Está en la página 1de 4

Disponibilidad Rendimiento Calidad PC70+230 Calidad -200

Semana 3 55% 65% 100% 0%


Semana 4 40% 35% 100% 100%
Semana 5 40% 65% 100% 100%
Semana 6 47% 55% 100% 100%

Disponibilida
13
3;
32
%
Ho
pro
ma
Ho
jad

28
6;
68
%
PC70+200 PC-200
Horas Horas
SS Kg Kg/Hr % SS
programadas Trabajadas
84 46.5 162 162,000.00 3,483.87 66.10% 65
60 24 52 59,617.00 2,484.04 63.60% 26
60 24 92 119,411.00 4,975.46 68.20% 45
82 38.5 100 134,754.00 3,500.10 66.10% 53
286 133 406 475,782.00 14,443.47 1,023,110.17 264.00% 189

PC70+200 475,782.00 0.66280226


Disponibilidad PC-200
13 242,052.00
3;
32 717,834.00
%
Horas
progra-
Kilogramos fabricad
madas
Horas Traba- 242,052.00;
jadas 34%

28
6;
68
%

475,782.00;
66%
Total

Kg Kg/Hr % SS Kg Kg/Hr

82,992.00 1,784.77 33.90% 227 244,992.00 5,268.65


34,127.00 1,421.96 36.40% 78 93,744.00 3,906.00
55,670.00 2,319.58 31.80% 137 175,081.00 7,295.04
69,263.00 1,799.04 33.90% 153 204,017.00 5,299.14
242,052.00 7,325.35 520,502.80 136.00% 595 717,834.00 21,768.83

Toneladas
PC70+200
Reales 475.78
Teoricas 1,023.11
ogramos fabricados

Toneladas PC70+200
PC70+200
PC-200 475.78
32% Reales
Teoricas

475,782.00;
66%
1,023.11
68%

Fabricacion to
7
3

1543.6;
68%
1,543,612.96

Fabricacion
PC-200 total
242.05 717.8
520.50 1543.6

C70+200 Toneladas PC-200


242.05
475.78 32%
32% Reales Reales
Teoricas Teoricas

520.50
68%

Fabricacion total
717.8;
32%
Reales
Teoricas

543.6;
68%

También podría gustarte