURA
02.06.07.01 PINTURA EN BARANDAS METALICAS m2 49.02 1,347.56 0.00% - 0.00% - 0.00% - 100.00% 1,347.56 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.07.02 PINTURA EN VEREDA LATERAL m2 12.90 229.62 0.00% - 0.00% - 0.00% - 100.00% 229.62 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.08 VARIOS
02.06.08.01 BASE METÁLICA PARA BARANDAS und 30.00 16,832.40 0.00% - 0.00% - 100.00% 16,832.40 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.08.02 TUBO FºGº PARA BARANDA m 51.60 21,599.76 0.00% - 0.00% - 100.00% 21,599.76 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.08.03 ADQUISICION Y COLOCACION DE PLANCHA NEOPRENO pza 4.00 9,722.64 0.00% - 0.00% - 100.00% 9,722.64 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.08.04 TUBO DE DRENAJE EN LOSA CON TUB. PVC Ø 3" m 9.60 478.46 0.00% - 0.00% - 100.00% 478.46 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.08.05 TUBOS DE DRENAJE EN ESTRIBO m 9.60 463.30 0.00% - 100.00% 463.30 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.08.06 JUNTAS DE DILATACION METALICA (Apoyo Fijo y Movil) m 15.80 28,498.93 0.00% - 0.00% - 0.00% - 100.00% 28,498.93 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.08.07 CARTEL INFORMATICO GLB 1.00 5,442.01 0.00% - 0.00% - 0.00% - 100.00% 5,442.01 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.09 MITIGACION DE IMPACTO AMBIENTAL
02.06.09.01 MITIGACION DE IMPACTO AMBIENTAL GLB 1.00 20,000.00 25.00% 5,000.00 25.00% 5,000.00 25.00% 5,000.00 25.00% 5,000.00 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.06.10 OBRAS COMPLEMENTARIAS
02.06.10.01 LIMPIEZA FINAL DE OBRA GLB 1.00 1,640.86 0.00% - 0.00% - 0.00% - 100.00% 1,640.86 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.07 CONSTRUCCION DE PUENTE CARROZABLE ACCAHUALLA LUZ=30.00M
02.07.01 OBRAS PROVISIONALES
02.07.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO GLB 1.00 20,280.00 0.00% - 0.00% - 0.00% - 0.00% - 15.85% 3,214.38 34.15% 6,925.62 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 10,140.00 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.07.01.02 DESBROCE Y LIMPIEZA MANUAL DEL TERRENO m2 1,100.00 858.00 0.00% - 0.00% - 0.00% - 0.00% - 15.85% 135.99 34.15% 293.01 50.00% 429.00 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.07.01.03 CAMPAMENTO DE LA OBRA m2 225.00 50,341.50 0.00% - 0.00% - 0.00% - 0.00% - 15.85% 7,979.13 34.15% 17,191.62 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 25,170.75 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.07.02 TRABAJOS PRELIMINARES
02.07.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 226.84 1,395.07 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 1,395.07 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.07.02.02 CONTROL TOPOGRAFICO mes 6.00 15,071.70 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 20.00% 3,014.34 20.00% 3,014.34 20.00% 3,014.34 20.00% 3,014.34 20.00% 3,014.34 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.07.02.03 PASE PROVISIONAL (BADO)
02.07.02.03.01 TRAZO NIVELACION Y REPLANTEO m2 300.00 867.00 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 867.00 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.07.02.03.02 CORTE DE MATERIAL DE ROCA SUELTA m3 2,724.26 35,469.87 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 100.00% 35,469.87 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.07.02.03.03 ELIMINACION DE MATERIAL EXEDENTE C/MAQUINARIA D= 1 KM m3 3,022.40 25,720.62 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 80.00% 20,576.50 20.00% 5,144.12 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.07.02.03.04 RELLENO CON MATERIAL PROPIO PARA EXPLANACIONES m3 205.59 2,035.34 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 50.00% 1,017.67 50.00% 1,017.67 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% -
02.07.02.03.05 MANTENIMIENTO DE PASE PROVISIONAL mes 5.00 7,849.45 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 20.00% 1,569.89 20.00% 1,569.89 20.00% 1,569.89 20.00% 1,569.89 20.00% 1,569.89 0.00% - 0.00% -
FORMATO FF-16
CRONOGRAMA REQUERIMIENTO DE MATERIALES
PROYECTO:
#REF!
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 TOTAL
Precio
Item Descripción Und. Cantidad Parcial Presupuestad Presupuestad Presupuestad Presupuestad Presupuestad
unitario Cantidad Presupuestado Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Presupuestado
o o o o o
1 ALAMBRE NEGRO RECOCIDO # 16 kg 1,706.8088 3.67 6,263.99 55.98 205.45 12.95 47.54 194.55 713.98 542.14 1,989.66 463.70 1,701.77 437.49 1,605.59 1,706.81 6,263.99
2 ALAMBRE NEGRO RECOCIDO # 8 kg 3,825.6632 3.67 14,040.18 78.34 287.50 173.49 636.70 468.51 1,719.45 1,091.34 4,005.20 1,179.19 4,327.62 834.80 3,063.70 3,825.66 14,040.18
3 CLAVOS PARA MADERA C/C 3" kg 1,990.5825 3.67 7,305.44 39.15 143.69 86.72 318.25 241.12 884.90 570.46 2,093.57 616.61 2,262.96 436.53 1,602.06 1,990.58 7,305.44
4 PERNOS 1/4" X 2 1/2" und 30.0000 6.36 190.80 - - 30.00 190.80 - - - - - - - - 30.00 190.80
5 ACERO DE REFUERZO FY=4200 GRADO 60 kg 56,275.5852 2.97 167,138.49 254.99 757.32 449.99 1,336.48 6,756.91 20,068.02 18,362.69 54,537.20 15,690.14 46,599.70 14,760.86 43,839.77 56,275.59 167,138.49
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 VARILLA DE 3/8" X 9 m. var 2.0112 3.67 7.38
6 7.38
- - 2.01 7.38 - - - - - - - - 2.01
7 ARENA FINA m3 49.1213 83.05 4,079.52 - - 35.87 2,979.07 13.25 1,100.45 - - - - - - 49.12 4,079.52
8 TIERRA DE CHACRA O VEGETAL m3 87.3430 40.50 3,537.39 - - 64.88 2,627.73 22.46 909.66 - - - - - - 87.34 3,537.39
9 PIEDRA CHANCADA DE 3/4" m3 2,672.9683 55.08 147,227.09 124.06 6,833.06 286.99 15,807.46 763.34 42,044.92 808.10 44,510.03 555.60 30,602.61 134.88 7,429.00 2,672.97 147,227.09
10 PIEDRA MEDIANA DE 4" m3 360.5529 42.37 15,276.63 - - 134.38 5,693.73 226.17 9,582.90 - - - - - - 360.55 15,276.63
11 ARENA GRUESA m3 2,340.5533 47.46 111,082.66 105.54 5,008.85 244.72 11,614.56 626.71 29,743.73 717.09 34,033.06 511.44 24,273.07 135.05 6,409.39 2,340.55 111,082.66
12 MATERIAL CLASIFICADO PARA BASE m3 6,391.0399 43.64 278,904.98 4,735.60 206,661.67 360.18 15,718.07 920.92 40,189.09 374.34 16,336.15 - - - - 6,391.04 278,904.98
13 ASFALTO RC-250 gln 3,339.5848 13.56 45,284.77 - - 224.82 3,048.59 620.60 8,415.31 1,402.45 19,017.25 1,091.71 14,803.62 - - 3,339.58 45,284.77
14 CEMENTO PORTLAND TIPO I (42.5KG) BOL 33,807.5041 20.06 678,178.53 1,696.49 34,031.65 4,125.92 82,765.86 9,391.64 188,396.30 9,759.68 195,779.18 6,962.46 139,666.96 1,871.31 37,538.58 33,807.50 678,178.53
15 YESO EN BOLSAS DE 25 KG. BOL 5.8682 6.77 39.73 4.14 28.02 1.63 11.03 0.10 0.68 - - - - - - 5.87 39.73
16 GASOLINA 84 OCTANOS gln 109.1586 10.85 1,184.37 - - 79.72 864.94 29.44 319.43 - - - - - - 109.16 1,184.37
17 HORMIGON m3 26.0400 36.16 941.61 - - 26.04 941.61 - - - - - - - - 26.04 941.61
18 AGUA m3 5,144.6477 0.85 4,372.95 1,838.63 1,562.84 708.58 602.30 1,183.69 1,006.14 930.49 790.91 438.19 372.46 45.07 38.31 5,144.65 4,372.95
19 TECNOPORT m2 2,692.0740 10.59 28,509.06 - - 2,439.50 25,834.35 252.57 2,674.71 - - - - - - 2,692.07 28,509.06
20 ESTACAS DE FIERRO Ø3/8" und 1,956.0530 1.00 1,956.05 1,381.22 1,381.21 542.77 542.77 32.07 32.07 - - - - - - 1,956.05 1,956.05
21 REGLA DE MADERA p2 1,539.0270 4.50 6,925.62 90.83 408.71 253.46 1,140.57 209.64 943.39 492.81 2,217.64 391.75 1,762.90 100.53 452.40 1,539.03 6,925.62
22 ARBOLES ORNAMENTALES und 26.0000 21.19 550.94 - - 26.00 550.94 - - - - - - - - 26.00 550.94
23 MADERA TORNILLO INC.CORTE P/ENCOFRADO p2 22,733.2450 3.98 90,478.32 673.88 2,682.03 1,158.61 4,611.26 2,858.61 11,377.29 6,447.24 25,660.00 6,814.84 27,123.05 4,780.08 19,024.70 22,733.25 90,478.32
24 GAVION CAJA DE 5X1.00X1.00 (ZINC+ALUM) und 288.0000 318.04 91,595.52 - - 127.98 40,702.76 160.02 50,892.76 - - - - - - 288.00 91,595.52
25 GRASS AMERICANO m2 1,834.2030 1.50 2,751.30 - - 843.66 1,265.48 990.55 1,485.82 - - - - - - 1,834.20 2,751.30
26 THINER STANDARD gln 115.3104 21.00 2,421.52 - - 0.94 19.74 114.37 2,401.78 - - - - - - 115.31 2,421.52
27 PETROLEO gln 1,045.7011 11.92 12,464.76 849.72 10,128.70 195.98 2,336.06 - - - - - - - - 1,045.70 12,464.76
28 PINTURA ESMALTE PARA TRAFICO gln 190.6215 50.00 9,531.08 - - 190.62 9,531.08 - - - - - - - - 190.62 9,531.08
29 PINTURA ESMALTE REFLECTANTE gln 3.7500 118.00 442.50 - - 3.75 442.50 - - - - - - - - 3.75 442.50
30 PINTURA ESMALTE gln 198.6051 31.57 6,269.96 138.12 4,360.34 57.28 1,808.28 3.21 101.34 - - - - - - 198.61 6,269.96
31 PINTURA ANTICORROSIVA gln 3.7500 35.00 131.25 - - 3.75 131.25 - - - - - - - - 3.75 131.25
32 PLANCHA DE ACERO DE 1.6mm X 1.22 M X 2.40 m. pln 3.7500 101.69 381.34 - - 3.75 381.34 - - - - - - - - 3.75 381.34
33 TUBO DE FIERRO GALVANIZADO 2" m 106.5000 8.47 902.06 - - 106.50 902.06 - - - - - - - - 106.50 902.06

TOTAL 1,740,367.79 274,481.04 235,412.54 415,004.13 400,969.85 293,496.72 121,003.51 1,740,367.79


FORMATO FF-17
CRONOGRAMA REQUERIMIENTO DE MAQUINARIA Y EQUIPO
PROYECTO:
#REF!
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 TOTAL
Precio
Item Descripción Und. Cantidad Parcial Presupuestad Presupuestad Presupuestad Presupuestad Presupuestad Presupuestad
unitario Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Presupuestado
o o o o o o
1 TEODOLITO HE 312.9686 3.39 1,060.96 220.99 749.16 86.85 294.41 5.13 17.39 - - - - - - 312.97 1,060.96
2 GEOTEXTIL NO TEJIDO MAC TEX N°40.1 m2 1,250.3000 2.87 3,588.36 - - 1,249.93 3,587.30 0.37 1.06 - - - - - - 1,250.30 3,588.36
3 MEZCLADORA DE CONCRETO DE 9 -11P3 hm 1,151.8208 12.71 14,639.64 98.87 1,256.69 236.75 3,009.04 228.20 2,900.40 253.30 3,219.42 235.80 2,997.03 98.90 1,257.06 1,151.82 14,639.64
4 MEZCLADORA DE CONCRETO DE 9 -11P3 HE 1,055.0481 12.71 13,409.66 - - 0.71 8.98 325.43 4,136.25 461.56 5,866.46 249.99 3,177.40 17.35 220.57 1,055.05 13,409.66
5 CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000 hm 115.4523 103.81 11,985.10 115.45 11,985.10 - - - - - - - - - - 115.45 11,985.10
6 VOLQUETE DE 10 M3 hm 7.0194 93.22 654.35 - - 7.02 654.35 - - - - - - - - 7.02 654.35
7 COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP hm 29.9506 12.71 380.67 - - 29.95 380.67 - - - - - - - - 29.95 380.67
8 RODILLO LISO VIBR AUTOP 101-135HP 10-12T hm 233.2495 152.54 35,579.88 233.25 35,579.88 - - - - - - - - - - 233.25 35,579.88
9 COMPACTADOR VIBR. TIPO PLANCHA 7 HP HE 1,331.2272 12.71 16,919.90 - - 359.71 4,571.91 713.39 9,067.20 258.13 3,280.79 - - - - 1,331.23 16,919.90
10 CARGADOR S/LLANTAS 125 HP 2.5 YD3. hm 810.2356 169.49 137,326.83 206.97 35,079.15 338.32 57,341.54 238.82 40,477.38 11.48 1,945.73 14.65 2,483.01 - - 810.24 137,326.83
11 VIBRADOR DE CONCRETO 4 HP 2.40" hm 108.1171 5.83 630.32 - - 89.80 523.52 18.32 106.80 - - - - - - 108.12 630.32
12 VIBRADOR DE CONCRETO 4 HP 2.40" HE 2,187.9337 5.83 12,755.65 106.48 620.77 254.59 1,484.28 544.15 3,172.38 677.14 3,947.74 483.15 2,816.78 122.42 713.71 2,187.93 12,755.65
13 TRACTOR D6D-140HP hm 344.5564 220.33 75,916.11 216.33 47,664.87 128.22 28,251.24 - - - - - - - - 344.56 75,916.11
14 MOTONIVELADORA DE 125 HP hm 233.2495 186.44 43,487.04 233.25 43,487.04 - - - - - - - - - - 233.25 43,487.04
15 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 hm 89.8069 12.71 1,141.45 - - 89.81 1,141.45 - - - - - - - - 89.81 1,141.45
16 VOLQUETE DE 15 M3 hm 1,615.5399 93.22 150,600.63 414.47 38,636.65 677.50 63,156.16 478.27 44,584.05 15.98 1,489.65 29.33 2,734.13 - - 1,615.54 150,600.63
17 NIVEL TOPOGRAFICO HE 312.9686 2.54 794.94 220.99 561.32 86.85 220.59 5.13 13.03 - - - - - - 312.97 794.94

TOTAL 520,871.49 215,620.64 164,625.44 104,475.94 19,749.79 14,208.34 2,191.34 520,871.49


FORMATO FF-18
CRONOGRAMA REQUERIMIENTO DE MANO DE OBRA
PROYECTO:
#REF!
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 TOTAL
Precio
Item Descripción Und. Cantidad Parcial Presupuestad Presupuestad Presupuestad Presupuestad Presupuestad Presupuestad
unitario Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Presupuestado
o o o o o o
1 TOPOGRAFO hh 312.9690 17.99 5,630.31 220.99 3,975.65 86.85 1,562.38 5.13 92.29 - - - - - - 312.97 5,630.31
2 OPERARIO hh 15,459.3587 17.99 278,113.86 1,054.78 18,975.43 2,051.86 36,912.92 3,812.26 68,582.48 3,855.23 69,355.53 3,027.01 54,455.88 1,658.23 29,831.61 15,459.36 278,113.86
3 OFICIAL hh 18,365.6093 15.01 275,667.80 1,575.60 23,649.83 2,099.44 31,512.63 4,629.77 69,492.88 4,788.86 71,880.72 3,501.24 52,553.58 1,770.70 26,578.16 18,365.61 275,667.80
4 PEON hh 58,154.1170 13.47 783,335.96 4,192.77 56,476.59 20,659.44 278,282.67 10,180.70 137,134.08 10,852.85 146,187.84 8,760.65 118,005.95 3,507.71 47,248.83 58,154.12 783,335.96

TOTAL 1,342,747.93 103,077.49 348,270.60 275,301.73 287,424.09 225,015.41 103,658.60 1,342,747.93


FORMATO FF-18
CRONOGRAMA REQUERIMIENTO DE SUBCONTRATOS
PROYECTO:
#REF!
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 TOTAL
Precio
Item Descripción Und. Cantidad Parcial Presupuestad Presupuestad Presupuestad Presupuestad Presupuestad Presupuestad
unitario Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Presupuestado
o o o o o o
CARTEL DE OBRA DE 3.60M X 8.50M (INCLUYE INSTALACIÓN Y TRANSPORTE) und 1.0000 1,357.00 1,357.00
1 1,357.00
1.00 1,357.00 - - - - - - - - - - 1.00
2 ALQUILER DE ALMACÉN mes 6.0000 200.00 1,200.00 1.00 200.00 1.00 200.00 1.00 200.00 1.00 200.00 1.00 200.00 1.00 200.00 6.00 1,200.00
MOVILIZACIÓN DE MAQUINARIAS Y HERRRAMIENTAS PARA LA OBRA GLB 1.0000 2,500.00 2,500.00
3 2,500.00
1.00 2,500.00 - - - - - - - - - - 1.00
4 CAPACITADOR TECNICO GLB 2.0000 3,000.00 6,000.00 - - 2.00 6,000.00 - - - - - - - - 2.00 6,000.00

TOTAL 11,057.00 4,057.00 6,200.00 200.00 200.00 200.00 200.00 11,057.00


FORMATO FF-19
CRONOGRAMA REQUERIMIENTO DE OTROS SERVICIOS
#REF!

También podría gustarte