Está en la página 1de 56

S10 1

Presupuesto
Presupu “AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE
esto ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”

Cliente Costo
al
Lugar

Item Descripción Und. Metrado Precio S/. Parcial S/.

01 OBRAS PROVISIONALES 3,285.31

01.01 GUARDIANIA, DEPOSITO Y ALMACEN glb 1.00 1,108.42 1,108.42

01.02 CARTEL DE OBRA 3.60 M X 4.80 M u 1.00 2,176.89 2,176.89

02 ESTRUCTURAS - 01 AULA 94,290.27

02.01 OBRAS PRELIMINARES 2,313.72

02.01.01 LIMPIEZA DE TERRENO MANUAL m2 156.65 2.47 386.93

02.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 156.65 4.11 643.83

02.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 156.65 8.19 1,282.96

02.02 OBRAS DE CONCRETO SIMPLE 5,722.75

02.02.01 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 129.24 44.28 5,722.75

02.03 OBRAS DE CONCRETO ARMADO 42,518.23

02.03.01 COLUMNAS 16,662.78

02.03.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 6.69 541.94 3,625.58

02.03.01.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,144.08 6.34 7,253.47

02.03.01.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 86.17 67.12 5,783.73

02.03.02 VIGAS 20,378.55

02.03.02.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 8.63 454.60 3,923.20

02.03.02.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,167.55 6.42 7,495.67

02.03.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 114.53 78.23 8,959.68

02.03.03 COLUMNETAS DE AMARRE 2,771.95

02.03.03.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 1.85 470.02 869.54

02.03.03.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 141.33 6.34 896.03

02.03.03.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 27.17 37.04 1,006.38

02.03.04 VIGUETAS DE AMARRE 836.36

02.03.04.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.36 407.54 146.71

02.03.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 38.67 6.34 245.17

02.03.04.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 12.00 37.04 444.48

02.03.05 LOSAS ALIGERADAS 1,868.59

02.03.05.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 0.87 443.45 385.80

02.03.05.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 51.95 6.34 329.36

02.03.05.03 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2 11.62 78.23 909.03

02.03.05.04 LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO u 104.00 2.35 244.40

02.04 ESTRUCTURAS DE MADERA (TIJERALES) 43,399.41

02.04.01 TIJERAL DE MADERA SEGUN DISEÑO u 6.00 2,331.08 13,986.48

02.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". u 24.00 308.09 7,394.16

02.04.03 ANCLAJE DE TIJERAL DE MADERA u 12.00 1,004.25 12,051.00

02.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 175.85 51.94 9,133.65

02.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 20.28 41.13 834.12

02.05 PRUEBAS DE LABORATORIO 336.16

02.05.01 PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA COMPRESION) u 8.00 42.02 336.16
03 ESTRUCTURAS - ADMINISTRACION 62,187.84

03.01 OBRAS PRELIMINARES 3,782.25

03.01.01 LIMPIEZA DE TERRENO MANUAL m2 91.08 2.47 224.97

03.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 111.23 4.11 457.16

03.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 111.23 8.19 910.97

03.01.04 DEMOLICION DE MURO DE ADOBE E=0.40m m3 54.99 39.81 2,189.15

03.02 MOVIMIENTO DE TIERRAS 3,817.10

03.02.01 EXCAVACION PARA ZAPATAS DE 1.70M DE PROFUNDIDAD m3 18.15 44.96 816.02

03.02.02 EXCAVACION PARA CUNETAS m3 6.85 28.10 192.49

03.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 11.75 17.36 203.98

03.02.04 RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO LIVIANO m2 85.36 10.12 863.84

03.02.05 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 92.94 18.73 1,740.77


03.03 OBRAS DE CONCRETO SIMPLE 7,753.19

03.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 13.96 34.43 480.64

03.03.02 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 3.30 307.69 1,015.38

03.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 26.50 76.38 2,024.07

03.03.04 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 51.15 44.28 2,264.92

03.03.05 CONCRETO EN CUNETAS FC 175KG/CM2 m3 4.03 282.60 1,138.88

03.03.06 ENCOFRADO DE CUNETAS m2 19.34 42.88 829.30

03.04 OBRAS DE CONCRETO ARMADO 24,400.08

03.04.01 ZAPATAS 4,536.97

03.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 7.38 431.54 3,184.77

03.04.01.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 213.28 6.34 1,352.20

03.04.02 VIGAS DE CIMENTACION 3,188.10

03.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 2.14 448.93 960.71

03.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35

03.04.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 17.10 71.64 1,225.04

03.04.03 SOBRECIMIENTO ARMADO 1,002.35

03.04.03.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35

03.04.04 COLUMNAS 6,026.45

03.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.13 541.94 1,154.33

03.04.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 507.51 6.34 3,217.61

03.04.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 24.65 67.12 1,654.51

03.04.05 VIGAS 7,563.76

03.04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.37 454.60 1,532.00

03.04.05.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 597.24 6.42 3,834.28

03.04.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 28.09 78.23 2,197.48

03.04.06 COLUMNETAS DE AMARRE 986.02

03.04.06.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 0.55 470.02 258.51

03.04.06.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 71.75 6.34 454.90

03.04.06.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 7.36 37.04 272.61

03.04.07 VIGUETAS DE AMARRE 1,096.43

03.04.07.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.88 407.54 358.64

03.04.07.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 64.90 6.34 411.47

03.04.07.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 8.81 37.04 326.32

03.05 ESTRUCTURAS DE MADERA (TIJERALES) 21,678.86

03.05.01 TIJERAL DE MADERA SEGUN DISEÑO u 3.00 2,331.08 6,993.24

03.05.02 CORREAS DE MADERA TORNILLO DE 2"x3". u 12.00 302.09 3,625.08

03.05.03 ANCLAJE DE TIJERAL DE MADERA u 6.00 1,004.25 6,025.50

03.05.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 89.10 51.94 4,627.85

03.05.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 9.90 41.13 407.19


03.06 PRUEBAS DE LABORATORIO 756.36

03.06.01 PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA COMPRESION) u 18.00 42.02 756.36

04 ESTRUCTURAS CERCO PERIMETRICO 204,094.62

04.01 OBRAS PRELIMINARES 3,075.26

04.01.01 LIMPIEZA DE TERRENO MANUAL m2 208.21 2.47 514.28

04.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 208.21 4.11 855.74

04.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 208.21 8.19 1,705.24

04.02 MOVIMIENTO DE TIERRAS 8,506.68

04.02.01 EXCAVACION PARA CIMIENTOS HASTA 0.70M DE PROFUNDIDAD EN TERRENO NORMAL m3 182.99 28.10 5,142.02

04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 157.36 17.36 2,731.77

04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 33.79 18.73 632.89

04.03 OBRAS DE CONCRETO SIMPLE 90,398.33


04.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 208.21 34.43 7,168.67

04.03.02 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 145.75 232.29 33,856.27

04.03.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 37.23 307.69 11,455.30

04.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 496.44 76.38 37,918.09

04.04 OBRAS DE CONCRETO ARMADO 102,114.35

04.04.01 SOBRECIMIENTO ARMADO 12,242.35

04.04.01.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,930.97 6.34 12,242.35

04.04.02 COLUMNAS 22,733.26

04.04.02.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 9.45 497.51 4,701.47

04.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,510.20 6.34 9,574.67

04.04.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 126.00 67.12 8,457.12

04.04.03 VIGAS 67,138.74

04.04.03.01 CONCRETO EN VIGAS f'c=175 kg/cm2 m3 87.36 497.51 43,462.47

04.04.03.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,573.61 6.42 10,102.58

04.04.03.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 173.51 78.23 13,573.69

05 FLETE TERRESTRE 16,696.11

05.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 111,307.41 0.15 16,696.11

01 ARQUITECTURA - 01 AULA 53,654.45

01.01 MUROS Y TABIQUES DE ALBAÑILERIA 7,141.20

01.01.01 MURO DE LADRILLO TIPO IV 18 HUECOS DE SOGA C:A 1:4 x 1.50CM m2 116.61 61.24 7,141.20

01.02 REVOQUES ENLUCIDOS 14,550.96

01.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 98.74 39.64 3,914.05

01.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 125.65 35.98 4,520.89

01.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 55.04 32.12 1,767.88

01.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 66.62 47.33 3,153.12

01.02.05 TARRAJEO DE ESCALERAS m2 23.78 34.20 813.28

01.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 13.09 14.06 184.05

01.02.07 BRUÑAS 1" m 158.15 1.25 197.69

01.03 CIELORRASO 7,045.00

01.03.01 CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO DE 2" x 2" x 10´ m2 129.74 52.88 6,860.65

01.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 7.54 24.45 184.35

01.04 PISOS Y PAVIMENTOS 4,571.94

01.04.01 PISO DE CONCRETO E=4", PULIDO, BRUÑADO Y COLOREADO m2 112.25 40.73 4,571.94

01.05 ZOCALOS Y CONTRAZOCALOS 915.01

01.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 C:A m 74.09 12.35 915.01

01.06 CARPINTERIA DE MADERA 1,648.00

01.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION u 2.00 754.00 1,508.00
01.06.02 TICERO DE MADERA CEDRO (L=3.10m) BARNIZADO u 2.00 70.00 140.00
01.07 CARPINTERIA METALICA 7,509.28

01.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 23.32 198.55 4,630.19

01.07.02 REJILLA METALICA FIJA u 2.00 112.98 225.96

01.07.03 PASAMANO DE ACERO TUBO DE 2" m 22.00 96.79 2,129.38

01.07.04 CANTONERA PARA ESCALERA SEGUN PLANOS m 25.00 20.95 523.75

01.08 CERRAJERIA 353.70

01.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 6.00 29.55 177.30

01.08.02 CHAPA DE PARCHE DE TRES GOLPES pza 2.00 88.20 176.40

01.09 VIDRIOS, CRISTALES Y SIMILARES 1,984.87

01.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 363.53 5.46 1,984.87

01.10 PINTURA 5,499.53

01.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 98.74 10.32 1,019.00

01.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 137.27 7.19 986.97
01.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 55.04 8.52 468.94

01.10.04 PINTURA EN VIGAS C/LATEX LAVABLE m2 66.62 8.79 585.59

01.10.05 PINTURA EN DERRAMES C/LATEX LAVABLE m 13.09 2.18 28.54

01.10.06 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 129.74 9.77 1,267.56

01.10.07 PINTURA EN PIZARRA m2 7.40 12.77 94.50

01.10.08 PINTURA EN FRISO DE MADERA m2 7.34 12.62 92.63

01.10.09 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 74.09 5.66 419.35

01.10.10 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 5.20 16.18 84.14

01.10.11 PINTURA ESMALTE EN BRUÑAS DE 1" m 158.15 2.86 452.31

01.11 VARIOS 22.30

01.11.01 JUNTAS SISMICA 1" m 4.46 5.00 22.30

01.12 SISTEMA DE AGUA DE LLUVIA 2,412.66

01.12.01 TUBERIAS Y ACCESORIOS 2,412.66

01.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 24.05 16.31 392.26

01.12.01.02 CODO PVC-SAP 3" * 90 u 7.00 13.20 92.40

01.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 39.22 16.46 645.56

01.12.01.04 SOPORTE DE CANALETA u 25.00 3.89 97.25

01.12.01.05 ABRAZADERA PARA CANALETA u 13.00 19.54 254.02

01.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 9.79 37.04 362.62

01.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.67 393.71 263.79

01.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 8.14 28.92 235.41

01.12.01.09 PINTURA EN FALSA COLUMNA m2 8.14 8.52 69.35

02 ARQUITECTURA -ADMINISTRACION 39,987.76

02.01 MUROS Y TABIQUES DE ALBAÑILERIA 5,296.73

02.01.01 MURO DE LADRILLO TIPO IV 18 HUECOS DE CABEZA C:A 1:4 x 1.50CM m2 38.57 104.35 4,024.78

02.01.02 MURO DE LADRILLO TIPO IV 18 HUECOS DE SOGA C:A 1:4 x 1.50CM m2 20.77 61.24 1,271.95

02.02 REVOQUES ENLUCIDOS 8,521.73

02.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 58.30 39.64 2,311.01

02.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 61.21 35.98 2,202.34

02.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 10.37 32.12 333.08

02.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 25.90 47.33 1,225.85

02.02.05 TARRAJEO EN PESTAÑAS CON C:A 1:5 E = 1.50cm m2 8.05 47.33 381.01

02.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 33.80 14.06 475.23

02.02.07 FROTACHADO EN CUNETAS CON C:A 1:5 E = 1.50cm CON IMPERMEABILIZANTE m2 36.51 32.88 1,200.45

02.02.08 BRUÑAS DE 1/2" m 263.22 1.25 329.03

02.02.09 BRUÑAS 3/4" m 50.98 1.25 63.73

02.03 CIELORRASO 4,469.96

02.03.01 CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO DE 2" x 2" x 10´ m2 81.83 52.88 4,327.17
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO DE 2" x 2" x 10´

02.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 5.84 24.45 142.79
02.04 PISOS Y PAVIMENTOS 4,864.78

02.04.01 PISO MACHIEMBRADO m2 66.00 38.11 2,515.26

02.04.02 VEREDA DE CONCRETO f'c= 175 kg/cm2 H=0.10M m2 34.21 57.94 1,982.13

02.04.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 4.81 76.38 367.39

02.05 ZOCALOS Y CONTRAZOCALOS 2,630.97

02.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 C:A m 30.51 12.35 376.80

02.05.02 CONTRAZOCALO DE MADERA CEDRO DE 4" RODON 1" m 28.23 79.85 2,254.17

02.06 CARPINTERIA DE MADERA 5,632.18

02.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION u 1.00 754.00 754.00

02.06.02 PUERTA CONTRAPLACADA DE MADERA TORNILLO SEGUN DISEÑO INCL. INSTALACION u 2.00 380.00 760.00

02.06.03 TABIQUERIA DE MELAMINE DE 1" m2 22.50 183.03 4,118.18


02.07 CARPINTERIA METALICA 1,367.82

02.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 6.32 198.55 1,254.84

02.07.02 REJILLA METALICA FIJA u 1.00 112.98 112.98

02.08 CERRAJERIA 752.85

02.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 10.00 29.55 295.50

02.08.02 CHAPA DE PARCHE DE TRES GOLPES pza 3.00 88.20 264.60

02.08.03 MANIJA DE BRONCE DE 4" PARA PUERTAS pza 3.00 64.25 192.75

02.09 VIDRIOS, CRISTALES Y SIMILARES 483.65

02.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 88.58 5.46 483.65

02.10 PINTURA 4,045.08

02.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 58.30 10.32 601.66

02.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 61.21 7.19 440.10

02.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 10.37 8.52 88.35

02.10.04 PINTURA EN COLUMNETAS C/LATEX LAVABLE m2 3.12 8.52 26.58

02.10.05 PINTURA EN VIGAS C/LATEX LAVABLE m2 25.90 8.79 227.66

02.10.06 PINTURA EN PESTAÑAS C/LATEX LAVABLE m2 8.05 8.79 70.76

02.10.07 PINTURA EN DERRAMES C/LATEX LAVABLE m 40.20 2.18 87.64

02.10.08 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 77.79 9.77 760.01

02.10.09 PINTURA EN FRISO DE MADERA m2 3.90 12.62 49.22

02.10.10 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 30.51 5.66 172.69

02.10.11 PINTURA BARNIZ EN CONTRAZOCALO DE MADERA DE CEDRO 4" CON RODON m 28.23 16.18 456.76

02.10.12 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 10.20 16.18 165.04

02.10.13 PINTURA ESMALTE EN BRUÑAS 1/2" m 263.22 2.86 752.81

02.10.14 PINTURA ESMALTE EN BRUÑAS DE MUROS EXTERIORES 3/4" m 50.98 2.86 145.80

02.11 VARIOS 128.25

02.11.01 JUNTAS DE DILATACION m 7.10 5.00 35.50

02.11.02 JUNTAS SISMICA 1" m 18.55 5.00 92.75

02.12 SISTEMA DE AGUA DE LLUVIA 1,793.76

02.12.01 TUBERIAS Y ACCESORIOS 1,793.76

02.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 22.00 16.31 358.82

02.12.01.02 CODO PVC-SAP 3" * 90 u 12.00 13.20 158.40

02.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 19.50 16.46 320.97

02.12.01.04 SOPORTE DE CANALETA u 16.00 3.89 62.24

02.12.01.05 ABRAZADERA PARA CANALETA u 20.00 19.54 390.80

02.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 4.95 37.04 183.35

02.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.34 393.71 133.86

02.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 4.95 28.92 143.15

02.12.01.09 PINTURA EN FALSA COLUMNA m2 4.95 8.52 42.17


03 ARQUITECTURA CERCO PERIMETRICO 92,334.44

03.01 MUROS Y TABIQUES DE ALBAÑILERIA 48,226.50

03.01.01 MURO DE LADRILLO TIPO IV 18 HUECOS DE SOGA C:A 1:4 x 1.50CM m2 787.50 61.24 48,226.50

03.02 REVOQUES ENLUCIDOS 34,401.75

03.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 496.44 39.64 19,678.88

03.02.02 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 126.00 32.12 4,047.12

03.02.03 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 225.56 47.33 10,675.75

03.03 CARPINTERIA METALICA 3,500.00

03.03.01 PORTON METALICO 3.50m x 3.00m und 1.00 3,500.00 3,500.00

03.04 PINTURA 3,056.19

03.04.01 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 126.00 8.52 1,073.52

03.04.02 PINTURA EN VIGAS C/LATEX LAVABLE m2 225.56 8.79 1,982.67

03.05 VARIOS

03.06 JUNTAS DE DILATACION m 630.00 5.00 3,150.00


04 FLETE TERRESTRE 26,051.25

04.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 173,674.98 0.15 26,051.25

05 EQUIPAMIENTO Y MOBILIARIO 5,000.00

05.01 MOBILIARIO DE COLEGIO (ESCRITORIOS,CARPETAS,COMPUTADORAS) glb 1.00 5,000.00 5,000.00

01 INSTALACIONES ELECTRICAS - 01 AULA 3,824.09

01.01 SISTEMA ELECTRICO 1,410.90

01.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 10.00 63.96 639.60

01.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 4.00 54.26 217.04

01.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 2.00 47.00 94.00

01.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 2.00 46.89 93.78

01.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 8.00 45.81 366.48

01.02 CANALIZACIONES, TUBERIAS Y/O CABLES 972.83

01.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES 390.69

01.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 109.13 3.58 390.69

01.02.02 CABLES ELECTRICOS 582.14

01.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 148.00 2.87 424.76

01.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 70.26 2.24 157.38

01.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS 498.60

01.03.01 TABLERO DE DISTRIBUCION 498.60

01.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS u 2.00 249.30 498.60

01.04 ARTEFACTOS ELECTRICOS 941.76

01.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA u 8.00 107.37 858.96

01.04.02 SPOT LIGHT u 2.00 41.40 82.80

02 INSTALACIONES ELECTRICAS - ADMINISTRACION 1,953.92

02.01 SISTEMA ELECTRICO 772.85

02.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 4.00 63.96 255.84

02.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 1.00 54.26 54.26

02.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 3.00 47.00 141.00

02.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 1.00 46.89 46.89

02.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 6.00 45.81 274.86

02.02 CANALIZACIONES, TUBERIAS Y/O CABLES 412.83

02.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES 151.26

02.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 42.25 3.58 151.26

02.02.02 CABLES ELECTRICOS 261.57

02.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 50.21 2.87 144.10

02.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 52.44 2.24 117.47

02.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS 297.36


02.03.01 TABLERO DE DISTRIBUCION 249.30

02.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS u 1.00 249.30 249.30

02.03.02 CAJA DE PASO 48.06

02.03.02.01 CAJA DE PASE F.G. 4" x 4" x 2" u 2.00 24.03 48.06

02.04 ARTEFACTOS ELECTRICOS 470.88

02.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA u 4.00 107.37 429.48

02.04.02 SPOT LIGHT u 1.00 41.40 41.40

03 FLETE TERRESTRE 37.29

03.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 248.61 0.15 37.29

COSTO DIRECTO 603,397.35


GASTOS GENERALES 9% 54,305.76
UTILIDAD 5% 30,169.87

SUBTOTAL 687,872.98
IMPUESTO (IGV 18%) 123,817.14

TOTAL 811,690.12
PRESUPUESTO
VALORIZACION N° 01
PROYECTO: AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 711,265.59
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 30-Nov-14 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. VICTOR COBADIS ROMERO RIVEROS

PORCENT
PRESUPUESTADO VALORIZACION N° 01 SALDO
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
01 ESTRUCTURAS 168,526.81
01.01 OBRAS PRELIMINARES 10,097.00 0.00 0.00 1.00 0.00 1.00 0.00 -1.00 10,097.00 0.00%
01.01.01 CONTENEDOR OFICINA día 90.00 20.00 1,800.00 0.00 0.00 1.00 20.00 1.00 20.00 89.00 1,780.00 1.11%
01.01.02 CONTENEDOR ALMACEN día 90.00 20.00 1,800.00
01.01.03 CONTENEDOR INODORO, LAVATORIOS día 90.00 20.00 1,800.00
01.01.04 TRAZO INICIAL gbl 1.00 77.00 77.00 0.00 0.00 1.00 77.00 1.00 77.00 0.00 0.00 100.00%
01.01.05 TRAZO DURANTE LA EJECUCION DE LA OBRA día 60.00 77.00 4,620.00 0.00 0.00 60.00 4,620.00 60.00 4,620.00 0.00 0.00 100.00%
01.02 TRANSPORTE VERTICAL Y HORIZONTAL DE MATERIALES 22,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22,000.00 0.00%
01.02.01 TRANSPORTE VERTICAL Y HORIZONTAL DE MATERIALES EN OBRA vje 5,000.00 4.40 22,000.00
01.03 DEMOLICIONES 3,167.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,167.20 0.00%
01.03.01 DEMOLICION CONSTRUCCION EXISTENTE m3 5.00 296.60 1,483.00
01.03.02 PICADO DE REBABAS EN CIMIENTOS Y SOBRECIMIENTOS DE CONSTRU m2 30.00 56.14 1,684.20
01.04 MOVIMIENTO DE TIERRAS 5,397.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,397.51 0.00%
01.04.01 LIMPIEZA DE TERRENO MANUAL m2 355.00 2.61 926.55 0.00 0.00 1,144.08 2,986.05 1,144.08 2,986.05 -789.08 -2,059.50 322.28%
01.04.02 EXCAVACION PARA CIMIENTOS HASTA 1.00 mTERRENO NORMAL m3 66.00 23.11 1,525.26 0.00 0.00 0.00 0.00 0.00 0.00 66.00 1,525.26 0.00%
01.04.03 NIVELACION INTERIOR APISONADO MANUAL m2 290.00 1.76 510.40
01.04.04 ELIMINACION CON TRANSPORTE (CARGUIO A MANO) R=25 m3/día m3 70.00 34.79 2,435.30 0.00 0.00 0.00 0.00 0.00 0.00 70.00 2,435.30 0.00%
01.05 CONCRETO SIMPLE 21,066.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21,066.03 0.00%
01.05.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 33.00 9.36 308.88 0.00 0.00 0.00 0.00 0.00 0.00 33.00 308.88 0.00%
01.05.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 66.00 128.71 8,494.86
01.05.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0 m2 45.00 28.63 1,288.35 0.00 0.00 0.00 0.00 0.00 0.00 45.00 1,288.35 0.00%
01.05.04 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS m3 34.20 159.51 5,455.24 0.00 0.00 0.00 0.00 0.00 0.00 34.20 5,455.24 0.00%
01.05.05 CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON E=4" m2 290.00 19.03 5,518.70 0.00 0.00 0.00 0.00 0.00 0.00 290.00 5,518.70 0.00%
01.06 CONCRETO ARMADO 106,799.07
01.06.01 ZAPATAS Y VIGAS DE CIMENTACION 9,680.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,680.08 0.00%
01.06.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3 20.00 245.37 4,907.40 0.00 0.00 0.00 0.00 0.00 0.00 20.00 4,907.40 0.00%
01.06.01.02 ENCOFRADO DE ZAPATAS m2 17.00 26.86 456.62 0.00 0.00 0.00 0.00 0.00 0.00 17.00 456.62 0.00%
01.06.01.03 ACERO fy=4200 kg/cm2 GRADO 60 en ZAPATAS kg 1,120.00 2.27 2,542.40
01.06.01.04 ENCOFRADO DE VIGAS DE CIMENTACION m2 7.00 32.51 227.57 0.00 0.00 0.00 0.00 0.00 0.00 7.00 227.57 0.00%
01.06.01.05 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 3.50 251.06 878.71 0.00 0.00 0.00 0.00 0.00 0.00 3.50 878.71 0.00%
01.06.01.06 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS DE CIMENTACION kg 294.00 2.27 667.38 0.00 0.00 0.00 0.00 0.00 0.00 294.00 667.38 0.00%
01.06.02 COLUMNAS 15,956.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,956.96 0.00%
01.06.02.01 ACERO fy=4200 kg/cm2 GRADO 60 en COLUMNAS kg 2,248.00 2.27 5,102.96
01.06.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 126.00 43.25 5,449.50 0.00 0.00 0.00 0.00 0.00 0.00 126.00 5,449.50 0.00%
01.06.02.03 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 18.00 300.25 5,404.50 0.00 0.00 0.00 0.00 0.00 0.00 18.00 5,404.50 0.00%
01.06.03 VIGAS 32,142.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32,142.24 0.00%
01.06.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 96.00 61.65 5,918.40 0.00 0.00 0.00 0.00 0.00 0.00 96.00 5,918.40 0.00%
01.06.03.02 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS kg 9,000.00 2.27 20,430.00 0.00 0.00 0.00 0.00 0.00 0.00 9,000.00 20,430.00 0.00%
01.06.03.03 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 24.00 241.41 5,793.84
01.06.04 LOSAS ALIGERADAS 45,107.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45,107.18 0.00%
01.06.04.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 486.00 39.34 19,119.24
01.06.04.02 LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADO pza 5,830.00 1.01 5,888.30
01.06.04.03 ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS kg 3,300.00 2.27 7,491.00
01.06.04.04 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 48.00 262.68 12,608.64 0.00 0.00 0.00 0.00 0.00 0.00 48.00 12,608.64 0.00%
01.06.05 ESCALERAS 3,912.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,912.61 0.00%
01.06.05.01 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 24.00 52.55 1,261.20 0.00 0.00 0.00 0.00 0.00 0.00 24.00 1,261.20 0.00%
01.06.05.02 ACERO fy=4200 kg/cm2 GRADO 60 en ESCALERAS kg 520.00 2.27 1,180.40 0.00 0.00 0.00 0.00 0.00 0.00 520.00 1,180.40 0.00%
01.06.05.03 CONCRETO EN ESCALERAS f'c=210 kg/cm2 m3 5.60 262.68 1,471.01
01 ARQUITECTURA 264,900.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 264,900.67 0.00%
01.01 ALBAÑILERIA 83,242.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 83,242.30 0.00%
MURO LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARRE DE
841.00
01.01.01 CABEZA,JUNTA 1.5 cm.MORTERO 1:1:5 m2 88.60 74,512.60 0.00 0.00 0.00 0.00 0.00 0.00 841.00 74,512.60 0.00%
MURO LADRILLO K.K.DE ARCILLA 18 H.(0.09x0.13x0.24) AMARRE DE
01.01.02 CANTO,MORTERO 1:1:5 ,JUNTA 1.5 cm. m2 210.00 41.57 8,729.70 0.00 0.00 0.00 0.00 0.00 0.00 210.00 8,729.70 0.00%
01.02 REVOQUES ENLUCIDOS Y MOLDURAS 25,799.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25,799.73 0.00%
01.02.01 TARRAJEO PRIMARIO m2 127.00 15.33 1,946.91
01.02.02 TARRAJEO DE MUROS INTERIORES m2 1,200.00 16.69 20,028.00 0.00 0.00 0.00 0.00 0.00 0.00 1,200.00 20,028.00 0.00%
01.02.03 TARRAJEO DE MUROS EXTERIORES m2 162.00 23.61 3,824.82 0.00 0.00 0.00 0.00 0.00 0.00 162.00 3,824.82 0.00%
01.03 CIELORRASOS 19,566.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,566.30 0.00%
01.03.01 TARRAJEO DE CIELORASO m2 870.00 22.49 19,566.30 0.00 0.00 0.00 0.00 0.00 0.00 870.00 19,566.30 0.00%
01.04 PISOS Y PAVIMENTOS 47,503.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47,503.09 0.00%
01.04.01 CONTRAPISO DE 2" m2 870.00 20.32 17,678.40 0.00 0.00 0.00 0.00 0.00 0.00 870.00 17,678.40 0.00%
01.04.02 PISO DE LOSETA VENECIANA 40x40 cm m2 120.00 44.55 5,346.00
01.04.03 PISO DE PORCELANATO DE 30 X 30 cm m2 39.50 68.43 2,702.99
PISO DE PARQUET HUAYACAN CANELO OSCURO 6 X 30 cm m2 710.00 30.67 21,775.70 0.00 0.00 0.00 0.00 0.00 0.00 710.00 21,775.70 0.00%
01.05 CONTRAZOCALOS 15,346.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,346.80 0.00%
01.05.01 CONTRAZOCALO DE MADERA CEDRO DE 3/4" X 2" CON RODON DE 3/4" m 870.00 17.64 15,346.80
01.06 ZOCALOS 8,089.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,089.20 0.00%
01.06.01 ZOCALO DE PORCELANATO 30X30 cm m2 126.00 64.20 8,089.20 0.00 0.00 0.00 0.00 0.00 0.00 126.00 8,089.20 0.00%
01.07 REVESTIMIENTOS 304.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 304.47 0.00%
01.07.01 FORJADO DE PASOS Y CONTRAPASOS m 8.20 37.13 304.47
01.08 CUBIERTAS 8,073.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,073.60 0.00%
01.08.01 LADRILLO PASTELERO 0.25x0.25x0.03 m.ASENTADO CON MORTERO 1:4 m2 290.00 27.84 8,073.60
01.09 CARPINTERIA DE MADERA 24,990.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24,990.11 0.00%
PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO
82.00
01.09.01 CEDRO 2"X3" m2 229.04 18,781.28 0.00 0.00 0.00 0.00 0.00 0.00 82.00 18,781.28 0.00%
01.09.02 VENTANA CON HOJAS DE MADERA CEDRO m2 35.50 99.30 3,525.15 0.00 0.00 0.00 0.00 0.00 0.00 35.50 3,525.15 0.00%
01.09.03 PUERTAS DE MADERA TABLEROS REBAJADOS DE 4.5 mm DE CEDRO m2 8.00 335.46 2,683.68
01.10 CARPINTERIA METALICA 1,381.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,381.45 0.00%
01.10.01 ESCALERA METALICA DE CARACOL und 1.00 1,381.45 1,381.45 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,381.45 0.00%
01.11 CERRAJERIA 2,913.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,913.80 0.00%
01.11.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 3 1/2 X 3 1/2" und 147.00 13.92 2,046.24
01.11.02 CERRADURA PARA PUERTA INGRESO und 2.00 161.38 322.76 0.00 0.00 0.00 0.00 0.00 0.00 2.00 322.76 0.00%
01.11.03 CERRADURA PARA PUERTA DE BAÑOS und 6.00 39.38 236.28 0.00 0.00 0.00 0.00 0.00 0.00 6.00 236.28 0.00%
01.11.04 CERRADURA PARA PUERTA INTERIORES und 9.00 34.28 308.52 0.00 0.00 0.00 0.00 0.00 0.00 9.00 308.52 0.00%
01.12 VIDRIOS, CRISTALES Y SIMILARES 1,466.64
01.12.01 VIDRIO SEMIDOBLE INCOLORO CRUDO p2 388.00 3.78 1,466.64 0.00 0.00 0.00 0.00 0.00 0.00 388.00 1,466.64 0.00%
01.13 PINTURA 19,436.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,436.64 0.00%
01.13.01 PINTURA LATEX EN CIELO RASO m2 870.00 7.81 6,794.70 0.00 0.00 0.00 0.00 0.00 0.00 870.00 6,794.70 0.00%
01.13.02 PINTURA LATEX EN MUROS INTERIORES m2 1,200.00 7.73 9,276.00
01.13.03 PINTURA LATEX EN MUROS EXTERIORES m2 162.00 14.27 2,311.74 0.00 0.00 0.00 0.00 0.00 0.00 162.00 2,311.74 0.00%
01.13.04 BARNIZ EN VENTANAS DE MADERA m2 25.50 6.40 163.20 0.00 0.00 0.00 0.00 0.00 0.00 25.50 163.20 0.00%
01.13.05 BARNIZ EN PUERTAS DE MADERA m2 100.00 8.91 891.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 891.00 0.00%
01.14 APARATOS Y ACCESORIOS SANITARIOS 6,786.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,786.54 0.00%
01.14.01 INODORO ONE PIECE BLANCO und 9.00 543.07 4,887.63 0.00 0.00 0.00 0.00 0.00 0.00 9.00 4,887.63 0.00%
01.14.02 LAVATORIO PEDESTAL BLANCO und 9.00 128.17 1,153.53
01.14.03 DUCHA CROMADA DE CABEZA GIRATORIA Y LLAVE MEZCLADORA und 9.00 26.33 236.97 0.00 0.00 0.00 0.00 0.00 0.00 9.00 236.97 0.00%
01.14.04 TOALLERO DE LOSA BLANCO und 9.00 24.83 223.47
01.14.05 PAPELERA LOSA BLANCO und 9.00 15.83 142.47
01.14.06 JABONERA LOSA BLANCO und 9.00 15.83 142.47
01 INSTALACIONES ELECTRICAS 33,259.16 0.00 0.00 208.21 0.00 208.21 0.00 -208.21 33,259.16 0.00%
01.01 SALIDA PARA CENTRO DE LUZ pto 180.00 78.62 14,151.60 0.00 0.00 208.21 16,369.47 208.21 16,369.47 -28.21 -2,217.87 115.67%
01.02 SALIDA PARA BRAQUETE pto 7.00 87.89 615.23 0.00 0.00 80.00 7,031.20 80.00 7,031.20 -73.00 -6,415.97 1142.86%
01.03 SALIDA PARA SPOT LIGHT pto 6.00 90.62 543.72
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE + L.T. A PRUEBA DE
01.04 AGUA pto 66.00 85.94 5,672.04 0.00 0.00 43.00 3,695.42 43.00 3,695.42 23.00 1,976.62 65.15%
01.05 SALIDA PARA COCINA ELECTRICA pto 3.00 63.04 189.12
01.06 SALIDA PARA CALENTADOR ELECTRICO pto 3.00 115.38 346.14 0.00 0.00 0.00 0.00 0.00 0.00 3.00 346.14 0.00%
01.07 SALIDA PARA TELEFONO EXTERNO pto 3.00 76.36 229.08 0.00 0.00 0.00 0.00 0.00 0.00 3.00 229.08 0.00%
01.08 SALIDA PARA TELEVISION pto 9.00 80.28 722.52
01.09 SALIDA PARA GONG und 3.00 34.14 102.42 0.00 0.00 0.00 0.00 0.00 0.00 3.00 102.42 0.00%
01.10 POZO DE TIERRA und 3.00 731.93 2,195.79 0.00 0.00 0.00 0.00 0.00 0.00 3.00 2,195.79 0.00%
01.11 TABLEROS DISTRIBUCION CAJA METALICA CON 12 POLOS und 10.00 849.15 8,491.50 0.00 0.00 0.00 0.00 0.00 0.00 10.00 8,491.50 0.00%
01 INSTALACIONES SANITARIAS 21,119.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21,119.62 0.00%
01.01 SISTEMA DE DESAGUE 5,960.16
01.01.01 SALIDA DESAGUE DE PVC SAL 2" pto 45.00 22.43 1,009.35
01.01.02 SALIDA DESAGUE DE PVC-SAL 4" pto 18.00 62.85 1,131.30 0.00 0.00 0.00 0.00 0.00 0.00 18.00 1,131.30 0.00%
01.01.03 SALIDA VENTILACION DE PVC-SAL 2" pto 36.00 57.45 2,068.20
01.01.04 MONTANTE DE TUBERIA PVC SAL 4" m 36.00 22.25 801.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 801.00 0.00%
01.01.05 REGISTRO DE BRONCE 3" und 9.00 24.73 222.57 0.00 0.00 0.00 0.00 0.00 0.00 9.00 222.57 0.00%
01.01.06 CAJAS DE REGISTRO DE DESAGUE 12" x 24" und 3.00 242.58 727.74 0.00 0.00 0.00 0.00 0.00 0.00 3.00 727.74 0.00%
01.02 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 9,552.58
01.02.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2" pto 27.00 71.98 1,943.46 0.00 0.00 0.00 0.00 0.00 0.00 27.00 1,943.46 0.00%
01.02.02 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 DE 1/2" m 76.00 27.79 2,112.04 0.00 0.00 0.00 0.00 0.00 0.00 76.00 2,112.04 0.00%
01.02.03 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 DE 3/4" m 98.00 15.34 1,503.32 0.00 0.00 0.00 0.00 0.00 0.00 98.00 1,503.32 0.00%
01.02.04 VALVULA COMPUERTA DE 1/2" und 5.00 68.53 342.65
01.02.05 VALVULA COMPUERTA DE 3/4" und 9.00 74.53 670.77 0.00 0.00 3.60 268.31 3.60 268.31 5.40 402.46 40.00%
01.02.06 SISTEMA DE RIEGO CONVENCIONAL und 2.00 39.10 78.20
01.02.07 TANQUE DE AGUA DE ETERNIT DE 1000 LITROS INCLUYE ACC. INTERNOS und 3.00 967.38 2,902.14
01.03 SISTEMA DE AGUA CALIENTE 5,606.88 0.00 0.00 42.68 0.00 42.68 0.00 -42.68 5,606.88 0.00%
01.03.01 SALIDA AGUA CALIENTE TUBERIA CPVC O 1/2" pto 27.00 101.57 2,742.39
01.03.02 RED DE DISTRIBUCION DE AGUA CALIENTE CON TUBERIA CPVC DE 1/2" m 120.00 22.30 2,676.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 2,676.00 0.00%
01.03.03 VALVULA COMPUERTA DE 1/2" und 3.00 62.83 188.49 0.00 0.00 0.00 0.00 0.00 0.00 3.00 188.49 0.00%
COSTO DIRECTO 487,806.26 35,067.45 35,067.45 1,064,417.85 7.19%
GASTOS GENERALES 12.5286% 61,115.29 3,156.07 3,156.07 95,797.61
UTILIDAD 10% 48,780.63 1,753.37 1,753.37 53,220.89
SUBTOTAL 597,702.18 39,976.89 39,976.89 1,213,436.35
IMPUESTO (IGV 19%) 113,563.41 7,195.84 7,195.84 218,418.54
TOTAL PRESUPUESTO 711,265.59 40,284.65 40,284.65 1,431,854.90
Avance por mes 40,284.65
Avance acumulado 40,284.65
% DE AVANCE EJECUTADO POR MES 22.50 5.66%
% DE AVANCE PROGRAMADO POR MES 22.50 4.37%
% DE AVANCE EJECUTADO ACUMULADO 5.66%
% DE AVANCE PROGRAMADO ACUMULADO 4.37%
CRONOGRAMA VALORIZADO PROGRAMADO
AMPLIACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA EN EL CASERIO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD
OBRA

Cliente MUNICIPALIDAD DISTRITAL DE ANGASMARCA


Lugar LA LIBERTAD - SANTIAGO DE CHUCO - ANGASMARCA
PLAZO DE EJECUCION 120 DIAS CALENDARIOS

MESES

N° PARTIDAS MONTO DEL 26/11/14 DEL 01/12/14 AL DEL 01/01/15 DEL 01/02/15 DEL 01/03/15 TOTAL
AL 30/11/14 31/12/14 AL 31/01/15 AL 28/02/15 AL 25/03/15

ESTRUCTURAS
1.00 OBRAS PROVISIONALES 3,285.31 100%

3,285.31 3,285.31

2.00 ESTRUCTURAS AULAS


2.01 OBRAS PRELIMINARES 2,313.72 100%

2,313.72 2,313.72

2.02 OBRAS DE CONCRETO SIMPLE 5,722.75 100%

5,722.75 5,722.75
2.03 OBRAS DE CONCRETO ARMADO

2.03.01 COLUMNAS 16,662.78 40% 60%

6,665.11 9,997.67 16,662.78

2.03.02 VIGAS 20,378.55 100%

20,378.55 20,378.55

2.03.03 COLUMNETAS DE AMARRE 2,771.95 100%

2,771.95 2,771.95

2.03.04 VIGUETAS DE AMARRE 836.36 100%

836.36 836.36

2.03.05 LOSAS ALIGERADAS 1,868.59 100%

1,868.59 1,868.59

2.04 ESTRUCTURAS DE MADERA (TIJERALES) 43,399.41 40% 60%

17,359.76 26,039.65 43,399.41

2.05 PRUEBAS DE LABORATORIO 336.16 50% 50%

168.08 168.08 336.16

3.00 ESTRUCTURAS - ADMINISTRACION


3.01 OBRAS PRELIMINARES 3,782.25 100%

3,782.25 3,782.25

3.02 MOVIMIENTO DE TIERRAS 3,817.10 100%

3,817.10 3,817.10

3.03 OBRAS DE CONCRETO SIMPLE 7,753.19 100%

7,753.19 7,753.19

3.04 OBRAS DE CONCRETO ARMADO


3.04.01 ZAPATAS 4,536.97 100%

4,536.97 4,536.97

3.04.02 VIGAS DE CIMENTACION 3,188.10 100%

3,188.10 3,188.10

3.04.03 SOBRECIMIENTO ARMADO 1,002.35 100%

1,002.35 1,002.35

3.04.04 COLUMNAS 6,026.45 100%

6,026.45 6,026.45

3.04.05 VIGAS 7563.76 50% 50%

3,781.88 3,781.88 7,563.76


3.04.06 COLUMNETAS DE AMARRE 986.02 100%

986.02 986.02

3.04.07 VIGUETAS DE AMARRE 1096.43 100%

1,096.43 1,096.43

3.05 ESTRUCTURAS DE MADERA (TIJERALES) 21678.86 100%

21,678.86 21,678.86

3.06 PRUEBAS DE LABORATORIO 756.36 50% 50%

378.18 378.18 756.36

4.00 ESTRUCTURAS - CERCO PERIMETRICO


4.01 OBRAS PRELIMINARES 3075.26 100%

3,075.26 3,075.26

4.02 MOVIMIENTO DE TIERRAS 8506.68 50% 50%

4,253.34 4,253.34 8,506.68

4.03 OBRAS DE CONCRETO SIMPLE 90398.33 70% 30%

63,278.83 27,119.50 90,398.33

4.04 OBRAS DE CONCRETO ARMADO


4.04.01 SOBRECIMIENTO ARMADO 12242.35 70% 30%

8,569.65 3,672.71 12,242.35

4.04.02 COLUMNAS 22733.26 70% 30%

15,913.28 6,819.98 22,733.26

4.04.03 VIGAS 67138.74 70% 30%

46,997.12 20,141.62 67,138.74

5.00 FLETE TERRESTRE 16696.11 30% 70%

5,008.83 11,687.28 16,696.11

ARQUITECTURA
1.00 ARQUITECTURA - 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA 7141.2 25% 75%

1,785.30 5,355.90 7,141.20

1.02 REVOQUES ENLUCIDOS 14,550.96 100%

14,550.96 14,550.96

1.03 CIELO RASOS 7,045.00 100%

7,045.00 7,045.00

1.04 PISOS Y PAVIMENTOS 4,571.94 100%

4,571.94 4,571.94

1.05 ZOCALOS Y CONTRAZOCALOS 915.01 100%

915.01 915.01

1.06 CARPINTERIA DE MADERA 1,648.00 100%

1,648.00 1,648.00

1.07 CARPINTERIA METALICA 7,509.28 100%

7,509.28 7,509.28

1.08 CERRAJERIA 353.70 100%

353.70 353.70

1.09 VIDRIOS, CRISTALES Y SIMILARES 1,984.87 100%

1,984.87 1,984.87

1.10 PINTURA 5,499.53 100%

5,499.53 5,499.53

1.11 VARIOS 22.30 100%

22.30 22.30
1.12 SISTEMA DE AGUA DE LLUVIA 2,412.66 100%

2,412.66 2,412.66

2.00 ARQUITECTURA - ADMINISTRACION


2.01 MUROS Y TABIQUES DE ALBAÑILERIA 5,296.73 100%

5,296.73 5,296.73

2.02 REVOQUES ENLUCIDOS 8,521.73 50% 50%

4,260.87 4,260.87 8,521.73

2.03 CIELORRASO 4,469.96 50% 50%

2,234.98 2,234.98 4,469.96

2.04 PISOS Y PAVIMENTOS 4,864.78 100%

4,864.78 4,864.78

2.05 ZOCALOS Y CONTRAZOCALOS 2,630.97 100%

2,630.97 2,630.97
2.06 CARPINTERIA EN MADERA 5,632.18 100%

5,632.18 5,632.18

2.07 CARPINTERIA METALICA 1,367.82 100%

1,367.82 1,367.82

2.08 CERRAJERIA 752.85 100%

752.85 752.85

2.09 VIDRIOS, CRISTALES Y SIMILARES 483.65 100%

483.65 483.65

2.10 PINTURA 4,045.08 100%

4,045.08 4,045.08

2.10 VARIOS
2.10.01 JUNTAS DE DILATACION 35.5 100%

35.50 35.50

2.10.02 JUNTAS SISMICA 1" 92.75 100%

92.75 92.75

2.11 SISTEMA DE AGUA DE LLUVIA 1,793.76 100%

3.00 ARQUITECTURA - CERCO PERIMETRICO 1,793.76 1,793.76

3.01 MUROS Y TABIQUES DE ALBAÑILERIA 48,226.50 50% 50%

24,113.25 24,113.25 48,226.50

3.02 REVOQUES ENLUCIDOS 34,401.75 100%

34,401.75 34,401.75

3.03 CARPINTERIA METALICA 3,500.00 100%

3,500.00 3,500.00

3.04 PINTURA 3,056.19 100%

3,056.19 3,056.19

3.05 JUNTAS DE DILATACION 3,150.00 100%

3,150.00 3,150.00

4.00 FLETE TERRESTRE 26,051.25 50% 50%

13,025.63 13,025.63 26,051.25

5.00 EQUIPAMIENTO Y MOBILIARIO 5,000.00 100%

5,000.00 5,000.00
1.00 INSTALACIONES ELECTRICAS

1.01 INSTALACIONES ELECTRICAS 01 AULAS 3,824.09 100%

3,824.09 3,824.09

1.02 INSTALACIONES ELECTRICAS ADMINISTRACION 1,953.92 100%

1,953.92 1,953.92

1.03 FLETE TERRESTRE 37.29 100%

37.29 37.29
COSTO DIRECTO 603,397.35 26,386.9 228,222.0 182,449.8 126,114.4 40,224.3 603,397.35
0 GASTOS GENERALES (9% ) 54,305.76 2,374.82 20,539.98 16,420.48 11,350.30 3,620.18 54,305.76
UTILIDAD (5%) 30,169.87 1,319.34 11,411.10 9,122.49 6,305.72 2,011.21 30,169.87
SUB TOTAL 687,872.98 30,081.04 260,173.10 207,992.75 143,770.41 45,855.67 687,872.98
0 IGV (18 % ) 123,817.14 5,414.59 46,831.16 37,438.70 25,878.67 8,254.02 123,817.14
VALOR REFERENCIAL 811,690.12 35,495.62 307,004.26 245,431.45 169,649.08 54,109.69 811,690.12

AVANCE PROGRAMADO POR MES 811,690.12 35,495.62 307,004.26 245,431.45 169,649.08 54,109.69 811,690.12
% DE AVANCE PROGRAMADO POR MES 4.37% 37.82% 30.24% 20.90% 6.67% 100%
AVANCE PROGRAMADO ACUMULADO 35,495.62 342,499.89 587,931.34 757,580.42 811,690.12
% DE AVANCE PROGRAMADO ACUMULADO 100.00% 4.37% 42.20% 72.43% 93.33% 100.00%
###

### 0% 5%

###

### 36,001.56

###

###

###

###

###

###
###

###

###

###
###

2%

52.62
###

###

###

###

70%

### 0.00
70% 25%

0.00 0.00

437,058.68

A CUENTA DEL 50% DE RETENCION POR CARTA DE FIEL CUM,PLIMINETO


### -518,718.94 40584.5058

CARTA Nº 016-2014-VELVAL SAC/GG

861,218.81

596677.86
247982.42
16558.55
861218.83

634,649.09

63,464.91

31,732.45

------------

729,846.45

131,372.36

========

861,218.81
CURVA "S"

CRONOGRAMA DE AVANCE POR MES PROGRAMADO VS EJECUTADO PORCENTAJE DE AVANCE POR MES PROGRAMADO VS EJECUTADO

Avances por mes Porcentajes de avances mensuales


EL 26 Nov. Al 30 Nov. EL 26 Nov. Al 30 Nov.
AVANCE PROGRAMADO 0.00 35,495.62 PORCENTAJE PROGRAMADO 0% 4.37%
AVANCE EJECUTADO 0.00 40,284.65 PORCENTAJE EJECUTADO 0% 5.66%

AVANCE POR MES PROGRAMADO VS EJECUTADO PORCENTAJE DE AVANCE POR MES PROGRAMADO VS EJECUTADO
6%
45,000.00
5.66%

40,000.00 40,284.65
5%

35,000.00 35,495.62
4.37%

4%
30,000.00

25,000.00
AVANCE PROGRAMADO 3% PORCENTAJE PROGRAMADO
AVANCE EJECUTADO PORCENTAJE EJECUTADO
20,000.00

15,000.00 2%

10,000.00

1%

5,000.00

0.00 0.00 0% 0%
EL 26 Nov. Al 30 Nov. EL 26 Nov. Al 30 Nov.

CRONOGRAMA DE AVANCES ACUMULADOS PROGRAMADO VS EJECUTADO PORCENTAJE DE AVANCE ACUMULADO PROGRAMADO VS EJECUTADO

Avances acumulados Porcentajes de avances acumulados


EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar. EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar.
AVANCE PROGRAMADO 0.00 35,495.62 342,499.89 587,931.34 757,580.42 811,690.12 PORCENTAJE PROGRAMADO 0% 4.37% 42.20% 72.43% 93.33% 100.00%
AVANCE EJECUTADO 0.00 40,284.65 PORCENTAJE EJECUTADO 0% 5.66%

AVANCES ACUMULADOS PROGRAMADOS VS EJECUTADOS PORCENTAJE DE AVANCES ACUMULADOS PROGRADO VS EJECUTADO


900,000.00 120%

811,690.12
800,000.00
757,580.42 100% 100.00%

700,000.00 93.33%

600,000.00 80%
587,931.34
72.43%

500,000.00
AVANCE PROGRAMADO 60% PORCENTAJE PROGRAMADO
AVANCE EJECUTADO PORCENTAJE EJECUTADO
400,000.00

342,499.89
42.20%
300,000.00 40%

200,000.00
20%

100,000.00
5.66%
4.37%
40,284.65
35,495.62
0% 0%
0.00 0.00
EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar.
EL 26 Nov. Al 30 Nov. Al 31 Dic. AL 31 Ene. Al 28 Feb. Al 25 Mar.
CONTROL DE METRADOS EJECUTADOS
PROYECTO:

AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE
ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD: MUNICIPALIDAD DISTRITAL DE ANGASMARCA
UBICACIÓN: LA LIBERTAD - SANTIAGO DE CHUCO - ANGASMARCA - COLPA SECA
FECHA: 30-Nov-14
EJECUTADA:CONTRATISTAS GENERALES VELVAL S.A.C.
RESIDENTE : Ing. OSCAR O. REYES FLORES
SUPERVISOR : Ing. VICTOR C. ROMERO RIVEROS

PRESUPUESTADO VALORIZACION N°
PART.
SUB ANTERIOR
Nº DESCRIPCION UNID. METRAD. C.U.
TOTAL METRAD.
1.00 OBRAS PROVISIONALES
1.01 GUARDIANIA, DEPOSITO Y ALMACEN GLB 1.00 1,108.42 1,108.42 0.00
1.02 CARTEL DE OBRA 3.60 M X 4.80 M UND 1.00 2,176.89 2,176.89 0.00
2.00 ESTRUCTURAS-01 AULA
2.01 OBRAS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 156.65 2.47 386.93 0.00
02.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 156.65 4.11 643.83 0.00
02.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 156.65 8.19 1,282.96 0.00
2.03 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
2.03.01 COLUMNAS
02.03.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,144.08 6.34 7,253.47 0.00
4.00 ESTRUCTURAS-CERCO PERIMETRICO
4.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 208.21 2.47 514.28 0.00
04.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 208.21 4.11 855.74 0.00
04.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 208.21 8.19 1,705.24 0.00
4.02 MOVIMIENTO DE TIERRAS
04.02.01 m3 182.99 28.10 5,142.02 0.00
EXCAVACION PARA CIMIENTOS HASTA 0.70M DE PROFUNDIDAD EN
TERRENO NORMAL
5.00 FLETE TERRESTRE ESTRUCTURAS
5.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 111,307.41 0.15 16,696.11 0.00
1.00 ARQUITECTURA- 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOG m2 116.61 61.24 7,141.20 0.00
4.00 FLETE TERRESTRE ARQUITECTURA
4.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 173,674.98 0.15 26,051.25 0.00
RESUMEN GENERAL DE LA VALORIZACIÓN Nº 01
PROYECTO:
AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE
ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD: MUNICIPALIDAD DISTRITAL DE ANGASMARCA
UBICACIÓN: LA LIBERTAD - SANTIAGO DE CHUCO - ANGASMARCA - COLPA SECA
FECHA: 30-Nov-14
EJECUTADA:CONTRATISTAS GENERALES VELVAL S.A.C.
RESIDENTE : Ing. OSCAR O. REYES FLORES
SUPERVISOR : Ing. VICTOR C. ROMERO RIVEROS

VALORIZACIÓN DEL 26 AL 30 DE NOVIEMBRE

ITEM CONCEPTO PARCIAL TOTAL

1.0.0 VALORIZACIÓN CONTRACTUAL


1.0.1 VALORIZACIÓN CONTRACTUAL 39,976.89
1.1.0 REINTEGRO
1.1.1 REAJUSTE RECONOCIDO 0

TOTAL MONTO BRUTO (A) 39,976.89

2.0.0 DESCUENTOS
2.1.0 AMORTIZACIÓN DEL ADELANTO DIRECTO
2.1.1 AMORTIZACIÓN DEL ADELANTO DIRECTO 0
2.3.0 AMORTIZACIÓN DEL ADELANTO DE MATERIALES
2.3.1 AMORTIZACIÓN DEL ADELANTO DE MATERIALES 0
2.4.0 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DIRECTO
2.4.1 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DIRECTO 0
2.5.0 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DE MATERIALES
2.5.1 DEDUCCIÓN QUE NO CORRESPONDE ADELANTO DE MATERIALES 0

TOTAL DESCUENTOS (B) 0

TOTAL NETO (A-B) 39,976.89


IGV 18% 7195.84

TOTAL A PAGAR AL CONTRATISTA 40,284.65

DETALLE DE LA VALORIZACIÓN Nº1


VALORIZACIÓN MES (V) 39,976.89
REINTEGROS (R ) 0
VALORIZACIÓN BRUTA (VB)= V+R 0
AMORTIZACIÓN POR ADELANTO (ADD) 0
VALORIZACIÓN NETA (VN=VB-AAD) 0
IGV (18% *VN) 7195.84
TOTAL (VN+IGV) 40,284.65
VALORIZACION N° 01
PROYECTO: AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 123,817.12
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 30-Nov-14 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. VICTOR COBADIS ROMERO RIVEROS

PORCENT
PRESUPUESTADO VALORIZACION N° 01 SALDO
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
1.00 OBRAS PROVISIONALES
1.01 GUARDIANIA, DEPOSITO Y ALMACEN GLB 1.00 1,108.42 1,108.42 0.00 0.00 1.00 1,108.42 1.00 1,108.42 0.00 0.00 100.00%
1.02 CARTEL DE OBRA 3.60 M X 4.80 M UND 1.00 2,176.89 2,176.89 0.00 0.00 1.00 2,176.89 1.00 2,176.89 0.00 0.00 100.00%
2.00 ESTRUCTURAS-01 AULA
2.01 OBRAS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 156.65 2.47 386.93 0.00 0.00 156.65 386.93 156.65 386.93 0.00 0.00 100.00%
02.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 156.65 4.11 643.83 0.00 0.00 156.65 643.83 156.65 643.83 0.00 0.00 100.00%
02.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 156.65 8.19 1,282.96 0.00 0.00 78.33 641.48 78.33 641.48 78.33 641.48 50.00%
2.02 OBRAS DE CONCRETO SIMPLE
02.02.01 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 129.24 44.28 5,722.75 0.00 0.00 0.00 0.00 0.00 0.00 129.24 5,722.75 0.00%
2.03 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
2.03.01 COLUMNAS
02.03.01.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 6.69 541.94 3,625.58 0.00 0.00 0.00 0.00 0.00 0.00 6.69 3,625.58 0.00%
02.03.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,144.08 6.34 7,253.47 0.00 0.00 1,144.08 7,253.47 1,144.08 7,253.47 0.00 0.00 100.00%
02.03.01.03 ENCOFRADO y DESENCOFRADO EN COLUMNAS m2 86.17 67.12 5,783.73 0.00 0.00 0.00 0.00 0.00 0.00 86.17 5,783.73 0.00%
2.03.02 VIGAS
02.03.02.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 8.63 454.60 3,923.20 0.00 0.00 0.00 0.00 0.00 0.00 8.63 3,923.20 0.00%
02.03.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,167.55 6.42 7,495.67 0.00 0.00 0.00 0.00 0.00 0.00 1,167.55 7,495.67 0.00%
02.03.02.03 ENCOFRADO y DESENCOFRADO EN VIGAS m2 114.53 78.23 8,959.68 0.00 0.00 0.00 0.00 0.00 0.00 114.53 8,959.68 0.00%
2.03.03 COLUMNETAS DE AMARRE
02.03.03.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 1.85 470.02 869.54 0.00 0.00 0.00 0.00 0.00 0.00 1.85 869.54 0.00%
02.03.03.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 141.33 6.34 896.03 0.00 0.00 0.00 0.00 0.00 0.00 141.33 896.03 0.00%
02.03.03.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 27.17 37.04 1,006.38 0.00 0.00 0.00 0.00 0.00 0.00 27.17 1,006.38 0.00%
2.03.04 VIGUETAS DE AMARRE
02.03.04.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.36 407.54 146.71 0.00 0.00 0.00 0.00 0.00 0.00 0.36 146.71 0.00%
02.03.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 38.67 6.34 245.17 0.00 0.00 0.00 0.00 0.00 0.00 38.67 245.17 0.00%
02.03.04.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 12.00 37.04 444.48 0.00 0.00 0.00 0.00 0.00 0.00 12.00 444.48 0.00%
2.03.05 LOSA ALIGERADA
02.03.05.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 0.87 443.45 385.80 0.00 0.00 0.00 0.00 0.00 0.00 0.87 385.80 0.00%
02.03.05.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 51.95 6.34 329.36 0.00 0.00 0.00 0.00 0.00 0.00 51.95 329.36 0.00%
02.03.05.03 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2 11.62 78.23 909.03 0.00 0.00 0.00 0.00 0.00 0.00 11.62 909.03 0.00%
02.03.05.04 LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO UND 104.00 2.35 244.40 0.00 0.00 0.00 0.00 0.00 0.00 104.00 244.40 0.00%
2.04 ESTRUCTURAS DE MADERA (TIJERALES)
02.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 6.00 2,331.08 13,986.48 0.00 0.00 0.00 0.00 0.00 0.00 6.00 13,986.48 0.00%
02.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 24.00 308.09 7,394.16 0.00 0.00 0.00 0.00 0.00 0.00 24.00 7,394.16 0.00%
02.04.03 ANCLAJE DE TIJERAL DE MADERA UND 12.00 1,004.25 12,051.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 12,051.00 0.00%
02.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 175.85 51.94 9,133.65 0.00 0.00 0.00 0.00 0.00 0.00 175.85 9,133.65 0.00%
02.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 20.28 41.13 834.12 0.00 0.00 0.00 0.00 0.00 0.00 20.28 834.12 0.00%
2.05 PRUEBAS DE LABORATORIO
02.05.01 UND 8.00 42.02 336.16 0.00 0.00 0.00 0.00 0.00 0.00 8.00 336.16 0.00%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
3.00 ESTRUCTURAS-ADMINISTRACION
3.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 91.08 2.47 224.97 0.00 0.00 0.00 0.00 0.00 0.00 91.08 224.97 0.00%
03.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 111.23 4.11 457.16 0.00 0.00 0.00 0.00 0.00 0.00 111.23 457.16 0.00%
03.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 111.23 8.19 910.97 0.00 0.00 0.00 0.00 0.00 0.00 111.23 910.97 0.00%
03.01.04 DEMOLICION DE MURO DE ADOBE E=0.40m m3 54.99 39.81 2,189.15 0.00 0.00 0.00 0.00 0.00 0.00 54.99 2,189.15 0.00%
3.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION PARA ZAPATAS DE 1.70M DE PROFUNDIDAD m3 18.15 44.96 816.02 0.00 0.00 0.00 0.00 0.00 0.00 18.15 816.02 0.00%
03.02.02 EXCAVACION PARA CUNETAS m3 6.85 28.10 192.49 0.00 0.00 0.00 0.00 0.00 0.00 6.85 192.49 0.00%
03.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 11.75 17.36 203.98 0.00 0.00 0.00 0.00 0.00 0.00 11.75 203.98 0.00%
03.02.04 RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO LIVIANO m3 85.36 10.12 863.84 0.00 0.00 0.00 0.00 0.00 0.00 85.36 863.84 0.00%
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 92.94 18.73 1,740.77 0.00 0.00 0.00 0.00 0.00 0.00 92.94 1,740.77 0.00%
3.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 13.96 34.43 480.64 0.00 0.00 0.00 0.00 0.00 0.00 13.96 480.64 0.00%
03.03.02 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 3.30 307.69 1,015.38 0.00 0.00 0.00 0.00 0.00 0.00 3.30 1,015.38 0.00%
03.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 26.50 76.38 2,024.07 0.00 0.00 0.00 0.00 0.00 0.00 26.50 2,024.07 0.00%
03.03.04 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 51.15 44.28 2,264.92 0.00 0.00 0.00 0.00 0.00 0.00 51.15 2,264.92 0.00%
03.03.05 CONCRETO EN CUNETAS FC 175KG/CM2 m3 4.03 282.60 1,138.88 0.00 0.00 0.00 0.00 0.00 0.00 4.03 1,138.88 0.00%
03.03.06 ENCOFRADO DE CUNETAS m2 19.34 42.88 829.30 0.00 0.00 0.00 0.00 0.00 0.00 19.34 829.30 0.00%
3.04 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
3.04.01 ZAPATAS
03.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 7.38 431.54 3,184.77 0.00 0.00 0.00 0.00 0.00 0.00 7.38 3,184.77 0.00%
03.04.01.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 213.28 6.34 1,352.20 0.00 0.00 0.00 0.00 0.00 0.00 213.28 1,352.20 0.00%
3.04.02 VIGAS DE CIMENTACION
03.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 2.14 448.93 960.71 0.00 0.00 0.00 0.00 0.00 0.00 2.14 960.71 0.00%
03.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10 1,002.35 0.00%
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 17.10 71.64 1,225.04 0.00 0.00 0.00 0.00 0.00 0.00 17.10 1,225.04 0.00%
3.04.03 SOBRECIMIENTO ARMADO
03.04.03.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10 1,002.35 0.00%
3.04.04 COLUMNAS
03.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.13 541.94 1,154.33 0.00 0.00 0.00 0.00 0.00 0.00 2.13 1,154.33 0.00%
03.04.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 507.51 6.34 3,217.61 0.00 0.00 0.00 0.00 0.00 0.00 507.51 3,217.61 0.00%
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 24.65 67.12 1,654.51 0.00 0.00 0.00 0.00 0.00 0.00 24.65 1,654.51 0.00%
3.04.05 VIGAS
03.04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.37 454.60 1,532.00 0.00 0.00 0.00 0.00 0.00 0.00 3.37 1,532.00 0.00%
03.04.05.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 597.24 6.42 3,834.28 0.00 0.00 0.00 0.00 0.00 0.00 597.24 3,834.28 0.00%
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 28.09 78.23 2,197.48 0.00 0.00 0.00 0.00 0.00 0.00 28.09 2,197.48 0.00%
3.04.06 COLUMNETAS DE AMARRE
03.04.06.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 0.55 470.02 258.51 0.00 0.00 0.00 0.00 0.00 0.00 0.55 258.51 0.00%
03.04.06.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 71.75 6.34 454.90 0.00 0.00 0.00 0.00 0.00 0.00 71.75 454.90 0.00%
03.04.06.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 7.36 37.04 272.61 0.00 0.00 0.00 0.00 0.00 0.00 7.36 272.61 0.00%
3.04.07 VIGUETAS DE AMARRE
03.04.07.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.88 407.54 358.64 0.00 0.00 0.00 0.00 0.00 0.00 0.88 358.64 0.00%
03.04.07.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 64.90 6.34 411.47 0.00 0.00 0.00 0.00 0.00 0.00 64.90 411.47 0.00%
03.04.07.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 8.81 37.04 326.32 0.00 0.00 0.00 0.00 0.00 0.00 8.81 326.32 0.00%
3.05 ESTRUCTURAS DE MADERA (TIJERALES)
03.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 3.00 2,331.08 6,993.24 0.00 0.00 0.00 0.00 0.00 0.00 3.00 6,993.24 0.00%
03.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 12.00 302.09 3,625.08 0.00 0.00 0.00 0.00 0.00 0.00 12.00 3,625.08 0.00%
03.04.03 ANCLAJE DE TIJERAL DE MADERA UND 6.00 1,004.25 6,025.50 0.00 0.00 0.00 0.00 0.00 0.00 6.00 6,025.50 0.00%
03.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 89.10 51.94 4,627.85 0.00 0.00 0.00 0.00 0.00 0.00 89.10 4,627.85 0.00%
03.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 9.90 41.13 407.19 0.00 0.00 0.00 0.00 0.00 0.00 9.90 407.19 0.00%
3.06 PRUEBAS DE LABORATORIO
03.06.01 UND 18.00 42.02 756.36 0.00 0.00 0.00 0.00 0.00 0.00 18.00 756.36 0.00%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
4.00 ESTRUCTURAS-CERCO PERIMETRICO
4.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 208.21 2.47 514.28 0.00 0.00 208.21 514.28 208.21 514.28 0.00 0.00 100.00%
04.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 208.21 4.11 855.74 0.00 0.00 208.21 855.74 208.21 855.74 0.00 0.00 100.00%
04.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 208.21 8.19 1,705.24 0.00 0.00 80.00 655.20 80.00 655.20 128.21 1,050.04 38.42%
4.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION PARA CIMIENTOS HASTA 0.70M DE PROFUNDIDAD EN m3 182.99 28.10 5,142.02 0.00 0.00 43.00 1,208.30 43.00 1,208.30 139.99 3,933.72 23.50%
TERRENO NORMAL
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 157.36 17.36 2,731.77 0.00 0.00 0.00 0.00 0.00 0.00 157.36 2,731.77 0.00%
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 33.79 18.73 632.89 0.00 0.00 0.00 0.00 0.00 0.00 33.79 632.89 0.00%
4.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 208.21 34.43 7,168.67 0.00 0.00 0.00 0.00 0.00 0.00 208.21 7,168.67 0.00%
04.03.02 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 145.75 232.29 33,856.27 0.00 0.00 0.00 0.00 0.00 0.00 145.75 33,856.27 0.00%
04.03.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 37.23 307.69 11,455.30 0.00 0.00 0.00 0.00 0.00 0.00 37.23 11,455.30 0.00%
04.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 496.44 76.38 37,918.09 0.00 0.00 0.00 0.00 0.00 0.00 496.44 37,918.09 0.00%
4.04 OBRAS DE CONCRETO ARMADO
4.04.01 SOBRECIMIENTO ARMADO
04.04.01.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,930.97 6.34 12,242.35 0.00 0.00 0.00 0.00 0.00 0.00 1,930.97 12,242.35 0.00%
4.04.02 COLUMNAS
04.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 9.45 497.51 4,701.47 0.00 0.00 0.00 0.00 0.00 0.00 9.45 4,701.47 0.00%
04.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,510.20 6.34 9,574.67 0.00 0.00 0.00 0.00 0.00 0.00 1,510.20 9,574.67 0.00%
04.04.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 126.00 67.12 8,457.12 0.00 0.00 0.00 0.00 0.00 0.00 126.00 8,457.12 0.00%
4.04.03 VIGAS
04.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 87.36 497.51 43,462.47 0.00 0.00 0.00 0.00 0.00 0.00 87.36 43,462.47 0.00%
04.04.03.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,573.61 6.42 10,102.58 0.00 0.00 0.00 0.00 0.00 0.00 1,573.61 10,102.58 0.00%
04.04.03.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 173.51 78.23 13,573.69 0.00 0.00 0.00 0.00 0.00 0.00 173.51 13,573.69 0.00%
5.00 FLETE TERRESTRE
5.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 111,307.41 0.15 16,696.11 0.00 0.00 44,522.96 6,678.44 44,522.96 6,678.44 66,784.45 10,017.67 40.00%
1.00 ARQUITECTURA- 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 116.61 61.24 7,141.20 0.00 0.00 42.68 2,613.72 42.68 2,613.72 73.93 4,527.47 36.60%
1.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 98.74 39.64 3,914.05 0.00 0.00 0.00 0.00 0.00 0.00 98.74 3,914.05 0.00%
01.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 125.65 35.98 4,520.89 0.00 0.00 0.00 0.00 0.00 0.00 125.65 4,520.89 0.00%
01.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 55.04 32.12 1,767.88 0.00 0.00 0.00 0.00 0.00 0.00 55.04 1,767.88 0.00%
01.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 66.62 47.33 3,153.12 0.00 0.00 0.00 0.00 0.00 0.00 66.62 3,153.12 0.00%
01.02.05 TARRAJEO DE ESCALERAS m2 23.78 34.20 813.28 0.00 0.00 0.00 0.00 0.00 0.00 23.78 813.28 0.00%
01.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 13.09 14.06 184.05 0.00 0.00 0.00 0.00 0.00 0.00 13.09 184.05 0.00%
01.02.07 BRUÑAS 1" m 158.15 1.25 197.69 0.00 0.00 0.00 0.00 0.00 0.00 158.15 197.69 0.00%
1.03 CIELORRASOS
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO 129.74
01.03.01 DE 2" x 2" x 10´ m2 52.88 6,860.65 0.00 0.00 0.00 0.00 0.00 0.00 129.74 6,860.65 0.00%
01.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 7.54 24.45 184.35 0.00 0.00 0.00 0.00 0.00 0.00 7.54 184.35 0.00%
1.04 PISOS Y PAVIMENTOS
01.04.01 PISO DE CONCRETO E=4", PULIDO, BRUÑADO Y COLOREADO m2 112.25 40.73 4,571.94 0.00 0.00 0.00 0.00 0.00 0.00 112.25 4,571.94 0.00%
1.05 ZOCALOS Y CONTRAZOCALOS
01.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 74.09 12.35 915.01 0.00 0.00 0.00 0.00 0.00 0.00 74.09 915.01 0.00%
C:A m
1.06 CARPINTERIA DE MADERA
01.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 2.00 754.00 1,508.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,508.00 0.00%
01.06.02 TICERO DE MADERA CEDRO (L=3.10m) BARNIZADO UND 2.00 70.00 140.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 140.00 0.00%
1.07 CARPINTERIA METALICA
01.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 23.32 198.55 4,630.19 0.00 0.00 0.00 0.00 0.00 0.00 23.32 4,630.19 0.00%
01.07.02 REJILLA METALICA FIJA UND 2.00 112.98 225.96 0.00 0.00 0.00 0.00 0.00 0.00 2.00 225.96 0.00%
01.07.03 PASAMANO DE ACERO TUBO DE 2" m 22.00 96.79 2,129.38 0.00 0.00 0.00 0.00 0.00 0.00 22.00 2,129.38 0.00%
01.07.04 CANTONERA PARA ESCALERA SEGUN PLANOS m 25.00 20.95 523.75 0.00 0.00 0.00 0.00 0.00 0.00 25.00 523.75 0.00%
1.08 CERRAJERIA
01.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" PZA 6.00 29.55 177.30 0.00 0.00 0.00 0.00 0.00 0.00 6.00 177.30 0.00%
01.08.02 CHAPA DE PARCHE DE TRES GOLPES PZA 2.00 88.20 176.40 0.00 0.00 0.00 0.00 0.00 0.00 2.00 176.40 0.00%
1.09 VIDRIOS, CRISTALES Y SIMILARES
01.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 363.53 5.46 1,984.87 0.00 0.00 0.00 0.00 0.00 0.00 363.53 1,984.87 0.00%
1.10 PINTURA
01.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 98.74 10.32 1,019.00 0.00 0.00 0.00 0.00 0.00 0.00 98.74 1,019.00 0.00%
01.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 137.27 7.19 986.97 0.00 0.00 0.00 0.00 0.00 0.00 137.27 986.97 0.00%
01.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 55.04 8.52 468.94 0.00 0.00 0.00 0.00 0.00 0.00 55.04 468.94 0.00%
01.10.04 PINTURA EN VIGAS C/LATEX LAVABLE m2 66.62 8.79 585.59 0.00 0.00 0.00 0.00 0.00 0.00 66.62 585.59 0.00%
01.10.05 PINTURA EN DERRAMES C/LATEX LAVABLE m 13.09 2.18 28.54 0.00 0.00 0.00 0.00 0.00 0.00 13.09 28.54 0.00%
01.10.06 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 129.74 9.77 1,267.56 0.00 0.00 0.00 0.00 0.00 0.00 129.74 1,267.56 0.00%
01.10.07 PINTURA EN PIZARRA m2 7.40 12.77 94.50 0.00 0.00 0.00 0.00 0.00 0.00 7.40 94.50 0.00%
01.10.08 PINTURA EN FRISO DE MADERA m2 7.34 12.62 92.63 0.00 0.00 0.00 0.00 0.00 0.00 7.34 92.63 0.00%
01.10.09 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 74.09 5.66 419.35 0.00 0.00 0.00 0.00 0.00 0.00 74.09 419.35 0.00%
01.10.10 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 5.20 16.18 84.14 0.00 0.00 0.00 0.00 0.00 0.00 5.20 84.14 0.00%
01.10.11 PINTURA ESMALTE EN BRUÑAS DE 1" m 158.15 2.86 452.31 0.00 0.00 0.00 0.00 0.00 0.00 158.15 452.31 0.00%
1.11 VARIOS
01.11.11 JUNTAS SISMICA 1" m 4.46 5.00 22.30 0.00 0.00 0.00 0.00 0.00 0.00 4.46 22.30 0.00%
1.12 SISTEMA DE AGUA FRIA
1.12.01 TUBERIAS Y ACCESORIOS
01.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 24.05 16.31 392.26 0.00 0.00 0.00 0.00 0.00 0.00 24.05 392.26 0.00%
01.12.01.02 CODO PVC-SAP 3" * 90 UND 7.00 13.20 92.40 0.00 0.00 0.00 0.00 0.00 0.00 7.00 92.40 0.00%
01.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 39.22 16.46 645.56 0.00 0.00 0.00 0.00 0.00 0.00 39.22 645.56 0.00%
01.12.01.04 SOPORTE DE CANALETA UND 25.00 3.89 97.25 0.00 0.00 0.00 0.00 0.00 0.00 25.00 97.25 0.00%
01.12.01.05 ABRAZADERA PARA CANALETA UND 13.00 19.54 254.02 0.00 0.00 0.00 0.00 0.00 0.00 13.00 254.02 0.00%
01.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 9.79 37.04 362.62 0.00 0.00 0.00 0.00 0.00 0.00 9.79 362.62 0.00%
01.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.67 393.71 263.79 0.00 0.00 0.00 0.00 0.00 0.00 0.67 263.79 0.00%
01.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 8.14 28.92 235.41 0.00 0.00 0.00 0.00 0.00 0.00 8.14 235.41 0.00%
01.12.01.09 PINTURA EN FALSA COLUMNA m2 8.14 8.52 69.35 0.00 0.00 0.00 0.00 0.00 0.00 8.14 69.35 0.00%
2.00 ARQUITECTURA- ADMINISTRACION
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE CABEZA J m2 38.57 104.35 4,024.78 0.00 0.00 0.00 0.00 0.00 0.00 38.57 4,024.78 0.00%
02.01.02 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 20.77 61.24 1,271.95 0.00 0.00 0.00 0.00 0.00 0.00 20.77 1,271.95 0.00%
2.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 58.30 39.64 2,311.01 0.00 0.00 0.00 0.00 0.00 0.00 58.30 2,311.01 0.00%
02.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 61.21 35.98 2,202.34 0.00 0.00 0.00 0.00 0.00 0.00 61.21 2,202.34 0.00%
02.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 10.37 32.12 333.08 0.00 0.00 0.00 0.00 0.00 0.00 10.37 333.08 0.00%
02.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 25.90 47.33 1,225.85 0.00 0.00 0.00 0.00 0.00 0.00 25.90 1,225.85 0.00%
02.02.05 TARRAJEO EN PESTAÑAS CON C:A 1:5 E = 1.50cm m2 8.05 47.33 381.01 0.00 0.00 0.00 0.00 0.00 0.00 8.05 381.01 0.00%
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 33.80 14.06 475.23 0.00 0.00 0.00 0.00 0.00 0.00 33.80 475.23 0.00%
02.02.07 FROTACHADO EN CUNETAS CON C:A 1:5 E = 1.50cm CON IMPERMEABILIZANT m2 36.51 32.88 1,200.45 0.00 0.00 0.00 0.00 0.00 0.00 36.51 1,200.45 0.00%
02.02.08 BRUÑAS DE 1/2" m 263.22 1.25 329.03 0.00 0.00 0.00 0.00 0.00 0.00 263.22 329.03 0.00%
02.02.09 BRUÑAS 3/4" m 50.98 1.25 63.73 0.00 0.00 0.00 0.00 0.00 0.00 50.98 63.73 0.00%
2.03 CIELORRASO
02.03.01 CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO m2 81.83 52.88 4,327.17 0.00 0.00 0.00 0.00 0.00 0.00 81.83 4,327.17 0.00%
DE 2" x 2" x 10´
02.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 5.84 24.45 142.79 0.00 0.00 0.00 0.00 0.00 0.00 5.84 142.79 0.00%
2.04 PISOS Y PAVIMENTOS
02.04.01 PISO MACHIEMBRADO m2 66.00 38.11 2,515.26 0.00 0.00 0.00 0.00 0.00 0.00 66.00 2,515.26 0.00%
02.04.02 VEREDA DE CONCRETO f'c= 175 kg/cm2 H=0.10M m2 34.21 57.94 1,982.13 0.00 0.00 0.00 0.00 0.00 0.00 34.21 1,982.13 0.00%
02.04.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 4.81 76.38 367.39 0.00 0.00 0.00 0.00 0.00 0.00 4.81 367.39 0.00%
2.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 m 30.51 12.35 376.80 0.00 0.00 0.00 0.00 0.00 0.00 30.51 376.80 0.00%
02.05.02 CONTRAZOCALO DE MADERA CEDRO DE 4" RODON 1" m 28.23 79.85 2,254.17 0.00 0.00 0.00 0.00 0.00 0.00 28.23 2,254.17 0.00%
2.06 CARPINTERIA DE MADERA
02.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 1.00 754.00 754.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 754.00 0.00%
02.06.02 PUERTA CONTRAPLACADA DE MADERA TORNILLO SEGUN DISEÑO INCL. INS UND 2.00 380.00 760.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 760.00 0.00%
02.06.03 TABIQUERIA DE MELAMINE DE 1" m2 22.50 183.03 4,118.18 0.00 0.00 0.00 0.00 0.00 0.00 22.50 4,118.18 0.00%
2.07 CARPINTERIA METALICA
02.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 6.32 198.55 1,254.84 0.00 0.00 0.00 0.00 0.00 0.00 6.32 1,254.84 0.00%
02.07.02 REJILLA METALICA FIJA UND 1.00 112.98 112.98 0.00 0.00 0.00 0.00 0.00 0.00 1.00 112.98 0.00%
2.08 CERRAJERIA
02.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 10.00 29.55 295.50 0.00 0.00 0.00 0.00 0.00 0.00 10.00 295.50 0.00%
02.08.02 CHAPA DE PARCHE DE TRES GOLPES pza 3.00 88.20 264.60 0.00 0.00 0.00 0.00 0.00 0.00 3.00 264.60 0.00%
02.08.03 MANIJA DE BRONCE DE 4" PARA PUERTAS pza 3.00 64.25 192.75 0.00 0.00 0.00 0.00 0.00 0.00 3.00 192.75 0.00%
2.09 VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 88.58 5.46 483.65 0.00 0.00 0.00 0.00 0.00 0.00 88.58 483.65 0.00%
2.10 PINTURA
02.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 58.30 10.32 601.66 0.00 0.00 0.00 0.00 0.00 0.00 58.30 601.66 0.00%
02.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 61.21 7.19 440.10 0.00 0.00 0.00 0.00 0.00 0.00 61.21 440.10 0.00%
02.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 10.37 8.52 88.35 0.00 0.00 0.00 0.00 0.00 0.00 10.37 88.35 0.00%
02.10.04 PINTURA EN COLUMNETAS C/LATEX LAVABLE m2 3.12 8.52 26.58 0.00 0.00 0.00 0.00 0.00 0.00 3.12 26.58 0.00%
02.10.05 PINTURA EN VIGAS C/LATEX LAVABLE m2 25.90 8.79 227.66 0.00 0.00 0.00 0.00 0.00 0.00 25.90 227.66 0.00%
02.10.06 PINTURA EN PESTAÑAS C/LATEX LAVABLE m2 8.05 8.79 70.76 0.00 0.00 0.00 0.00 0.00 0.00 8.05 70.76 0.00%
02.10.07 PINTURA EN DERRAMES C/LATEX LAVABLE m 40.20 2.18 87.64 0.00 0.00 0.00 0.00 0.00 0.00 40.20 87.64 0.00%
02.10.08 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 77.79 9.77 760.01 0.00 0.00 0.00 0.00 0.00 0.00 77.79 760.01 0.00%
02.10.09 PINTURA EN FRISO DE MADERA m2 3.90 12.62 49.22 0.00 0.00 0.00 0.00 0.00 0.00 3.90 49.22 0.00%
02.10.10 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 30.51 5.66 172.69 0.00 0.00 0.00 0.00 0.00 0.00 30.51 172.69 0.00%
02.10.11 PINTURA BARNIZ EN CONTRAZOCALO DE MADERA DE CEDRO 4" CON RODON m 28.23 16.18 456.76 0.00 0.00 0.00 0.00 0.00 0.00 28.23 456.76 0.00%
02.10.12 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 10.20 16.18 165.04 0.00 0.00 0.00 0.00 0.00 0.00 10.20 165.04 0.00%
02.10.13 PINTURA ESMALTE EN BRUÑAS 1/2" m 263.22 2.86 752.81 0.00 0.00 0.00 0.00 0.00 0.00 263.22 752.81 0.00%
02.10.14 PINTURA ESMALTE EN BRUÑAS DE MUROS EXTERIORES 3/4" m 50.98 2.86 145.80 0.00 0.00 0.00 0.00 0.00 0.00 50.98 145.80 0.00%
2.11 VARIOS
02.11.01 JUNTAS DE DILATACION m 7.10 5.00 35.50 0.00 0.00 0.00 0.00 0.00 0.00 7.10 35.50 0.00%
02.11.02 JUNTAS SISMICA 1" m 18.55 5.00 92.75 0.00 0.00 0.00 0.00 0.00 0.00 18.55 92.75 0.00%
2.12 SISTEMA DE AGUA FRIA
2.12.01 TUBERIAS Y ACCESORIOS
02.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 22.00 16.31 358.82 0.00 0.00 0.00 0.00 0.00 0.00 22.00 358.82 0.00%
02.12.01.02 CODO PVC-SAP 3" * 90 und 12.00 13.20 158.40 0.00 0.00 0.00 0.00 0.00 0.00 12.00 158.40 0.00%
02.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 19.50 16.46 320.97 0.00 0.00 0.00 0.00 0.00 0.00 19.50 320.97 0.00%
02.12.01.04 SOPORTE DE CANALETA und 16.00 3.89 62.24 0.00 0.00 0.00 0.00 0.00 0.00 16.00 62.24 0.00%
02.12.01.05 ABRAZADERA PARA CANALETA und 20.00 19.54 390.80 0.00 0.00 0.00 0.00 0.00 0.00 20.00 390.80 0.00%
02.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 4.95 37.04 183.35 0.00 0.00 0.00 0.00 0.00 0.00 4.95 183.35 0.00%
02.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.34 393.71 133.86 0.00 0.00 0.00 0.00 0.00 0.00 0.34 133.86 0.00%
02.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 4.95 28.92 143.15 0.00 0.00 0.00 0.00 0.00 0.00 4.95 143.15 0.00%
02.12.01.09 PINTURA EN FALSA COLUMNA m3 4.95 8.52 42.17 0.00 0.00 0.00 0.00 0.00 0.00 4.95 42.17 0.00%
3.00 ARQUITECTURA- CERCO PERIMETRICO
3.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 787.5 61.24 48,226.50 0.00 0.00 0.00 0.00 0.00 0.00 787.50 48,226.50 0.00%
3.02 REVOQUES ENLUCIDOS
03.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 496.44 39.64 19,678.88 0.00 0.00 0.00 0.00 0.00 0.00 496.44 19,678.88 0.00%
03.02.02 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 126.00 32.12 4,047.12 0.00 0.00 0.00 0.00 0.00 0.00 126.00 4,047.12 0.00%
03.02.03 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 225.56 47.33 10,675.75 0.00 0.00 0.00 0.00 0.00 0.00 225.56 10,675.75 0.00%
3.03 CARPINTERIA METALICA
03.03.01 PORTON METALICO 3.50m x 3.00m und 1.00 3,500.00 3,500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,500.00 0.00%
3.04 PINTURA
03.04.01 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 126.00 8.52 1,073.52 0.00 0.00 0.00 0.00 0.00 0.00 126.00 1,073.52 0.00%
03.04.02 PINTURA EN VIGAS C/LATEX LAVABLE m2 225.56 8.79 1,982.67 0.00 0.00 0.00 0.00 0.00 0.00 225.56 1,982.67 0.00%
3.05 VARIOS
03.05.01 JUNTAS DE DILATACION m 630.00 5.00 3,150.00 0.00 0.00 0.00 0.00 0.00 0.00 630.00 3,150.00 0.00%
4.00 FLETE TERRESTRE
4.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 173,674.98 0.15 26,051.25 0.00 0.00 34,735.00 5,210.25 34,735.00 5,210.25 138,939.98 20,841.00 20.00%
5.00 EQUIPAMIENTO Y MOBILIARIO
5.01 MOBILIARIO DE COLEGIO (ESCRITORIOS,CARPETAS,COMPUTADORAS) glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 0.00%
1.00 INSTALACIONES ELECTRICAS - 01 AULA
1.01 SISTEMA ELECTRICO
1.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 10.00 63.96 639.60 0.00 0.00 0.00 0.00 0.00 0.00 10.00 639.60 0.00%
1.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 4.00 54.26 217.04 0.00 0.00 0.00 0.00 0.00 0.00 4.00 217.04 0.00%
1.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 2.00 47.00 94.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 94.00 0.00%
1.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 2.00 46.89 93.78 0.00 0.00 0.00 0.00 0.00 0.00 2.00 93.78 0.00%
1.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 8.00 45.81 366.48 0.00 0.00 0.00 0.00 0.00 0.00 8.00 366.48 0.00%
1.02 CANALIZACIONES, TUBERIAS Y/O CABLES
1.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
1.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 109.13 3.58 390.69 0.00 0.00 0.00 0.00 0.00 0.00 109.13 390.69 0.00%
1.02.02 CABLES ELECTRICOS
1.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 148.00 2.87 424.76 0.00 0.00 0.00 0.00 0.00 0.00 148.00 424.76 0.00%
1.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 70.26 2.24 157.38 0.00 0.00 0.00 0.00 0.00 0.00 70.26 157.38 0.00%
1.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
1.03.01 TABLERO DE DISTRIBUCION
1.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 2.00 249.30 498.60 0.00 0.00 0.00 0.00 0.00 0.00 2.00 498.60 0.00%
1.04 ARTEFACTOS ELECTRICOS
1.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 8.00 107.37 858.96 0.00 0.00 0.00 0.00 0.00 0.00 8.00 858.96 0.00%
1.04.02 SPOT LIGHT und 2.00 41.40 82.80 0.00 0.00 0.00 0.00 0.00 0.00 2.00 82.80 0.00%
2.00 INSTALACIONES ELECTRICAS - ADMINISTRACION
2.01 SISTEMA ELECTRICO
2.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 4.00 63.96 255.84 0.00 0.00 0.00 0.00 0.00 0.00 4.00 255.84 0.00%
2.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 1.00 54.26 54.26 0.00 0.00 0.00 0.00 0.00 0.00 1.00 54.26 0.00%
2.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 3.00 47.00 141.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 141.00 0.00%
2.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 1.00 46.89 46.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00 46.89 0.00%
2.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 6.00 45.81 274.86 0.00 0.00 0.00 0.00 0.00 0.00 6.00 274.86 0.00%
2.02 CANALIZACIONES, TUBERIAS Y/O CABLES
2.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
2.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 42.25 3.58 151.26 0.00 0.00 0.00 0.00 0.00 0.00 42.25 151.26 0.00%
2.02.02 CABLES ELECTRICOS
2.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 50.21 2.87 144.10 0.00 0.00 0.00 0.00 0.00 0.00 50.21 144.10 0.00%
2.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 52.44 2.24 117.47 0.00 0.00 0.00 0.00 0.00 0.00 52.44 117.47 0.00%
2.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
2.03.01 TABLERO DE DISTRIBUCION
2.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 1.00 249.30 249.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 249.30 0.00%
2.03.02 CAJA DE PASO 0.00 0.00
2.03.02.01 CAJA DE PASE F.G. 4" x 4" x 2" und 2.00 24.03 48.06 0.00 0.00 0.00 0.00 0.00 0.00 2.00 48.06 0.00%
2.04 ARTEFACTOS ELECTRICOS 0.00 0.00
2.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 4.00 107.37 429.48 0.00 0.00 0.00 0.00 0.00 0.00 4.00 429.48 0.00%
2.04.02 SPOT LIGHT und 1.00 41.40 41.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 41.40 0.00%
3.00 FLETE TERRESTRE
3.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 248.61 0.15 37.29 0.00 0.00 0.00 0.00 0.00 0.00 248.61 37.29 0.00%
COSTO TOTAL DIRECTO 603,397.28 29,946.95 29,946.95 573,450.32 4.96%
GASTOS GENERALES 9% 54,305.75 2,695.23 2,695.23 51,610.53
UTILIDAD 5% 30,169.86 1,497.35 1,497.35 28,672.52
SUB TOTAL 687,872.90 34,139.53 34,139.53 653,733.37
IGV 18% 123,817.12 6,145.12 6,145.12 117,672.01
TOTAL S/, 811,690.02 40,284.64 40,284.64 771,405.37
Avance acumulado 40,284.64
% DE AVANCE EJECUTADO POR MES 22.50 40,284.64
% DE AVANCE PROGRAMADO POR MES 22.50 4.37%
% DE AVANCE EJECUTADO ACUMULADO 4.96%
% DE AVANCE PROGRAMADO ACUMULADO 4.37%
VALORIZACION N° 01
PROYECTO: AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 811,690.12
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 30-Nov-14 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. VICTOR COBADIS ROMERO RIVEROS

PRESUPUESTADO VALORIZACION N° 01 SALDO


PART.
SUB ANTERIOR ACTUAL ACUMULADO
Nº DESCRIPCION UNID. METRAD. C.U. METRAD.
TOTAL METRAD. COSTO METRAD. COSTO METRAD. COSTO
1.00 OBRAS PROVISIONALES
1.01 GUARDIANIA, DEPOSITO Y ALMACEN GLB 1.00 1,108.42 1,108.42 0.00 0.00 1.00 1,108.42 1.00 1,108.42 0.00
1.02 CARTEL DE OBRA 3.60 M X 4.80 M UND 1.00 2,176.89 2,176.89 0.00 0.00 1.00 2,176.89 1.00 2,176.89 0.00
2.00 ESTRUCTURAS-01 AULA
2.01 OBRAS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 156.65 2.47 386.93 0.00 0.00 156.65 386.93 156.65 386.93 0.00
02.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 156.65 4.11 643.83 0.00 0.00 156.65 643.83 156.65 643.83 0.00
02.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 156.65 8.19 1,282.96 0.00 0.00 78.33 641.48 78.33 641.48 78.33
2.02 OBRAS DE CONCRETO SIMPLE
02.02.01 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 129.24 44.28 5,722.75 0.00 0.00 0.00 0.00 0.00 0.00 129.24
2.03 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
2.03.01 COLUMNAS
02.03.01.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 6.69 541.94 3,625.58 0.00 0.00 0.00 0.00 0.00 0.00 6.69
02.03.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,144.08 6.34 7,253.47 0.00 0.00 1,144.08 7,253.47 1,144.08 7,253.47 0.00
02.03.01.03 ENCOFRADO y DESENCOFRADO EN COLUMNAS m2 86.17 67.12 5,783.73 0.00 0.00 0.00 0.00 0.00 0.00 86.17
2.03.02 VIGAS
02.03.02.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 8.63 454.60 3,923.20 0.00 0.00 0.00 0.00 0.00 0.00 8.63
02.03.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,167.55 6.42 7,495.67 0.00 0.00 0.00 0.00 0.00 0.00 1,167.55
02.03.02.03 ENCOFRADO y DESENCOFRADO EN VIGAS m2 114.53 78.23 8,959.68 0.00 0.00 0.00 0.00 0.00 0.00 114.53
2.03.03 COLUMNETAS DE AMARRE
02.03.03.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 1.85 470.02 869.54 0.00 0.00 0.00 0.00 0.00 0.00 1.85
02.03.03.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 141.33 6.34 896.03 0.00 0.00 0.00 0.00 0.00 0.00 141.33
02.03.03.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 27.17 37.04 1,006.38 0.00 0.00 0.00 0.00 0.00 0.00 27.17
2.03.04 VIGUETAS DE AMARRE
02.03.04.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.36 407.54 146.71 0.00 0.00 0.00 0.00 0.00 0.00 0.36
02.03.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 38.67 6.34 245.17 0.00 0.00 0.00 0.00 0.00 0.00 38.67
02.03.04.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 12.00 37.04 444.48 0.00 0.00 0.00 0.00 0.00 0.00 12.00
2.03.05 LOSA ALIGERADA
02.03.05.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 0.87 443.45 385.80 0.00 0.00 0.00 0.00 0.00 0.00 0.87
02.03.05.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 51.95 6.34 329.36 0.00 0.00 0.00 0.00 0.00 0.00 51.95
02.03.05.03 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2 11.62 78.23 909.03 0.00 0.00 0.00 0.00 0.00 0.00 11.62
02.03.05.04 LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO UND 104.00 2.35 244.40 0.00 0.00 0.00 0.00 0.00 0.00 104.00
2.04 ESTRUCTURAS DE MADERA (TIJERALES)
02.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 6.00 2,331.08 13,986.48 0.00 0.00 0.00 0.00 0.00 0.00 6.00
02.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 24.00 308.09 7,394.16 0.00 0.00 0.00 0.00 0.00 0.00 24.00
02.04.03 ANCLAJE DE TIJERAL DE MADERA UND 12.00 1,004.25 12,051.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00
02.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 175.85 51.94 9,133.65 0.00 0.00 0.00 0.00 0.00 0.00 175.85
02.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 20.28 41.13 834.12 0.00 0.00 0.00 0.00 0.00 0.00 20.28
2.05 PRUEBAS DE LABORATORIO
02.05.01 UND 8.00 42.02 336.16 0.00 0.00 0.00 0.00 0.00 0.00 8.00
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
3.00 ESTRUCTURAS-ADMINISTRACION
3.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 91.08 2.47 224.97 0.00 0.00 0.00 0.00 0.00 0.00 91.08
03.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 111.23 4.11 457.16 0.00 0.00 0.00 0.00 0.00 0.00 111.23
03.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 111.23 8.19 910.97 0.00 0.00 0.00 0.00 0.00 0.00 111.23
03.01.04 DEMOLICION DE MURO DE ADOBE E=0.40m m3 54.99 39.81 2,189.15 0.00 0.00 0.00 0.00 0.00 0.00 54.99
3.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION PARA ZAPATAS DE 1.70M DE PROFUNDIDAD m3 18.15 44.96 816.02 0.00 0.00 0.00 0.00 0.00 0.00 18.15
03.02.02 EXCAVACION PARA CUNETAS m3 6.85 28.10 192.49 0.00 0.00 0.00 0.00 0.00 0.00 6.85
03.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 11.75 17.36 203.98 0.00 0.00 0.00 0.00 0.00 0.00 11.75
03.02.04 RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO LIVIANO m3 85.36 10.12 863.84 0.00 0.00 0.00 0.00 0.00 0.00 85.36
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 92.94 18.73 1,740.77 0.00 0.00 0.00 0.00 0.00 0.00 92.94
3.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 13.96 34.43 480.64 0.00 0.00 0.00 0.00 0.00 0.00 13.96
03.03.02 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 3.30 307.69 1,015.38 0.00 0.00 0.00 0.00 0.00 0.00 3.30
03.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 26.50 76.38 2,024.07 0.00 0.00 0.00 0.00 0.00 0.00 26.50
03.03.04 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 51.15 44.28 2,264.92 0.00 0.00 0.00 0.00 0.00 0.00 51.15
03.03.05 CONCRETO EN CUNETAS FC 175KG/CM2 m3 4.03 282.60 1,138.88 0.00 0.00 0.00 0.00 0.00 0.00 4.03
03.03.06 ENCOFRADO DE CUNETAS m2 19.34 42.88 829.30 0.00 0.00 0.00 0.00 0.00 0.00 19.34
3.04 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
3.04.01 ZAPATAS
03.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 7.38 431.54 3,184.77 0.00 0.00 0.00 0.00 0.00 0.00 7.38
03.04.01.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 213.28 6.34 1,352.20 0.00 0.00 0.00 0.00 0.00 0.00 213.28
3.04.02 VIGAS DE CIMENTACION
03.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 2.14 448.93 960.71 0.00 0.00 0.00 0.00 0.00 0.00 2.14
03.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 17.10 71.64 1,225.04 0.00 0.00 0.00 0.00 0.00 0.00 17.10
3.04.03 SOBRECIMIENTO ARMADO
03.04.03.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10
3.04.04 COLUMNAS
03.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.13 541.94 1,154.33 0.00 0.00 0.00 0.00 0.00 0.00 2.13
03.04.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 507.51 6.34 3,217.61 0.00 0.00 0.00 0.00 0.00 0.00 507.51
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 24.65 67.12 1,654.51 0.00 0.00 0.00 0.00 0.00 0.00 24.65
3.04.05 VIGAS
03.04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.37 454.60 1,532.00 0.00 0.00 0.00 0.00 0.00 0.00 3.37
03.04.05.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 597.24 6.42 3,834.28 0.00 0.00 0.00 0.00 0.00 0.00 597.24
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 28.09 78.23 2,197.48 0.00 0.00 0.00 0.00 0.00 0.00 28.09
3.04.06 COLUMNETAS DE AMARRE
03.04.06.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 0.55 470.02 258.51 0.00 0.00 0.00 0.00 0.00 0.00 0.55
03.04.06.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 71.75 6.34 454.90 0.00 0.00 0.00 0.00 0.00 0.00 71.75
03.04.06.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 7.36 37.04 272.61 0.00 0.00 0.00 0.00 0.00 0.00 7.36
3.04.07 VIGUETAS DE AMARRE
03.04.07.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.88 407.54 358.64 0.00 0.00 0.00 0.00 0.00 0.00 0.88
03.04.07.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 64.90 6.34 411.47 0.00 0.00 0.00 0.00 0.00 0.00 64.90
03.04.07.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 8.81 37.04 326.32 0.00 0.00 0.00 0.00 0.00 0.00 8.81
3.05 ESTRUCTURAS DE MADERA (TIJERALES)
03.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 3.00 2,331.08 6,993.24 0.00 0.00 0.00 0.00 0.00 0.00 3.00
03.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 12.00 302.09 3,625.08 0.00 0.00 0.00 0.00 0.00 0.00 12.00
03.04.03 ANCLAJE DE TIJERAL DE MADERA UND 6.00 1,004.25 6,025.50 0.00 0.00 0.00 0.00 0.00 0.00 6.00
03.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 89.10 51.94 4,627.85 0.00 0.00 0.00 0.00 0.00 0.00 89.10
03.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 9.90 41.13 407.19 0.00 0.00 0.00 0.00 0.00 0.00 9.90
3.06 PRUEBAS DE LABORATORIO
03.06.01 UND 18.00 42.02 756.36 0.00 0.00 0.00 0.00 0.00 0.00 18.00
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
4.00 ESTRUCTURAS-CERCO PERIMETRICO
4.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 208.21 2.47 514.28 0.00 0.00 208.21 514.28 208.21 514.28 0.00
04.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 208.21 4.11 855.74 0.00 0.00 208.21 855.74 208.21 855.74 0.00
04.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 208.21 8.19 1,705.24 0.00 0.00 80.00 655.20 80.00 655.20 128.21
4.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION PARA CIMIENTOS HASTA 0.70M DE PROFUNDIDAD EN m3 182.99 28.10 5,142.02 0.00 0.00 43.00 1,208.30 43.00 1,208.30 139.99
TERRENO NORMAL
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 157.36 17.36 2,731.77 0.00 0.00 0.00 0.00 0.00 0.00 157.36
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 33.79 18.73 632.89 0.00 0.00 0.00 0.00 0.00 0.00 33.79
4.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 208.21 34.43 7,168.67 0.00 0.00 0.00 0.00 0.00 0.00 208.21
04.03.02 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 145.75 232.29 33,856.27 0.00 0.00 0.00 0.00 0.00 0.00 145.75
04.03.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 37.23 307.69 11,455.30 0.00 0.00 0.00 0.00 0.00 0.00 37.23
04.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 496.44 76.38 37,918.09 0.00 0.00 0.00 0.00 0.00 0.00 496.44
4.04 OBRAS DE CONCRETO ARMADO
4.04.01 SOBRECIMIENTO ARMADO
04.04.01.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,930.97 6.34 12,242.35 0.00 0.00 0.00 0.00 0.00 0.00 1,930.97
4.04.02 COLUMNAS
04.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 9.45 497.51 4,701.47 0.00 0.00 0.00 0.00 0.00 0.00 9.45
04.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,510.20 6.34 9,574.67 0.00 0.00 0.00 0.00 0.00 0.00 1,510.20
04.04.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 126.00 67.12 8,457.12 0.00 0.00 0.00 0.00 0.00 0.00 126.00
4.04.03 VIGAS
04.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 87.36 497.51 43,462.47 0.00 0.00 0.00 0.00 0.00 0.00 87.36
04.04.03.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,573.61 6.42 10,102.58 0.00 0.00 0.00 0.00 0.00 0.00 1,573.61
04.04.03.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 173.51 78.23 13,573.69 0.00 0.00 0.00 0.00 0.00 0.00 173.51
5.00 FLETE TERRESTRE
5.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 111,307.41 0.15 16,696.11 0.00 0.00 44,522.96 6,678.44 44,522.96 6,678.44 66,784.45
1.00 ARQUITECTURA- 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 116.61 61.24 7,141.20 0.00 0.00 42.68 2,613.72 42.68 2,613.72 73.93
1.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 98.74 39.64 3,914.05 0.00 0.00 0.00 0.00 0.00 0.00 98.74
01.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 125.65 35.98 4,520.89 0.00 0.00 0.00 0.00 0.00 0.00 125.65
01.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 55.04 32.12 1,767.88 0.00 0.00 0.00 0.00 0.00 0.00 55.04
01.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 66.62 47.33 3,153.12 0.00 0.00 0.00 0.00 0.00 0.00 66.62
01.02.05 TARRAJEO DE ESCALERAS m2 23.78 34.20 813.28 0.00 0.00 0.00 0.00 0.00 0.00 23.78
01.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 13.09 14.06 184.05 0.00 0.00 0.00 0.00 0.00 0.00 13.09
01.02.07 BRUÑAS 1" m 158.15 1.25 197.69 0.00 0.00 0.00 0.00 0.00 0.00 158.15
1.03 CIELORRASOS
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO 129.74
01.03.01 DE 2" x 2" x 10´ m2 52.88 6,860.65 0.00 0.00 0.00 0.00 0.00 0.00 129.74
01.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 7.54 24.45 184.35 0.00 0.00 0.00 0.00 0.00 0.00 7.54
1.04 PISOS Y PAVIMENTOS
01.04.01 PISO DE CONCRETO E=4", PULIDO, BRUÑADO Y COLOREADO m2 112.25 40.73 4,571.94 0.00 0.00 0.00 0.00 0.00 0.00 112.25
1.05 ZOCALOS Y CONTRAZOCALOS
01.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 74.09 12.35 915.01 0.00 0.00 0.00 0.00 0.00 0.00 74.09
C:A m
1.06 CARPINTERIA DE MADERA
01.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 2.00 754.00 1,508.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00
01.06.02 TICERO DE MADERA CEDRO (L=3.10m) BARNIZADO UND 2.00 70.00 140.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00
1.07 CARPINTERIA METALICA
01.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 23.32 198.55 4,630.19 0.00 0.00 0.00 0.00 0.00 0.00 23.32
01.07.02 REJILLA METALICA FIJA UND 2.00 112.98 225.96 0.00 0.00 0.00 0.00 0.00 0.00 2.00
01.07.03 PASAMANO DE ACERO TUBO DE 2" m 22.00 96.79 2,129.38 0.00 0.00 0.00 0.00 0.00 0.00 22.00
01.07.04 CANTONERA PARA ESCALERA SEGUN PLANOS m 25.00 20.95 523.75 0.00 0.00 0.00 0.00 0.00 0.00 25.00
1.08 CERRAJERIA
01.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" PZA 6.00 29.55 177.30 0.00 0.00 0.00 0.00 0.00 0.00 6.00
01.08.02 CHAPA DE PARCHE DE TRES GOLPES PZA 2.00 88.20 176.40 0.00 0.00 0.00 0.00 0.00 0.00 2.00
1.09 VIDRIOS, CRISTALES Y SIMILARES
01.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 363.53 5.46 1,984.87 0.00 0.00 0.00 0.00 0.00 0.00 363.53
1.10 PINTURA
01.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 98.74 10.32 1,019.00 0.00 0.00 0.00 0.00 0.00 0.00 98.74
01.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 137.27 7.19 986.97 0.00 0.00 0.00 0.00 0.00 0.00 137.27
01.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 55.04 8.52 468.94 0.00 0.00 0.00 0.00 0.00 0.00 55.04
01.10.04 PINTURA EN VIGAS C/LATEX LAVABLE m2 66.62 8.79 585.59 0.00 0.00 0.00 0.00 0.00 0.00 66.62
01.10.05 PINTURA EN DERRAMES C/LATEX LAVABLE m 13.09 2.18 28.54 0.00 0.00 0.00 0.00 0.00 0.00 13.09
01.10.06 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 129.74 9.77 1,267.56 0.00 0.00 0.00 0.00 0.00 0.00 129.74
01.10.07 PINTURA EN PIZARRA m2 7.40 12.77 94.50 0.00 0.00 0.00 0.00 0.00 0.00 7.40
01.10.08 PINTURA EN FRISO DE MADERA m2 7.34 12.62 92.63 0.00 0.00 0.00 0.00 0.00 0.00 7.34
01.10.09 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 74.09 5.66 419.35 0.00 0.00 0.00 0.00 0.00 0.00 74.09
01.10.10 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 5.20 16.18 84.14 0.00 0.00 0.00 0.00 0.00 0.00 5.20
01.10.11 PINTURA ESMALTE EN BRUÑAS DE 1" m 158.15 2.86 452.31 0.00 0.00 0.00 0.00 0.00 0.00 158.15
1.11 VARIOS
01.11.11 JUNTAS SISMICA 1" m 4.46 5.00 22.30 0.00 0.00 0.00 0.00 0.00 0.00 4.46
1.12 SISTEMA DE AGUA FRIA
1.12.01 TUBERIAS Y ACCESORIOS
01.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 24.05 16.31 392.26 0.00 0.00 0.00 0.00 0.00 0.00 24.05
01.12.01.02 CODO PVC-SAP 3" * 90 UND 7.00 13.20 92.40 0.00 0.00 0.00 0.00 0.00 0.00 7.00
01.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 39.22 16.46 645.56 0.00 0.00 0.00 0.00 0.00 0.00 39.22
01.12.01.04 SOPORTE DE CANALETA UND 25.00 3.89 97.25 0.00 0.00 0.00 0.00 0.00 0.00 25.00
01.12.01.05 ABRAZADERA PARA CANALETA UND 13.00 19.54 254.02 0.00 0.00 0.00 0.00 0.00 0.00 13.00
01.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 9.79 37.04 362.62 0.00 0.00 0.00 0.00 0.00 0.00 9.79
01.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.67 393.71 263.79 0.00 0.00 0.00 0.00 0.00 0.00 0.67
01.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 8.14 28.92 235.41 0.00 0.00 0.00 0.00 0.00 0.00 8.14
01.12.01.09 PINTURA EN FALSA COLUMNA m2 8.14 8.52 69.35 0.00 0.00 0.00 0.00 0.00 0.00 8.14
2.00 ARQUITECTURA- ADMINISTRACION
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE CABEZA J m2 38.57 104.35 4,024.78 0.00 0.00 0.00 0.00 0.00 0.00 38.57
02.01.02 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 20.77 61.24 1,271.95 0.00 0.00 0.00 0.00 0.00 0.00 20.77
2.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 58.30 39.64 2,311.01 0.00 0.00 0.00 0.00 0.00 0.00 58.30
02.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 61.21 35.98 2,202.34 0.00 0.00 0.00 0.00 0.00 0.00 61.21
02.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 10.37 32.12 333.08 0.00 0.00 0.00 0.00 0.00 0.00 10.37
02.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 25.90 47.33 1,225.85 0.00 0.00 0.00 0.00 0.00 0.00 25.90
02.02.05 TARRAJEO EN PESTAÑAS CON C:A 1:5 E = 1.50cm m2 8.05 47.33 381.01 0.00 0.00 0.00 0.00 0.00 0.00 8.05
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 33.80 14.06 475.23 0.00 0.00 0.00 0.00 0.00 0.00 33.80
02.02.07 FROTACHADO EN CUNETAS CON C:A 1:5 E = 1.50cm CON IMPERMEABILIZANT m2 36.51 32.88 1,200.45 0.00 0.00 0.00 0.00 0.00 0.00 36.51
02.02.08 BRUÑAS DE 1/2" m 263.22 1.25 329.03 0.00 0.00 0.00 0.00 0.00 0.00 263.22
02.02.09 BRUÑAS 3/4" m 50.98 1.25 63.73 0.00 0.00 0.00 0.00 0.00 0.00 50.98
2.03 CIELORRASO
02.03.01 CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO m2 81.83 52.88 4,327.17 0.00 0.00 0.00 0.00 0.00 0.00 81.83
DE 2" x 2" x 10´
02.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 5.84 24.45 142.79 0.00 0.00 0.00 0.00 0.00 0.00 5.84
2.04 PISOS Y PAVIMENTOS
02.04.01 PISO MACHIEMBRADO m2 66.00 38.11 2,515.26 0.00 0.00 0.00 0.00 0.00 0.00 66.00
02.04.02 VEREDA DE CONCRETO f'c= 175 kg/cm2 H=0.10M m2 34.21 57.94 1,982.13 0.00 0.00 0.00 0.00 0.00 0.00 34.21
02.04.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 4.81 76.38 367.39 0.00 0.00 0.00 0.00 0.00 0.00 4.81
2.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 m 30.51 12.35 376.80 0.00 0.00 0.00 0.00 0.00 0.00 30.51
02.05.02 CONTRAZOCALO DE MADERA CEDRO DE 4" RODON 1" m 28.23 79.85 2,254.17 0.00 0.00 0.00 0.00 0.00 0.00 28.23
2.06 CARPINTERIA DE MADERA
02.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 1.00 754.00 754.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
02.06.02 PUERTA CONTRAPLACADA DE MADERA TORNILLO SEGUN DISEÑO INCL. INS UND 2.00 380.00 760.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00
02.06.03 TABIQUERIA DE MELAMINE DE 1" m2 22.50 183.03 4,118.18 0.00 0.00 0.00 0.00 0.00 0.00 22.50
2.07 CARPINTERIA METALICA
02.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 6.32 198.55 1,254.84 0.00 0.00 0.00 0.00 0.00 0.00 6.32
02.07.02 REJILLA METALICA FIJA UND 1.00 112.98 112.98 0.00 0.00 0.00 0.00 0.00 0.00 1.00
2.08 CERRAJERIA
02.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 10.00 29.55 295.50 0.00 0.00 0.00 0.00 0.00 0.00 10.00
02.08.02 CHAPA DE PARCHE DE TRES GOLPES pza 3.00 88.20 264.60 0.00 0.00 0.00 0.00 0.00 0.00 3.00
02.08.03 MANIJA DE BRONCE DE 4" PARA PUERTAS pza 3.00 64.25 192.75 0.00 0.00 0.00 0.00 0.00 0.00 3.00
2.09 VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 88.58 5.46 483.65 0.00 0.00 0.00 0.00 0.00 0.00 88.58
2.10 PINTURA
02.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 58.30 10.32 601.66 0.00 0.00 0.00 0.00 0.00 0.00 58.30
02.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 61.21 7.19 440.10 0.00 0.00 0.00 0.00 0.00 0.00 61.21
02.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 10.37 8.52 88.35 0.00 0.00 0.00 0.00 0.00 0.00 10.37
02.10.04 PINTURA EN COLUMNETAS C/LATEX LAVABLE m2 3.12 8.52 26.58 0.00 0.00 0.00 0.00 0.00 0.00 3.12
02.10.05 PINTURA EN VIGAS C/LATEX LAVABLE m2 25.90 8.79 227.66 0.00 0.00 0.00 0.00 0.00 0.00 25.90
02.10.06 PINTURA EN PESTAÑAS C/LATEX LAVABLE m2 8.05 8.79 70.76 0.00 0.00 0.00 0.00 0.00 0.00 8.05
02.10.07 PINTURA EN DERRAMES C/LATEX LAVABLE m 40.20 2.18 87.64 0.00 0.00 0.00 0.00 0.00 0.00 40.20
02.10.08 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 77.79 9.77 760.01 0.00 0.00 0.00 0.00 0.00 0.00 77.79
02.10.09 PINTURA EN FRISO DE MADERA m2 3.90 12.62 49.22 0.00 0.00 0.00 0.00 0.00 0.00 3.90
02.10.10 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 30.51 5.66 172.69 0.00 0.00 0.00 0.00 0.00 0.00 30.51
02.10.11 PINTURA BARNIZ EN CONTRAZOCALO DE MADERA DE CEDRO 4" CON RODON m 28.23 16.18 456.76 0.00 0.00 0.00 0.00 0.00 0.00 28.23
02.10.12 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 10.20 16.18 165.04 0.00 0.00 0.00 0.00 0.00 0.00 10.20
02.10.13 PINTURA ESMALTE EN BRUÑAS 1/2" m 263.22 2.86 752.81 0.00 0.00 0.00 0.00 0.00 0.00 263.22
02.10.14 PINTURA ESMALTE EN BRUÑAS DE MUROS EXTERIORES 3/4" m 50.98 2.86 145.80 0.00 0.00 0.00 0.00 0.00 0.00 50.98
2.11 VARIOS
02.11.01 JUNTAS DE DILATACION m 7.10 5.00 35.50 0.00 0.00 0.00 0.00 0.00 0.00 7.10
02.11.02 JUNTAS SISMICA 1" m 18.55 5.00 92.75 0.00 0.00 0.00 0.00 0.00 0.00 18.55
2.12 SISTEMA DE AGUA FRIA
2.12.01 TUBERIAS Y ACCESORIOS
02.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 22.00 16.31 358.82 0.00 0.00 0.00 0.00 0.00 0.00 22.00
02.12.01.02 CODO PVC-SAP 3" * 90 und 12.00 13.20 158.40 0.00 0.00 0.00 0.00 0.00 0.00 12.00
02.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 19.50 16.46 320.97 0.00 0.00 0.00 0.00 0.00 0.00 19.50
02.12.01.04 SOPORTE DE CANALETA und 16.00 3.89 62.24 0.00 0.00 0.00 0.00 0.00 0.00 16.00
02.12.01.05 ABRAZADERA PARA CANALETA und 20.00 19.54 390.80 0.00 0.00 0.00 0.00 0.00 0.00 20.00
02.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 4.95 37.04 183.35 0.00 0.00 0.00 0.00 0.00 0.00 4.95
02.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.34 393.71 133.86 0.00 0.00 0.00 0.00 0.00 0.00 0.34
02.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 4.95 28.92 143.15 0.00 0.00 0.00 0.00 0.00 0.00 4.95
02.12.01.09 PINTURA EN FALSA COLUMNA m3 4.95 8.52 42.17 0.00 0.00 0.00 0.00 0.00 0.00 4.95
3.00 ARQUITECTURA- CERCO PERIMETRICO
3.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 787.5 61.24 48,226.50 0.00 0.00 0.00 0.00 0.00 0.00 787.50
3.02 REVOQUES ENLUCIDOS
03.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 496.44 39.64 19,678.88 0.00 0.00 0.00 0.00 0.00 0.00 496.44
03.02.02 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 126.00 32.12 4,047.12 0.00 0.00 0.00 0.00 0.00 0.00 126.00
03.02.03 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 225.56 47.33 10,675.75 0.00 0.00 0.00 0.00 0.00 0.00 225.56
3.03 CARPINTERIA METALICA
03.03.01 PORTON METALICO 3.50m x 3.00m und 1.00 3,500.00 3,500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
3.04 PINTURA
03.04.01 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 126.00 8.52 1,073.52 0.00 0.00 0.00 0.00 0.00 0.00 126.00
03.04.02 PINTURA EN VIGAS C/LATEX LAVABLE m2 225.56 8.79 1,982.67 0.00 0.00 0.00 0.00 0.00 0.00 225.56
3.05 VARIOS
03.05.01 JUNTAS DE DILATACION m 630.00 5.00 3,150.00 0.00 0.00 0.00 0.00 0.00 0.00 630.00
4.00 FLETE TERRESTRE
4.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 173,674.98 0.15 26,051.25 0.00 0.00 34,735.00 5,210.25 34,735.00 5,210.25 138,939.98
5.00 EQUIPAMIENTO Y MOBILIARIO
5.01 MOBILIARIO DE COLEGIO (ESCRITORIOS,CARPETAS,COMPUTADORAS) glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00
1.00 INSTALACIONES ELECTRICAS - 01 AULA
1.01 SISTEMA ELECTRICO
1.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 10.00 63.96 639.60 0.00 0.00 0.00 0.00 0.00 0.00 10.00
1.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 4.00 54.26 217.04 0.00 0.00 0.00 0.00 0.00 0.00 4.00
1.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 2.00 47.00 94.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00
1.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 2.00 46.89 93.78 0.00 0.00 0.00 0.00 0.00 0.00 2.00
1.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 8.00 45.81 366.48 0.00 0.00 0.00 0.00 0.00 0.00 8.00
1.02 CANALIZACIONES, TUBERIAS Y/O CABLES
1.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
1.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 109.13 3.58 390.69 0.00 0.00 0.00 0.00 0.00 0.00 109.13
1.02.02 CABLES ELECTRICOS
1.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 148.00 2.87 424.76 0.00 0.00 0.00 0.00 0.00 0.00 148.00
1.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 70.26 2.24 157.38 0.00 0.00 0.00 0.00 0.00 0.00 70.26
1.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
1.03.01 TABLERO DE DISTRIBUCION
1.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 2.00 249.30 498.60 0.00 0.00 0.00 0.00 0.00 0.00 2.00
1.04 ARTEFACTOS ELECTRICOS
1.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 8.00 107.37 858.96 0.00 0.00 0.00 0.00 0.00 0.00 8.00
1.04.02 SPOT LIGHT und 2.00 41.40 82.80 0.00 0.00 0.00 0.00 0.00 0.00 2.00
2.00 INSTALACIONES ELECTRICAS - ADMINISTRACION
2.01 SISTEMA ELECTRICO
2.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 4.00 63.96 255.84 0.00 0.00 0.00 0.00 0.00 0.00 4.00
2.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 1.00 54.26 54.26 0.00 0.00 0.00 0.00 0.00 0.00 1.00
2.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 3.00 47.00 141.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00
2.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 1.00 46.89 46.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00
2.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 6.00 45.81 274.86 0.00 0.00 0.00 0.00 0.00 0.00 6.00
2.02 CANALIZACIONES, TUBERIAS Y/O CABLES
2.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
2.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 42.25 3.58 151.26 0.00 0.00 0.00 0.00 0.00 0.00 42.25
2.02.02 CABLES ELECTRICOS
2.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 50.21 2.87 144.10 0.00 0.00 0.00 0.00 0.00 0.00 50.21
2.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 52.44 2.24 117.47 0.00 0.00 0.00 0.00 0.00 0.00 52.44
2.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
2.03.01 TABLERO DE DISTRIBUCION
2.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 1.00 249.30 249.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00
2.03.02 CAJA DE PASO 0.00 0.00
2.03.02.01 CAJA DE PASE F.G. 4" x 4" x 2" und 2.00 24.03 48.06 0.00 0.00 0.00 0.00 0.00 0.00 2.00
2.04 ARTEFACTOS ELECTRICOS 0.00 0.00
2.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 4.00 107.37 429.48 0.00 0.00 0.00 0.00 0.00 0.00 4.00
2.04.02 SPOT LIGHT und 1.00 41.40 41.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00
3.00 FLETE TERRESTRE
3.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 248.61 0.15 37.29 0.00 0.00 0.00 0.00 0.00 0.00 248.61
COSTO TOTAL DIRECTO 603,397.35 29,946.95 29,946.95
GASTOS GENERALES 9% 54,305.76 2,695.23 2,695.23
UTILIDAD 5% 30,169.87 1,497.35 1,497.35
SUB TOTAL 687,872.98 34,139.53 34,139.53
IGV 18% 123,817.14 6,145.12 6,145.12
TOTAL S/, 811,690.12 40,284.65 40,284.65
Avance por mes 40,284.65
Avance acumulado 40,284.65
% DE AVANCE EJECUTADO POR MES 22.50 4.96%
% DE AVANCE PROGRAMADO POR MES 22.50 4.37%
% DE AVANCE EJECUTADO ACUMULADO 4.96%
% DE AVANCE PROGRAMADO ACUMULADO 4.37%
VALORIZACION N° 01
PROYECTO: AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 811,690.12
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 30-Nov-14 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. VICTOR COBADIS ROMERO RIVEROS

PORCENT
PRESUPUESTADO VALORIZACION N° 01 SALDO
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
1.00 OBRAS PROVISIONALES
1.01 GUARDIANIA, DEPOSITO Y ALMACEN GLB 1.00 1,108.42 1,108.42 0.00 0.00 1.00 1,108.42 1.00 1,108.42 0.00 0.00 100.00%
1.02 CARTEL DE OBRA 3.60 M X 4.80 M UND 1.00 2,176.89 2,176.89 0.00 0.00 1.00 2,176.89 1.00 2,176.89 0.00 0.00 100.00%
2.00 ESTRUCTURAS-01 AULA
2.01 OBRAS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 156.65 2.47 386.93 0.00 0.00 156.65 386.93 156.65 386.93 0.00 0.00 100.00%
02.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 156.65 4.11 643.83 0.00 0.00 156.65 643.83 156.65 643.83 0.00 0.00 100.00%
02.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 156.65 8.19 1,282.96 0.00 0.00 78.33 641.48 78.33 641.48 78.33 641.48 50.00%
2.02 OBRAS DE CONCRETO SIMPLE
02.02.01 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 129.24 44.28 5,722.75 0.00 0.00 0.00 0.00 0.00 0.00 129.24 5,722.75 0.00%
2.03 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
2.03.01 COLUMNAS
02.03.01.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 6.69 541.94 3,625.58 0.00 0.00 0.00 0.00 0.00 0.00 6.69 3,625.58 0.00%
02.03.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,144.08 6.34 7,253.47 0.00 0.00 1,144.08 7,253.47 1,144.08 7,253.47 0.00 0.00 100.00%
02.03.01.03 ENCOFRADO y DESENCOFRADO EN COLUMNAS m2 86.17 67.12 5,783.73 0.00 0.00 0.00 0.00 0.00 0.00 86.17 5,783.73 0.00%
2.03.02 VIGAS
02.03.02.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 8.63 454.60 3,923.20 0.00 0.00 0.00 0.00 0.00 0.00 8.63 3,923.20 0.00%
02.03.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,167.55 6.42 7,495.67 0.00 0.00 0.00 0.00 0.00 0.00 1,167.55 7,495.67 0.00%
02.03.02.03 ENCOFRADO y DESENCOFRADO EN VIGAS m2 114.53 78.23 8,959.68 0.00 0.00 0.00 0.00 0.00 0.00 114.53 8,959.68 0.00%
2.03.03 COLUMNETAS DE AMARRE
02.03.03.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 1.85 470.02 869.54 0.00 0.00 0.00 0.00 0.00 0.00 1.85 869.54 0.00%
02.03.03.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 141.33 6.34 896.03 0.00 0.00 0.00 0.00 0.00 0.00 141.33 896.03 0.00%
02.03.03.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 27.17 37.04 1,006.38 0.00 0.00 0.00 0.00 0.00 0.00 27.17 1,006.38 0.00%
2.03.04 VIGUETAS DE AMARRE
02.03.04.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.36 407.54 146.71 0.00 0.00 0.00 0.00 0.00 0.00 0.36 146.71 0.00%
02.03.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 38.67 6.34 245.17 0.00 0.00 0.00 0.00 0.00 0.00 38.67 245.17 0.00%
02.03.04.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 12.00 37.04 444.48 0.00 0.00 0.00 0.00 0.00 0.00 12.00 444.48 0.00%
2.03.05 LOSA ALIGERADA
02.03.05.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 0.87 443.45 385.80 0.00 0.00 0.00 0.00 0.00 0.00 0.87 385.80 0.00%
02.03.05.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 51.95 6.34 329.36 0.00 0.00 0.00 0.00 0.00 0.00 51.95 329.36 0.00%
02.03.05.03 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2 11.62 78.23 909.03 0.00 0.00 0.00 0.00 0.00 0.00 11.62 909.03 0.00%
02.03.05.04 LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO UND 104.00 2.35 244.40 0.00 0.00 0.00 0.00 0.00 0.00 104.00 244.40 0.00%
2.04 ESTRUCTURAS DE MADERA (TIJERALES)
02.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 6.00 2,331.08 13,986.48 0.00 0.00 0.00 0.00 0.00 0.00 6.00 13,986.48 0.00%
02.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 24.00 308.09 7,394.16 0.00 0.00 0.00 0.00 0.00 0.00 24.00 7,394.16 0.00%
02.04.03 ANCLAJE DE TIJERAL DE MADERA UND 12.00 1,004.25 12,051.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 12,051.00 0.00%
02.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 175.85 51.94 9,133.65 0.00 0.00 0.00 0.00 0.00 0.00 175.85 9,133.65 0.00%
02.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 20.28 41.13 834.12 0.00 0.00 0.00 0.00 0.00 0.00 20.28 834.12 0.00%
2.05 PRUEBAS DE LABORATORIO
02.05.01 UND 8.00 42.02 336.16 0.00 0.00 0.00 0.00 0.00 0.00 8.00 336.16 0.00%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
3.00 ESTRUCTURAS-ADMINISTRACION
3.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 91.08 2.47 224.97 0.00 0.00 0.00 0.00 0.00 0.00 91.08 224.97 0.00%
03.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 111.23 4.11 457.16 0.00 0.00 0.00 0.00 0.00 0.00 111.23 457.16 0.00%
03.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 111.23 8.19 910.97 0.00 0.00 0.00 0.00 0.00 0.00 111.23 910.97 0.00%
03.01.04 DEMOLICION DE MURO DE ADOBE E=0.40m m3 54.99 39.81 2,189.15 0.00 0.00 0.00 0.00 0.00 0.00 54.99 2,189.15 0.00%
3.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION PARA ZAPATAS DE 1.70M DE PROFUNDIDAD m3 18.15 44.96 816.02 0.00 0.00 0.00 0.00 0.00 0.00 18.15 816.02 0.00%
03.02.02 EXCAVACION PARA CUNETAS m3 6.85 28.10 192.49 0.00 0.00 0.00 0.00 0.00 0.00 6.85 192.49 0.00%
03.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 11.75 17.36 203.98 0.00 0.00 0.00 0.00 0.00 0.00 11.75 203.98 0.00%
03.02.04 RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO LIVIANO m3 85.36 10.12 863.84 0.00 0.00 0.00 0.00 0.00 0.00 85.36 863.84 0.00%
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 92.94 18.73 1,740.77 0.00 0.00 0.00 0.00 0.00 0.00 92.94 1,740.77 0.00%
3.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 13.96 34.43 480.64 0.00 0.00 0.00 0.00 0.00 0.00 13.96 480.64 0.00%
03.03.02 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 3.30 307.69 1,015.38 0.00 0.00 0.00 0.00 0.00 0.00 3.30 1,015.38 0.00%
03.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 26.50 76.38 2,024.07 0.00 0.00 0.00 0.00 0.00 0.00 26.50 2,024.07 0.00%
03.03.04 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 51.15 44.28 2,264.92 0.00 0.00 0.00 0.00 0.00 0.00 51.15 2,264.92 0.00%
03.03.05 CONCRETO EN CUNETAS FC 175KG/CM2 m3 4.03 282.60 1,138.88 0.00 0.00 0.00 0.00 0.00 0.00 4.03 1,138.88 0.00%
03.03.06 ENCOFRADO DE CUNETAS m2 19.34 42.88 829.30 0.00 0.00 0.00 0.00 0.00 0.00 19.34 829.30 0.00%
3.04 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
3.04.01 ZAPATAS
03.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 7.38 431.54 3,184.77 0.00 0.00 0.00 0.00 0.00 0.00 7.38 3,184.77 0.00%
03.04.01.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 213.28 6.34 1,352.20 0.00 0.00 0.00 0.00 0.00 0.00 213.28 1,352.20 0.00%
3.04.02 VIGAS DE CIMENTACION
03.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 2.14 448.93 960.71 0.00 0.00 0.00 0.00 0.00 0.00 2.14 960.71 0.00%
03.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10 1,002.35 0.00%
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 17.10 71.64 1,225.04 0.00 0.00 0.00 0.00 0.00 0.00 17.10 1,225.04 0.00%
3.04.03 SOBRECIMIENTO ARMADO
03.04.03.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10 1,002.35 0.00%
3.04.04 COLUMNAS
03.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.13 541.94 1,154.33 0.00 0.00 0.00 0.00 0.00 0.00 2.13 1,154.33 0.00%
03.04.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 507.51 6.34 3,217.61 0.00 0.00 0.00 0.00 0.00 0.00 507.51 3,217.61 0.00%
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 24.65 67.12 1,654.51 0.00 0.00 0.00 0.00 0.00 0.00 24.65 1,654.51 0.00%
3.04.05 VIGAS
03.04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.37 454.60 1,532.00 0.00 0.00 0.00 0.00 0.00 0.00 3.37 1,532.00 0.00%
03.04.05.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 597.24 6.42 3,834.28 0.00 0.00 0.00 0.00 0.00 0.00 597.24 3,834.28 0.00%
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 28.09 78.23 2,197.48 0.00 0.00 0.00 0.00 0.00 0.00 28.09 2,197.48 0.00%
3.04.06 COLUMNETAS DE AMARRE
03.04.06.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 0.55 470.02 258.51 0.00 0.00 0.00 0.00 0.00 0.00 0.55 258.51 0.00%
03.04.06.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 71.75 6.34 454.90 0.00 0.00 0.00 0.00 0.00 0.00 71.75 454.90 0.00%
03.04.06.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 7.36 37.04 272.61 0.00 0.00 0.00 0.00 0.00 0.00 7.36 272.61 0.00%
3.04.07 VIGUETAS DE AMARRE
03.04.07.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.88 407.54 358.64 0.00 0.00 0.00 0.00 0.00 0.00 0.88 358.64 0.00%
03.04.07.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 64.90 6.34 411.47 0.00 0.00 0.00 0.00 0.00 0.00 64.90 411.47 0.00%
03.04.07.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 8.81 37.04 326.32 0.00 0.00 0.00 0.00 0.00 0.00 8.81 326.32 0.00%
3.05 ESTRUCTURAS DE MADERA (TIJERALES)
03.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 3.00 2,331.08 6,993.24 0.00 0.00 0.00 0.00 0.00 0.00 3.00 6,993.24 0.00%
03.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 12.00 302.09 3,625.08 0.00 0.00 0.00 0.00 0.00 0.00 12.00 3,625.08 0.00%
03.04.03 ANCLAJE DE TIJERAL DE MADERA UND 6.00 1,004.25 6,025.50 0.00 0.00 0.00 0.00 0.00 0.00 6.00 6,025.50 0.00%
03.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 89.10 51.94 4,627.85 0.00 0.00 0.00 0.00 0.00 0.00 89.10 4,627.85 0.00%
03.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 9.90 41.13 407.19 0.00 0.00 0.00 0.00 0.00 0.00 9.90 407.19 0.00%
3.06 PRUEBAS DE LABORATORIO
03.06.01 UND 18.00 42.02 756.36 0.00 0.00 0.00 0.00 0.00 0.00 18.00 756.36 0.00%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
4.00 ESTRUCTURAS-CERCO PERIMETRICO
4.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 208.21 2.47 514.28 0.00 0.00 208.21 514.28 208.21 514.28 0.00 0.00 100.00%
04.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 208.21 4.11 855.74 0.00 0.00 208.21 855.74 208.21 855.74 0.00 0.00 100.00%
04.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 208.21 8.19 1,705.24 0.00 0.00 80.00 655.20 80.00 655.20 128.21 1,050.04 38.42%
4.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION PARA CIMIENTOS HASTA 0.70M DE PROFUNDIDAD EN m3 182.99 28.10 5,142.02 0.00 0.00 43.00 1,208.30 43.00 1,208.30 139.99 3,933.72 23.50%
TERRENO NORMAL
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 157.36 17.36 2,731.77 0.00 0.00 0.00 0.00 0.00 0.00 157.36 2,731.77 0.00%
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 33.79 18.73 632.89 0.00 0.00 0.00 0.00 0.00 0.00 33.79 632.89 0.00%
4.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 208.21 34.43 7,168.67 0.00 0.00 0.00 0.00 0.00 0.00 208.21 7,168.67 0.00%
04.03.02 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 145.75 232.29 33,856.27 0.00 0.00 0.00 0.00 0.00 0.00 145.75 33,856.27 0.00%
04.03.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 37.23 307.69 11,455.30 0.00 0.00 0.00 0.00 0.00 0.00 37.23 11,455.30 0.00%
04.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 496.44 76.38 37,918.09 0.00 0.00 0.00 0.00 0.00 0.00 496.44 37,918.09 0.00%
4.04 OBRAS DE CONCRETO ARMADO
4.04.01 SOBRECIMIENTO ARMADO
04.04.01.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,930.97 6.34 12,242.35 0.00 0.00 0.00 0.00 0.00 0.00 1,930.97 12,242.35 0.00%
4.04.02 COLUMNAS
04.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 9.45 497.51 4,701.47 0.00 0.00 0.00 0.00 0.00 0.00 9.45 4,701.47 0.00%
04.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,510.20 6.34 9,574.67 0.00 0.00 0.00 0.00 0.00 0.00 1,510.20 9,574.67 0.00%
04.04.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 126.00 67.12 8,457.12 0.00 0.00 0.00 0.00 0.00 0.00 126.00 8,457.12 0.00%
4.04.03 VIGAS
04.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 87.36 497.51 43,462.47 0.00 0.00 0.00 0.00 0.00 0.00 87.36 43,462.47 0.00%
04.04.03.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,573.61 6.42 10,102.58 0.00 0.00 0.00 0.00 0.00 0.00 1,573.61 10,102.58 0.00%
04.04.03.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 173.51 78.23 13,573.69 0.00 0.00 0.00 0.00 0.00 0.00 173.51 13,573.69 0.00%
5.00 FLETE TERRESTRE
5.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 111,307.41 0.15 16,696.11 0.00 0.00 44,522.96 6,678.44 44,522.96 6,678.44 66,784.45 10,017.67 40.00%
COSTO TOTAL DIRECTO 603,397.35 22,122.98 #REF! #REF! #REF!
GASTOS GENERALES 9% 54,305.76 1,991.07 #REF! #REF!
UTILIDAD 5% 30,169.87 1,106.15 #REF! #REF!
SUB TOTAL 687,872.98 25,220.20 #REF! #REF!
1.00 ARQUITECTURA- 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 116.61 61.24 7,141.20 0.00 0.00 42.68 2,613.72 42.68 2,613.72 73.93 4,527.47 36.60%
1.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 98.74 39.64 3,914.05 0.00 0.00 0.00 0.00 0.00 0.00 98.74 3,914.05 0.00%
01.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 125.65 35.98 4,520.89 0.00 0.00 0.00 0.00 0.00 0.00 125.65 4,520.89 0.00%
01.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 55.04 32.12 1,767.88 0.00 0.00 0.00 0.00 0.00 0.00 55.04 1,767.88 0.00%
01.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 66.62 47.33 3,153.12 0.00 0.00 0.00 0.00 0.00 0.00 66.62 3,153.12 0.00%
01.02.05 TARRAJEO DE ESCALERAS m2 23.78 34.20 813.28 0.00 0.00 0.00 0.00 0.00 0.00 23.78 813.28 0.00%
01.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 13.09 14.06 184.05 0.00 0.00 0.00 0.00 0.00 0.00 13.09 184.05 0.00%
01.02.07 BRUÑAS 1" m 158.15 1.25 197.69 0.00 0.00 0.00 0.00 0.00 0.00 158.15 197.69 0.00%
1.03 CIELORRASOS
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO 129.74
01.03.01 DE 2" x 2" x 10´ m2 52.88 6,860.65 0.00 0.00 0.00 0.00 0.00 0.00 129.74 6,860.65 0.00%
01.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 7.54 24.45 184.35 0.00 0.00 0.00 0.00 0.00 0.00 7.54 184.35 0.00%
1.04 PISOS Y PAVIMENTOS
01.04.01 PISO DE CONCRETO E=4", PULIDO, BRUÑADO Y COLOREADO m2 112.25 40.73 4,571.94 0.00 0.00 0.00 0.00 0.00 0.00 112.25 4,571.94 0.00%
1.05 ZOCALOS Y CONTRAZOCALOS
01.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 74.09 12.35 915.01 0.00 0.00 0.00 0.00 0.00 0.00 74.09 915.01 0.00%
C:A m
1.06 CARPINTERIA DE MADERA
01.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 2.00 754.00 1,508.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,508.00 0.00%
01.06.02 TICERO DE MADERA CEDRO (L=3.10m) BARNIZADO UND 2.00 70.00 140.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 140.00 0.00%
1.07 CARPINTERIA METALICA
01.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 23.32 198.55 4,630.19 0.00 0.00 0.00 0.00 0.00 0.00 23.32 4,630.19 0.00%
01.07.02 REJILLA METALICA FIJA UND 2.00 112.98 225.96 0.00 0.00 0.00 0.00 0.00 0.00 2.00 225.96 0.00%
01.07.03 PASAMANO DE ACERO TUBO DE 2" m 22.00 96.79 2,129.38 0.00 0.00 0.00 0.00 0.00 0.00 22.00 2,129.38 0.00%
01.07.04 CANTONERA PARA ESCALERA SEGUN PLANOS m 25.00 20.95 523.75 0.00 0.00 0.00 0.00 0.00 0.00 25.00 523.75 0.00%
1.08 CERRAJERIA
01.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" PZA 6.00 29.55 177.30 0.00 0.00 0.00 0.00 0.00 0.00 6.00 177.30 0.00%
01.08.02 CHAPA DE PARCHE DE TRES GOLPES PZA 2.00 88.20 176.40 0.00 0.00 0.00 0.00 0.00 0.00 2.00 176.40 0.00%
1.09 VIDRIOS, CRISTALES Y SIMILARES
01.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 363.53 5.46 1,984.87 0.00 0.00 0.00 0.00 0.00 0.00 363.53 1,984.87 0.00%
1.10 PINTURA
01.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 98.74 10.32 1,019.00 0.00 0.00 0.00 0.00 0.00 0.00 98.74 1,019.00 0.00%
01.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 137.27 7.19 986.97 0.00 0.00 0.00 0.00 0.00 0.00 137.27 986.97 0.00%
01.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 55.04 8.52 468.94 0.00 0.00 0.00 0.00 0.00 0.00 55.04 468.94 0.00%
01.10.04 PINTURA EN VIGAS C/LATEX LAVABLE m2 66.62 8.79 585.59 0.00 0.00 0.00 0.00 0.00 0.00 66.62 585.59 0.00%
01.10.05 PINTURA EN DERRAMES C/LATEX LAVABLE m 13.09 2.18 28.54 0.00 0.00 0.00 0.00 0.00 0.00 13.09 28.54 0.00%
01.10.06 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 129.74 9.77 1,267.56 0.00 0.00 0.00 0.00 0.00 0.00 129.74 1,267.56 0.00%
01.10.07 PINTURA EN PIZARRA m2 7.40 12.77 94.50 0.00 0.00 0.00 0.00 0.00 0.00 7.40 94.50 0.00%
01.10.08 PINTURA EN FRISO DE MADERA m2 7.34 12.62 92.63 0.00 0.00 0.00 0.00 0.00 0.00 7.34 92.63 0.00%
01.10.09 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 74.09 5.66 419.35 0.00 0.00 0.00 0.00 0.00 0.00 74.09 419.35 0.00%
01.10.10 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 5.20 16.18 84.14 0.00 0.00 0.00 0.00 0.00 0.00 5.20 84.14 0.00%
01.10.11 PINTURA ESMALTE EN BRUÑAS DE 1" m 158.15 2.86 452.31 0.00 0.00 0.00 0.00 0.00 0.00 158.15 452.31 0.00%
1.11 VARIOS
01.11.11 JUNTAS SISMICA 1" m 4.46 5.00 22.30 0.00 0.00 0.00 0.00 0.00 0.00 4.46 22.30 0.00%
1.12 SISTEMA DE AGUA FRIA
1.12.01 TUBERIAS Y ACCESORIOS
01.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 24.05 16.31 392.26 0.00 0.00 0.00 0.00 0.00 0.00 24.05 392.26 0.00%
01.12.01.02 CODO PVC-SAP 3" * 90 UND 7.00 13.20 92.40 0.00 0.00 0.00 0.00 0.00 0.00 7.00 92.40 0.00%
01.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 39.22 16.46 645.56 0.00 0.00 0.00 0.00 0.00 0.00 39.22 645.56 0.00%
01.12.01.04 SOPORTE DE CANALETA UND 25.00 3.89 97.25 0.00 0.00 0.00 0.00 0.00 0.00 25.00 97.25 0.00%
01.12.01.05 ABRAZADERA PARA CANALETA UND 13.00 19.54 254.02 0.00 0.00 0.00 0.00 0.00 0.00 13.00 254.02 0.00%
01.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 9.79 37.04 362.62 0.00 0.00 0.00 0.00 0.00 0.00 9.79 362.62 0.00%
01.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.67 393.71 263.79 0.00 0.00 0.00 0.00 0.00 0.00 0.67 263.79 0.00%
01.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 8.14 28.92 235.41 0.00 0.00 0.00 0.00 0.00 0.00 8.14 235.41 0.00%
01.12.01.09 PINTURA EN FALSA COLUMNA m2 8.14 8.52 69.35 0.00 0.00 0.00 0.00 0.00 0.00 8.14 69.35 0.00%
2.00 ARQUITECTURA- ADMINISTRACION
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE CABEZA J m2 38.57 104.35 4,024.78 0.00 0.00 0.00 0.00 0.00 0.00 38.57 4,024.78 0.00%
02.01.02 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 20.77 61.24 1,271.95 0.00 0.00 0.00 0.00 0.00 0.00 20.77 1,271.95 0.00%
2.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 58.30 39.64 2,311.01 0.00 0.00 0.00 0.00 0.00 0.00 58.30 2,311.01 0.00%
02.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 61.21 35.98 2,202.34 0.00 0.00 0.00 0.00 0.00 0.00 61.21 2,202.34 0.00%
02.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 10.37 32.12 333.08 0.00 0.00 0.00 0.00 0.00 0.00 10.37 333.08 0.00%
02.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 25.90 47.33 1,225.85 0.00 0.00 0.00 0.00 0.00 0.00 25.90 1,225.85 0.00%
02.02.05 TARRAJEO EN PESTAÑAS CON C:A 1:5 E = 1.50cm m2 8.05 47.33 381.01 0.00 0.00 0.00 0.00 0.00 0.00 8.05 381.01 0.00%
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 33.80 14.06 475.23 0.00 0.00 0.00 0.00 0.00 0.00 33.80 475.23 0.00%
02.02.07 FROTACHADO EN CUNETAS CON C:A 1:5 E = 1.50cm CON IMPERMEABILIZANT m2 36.51 32.88 1,200.45 0.00 0.00 0.00 0.00 0.00 0.00 36.51 1,200.45 0.00%
02.02.08 BRUÑAS DE 1/2" m 263.22 1.25 329.03 0.00 0.00 0.00 0.00 0.00 0.00 263.22 329.03 0.00%
02.02.09 BRUÑAS 3/4" m 50.98 1.25 63.73 0.00 0.00 0.00 0.00 0.00 0.00 50.98 63.73 0.00%
2.03 CIELORRASO
02.03.01 CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO m2 81.83 52.88 4,327.17 0.00 0.00 0.00 0.00 0.00 0.00 81.83 4,327.17 0.00%
DE 2" x 2" x 10´
02.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 5.84 24.45 142.79 0.00 0.00 0.00 0.00 0.00 0.00 5.84 142.79 0.00%
2.04 PISOS Y PAVIMENTOS
02.04.01 PISO MACHIEMBRADO m2 66.00 38.11 2,515.26 0.00 0.00 0.00 0.00 0.00 0.00 66.00 2,515.26 0.00%
02.04.02 VEREDA DE CONCRETO f'c= 175 kg/cm2 H=0.10M m2 34.21 57.94 1,982.13 0.00 0.00 0.00 0.00 0.00 0.00 34.21 1,982.13 0.00%
02.04.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 4.81 76.38 367.39 0.00 0.00 0.00 0.00 0.00 0.00 4.81 367.39 0.00%
2.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 m 30.51 12.35 376.80 0.00 0.00 0.00 0.00 0.00 0.00 30.51 376.80 0.00%
02.05.02 CONTRAZOCALO DE MADERA CEDRO DE 4" RODON 1" m 28.23 79.85 2,254.17 0.00 0.00 0.00 0.00 0.00 0.00 28.23 2,254.17 0.00%
2.06 CARPINTERIA DE MADERA
02.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 1.00 754.00 754.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 754.00 0.00%
02.06.02 PUERTA CONTRAPLACADA DE MADERA TORNILLO SEGUN DISEÑO INCL. INS UND 2.00 380.00 760.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 760.00 0.00%
02.06.03 TABIQUERIA DE MELAMINE DE 1" m2 22.50 183.03 4,118.18 0.00 0.00 0.00 0.00 0.00 0.00 22.50 4,118.18 0.00%
2.07 CARPINTERIA METALICA
02.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 6.32 198.55 1,254.84 0.00 0.00 0.00 0.00 0.00 0.00 6.32 1,254.84 0.00%
02.07.02 REJILLA METALICA FIJA UND 1.00 112.98 112.98 0.00 0.00 0.00 0.00 0.00 0.00 1.00 112.98 0.00%
2.08 CERRAJERIA
02.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 10.00 29.55 295.50 0.00 0.00 0.00 0.00 0.00 0.00 10.00 295.50 0.00%
02.08.02 CHAPA DE PARCHE DE TRES GOLPES pza 3.00 88.20 264.60 0.00 0.00 0.00 0.00 0.00 0.00 3.00 264.60 0.00%
02.08.03 MANIJA DE BRONCE DE 4" PARA PUERTAS pza 3.00 64.25 192.75 0.00 0.00 0.00 0.00 0.00 0.00 3.00 192.75 0.00%
2.09 VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 88.58 5.46 483.65 0.00 0.00 0.00 0.00 0.00 0.00 88.58 483.65 0.00%
2.10 PINTURA
02.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 58.30 10.32 601.66 0.00 0.00 0.00 0.00 0.00 0.00 58.30 601.66 0.00%
02.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 61.21 7.19 440.10 0.00 0.00 0.00 0.00 0.00 0.00 61.21 440.10 0.00%
02.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 10.37 8.52 88.35 0.00 0.00 0.00 0.00 0.00 0.00 10.37 88.35 0.00%
02.10.04 PINTURA EN COLUMNETAS C/LATEX LAVABLE m2 3.12 8.52 26.58 0.00 0.00 0.00 0.00 0.00 0.00 3.12 26.58 0.00%
02.10.05 PINTURA EN VIGAS C/LATEX LAVABLE m2 25.90 8.79 227.66 0.00 0.00 0.00 0.00 0.00 0.00 25.90 227.66 0.00%
02.10.06 PINTURA EN PESTAÑAS C/LATEX LAVABLE m2 8.05 8.79 70.76 0.00 0.00 0.00 0.00 0.00 0.00 8.05 70.76 0.00%
02.10.07 PINTURA EN DERRAMES C/LATEX LAVABLE m 40.20 2.18 87.64 0.00 0.00 0.00 0.00 0.00 0.00 40.20 87.64 0.00%
02.10.08 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 77.79 9.77 760.01 0.00 0.00 0.00 0.00 0.00 0.00 77.79 760.01 0.00%
02.10.09 PINTURA EN FRISO DE MADERA m2 3.90 12.62 49.22 0.00 0.00 0.00 0.00 0.00 0.00 3.90 49.22 0.00%
02.10.10 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 30.51 5.66 172.69 0.00 0.00 0.00 0.00 0.00 0.00 30.51 172.69 0.00%
02.10.11 PINTURA BARNIZ EN CONTRAZOCALO DE MADERA DE CEDRO 4" CON RODON m 28.23 16.18 456.76 0.00 0.00 0.00 0.00 0.00 0.00 28.23 456.76 0.00%
02.10.12 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 10.20 16.18 165.04 0.00 0.00 0.00 0.00 0.00 0.00 10.20 165.04 0.00%
02.10.13 PINTURA ESMALTE EN BRUÑAS 1/2" m 263.22 2.86 752.81 0.00 0.00 0.00 0.00 0.00 0.00 263.22 752.81 0.00%
02.10.14 PINTURA ESMALTE EN BRUÑAS DE MUROS EXTERIORES 3/4" m 50.98 2.86 145.80 0.00 0.00 0.00 0.00 0.00 0.00 50.98 145.80 0.00%
2.11 VARIOS
02.11.01 JUNTAS DE DILATACION m 7.10 5.00 35.50 0.00 0.00 0.00 0.00 0.00 0.00 7.10 35.50 0.00%
02.11.02 JUNTAS SISMICA 1" m 18.55 5.00 92.75 0.00 0.00 0.00 0.00 0.00 0.00 18.55 92.75 0.00%
2.12 SISTEMA DE AGUA FRIA
2.12.01 TUBERIAS Y ACCESORIOS
02.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 22.00 16.31 358.82 0.00 0.00 0.00 0.00 0.00 0.00 22.00 358.82 0.00%
02.12.01.02 CODO PVC-SAP 3" * 90 und 12.00 13.20 158.40 0.00 0.00 0.00 0.00 0.00 0.00 12.00 158.40 0.00%
02.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 19.50 16.46 320.97 0.00 0.00 0.00 0.00 0.00 0.00 19.50 320.97 0.00%
02.12.01.04 SOPORTE DE CANALETA und 16.00 3.89 62.24 0.00 0.00 0.00 0.00 0.00 0.00 16.00 62.24 0.00%
02.12.01.05 ABRAZADERA PARA CANALETA und 20.00 19.54 390.80 0.00 0.00 0.00 0.00 0.00 0.00 20.00 390.80 0.00%
02.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 4.95 37.04 183.35 0.00 0.00 0.00 0.00 0.00 0.00 4.95 183.35 0.00%
02.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.34 393.71 133.86 0.00 0.00 0.00 0.00 0.00 0.00 0.34 133.86 0.00%
02.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 4.95 28.92 143.15 0.00 0.00 0.00 0.00 0.00 0.00 4.95 143.15 0.00%
02.12.01.09 PINTURA EN FALSA COLUMNA m3 4.95 8.52 42.17 0.00 0.00 0.00 0.00 0.00 0.00 4.95 42.17 0.00%
3.00 ARQUITECTURA- CERCO PERIMETRICO
3.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 787.5 61.24 48,226.50 0.00 0.00 0.00 0.00 0.00 0.00 787.50 48,226.50 0.00%
3.02 REVOQUES ENLUCIDOS
03.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 496.44 39.64 19,678.88 0.00 0.00 0.00 0.00 0.00 0.00 496.44 19,678.88 0.00%
03.02.02 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 126.00 32.12 4,047.12 0.00 0.00 0.00 0.00 0.00 0.00 126.00 4,047.12 0.00%
03.02.03 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 225.56 47.33 10,675.75 0.00 0.00 0.00 0.00 0.00 0.00 225.56 10,675.75 0.00%
3.03 CARPINTERIA METALICA
03.03.01 PORTON METALICO 3.50m x 3.00m und 1.00 3,500.00 3,500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,500.00 0.00%
3.04 PINTURA
03.04.01 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 126.00 8.52 1,073.52 0.00 0.00 0.00 0.00 0.00 0.00 126.00 1,073.52 0.00%
03.04.02 PINTURA EN VIGAS C/LATEX LAVABLE m2 225.56 8.79 1,982.67 0.00 0.00 0.00 0.00 0.00 0.00 225.56 1,982.67 0.00%
3.05 VARIOS
03.05.01 JUNTAS DE DILATACION m 630.00 5.00 3,150.00 0.00 0.00 0.00 0.00 0.00 0.00 630.00 3,150.00 0.00%
4.00 FLETE TERRESTRE
4.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 173,674.98 0.15 26,051.25 0.00 0.00 34,735.00 5,210.25 34,735.00 5,210.25 138,939.98 20,841.00 20.00%
5.00 EQUIPAMIENTO Y MOBILIARIO
5.01 MOBILIARIO DE COLEGIO (ESCRITORIOS,CARPETAS,COMPUTADORAS) glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 0.00%
COSTO TOTAL DIRECTO 603,397.35 7,823.97 #REF! #REF! #REF!
GASTOS GENERALES 9% 54,305.76 704.16 #REF! #REF!
UTILIDAD 5% 30,169.87 391.20 #REF! #REF!
SUB TOTAL 687,872.98 8,919.33 #REF! #REF!
1.00 INSTALACIONES ELECTRICAS - 01 AULA
1.01 SISTEMA ELECTRICO
1.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 10.00 63.96 639.60 0.00 0.00 0.00 0.00 0.00 0.00 10.00 639.60 0.00%
1.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 4.00 54.26 217.04 0.00 0.00 0.00 0.00 0.00 0.00 4.00 217.04 0.00%
1.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 2.00 47.00 94.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 94.00 0.00%
1.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 2.00 46.89 93.78 0.00 0.00 0.00 0.00 0.00 0.00 2.00 93.78 0.00%
1.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 8.00 45.81 366.48 0.00 0.00 0.00 0.00 0.00 0.00 8.00 366.48 0.00%
1.02 CANALIZACIONES, TUBERIAS Y/O CABLES
1.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
1.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 109.13 3.58 390.69 0.00 0.00 0.00 0.00 0.00 0.00 109.13 390.69 0.00%
1.02.02 CABLES ELECTRICOS
1.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 148.00 2.87 424.76 0.00 0.00 0.00 0.00 0.00 0.00 148.00 424.76 0.00%
1.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 70.26 2.24 157.38 0.00 0.00 0.00 0.00 0.00 0.00 70.26 157.38 0.00%
1.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
1.03.01 TABLERO DE DISTRIBUCION
1.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 2.00 249.30 498.60 0.00 0.00 0.00 0.00 0.00 0.00 2.00 498.60 0.00%
1.04 ARTEFACTOS ELECTRICOS
1.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 8.00 107.37 858.96 0.00 0.00 0.00 0.00 0.00 0.00 8.00 858.96 0.00%
1.04.02 SPOT LIGHT und 2.00 41.40 82.80 0.00 0.00 0.00 0.00 0.00 0.00 2.00 82.80 0.00%
2.00 INSTALACIONES ELECTRICAS - ADMINISTRACION
2.01 SISTEMA ELECTRICO
2.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 4.00 63.96 255.84 0.00 0.00 0.00 0.00 0.00 0.00 4.00 255.84 0.00%
2.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 1.00 54.26 54.26 0.00 0.00 0.00 0.00 0.00 0.00 1.00 54.26 0.00%
2.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 3.00 47.00 141.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 141.00 0.00%
2.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 1.00 46.89 46.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00 46.89 0.00%
2.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 6.00 45.81 274.86 0.00 0.00 0.00 0.00 0.00 0.00 6.00 274.86 0.00%
2.02 CANALIZACIONES, TUBERIAS Y/O CABLES
2.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
2.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 42.25 3.58 151.26 0.00 0.00 0.00 0.00 0.00 0.00 42.25 151.26 0.00%
2.02.02 CABLES ELECTRICOS
2.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 50.21 2.87 144.10 0.00 0.00 0.00 0.00 0.00 0.00 50.21 144.10 0.00%
2.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 52.44 2.24 117.47 0.00 0.00 0.00 0.00 0.00 0.00 52.44 117.47 0.00%
2.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
2.03.01 TABLERO DE DISTRIBUCION
2.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 1.00 249.30 249.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 249.30 0.00%
2.03.02 CAJA DE PASO 0.00 0.00
2.03.02.01 CAJA DE PASE F.G. 4" x 4" x 2" und 2.00 24.03 48.06 0.00 0.00 0.00 0.00 0.00 0.00 2.00 48.06 0.00%
2.04 ARTEFACTOS ELECTRICOS 0.00 0.00
2.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 4.00 107.37 429.48 0.00 0.00 0.00 0.00 0.00 0.00 4.00 429.48 0.00%
2.04.02 SPOT LIGHT und 1.00 41.40 41.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 41.40 0.00%
3.00 FLETE TERRESTRE
3.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 248.61 0.15 37.29 0.00 0.00 0.00 0.00 0.00 0.00 248.61 37.29 0.00%
COSTO TOTAL DIRECTO 603,397.35 0.00 #REF! #REF! #REF!
GASTOS GENERALES 9% 54,305.76 0.00 #REF! #REF!
UTILIDAD 5% 30,169.87 0.00 #REF! #REF!
SUB TOTAL 687,872.98 0.00 #REF! #REF!
COSTO TOTAL DIRECTO 603,397.35 98,226.01 #REF! #REF! #REF!
GASTOS GENERALES 9% 54,305.76 8,840.34 #REF! #REF!
UTILIDAD 5% 30,169.87 4,911.30 #REF! #REF!
SUB TOTAL 687,872.98 111,977.65 #REF! #REF!
IGV 18% 123,817.14 20,155.98 #REF! #REF!
TOTAL S/, 811,690.12 40,284.65 40,284.65 #REF!
Avance por mes 40,284.65
Avance acumulado 40,284.65
% DE AVANCE EJECUTADO POR MES 22.50 4.96%
% DE AVANCE PROGRAMADO POR MES 22.50 4.37%
% DE AVANCE EJECUTADO ACUMULADO 4.96%
% DE AVANCE PROGRAMADO ACUMULADO 4.37%
VALORIZACION N° 01
PROYECTO: AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : 711,265.59
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 30-Nov-14 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. VICTOR COBADIS ROMERO RIVEROS

PORCENT
PRESUPUESTADO VALORIZACION N° 01 SALDO
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
01 ESTRUCTURAS 168,526.81
01.01 OBRAS PRELIMINARES 10,097.00 0.00 0.00 1.00 0.00 1.00 0.00 -1.00 10,097.00 0.00%
01.01.01 CONTENEDOR OFICINA día 90.00 20.00 1,800.00 0.00 0.00 1.00 20.00 1.00 20.00 89.00 1,780.00 1.11%
01.01.02 CONTENEDOR ALMACEN día 90.00 20.00 1,800.00
01.01.03 CONTENEDOR INODORO, LAVATORIOS día 90.00 20.00 1,800.00
01.01.04 TRAZO INICIAL gbl 1.00 77.00 77.00 0.00 0.00 1.00 77.00 1.00 77.00 0.00 0.00 100.00%
01.01.05 TRAZO DURANTE LA EJECUCION DE LA OBRA día 60.00 77.00 4,620.00 0.00 0.00 60.00 4,620.00 60.00 4,620.00 0.00 0.00 100.00%
01.02 TRANSPORTE VERTICAL Y HORIZONTAL DE MATERIALES 22,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22,000.00 0.00%
01.02.01 TRANSPORTE VERTICAL Y HORIZONTAL DE MATERIALES EN OBRA vje 5,000.00 4.40 22,000.00
01.03 DEMOLICIONES 3,167.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,167.20 0.00%
01.03.01 DEMOLICION CONSTRUCCION EXISTENTE m3 5.00 296.60 1,483.00
01.03.02 PICADO DE REBABAS EN CIMIENTOS Y SOBRECIMIENTOS DE CONSTRUCCION AD m2 30.00 56.14 1,684.20
01.04 MOVIMIENTO DE TIERRAS 5,397.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,397.51 0.00%
01.04.01 LIMPIEZA DE TERRENO MANUAL m2 355.00 2.61 926.55 0.00 0.00 1,144.08 2,986.05 1,144.08 2,986.05 -789.08 -2,059.50 322.28%
01.04.02 EXCAVACION PARA CIMIENTOS HASTA 1.00 mTERRENO NORMAL m3 66.00 23.11 1,525.26 0.00 0.00 0.00 0.00 0.00 0.00 66.00 1,525.26 0.00%
01.04.03 NIVELACION INTERIOR APISONADO MANUAL m2 290.00 1.76 510.40
01.04.04 ELIMINACION CON TRANSPORTE (CARGUIO A MANO) R=25 m3/día m3 70.00 34.79 2,435.30 0.00 0.00 0.00 0.00 0.00 0.00 70.00 2,435.30 0.00%
01.05 CONCRETO SIMPLE 21,066.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21,066.03 0.00%
01.05.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 33.00 9.36 308.88 0.00 0.00 0.00 0.00 0.00 0.00 33.00 308.88 0.00%
01.05.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 66.00 128.71 8,494.86
01.05.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m m2 45.00 28.63 1,288.35 0.00 0.00 0.00 0.00 0.00 0.00 45.00 1,288.35 0.00%
01.05.04 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS m3 34.20 159.51 5,455.24 0.00 0.00 0.00 0.00 0.00 0.00 34.20 5,455.24 0.00%
01.05.05 CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON E=4" m2 290.00 19.03 5,518.70 0.00 0.00 0.00 0.00 0.00 0.00 290.00 5,518.70 0.00%
01.06 CONCRETO ARMADO 106,799.07
01.06.01 ZAPATAS Y VIGAS DE CIMENTACION 9,680.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,680.08 0.00%
01.06.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3 20.00 245.37 4,907.40 0.00 0.00 0.00 0.00 0.00 0.00 20.00 4,907.40 0.00%
01.06.01.02 ENCOFRADO DE ZAPATAS m2 17.00 26.86 456.62 0.00 0.00 0.00 0.00 0.00 0.00 17.00 456.62 0.00%
01.06.01.03 ACERO fy=4200 kg/cm2 GRADO 60 en ZAPATAS kg 1,120.00 2.27 2,542.40
01.06.01.04 ENCOFRADO DE VIGAS DE CIMENTACION m2 7.00 32.51 227.57 0.00 0.00 0.00 0.00 0.00 0.00 7.00 227.57 0.00%
01.06.01.05 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 3.50 251.06 878.71 0.00 0.00 0.00 0.00 0.00 0.00 3.50 878.71 0.00%
01.06.01.06 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS DE CIMENTACION kg 294.00 2.27 667.38 0.00 0.00 0.00 0.00 0.00 0.00 294.00 667.38 0.00%
01.06.02 COLUMNAS 15,956.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,956.96 0.00%
01.06.02.01 ACERO fy=4200 kg/cm2 GRADO 60 en COLUMNAS kg 2,248.00 2.27 5,102.96
01.06.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 126.00 43.25 5,449.50 0.00 0.00 0.00 0.00 0.00 0.00 126.00 5,449.50 0.00%
01.06.02.03 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 18.00 300.25 5,404.50 0.00 0.00 0.00 0.00 0.00 0.00 18.00 5,404.50 0.00%
01.06.03 VIGAS 32,142.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32,142.24 0.00%
01.06.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 96.00 61.65 5,918.40 0.00 0.00 0.00 0.00 0.00 0.00 96.00 5,918.40 0.00%
01.06.03.02 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS kg 9,000.00 2.27 20,430.00 0.00 0.00 0.00 0.00 0.00 0.00 9,000.00 20,430.00 0.00%
01.06.03.03 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 24.00 241.41 5,793.84
01.06.04 LOSAS ALIGERADAS 45,107.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45,107.18 0.00%
01.06.04.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 486.00 39.34 19,119.24
01.06.04.02 LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADO pza 5,830.00 1.01 5,888.30
01.06.04.03 ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS kg 3,300.00 2.27 7,491.00
01.06.04.04 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 48.00 262.68 12,608.64 0.00 0.00 0.00 0.00 0.00 0.00 48.00 12,608.64 0.00%
01.06.05 ESCALERAS 3,912.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,912.61 0.00%
01.06.05.01 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 24.00 52.55 1,261.20 0.00 0.00 0.00 0.00 0.00 0.00 24.00 1,261.20 0.00%
01.06.05.02 ACERO fy=4200 kg/cm2 GRADO 60 en ESCALERAS kg 520.00 2.27 1,180.40 0.00 0.00 0.00 0.00 0.00 0.00 520.00 1,180.40 0.00%
01.06.05.03 CONCRETO EN ESCALERAS f'c=210 kg/cm2 m3 5.60 262.68 1,471.01
02 ARQUITECTURA 264,900.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 264,900.67 0.00%
02.01 ALBAÑILERIA 83,242.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 83,242.30 0.00%
02.01.01 MURO LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARRE DE CABEZA,JUNTA 1. m2 841.00 88.60 74,512.60 0.00 0.00 0.00 0.00 0.00 0.00 841.00 74,512.60 0.00%
02.01.02 MURO LADRILLO K.K.DE ARCILLA 18 H.(0.09x0.13x0.24) AMARRE DE CANTO,MORTERO
m2 210.00 41.57 8,729.70 0.00 0.00 0.00 0.00 0.00 0.00 210.00 8,729.70 0.00%
02.02 REVOQUES ENLUCIDOS Y MOLDURAS 25,799.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25,799.73 0.00%
02.02.01 TARRAJEO PRIMARIO m2 127.00 15.33 1,946.91
02.02.02 TARRAJEO DE MUROS INTERIORES m2 1,200.00 16.69 20,028.00 0.00 0.00 0.00 0.00 0.00 0.00 1,200.00 20,028.00 0.00%
02.02.03 TARRAJEO DE MUROS EXTERIORES m2 162.00 23.61 3,824.82 0.00 0.00 0.00 0.00 0.00 0.00 162.00 3,824.82 0.00%
02.03 CIELORRASOS 19,566.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,566.30 0.00%
02.03.01 TARRAJEO DE CIELORASO m2 870.00 22.49 19,566.30 0.00 0.00 0.00 0.00 0.00 0.00 870.00 19,566.30 0.00%
02.04 PISOS Y PAVIMENTOS 47,503.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47,503.09 0.00%
02.04.01 CONTRAPISO DE 2" m2 870.00 20.32 17,678.40 0.00 0.00 0.00 0.00 0.00 0.00 870.00 17,678.40 0.00%
02.04.02 PISO DE LOSETA VENECIANA 40x40 cm m2 120.00 44.55 5,346.00
02.04.03 PISO DE PORCELANATO DE 30 X 30 cm m2 39.50 68.43 2,702.99
02.04.04 PISO DE PARQUET HUAYACAN CANELO OSCURO 6 X 30 cm m2 710.00 30.67 21,775.70 0.00 0.00 0.00 0.00 0.00 0.00 710.00 21,775.70 0.00%
02.05 CONTRAZOCALOS 15,346.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,346.80 0.00%
02.05.01 CONTRAZOCALO DE MADERA CEDRO DE 3/4" X 2" CON RODON DE 3/4" m 870.00 17.64 15,346.80
02.06 ZOCALOS 8,089.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,089.20 0.00%
02.06.01 ZOCALO DE PORCELANATO 30X30 cm m2 126.00 64.20 8,089.20 0.00 0.00 0.00 0.00 0.00 0.00 126.00 8,089.20 0.00%
02.07 REVESTIMIENTOS 304.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 304.47 0.00%
02.07.01 FORJADO DE PASOS Y CONTRAPASOS m 8.20 37.13 304.47
02.08 CUBIERTAS 8,073.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,073.60 0.00%
02.08.01 LADRILLO PASTELERO 0.25x0.25x0.03 m.ASENTADO CON MORTERO 1:4 m2 290.00 27.84 8,073.60
02.09 CARPINTERIA DE MADERA 24,990.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24,990.11 0.00%
02.09.01 PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO 2"X3m2 82.00 229.04 18,781.28 0.00 0.00 0.00 0.00 0.00 0.00 82.00 18,781.28 0.00%
02.09.02 VENTANA CON HOJAS DE MADERA CEDRO m2 35.50 99.30 3,525.15 0.00 0.00 0.00 0.00 0.00 0.00 35.50 3,525.15 0.00%
02.09.03 PUERTAS DE MADERA TABLEROS REBAJADOS DE 4.5 mm DE CEDRO m2 8.00 335.46 2,683.68
02.10 CARPINTERIA METALICA 1,381.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,381.45 0.00%
02.10.01 ESCALERA METALICA DE CARACOL und 1.00 1,381.45 1,381.45 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,381.45 0.00%
02.11 CERRAJERIA 2,913.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,913.80 0.00%
02.11.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 3 1/2 X 3 1/2" und 147.00 13.92 2,046.24
02.11.02 CERRADURA PARA PUERTA INGRESO und 2.00 161.38 322.76 0.00 0.00 0.00 0.00 0.00 0.00 2.00 322.76 0.00%
02.11.03 CERRADURA PARA PUERTA DE BAÑOS und 6.00 39.38 236.28 0.00 0.00 0.00 0.00 0.00 0.00 6.00 236.28 0.00%
02.11.04 CERRADURA PARA PUERTA INTERIORES und 9.00 34.28 308.52 0.00 0.00 0.00 0.00 0.00 0.00 9.00 308.52 0.00%
02.12 VIDRIOS, CRISTALES Y SIMILARES 1,466.64
02.12.01 VIDRIO SEMIDOBLE INCOLORO CRUDO p2 388.00 3.78 1,466.64 0.00 0.00 0.00 0.00 0.00 0.00 388.00 1,466.64 0.00%
02.13 PINTURA 19,436.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,436.64 0.00%
02.13.01 PINTURA LATEX EN CIELO RASO m2 870.00 7.81 6,794.70 0.00 0.00 0.00 0.00 0.00 0.00 870.00 6,794.70 0.00%
02.13.02 PINTURA LATEX EN MUROS INTERIORES m2 1,200.00 7.73 9,276.00
02.13.03 PINTURA LATEX EN MUROS EXTERIORES m2 162.00 14.27 2,311.74 0.00 0.00 0.00 0.00 0.00 0.00 162.00 2,311.74 0.00%
02.13.04 BARNIZ EN VENTANAS DE MADERA m2 25.50 6.40 163.20 0.00 0.00 0.00 0.00 0.00 0.00 25.50 163.20 0.00%
02.13.05 BARNIZ EN PUERTAS DE MADERA m2 100.00 8.91 891.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 891.00 0.00%
02.14 APARATOS Y ACCESORIOS SANITARIOS 6,786.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,786.54 0.00%
02.14.01 INODORO ONE PIECE BLANCO und 9.00 543.07 4,887.63 0.00 0.00 0.00 0.00 0.00 0.00 9.00 4,887.63 0.00%
02.14.02 LAVATORIO PEDESTAL BLANCO und 9.00 128.17 1,153.53
02.14.03 DUCHA CROMADA DE CABEZA GIRATORIA Y LLAVE MEZCLADORA und 9.00 26.33 236.97 0.00 0.00 0.00 0.00 0.00 0.00 9.00 236.97 0.00%
02.14.04 TOALLERO DE LOSA BLANCO und 9.00 24.83 223.47
02.14.05 PAPELERA LOSA BLANCO und 9.00 15.83 142.47
02.14.06 JABONERA LOSA BLANCO und 9.00 15.83 142.47
03 INSTALACIONES ELECTRICAS 33,259.16 0.00 0.00 208.21 0.00 208.21 0.00 -208.21 33,259.16 0.00%
03.01 SALIDA PARA CENTRO DE LUZ pto 180.00 78.62 14,151.60 0.00 0.00 208.21 16,369.47 208.21 16,369.47 -28.21 -2,217.87 115.67%
03.02 SALIDA PARA BRAQUETE pto 7.00 87.89 615.23 0.00 0.00 80.00 7,031.20 80.00 7,031.20 -73.00 -6,415.97 1142.86%
03.03 SALIDA PARA SPOT LIGHT pto 6.00 90.62 543.72
03.04 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE + L.T. A PRUEBA DE AGUA pto 66.00 85.94 5,672.04 0.00 0.00 43.00 3,695.42 43.00 3,695.42 23.00 1,976.62 65.15%
03.05 SALIDA PARA COCINA ELECTRICA pto 3.00 63.04 189.12
03.06 SALIDA PARA CALENTADOR ELECTRICO pto 3.00 115.38 346.14 0.00 0.00 0.00 0.00 0.00 0.00 3.00 346.14 0.00%
03.07 SALIDA PARA TELEFONO EXTERNO pto 3.00 76.36 229.08 0.00 0.00 0.00 0.00 0.00 0.00 3.00 229.08 0.00%
03.08 SALIDA PARA TELEVISION pto 9.00 80.28 722.52
03.09 SALIDA PARA GONG und 3.00 34.14 102.42 0.00 0.00 0.00 0.00 0.00 0.00 3.00 102.42 0.00%
03.10 POZO DE TIERRA und 3.00 731.93 2,195.79 0.00 0.00 0.00 0.00 0.00 0.00 3.00 2,195.79 0.00%
03.11 TABLEROS DISTRIBUCION CAJA METALICA CON 12 POLOS und 10.00 849.15 8,491.50 0.00 0.00 0.00 0.00 0.00 0.00 10.00 8,491.50 0.00%
04 INSTALACIONES SANITARIAS 21,119.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21,119.62 0.00%
04.01 SISTEMA DE DESAGUE 5,960.16
04.01.01 SALIDA DESAGUE DE PVC SAL 2" pto 45.00 22.43 1,009.35
04.01.02 SALIDA DESAGUE DE PVC-SAL 4" pto 18.00 62.85 1,131.30 0.00 0.00 0.00 0.00 0.00 0.00 18.00 1,131.30 0.00%
04.01.03 SALIDA VENTILACION DE PVC-SAL 2" pto 36.00 57.45 2,068.20
04.01.04 MONTANTE DE TUBERIA PVC SAL 4" m 36.00 22.25 801.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 801.00 0.00%
04.01.05 REGISTRO DE BRONCE 3" und 9.00 24.73 222.57 0.00 0.00 0.00 0.00 0.00 0.00 9.00 222.57 0.00%
04.01.06 CAJAS DE REGISTRO DE DESAGUE 12" x 24" und 3.00 242.58 727.74 0.00 0.00 0.00 0.00 0.00 0.00 3.00 727.74 0.00%
04.02 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 9,552.58
04.02.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2" pto 27.00 71.98 1,943.46 0.00 0.00 0.00 0.00 0.00 0.00 27.00 1,943.46 0.00%
04.02.02 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 DE 1/2" m 76.00 27.79 2,112.04 0.00 0.00 0.00 0.00 0.00 0.00 76.00 2,112.04 0.00%
04.02.03 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 DE 3/4" m 98.00 15.34 1,503.32 0.00 0.00 0.00 0.00 0.00 0.00 98.00 1,503.32 0.00%
04.02.04 VALVULA COMPUERTA DE 1/2" und 5.00 68.53 342.65
04.02.05 VALVULA COMPUERTA DE 3/4" und 9.00 74.53 670.77 0.00 0.00 3.60 268.31 3.60 268.31 5.40 402.46 40.00%
04.02.06 SISTEMA DE RIEGO CONVENCIONAL und 2.00 39.10 78.20
04.02.07 TANQUE DE AGUA DE ETERNIT DE 1000 LITROS INCLUYE ACC. INTERNOS und 3.00 967.38 2,902.14
04.03 SISTEMA DE AGUA CALIENTE 5,606.88 0.00 0.00 42.68 0.00 42.68 0.00 -42.68 5,606.88 0.00%
04.03.01 SALIDA AGUA CALIENTE TUBERIA CPVC O 1/2" pto 27.00 101.57 2,742.39
04.03.02 RED DE DISTRIBUCION DE AGUA CALIENTE CON TUBERIA CPVC DE 1/2" m 120.00 22.30 2,676.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 2,676.00 0.00%
04.03.03 VALVULA COMPUERTA DE 1/2" und 3.00 62.83 188.49 0.00 0.00 0.00 0.00 0.00 0.00 3.00 188.49 0.00%
COSTO DIRECTO 487,806.26 35,067.45 35,067.45 1,064,417.85 7.19%
GASTOS GENERALES 12.5286% 61,115.29 3,156.07 3,156.07 95,797.61
UTILIDAD 10% 48,780.63 1,753.37 1,753.37 53,220.89
SUBTOTAL 597,702.18 39,976.89 39,976.89 1,213,436.35
IMPUESTO (IGV 19%) 113,563.41 7,195.84 7,195.84 218,418.54
TOTAL PRESUPUESTO 711,265.59 40,284.65 40,284.65 1,431,854.90
Avance por mes 40,284.65
Avance acumulado 40,284.65
% DE AVANCE EJECUTADO POR MES 22.50 5.66%
% DE AVANCE PROGRAMADO POR MES 22.50 4.37%
% DE AVANCE EJECUTADO ACUMULADO 5.66%
% DE AVANCE PROGRAMADO ACUMULADO 4.37%
VALORIZACION N° 01
PROYECTO: AMPLIACIÓN DE LOS SERVICIOS EDUCATIVOS EN LA I.E. CRUZ PAMPA, EN EL CASERÍO DE CRUZ PAMPA, DISTRITO DE ANGASMARCA, PROVINCIA DE SANTIAGO DE CHUCO – LA LIBERTAD”
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANGASMARCA MONTO INVERSION s/. : #REF!
DIST. ANGASMARCA
PROV: SANTIAGO DE CHUCO
FECHA: 30-Nov-14 Residente de Obra : Ing. OSCAR O. REYES FLORES Supervisor de Obra : Ing. VICTOR COBADIS ROMERO RIVEROS

PORCENT
PRESUPUESTADO VALORIZACION N° 01 SALDO
AJE
PART.
SUB ANTERIOR ACTUAL ACUMULADO VALORIZA
Nº DESCRIPCION UNID. METRAD. C.U. METRAD. COSTO
TOTAL DO
METRAD. COSTO METRAD. COSTO METRAD. COSTO S/.
1.00 OBRAS PROVISIONALES
1.01 GUARDIANIA, DEPOSITO Y ALMACEN GLB 1.00 1,108.42 1,108.42 0.00 0.00 1.00 1,108.42 1.00 1,108.42 0.00 0.00 100.00%
1.02 CARTEL DE OBRA 3.60 M X 4.80 M UND 1.00 2,176.89 2,176.89 0.00 0.00 1.00 2,176.89 1.00 2,176.89 0.00 0.00 100.00%
2.00 ESTRUCTURAS-01 AULA
2.01 OBRAS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 156.65 2.47 386.93 0.00 0.00 156.65 386.93 156.65 386.93 0.00 0.00 100.00%
02.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 156.65 4.11 643.83 0.00 0.00 156.65 643.83 156.65 643.83 0.00 0.00 100.00%
02.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 156.65 8.19 1,282.96 0.00 0.00 78.33 641.48 78.33 641.48 78.33 641.48 50.00%
2.02 OBRAS DE CONCRETO SIMPLE
02.02.01 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 129.24 44.28 5,722.75 0.00 0.00 0.00 0.00 0.00 0.00 129.24 5,722.75 0.00%
2.03 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
2.03.01 COLUMNAS
02.03.01.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 6.69 541.94 3,625.58 0.00 0.00 0.00 0.00 0.00 0.00 6.69 3,625.58 0.00%
02.03.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,144.08 6.34 7,253.47 0.00 0.00 1,144.08 7,253.47 1,144.08 7,253.47 0.00 0.00 100.00%
02.03.01.03 ENCOFRADO y DESENCOFRADO EN COLUMNAS m2 86.17 67.12 5,783.73 0.00 0.00 0.00 0.00 0.00 0.00 86.17 5,783.73 0.00%
2.03.02 VIGAS
02.03.02.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 8.63 454.60 3,923.20 0.00 0.00 0.00 0.00 0.00 0.00 8.63 3,923.20 0.00%
02.03.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,167.55 6.42 7,495.67 0.00 0.00 0.00 0.00 0.00 0.00 1,167.55 7,495.67 0.00%
02.03.02.03 ENCOFRADO y DESENCOFRADO EN VIGAS m2 114.53 78.23 8,959.68 0.00 0.00 0.00 0.00 0.00 0.00 114.53 8,959.68 0.00%
2.03.03 COLUMNETAS DE AMARRE
02.03.03.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 1.85 470.02 869.54 0.00 0.00 0.00 0.00 0.00 0.00 1.85 869.54 0.00%
02.03.03.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 141.33 6.34 896.03 0.00 0.00 0.00 0.00 0.00 0.00 141.33 896.03 0.00%
02.03.03.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 27.17 37.04 1,006.38 0.00 0.00 0.00 0.00 0.00 0.00 27.17 1,006.38 0.00%
2.03.04 VIGUETAS DE AMARRE
02.03.04.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.36 407.54 146.71 0.00 0.00 0.00 0.00 0.00 0.00 0.36 146.71 0.00%
02.03.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 38.67 6.34 245.17 0.00 0.00 0.00 0.00 0.00 0.00 38.67 245.17 0.00%
02.03.04.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 12.00 37.04 444.48 0.00 0.00 0.00 0.00 0.00 0.00 12.00 444.48 0.00%
2.03.05 LOSA ALIGERADA
02.03.05.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 0.87 443.45 385.80 0.00 0.00 0.00 0.00 0.00 0.00 0.87 385.80 0.00%
02.03.05.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 51.95 6.34 329.36 0.00 0.00 0.00 0.00 0.00 0.00 51.95 329.36 0.00%
02.03.05.03 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2 11.62 78.23 909.03 0.00 0.00 0.00 0.00 0.00 0.00 11.62 909.03 0.00%
02.03.05.04 LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO UND 104.00 2.35 244.40 0.00 0.00 0.00 0.00 0.00 0.00 104.00 244.40 0.00%
2.04 ESTRUCTURAS DE MADERA (TIJERALES)
02.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 6.00 2,331.08 13,986.48 0.00 0.00 0.00 0.00 0.00 0.00 6.00 13,986.48 0.00%
02.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 24.00 308.09 7,394.16 0.00 0.00 0.00 0.00 0.00 0.00 24.00 7,394.16 0.00%
02.04.03 ANCLAJE DE TIJERAL DE MADERA UND 12.00 1,004.25 12,051.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 12,051.00 0.00%
02.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 175.85 51.94 9,133.65 0.00 0.00 0.00 0.00 0.00 0.00 175.85 9,133.65 0.00%
02.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 20.28 41.13 834.12 0.00 0.00 0.00 0.00 0.00 0.00 20.28 834.12 0.00%
2.05 PRUEBAS DE LABORATORIO
02.05.01 UND 8.00 42.02 336.16 0.00 0.00 0.00 0.00 0.00 0.00 8.00 336.16 0.00%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
3.00 ESTRUCTURAS-ADMINISTRACION
3.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 91.08 2.47 224.97 0.00 0.00 0.00 0.00 0.00 0.00 91.08 224.97 0.00%
03.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 111.23 4.11 457.16 0.00 0.00 0.00 0.00 0.00 0.00 111.23 457.16 0.00%
03.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 111.23 8.19 910.97 0.00 0.00 0.00 0.00 0.00 0.00 111.23 910.97 0.00%
03.01.04 DEMOLICION DE MURO DE ADOBE E=0.40m m3 54.99 39.81 2,189.15 0.00 0.00 0.00 0.00 0.00 0.00 54.99 2,189.15 0.00%
3.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION PARA ZAPATAS DE 1.70M DE PROFUNDIDAD m3 18.15 44.96 816.02 0.00 0.00 0.00 0.00 0.00 0.00 18.15 816.02 0.00%
03.02.02 EXCAVACION PARA CUNETAS m3 6.85 28.10 192.49 0.00 0.00 0.00 0.00 0.00 0.00 6.85 192.49 0.00%
03.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 11.75 17.36 203.98 0.00 0.00 0.00 0.00 0.00 0.00 11.75 203.98 0.00%
03.02.04 RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO LIVIANO m3 85.36 10.12 863.84 0.00 0.00 0.00 0.00 0.00 0.00 85.36 863.84 0.00%
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 92.94 18.73 1,740.77 0.00 0.00 0.00 0.00 0.00 0.00 92.94 1,740.77 0.00%
3.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 13.96 34.43 480.64 0.00 0.00 0.00 0.00 0.00 0.00 13.96 480.64 0.00%
03.03.02 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 3.30 307.69 1,015.38 0.00 0.00 0.00 0.00 0.00 0.00 3.30 1,015.38 0.00%
03.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 26.50 76.38 2,024.07 0.00 0.00 0.00 0.00 0.00 0.00 26.50 2,024.07 0.00%
03.03.04 FALSO PISO DE CONCRETO E=3" F'C=140 kg/cm2 / INCL. DURMIENTES m2 51.15 44.28 2,264.92 0.00 0.00 0.00 0.00 0.00 0.00 51.15 2,264.92 0.00%
03.03.05 CONCRETO EN CUNETAS FC 175KG/CM2 m3 4.03 282.60 1,138.88 0.00 0.00 0.00 0.00 0.00 0.00 4.03 1,138.88 0.00%
03.03.06 ENCOFRADO DE CUNETAS m2 19.34 42.88 829.30 0.00 0.00 0.00 0.00 0.00 0.00 19.34 829.30 0.00%
3.04 OBRAS DE CONCRETO ARMADO ESTRUCTURAL
3.04.01 ZAPATAS
03.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 7.38 431.54 3,184.77 0.00 0.00 0.00 0.00 0.00 0.00 7.38 3,184.77 0.00%
03.04.01.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 213.28 6.34 1,352.20 0.00 0.00 0.00 0.00 0.00 0.00 213.28 1,352.20 0.00%
3.04.02 VIGAS DE CIMENTACION
03.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 2.14 448.93 960.71 0.00 0.00 0.00 0.00 0.00 0.00 2.14 960.71 0.00%
03.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10 1,002.35 0.00%
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 17.10 71.64 1,225.04 0.00 0.00 0.00 0.00 0.00 0.00 17.10 1,225.04 0.00%
3.04.03 SOBRECIMIENTO ARMADO
03.04.03.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 158.10 6.34 1,002.35 0.00 0.00 0.00 0.00 0.00 0.00 158.10 1,002.35 0.00%
3.04.04 COLUMNAS
03.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.13 541.94 1,154.33 0.00 0.00 0.00 0.00 0.00 0.00 2.13 1,154.33 0.00%
03.04.04.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 507.51 6.34 3,217.61 0.00 0.00 0.00 0.00 0.00 0.00 507.51 3,217.61 0.00%
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 24.65 67.12 1,654.51 0.00 0.00 0.00 0.00 0.00 0.00 24.65 1,654.51 0.00%
3.04.05 VIGAS
03.04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.37 454.60 1,532.00 0.00 0.00 0.00 0.00 0.00 0.00 3.37 1,532.00 0.00%
03.04.05.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 597.24 6.42 3,834.28 0.00 0.00 0.00 0.00 0.00 0.00 597.24 3,834.28 0.00%
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 28.09 78.23 2,197.48 0.00 0.00 0.00 0.00 0.00 0.00 28.09 2,197.48 0.00%
3.04.06 COLUMNETAS DE AMARRE
03.04.06.01 CONCRETO EN COLUMNETAS DE AMARRE F'C=175 KG/CM2 m3 0.55 470.02 258.51 0.00 0.00 0.00 0.00 0.00 0.00 0.55 258.51 0.00%
03.04.06.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 71.75 6.34 454.90 0.00 0.00 0.00 0.00 0.00 0.00 71.75 454.90 0.00%
03.04.06.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS DE AMARRE m2 7.36 37.04 272.61 0.00 0.00 0.00 0.00 0.00 0.00 7.36 272.61 0.00%
3.04.07 VIGUETAS DE AMARRE
03.04.07.01 CONCRETO EN VIGUETAS DE AMARRE F'C=175 KG/CM2 m3 0.88 407.54 358.64 0.00 0.00 0.00 0.00 0.00 0.00 0.88 358.64 0.00%
03.04.07.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 64.90 6.34 411.47 0.00 0.00 0.00 0.00 0.00 0.00 64.90 411.47 0.00%
03.04.07.03 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE m2 8.81 37.04 326.32 0.00 0.00 0.00 0.00 0.00 0.00 8.81 326.32 0.00%
3.05 ESTRUCTURAS DE MADERA (TIJERALES)
03.04.01 TIJERAL DE MADERA SEGUN DISEÑO UND 3.00 2,331.08 6,993.24 0.00 0.00 0.00 0.00 0.00 0.00 3.00 6,993.24 0.00%
03.04.02 CORREAS DE MADERA TORNILLO DE 2"x3". UND 12.00 302.09 3,625.08 0.00 0.00 0.00 0.00 0.00 0.00 12.00 3,625.08 0.00%
03.04.03 ANCLAJE DE TIJERAL DE MADERA UND 6.00 1,004.25 6,025.50 0.00 0.00 0.00 0.00 0.00 0.00 6.00 6,025.50 0.00%
03.04.04 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 89.10 51.94 4,627.85 0.00 0.00 0.00 0.00 0.00 0.00 89.10 4,627.85 0.00%
03.04.05 CUMBRERA ARTICULADA TIPO TEJA ANDINA m 9.90 41.13 407.19 0.00 0.00 0.00 0.00 0.00 0.00 9.90 407.19 0.00%
3.06 PRUEBAS DE LABORATORIO
03.06.01 UND 18.00 42.02 756.36 0.00 0.00 0.00 0.00 0.00 0.00 18.00 756.36 0.00%
PRUEBA DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)
4.00 ESTRUCTURAS-CERCO PERIMETRICO
4.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 208.21 2.47 514.28 0.00 0.00 208.21 514.28 208.21 514.28 0.00 0.00 100.00%
04.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 208.21 4.11 855.74 0.00 0.00 208.21 855.74 208.21 855.74 0.00 0.00 100.00%
04.01.03 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 208.21 8.19 1,705.24 0.00 0.00 80.00 655.20 80.00 655.20 128.21 1,050.04 38.42%
4.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION PARA CIMIENTOS HASTA 0.70M DE PROFUNDIDAD EN m3 182.99 28.10 5,142.02 0.00 0.00 43.00 1,208.30 43.00 1,208.30 139.99 3,933.72 23.50%
TERRENO NORMAL
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 157.36 17.36 2,731.77 0.00 0.00 0.00 0.00 0.00 0.00 157.36 2,731.77 0.00%
04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=30M m3 33.79 18.73 632.89 0.00 0.00 0.00 0.00 0.00 0.00 33.79 632.89 0.00%
4.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADOS CONCRETO C:H -1:10, E=4" PARA ZAPATAS m2 208.21 34.43 7,168.67 0.00 0.00 0.00 0.00 0.00 0.00 208.21 7,168.67 0.00%
04.03.02 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 145.75 232.29 33,856.27 0.00 0.00 0.00 0.00 0.00 0.00 145.75 33,856.27 0.00%
04.03.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25%P.M. m3 37.23 307.69 11,455.30 0.00 0.00 0.00 0.00 0.00 0.00 37.23 11,455.30 0.00%
04.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H=50CM. m2 496.44 76.38 37,918.09 0.00 0.00 0.00 0.00 0.00 0.00 496.44 37,918.09 0.00%
4.04 OBRAS DE CONCRETO ARMADO
4.04.01 SOBRECIMIENTO ARMADO
04.04.01.01 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,930.97 6.34 12,242.35 0.00 0.00 0.00 0.00 0.00 0.00 1,930.97 12,242.35 0.00%
4.04.02 COLUMNAS
04.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 9.45 497.51 4,701.47 0.00 0.00 0.00 0.00 0.00 0.00 9.45 4,701.47 0.00%
04.04.02.02 ACERO FY=4200 KG/CM2 GRADO 60 kg 1,510.20 6.34 9,574.67 0.00 0.00 0.00 0.00 0.00 0.00 1,510.20 9,574.67 0.00%
04.04.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 126.00 67.12 8,457.12 0.00 0.00 0.00 0.00 0.00 0.00 126.00 8,457.12 0.00%
4.04.03 VIGAS
04.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 87.36 497.51 43,462.47 0.00 0.00 0.00 0.00 0.00 0.00 87.36 43,462.47 0.00%
04.04.03.02 ACERO fy=4200 kg/cm2 GRADO 60 kg 1,573.61 6.42 10,102.58 0.00 0.00 0.00 0.00 0.00 0.00 1,573.61 10,102.58 0.00%
04.04.03.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 173.51 78.23 13,573.69 0.00 0.00 0.00 0.00 0.00 0.00 173.51 13,573.69 0.00%
5.00 FLETE TERRESTRE
5.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 111,307.41 0.15 16,696.11 0.00 0.00 44,522.96 6,678.44 44,522.96 6,678.44 66,784.45 10,017.67 40.00%
COSTO TOTAL DIRECTO #REF! 22,122.98 #REF! #REF! #REF!
GASTOS GENERALES 9% #REF! 1,991.07 #REF! #REF!
UTILIDAD 5% #REF! 1,106.15 #REF! #REF!
SUB TOTAL #REF! 25,220.20 #REF! #REF!
1.00 ARQUITECTURA- 01 AULA
1.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 116.61 61.24 7,141.20 0.00 0.00 42.68 2,613.72 42.68 2,613.72 73.93 4,527.47 36.60%
1.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 98.74 39.64 3,914.05 0.00 0.00 0.00 0.00 0.00 0.00 98.74 3,914.05 0.00%
01.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 125.65 35.98 4,520.89 0.00 0.00 0.00 0.00 0.00 0.00 125.65 4,520.89 0.00%
01.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 55.04 32.12 1,767.88 0.00 0.00 0.00 0.00 0.00 0.00 55.04 1,767.88 0.00%
01.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 66.62 47.33 3,153.12 0.00 0.00 0.00 0.00 0.00 0.00 66.62 3,153.12 0.00%
01.02.05 TARRAJEO DE ESCALERAS m2 23.78 34.20 813.28 0.00 0.00 0.00 0.00 0.00 0.00 23.78 813.28 0.00%
01.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 13.09 14.06 184.05 0.00 0.00 0.00 0.00 0.00 0.00 13.09 184.05 0.00%
01.02.07 BRUÑAS 1" m 158.15 1.25 197.69 0.00 0.00 0.00 0.00 0.00 0.00 158.15 197.69 0.00%
1.03 CIELORRASOS
CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO 129.74
01.03.01 DE 2" x 2" x 10´ m2 52.88 6,860.65 0.00 0.00 0.00 0.00 0.00 0.00 129.74 6,860.65 0.00%
01.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 7.54 24.45 184.35 0.00 0.00 0.00 0.00 0.00 0.00 7.54 184.35 0.00%
1.04 PISOS Y PAVIMENTOS
01.04.01 PISO DE CONCRETO E=4", PULIDO, BRUÑADO Y COLOREADO m2 112.25 40.73 4,571.94 0.00 0.00 0.00 0.00 0.00 0.00 112.25 4,571.94 0.00%
1.05 ZOCALOS Y CONTRAZOCALOS
01.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 74.09 12.35 915.01 0.00 0.00 0.00 0.00 0.00 0.00 74.09 915.01 0.00%
C:A m
1.06 CARPINTERIA DE MADERA
01.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 2.00 754.00 1,508.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,508.00 0.00%
01.06.02 TICERO DE MADERA CEDRO (L=3.10m) BARNIZADO UND 2.00 70.00 140.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 140.00 0.00%
1.07 CARPINTERIA METALICA
01.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 23.32 198.55 4,630.19 0.00 0.00 0.00 0.00 0.00 0.00 23.32 4,630.19 0.00%
01.07.02 REJILLA METALICA FIJA UND 2.00 112.98 225.96 0.00 0.00 0.00 0.00 0.00 0.00 2.00 225.96 0.00%
01.07.03 PASAMANO DE ACERO TUBO DE 2" m 22.00 96.79 2,129.38 0.00 0.00 0.00 0.00 0.00 0.00 22.00 2,129.38 0.00%
01.07.04 CANTONERA PARA ESCALERA SEGUN PLANOS m 25.00 20.95 523.75 0.00 0.00 0.00 0.00 0.00 0.00 25.00 523.75 0.00%
1.08 CERRAJERIA
01.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" PZA 6.00 29.55 177.30 0.00 0.00 0.00 0.00 0.00 0.00 6.00 177.30 0.00%
01.08.02 CHAPA DE PARCHE DE TRES GOLPES PZA 2.00 88.20 176.40 0.00 0.00 0.00 0.00 0.00 0.00 2.00 176.40 0.00%
1.09 VIDRIOS, CRISTALES Y SIMILARES
01.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 363.53 5.46 1,984.87 0.00 0.00 0.00 0.00 0.00 0.00 363.53 1,984.87 0.00%
1.10 PINTURA
01.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 98.74 10.32 1,019.00 0.00 0.00 0.00 0.00 0.00 0.00 98.74 1,019.00 0.00%
01.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 137.27 7.19 986.97 0.00 0.00 0.00 0.00 0.00 0.00 137.27 986.97 0.00%
01.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 55.04 8.52 468.94 0.00 0.00 0.00 0.00 0.00 0.00 55.04 468.94 0.00%
01.10.04 PINTURA EN VIGAS C/LATEX LAVABLE m2 66.62 8.79 585.59 0.00 0.00 0.00 0.00 0.00 0.00 66.62 585.59 0.00%
01.10.05 PINTURA EN DERRAMES C/LATEX LAVABLE m 13.09 2.18 28.54 0.00 0.00 0.00 0.00 0.00 0.00 13.09 28.54 0.00%
01.10.06 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 129.74 9.77 1,267.56 0.00 0.00 0.00 0.00 0.00 0.00 129.74 1,267.56 0.00%
01.10.07 PINTURA EN PIZARRA m2 7.40 12.77 94.50 0.00 0.00 0.00 0.00 0.00 0.00 7.40 94.50 0.00%
01.10.08 PINTURA EN FRISO DE MADERA m2 7.34 12.62 92.63 0.00 0.00 0.00 0.00 0.00 0.00 7.34 92.63 0.00%
01.10.09 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 74.09 5.66 419.35 0.00 0.00 0.00 0.00 0.00 0.00 74.09 419.35 0.00%
01.10.10 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 5.20 16.18 84.14 0.00 0.00 0.00 0.00 0.00 0.00 5.20 84.14 0.00%
01.10.11 PINTURA ESMALTE EN BRUÑAS DE 1" m 158.15 2.86 452.31 0.00 0.00 0.00 0.00 0.00 0.00 158.15 452.31 0.00%
1.11 VARIOS
01.11.11 JUNTAS SISMICA 1" m 4.46 5.00 22.30 0.00 0.00 0.00 0.00 0.00 0.00 4.46 22.30 0.00%
1.12 SISTEMA DE AGUA FRIA
1.12.01 TUBERIAS Y ACCESORIOS
01.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 24.05 16.31 392.26 0.00 0.00 0.00 0.00 0.00 0.00 24.05 392.26 0.00%
01.12.01.02 CODO PVC-SAP 3" * 90 UND 7.00 13.20 92.40 0.00 0.00 0.00 0.00 0.00 0.00 7.00 92.40 0.00%
01.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 39.22 16.46 645.56 0.00 0.00 0.00 0.00 0.00 0.00 39.22 645.56 0.00%
01.12.01.04 SOPORTE DE CANALETA UND 25.00 3.89 97.25 0.00 0.00 0.00 0.00 0.00 0.00 25.00 97.25 0.00%
01.12.01.05 ABRAZADERA PARA CANALETA UND 13.00 19.54 254.02 0.00 0.00 0.00 0.00 0.00 0.00 13.00 254.02 0.00%
01.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 9.79 37.04 362.62 0.00 0.00 0.00 0.00 0.00 0.00 9.79 362.62 0.00%
01.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.67 393.71 263.79 0.00 0.00 0.00 0.00 0.00 0.00 0.67 263.79 0.00%
01.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 8.14 28.92 235.41 0.00 0.00 0.00 0.00 0.00 0.00 8.14 235.41 0.00%
01.12.01.09 PINTURA EN FALSA COLUMNA m2 8.14 8.52 69.35 0.00 0.00 0.00 0.00 0.00 0.00 8.14 69.35 0.00%
2.00 ARQUITECTURA- ADMINISTRACION
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE CABEZA J m2 38.57 104.35 4,024.78 0.00 0.00 0.00 0.00 0.00 0.00 38.57 4,024.78 0.00%
02.01.02 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 20.77 61.24 1,271.95 0.00 0.00 0.00 0.00 0.00 0.00 20.77 1,271.95 0.00%
2.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 58.30 39.64 2,311.01 0.00 0.00 0.00 0.00 0.00 0.00 58.30 2,311.01 0.00%
02.02.02 TARRAJEO EN MUROS INTERIORES CON C:A 1:5 E = 1.50cm m2 61.21 35.98 2,202.34 0.00 0.00 0.00 0.00 0.00 0.00 61.21 2,202.34 0.00%
02.02.03 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 10.37 32.12 333.08 0.00 0.00 0.00 0.00 0.00 0.00 10.37 333.08 0.00%
02.02.04 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 25.90 47.33 1,225.85 0.00 0.00 0.00 0.00 0.00 0.00 25.90 1,225.85 0.00%
02.02.05 TARRAJEO EN PESTAÑAS CON C:A 1:5 E = 1.50cm m2 8.05 47.33 381.01 0.00 0.00 0.00 0.00 0.00 0.00 8.05 381.01 0.00%
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 33.80 14.06 475.23 0.00 0.00 0.00 0.00 0.00 0.00 33.80 475.23 0.00%
02.02.07 FROTACHADO EN CUNETAS CON C:A 1:5 E = 1.50cm CON IMPERMEABILIZANT m2 36.51 32.88 1,200.45 0.00 0.00 0.00 0.00 0.00 0.00 36.51 1,200.45 0.00%
02.02.08 BRUÑAS DE 1/2" m 263.22 1.25 329.03 0.00 0.00 0.00 0.00 0.00 0.00 263.22 329.03 0.00%
02.02.09 BRUÑAS 3/4" m 50.98 1.25 63.73 0.00 0.00 0.00 0.00 0.00 0.00 50.98 63.73 0.00%
2.03 CIELORRASO
02.03.01 CIELORRASO DE TRIPLAY DE 4.00mm ENTRAMADO DE MADERA TORNILLO m2 81.83 52.88 4,327.17 0.00 0.00 0.00 0.00 0.00 0.00 81.83 4,327.17 0.00%
DE 2" x 2" x 10´
02.03.02 FRISO DE MADERA TORNILLO DE 1" x 8" x 10´ m2 5.84 24.45 142.79 0.00 0.00 0.00 0.00 0.00 0.00 5.84 142.79 0.00%
2.04 PISOS Y PAVIMENTOS
02.04.01 PISO MACHIEMBRADO m2 66.00 38.11 2,515.26 0.00 0.00 0.00 0.00 0.00 0.00 66.00 2,515.26 0.00%
02.04.02 VEREDA DE CONCRETO f'c= 175 kg/cm2 H=0.10M m2 34.21 57.94 1,982.13 0.00 0.00 0.00 0.00 0.00 0.00 34.21 1,982.13 0.00%
02.04.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 4.81 76.38 367.39 0.00 0.00 0.00 0.00 0.00 0.00 4.81 367.39 0.00%
2.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALO DE CEMENTO S/COLOREAR H= 30cm PULIDO E= 2.00cm MEZCLA 1:5 m 30.51 12.35 376.80 0.00 0.00 0.00 0.00 0.00 0.00 30.51 376.80 0.00%
02.05.02 CONTRAZOCALO DE MADERA CEDRO DE 4" RODON 1" m 28.23 79.85 2,254.17 0.00 0.00 0.00 0.00 0.00 0.00 28.23 2,254.17 0.00%
2.06 CARPINTERIA DE MADERA
02.06.01 PUERTA APANELADA DE MADERA TORNILLO S.D INC. INSTALACION UND 1.00 754.00 754.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 754.00 0.00%
02.06.02 PUERTA CONTRAPLACADA DE MADERA TORNILLO SEGUN DISEÑO INCL. INS UND 2.00 380.00 760.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 760.00 0.00%
02.06.03 TABIQUERIA DE MELAMINE DE 1" m2 22.50 183.03 4,118.18 0.00 0.00 0.00 0.00 0.00 0.00 22.50 4,118.18 0.00%
2.07 CARPINTERIA METALICA
02.07.01 VENTANAS DE ALUMINIO SEGUN DISEÑ0 m2 6.32 198.55 1,254.84 0.00 0.00 0.00 0.00 0.00 0.00 6.32 1,254.84 0.00%
02.07.02 REJILLA METALICA FIJA UND 1.00 112.98 112.98 0.00 0.00 0.00 0.00 0.00 0.00 1.00 112.98 0.00%
2.08 CERRAJERIA
02.08.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 10.00 29.55 295.50 0.00 0.00 0.00 0.00 0.00 0.00 10.00 295.50 0.00%
02.08.02 CHAPA DE PARCHE DE TRES GOLPES pza 3.00 88.20 264.60 0.00 0.00 0.00 0.00 0.00 0.00 3.00 264.60 0.00%
02.08.03 MANIJA DE BRONCE DE 4" PARA PUERTAS pza 3.00 64.25 192.75 0.00 0.00 0.00 0.00 0.00 0.00 3.00 192.75 0.00%
2.09 VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIO SEMIDOBLE TRANSPARENTE p2 88.58 5.46 483.65 0.00 0.00 0.00 0.00 0.00 0.00 88.58 483.65 0.00%
2.10 PINTURA
02.10.01 PINTURA LATEX EN MUROS EXTERIORES C/LATEX LAVABLE m2 58.30 10.32 601.66 0.00 0.00 0.00 0.00 0.00 0.00 58.30 601.66 0.00%
02.10.02 PINTURA LATEX EN MUROS INTERIORES C/LATEX LAVABLE m2 61.21 7.19 440.10 0.00 0.00 0.00 0.00 0.00 0.00 61.21 440.10 0.00%
02.10.03 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 10.37 8.52 88.35 0.00 0.00 0.00 0.00 0.00 0.00 10.37 88.35 0.00%
02.10.04 PINTURA EN COLUMNETAS C/LATEX LAVABLE m2 3.12 8.52 26.58 0.00 0.00 0.00 0.00 0.00 0.00 3.12 26.58 0.00%
02.10.05 PINTURA EN VIGAS C/LATEX LAVABLE m2 25.90 8.79 227.66 0.00 0.00 0.00 0.00 0.00 0.00 25.90 227.66 0.00%
02.10.06 PINTURA EN PESTAÑAS C/LATEX LAVABLE m2 8.05 8.79 70.76 0.00 0.00 0.00 0.00 0.00 0.00 8.05 70.76 0.00%
02.10.07 PINTURA EN DERRAMES C/LATEX LAVABLE m 40.20 2.18 87.64 0.00 0.00 0.00 0.00 0.00 0.00 40.20 87.64 0.00%
02.10.08 PINTURA OLEO MATE EN CIELORRASO DE TRIPLAY m2 77.79 9.77 760.01 0.00 0.00 0.00 0.00 0.00 0.00 77.79 760.01 0.00%
02.10.09 PINTURA EN FRISO DE MADERA m2 3.90 12.62 49.22 0.00 0.00 0.00 0.00 0.00 0.00 3.90 49.22 0.00%
02.10.10 PINTURA ESMALTE EN ZOCALO DE CEMENTO H= 30cm EXTERIOR m 30.51 5.66 172.69 0.00 0.00 0.00 0.00 0.00 0.00 30.51 172.69 0.00%
02.10.11 PINTURA BARNIZ EN CONTRAZOCALO DE MADERA DE CEDRO 4" CON RODON m 28.23 16.18 456.76 0.00 0.00 0.00 0.00 0.00 0.00 28.23 456.76 0.00%
02.10.12 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 10.20 16.18 165.04 0.00 0.00 0.00 0.00 0.00 0.00 10.20 165.04 0.00%
02.10.13 PINTURA ESMALTE EN BRUÑAS 1/2" m 263.22 2.86 752.81 0.00 0.00 0.00 0.00 0.00 0.00 263.22 752.81 0.00%
02.10.14 PINTURA ESMALTE EN BRUÑAS DE MUROS EXTERIORES 3/4" m 50.98 2.86 145.80 0.00 0.00 0.00 0.00 0.00 0.00 50.98 145.80 0.00%
2.11 VARIOS
02.11.01 JUNTAS DE DILATACION m 7.10 5.00 35.50 0.00 0.00 0.00 0.00 0.00 0.00 7.10 35.50 0.00%
02.11.02 JUNTAS SISMICA 1" m 18.55 5.00 92.75 0.00 0.00 0.00 0.00 0.00 0.00 18.55 92.75 0.00%
2.12 SISTEMA DE AGUA FRIA
2.12.01 TUBERIAS Y ACCESORIOS
02.12.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE PLUVIAL DE 3" m 22.00 16.31 358.82 0.00 0.00 0.00 0.00 0.00 0.00 22.00 358.82 0.00%
02.12.01.02 CODO PVC-SAP 3" * 90 und 12.00 13.20 158.40 0.00 0.00 0.00 0.00 0.00 0.00 12.00 158.40 0.00%
02.12.01.03 CANALETA SEMICIRCULAR GALVANIZADA DE e=1/27" m 19.50 16.46 320.97 0.00 0.00 0.00 0.00 0.00 0.00 19.50 320.97 0.00%
02.12.01.04 SOPORTE DE CANALETA und 16.00 3.89 62.24 0.00 0.00 0.00 0.00 0.00 0.00 16.00 62.24 0.00%
02.12.01.05 ABRAZADERA PARA CANALETA und 20.00 19.54 390.80 0.00 0.00 0.00 0.00 0.00 0.00 20.00 390.80 0.00%
02.12.01.06 ENCOFRADO Y DESENCOFRADO EN FALSA COLUMNA m2 4.95 37.04 183.35 0.00 0.00 0.00 0.00 0.00 0.00 4.95 183.35 0.00%
02.12.01.07 CONCRETO EN FALSALSA COLUMNA FC 140KG/CM2 m3 0.34 393.71 133.86 0.00 0.00 0.00 0.00 0.00 0.00 0.34 133.86 0.00%
02.12.01.08 TARRAJEO EN FALSA COLUMNA C:A 1:5 E=1.50cm m2 4.95 28.92 143.15 0.00 0.00 0.00 0.00 0.00 0.00 4.95 143.15 0.00%
02.12.01.09 PINTURA EN FALSA COLUMNA m3 4.95 8.52 42.17 0.00 0.00 0.00 0.00 0.00 0.00 4.95 42.17 0.00%
3.00 ARQUITECTURA- CERCO PERIMETRICO
3.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUN m2 787.5 61.24 48,226.50 0.00 0.00 0.00 0.00 0.00 0.00 787.50 48,226.50 0.00%
3.02 REVOQUES ENLUCIDOS
03.02.01 TARRAJEO EN MUROS EXTERIORES CON C:A 1:5 E = 1.50cm m2 496.44 39.64 19,678.88 0.00 0.00 0.00 0.00 0.00 0.00 496.44 19,678.88 0.00%
03.02.02 TARRAJEO EN COLUMNAS CON C:A 1:5 E = 1.50cm m2 126.00 32.12 4,047.12 0.00 0.00 0.00 0.00 0.00 0.00 126.00 4,047.12 0.00%
03.02.03 TARRAJEO EN VIGAS CON C:A 1:5 E = 1.50cm m2 225.56 47.33 10,675.75 0.00 0.00 0.00 0.00 0.00 0.00 225.56 10,675.75 0.00%
3.03 CARPINTERIA METALICA
03.03.01 PORTON METALICO 3.50m x 3.00m und 1.00 3,500.00 3,500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,500.00 0.00%
3.04 PINTURA
03.04.01 PINTURA EN COLUMNAS C/LATEX LAVABLE m2 126.00 8.52 1,073.52 0.00 0.00 0.00 0.00 0.00 0.00 126.00 1,073.52 0.00%
03.04.02 PINTURA EN VIGAS C/LATEX LAVABLE m2 225.56 8.79 1,982.67 0.00 0.00 0.00 0.00 0.00 0.00 225.56 1,982.67 0.00%
3.05 VARIOS
03.05.01 JUNTAS DE DILATACION m 630.00 5.00 3,150.00 0.00 0.00 0.00 0.00 0.00 0.00 630.00 3,150.00 0.00%
4.00 FLETE TERRESTRE
4.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 173,674.98 0.15 26,051.25 0.00 0.00 34,735.00 5,210.25 34,735.00 5,210.25 138,939.98 20,841.00 20.00%
5.00 EQUIPAMIENTO Y MOBILIARIO
5.01 MOBILIARIO DE COLEGIO (ESCRITORIOS,CARPETAS,COMPUTADORAS) glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 0.00%
COSTO TOTAL DIRECTO #REF! 7,823.97 #REF! #REF! #REF!
GASTOS GENERALES 9% #REF! 704.16 #REF! #REF!
UTILIDAD 5% #REF! 391.20 #REF! #REF!
SUB TOTAL #REF! 8,919.33 #REF! #REF!
1.00 INSTALACIONES ELECTRICAS - 01 AULA
1.01 SISTEMA ELECTRICO
1.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 10.00 63.96 639.60 0.00 0.00 0.00 0.00 0.00 0.00 10.00 639.60 0.00%
1.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 4.00 54.26 217.04 0.00 0.00 0.00 0.00 0.00 0.00 4.00 217.04 0.00%
1.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 2.00 47.00 94.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 94.00 0.00%
1.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 2.00 46.89 93.78 0.00 0.00 0.00 0.00 0.00 0.00 2.00 93.78 0.00%
1.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 8.00 45.81 366.48 0.00 0.00 0.00 0.00 0.00 0.00 8.00 366.48 0.00%
1.02 CANALIZACIONES, TUBERIAS Y/O CABLES
1.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
1.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 109.13 3.58 390.69 0.00 0.00 0.00 0.00 0.00 0.00 109.13 390.69 0.00%
1.02.02 CABLES ELECTRICOS
1.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 148.00 2.87 424.76 0.00 0.00 0.00 0.00 0.00 0.00 148.00 424.76 0.00%
1.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 70.26 2.24 157.38 0.00 0.00 0.00 0.00 0.00 0.00 70.26 157.38 0.00%
1.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
1.03.01 TABLERO DE DISTRIBUCION
1.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 2.00 249.30 498.60 0.00 0.00 0.00 0.00 0.00 0.00 2.00 498.60 0.00%
1.04 ARTEFACTOS ELECTRICOS
1.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 8.00 107.37 858.96 0.00 0.00 0.00 0.00 0.00 0.00 8.00 858.96 0.00%
1.04.02 SPOT LIGHT und 2.00 41.40 82.80 0.00 0.00 0.00 0.00 0.00 0.00 2.00 82.80 0.00%
2.00 INSTALACIONES ELECTRICAS - ADMINISTRACION
2.01 SISTEMA ELECTRICO
2.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 4.00 63.96 255.84 0.00 0.00 0.00 0.00 0.00 0.00 4.00 255.84 0.00%
2.01.02 SALIDA DE TECHO PARA SPOT LIGHT pto 1.00 54.26 54.26 0.00 0.00 0.00 0.00 0.00 0.00 1.00 54.26 0.00%
2.01.03 SALIDA DE PARED PARA INTERRUPTOR SIMPLE pto 3.00 47.00 141.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 141.00 0.00%
2.01.04 SALIDA DE PARED PARA INTERRUPTOR DOBLE pto 1.00 46.89 46.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00 46.89 0.00%
2.01.05 SALIDA DE PARED PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA pto 6.00 45.81 274.86 0.00 0.00 0.00 0.00 0.00 0.00 6.00 274.86 0.00%
2.02 CANALIZACIONES, TUBERIAS Y/O CABLES
2.02.01 TUBERIAS EMPOTRADAS Y/O VISIBLES
2.02.01.01 TUBERIA PVC SEL D=20mm (3/4") m 42.25 3.58 151.26 0.00 0.00 0.00 0.00 0.00 0.00 42.25 151.26 0.00%
2.02.02 CABLES ELECTRICOS
2.02.02.01 CABLE ELECTRICO TW DE 2 x 4mm2 m 50.21 2.87 144.10 0.00 0.00 0.00 0.00 0.00 0.00 50.21 144.10 0.00%
2.02.02.02 CABLE ELECTRICO TW 2 x 2.5mm2 m 52.44 2.24 117.47 0.00 0.00 0.00 0.00 0.00 0.00 52.44 117.47 0.00%
2.03 TABLEROS, LLAVES, CUCHILLAS Y CAJAS
2.03.01 TABLERO DE DISTRIBUCION
2.03.01.01 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA DE 3 CIRCUITOS und 1.00 249.30 249.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 249.30 0.00%
2.03.02 CAJA DE PASO 0.00 0.00
2.03.02.01 CAJA DE PASE F.G. 4" x 4" x 2" und 2.00 24.03 48.06 0.00 0.00 0.00 0.00 0.00 0.00 2.00 48.06 0.00%
2.04 ARTEFACTOS ELECTRICOS 0.00 0.00
2.04.01 FLUORESCENTE RECTO 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 4.00 107.37 429.48 0.00 0.00 0.00 0.00 0.00 0.00 4.00 429.48 0.00%
2.04.02 SPOT LIGHT und 1.00 41.40 41.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 41.40 0.00%
3.00 FLETE TERRESTRE
3.01 FLETE TERRESTRE TRUJILLO A CRUZ PAMPA kg 248.61 0.15 37.29 0.00 0.00 0.00 0.00 0.00 0.00 248.61 37.29 0.00%
COSTO TOTAL DIRECTO #REF! 0.00 #REF! #REF! #REF!
GASTOS GENERALES 9% #REF! 0.00 #REF! #REF!
UTILIDAD 5% #REF! 0.00 #REF! #REF!
SUB TOTAL #REF! 0.00 #REF! #REF!
COSTO TOTAL DIRECTO #REF! 98,226.01 #REF! #REF! #REF!
GASTOS GENERALES 9% #REF! 8,840.34 #REF! #REF!
UTILIDAD 5% #REF! 4,911.30 #REF! #REF!
SUB TOTAL #REF! 111,977.65 #REF! #REF!
IGV 18% #REF! 20,155.98 #REF! #REF!
TOTAL S/, #REF! 132,133.63 #REF! #REF!
Avance acumulado 132,133.63
% DE AVANCE EJECUTADO POR MES 22.50 #REF!
% DE AVANCE PROGRAMADO POR MES 22.50 4.37%
% DE AVANCE EJECUTADO ACUMULADO #REF!
% DE AVANCE PROGRAMADO ACUMULADO 4.37%